HomeMy WebLinkAbout310757_Compliance Evaluation Inspection_20210826Facility Number = -
O Division of Water Resources
0 Division of Soil and Water Conservation
0 Other Agency
(Type of Visit: (9,ICompliance Inspection O Operation Review O Structure Evaluation 0 Technical Assistance 1
Reason for Visit: jv�,RRoutine 0 Complaint 0 Follow-up 0 Referral 0 Emereencv 0 Other 0 Denied Access I
Date of Visit: Arrival Time: Departure Time: County: �•
Farm Name: iguu', 61kf11 T ,v Owner Email:
Owner Name: /
�1 It Lam. 0��-G" Phone:
Mailing Address:
Physical Address:
Facility Contact:
Title:
Onsite Representative: `/ a_ Iv1 616 ALI Integrator:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
W an two Feedej
eedef r to Finis]
Farrow to Weai
Farrow to Feed
Farrow to Finis
Other
Latitude:
Phone:
Certification Number:
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
NNon--
La er
Design Current
Dry Poultry Capacity POD.
La ers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Region:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes ❑ NA ❑ NE
❑ Yes ❑ No
❑ Yes ❑ No
❑ NA ❑ NE
❑NA ❑NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes NA ❑ NE
❑ Ye No ❑ NA ❑ NE
Page I of 3 511212020 Continued
Facility Number: - .� J Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes EDIKu ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes IJ- o ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 2Jo ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes Io ❑ NA ❑ NE
maintenance or improvement?
Waste Auplication
10. Are there any required buffers, setbacks, or compliance alternatives that need
[—]Yes
E�J'No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
C�'No
❑ NA
❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 101bs. ❑ Total Phosphorus ❑ Failure to Incorporate
Manure/Sludge
into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside
of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
Elio
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
["to
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
�Io
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
2`No
NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
o
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
Q-No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
ED-No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Design [:]Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [2'ro ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �o ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes U ' o ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
FacilityNumber: - Date of inspection: PI
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes D:INo ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes []'moo— ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a PDA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ED-M7i'❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
E3-< ❑ NA
❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
�o ❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
B_No ❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
PX01 ❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
L No ❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
[C o<( ❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
0 ❑ NA
❑ NE
Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
.56: i ovo ((n.l (.I C�--&I 61r511 5.— lieCv c du -ea
J
63 )�V Q-1J t7Y� aka(i
Reviewer/Inspector Name: t//n Phone: 7 o roll (/d4 %S
Reviewer/Inspector Signature: Date: �d6
Page 3 of 3 511212020