June 29, 2007
Mr. Steve Lund O ~ I
US Army Corp of Engineers ,1
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, N. C. 28801-5006
SUBJECT: Pipe Replacement on New Alignment by Boring/Jacking Method and Stream Relocation,
Main Street (Belmont), Gaston County
Dear Mr. Lund:
The North Carolina Deparhnent of Transportation request authorization for the replacement of a failed
140-foot pipe with a 140-foot 48"steel casing pipe bored on new alignment. The pipe placement on a
new alignment will necessitate the construction/reconstruction of 100 feet of stream channel.
Approximately 80 feet of the channel will be new channel and the remaining 20 feet will be
reconstruction of the existing channel after the removal of a 77-foot temporary pipe. The temporary pipe
was installed in the existing stream channel to provide an access and staging area for the boring/jacking
procedure. The new channel dimensions are based upon a reference cross-section surveyed ~43 feet
downstream of the site. The streambanks will be stabilized with coir fiber matting prior to turning water
into the new channel. Temporary cofferdams and bypass pumping will be utilized to manage the stream
during temporary pipe removal and stream channel reconstruction. Upon project completion, the channel
disturbed by the staging area and temporary cofferdams will be restored to pre-project contours and all
disturbed areas seeded and stabilized. The total scope of the work will result in 100 feet of stream
relocation/restoration to an unnamed tributary to the Catawba River, which is classified as a WS-N & B
watershed by the Division of Water Quality.
The project site is located on an urban arterial; however, it is located > %i mile from the critical watershed
area. Hazardous spill basins are not required. Enclosed is the hazardous spill basin checklist. This office
has conducted a GIS and field survey for the project for historical sites and threatened/endangered species
sites. No sites listed on the National Register of Historic Places are located in the vicinity of the project
nor did there appear to be any eligible structures.
The federally listed species for Gaston County (USFWS listed dated April 27, 2006) include Bald eagle
(Haliaeetus leucocephalus), Schweinitz's sunflower (Helianthus schweinitzii), and Bog turtle (Glyptemys
muhlenbergii). Natural Heritage Program records document the nearest Bald eagle location approximately
6.5 miles south of the proposed project area, on Lake Wylie at the North Carolina/South Carolina line.
Bald eagles typically nest in tall, living trees near open water. The proposed project is located
approximately 2.0 miles west of the upper portion of Lake Wylie. The project site is located in downtown
Main Street, Belmont
Page 2
June 29, 2007
Belmont. There is no suitable habitat in the surrounding area and no bald eagles were observed during
the site visit; therefore, no impact on the species is anticipated. Natural Heritage Program records
document the nearest Schweinitz's sunflower location approximately 4.7 miles northeast of the proposed
project area (in Mecklenburg County). The sunflower is usually found in upland open areas protected
from shade or excessive competition. Due to the site location in downtown Belmont, there is no potential
habitat within the proposed project area and no species were observed during the site visit. No impact on
the species is anticipated. Natural Heritage Program records document the nearest bog turtle location
approximately 9.5 miles northwest of the proposed project area. Bog turtles are typically found in bogs,
marshes, and wet pastures. There is no suitable habitat located within the project footprint. T/SA species
are not subject to Section 7 consultation; however, no impact on this species is anticipated. NCDOT is
recommending a finding of "no effect" for T&E species and historical structures.
I have enclosed apre-construction notification for a NW#33 and NW#27, sketches of planned activities,
and location maps relative to the project.
Project information for the 401 Automated Payment Procedure is as follows:
• Work order number: 150456-55120005-12.103611-3855
• TIP #: NA
• Project Category: $200.00 Fee
If you have any questions or concerns, please feel free to contact me at (704) 480-9044. Thank you for
your time and consideration to this matter
Respectfully yours,
M.L. Holder, P.E.
Division Engineer
Twelfth Division
e, ~~~
Trish Simon
Division 12 Environmental Supervisor
Enclosures
Cc: John Hennessy, DWQ, Transportation Permitting Unit
Polly Lespinasse, DWQ, Mooresville Regional Office
Office Use Only: Form Version March OS
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
1. Check all of the approval(s) requested for this project:
^ Section 404 Permit ^ Riparian or Watershed Buffer Rules
^ Section 10 Permit ^ Isolated Wetland Permit from DWQ
® 401 Water Quality Certification ^ Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NW #33 & #27
~WQC#3634 and WOC#3626)
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ^
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ^
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ^
II. Applicant Information
1. Owner/Applicant Information
Name: Mike Holder N.C. Department of Transportation
Mailing Address: P.O. Box 47
Shelby, North Carolina 28151
Telephone Number: 704-480-9020
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Trish Simon
Company Affiliation: N.C. Department of Transportation
Mailing Address: P.O. Box 47
Shelby North Carolina 28151
Telephone Number: 704-480-9044 Fax Number: 704-480-5401
E-mail Address: tsimonnn dot.state.nc.us
Fax Number: 704-480-5401
Page 1 of 8
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Stream Relocation due to Jackin~/Boring of Pipe on New Alignment, Main
Street (Belmont)
2. T.I.P. Project Number or State Project Number (NCDOT Only): 12.103611
3. Property Identification Number (Tax PIN): NA
4. Location
County: Gaston Nearest Town: Belmont
Subdivision name (include phase/lot number): NA
Directions to site (include road numbers/names, landmarks, etc.): Site is located south of
railroad tracks in downtown Belmont.
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): 35°14'30"°N 81°02'11"°W
6. Property size (acres): < 0.10 acres
7. Name of nearest receiving body of water: Unnamed tributary to Catawba River, WS-IV & B
Watershed (Lake Wylie below 570 feet).
8. River Basin: Catawba
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http•//h2o enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Existin~~Conditions-Stream and pipe in urban area. General
Land Use- Commercial Businesses.
Page 2 of 8
10. Describe the overall project in detail, including the type of equipment to be used_
Replacement of a failed 140-foot pipe with a 140-foot 48"steel casing_pipe bored on new
ali~mment The pipe placement on a new ali~mnent will necessitate the construction/
reconstruction of 100 feet of stream channel. Approximately 80 feet of the channel will be
new channel and the remaining 20 feet will be reconstruction of the existing channel after the
removal of a 77-foot temporary pipe which was installed in the existing stream channel to
provide an access and staging area for the boring/jacking_procedure. The new channel
dimensions are based upon a reference cross-section surveyed ~-43 feet downstream. The
streambanks will be stabilized with coir fiber matting_prior to turning water into the new
channel Typical heave equipment (trackhoe backhoe etc twill be used for the construction
of this project
11. Explain the purpose of the proposed work: The purpose of the proposed work is to repair a
failed ape and to reconnect the pipe invert to the existing stream channel.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.NA
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No future permit requests are anticipated at this site
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
Page 3 of 8
1. Provide a written description of the proposed impacts: Impacts from temporar~piUe
placement and from stream relocation.
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
separately list impacts due to both structure and flooding.
Wetland Impact Type of Wetland Located within
100-year Distance to
Nearest Area of
Impact
Site Number Type of Impact (e.g., forested, marsh, Floodplain Stream (acres)
(indicate on map) herbaceous, bog, etc.) es/no linear feet)
Total Wetland Impact (acres) 0
3. List the total acreage (estimated) of all existing wetlands on the property: 0
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acrea e, multi 1 len X width, then divide b 43,560.
Stream Im act
p
Stream
Perennial or Average
Stream Width Impact Area of
Number Name Type of Impact Intermittent? Before Length Impact
(indicate on map) Im act (linear feet) (acres)
1 UT to
Catawba Stream Relocation/
Perennial
4 feet
100 feet
.009
River
Reconstruction
Temporary «
1 Cofferdams/Bypass 120 feet 0.01
Piping
Temporary Pipe
1 (contained within <. 77 feet .007
impacts of temp.
cofferdams/piping
* 100 feet *,009 acre
Total Stream Impact (by length and acreage) Permanent
120 feet permanent
*Permanent impacts contained within area of temporary impacts
temporary .O1 acre
temporary
impacts impacts
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc.
Page 4 of 8
Open Water Impact
Site Number Name of Waterbody
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay, me act
p
(indicate on ma) (if applicable) ocean, etc.) (acres)
Total Open Water Impact (acres) ~
6
List the cumulative im act to all Waters of the U.S. resultin from the ro'ect:
Stream Impact (acres): Permanent 0.009
Wetland Impact (acres): 0
Open Water Impact (acres): 0
Total Impact to Waters of the U.S. (acres) 0.009
Total Stream Impact (linear feet): Permanent 100 feet
7. Isolated Waters
Do any isolated waters exist on the property? ^ Yes ®No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond:
8. Pond Creation NO POND IMPACTS
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. 'The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. The stream relocation
associated with this ape project is being constructed/reconstructed to channel dimensions based
won downstream reference cross-section and the streambanks will be stabilized utilizing coir
fiber matting.
Page 5 of 8
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USAGE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USAGE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o. enr.state.nc.us/ncwetlands/strmgide.html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attacch directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
MITIGATION NOT ANTICIPATED
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
3.
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount ofNon-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
Page 6 of 8
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ^
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ^ No
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ^ No
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multi tiers.
* Impact Required
Zone ,_______ r _~~ Multiplier ,,,~;«:,..,«;,.,,
1 ~ ~ 3 (2 for Catawba)
2 1.5
Total I ~ ~ ~
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additiona120 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260.
Page 7 of 8
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level.
No increase in impervious surface is proposed.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
No wastewater is generated from the project.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ^ No
Is this anafter-the-fact permit application? Yes ^ No ^
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ^ No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:
The ape repair and stream reconstruction will not result in additional development of the
surrounding area
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 8 of 8
~_
D
~
~ ~1
0
1
Z
O
~
r
~ J m
1
m ~
~" °
Q J
~
a 1
O
-
in
~
D
~ ^
~ n ~p 0
o za fTl
n ° ~
o
D
N ~ µ
m ° °m r
n n
n N
~ m~~
~ O c, am
m D
o j
N X " O
~
o D
+°, ~
~
D N N C7 2 =
~l O -t
~.+ ji
ao
O
O
r~~ N
ti
~~C a
~2y ~
°~~n vio
m~ ~~
~~m QO
I~ `O
~~m n~
_~ ~
Q
0
~~=-~-`~
i ~
\ N
/ ~ `~ O ~
~ \
~n
H N
Z mJ
~ O V
N mm V
~ ~ y
< '°
m n1
~ ~ x
m ~ +_
O O ~ J
O o
m ~~_ ~ ~N
JO
In ~ ~~ ~ p3
~ m ~o m ~ ~
or" v m~ °a
~~ ~ o0
D O] DC ~
m m r~ Q
rn o o m
Z ZT~
_~ ~ O W
mcn O ins
~~ ~ -i
n m ~~
-m n mD
r ~_ n~
D O ~~
N z O7-
D DZ
-I ZO
O ~
Z ~
N
O
3
Jo ~O
O_ O
/J ~N
~~
6 ~o
~ n~
~ ~~
z ~~^}~
m I~ Y.
a
D 41~
~ O
O~ / (Op
7\\L\/ 9B•~_
m
L~
N
z
C m
~ r
C ~
~ ~
~ Y m° to omen @U@ ~i"an~~ ti
~3~~~
-~ J~o~~p '~O~ 3 N~~ F.!v o'~o~;oo~~On~~p~go ~~n
~C ~~3~3.g ~$Z~ij C~~ ~
l ~
$
3 ~~O
~~ °°~ Q
d ~`-'~
~~ m~ ~~~
~o~ ~ ~ 0 3 0
'
°
~~m~~n ° °
~°~~ ~ ~ H
~,dro =~ _ Fg; B ~ ~ j °
a m°ao~ ~~ ,~ ~ '^ '° ~°~ ~ ~ g 8
R° ~ ~ ~ 8
~ ~" ~~~ ~H o ~ ~ a g o =~ ~ i ~ ~ ~ ~ ~
~~ n ~
oy ~~
'
~
~~0
~`~`~
3
~
~ o ~
~
`°
~
~p° `
~ ~ o ~ n F ~
~ 3
`
"
~
~
o°
~~~HB
~
~°~
~m
o
~ ~
~ ° ~
3 ~ 3 ro
o
$ ~
$
~ E
~
g
~
~ m ~ ° ~ ~ n
° o ~ ~ $ ° °_
Nza
~ ~ F
~~ o ~ ~ o y+
a ~ ; F ° ~ ~ ~
s
F
o~
° `g ~
mn`t4 ~ ~_ _
~
A
~
$
~ ~ g ~o
~~ S ~ °
~ 3
a ~
~ ~
~ S
i ~ ~
W N_ _
~~ ~iD nab
~- CJ7 ~<C
~+ ~~~ ~~~
O~ ~~ C~
-'n .cn rt n ~
~ { ~ ~ O `<
ao ~~ ~~
~~~ (n 1(D
~ ~ •m 3
~m moa ~o
o + ~{
cD~ cn ~ O
b~ ~~~ ~Q
+N ~N~ p(D
a ~
~ cn~ 7C
~ a~n
a O + +~
~ s ~
Q ~~ N+
~ ~
T~
V
-~
P
Q. 3
U
Q~ _
J In
P
-d
0
ro
o -ti
~ G
~ 7l
J
LQ.
0
l
G
~ ~ ~ ~ oN~
~ ~ ~ /L- J _ v~o
~ i
~ ~ ~ ~ -
o ~°q~V ~ ~ i ~ n
~ o r
~ A• (~ £ ; ~ W ~j DO N
N y ~'^+ m ~ z x~ n Z
Im
w " O 3+ I m a O o a v ~ a ~
O ~r ~~ ~ ~ w I O D N 7~ l O r
y D
` 'O m o*
w~ _ nm
0 7~ ~ N ~ p N
~~ ~ ~ ~ ~ ~,
Q~ ,
/ 7e~m
,j~O \ 3 \\ ~ ~ ~
CEO
V Z
V o~
r
m
0
0
Z
a c~ o
~ ~ D ~
~ ~ ~ -I
C~
D
~ ~ ~
cn o -~ O
~ ~ o Z
o ~
z ~
CD N
0 0 o D
~ ~
~ ~ z
z ~ o ~
~ ~ ~ D
~ o z o
~Q
m
N
00
Q
i ~..
,gym
H o1
z m
z
-~> I '~ M
9 o
m n= z
r~ za
i w s maD
O °m ~ = o~ ~o m=
° I =0 1a
~~ ~„
O ~I~ ~~ ° m
m
Z z
s I
~ I
I
~1
~ ~
'~1 ~
~ ~
~ '
I =o
=
'~ z ~
a
m
~o ~
m
= I
~ _ ~_
°
~ ~ ~ ~9
a
9 m
3 ~
(/ ~a y I o ~ z
r ~
/
~
Y/ y° ~ ~ I z< °_
J
~ wz»~ '~" I my
7 y ~ a
1 Z
° ~ ~
~..~ '~Ilz(p
~~> z~2
-ems
z I
O
m
Z °ezim
xm ~ma
=~_ ~
Q
m ~~
~,_
z sxr
o.,o
m= z
m°
v
~
~ °
o
r -
+
zr moo
mw ~
z
°w mo
_ ~ Z
a
A 9 N
= s m
M
£
~ o ~7 :OO N ON
O
~I ~_ ~ ~ o m
z
~ Q mp N w ~
mm _ ~O
~
y r ~ A a i t ~
N D µ
H ~ N '
~
O m
a A a
s s F
-
..
Z
C!~ (/~ v
~
~
T
.
~
C
r
J
H
H ~
- ;~
~- ~~ ~
y ~?
O
z
~
2
w
v /~
~ 29,2 ~ / _-2104 `; \ 2026 S
- - ~ z es a x621 /~ /J / ~ r
~i i p - \ - ~ ~~l - _ _ _ _ \,~ - - _ _ _ \ 1 ~ 2093 ~ / ~ J Z
r I v
000 > 0 9 - ~ r4 2093 1 ~ ~ / _
9 ~ 4` ~ \ - 2~/ ''3211 2121 B5~ + ~ \ / I U
+. ~ ~ \\ 2154 MI89 Y p \ ~ J ~~\ I / i Ii
!3~9 I
~NMIE -0 ~ Ns } \ 8 2'22 2153202 ~ Barm ~ ~/ / I'
~ em I 6 2123 2019 m .n~ 1 ' LpreaO` / I
z3w zzt9 ~ ~, ~' \ ) ~ ~ ~ e 1~1e .®~ me tiz - - - - - - -
2209 y ~~ ~ et \
B Y~ '~\ % ~ ~' 2094 nl L~p.`tL - _ _ _a a ® w ~ ~ ~ ,
y , / / I ' / / \l k 0 207 \~ I
eJ!7X\\` 9 '\ dV 2144 tl ~ s ~ ~/ 9 g r 2077 -\
~ a.ae,wi ~ s ~ ~~ L•~a eer, ~ ?. .\..
'+ ~ ~\, ibm 5cn e \ _ d ~ I _ - -`;tarry cn 1 ienara Fm t 09 ~' 2078 2079 n `~ 1 ~
'.94 d, f ~ _ ~ / \~ ~ 201 I 217 ~i jo soaria / ~ bo-n i~ ~ /
^' \ \ \ / 1 > _ a - Gaae 5cn 2~ + s 2081
/.
~ ~~ ;Y \ 2015 t w 1 'L~647 me ~~osHes± y couaae wvt % s -~ 2080 ~ ~`~
N _ \~ I
q 2209 ro ~ 2014 !~.~ p ! 2583 n 4 3083 _ ~ ' / / ~ 4U / pia ~ 4' ~ ~ 2083
2564 \ 25fi0 ~ / ~ t - g
2490 \ ~ a ~ p ~ A \ m~ ~ ^~
2014 \w / ~ l . ~ ~ ~ =082 BL nr ory
,\ \ ~ ~ 2017 d ~ roPM e.7e9 ? ~ \ / ~ Te r°: s nr /
Ldp Care \ ~ 8pyr~ ~ Be~Snf ml 7 ~~
2506 / ~ •~ Eo ~ / Cebw6o
;/. / ~ ~ 2754'] ~~o;~t
i 25fi5 /~ Bm~r t y'
Want \ , Ebamsr // 1 Ebm 5cn 2519 m ~ I
3072 \ ~., `.a 2480 // ~ Y ' ~ ~
m p
\ ~' ~ 2565 5- ~~ /~.
2505 \ ~"~ / / c \" ~~ 2545 /, t a ~
5•l town Ban 2580 tl /`4 ~ \ S , - / \ ~~_
4• / 2584 Elm ~ 2546 a I t /
CPANERTON 2014 y - I-
roP.3015 ~ / ur vw san / .x ~ r
/ Baot Cn 2547 w`. I / d'
I 2519 f 2545
za9o ~~"~ I ~ -
- / / mourn eEU4orrr / ~ ~~
/ ~ / / NNNC.1 ~ / '~ m
J \ `M7 \~~
/ ~\ ' ' 2550 \ \ d 2533 II ' 3 W
/ \ / 1 ~
l\ ~F I ~ _ 2560 F '~ rt 2654 Q J
\ B A 3043 I U
L \`: / 2534 7 I I Y
m70 ~~ % \~ \ ` F .w \ 2533 ~ - ~ (~
oe ~ \ 7042 -~ -\ :`
nw ev.aw[nris ~ \ l ~ 8 1 m - - \ I W
~\ 2s17 ~~~~ / ~ / ~ Buln;"BSS , .a ^ ~ ~'f m ~ ,
~ I J j ~ .. y 36a zs3z ~ ~ ~
/ 2643 2771 1~. \
~ F \
/• ~ ~ ~ ~ 2534 / 9 \ ~~ `..
_.. _ \ I / ice' \ <
/ ~/ G% IJ ~_~... 2574 \
sowrn voint ld 2831 \ \\
~•. r~ex cn 2516 ~ •~ _ I Boot cn 26149 \ ~` Y
6 2519 '.1 _ ~v, _ _ \ 2833 \ C.-.
d ~\ I _~w~__'-a____ 1fa F~2832 1
\ 3003 ~ / ~ ~ ~ 1 \
$ \ 1 Soem Point 3000°' 30M 3321 \ / // ~,
u. tarwrcn 2519 1 FRB Baot [n a, g e _ _ \ / \\.. \
~' 2848 a.~a °+ ` 2521 2668 ~` ~ \ \ 3128 $ u - C 2529 - 2529 1 / / /
a \ , r~-s. e ~ 1
9 2520' ~~ 1 1\ -0 c w1(I 258fi / '.~; w ~- _ `
\ M ~'
9 ~~ ~• \ rt ~ ' / Metnr CnCnapel / /_
2692 ~ /n \,~ 1 r ~ `\ 2631 / / 3002 ~
2831 111 'IU \ ~',~ Q/~/ ` \ ~ 3001 ~ / 2645 ~ 3090 / '
,4 p `^~~ ~~"' \~ \ 3092 u ue vcn % J'd //
O 2830 ~ ~~ \ N \ .y 530 d 2635 // ////I
b f ~ l l ,
-~---~\ \ ~ • 1
1 \ n/ ~l '
.~ ~ 2887 y 2658 ~/~'-'. •.~ / f \. 2644 //a/ 1
.2889 2686 ` ~ '2531 ~ \ /a / I ~' \
~ ~ _ _ _ - - - - - - - - ~ ~"'W~ ~ f \ \ 2635 A 2646 2741 i' 2528 / ~// I
2435 L wBraobr Cn io A 6 - . -e ~\7 ~ \ ` 9 i // ! ~ '
2757 2649 n /~ ~ ~ \ \ r / Duve n: \
_ 3096 C ~j~ ~ ~ \ /
2774 ~ I\ C /a \
27se - zeo9 y 2649 ~1~~~ - ~ o ~ 2~4o n. i.~~~~~
' ~~ r 2~ /
_ / ~ // /
297, / / ~~ iI
2522 \~~+ C ~ 2816 ~
. / 2757 a A 285d\ i~ \_\\°~`~\~\ `` l~~~• • \\\\~ a. ?~9 ,/ // /
\`. /
---- ~y
Baetl
18
a 163
on5ct~
0
~'•
1857 '
1652,
`x \/~
\\
1838
r-~
I -~
I
I C
I \
1838
O6LNFW
POP.1
' 1852
~~ -~~///
C 14
.\
~,
C
n
l'
L
C
G
ti
T
j
,~ a ,M1
~! ~ ~ • AAA ... a. ~ ~ -
~ ;
:,
rS
~ . ... ~... h ~
4
~~ ~ ` ...
.~ ~
pX 4 ~ .rr
T~] s~
X'
A ~ rte. T ~ `•~rt'~~1` '~~, ~' *. -.0-~'44..
.~i yw r'---„ 4 '~''`+. \ . ~ ~~'+" ~ yy~ ~'"~''~,r,i- .~.~4~~,~' ~ 1°' sk,. _ ~~ ~! apt ` ~~'v
74 + ~ ~J~,'~,~'• ~• '"~-. ''y~yY.'~` = fi`a1'~•..~"""'"*e., "I k I ri ~ ,1,
•~ _'~`'~'--ti_ `'tip ,,,,r` ,a, ,,,,,~ ,, ' i ..,~ } k~ 'S ~~r k ,4•A'
~, ~ ~ f k ,
-~ 1' ~~` ~'f ~ „tip. ~s ~. .~ arm ~r ~ ~' ~ ri
1
1. ,.. //. lr ~ e .._
,..~~ ,." - ~~ ~i Stream _''~"' ~z ~ -~ '~
.~ ~ ~-- _ ~h ~' ~-~` Relocation ,~ : -~-a-• ~''~,'' ~1,~°~
4~
..r-t ~ -
w.
,'4. '~F- I ~~~ ~ ~
z 'i r .
~ ' bk
_ ~ , _ . -i4
t i5• t ~
,'• 1
• T
,i{,,,+a~, ~ r 4 ~1 ..~.y~ax { 5~ 'w•r'+~ ~'''E'h~ '~w i r 5 ~ V~"b~ A•
Y+'l{~'`_ ~ ~~( a' 6 p'~+.'.5 1.~. X71 -'~..i `-,,_ ~f' ~ "~,t ~ ~~„~•~4y~,,.~i..: ~u~; .. ~
f r F ~'~' ~ ! ~ hy,.._ _ 7 ~~ s'~,y, "~•, ,4. ~ ~,..r !~ 'y °''r''Jh ~ y. ~„rs°~ ~;," ~
'~ +..ti~ ~. f 1' ~ ~ ~. ~ ~ d r r ~ r ~ ~ ~
J r ~y 'I
'f?+s. ~ ~ ~~,,. -<<~. '1~~ '4.4 ~'~, A. r'R~~~ 4~ ~ I 1 f k u ~1
A i ice` r
~ ~'y ..""""' ti ~ ~ ~; ~ ~ t "mss
~F ''~ «~-~,~ ~~` .-.. 4, 5 4~4 j •' ~'~' ~+J! ~ ~ •r _ ~..r.. • ~ F''~ -mot"'.
~. {(1 .. .
h ~ :-,
t' 4 ~1r
~~ 44 i.-~ rF ~ Y• f ~ r y y ~ k
4 ,~ J"'~ f 4E 4 i-A~ ~ ff' ~ 'a k ~ , ' 4^
f -A ,7 ~~
~'. ji+. 4.~ ~,g, r' i~ ~~.v 'a' ~ eb
Name: BELMONT Location: 035° 14' 30.25" N 081 ° 02' 11.5" W
Date: 6/28/2007 Caption: Stream Relocation (due to Boring/Jacking of Pipe on new
Scale: 1 inch equals 1000 feet alignment), Main St (Belmont); UT to Catawba River, WS-IV B
tld1N
d
' N
Q
m ^ P 9
n ~ 3
n
O
~ 2
v
O 9 N
D p z ~
m~ Z m ~
m D
r D v
N
-~ ~ H1S 3NH H
N ~ ~,,
w
v
cwn
N
~ ,~~ G m
1
_J tis~~"
N
Z
~ oo W O
N m ~ N
Z z
\ cT m m
co D m D
- mm
x y
\ `~
~ F
~ ~
N ~
c'
3
O
0
ti
D
O
c
0
~m
ao
\W Z
Z
m
rn
N
o /
N
b
/
w a r ~ ene ~ D D D D O it A F m z~ ~ P°n' °° °o °•° O? 0 0
v~ _. n~ G G O n m ~ ~ = o D m m ° ~ » m T m T { < NAG { {
3 ~
~ ~ o
° X ~ 3 o c o n o ~ d ~ ?;
-
~ a w
~ 0 a G~
-~
D ^w D
°
• ~
r
D
~
a - >
° A
~ ? o
O
e $
H
m
~ ' Win=
T T v° ~ T T
A
w o ~ j : D ~ T ~
c D _v D o D ~
u w D ^^ D D D 3 3. n~
°° °y° ~^e p <° ^ n C
n n
z
~ 3 _ te= n c
v. n
a n
Pn
°ON aoN N ~ a..nE ~ ::°~' °~' n_o•~ mcm'w^ ~ f w ~ °~
m W
OC Oo wN
°°„' n „g ~~°~ ~°, ~NE ° 3°F°, d^`
Sc°~ r'c~ ~' ~ 3d4e~i °
° ~ 3 7 ~ ° ~ c 'a ~F n n
Z o c ~ ° °
0 a
.
a~~ 3~~ c 3. ?~Qn..~ w ~ a~ m~RC rt~oo o.°
0 3 n o >> w ^^ o
o N o 0 Z Z
~ 7Y'c' O T • n ~ ~ ~ ~ ~ ~
r ,~ Q^ °° Z
O n
o° a
owon~
Q o ~
m4 ^4 nno< awo< "< ~ ~ ° °
w {
i O n ? "-' ~ o
~
~
°a, °a, 3 0 '..~~va3 o3.w, ~~ 4~~ Tom: d~ T s • ~{
~ ~ v -.
c ~ o O , < i ° °. n
°
o ~
o :: °
w '"
~ n ~ ^ ° m
~ O 0
:. ~
m ,
d o a ~ a
- o
c c
m ~
a
~
.
n
o
o
w .° ~ Q n N A n a ° a o- n_ - - a a
o n-•
w~ 3- S o o-
c. e- o- •° ~c N
^ r
D Z °
..
n ~ 3
D
~
~ ~
N
•, o. n m
P ~
~
~
M N ~ ~ ate.. .Q SE E n
3n
m o
°
~
~ Z
D m
v ~
° Q
~
~
2 aw o n 'v
.~
v~ w wo wo a
nc ^'
n ^~ o-='
n=
n a
wo ~ ~,
oa o a N N~ n° ~~ no o
p s i
-
m
-
'•
•
~
a ~- ,
T
'-'S om~ o.a
~ offi~
w ~.°.o ° °
a£ of n Z C7 O
. o
a
.
a a ?
Z Y •
H
a r+
n e R ° .... ~~ o w n ~ n -
?= ~`° o n5o°p - H='s Hna D c
3 7a ~
v r
m
3 ~ N '
r ~ r n ° co ° QOa nn Qo. °
d ° °' ^ ::
° -1 o tT X m W
N ~ o D ^
o.
n
n.~ a.~ ~ ~no~~ °~< o n° °~° o
~ 1
N -~ a y 6~ u
n b
.< n p
~ ~
va
nE E ocTO moo oa
pY ow G Own00 O° ~ OO S O N N ~
' °e n ao uaa a N aN N o.
n
e
V1
.o 1
° Y
N
a
NCDOT
HAZARDOUS SPILL BASIN CHECKLIST
Division: 1 ~ County: Gactnn Project ID:
River Basin: Catawba Bridge No: Stream Relocation due to
Borin~/Jacking of Pipe on New alig_ ent
Route: Main Street, Belmont Stream: Unnamed tributary to Catawba
River, WS-IV & B Watershed
Water Quality Criteria:
Yes No
Stream Crossing Blue Line On USGS r r
ORW r ~
WSI r r
WS II,III OR IV, Crossing Within O.Smi of W.S. Critical Area r ~
Roadway Criteria:
Route Designation-
Yes No
Arterial Urban r r
Arterial Rural r" r
Additional Site Information:
Is a Hazardous Spill Basin Required?
Yes No
r r
Criteria Based Upon NCDOT "Best Management Practices for the