Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20130742 Ver 1_Application_20130719
S TATE OF N ORTH C AROLINA
D EPARTMENT OF T RANSPORTATION
P AT L. M C C RORY A NTHONY J. T ATA
G OVERNOR S ECRETARY
July 1 9 , 2013
U.S. Army Corps of Engineers
Regulatory Field Office
2407 West 5 th St.
Washington, NC 27889
Attention: Mr . Tom Steffens
NCDOT Coordinator
Dear Sir :
Subject: Application for Section 404 Nationwide Permit (NWP) 3 , Section 401
Water Quality Certification , and Tar -Pamlico Riparian Buffer
Authorization for the replacement of Bridge No. 111 over Briery Swamp
on S R 1 5 88 in Pitt County; TIP Project B -51 11 ; Federal Aid Project No.
BR Z -15 88 (2); D ebit $240 from WBS No. 4 2 2 4 9 .1.1.
Please find enclosed PCN, permit drawings, stormwater management plan, and roadway
plans for the above referenced project proposed by the North Carolina Department of
Transportation (NCDOT). A Programmatic Categorical Ex clusion (P CE) was completed
for this project on March 12 , 201 2 and distributed shortly thereafter. Additional copies
are available at the NCDOT website: http://207.4.62.65/PDEA/EnvironmentalDocs /. The
NCDOT proposes to replace existing Bridge No. 111 over Briery Swamp on SR 15 88 in
Pitt County. The project involves replacement of the existing structurally deficient
bridge and approach with new structures. Bridge 111 will be replaced with a new 1 15 -
foot long t hre e -span bridge .
Proposed permanent impacts to riparian wetlands from bridge construction are <0.01 acre
of fill . There will be a total of 286 square feet of zone 1 buffer impacts and 113 square
feet in zone 2. Traffic will be detoured off -site during construction.
This project calls for a letting date of J anuary 21 , 201 4 and a review date of December 3,
2013; however, the let date may advance as additional funding becomes available.
Regulatory Approvals
S ection 404 Permit : All aspects of this project are being processed by the Federal
Highway Administration as a "Categorical Exclusion" in accordance with 23 CFR
MAILING ADDRESS:
NC D EPARTMENT O F T RANSPORTATION
P ROJECT D EVELOPMENT & E NVIRONMENTAL A NALYSIS U NIT
1598 M AIL S ERVICE C ENTER
R ALEIGH NC 27699 -1548
T ELEPHONE : 919 -707 -6000
FAX: 919 -212 -5785
W EBSITE :NCDOT .GOV
LOCATION:
C ENTURY C ENTER , B UILDING B
1020 B IRCH R IDGE D RIVE
R ALEIGH NC 27610
Pre -Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the
Corps: Section 404 Permit Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? Yes No
1d. Type(s) of approval sought from the DWQ (check all that apply):
401 Water Quality Certification – Regular Non -404 Jurisdictional General Permit
401 Water Quality Certification – Express Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
Yes No
For the record only for Corps Permit:
Yes No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts ? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
Yes No
1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h
below.
Yes No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No
2. Project Information
2a. Name of project: Replac e ment of Bridge 111 over Briery Swamp on SR 15 88
2b. County: Pitt
2c. Nearest municipality / town: Stokes
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state
project no: B -5 11 1
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if
applicable): not applicable
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699 -1598
3f. Telephone no.: (919) 707 -61 35
3g. Fax no.: (919) 2 50 -4224
3h. Email address: cdmanley @ncdot.gov
Office Use Only:
Corps action ID no. _____________
DWQ project no. _______________
Form Version 1.3 Dec 10 2008
1
4. Applicant Information (if different from owner)
4a. Applicant is: Agent Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
2
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1b. Site coordinates (in decimal degrees): Latitude: 3 5 .704073 Longitude: - 7 7 .2 3 9991
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: 0 .5 acre
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: Briery Swamp
2b. Water Quality Classification of nearest receiving water: C; S w; NSW
2c. River basin: Tar Pamlico
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing conditions at the s ite include maintained / disturbed roadside shoulder and agriculture in addition to forested
wetlands. Land use in the project vicinity is predominantly residential with some agriculture .
3b. List the total estimated acreage of all existing wetlands on the property:
0.1
3c. List the total estimated linear feet of all existing streams (intermitte nt and perennial) on the property:
65
3d. Explain the purpose of the proposed project:
To replace a structurally deficient and functi o nally obsolete bridge.
3e. Describe the overall project in detail, including the type of equipment to be used:
The project involves replacing a 10 0 -foot 6 span bridge with a 115 -foot 3 span bridge on the existing alignment with an
off -site detour. Standard road building equipment, such as trucks, d ozers, and cranes will be used. The 6 inch water line
w ill be relocated by directional bore method within jurisdictional areas .
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments: Requeste d August 31,2009
Yes No Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made? Preliminary Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Jim Hauser
Agency/Consultant Company: NCDOT
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? Yes No Unknown
5b. If yes, explain in detail according to “help file” instructions.
6. Future Project Plans
6a. Is this a phased project? Yes No
6b. If yes, explain.
3
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
Wetlands Streams - tributaries Buffers
Open Waters Pond C onstruction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number –
Permanent (P) or
Temporary (T)
2b.
Type of impact
2c.
Type of wetland
(if known)
2d.
Forested
2e.
Type of jurisdiction
(Corps - 404, 10
DWQ – non -404, other)
2f.
Area of impact
(acres)
Site 1 P T Fill Riparian Yes
No
Corps
DWQ <0.0 1
Site 1 P T Fill Riparian Yes
No
Corps
DWQ <0.01
Site 2 P T Yes
No
Corps
DWQ
Site 3 P T Yes
No
Corps
DWQ
Site 4 P T Yes
No
Corps
DWQ
Site 5 P T Yes
No
Corps
DWQ
2g . Total wetland impacts <0 .0 1 Perm .
<0 .0 1 Temp .
2h. Comments: There will be 0.05 ac of hand clearing . Additionally, there will be <0.01 ac of t emporary f ill in w etlands in
the hand c learing areas for the installation of erosion control measures, including t empo rary silt fence and/or special
s ediment c ontrol f ence.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number -
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial
(PER) or
intermittent
(INT)?
3e.
Type of
jurisdiction
(Corps - 404, 10
DWQ – non -404,
other)
3f.
Average
stream
width
(feet)
3g.
Impact length
(linear feet)
S ite 2 P T PER
INT
Corps
DWQ
S ite 2 P T PER
INT
Corps
DWQ
S ite 3 P T PER
INT
Corps
DWQ
S ite 4 P T PER
INT
Corps
DWQ
S ite 5 P T PER
INT
Corps
DWQ
S ite 6 P T PER
INT
Corps
DWQ
3h. Total stream and tributary i mpacts 0 Perm
4
0 Temp
3i. Comments:
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number –
Permanent (P) or
Temporary (T)
4b.
Name of
waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody type
4e.
Area of impact (acres)
O1 P T
O2 P T
O3 P T
O4 P T
4f. Total open water impacts 0.0 Permanent
0.0 Temporary
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
Pond ID
number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded Filled Excavat
ed Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
Yes No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
5
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer , then complete the chart below. If yes, then individually list all buffer
impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a .
Project is in which protected basin?
Neuse Tar -Pamlico Other:
Catawba Randleman
6b.
Buffer impact
number –
Permanent (P) or
Temporary (T)
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1 impact
(square feet)
6g.
Zone 2 impact
(square feet)
B 1 P T Bridge Briery Swamp Yes
No 286 113
B 2 P T Yes
No
B 3 P T Yes
No
6h. Total buffer impacts 286 113
6i. Comments:
6
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The proposed bridge will have 3 span s verses the existing 6 -span bridge ; the proposed bridge will be at approximately
the same grade as the existing structure; an off -site detour will be used, 3:1 fill slopes in jurisdictional areas . No d eck
drains. Placement of stormwater control measure s outside wetland s where practicable . Best Management Practices for
the Protection of Surface Waters will be implemented.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Hand clearing will be used instead of mechanized clearing. Open trench excavation minimized for utility relocat ion by
using trenchless (directional bore) methodolgy where practicabl e . Top -down construction .
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
Yes No
If no, explain: Due to minimal i mpact s mitigation is not
proposed
2b. If yes, mitigation is required by (check all that apply): DWQ Corps
2c. If yes, which mitigation option will be used for this
project?
Mitigation bank
Payment to in -lieu fee program
Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached. Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: warm cool cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non -riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
7
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an ap proved in -lieu fee fund).
6h. Comments:
8
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
Yes No
1b. If yes, then is a diffuse flow plan included? If no t , explain why.
Comments: See attached permit drawings and Stormwater Management
Plan.
Yes No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? Yes No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings and stormwater management plan .
2e. Who will be responsible for the review of the Stormwater Management Plan?
Certified Local Government
DWQ Stormwater Program
DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government’s jurisdiction is this project? not applicable
3b. Which of the following locally -implemented stormwater management programs
apply (check all that apply):
Phase II
NSW
USMP
Water Supply Watershed
Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
attached?
Yes No
4. DWQ Stormwater Program Review
4a. Which of the following state -implemented stormwater management programs apply
(check all that apply):
Coastal counties
HQW
ORW
Session Law 2006 -246
Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? Yes No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No N/A
5b. Have all of the 401 Unit submittal requirements been met? Yes No N/A
9
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal/state) land? Yes No
1b. If you answered “yes” to the above, does the project require preparation of an
environmental document pursuan t to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
Yes No
1c. If you answered “yes” to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
Comments:
Yes No
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
or Riparian Buffer Rules (15A NCAC 2B .0200)?
Yes No
2b. Is this an after -the -fact permit application? Yes No
2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violat ion(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
additional development, which could impact nearby downstream water quality?
Yes
No
3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered “no,” provide a short narrative description.
Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby
land uses nor stimulate growth. Therefore, a detailed indirec t or cumulative effects study will not be necessary.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
10
(Version 1.2; Released July 2012)
B-5111 County(ies):Pitt Page 1 of 3
Project Type:Date:
Phone:Phone:
Email:Email:
County(ies):
CAMA County?
Design/Future:Existing:
Surrounding Land Use: Wooded 320.00
734
0.16 Project Built-Upon Area (ac.)
Proposed Project Existing Site
Project Length (lin. Miles or feet):
Buffer Rules in Effect
Project Description
None
No
None
NCDWQ Surface Water Classification for Primary Receiving Water
303(d) Impairments:
River Basin(s):
Primary Receiving Water:
Class C
Other Stream Classification:
City/Town:
1020 Birch Ridge Road, Raleigh, 27610 Address:
Stokes
919-707-6713
Pitt
ac.
General Project Narrative:The project B-5111 consists of replacing the existing bridge with a new 117.5' long 21" cored slab bridge with 27.83' clear roadway with 3' offset to the rails. The project area is
approximately 0.43 acres. The project drainage system consits of grated inlets with associated pipe systems with rip rap pipe outlet protection. There is a wetland site
surrounding the bridge that will be impacted by the proposed project. Impacts have been minimized by using rip rap at the storm systems that outlet into the wetlands. The
PSH's are not considered in the wetland to avoid wetland adverse impact.
Typical Cross Section Description:
References
580
0.18
Average Daily Traffic (veh/hr/day):
ac.
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR LINEAR ROADWAY PROJECTS
MARSHALL CLAWSON, PE
Bridge Replacement
General Project Information
Address:
3/6/2013
Project/TIP No.:
NCDOT Contact:
Project No.:B-5111
Contractor / Designer:
mclawson@ncdot.gov
Tar-Pamlico
28-103-8
The typical section consist of a 20 ft EOP with the 3:1 side slope. The replaced bridge
is 27'-10" clear roadway.
The typical section consist of a 20 ft EOP.
Tar-Pamlico
NCDWQ Stream Index No.:
Supplemental: Swamp Waters (Sw)
Primary:
Briery Swamp
4 GARY LOVERING, PE
G
R
A
D
I
N
G
,
D
R
A
I
N
A
G
E
,
S
T
R
U
C
T
U
R
E
A
N
D
P
A
V
I
N
G
D
H
V
D T V
======
%M
P
H
A
D
T
A
D
T
%
*
DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS
F
U
N
C
C
L
A
S
S
=
0 0 0
P
R
O
F
I
L
E
(
H
O
R
I
Z
O
N
T
A
L
)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
STATE STATE PROJECT REFERENCE NO.STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO.TOTAL SHEETS N.C.SHEET 1
D
E
S
I
G
N
D
A
T
A
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
SIGNATURE:SIGNATURE:P.E.P.E.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
PROJECT ENGINEER PROJECT DESIGN ENGINEER
G
R
A
P
H
I
C
S
C
A
L
E
S
P
L
A
N
S
P
R
O
F
I
L
E
(
V
E
R
T
I
C
A
L
)
HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN
L
O
C
A
T
I
O
N
:
T
Y
P
E
O
F
W
O
R
K
:
0 9 /0 8 /9 9
B-5111
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
0 0 0
0 8 -A P R -2 0 1 3 0 9 :2 8
R :\R o a d w a y \P r o j \B 5 1 1 1 _R d y _t s h .d g n
$$$$U S E R N A M E $$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
C O N T R A C T :T I P P R O J E C T :B -5 1 1 1
D E P A R T M E N T O F T R A N S P O R T A T I O N S T A T E O F N O R T H C A R O L I N A 42249.1.1 BRZ-1588(2)PE
5
0
1
0
0
5
0
2
5
5
0
1
0
0
5
0
2
5
1
0
2
0
1
0
5
S
U
B
-
R
E
G
I
O
N
A
L
T
I
E
R
R
U
R
A
L
L
O
C
A
L
6
0
2
0
1
3
2
0
3
3
5
8
0
7
3
4
*
T
T
S
T
=
2
%
D
U
A
L
3
%
5 1
0
%
6
0
=
0
.
0
6
1
M
I
L
E
S
=
0
.
0
2
2
M
I
L
E
S
=
0
.
0
3
9
M
I
L
E
S
-
L
-
S
T
A
2
0
+
0
8
.
7
4
B
E
G
I
N
B
R
I
D
G
E
T O N C 3 0
V
I
C
I
N
I
T
Y
M
A
P
N
T
S
O
F
F
S
I
T
E
D
E
T
O
U
R
L
O
C
A
T
I
O
N
P
R
O
J
E
C
T
S
e
e
S
h
e
e
t
1
-
C
f
o
r
C
o
n
t
r
o
l
S
h
e
e
t
S
e
e
S
h
e
e
t
1
-
B
f
o
r
S
y
m
b
o
l
o
g
y
S
h
e
e
t
S
e
e
S
h
e
e
t
1
-
A
F
o
r
I
n
d
e
x
o
f
S
h
e
e
t
s
L
E
T
T
I
N
G
D
A
T
E
:
P
I
T
T
C
O
U
N
T
Y
B
R
I
D
G
E
N
O
.
1
1
1
O
V
E
R
B
R
I
E
R
Y
S
W
A
M
P
O
N
S
R
1
5
8
8
T
O
T
A
L
L
E
N
G
T
H
O
F
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
1
L
E
N
G
T
H
S
T
R
U
C
T
U
R
E
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
1
L
E
N
G
T
H
R
O
A
D
W
A
Y
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
1
-
L
-
S
T
A
1
9
+
0
0
.
0
0
B
E
G
I
N
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
1
T
O
N C
9
0
3
-L- STA 21+26.26 END BRIDGE -L- STA 22+20.00 END TIP PROJECT B-5111
1
5
5
1
1
5
5
3
1
5
5
3
1
5
4
3
1
5
8
8
1
5
8
8
1
5
3
8
1
5
4
3
1
5
4
2
1
5
4
2
1
5
4
4
1
5
4
5
B e
a
r g
r a
s s R d
B r i e r y S w a m p R d
J
e
r
o
m
e
B
u
t l
e
r
R
d
S
c
h
o
o
l
R
d
C l e
m
m
o
n s
S
R
1 5
8
8
B
R
I E
R
Y
S
W A M P
R
O A D
S R 1 5 8 8 B R I E R Y S W A M P R O A D
B R I E R Y S W A M P
-
L
-
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
42249.2.1 BRZ-1588(2)RW & UTIL
A
U
G
U
S
T
2
2
,
2
0
1
2
J
A
N
U
A
R
Y
2
1
,
2
0
1
4
2
.
T
H
I
S
P
R
O
J
E
C
T
I
S
N
O
T
L
O
C
A
T
E
D
W
I
T
H
I
N
A
N
Y
M
U
N
I
C
I
P
A
L
B
O
U
N
D
A
R
I
E
S
.
E
X
T
E
N
D
T
O
T
H
E
R
/
W
W
I
T
H
I
N
T
H
E
L
I
M
I
T
S
O
F
T
H
E
B
R
I
D
G
E
.
1
.
C
L
E
A
R
I
N
G
O
N
T
H
I
S
P
R
O
J
E
C
T
S
H
A
L
L
B
E
P
E
R
F
O
R
M
E
D
T
O
T
H
E
L
I
M
I
T
S
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
I
I
I
.
H
O
W
E
V
E
R
,
C
L
E
A
R
I
N
G
S
H
O
U
L
D
N
O
T
E
:
KEVIN E. MOORE, PE 42249.3.1 BRZ-1588(2)
C 2 0 3 3 0 0
2 0
S
t
o
k
e
s
W
h
i
c
h
a
r
d
B R I E R Y
C R E E K
9
0
3
9
0
3
9
0
3
3
0
3
0
3
0
N S R S 2 0 0 7 N A D 8 3 /
E
x
i
s
t
i
n
g
E
d
g
e
o
f
P
a
v
e
m
e
n
t
E
x
i
s
t
i
n
g
C
u
r
b
P
r
o
p
o
s
e
d
S
l
o
p
e
S
t
a
k
e
s
C
u
t
P
r
o
p
o
s
e
d
S
l
o
p
e
S
t
a
k
e
s
F
i
l
l
E
x
i
s
t
i
n
g
M
e
t
a
l
G
u
a
r
d
r
a
i
l
E
x
i
s
t
i
n
g
C
a
b
l
e
G
u
i
d
e
r
a
i
l
P
r
o
p
o
s
e
d
G
u
a
r
d
r
a
i
l
E
q
u
a
l
i
t
y
S
y
m
b
o
l
P
a
v
e
m
e
n
t
R
e
m
o
v
a
l
B
a
s
e
l
i
n
e
C
o
n
t
r
o
l
P
o
i
n
t
R
I
G
H
T
O
F
W
A
Y
:
E
x
i
s
t
i
n
g
R
i
g
h
t
o
f
W
a
y
M
a
r
k
e
r
E
x
i
s
t
i
n
g
R
i
g
h
t
o
f
W
a
y
L
i
n
e
h
E
x
i
s
t
i
n
g
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
P
r
o
p
o
s
e
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
P
r
o
p
o
s
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
C F
E
x
i
s
t
i
n
g
E
a
s
e
m
e
n
t
L
i
n
e
P
r
o
p
o
s
e
d
T
e
m
p
o
r
a
r
y
C
o
n
s
t
r
u
c
t
i
o
n
E
a
s
e
m
e
n
t
P
r
o
p
o
s
e
d
T
e
m
p
o
r
a
r
y
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
P
r
o
p
o
s
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
P
r
o
p
o
s
e
d
P
e
r
m
a
n
e
n
t
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
H
Y
D
R
O
L
O
G
Y
:
S
t
r
e
a
m
o
r
B
o
d
y
o
f
W
a
t
e
r
H
y
d
r
o
,
P
o
o
l
o
r
R
e
s
e
r
v
o
i
r
F
l
o
w
A
r
r
o
w
D
i
s
a
p
p
e
a
r
i
n
g
S
t
r
e
a
m
S
p
r
i
n
g
;
z
v W
K
P
r
o
p
o
s
e
d
L
a
t
e
r
a
l
,
T
a
i
l
,
H
e
a
d
D
i
t
c
h
F
a
l
s
e
S
u
m
p
P
r
o
p
o
s
e
d
C
a
b
l
e
G
u
i
d
e
r
a
i
l
M
A
J
O
R
:
B
r
i
d
g
e
,
T
u
n
n
e
l
o
r
B
o
x
C
u
l
v
e
r
t
B
r
i
d
g
e
W
i
n
g
W
a
l
l
,
H
e
a
d
W
a
l
l
a
n
d
E
n
d
W
a
l
l
M
I
N
O
R
:
H
e
a
d
a
n
d
E
n
d
W
a
l
l
P
i
p
e
C
u
l
v
e
r
t
F
o
o
t
b
r
i
d
g
e
P
a
v
e
d
D
i
t
c
h
G
u
t
t
e
r
U
T
I
L
I
T
I
E
S
:
R
O
A
D
S
A
N
D
R
E
L
A
T
E
D
F
E
A
T
U
R
E
S
:
E
x
i
s
t
i
n
g
P
o
w
e
r
P
o
l
e
P
r
o
p
o
s
e
d
P
o
w
e
r
P
o
l
e
P
U
/
G
P
o
w
e
r
C
a
b
l
e
H
a
n
d
H
o
l
e
P
o
w
e
r
M
a
n
h
o
l
e
P
o
w
e
r
L
i
n
e
T
o
w
e
r
P
o
w
e
r
T
r
a
n
s
f
o
r
m
e
r
E
x
i
s
t
i
n
g
J
o
i
n
t
U
s
e
P
o
l
e
P
r
o
p
o
s
e
d
J
o
i
n
t
U
s
e
P
o
l
e
E
x
i
s
t
i
n
g
T
e
l
e
p
h
o
n
e
P
o
l
e
P
r
o
p
o
s
e
d
T
e
l
e
p
h
o
n
e
P
o
l
e
T
e
l
e
p
h
o
n
e
M
a
n
h
o
l
e
T
e
l
e
p
h
o
n
e
B
o
o
t
h
T
e
l
e
p
h
o
n
e
P
e
d
e
s
t
a
l
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
H
a
n
d
H
o
l
e
R }T p Q l e ]/b
H
-
F
r
a
m
e
P
o
l
e
O O
P
O
W
E
R
:
T
E
L
E
P
H
O
N
E
:
T
e
l
e
p
h
o
n
e
C
e
l
l
T
o
w
e
r
R
e
c
o
r
d
e
d
U
/
G
P
o
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
WATER:Water Manhole Water Meter Water Valve Water Hydrant Recorded U/G Water Line 4 I H a TV:TV Satellite Dish TV Pedestal TV Tower U/G TV Cable Hand Hole Recorded U/G TV Cable Recorded U/G Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*)r |I ]GAS:Gas Valve Gas Meter Recorded U/G Gas Line n c SANITARY SEWER:Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*)d o A/G Water Above Ground Gas Line A/G Gas Above Ground Water Line Above Ground Sanitary Sewer A/G Sanitary Sewer MISCELLANEOUS:Utility Pole O F S 3 Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line ?CONC CONC WW v v
D
r
a
i
n
a
g
e
B
o
x
:
C
a
t
c
h
B
a
s
i
n
,
D
I
o
r
J
B
S
t
o
r
m
S
e
w
e
r
S
t
o
r
m
S
e
w
e
r
M
a
n
h
o
l
e
m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil
B
O
U
N
D
A
R
I
E
S
A
N
D
P
R
O
P
E
R
T
Y
:
S
t
a
t
e
L
i
n
e
C
o
u
n
t
y
L
i
n
e
T
o
w
n
s
h
i
p
L
i
n
e
C
i
t
y
L
i
n
e
R
e
s
e
r
v
a
t
i
o
n
L
i
n
e
P
r
o
p
e
r
t
y
L
i
n
e
E
x
i
s
t
i
n
g
I
r
o
n
P
i
n
P
r
o
p
e
r
t
y
C
o
r
n
e
r
P
r
o
p
e
r
t
y
M
o
n
u
m
e
n
t
E
x
i
s
t
i
n
g
F
e
n
c
e
L
i
n
e
P
r
o
p
o
s
e
d
W
o
v
e
n
W
i
r
e
F
e
n
c
e
P
r
o
p
o
s
e
d
C
h
a
i
n
L
i
n
k
F
e
n
c
e
P
r
o
p
o
s
e
d
B
a
r
b
e
d
W
i
r
e
F
e
n
c
e
g F 1
2
3
E
x
i
s
t
i
n
g
W
e
t
l
a
n
d
B
o
u
n
d
a
r
y
P
r
o
p
o
s
e
d
W
e
t
l
a
n
d
B
o
u
n
d
a
r
y
E
x
i
s
t
i
n
g
E
n
d
a
n
g
e
r
e
d
A
n
i
m
a
l
B
o
u
n
d
a
r
y
E
x
i
s
t
i
n
g
E
n
d
a
n
g
e
r
e
d
P
l
a
n
t
B
o
u
n
d
a
r
y
B
U
I
L
D
I
N
G
S
A
N
D
O
T
H
E
R
C
U
L
T
U
R
E
:
A
r
e
a
O
u
t
l
i
n
e
G
a
s
P
u
m
p
V
e
n
t
o
r
U
/
G
T
a
n
k
C
a
p
C
h
u
r
c
h
S
c
h
o
o
l
D
a
m
S
i
g
n
S
m
a
l
l
M
i
n
e
W
e
l
l
V M W W S x
F
o
u
n
d
a
t
i
o
n
S
B
u
i
l
d
i
n
g
y y
V
E
G
E
T
A
T
I
O
N
:
S
i
n
g
l
e
T
r
e
e
X Y
Vineyard
S
i
n
g
l
e
S
h
r
u
b
H
e
d
g
e
W
o
o
d
s
L
i
n
e
O
r
c
h
a
r
d
V
i
n
e
y
a
r
d
R
A
I
L
R
O
A
D
S
:
S
t
a
n
d
a
r
d
G
a
u
g
e
R
R
S
i
g
n
a
l
M
i
l
e
p
o
s
t
S
w
i
t
c
h
R
R
A
b
a
n
d
o
n
e
d
R
R
D
i
s
m
a
n
t
l
e
d
S
FL
O
W
D
e
s
i
g
n
a
t
e
d
U
/
G
P
o
w
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
(
S
.
U
.
E
.
*
)
Designated U/G Water Line (S.U.E.*)Designated U/G TV Cable (S.U.E.*)Designated U/G Gas Line (S.U.E.*)U/G Test Hole (S.U.E.*)
*
S
.
U
.
E
.
=
S
u
b
s
u
r
f
a
c
e
U
t
i
l
i
t
y
E
n
g
i
n
e
e
r
i
n
g
W
L
B
E
I
P
B
E
C
M
CONC HW CB
C
S
X
T
R
A
N
S
P
O
R
T
A
T
I
O
N
M
I
L
E
P
O
S
T
3
5
S
W
I
T
C
H
C
e
m
e
t
e
r
y
E
X
I
S
T
I
N
G
S
T
R
U
C
T
U
R
E
S
:
P
a
r
c
e
l
/
S
e
q
u
e
n
c
e
N
u
m
b
e
r
E
AATUR End of Information E.O.I.
N
o
t
e
:
N
o
t
t
o
S
c
a
l
e
SHEET NO.PROJECT REFERENCE NO.1-B B-5111 Abandoned According to Utility Records
W
L
B
E
A
B
E
P
B
R W
R W
R W
C A E
T
D
E
P
D
E
P
U
E
S P P T T TC TC T FO T FO W W TV TV TV FO TV FO G G SS FSS FSS ?UTL
J
u
r
i
s
d
i
c
t
i
o
n
a
l
S
t
r
e
a
m
J
S
0 4 /1 6 /1 1
B
u
f
f
e
r
Z
o
n
e
1
B
u
f
f
e
r
Z
o
n
e
2
B
Z
1
B
Z
2
W
e
t
l
a
n
d
P
r
o
p
o
s
e
d
P
e
r
m
a
n
e
n
t
E
a
s
e
m
e
n
t
w
i
t
h
I
r
o
n
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
P
r
o
p
o
s
e
d
T
e
m
p
o
r
a
r
y
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
T
U
E
I
r
o
n
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
P
r
o
p
o
s
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
C
o
n
c
r
e
t
e
o
r
G
r
a
n
i
t
e
M
a
r
k
e
r
P
r
o
p
o
s
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
D
U
E
P
r
o
p
o
s
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
/
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
A
U
E
P
r
o
p
o
s
e
d
A
e
r
i
a
l
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
C
R
P
r
o
p
o
s
e
d
C
u
r
b
R
a
m
p
C
C
F
R
C
u
r
b
C
u
t
F
u
t
u
r
e
R
a
m
p
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
C
O
N
V
E
N
T
I
O
N
A
L
P
L
A
N
S
H
E
E
T
S
Y
M
B
O
L
S
K
n
o
w
n
S
o
i
l
C
o
n
t
a
m
i
n
a
t
i
o
n
:
B
o
u
n
d
a
r
y
o
r
S
i
t
e
P
o
t
e
n
t
i
a
l
S
o
i
l
C
o
n
t
a
m
i
n
a
t
i
o
n
:
B
o
u
n
d
a
r
y
o
r
S
i
t
e
Underground Storage Tank, Approx. Loc.Geoenvironmental Boring UST
0
.
0
2
F
T /F
T
0 .0 2 F T /F T GRADE POINT
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
0
.
0
8
0 .0 8
V
A
R
S
E
E
X -
S
E
C
T I
O
N
S
V A R S E E X -S E C T I O N S
0
.
0
2
F
T
/F
T
0 .0 2 F T /F T GRADE POINT
0
.
0
8
0 .0 8
V
A
R
S
E
E
X -
S
E
C
T I
O
N
S
V A R S E E X -S E C T I O N S C L C L
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
U
M
I
N
.
M
I
N
.
C
S
U
R
V
E
Y
L
C L
DO NOT USE FOR CONSTRUCTION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS
E
X
I
S
T
I
N
G
EXISTING
1
0
’
10’-L-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
1
U
W
T
T
1
0
’
10’
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
2
T
T -L-
1
0
’
1
0
’
-
L
-
B
R
I
D
G
E
T
Y
P
I
C
A
L
P
A
V
E
M
E
N
T
S
C
H
E
D
U
L
E
F
I
N
A
L
D
E
S
I
G
N
G
R
A
D
E
P
O
I
N
T
GRADE TO THIS LINE
0
.
0
8
0 .0 8 C L EXISTING EXISTING 10’10’-L-U
T
T SHEET NO.PROJECT REFERENCE NO.ROADWAY DESIGN ENGINEER ENGINEER 2 B-5111 PAVEMENT DESIGN
6 /2 /9 9
0 8 -A P R -2 0 1 3 0 9 :2 8
R :\R o a d w a y \P r o j \B 5 1 1 1 _R d y _t y p .d g n
$$$$U S E R N A M E $$$$
0
.
0
4
F
T
/F
T
0
.
0
4
F
T /F
T
6
’
6’
6
’
6’
-
L
-
S
T
A
2
0
+
0
8
.
7
4
(
B
E
G
I
N
B
R
I
D
G
E
)
T
O
-
L
-
S
T
A
2
1
+
2
6
.
2
6
(
E
N
D
B
R
I
D
G
E
)
C
1
E
1
E1
C
2
C2
C
2
E
1
C
1
C
1
C
3
4
"
E
2
4
"
E
2
-
L
-
S
T
A
2
1
+
5
0
T
O
-
L
-
S
T
A
2
2
+
0
0
.
0
0
-
L
-
S
T
A
1
9
+
0
0
.
0
0
T
O
-
L
-
S
T
A
1
9
+
8
0
BEHIND GUARDRAIL INSTALLATION MAINTAIN 3’ OF GRADED SHOULDER
6
’
6’C1
E
1
E1
C
2
C2 TYPICAL SECTION 3
X -
S
E
C
T I
O
N
S
V
A
R
S
E
E
X -S E C T I O N S V A R S E E E X I S T I N G E X I S T I N G
-
L
-
S
T
A
2
2
+
0
0
.
0
0
T
O
-
L
-
S
T
A
2
2
+
2
0
.
0
0
-
L
-
S
T
A
2
1
+
2
6
.
2
6
(
E
N
D
B
R
I
D
G
E
)
T
O
-
L
-
S
T
A
2
1
+
5
0
-
L
-
S
T
A
1
9
+
8
0
T
O
-
L
-
S
T
A
2
0
+
0
8
.
7
4
(
B
E
G
I
N
B
R
I
D
G
E
)
3
’
M
I
N
.
V
A
R
I
E
S
3
’
M
I
N
.
V
A
R
I
E
S
"
4
3
3
"
4
3
3
"
4
3
3
C
3
7.5"7.5"7.5"7.5"
7
.
5
"
S
T
A
N
D
A
R
D
W
E
D
G
I
N
G
D
E
T
A
I
L
2
7
’
-
1
0
"
*
**
**
P
R
O
P
.
V
A
R
.
D
E
P
T
H
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
C
O
U
R
S
E
,
T
Y
P
E
S
F
9
.
5
A
,
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
1
0
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
E
R
1
"
D
E
P
T
H
.
T
O
B
E
P
L
A
C
E
D
I
N
L
A
Y
E
R
S
N
O
T
T
O
E
X
C
E
E
D
1
"
I
N
D
E
P
T
H
.
C
3
C
1
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
3
7
.
5
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
R
O
P
.
A
P
P
R
O
X
.
1
"
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
C
O
U
R
S
E
,
T
Y
P
E
S
F
9
.
5
A
,
C
2
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
3
7
.
5
.
P
E
R
S
Q
.
Y
D
.
I
N
E
A
C
H
O
F
T
W
O
L
A
Y
E
R
S
.
P
R
O
P
.
A
P
P
R
O
X
.
2
"
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
C
O
U
R
S
E
,
T
Y
P
E
S
F
9
.
5
A
,
P
R
O
P
.
V
A
R
.
D
E
P
T
H
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
B
A
S
E
C
O
U
R
S
E
,
T
Y
P
E
B
2
5
.
0
B
,
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
1
4
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
E
R
1
"
D
E
P
T
H
.
T
O
T
H
A
N
5
"
I
N
D
E
P
T
H
.
B
E
P
L
A
C
E
D
I
N
L
A
Y
E
R
S
N
O
T
L
E
S
S
T
H
A
N
4
"
I
N
D
E
P
T
H
O
R
G
R
E
A
T
E
R
E
2
E
A
R
T
H
M
A
T
E
R
I
A
L
.
T
E
X
I
S
T
I
N
G
P
A
V
E
M
E
N
T
.
U
V
A
R
I
A
B
L
E
D
E
P
T
H
A
S
P
H
A
L
T
P
A
V
E
M
E
N
T
(
S
E
E
S
T
A
N
D
A
R
D
W
E
D
G
I
N
G
D
E
T
A
I
L
)
W N
O
T
E
:
P
A
V
E
M
E
N
T
E
D
G
E
S
L
O
P
E
S
A
R
E
1
:
1
U
N
L
E
S
S
S
H
O
W
N
O
T
H
E
R
W
I
S
E
.
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
5
7
0
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
R
O
P
.
A
P
P
R
O
X
.
5
"
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
B
A
S
E
C
O
U
R
S
E
,
T
Y
P
E
B
2
5
.
0
B
,
E
1
3
2
.
6
8
’
+
7
5
.
2
3
DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS
S
K
E
T
C
H
O
F
B
R
I
D
G
E
I
N
R
E
L
A
T
I
O
N
S
H
I
P
T
O
P
A
V
E
M
E
N
T
FOR -L- PROFILE, SEE SHEET 5 -L -
-
L -
0 8 -A P R -2 0 1 3 0 9 :2 8
R :\R o a d w a y \P r o j \B 5 1 1 1 _r d y _p s h _s 4 .d g n
$$$$U S E R N A M E $$$$
HYDRAULICS ROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.
5 /1 4 /9 9
SHEET NO.PROJECT REFERENCE NO.4 B-5111
T Y P
E
I I I
0 4
T Y P E
I I I
T Y P E
I I I
3 ’ M I N .2 0 ’
2 7 .8 3 ’
-
L
-
S
T
A
1
9
+
9
7
.
7
4
B
E
G
I
N
A
P
P
R
O
A
C
H
S
L
A
B
-
L
-
S
T
A
2
0
+
0
8
.
7
4
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
2
1
+
2
6
.
2
6
E
N
D
B
R
I
D
G
E
-
L
-
S
T
A
2
1
+
3
7
.
2
6
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
3 ’ M I N .T Y P E
I I I
B
E
R
M
G
U
T
T
E
R
S
H
O
U
L
D
E
R
B
E
R
M
G
U
T
T
E
R
S
H
O
U
L
D
E
R
0 5
-
L -
0 4
BRIDGE APPROACH SLAB
N
O
T
T
O
S
C
A
L
E
B R I E R Y S W A M P
6
" P
V
C
1 8 0 .1 3 ’
5 2 .0 8 ’
5
2 .
6
1 ’
8 8 .
1 8 ’
1 8 2 .0 0 ’
O F B R I E R Y S W A M P
P R O P E R T Y L I N E W I T H R U N
P
K
D
B
1
5
2
4
P
G
1
1
5
C
A
F
P
R
O
P
E
R
T
I
E
S
,
L
L
C
JAMES OLIVER ROEBUCK DB 2615 PG 426 MB 5 PG 173 JAMES OLIVER ROEBUCK DB 2615 PG 426 MB 5 PG 173
W
I
L
L
I
A
M
R
.
V
A
N
L
A
N
D
I
N
G
H
A
M
,
E
T
U
X
D
B
2
5
3
P
G
3
1
8
1
9
’
B
S
T
S R 1 5 8 8 B R I E R Y S W A M P R D
1 9
’ B
S
T
S
R
1 5
8
8
B
R
I E
R
Y
S
W A M P
R
D
2 0
2 5
-L - P C S t a . 1 9 +0 4 .0 4
-L - P T S t a . 2 6 +9 3 .7 1
P
I
S
t
a
2
3
+
0
4
.
5
1
D L
=
7
8
9
.
6
7
’
T
=
4
0
0
.
4
7
’
R
=
1
,
9
2
5
.
0
0
’
-
L
-
G
R A U
3
5
0
G
R A
U
3
5
0
G
R
A
U
3
5
0
0 4
0 5
E X I S T .
0 4
E X I S T .
I
N
C
2
7
’
I N
C
2
7
’
+4 6
2 0 ’
2 0 ’
-
L
-
S
T
A
1
9
+
0
0
.
0
0
B
E
G
I
N
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
1
3
5
0
G
R A
U
-L- STA 22+20.00 END TIP PROJECT B-5111
F
F
F
F
F F
F F
1
2
B
M
#
1
B
L
-
2
EX
.
R
/
W
4
0
’
+
0
0
.
0
0
EX
.
R
/
W
4
0
’
5
5
’
+
1
7
.
0
0
EX
.
R
/
W
4
0
’
5
5
’
+
4
2
.
0
0
EX
.
R
/
W
4
0
’
5
5
’
+
9
5
.
0
0
EX
.
R
/
W
5
5
’
+
2
0
.
0
0
7
S
Y
F
I
L
T
E
R
F
A
B
R
I
C
E
S
T
.
2
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
7
S
Y
F
I
L
T
E
R
F
A
B
R
I
C
E
S
T
.
2
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
0
4
0
1
0
4
0
2
0
4
0
3
0
4
0
4
-
L
-
S
T
A
.
1
9
+
8
0
B
E
G
I
N
S
B
G
-
L
-
S
T
A
.
2
1
+
5
2
E
N
D
S
B
G
1 5 "
1 5
" R C
P -
I I I
0
4
0
5
0
4
0
6
T
B
J
B
w
/
M
H
1
5
"
R
C
P
-
I
I
I
1 5 "
w
/M
H
T B
J B
2
G
I
T
B
2
G
I
T
B
1 2
0
S Y
F F
E S T . 5
5
T O
N
S
C
L A
S
S
I I R I P
R A P
1 6
0
S Y
F F
E S
T . 7
5
T O
N
S
C
L A S
S
I I R I P
R A P
2 7 ’1 0 "
N S R S 2 0 0 7 N A D 8 3 /