Loading...
HomeMy WebLinkAbout20170239 Ver 1_Inspection follow-up_20210827 Carpenter,Kristi From:Conchilla, Ryan Sent:Friday, August 27, 2021 10:57 AM To:Parker, Jerry A; 'dmoore@rkk.com'; Howell, John Cc:Wanucha, Dave Subject:Mebane Bypass- inspection follow-up Jerry/Della, Good morning. A site inspection was performed yesterday and we have the following recommendations: At Station 25.75- The 36ā€¯concrete pipe outlet (see attached photo, looking east). Improvements to this area (dip-out/seeding/matting) should be made to minimize impact into the adjacent JS until the permanent tail ditch is constructed. A wetland or seasonal seed mix may be needed. Per our meeting with Travis, the NPDES records moving forward should also include an additional line item for observations of the turbidity curtain. Let me know if you have questions. Ryan Conchilla, PWS Environmental Specialist II 401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8) Division of Water Resources, NC Department of Environmental Quality Ryan.Conchilla@ncdenr.gov 1