HomeMy WebLinkAboutNCC214497_Site Plan or Location Map_20210827e®
(n
z
w
0
t
LEGEND
GEOTEXTILE FABRIC
UNDERY
.w
ti
PARCEL BGUNDAY
41. AA
_A
I�
' LIMIT DISTURBANCE
1-7
,
9
riFLOOD
ZONE
--FZ
w
SILT FENCE
POCK OUTLE
STING EXI GON f 4..3L.JRS
\—WIDTH AS REOUIRED
EMERGENG t�V��1=LC>tfV
WETLAND
(15
ELEV 67.50
�p/ IVgp�+�—� /+yyg{(�e^q�
Tt.mf Y9! '4i �Y"tfO YA DIVERSION
TEMPORARY
s
NC GRID
N D 83 (2011)
ADDITIONAL
N OTE"S
4
,00> 0 100' 200'
7
70
__. _. _ __. _ . r _ _, _ _. ..... , _. _ _. _.._ _ _,.._ _ _. _.. _ _
1 INCH =100 FEET HORZ.
1.
TOPOGRAPHIC fINC.,
Q QGRAPFiIC INFORMATION PROVIDED CAPE FEAR ENGINEERING,
ELEVATION
,
___ ,__.__. _._
_.___ . __ .._68
1 INCH =` 00 FEET VERTICAL
-BASED ON NAVD88.
66
66
2
CONTRACTOR TO FIELDV
VERIFY ALL
EXISTING UNDERGROUND UTILITIES BEFORE
m.n. .
-� I
_v_ _
--�---__._ M _______� .. ____ ___,______{_. _____
BEGINNING CONSTRUCTION.2
--------------
,'
62
60
3.
THE TOTAL AREA 4F DISTURBANCE
IS 569,859 SF (13.08 AC).
REQUIRED QRQUNDCOVER TIMES
4.
WETLAND DELINEATION BY NEEE HAM ENVIRONMENTAL, USACE VERIFICATION AND
SEE SEQUENCE OF LAND DISTURBANCE ,NOTES
APPROVAL SAW-2000-4029 �-
f
AND VEGETATION SCHEDULE DETAIL ON SHEET D-1�
5.
INSTALL POND 7, FOREBAY, AND
POND #8 WITH STQRMWATER OUTLETS AND
I +
��� 12 � I3 i� �
I7+ i��C�c�I�+7
f _
I5 Ida +
PIPING INFRASTRUCTURE BETWE=N
POND #8 AND POND #7 BEFORE BEGINNING
7 DAY MAXIMUM 1
ANY GRADING OR CONSTRUCTION.
!m
14 DAY MAXIM "U M
ISSUED FOR
agar }
OY
F e. 8 m
3
A
LIEN
10/ 4/17
0
ADDED BORROW POND
REMISED LOT LAYOUT,
RAS
ISSUED FOR CONSTRUCTION
5 17
A
ISSUED FOR STORMWATER, EROSION
E N
CONTROL AND CONTRACTOR PRICING
1 ,/10/14
REV;
DESCRIPTION
R VAY
REVISIONS
�±j
f iRt?JECT NUF.RBER SHEE �Ellv9.g�;R