Loading...
HomeMy WebLinkAboutNCC202614_NOT Closeout Documents_20210825North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Onslow Project: RTAMS TLZ Repair Erosion Repair River basin: White Oak Person financially responsible: MCB Camp Lejeune -Talia Prendergast Project #: ONSLO-2020-051 Address: 1005 Michael Road, Camp Lejeune, NC 28547 1. Project Location: Verona Loop Road, MCB Camp Lejeune Pictures: No 2. Weather and soil conditions: Sunny and workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below; 5. Violations: 6. Is the site in compliance with NPDES Permit NCG0I0000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply Degree of damage-. 8. Contact made with (name): Mike Taylor Title: Base Environmental Inspection report; Sent Report Date given: sent: December 07, 2020 9. Corrective action needed: 10. Comments: Project appears complete and stabilized. File will be closed. Any further/future development will require a new permit application to be submitted. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated. If you have any questions regarding this report, please contact the inspector at (910) 796-7315 or at connor.musiai@nc goo. t Reported by: Connor Musial Others present: Date of inspection: December 04, 2020 Time arriving on site: 2:00 PM Time leaving site: 2:30 PM CC: