Loading...
HomeMy WebLinkAboutNCC203667_NOT Closeout Documents_20210825North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Bladen Project: Weatherspoon Plant Delco 230kV Sub River basin: Lumber Person financially responsible: Duke Energy Progress, LLC - Randy Veltri, Project N: BLADE-2021-001 Director of Transmission Permitting Address: 440 South Tryon St, Charlotte, NC 28202 1. Project Location: Forrest Drive, Bladenboro Pictures: No 2. Weather and soil conditions: partly cloudy Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? No If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? N/A Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: August 18, 2021 10. Comments: project complete. soil stabilized/permanent vegetation established. Project closed. Reported by: Chris Baker Others present: Date of inspection: August 12, 2021 Time arriving on site: 11:00 AM Time leaving site: 11:30 AM cc: