HomeMy WebLinkAboutNCC203667_NOT Closeout Documents_20210825North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Bladen Project: Weatherspoon Plant Delco 230kV Sub River basin: Lumber
Person financially responsible: Duke Energy Progress, LLC - Randy Veltri, Project N: BLADE-2021-001
Director of Transmission Permitting
Address: 440 South Tryon St, Charlotte, NC 28202
1. Project Location: Forrest Drive, Bladenboro
Pictures: No
2. Weather and soil conditions: partly cloudy Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? No If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? N/A
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: August 18, 2021
10. Comments: project complete. soil stabilized/permanent vegetation established.
Project closed.
Reported by: Chris Baker Others present:
Date of inspection: August 12, 2021 Time arriving on site: 11:00 AM Time leaving site: 11:30 AM
cc: