HomeMy WebLinkAbout20190230 Ver 6_More Information Received_20210826Staff Review Form
Updated September 4, 2020
Staff Review
Does this application have all the attachments needed to accept it into the review process?*
6* Yes r No
ID#* Version* 6
20190230
Is this project a public transportation project?*
Is this a DOT
project?*
Reviewer List:*
Yes r No
Select Reviewing Office:*
Yes
r No
Garcy Ward:eads\gpward
Washington Regional Office - (252) 946-6481
Does this project require a request for payment to be sent?*
Yes
r
No
Project Submittal Form
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type:*
✓ For the Record Only (Courtesy Copy)
✓ New Project
✓ Modification/New Project with Existing ID
✓ More Information Response
✓ Other Agency Comments
✓ Pre -Application Submittal
✓ Re-Issuance\Renewal Request
✓ Stream or Buffer Appeal
Is this supplemental information that needs to be sent to the Corps?*
Yes r No
Project Contact Information
Name: Paul Williams
Who is submitting the inforrration?
Email Address: pcwilliams2@ncdot.gov
Project Information
Existing ID #:
20190230
20170001 (no dashes)
Existing Version:
6
1
Project Name: US 158 Widening/ Improvements ( R-2582A)
Is this a public transportation project?
(' Yes
✓ No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
✓ Yes r No r Unknown
TIP#: WBS#:
R-2582A 34472.1.4
(Applies to DOT projects only)
County (ies)
Northampton
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach docurrent
Revised R-2582A Wetland Impact Summary
128.88KB
Sh eet_2021.06.17. pdf
Only pdf or Ivry files are accepted.
Describe the attachments
or comments:
Clarification made to Wetland Impact Summary Sheet. Site 8 additional impacts are on secondary stream
SBO5B. Revised document attached.
Sign and Submit
17 By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to
the best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:
crru/Cr//rr %llYlrrnr✓.r'�v.
Submittal Date: Is filled in autorretically.
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS
SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 34+78 to 42+09
36" RCP -III / Roadway Fill
0.38
0.01
< 0.01
121
10
2
-L- 81+96 to 85+94
Triple 9 X 9 RCBC / Roadway Fill
0.03
0.01
0.03
0.14
0.01
226
35
3
-L- 92+72 to 96+17
Roadway Fill
0.17
0.09
< 0.01
4
-L- 138+79 to 144+44
42" RCP -III / Roadway Fill
2.10
0.28
0.01
< 0.01
252
21
5
-L- 186+64 to 194+68
Roadway Fill
3.33
0.17
0.25
6
-L- 201+68 to 205+06
Double 48" RCP -III / Roadway Fill
3.37
0.08
0.12
0.09
< 0.01
826
9
7
-L- 248+36 to 251+62
84" RCP -IV / Roadway Fill
1.26
0.01
0.08
0.04
< 0.01
549
35
8
-L- 282+72 to 287+92
Triple 8 X 7 RCBC / Roadway Fill
0.14
0.08
0.13
< 0.01
478
45
9
-L- 381+38 to 390+97
Roadway Fill
0.64
0.19
10
-L- 409+20 to 409+39
Roadway Fill
< 0.01
11
-L- 420+24 to 421+45
Roadway Fill
< 0.01
< 0.01
12
-L- 150+32 to 151+20
42" RCP -III / Roadway Fill
0.02
< 0.01
209
20
TOTALS*:
11.42
0.26
0.11
1.05
0.44
0.03
2661
175
0
*Rounded totals are sum of actual impacts
NOTES:
Site 6 includes 0.465 acres of fill impact due to the total take of wetland within the proposed roadway loop.
Site 3 includes additional 0.09 acres of temp. fill and remove 0.04 of Mechanized Clearing
Site 2 includes 20 linear feet of additional channel impacts from bank stabilization
Site 8 : additional 30 feet bank stabilization, additional 116 feet of perm. and 16 feet temp. stream impacts for secondary stream SBO5B
Site 5 includes additional 0.17 acres of temp. wetland fill
Site 7 includes additional 62 linear feet of stream impact
Revised 2021 06 17
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
06/17/2021
NORTHAMPTON COUNTY
R-2582A
34472.1.4
SHEET 53 OF 53