HomeMy WebLinkAbout20210966 Ver 1_Pre-Filing Meeting Information_20210826DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low and include location information.*
20210966 1
Winston-Salem Regional Office - (336) 776-9800
Dave Wanucha
Pre-Filing Me eting Reque st submitte d 5/24/2021
Jonathan Hefner
jhefner@wetherilleng.com
Jones Creek Greenway (TIP C-5181)
Town of Carrboro
Orange
City
Carrboro
State / Province / Region
NC
Postal / Zip Code
27510
Country
United States
Street Address
301 W. Main St,
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
The proposed project involves the construction of a 10ft. wide multi-
use path in the Orange County Town of Carrboro. The approximately
800ft. trail will begin at the current terminus of Lake Hogan Farms Rd.
on the east side of the road and will run north connecting to the
existing trail constructed by Orange County. The trail will have an
approximately 70 ft. long bridge over Buckhorn Branch. The
proposed project is included in the 2018-2027 North Carolina State
Transportation Improvement Program (STIP).
Jones Creek Greenway Buffer and Stream
Permit Drawings 10-15-30.pdf
2.26MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
5/24/2021