Loading...
HomeMy WebLinkAboutNCG520125_Compliance Evaluation Inspection_20210826DocuSign Envelope ID: 207D8C89-28F5-40B8-8F29-ED2FCBA185BA ROY COOPER Correrrror ELIZABETH S. BISER secretary S. DANIEL SMITH NORTH CAROLINA Enwlrnnmertal Quality August 26, 2021 Mr. Mark Marsh, Owner Marsh Farm Sand Mine 2434 Brocks Mill Road Cheraw, South Carolina 29520 Subject: Compliance Evaluation Inspection Marsh Farm Sand Mine NPDES Permit No. NCG520125 Gaston County Dear Mr. Marsh: Enclosed please find a copy of the Compliance Evaluation Inspection report for the inspection conducted at the subject facility on August 24, 2021, by Ori Tuvia. Frank Bryne's cooperation during the site visit was much appreciated. As was discussed during the inspection, please notify Mooresville Regional Office staff prior to the facility becoming active. The attached report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori.tuvia@ncdenr. gov. Sincerely, DocuSigned by: A14CC681AF27425... W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: Mooresville Regional Office Files (Laserfiche) Douglas Shoutd, ORC North Carolina Drpartrnent of Fmiranmcnial Quality I Division of Wairr Resources Hoores ilteknionalOrf€xe I bIDfast Center Avenue. Sate 301 I Mooresville. NarthCarcdina 2dlI5 7O4.663.I694 DocuSign Envelope ID: 207D8C89-28F5-40B8-8F29-ED2FCBA185BA United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection 1 IN I 2 IL I 3 I NCG520125 111 121 21/08/24 117 Type 1810I IIIIIIIIIII Inspector Fac Type 19I S I 2011 21IIIIII IIIIIIIIIIIIIIIIII I IIIIII P6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 67I1.0 I 70I I 711 172 I N I 73I 1 74 751 I I 1 I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES oermit Number) Marsh Farm Sand Mine 180 Old Hardin Rd Dallas NC 28034 Entry Time/Date 09:50AM 21/08/24 Permit Effective Date 21/03/01 Exit Time/Date 10:25AM 21/08/24 Permit Expiration Date 25/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Frank Bryne,180 Old Hardin Rd Dallas NC 28034//704-618-3746/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Ori cu igned by: DWR/MRO WQ/704-663-1699/ Date 8/26/2021 BB057A2DE017498... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger DWR/Division of Water Quality/704-235-2194/ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. p- DocuSigned by: 8/26/2021 "-A14CC681AF27425... Page# 1 DocuSign Envelope ID: 207D8C89-28F5-40B8-8F29-ED2FCBA185BA NPDES yr/mo/day 31 NCG520125 111 121 21/08/24 I17 Inspection Type 18LI 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# 2 DocuSign Envelope ID: 207D8C89-28F5-40B8-8F29-ED2FCBA185BA Permit: NCG520125 Inspection Date: 08/24/2021 Owner - Facility: Marsh Farm Sand Mine Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new El El ❑ application? Is the facility as described in the permit? El El • El # Are there any special conditions for the permit? El El • El Is access to the plant site restricted to the general public? ❑ ❑ • ❑ Is the inspector granted access to all areas for inspection? • El El El Comment: Permit became effective on March 1, 2021. Currently the site is still inactive, as they are searching for equipment. When the site becomes active, they intend to dip sand from the river and have any run-off water pass through a screen prior to discharging back to the river. Page# 3