Loading...
HomeMy WebLinkAboutNCG030151_DMR_20210301STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) / SPPP Annual Update DATA REVIEW FORM Calendar Year �2Oa 1 Individual NPDES Permit No. Certificate of Coverage (COC) No. 1011 This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: Altec Industries Creedmoor Manufacturing Division County: Granville Phone Number: (919 )418-8463 Total no. of SDOs monitored 1 Outfall No. 1 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ Non Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ Non If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No 0 Parameter, units Total Rainfall, inches Standard mg/L mg/L mg/L mg/L mg/L mg/L mg/L Benchmark N/A 6-9 100 50 .010 .075 .126 1 15 Date Sample Collected, mm/dd/yy pH7 TSS TSS, HQW, ORW, Tr and PNA Copper Lead Zinc TTO Non -polar oil and grease 2/14/21 2.14 8.8 4.80 4.80 .00784 ND .0592 ND ND SW U-264 - Generic Annual DMR Last revised 510212018 Additional Outfall Attachment Outfall No. Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No ❑ Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No ❑ Parameter, (units) Total Rainfall, inches Benchmark N/A Date Sample Collected, mmlddlyy SWU-264 - Generic Annual DMR Last revised 510212018 " I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature _ Date 03/01/21 For questions, contact your local Regional Office: DWQ Regional Office Contact Information: ASIIEYILLE REGIONAL.OFFICE 2090 US Highway 70 Swannanoa, NC 28778 (828)296-4500 RALEIGH REGIONAL OFFICE 3800 Barrett Drive Raleigh, NC 27609 (919) 791-4200 WINSTON-SALEM REGIONAL OFFICE 450 Hanes Mill Rd, Suite 300 Winston-Salem, NC 27105 (336)776-9800 _ �\`MI ngtan FAYETTEVILLE REGIONAL OFFICE 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 (910) 433-3300 WASH TON REGIONAL OFFICE 943 Washington Square Mall Washington, NC 27889 J (252)946-6481 CENTRAL OFFICE 1617 Mail Service Center Raleigh, NC 27699-1617 (919)807-6300 �oe MOORESVILLE REGIONAL OFFICE) 610 East Center Avenue/Suite 301 Mooresville, NC 28115 (704) 663-1699 WILMINGTON REGIONAL OFFICE, 127 Cardinal Drive Extension Wilmington, NC 28405-2845 (910) 796-7215 7o preserve, Protect and enhance North Carotina's water._." SWU-264 - Generic Annual DMR Last revised 5/OZ/2018 lr*w 400 NCDENR Storanwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit. Jeffnortai..ncdenr.orgfweb,(.wq/ws/sufIipdessw#tab- - Permit No.: Facility Name: AI:6--� l: or Certificate of Coverage No.: V/-C/G/ 2/. / C)/1/ j-1 / yx OQzVsLt;nn S County: v Phone No. -qi 4 - DK3S Inspector: SS Date of Inspection: 2// `//;-/ Time of Inspection:nn Total Event Precipitation (inches):I q Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) bYes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event' or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter i interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Perril'ittee or Designee) Pagel of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. t Structure (pipe, ditch, etc.) r Receiving Stream: ad 15 loj�� Describe the industrial activities t at occur within the qutfail drainage area: (&Yr, 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: 3. Odor: Describe any weak chlorine odor, etc.): _ dis 'nct odors that the discharge may have (i.e., smells strongly of oil, W✓lx. 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 20 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 0 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 10 22 3 4 5 7. Is there any foam in the stormwater discharge? Yes N 8. is there an oil sheen in the stormwater discharge? Yes N 9. is there evidence of erosion or deposition at the outfall? Yes N 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 S14'11•242, last modified 10/25/2012