Loading...
HomeMy WebLinkAboutSW1191201_Supplement-EZ Form_20210825SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 iProject Name NCNG Morganton Regional Readiness Center 2 1 Pro'ect Area ac 34.4 3 lCoastal Wetland Area ac 0 4 Surface Water Area ac 0.6 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H.1003(4) 7#11sBUA of vegetated setbacks provided (feet) 50 8e vegetated setback remain ve etated? Yes 9 other that as listed in .1003 4 c-d out of the setback? No 10 1 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 IDisconnected Impervious Surface (DIS) 0 21 ITreatment Swale 0 22 bry Pond 0 23 I StormFilter 0 24 [Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 IName and Title: Frank Slinsk , P.E., Senior Project Manager 28 Or anization: Timmons Grou 29 Street address: 5410 Trinity Road, Suite 102 30 City, State, Zip: _ number(s): !Email: Raleigh, NC, 27607 31 jPhone (919) 866-4505 32 frank.slinsky@timmons.com Certification Statement: I certify, under penalty of law that this Supplement-FZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ` �'�• ' (r ram. e� SAD Y •� � . .Q SEAL. ')7; 033612 Signature of Designer Date 8/tC,/I6ZI DRAINAGE AREAS Elss a hi h densi roect? Yes number of draina a areas/SCMs 2 art of this project subject to previous rule ns? No FDRMSLDADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Ty2e of SC M Wet Pond Wet Pond 5 Total BUA in project (scl ft 733796 sf 570010 sf 163786 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft 733796 sf _ 7 New BUA outside of subdivided lots (subject to ermittin s 570010 sf 163786 sf 8 Offsite - total area s . ft 9 Offsite BUA (sq ft 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft 526936 sf 465306 sf 61657 sf Sidewalk �sq ft 33389 sf 33389 sf — Roof (sq ft 66486 sf _ 64267 sf 2219 sf - Roadway s ft 5045 sf — 5045 sf - Future (sq ft 101913 sf 7048 sf 94865 sf Other, please specify in the comment box below (sq ft 11 New infiltrating permeable pavement on subdivided lots (sq ft 12 New infiltrating permeable pavement outside of subdivided lots (sq ft 13 Exisitng BUA that will remain (not subject to permittin sq ft _ 14 Existing BUA that is already permitted (sq ft 15 Existing BUA that will be removed (sq ft 16 Percent BUA 49% 76% 81% 17 Desi n storm inches 1 in 1 in 18 Desi n volume of SCM cu ft 45874 cf 13124 of 19 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the draina a areas : WET POND III 1�Drainage area number A2 B1 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 Does the SCM have retaining walls, gabion walls or other engineered 6 side slopes? No No Are the inlets, outlets, and receiving stream protected from erosion 7 (10-year storm)? Yes Yes Is there an overflow or bypass for inflow volume in excess of the 8 design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? If the SCM is on a single family lot, does (will?) the plat comply with 13 General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes an 18 Method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes Elevation of the excavated main pool depth (bottom of sediment 20 removal) (fmsl) 1196.00 1203.50 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 1197.00 1204.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 1201.00 1210.00 23 Elevation of the permanent pool (fmsl) 1201.50 1210.50 24 Elevation of the top of the vegetated shelf (fmsl) 1202.00 1211.00 25 Elevation of the temporary pool (fmsl) 1203.10 1212.25 26 Surface area of the main permanent pool (square feet) 21548.00 5701.00 27 Volume of the main permanent pool (cubic feet) 71664 cf 18510 cf 30� If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 11876 cf 2940 cf 33 Is this 15-20% of the volume in the main pool? Yes Yes 34 Clean -out depth for forebay (inches) 54 in 51 in 35 Design volume of SCM (cu ft) 45874 cf 13124 cl 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 3.5 in 1.5 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.4 3.6 Are the inlet(s) and outlet located in a manner that avoids short- 41 circuiting? Yes Yes 42 Are berms or baffles provided to improve the flow path? No No 43 Depth of forebay at entrance (inches) 66 in 60 in 44 Depth of forebay at exit (inches) 60 in 57 in 45 Does water flow out of the forebav in a non -erosive manner? Yes Yes Does the orifice drawdown from below the top surface of the 48 permanent pool? Yes Yes Does the pond minimize impacts to the receiving channel from the 1 49 yr, 24-hr storm? Yes Yes Are fountains proposed? (If Y, please provide documentation that 50 MDC(9) is met.) No No 511 Is a trash rack or other device provided to protect the outlet system? I Yes Yes )ITIONAL INFORMATION Please use t„Is s ace to rovide an additional information about the p p Y 55 wet pond(s): ;el is state owned land, therefore no drainage easement is required. Wet Pond 1 10:06 AM 8/25/2021