From:Williams, Paul C
Sent:Thursday, June 17, 2021 1:51 PM
To:Barnes, Kyle W CIV USARMY CESAW (USA)
Cc:Ward, Garcy
Subject:RE: \[External\] SAW-2019-00428 (NCDOT R2582A US158 Northampton)
Attachments:R-2582A Wetland Impact Summary Sheet_2021.06.17.pdf; Project Submittal Interim
Form.pdf; R-2582A Wetland Impact Summary Sheet.pdf
Working on sorting the mitigation out on the latest modifications, and just found a mistake on my submittal this
morning. The narrative included an additional 0.01 acres of mech. clearing in wetlands and a reduction of 0.03
acres of permanent fill in wetlands. The revisions actually reduced the mech. clearing 0.02 acres and the permanent fill
in wetlands 0.04 acres at Site 8. Sorry for the confusion, and I’ll update the request on Laserfiche in the near future.
As for the mitigation, after looking at the original permit application, the stream impacts for Site 7 originally didn’t
require mitigation. So I’m assuming the recent stream impacts from the channel relocations will not require
mitigation. As for Site 8, since the “new” stream impacts are less than 300 linear feet, the stream impacts there
shouldn’t require additional mitigation. The wetland impacts at Site 8 were reduced by 0.04 acres of perm. fill and 0.02
acres of mech. clearing. Those numbers have been rounded, so I believe wetland impacts that require mitigation should
be reduced by 0.053 acres.
Before I send anything to DMS to reflect any changes, do you agree with the above information? Should I wait to make
any mitigation changes until the end of the project in case additional changes are made? Since it looks like NCDOT has a
little bit of “credit” at this time, I’d like to leave the mitigation alone until the end of the project.
Attached are the latest impact summary, the original impact summary, and the latest submittal.
Thanks,
Paul C. Williams, Jr.
Division Environmental Officer
Division One
NC Department of Transportation
(252) 482-1861 office
(252) 333-9812 mobile
(252) 482-8722 fax
pcwilliams2@ncdot.gov
113 Airport Dr.
Suite 100
Edenton, NC 27932
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
1
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
From: NCDOT_REG <NCDOT_REG@usace.army.mil>
Sent: Thursday, June 17, 2021 11:12 AM
To: Williams, Paul C <pcwilliams2@ncdot.gov>
Cc: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Matthews, Monte K CIV USARMY
CESAW (USA) <Monte.K.Matthews@usace.army.mil>
Subject: \[External\] SAW-2019-00428 (NCDOT R2582A US158 Northampton)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good Morning,
We have received Modification/New Project with Existing ID for the above project and forwarded it to Mr.
Kyle Barnes for further processing
Thank you,
Josephine Schaffer
2
Project Submittal Interim Form
NORTH CAROLINA
Ertrlrcnmertrcl Qua( y
Updated September 4, 2020
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type:*
f For the Record Only (Courtesy Copy)
r New Project
C' Modification/New Project with Existing ID
f More Information Response
✓ Other Agency Comments
✓ Pre -Application Submittal
✓ Re-Issuance\Renewal Request
C- Stream or Buffer Appeal
Pre -Filing Meeting Information
Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not
be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in
accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project
proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section
121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was
submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read
more information on when this form is needed prior to application submission or here to view the form.
Attach documentation of Pre -Filing Meeting Request here:* Onsite
Meeting - 102.9..
5.5.2021.pdf
Date for Meeting Request* 5/5/2021
ID# Version
Project Contact Information
Name: Paul Williams
Wio is submitting the information?
Email Address:*
pcwilliams2@ncdot.gov
Project Information
Existing ID #:* Existing Version:*
20190230 5
20170001 (no dashes) 1
Project Name:*
US 158 Widening/ Improvements ( R-2582A)
Is this a public transportation project?*
(' Yes
✓ No
Is this a DOT project?*
( Yes
✓ No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?*
✓ Yes t: No C' Unknown
TIP#:
R-2582A
County (ies) *
Northampton
WBS#:
34472.1.4
(Applies to DOT projects only)
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach docunent
R-2582A Hyd_Permit_psh_22_06.17.2021.pdf
R-2582A Wetland Impact Summary
Sh eet_2021.06.17. pdf
Site 7 on Sheet 31 from R2582A_Permit Drawings -
Stream Relocation Modification - 06.11.2021.pdf
Only pa or krrz files are accepted.
Describe the attachments or add comments:
3.67MB
129.07KB
904.53KB
A secondary stream at Site 8 will be impacted by the project. NCDOT proposes to impact the stream with a
54" RCP. To minimize additional wetland impacts, rock plating and toe protection will be used on 2:1 fill slopes
on the RCP and fill slope along the secondary stream. This revision at Site 8 will result in an additional 116
linear feet of permanent stream impacts, 16 linear feet of temp. stream impacts, 0.01 acres of perm. surface
water impacts, and 0.01 acres of mech. clearing in wetlands. The revision will also result in a reduction of 0.03
acres of permanent fill in wetlands. Depicted in attached revised permit drawing.
Additionally, the stream at Site 7 requires additional impacts for stream relocation and stream stabilization.
Riprap stabilization for the main and secondary channels will result in an additional 41 linear feet of perm.
stream impact. Depicted in attached revised permit drawing.
* By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to
the best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:*
Submittal Date: Is filled in automatically once subrritted.
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS
SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 34+78 to 42+09
36" RCP -III / Roadway Fill
0.38
0.01
< 0.01
101
10
2
-L- 81+96 to 85+94
Triple 9 X 9 RCBC / Roadway Fill
0.03
0.01
0.03
0.14
0.01
226
35
3
-L- 92+72 to 96+17
Roadway Fill
0.17
< 0.01
0.04
4
-L- 138+79 to 144+44
42" RCP -III / Roadway Fill
2.10
0.28
0.01
< 0.01
252
21
5
-L- 186+64 to 194+68
Roadway Fill
3.33
0.25
6
-L- 201+68 to 205+06
Double 48" RCP -III / Roadway Fill
3.37
0.08
0.12
0.09
< 0.01
826
9
7
-L- 248+36 to 251+62
84" RCP -IV / Roadway Fill
1.26
0.02
0.07
0.04
< 0.01
480
63
8
-L- 282+72 to 287+92
Triple 8 X 7 RCBC / Roadway Fill
0.18
0.10
0.11
< 0.01
332
29
9
-L- 381+38 to 390+97
Roadway Fill
0.64
0.19
10
-L- 409+20 to 409+39
Roadway Fill
< 0.01
11
-L- 420+24 to 421+45
Roadway Fill
< 0.01
< 0.01
12
-L- 150+32 to 151+20
42" RCP -III / Roadway Fill
0.02
< 0.01
209
20
TOTALS*:
11.45
0.11
1.09
0.43
0.03
2426
187
0
*Rounded totals are sum of actual impacts
NOTES:
Site 6 includes 0.465 acres of fill impact due to the total take of wetland within the proposed roadway loop.
Revised 2016 09 09
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
REVISED 03/13/2019
NORTHAMPTON COUNTY
R-2582A
34472.1.4
SHEET 53 OF 53
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS
SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 34+78 to 42+09
36" RCP -III / Roadway Fill
0.38
0.01
< 0.01
121
10
2
-L- 81+96 to 85+94
Triple 9 X 9 RCBC / Roadway Fill
0.03
0.01
0.03
0.14
0.01
226
35
3
-L- 92+72 to 96+17
Roadway Fill
0.17
0.09
< 0.01
4
-L- 138+79 to 144+44
42" RCP -III / Roadway Fill
2.10
0.28
0.01
< 0.01
252
21
5
-L- 186+64 to 194+68
Roadway Fill
3.33
0.17
0.25
6
-L- 201+68 to 205+06
Double 48" RCP -III / Roadway Fill
3.37
0.08
0.12
0.09
< 0.01
826
9
7
-L- 248+36 to 251+62
84" RCP -IV / Roadway Fill
1.26
0.01
0.08
0.04
< 0.01
549
35
8
-L- 282+72 to 287+92
Triple 8 X 7 RCBC / Roadway Fill
0.14
0.08
0.13
< 0.01
478
45
9
-L- 381+38 to 390+97
Roadway Fill
0.64
0.19
10
-L- 409+20 to 409+39
Roadway Fill
< 0.01
11
-L- 420+24 to 421+45
Roadway Fill
< 0.01
< 0.01
12
-L- 150+32 to 151+20
42" RCP -III / Roadway Fill
0.02
< 0.01
209
20
TOTALS*:
11.42
0.26
0.11
1.05
0.44
0.03
2661
175
0
*Rounded totals are sum of actual impacts
NOTES:
Site 6 includes 0.465 acres of fill impact due to the total take of wetland within the proposed roadway loop.
Site 3 includes additional 0.09 acres of temp. fill and remove 0.04 of Mechanized Clearing
Site 2 includes 20 linear feet of additional channel impacts from bank stabilization
Site 8 : additional 30 feet bank stabilization, additional 116 feet of perm. and 16 feet temp. stream impacts from new culvert
Site 5 includes additional 0.17 acres of temp. wetland fill
Site 7 includes additional 62 linear feet of stream impact
Revised 2021 06 17
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
06/17/2021
NORTHAMPTON COUNTY
R-2582A
34472.1.4