HomeMy WebLinkAbout20190230 Ver 6_More Info Received_20210617 Carpenter,Kristi From:Williams, Paul C Sent:Thursday, June 17, 2021 1:51 PM To:Barnes, Kyle W CIV USARMY CESAW (USA) Cc:Ward, Garcy Subject:RE: \[External\] SAW-2019-00428 (NCDOT R2582A US158 Northampton) Attachments:R-2582A Wetland Impact Summary Sheet_2021.06.17.pdf; Project Submittal Interim Form.pdf; R-2582A Wetland Impact Summary Sheet.pdf Working on sorting the mitigation out on the latest modifications, and just found a mistake on my submittal this morning. The narrative included an additional 0.01 acres of mech. clearing in wetlands and a reduction of 0.03 acres of permanent fill in wetlands. The revisions actually reduced the mech. clearing 0.02 acres and the permanent fill in wetlands 0.04 acres at Site 8. Sorry for the confusion, and I’ll update the request on Laserfiche in the near future. As for the mitigation, after looking at the original permit application, the stream impacts for Site 7 originally didn’t require mitigation. So I’m assuming the recent stream impacts from the channel relocations will not require mitigation. As for Site 8, since the “new” stream impacts are less than 300 linear feet, the stream impacts there shouldn’t require additional mitigation. The wetland impacts at Site 8 were reduced by 0.04 acres of perm. fill and 0.02 acres of mech. clearing. Those numbers have been rounded, so I believe wetland impacts that require mitigation should be reduced by 0.053 acres. Before I send anything to DMS to reflect any changes, do you agree with the above information? Should I wait to make any mitigation changes until the end of the project in case additional changes are made? Since it looks like NCDOT has a little bit of “credit” at this time, I’d like to leave the mitigation alone until the end of the project. Attached are the latest impact summary, the original impact summary, and the latest submittal. Thanks, Paul C. Williams, Jr. Division Environmental Officer Division One NC Department of Transportation (252) 482-1861 office (252) 333-9812 mobile (252) 482-8722 fax pcwilliams2@ncdot.gov 113 Airport Dr. Suite 100 Edenton, NC 27932 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: NCDOT_REG <NCDOT_REG@usace.army.mil> Sent: Thursday, June 17, 2021 11:12 AM To: Williams, Paul C <pcwilliams2@ncdot.gov> Cc: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil> Subject: \[External\] SAW-2019-00428 (NCDOT R2582A US158 Northampton) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Morning, We have received Modification/New Project with Existing ID for the above project and forwarded it to Mr. Kyle Barnes for further processing Thank you, Josephine Schaffer 2 Project Submittal Interim Form NORTH CAROLINA Ertrlrcnmertrcl Qua( y Updated September 4, 2020 Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* f For the Record Only (Courtesy Copy) r New Project C' Modification/New Project with Existing ID f More Information Response ✓ Other Agency Comments ✓ Pre -Application Submittal ✓ Re-Issuance\Renewal Request C- Stream or Buffer Appeal Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here:* Onsite Meeting - 102.9.. 5.5.2021.pdf Date for Meeting Request* 5/5/2021 ID# Version Project Contact Information Name: Paul Williams Wio is submitting the information? Email Address:* pcwilliams2@ncdot.gov Project Information Existing ID #:* Existing Version:* 20190230 5 20170001 (no dashes) 1 Project Name:* US 158 Widening/ Improvements ( R-2582A) Is this a public transportation project?* (' Yes ✓ No Is this a DOT project?* ( Yes ✓ No Is the project located within a NC DCM Area of Environmental Concern (AEC)?* ✓ Yes t: No C' Unknown TIP#: R-2582A County (ies) * Northampton WBS#: 34472.1.4 (Applies to DOT projects only) Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docunent R-2582A Hyd_Permit_psh_22_06.17.2021.pdf R-2582A Wetland Impact Summary Sh eet_2021.06.17. pdf Site 7 on Sheet 31 from R2582A_Permit Drawings - Stream Relocation Modification - 06.11.2021.pdf Only pa or krrz files are accepted. Describe the attachments or add comments: 3.67MB 129.07KB 904.53KB A secondary stream at Site 8 will be impacted by the project. NCDOT proposes to impact the stream with a 54" RCP. To minimize additional wetland impacts, rock plating and toe protection will be used on 2:1 fill slopes on the RCP and fill slope along the secondary stream. This revision at Site 8 will result in an additional 116 linear feet of permanent stream impacts, 16 linear feet of temp. stream impacts, 0.01 acres of perm. surface water impacts, and 0.01 acres of mech. clearing in wetlands. The revision will also result in a reduction of 0.03 acres of permanent fill in wetlands. Depicted in attached revised permit drawing. Additionally, the stream at Site 7 requires additional impacts for stream relocation and stream stabilization. Riprap stabilization for the main and secondary channels will result in an additional 41 linear feet of perm. stream impact. Depicted in attached revised permit drawing. * By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature:* Submittal Date: Is filled in automatically once subrritted. WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 34+78 to 42+09 36" RCP -III / Roadway Fill 0.38 0.01 < 0.01 101 10 2 -L- 81+96 to 85+94 Triple 9 X 9 RCBC / Roadway Fill 0.03 0.01 0.03 0.14 0.01 226 35 3 -L- 92+72 to 96+17 Roadway Fill 0.17 < 0.01 0.04 4 -L- 138+79 to 144+44 42" RCP -III / Roadway Fill 2.10 0.28 0.01 < 0.01 252 21 5 -L- 186+64 to 194+68 Roadway Fill 3.33 0.25 6 -L- 201+68 to 205+06 Double 48" RCP -III / Roadway Fill 3.37 0.08 0.12 0.09 < 0.01 826 9 7 -L- 248+36 to 251+62 84" RCP -IV / Roadway Fill 1.26 0.02 0.07 0.04 < 0.01 480 63 8 -L- 282+72 to 287+92 Triple 8 X 7 RCBC / Roadway Fill 0.18 0.10 0.11 < 0.01 332 29 9 -L- 381+38 to 390+97 Roadway Fill 0.64 0.19 10 -L- 409+20 to 409+39 Roadway Fill < 0.01 11 -L- 420+24 to 421+45 Roadway Fill < 0.01 < 0.01 12 -L- 150+32 to 151+20 42" RCP -III / Roadway Fill 0.02 < 0.01 209 20 TOTALS*: 11.45 0.11 1.09 0.43 0.03 2426 187 0 *Rounded totals are sum of actual impacts NOTES: Site 6 includes 0.465 acres of fill impact due to the total take of wetland within the proposed roadway loop. Revised 2016 09 09 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS REVISED 03/13/2019 NORTHAMPTON COUNTY R-2582A 34472.1.4 SHEET 53 OF 53 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 34+78 to 42+09 36" RCP -III / Roadway Fill 0.38 0.01 < 0.01 121 10 2 -L- 81+96 to 85+94 Triple 9 X 9 RCBC / Roadway Fill 0.03 0.01 0.03 0.14 0.01 226 35 3 -L- 92+72 to 96+17 Roadway Fill 0.17 0.09 < 0.01 4 -L- 138+79 to 144+44 42" RCP -III / Roadway Fill 2.10 0.28 0.01 < 0.01 252 21 5 -L- 186+64 to 194+68 Roadway Fill 3.33 0.17 0.25 6 -L- 201+68 to 205+06 Double 48" RCP -III / Roadway Fill 3.37 0.08 0.12 0.09 < 0.01 826 9 7 -L- 248+36 to 251+62 84" RCP -IV / Roadway Fill 1.26 0.01 0.08 0.04 < 0.01 549 35 8 -L- 282+72 to 287+92 Triple 8 X 7 RCBC / Roadway Fill 0.14 0.08 0.13 < 0.01 478 45 9 -L- 381+38 to 390+97 Roadway Fill 0.64 0.19 10 -L- 409+20 to 409+39 Roadway Fill < 0.01 11 -L- 420+24 to 421+45 Roadway Fill < 0.01 < 0.01 12 -L- 150+32 to 151+20 42" RCP -III / Roadway Fill 0.02 < 0.01 209 20 TOTALS*: 11.42 0.26 0.11 1.05 0.44 0.03 2661 175 0 *Rounded totals are sum of actual impacts NOTES: Site 6 includes 0.465 acres of fill impact due to the total take of wetland within the proposed roadway loop. Site 3 includes additional 0.09 acres of temp. fill and remove 0.04 of Mechanized Clearing Site 2 includes 20 linear feet of additional channel impacts from bank stabilization Site 8 : additional 30 feet bank stabilization, additional 116 feet of perm. and 16 feet temp. stream impacts from new culvert Site 5 includes additional 0.17 acres of temp. wetland fill Site 7 includes additional 62 linear feet of stream impact Revised 2021 06 17 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 06/17/2021 NORTHAMPTON COUNTY R-2582A 34472.1.4 SHEET 53 OF 53