Loading...
HomeMy WebLinkAbout20111008 Ver 1_Certification of Completion_20130702• CHARL01'I'E. CHARLOTTE - MECKLENBURG UTILITY DEPARTMENT June 27, 2013 401/Wetlands Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 -1650 SUBJECT: West Blvd Water Main Extension To Whom It May Concern: Enclosed is the Certificate of Completion for the above project. Please call me at 704 - 391 -5145 if you have questions. Sincerely, CHARLOTTE - MECKLENBURG UTILITY DEPARTMENT Amy R. Vershel, P.E. Senior Engineering Project Manager Cc: File II - Io-C)g @ ri_' 9w LPM L;1 r= Do JUL '22013 CHARLOTTE - MECKLENBURG UTILITY DEPARTMENT www.cmutilities.com Engineering 5100 Brookshire Boulevard Charlotte, NC 28216 PH: 704/399 -2221 FAX:704/398 -9180 DWQ Project No. Applicant: Project Name: a Certificate of Completion County: they C- A f 0 Date of Issuance of 401 Water Quality Certification: l� Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 /Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was ed in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: 1/ Date: Xzk 1 -e4r Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: g 00 If U If this project was designed by a Certified Professional JUL - 2 2013 1, , as a duly registered Professional NR _ TY (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carol Bmrrsch authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: