Loading...
HomeMy WebLinkAboutNC0072877_Inspection_20070521• v4 n.1, MichaelF. Easley,Governor q C' William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources H May 21, 2007 Mayor Gerald W. Darden Town of Newton Grove PO Box 4 Newton Grove NC 28366 SUBJECT: May 17, 2007 Compliance Evaluation Inspection Town of Newton Grove Newton Grove WWTP Permit No: NC0072877 Sampson County Dear Mayor Darden: Alan W. Klimek, P.E., Director Division of Water Quality Enclosed please find a copy of the Compliance Evaluation Inspection Report from the inspection conducted on May 17, 2007. The time and assistance given by Mr. James Edward Ballance, ORC, is greatly appreciated. The facility was found to be in Compliance with permit NC0072877. Please refer to the enclosed inspection report for additional observations and comments. If you or your staff has any questions, please call me at 910-433-3329. Sincerely, Michael Lawyer Environmental Specialist cc: James Edward Ballance,.ORC FRO -Surface Water Protection Water Quality Central Files NorthCarolina Naturally North Carolina Division of Water Quality 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Phone (910) 433-3300 Customer Service Internet: www.ncwaterquality.org Fax (910) 486-0707 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper . United States Environmental Protection Agency EPA Washington, D.C. 20460 !-1 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection 1 'NI 2 151 31 N00072877 111 121 07/05/17 117 Type Inspector Fac Type 181 CI 191 SI 20III Remarks 211III1I1IIIII I1IIIIIIIIIIIIII11I11I1II111IIIII1166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 169 70I 31 711 I 721 NI 73I I 174 751 I I I I I I 180 l Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Newton Grove WWTP Pork Chop Hill Rd Newton Grove NC 28366 Entry Time/Date 09:50 AM 07/05/17 Permit Effective Date 07/02/01 Exit Time/Date 12:20 PM 07/05/17 Permit Expiration Date 12/01/31 Name(s) of Onsite Representative(s)/fitles(s)/Phone and Fax Number(s) /// James Edward Ballance/ORC/910-591-7871/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Gerald Darden,PO Box 4 Newton Grove NC 28366/14ay0r/910-594-0827/9105940827 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement • Operations & Maintenance • Records/Reports Self -Monitoring Program • Sludge Handling Disposal ■ Facility Site Review ■ Effluent/Receiving Waters . Laboratory ' Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) off Inspector(s) Agency/Office/Phone and Fax Numbers /Date Mike Lawyer !����1 FRO WQ//910-433-3300. ,3 Ext2.1/ �/ Z7 ��( !J 111 33Z`i Signature of ManagemitQ A Reviewer Agency/Office/Phone and Fax Numbers Da ; e.n s /!a7 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page # 1 31 NPDES NC0072877 11 121 yr/mo/day 07/05/17 17 Inspection Type 18I CI (cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Inspection conducted with the facility's ORC, Mr. Jim Ballance. Laboratory reports and DMRs were reviewed for accuracy and completeness for the following months; March, June, September and December 2006 as well as February 2007. No transcription errors were noted. Since the previous compliance inspection, one limit violation occurred in September 2006 for exceeding the weekly limit for BOD. At the time of inspection, facility appeared to be very well operated and maintained. All treatment units have adequate capacity for the current flow and the plant is already designed to handle future growth. This facility utilizes UV for disinfection, but is not equipped with a back-up system. It is strongly advised that the facility pursue its options for installing some form of back-up disinfection system should the UV system ever fail to operate. Page # 2 Permit: NC0072877 Owner - Facility: Newton Grove WWfP Inspection Date: 05/17/2007 Inspection Type: Compliance Evaluation Permit (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: Laboratory Are field parameters performed by certified personnel or laboratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Comment: Facility is certified for field parameters and uses Vann Laboratories in Wallace, NC for all other testing needs. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? • n n 11 Is all required information readily available, complete and current? • n n n Are all records maintained for 3•years (lab. reg. required 5 years)? ■ n n n Are analytical results consistent with data reported on DMRs? ■ n n n Is the chain -of -custody complete? • n ❑ n Dates, times and location of sampling ■ Name of individual performing the sampling ■ Results of analysis and calibration ■ Dates of analysis ■ Name of person performing analyses ■ Transported COCs ■ Are DMRs complete: do they include all permit parameters? • I] ❑El Has the facility submitted its annual compliance report to users and DWQ? • n ❑ n (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? n n ■ n Page # 3 Yes No NA NE n n■n ■ nnn n■nn ■ nn_n ■ nnn Yes No NA NE ■ nnn ■ nnn ■ nnn n nn■ nnn■ n nn■ Permit:, NC0072877 Owner - Facility: Newton Grove WWTP Inspection Date: 05/17/2007 Inspection Type: Compliance Evaluation Record Keeping Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade Tess or greater than the facility classification? Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Comment: Operations & Maintenance Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge 0 0 Judge, and other that are applicable? Comment: Bar Screens Type 'of bar screen a.Manual b.Mechanical Are the bars adequately screening debris? Is the screen free of excessive debris? . Is disposal of screening in compliance? Is the unit in good condition? Comment: Influent Sampling Yes No NA NE # Is composite sampling flow proportional? ❑ n ■ n Is sample collected above side streams? ■ n n n' Is proper volume collected? nnn ■ Is the tubing clean? ■ n n n Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? n ❑ ❑ ■ Is sampling performed according to the permit? ■ ❑ n Comment: Equalization Basins Yes No NA NE Is the basin aerated?. Yes No NA NE ■ nnn ■ nnn ■ 'nnn ■ nnn ■ .nnn Yes No NA NE ■ 'nnn no Yes No .NA NE n ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn Page # 4 Permit: NC0072877 Owner - Facility: Newton Grove WWTP Inspection Date: 05/17/2007 Inspection Type: Compliance Evaluation Equalization Basins Is the basin free of bypass lines or structures to the natural environment? Is the basin free of excessive grease? Are all pumps present? Are all pumps operable? Are float controls operable? Are audible and visual alarms operable? # Is basin size/volume adequate? Comment: Oxidation Ditches Are the aerators operational? Are the aerators free of excessive solids build up? # Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable? Are settleometer results acceptable. (> 30 minutes)? Is the DO level acceptable?(1.0 to 3.0 mg/I) Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes) Comment: Based on,the DMRs, the DO level in the oxidation ditch measures around 1-2 mg/L. Aerobic Digester Is the capacity adequate? Is the mixing adequate? Is the site free of excessive foaming in the tank? # Is the odor acceptable? # Is tankage available for properly waste sludge? Comment: Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Yes No NA NE ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn n nn■ ■ nnn Yes No NA NE ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn n nn■ ■ nnn n nn■ Yes No NA NE ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn Yes No NA NE ■ nnn ■ nnn ■ nnn Page # 5 1 Permit: NC0072877 Owner - Facility: Newton Grove wwTP Inspection Date: 05/17/2007. Inspection Type: Compliance Evaluation Secondary Clarifier. Yes No NA NE Is the site free of weir blockage? E n n n Is the site free of evidence of short-circuiting? N. n n n Is scum removal adequate? ■ , n n .n Is the site free of excessive floating sludge? • ❑ .n ,n Is the drive unit operational? ■ Q n n Is the return rate acceptable (low turbulence)? • n n 'n Is the overflow clear of excessive solids/pin floc? ■, n n n Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth) fl n n . Comment: Clarifier depth is:10 feet and the sludge blanket level at time of inspection was measured at about 3 feet. Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? • n n ❑ Is flow meter calibrated annually? • ❑ ❑ n Is' the flow meter operational? s n n (If units are separated) Does the chart recorder match the flow meter? fl n ■ n Comment: Facility is equipped with a digital flow meter, which was calibrated last in March 2007. Disinfection - UV Yes No NA NE Are extra UV bulbs available on site? ■ n ❑ n Are UV bulbs clean? n n n Is UV intensity adequate? • fl n n Is transmittance at or above designed level? n n n ■ Is there a backup system on site? n ■ n n Is effluent clear and free of solids? • ❑ 'n n Comment: Facility is not equipped with a backup disinfection system. Effluent Sampling. Yes No NA NE • Is composite sampling flow proportional? n 0 ■ n Is sample collected below all treatment units? - • n. n n Is proper volume collected? n .❑ n ■ Is the tubing clean? • n n n 1 Page # 6 Permit: NC0072877 Owner - Facility: Newton Grove VWVTP Inspection Date: 05/17/2007 Inspection Type: Compliance Evaluation Effluent Sampling Yes No NA NE Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? n n n ■ Is the facility sampling performed as required by the permit (frequency, sampling type representative)? ■ n n n Comment: Upstream / Downstream Sampling Yes No NA NE Is the facility sampling performed as required by the permit (frequency, sampling type, and sampling location)? • n n n Comment: Standby Power Yes No NA NE Is automatically activated standby power available? n n n Is the generator tested by interrupting primary power source? ■ n n n Is the generator tested under load? ■ n n n Was generator tested & operational during the inspection? n n n Do the generator(s) have adequate capacity to operate the entire wastewater site? ■ n n n Is there an emergency agreement with a fuel vendor for extended run on back-up power? Finn. Is the generator fuel level monitored? ■ n n n Comment: Page # 7