HomeMy WebLinkAboutNC0072877_Inspection_20070521•
v4
n.1, MichaelF. Easley,Governor
q
C' William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
H
May 21, 2007
Mayor Gerald W. Darden
Town of Newton Grove
PO Box 4
Newton Grove NC 28366
SUBJECT: May 17, 2007 Compliance Evaluation Inspection
Town of Newton Grove
Newton Grove WWTP
Permit No: NC0072877
Sampson County
Dear Mayor Darden:
Alan W. Klimek, P.E., Director
Division of Water Quality
Enclosed please find a copy of the Compliance Evaluation Inspection Report from the inspection
conducted on May 17, 2007. The time and assistance given by Mr. James Edward Ballance, ORC, is
greatly appreciated. The facility was found to be in Compliance with permit NC0072877.
Please refer to the enclosed inspection report for additional observations and comments. If you or your
staff has any questions, please call me at 910-433-3329.
Sincerely,
Michael Lawyer
Environmental Specialist
cc: James Edward Ballance,.ORC
FRO -Surface Water Protection
Water Quality Central Files
NorthCarolina
Naturally
North Carolina Division of Water Quality 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Phone (910) 433-3300 Customer Service
Internet: www.ncwaterquality.org Fax (910) 486-0707 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
. United States Environmental Protection Agency
EPA Washington, D.C. 20460
!-1 Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 'NI 2 151 31 N00072877 111 121 07/05/17 117
Type Inspector Fac Type
181 CI 191 SI 20III
Remarks
211III1I1IIIII I1IIIIIIIIIIIIII11I11I1II111IIIII1166
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 169 70I 31 711 I 721 NI 73I I 174 751 I I I I I I 180
l
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Newton Grove WWTP
Pork Chop Hill Rd
Newton Grove NC 28366
Entry Time/Date
09:50 AM 07/05/17
Permit Effective Date
07/02/01
Exit Time/Date
12:20 PM 07/05/17
Permit Expiration Date
12/01/31
Name(s) of Onsite Representative(s)/fitles(s)/Phone and Fax Number(s)
///
James Edward Ballance/ORC/910-591-7871/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Gerald Darden,PO Box 4 Newton Grove NC
28366/14ay0r/910-594-0827/9105940827 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement • Operations & Maintenance • Records/Reports
Self -Monitoring Program • Sludge Handling Disposal ■ Facility Site Review ■ Effluent/Receiving Waters
. Laboratory '
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) off Inspector(s) Agency/Office/Phone and Fax Numbers /Date
Mike Lawyer !����1 FRO WQ//910-433-3300. ,3 Ext2.1/ �/ Z7
��( !J 111
33Z`i
Signature of ManagemitQ A Reviewer Agency/Office/Phone and Fax Numbers Da
; e.n s /!a7
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page # 1
31
NPDES
NC0072877
11 121
yr/mo/day
07/05/17
17
Inspection Type
18I CI
(cont.) 1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Inspection conducted with the facility's ORC, Mr. Jim Ballance. Laboratory reports and DMRs were
reviewed for accuracy and completeness for the following months; March, June, September and December
2006 as well as February 2007. No transcription errors were noted. Since the previous compliance
inspection, one limit violation occurred in September 2006 for exceeding the weekly limit for BOD. At the
time of inspection, facility appeared to be very well operated and maintained. All treatment units have
adequate capacity for the current flow and the plant is already designed to handle future growth. This
facility utilizes UV for disinfection, but is not equipped with a back-up system. It is strongly advised that the
facility pursue its options for installing some form of back-up disinfection system should the UV system ever
fail to operate.
Page # 2
Permit: NC0072877 Owner - Facility: Newton Grove WWfP
Inspection Date: 05/17/2007 Inspection Type: Compliance Evaluation
Permit
(If the present permit expires in 6 months or less). Has the permittee submitted a new application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Laboratory
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Comment: Facility is certified for field parameters and uses Vann Laboratories in
Wallace, NC for all other testing needs.
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? • n n 11
Is all required information readily available, complete and current? • n n n
Are all records maintained for 3•years (lab. reg. required 5 years)? ■ n n n
Are analytical results consistent with data reported on DMRs? ■ n n n
Is the chain -of -custody complete? • n ❑ n
Dates, times and location of sampling ■
Name of individual performing the sampling ■
Results of analysis and calibration ■
Dates of analysis ■
Name of person performing analyses ■
Transported COCs ■
Are DMRs complete: do they include all permit parameters? • I] ❑El
Has the facility submitted its annual compliance report to users and DWQ? • n ❑ n
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? n n ■ n
Page # 3
Yes No NA NE
n n■n
■ nnn
n■nn
■ nn_n
■ nnn
Yes No NA NE
■ nnn
■ nnn
■ nnn
n nn■
nnn■
n nn■
Permit:, NC0072877 Owner - Facility: Newton Grove WWTP
Inspection Date: 05/17/2007 Inspection Type: Compliance Evaluation
Record Keeping
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade Tess or greater than the facility classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Comment:
Operations & Maintenance
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge 0 0
Judge, and other that are applicable?
Comment:
Bar Screens
Type 'of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
. Is disposal of screening in compliance?
Is the unit in good condition?
Comment:
Influent Sampling Yes No NA NE
# Is composite sampling flow proportional? ❑ n ■ n
Is sample collected above side streams? ■ n n n'
Is proper volume collected? nnn ■
Is the tubing clean? ■ n n n
Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? n ❑ ❑ ■
Is sampling performed according to the permit? ■ ❑ n
Comment:
Equalization Basins Yes No NA NE
Is the basin aerated?.
Yes No NA NE
■ nnn
■ nnn
■ 'nnn
■ nnn
■ .nnn
Yes No NA NE
■ 'nnn
no
Yes No .NA NE
n
■ nnn
■ nnn
■ nnn
■ nnn
■ nnn
Page # 4
Permit: NC0072877 Owner - Facility: Newton Grove WWTP
Inspection Date: 05/17/2007 Inspection Type: Compliance Evaluation
Equalization Basins
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
Comment:
Oxidation Ditches
Are the aerators operational?
Are the aerators free of excessive solids build up?
# Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Are settleometer results acceptable. (> 30 minutes)?
Is the DO level acceptable?(1.0 to 3.0 mg/I)
Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes)
Comment: Based on,the DMRs, the DO level in the oxidation ditch measures around
1-2 mg/L.
Aerobic Digester
Is the capacity adequate?
Is the mixing adequate?
Is the site free of excessive foaming in the tank?
# Is the odor acceptable?
# Is tankage available for properly waste sludge?
Comment:
Secondary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Yes No NA NE
■ nnn
■ nnn
■ nnn
■ nnn
■ nnn
n nn■
■ nnn
Yes No NA NE
■ nnn
■ nnn
■ nnn
■ nnn
■ nnn
n nn■
■ nnn
n nn■
Yes No NA NE
■ nnn
■ nnn
■ nnn
■ nnn
■ nnn
Yes No NA NE
■ nnn
■ nnn
■ nnn
Page # 5
1
Permit: NC0072877 Owner - Facility: Newton Grove wwTP
Inspection Date: 05/17/2007. Inspection Type: Compliance Evaluation
Secondary Clarifier. Yes No NA NE
Is the site free of weir blockage? E n n n
Is the site free of evidence of short-circuiting? N. n n n
Is scum removal adequate? ■ , n n .n
Is the site free of excessive floating sludge? • ❑ .n ,n
Is the drive unit operational? ■ Q n n
Is the return rate acceptable (low turbulence)? • n n 'n
Is the overflow clear of excessive solids/pin floc? ■, n n n
Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth) fl n n
. Comment: Clarifier depth is:10 feet and the sludge blanket level at time of inspection
was measured at about 3 feet.
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting? • n n ❑
Is flow meter calibrated annually? • ❑ ❑ n
Is' the flow meter operational? s n n
(If units are separated) Does the chart recorder match the flow meter? fl n ■ n
Comment: Facility is equipped with a digital flow meter, which was calibrated last in
March 2007.
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site? ■ n ❑ n
Are UV bulbs clean? n n n
Is UV intensity adequate? • fl n n
Is transmittance at or above designed level? n n n ■
Is there a backup system on site? n ■ n n
Is effluent clear and free of solids? • ❑ 'n n
Comment: Facility is not equipped with a backup disinfection system.
Effluent Sampling. Yes No NA NE
• Is composite sampling flow proportional? n 0 ■ n
Is sample collected below all treatment units? - • n. n n
Is proper volume collected? n .❑ n ■
Is the tubing clean? • n n n
1
Page # 6
Permit: NC0072877 Owner - Facility: Newton Grove VWVTP
Inspection Date: 05/17/2007 Inspection Type: Compliance Evaluation
Effluent Sampling Yes No NA NE
Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? n n n ■
Is the facility sampling performed as required by the permit (frequency, sampling type representative)? ■ n n n
Comment:
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, and sampling location)? • n n n
Comment:
Standby Power Yes No NA NE
Is automatically activated standby power available? n n n
Is the generator tested by interrupting primary power source? ■ n n n
Is the generator tested under load? ■ n n n
Was generator tested & operational during the inspection? n n n
Do the generator(s) have adequate capacity to operate the entire wastewater site? ■ n n n
Is there an emergency agreement with a fuel vendor for extended run on back-up power? Finn.
Is the generator fuel level monitored? ■ n n n
Comment:
Page # 7