Loading...
HomeMy WebLinkAboutNC0072877_Inspection_20100517•4 rr NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary May 17, 2010 Gerald Darden Town of Newton Grove PO Box 4 Newton Grove NC 28366 SUBJECT: May 11, 2010 Compliance Evaluation Inspection Town of Newton Grove Newton Grove WWTP Permit No: NC0072877 Sampson County Dear Mr. Darden: Enclosed please find a copy of the Compliance Evaluation Inspection Report from the inspection conducted on May 11, 2010 by Hughie White of the Fayetteville Regional Office. Mr. Jim Ballance assisted with this inspection and his assistance was greatly appreciated. The facility was found to be in Compliance with permit NC0072877. Please refer to the enclosed inspection report for additional observations and comments. If you or your staff has any questions, please call me at 910-433-3308. cc: James Ballance, ORC Central Files (Tayetteville Files 225 Green St., Suite 714, Fayetteville, NC 28301-5043 Phone: 910-433-33001 FAX: 910-486-07071 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity \ Affirmative Action Employer Sincerely, Hughie.:Whits' Environmental Specialist One NorthCarolina Naturally United States Environmental Protection Agency E n /\ Washington, D.C. 20460 f /`1 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection 1 I NI 2 15I 31 NC0072877 111 121 10/05/11 117 Type Inspector Fac Type 181 CI 19I sl 20I II I III I III 1 I I I I I I 166 Remarks 211 III I I I I I I I I I I I I I I I I I I I I I I I I I I I Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 169 70 I I 711 I 72 I NI 731 1 174 751 1 1 1 1 1 I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Newton Grove WWTP Pork Chop Hill Rd Newton Grove NC 28366 Entry Time/Date 11:30 AM 10/05/11 Permit Effective Date 07/02/01 Exit Time/Date 01:30 PM 10/05/11 Permit Expiration Date 12/01/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// James Edward Ballance/ORC/910-591-7871/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Gerald Darden,P0 Box 4 Newton Grove NC Contacted 28366/Mayor/910-594-0827/9105940827 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement • Operations & Maintenance • Records/Reports ■ Self -Monitoring Program ■ Sludge Handling Disposal • Facility Site Review • Effluent/Receiving Waters . Laboratory Section D: Summary of Findinq/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Hughie White FRO WQ//910-433-3300 Ext.708/ 4/ 7// Q /0€4d.-*------- Signature of Management Q A��R��eviewer 11// Agency/Office/Phone and Fax Numbers Date Belinda S Henson °g�,�,t;rie&D.I 96- FRO WQ//910-433-3300 Ext.726/ 5/ 7 Jl8 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page # 1 i 31 NPDES NC0072877 111 121 yr/mo/day 10/05/11 Inspection Type 117 18I C (cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Records and log books appeared to be properly maintained. The ORC visitation log was complete and. current. Calibration records were available for review. Laboratory data was reviewed. All data that was reviewed appeared to be correct as reported on the DMR's. All parameters and sampling appear to be performed in accrodance with the permit. A copy of the permit is kept on site. The previous years annual report was available for review. All treatment units appeared to be in proper working order. The flow meter is being calibrated as required. The effluent was very clear and appeared to be free of any visible solids. Page # 2 Permit: NC0072877 Owner - Facility: Newton Grove VWVfP Inspection Date: 05/11/2010 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? ■ n n ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge ■ n n n Judge, and other that are applicable? Comment: Permit (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Yes No NA NE n ❑■n ■ nnn n n■n ■ ❑ ❑ ❑ ■ n❑n Yes No NA NE ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn n n n n n n ■ nnn ■ nnn n n■n ■ nnn ■ nnn ■ nnn ■ nnn Page # 3 Permit: NC0072877 Owner - Facility: Newton Grove VVINTP Inspection Date: 05/11/2010 Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE Facility has copy of previous year's Annual Report on file for review? ■ ❑ ❑ n Comment: Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? ■ n n n Are the receiving water free of foam other than trace amounts and other debris? ■ n ❑ n If effluent (diffuser pipes are required) are they operating properly? n n ■ ❑ Comment: Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? ■ n n n Is flow meter calibrated annually? ■ n n n Is the flow meter operational? ■ n n ❑ (If units are separated) Does the chart recorder match the flow meter? Finn. Comment: Bar Screens Yes No NA NE Type of bar screen a.Manual ■ b.Mechanical n Are the bars adequately screening debris? ■ ❑ ❑ ❑ Is the screen free of excessive debris? ■ ❑ ❑ ❑ Is disposal of screening in compliance? ■ n n ❑ Is the unit in good condition? ■ ❑ n n Comment: Equalization Basins Yes No NA NE Is the basin aerated? ■ n ❑ ❑ Is the basin free of bypass lines or structures to the natural environment? ■ n n n Is the basin free of excessive grease? • ❑ ❑ ❑ Are all pumps present? ■ ❑ n n Are all pumps operable? • ❑ ❑ 11 Are float controls operable? ■ n nn Are audible and visual alarms operable? ❑ n ngs Page # 4 Permit: NC0072877 Owner - Facility:' Newton Grove WNTP Inspection Date: 05/11/2010 Inspection Type: Compliance Evaluation Equalization Basins # Is basin size/volume adequate? Comment: Oxidation Ditches Are the aerators operational? Are the aerators free of excessive solids build up? # Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable? Are settleometer results acceptable (> 30 minutes)? Is the DO level acceptable?(1.0 to 3.0 mg/I) Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes) Comment: Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately % of the sidewall depth) Comment: Aerobic Digester Is the capacity adequate? Is the mixing adequate? Is the site free of excessive foaming in the tank? # Is the odor acceptable? Yes No NA NE •nnn Yes No NA NE ■ nnn ■ nnn ■ nnn ■ nnn n nn■ n nn■ n nn■ n nn■ Yes No NA NE ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ ❑ ❑ ❑ ■ nnn ■ nnn ■ nnn Yes No NA NE ■ nnn ■ nnn ■ nnn ■ nnn Page # 5 Permit: NC0072877 Owner - Facility: Newton Grove VWVTP Inspection Date: 05/11/2010 Inspection Type: Compliance Evaluation Aerobic Digester # Is tankage available for properly waste sludge? Comment: The waste sludge is sprayed on land adjacent to the VVVVTP.- Disinfection - UV Are extra UV bulbs available on site? Are UV bulbs clean? Is UV intensity adequate? Is transmittance at or above designed level? Is there a backup system on site? Is effluent clear and free of solids? Comment: Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Comment: The generator was not load tested during this inspection. Laboratory .Are field parameters performed by certified personnel or laboratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? • # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Comment: Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Yes No -NA NE n :n■n Yes No. NA NE ■ nnn.- ■ n.n n• ■ n'nn• nnn.. ■ nnn ■ n.nn Yes No NA NE ■ nnn ■ nnn ■ nnn n ■nn ■ nnn ■ .nnn n nnl._ Yes No NA NE ■ nnn . nnn ■ nnn: n nn■ •n.n■n n n■.n Yes No NA NE n ■nn ® nrin Page # Permit: NC0072877 Owner - Facility: Newton Grove VWVTP Inspection Date: 05/11/2010 Inspection Type: Compliance Evaluation Effluent Sampling Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment: Sampler is set to collect samples at 15 minute intervals. Upstream / Downstream Sampling Yes No NA NE ■ nnn ■ nnn nnn■ ■ nnn Yes No NA NE Is the facility sampling performed as required by the permit (frequency, sampling type, and sampling location)? • 0 0 0 Comment: Page # 7