Loading...
HomeMy WebLinkAboutNCC202141_NOT Closeout Documents_20210823North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910)433-3300 Greystone Farms, Section Five, County: Cumberland Project: Part Two - Lot 195 River basin: Cape Fear Person Pnancially responsible: Loyd Builders of Fayetteville— Project #: CUMBE-2020-177 F.Royal Loyd, Owner COC: NCC202141 Address: 4140 Ferncreek Drive, Suite 101, Fayetteville NC 1. Project Location: Touchstone Drive, Fayetteville Pictures: No 2. Weather and soil conditions: sunny, workable soils Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No Degree of damage: S. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: 10. Comments: If Yes, where? (check all that apply) Title: Date given/sent: August 11, 2021 Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deq.nc.gov/FormsfNCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Lori Britt Others present: Date of inspection: August 04, 2021 Time arriving on site: 2:34 PM Time leaving site: 2:36 PM cc: