HomeMy WebLinkAboutNCC202141_NOT Closeout Documents_20210823North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910)433-3300
Greystone Farms, Section Five,
County: Cumberland Project: Part Two - Lot 195 River basin: Cape Fear
Person Pnancially responsible: Loyd Builders of Fayetteville— Project #: CUMBE-2020-177
F.Royal Loyd, Owner COC: NCC202141
Address: 4140 Ferncreek Drive, Suite 101, Fayetteville NC
1. Project Location: Touchstone Drive, Fayetteville
Pictures: No
2. Weather and soil conditions: sunny, workable soils Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No
Degree of damage:
S. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
10. Comments:
If Yes, where? (check all that apply)
Title:
Date given/sent: August 11, 2021
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or
self -inspections are required. Project is in compliance and released under the SPCA. Termination of
coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be
requested by the permittee via a Notice of Termination (NOT). The NOT is available at:
https:Hedocs.deq.nc.gov/FormsfNCGOI-Termination. Please note that this correspondence must be uploaded
as part of completing the NOT process.
Reported by: Lori Britt Others present:
Date of inspection: August 04, 2021 Time arriving on site: 2:34 PM Time leaving site: 2:36 PM
cc: