Loading...
HomeMy WebLinkAboutNCG050429_Inspection Report (City of WS)_20210408l" UstonVem Field Operalioas Stomnvater Division Ciry aF Winsron-Snlcm CO. Box 2511 Winston-Salem, NC 27102 CityLink 336.727.8000 March 3, 2021 Vance Vaughn Safety Manager Westrock Converting Company 5930 Grassy Creels Boulevard Winston-Salem, NC 27105 Dear Mr. Vaugbn: The Stormwater Division of the City of Winston-Salem would like to thank you for your time and professional courtesy regarding the February 24, 2021 inspection of Westrock Converting Company. As per our discussion, a copy of the completed inspection form has been enclosed to you. Part 5 of this report (Required Actions to be completed by Facility) contains Annotations #1-5 that Westrock Converting Company must complete. Please provide documentation that verifies Westrock Converting Company successfully completed the corrective measures to me by June 4, 2021. The Stormwater Division reserves the right to enter Westrock Converting Company as often as necessary to determine compliance with the permit requirement of NCG050429. Thank you for your continued support of the City ofWinston-Salem's Stormwater Program. If you have any questions, please feel free to contact me. Sincerely, Brandon ise, CESSWI Stormwater Inspector Office: (336) 747.6965 Cell: (336) 416-2379 E-Mail: BrandonWi@CityofWS.org �� ��� �", City Council: Mayor Allen Joiner; Denise D. Adams, Mayor Pro Tempore, North Ward; Barbara Hanes Broke, Northeast Ward; Robert C. Clark, West Ward; John C. Larson, South Ward; Jeff Macintosh, Northwest Ward; Kevin Mundy, Sonlhwesl Ward; Annette Scippio, East Ward; Call 311 or 336-727-800D lames'Paylor, Jr., Sonlheasl Ward; Lee D. Gerrity, Cily Manager citylink@cityofws.org f� r f �i .. .. Iti r. .. � .��. ' �. � � � 1 r .L .' f � .. �. � .� � �� @j INnslon6alem Stormwater/Erosion Control Division Industrial and Municipal Good Housekeeping Inspection Forin General Information A) Official Company Name: Westrock Converting Company B) Physical Address: 5900-A Grassy Creek Boulevard, Winston-Salem, NC 27105 C) Telephone Number: 336-661-1700(0) D) Mailing Address, if different from above address: 5930 Grassy Creek Boulevard,. Winston-Salem, NC 27105 E) Authorized contacts to represent entity in environmental regulatory issues: Primary contact: Vance Vaughn Title: Safety Manager Contact number(s): 336-661-6716(o) Email address: vance.vaughn@westrock.com Secondary contact: Daryl Bryant Title: Maintenance Superintendent Contact number(s): 336-661-7321(o), 336-578-3426(c) Email address: daryl.bryant@westrock.com F) Standard Industrial Classification (SIC) Number ofbusiness/operation (if applicable): 265 G) NC Stormwater NPDES Permit Number (if applicable): NCG050429 Permit Category: Apparel, Printing, Leather, Rubber ITj Any other control authority pennit(s) (e.g. air quality control, wastewater, hazardous waste) & number(s): Air Quality —Forsyth County 00856 RCRA Small Quantity — NCR000012690 I) Brief description of facility activities that occur on -site: Facility makes dyes and plates that are used for creation of displays for clients. Mass produced products are cut and printed in the 5930/5950 buildings. Facility also assembles different types of displays per customer requirements. I) Ultimate Receiving Waters: Mill Creek TMDL stream ❑Yes ®No If Yes, What Pollutants: Part 1-Stormwater Controls 1. Best Management Practices (BMPs) a. List the controls (structural or non-structural) emnloved by the E.g. Oil Water separators, cleaning schedules, structural BMP maintenance records 1. Trash is picked up on a Monday/Wednesday/Friday schedule 2. Industrial activity is performed indoors 3. Small stormwater pond at Outfall 4 b. Are the non-structural BMPs reasonable & appropriate for the facility? ®Yes ❑No Facility showed no signs of potential pollutants when performing the inspection. Trash was minimal to non-existent at the facility. c. Are stormwater control measures (SCMa) installed correctly, maintained, and effective operating condition? ®Yes ❑ No ❑ N/A Single pond at outfall 4 was in good shape with rip -rap around the outfall. A rip -rap ditch is located on the backside of the 5950 building and was in good shape. 2. Provide a brief descripfion of other controls that manage/prevent/minimize stmrnwater runoff (e.g., erosion and sediment controls, inlet protection/control at storm drains, diversion structures): Regular cleaning is performed by on -site staff. Catch basins are regularly inspected in addition to trash and leaf litter being removed as needed. Sediment build-up in the parking lot ditch is removed as needed. Part 2 —Stormwater Discharge Outfalls (SDOs) 1. Any evidence of discharge to receiving waters/MS4 from the SDOs? (e.g:: stormwater runoff, dry weather discharge, co -mingling of process wastewater, trash, debris, on and grease): ❑Yes ®No Outfalls showed no signs of potential pollutants at the time of the inspection. Debris and as at the outfalls was minimal. 2) Do the stormwater outfalls on -site correspond with those listed on the site map in the Stormwater Pollution Prevention Plan (SWPPP)? ®Yes ❑No Comments: 10 outfalls are on site that match the facility's map. Outfalls 1 & 10 are non -point sheet flow outfalls and it is recommended that the facility evaluate these outfalls for potential removal or creation of a true outfall. Ensure for future sampling events Outfall 4 is sampled from the discharge point of the stormwater pond outside of the security fence. 3) Summary of Stormwater Discharge Outfalls SDO Identification Potential Pollutants that Physical Location Latitude and could be discharged Longitude if known Outfall 1 TSS, OWGrease from Southeast corner of 5900 N/A Parkin Lot, Trash building. Outfall 2 TSS, OWGrease from East side of 5930 building, N/A Parking Lot Trash south end of parking area Outfall 3 TSS, Oil/Grease, Diesel East side of 5930 building, N/A Fuel, Trash middle of parking area Holding pond, on east side Outfall 4 TSS of facility between 5930 & N/A 5950 buildings Outfall 5 TSS Northeast corner of 5950 buildingN/A Outfall 6 TSS, Oil/Grease from Northwest corner of N/A Parking Lot, Trash facility TSS, Oil/Grease from Across the parking lot Outfall 7 Parking Lot, Trash form southwest corner of N/A 5930 building Corner of facility near Outfall 8 TSS, Trash Grassy Creek & Bethania N/A Station intersection At roof drain discharge Outfall 9 TSS, Dye from dye/plate making N/A building Outfall 10 TSS, Oil/Grease from Western end of 4720 N/A Parking Lot, Trash building's loading docks Part 3 - BMP: Inspection and maintenance program Yes N/A No Notes Is secondary containment provided for materials (including X Single diesel fuel tank waste) or products stored outside in tanks and/or containers with built in and external (where applicable)? secondary containment. Are secondary containment free of accumulated water, debris, X Secondary in good shape. cracks, holes, or evidence of leaks? Does the facility maintain secondary containment drain logs? X Secondary is built in and covered. Do the drain logs confirm the presence of pollutants and other X pertinent information, such as signatory requirements, name of secondary containment area, date, time, and if drainage is connected to MS4 or receiving waters? Are tanks and containers in good condition, closed, and X Diesel tank is labeled and properly marked? in good shape. Are tanks, containers, and piping free of rust, pits, X Diesel tank showed no deterioration, or evidence of leaks? signs of deterioration. Are tanks and containers protected from impacts from moving X vehicles and e ui ment? E.g. bollards and curbs Any activities that have not been addressed or designed in X order to minimize exposure to runoff (e.g. herbicide application) In the case of a spill, does the municipal operation or industrial X Keith Huffs information facility maintain and submit documentation to the City of WS needs to be added to spill on a spill release form? documentation. Any roof stacks that have the potential to release X Cyclones on rooftops solids/particulate? collect scrap before it is then processedindoors Are all hazardous materials properly labeled and stored to X prevent exposure to stormwater runoff? Are solid waste containers in good condition and of sufficient X All waste containers are size to contain all waste? If so, how is this determined? covered and in good shape. Do the solid waste containers have covers and closed drain X plugs? Are solid waste containers free of waste that requires special X handling/disposal? Are containers properly labeled to ensure correct disposal means? Are solid waste containers labeled "Prohibited - No Hazardous X Labeling needs to be Waste, No Recyclable Materials, No Liquids?" added to all waste containers. Are special containers provided for other types of waste? E.g. X liquid waste or hazardous waste Does the facility utilize oil water separators? If yes, are the X inspection and maintenance records documented? Are secondary containment drain valves maintained in the X Valve was closed and closed position, unless the facility is draining the secondary locked at the time of the containment? inspection. Site Overview Part 4 — Stormwater Pollution Prevention Plan (SWPP) Review Yes No Notes Is there a SWPPP? Is it up-to-date? X Updated 2/2021 Does SWPPP include a certification statement by the responsible X Signed by Gene Matthews corporate officer? (General Manager) Does the general map depict the facility's location on a USGS X USGS map with receiving quad map (or equivalent map) with receiving waters (or MS4) waters will need to be listed? added to SWPPP Identification of impaired waters or watershed (if applicable)? X No impaired waters. Narrative Description of these Industrial/Operational Activities: All narrative descriptions Storage Practices X required are provided in Unloading/Loading Activities X the SWPPP. Majority of Outdoor Processes X activities are performed Particulate Generating/Control Processes X indoors except for Waste Disposal X loading/unloading. Vehicle/Equipment Washing- X Does site map denote drainage items: flow direction, boundaries, X Map needs to be updated to % impervious, and structures? Does the map also include SDOs, include topography and % industrial activity areas, and site topography? impervious calculations. A list of major spills that have occurred within the past three years X with corrective actions to prevent futurespills)? A signed, annual certification that the facility has been tested for X Signed by Gene Matthews non-stormwater discharges from the site? (General Manager) Comments: SWPPP has been recently updated and has all the narrative aspects required. Maps for the facility need to be added to the SWPPP and updated to ensure they contain all required features. Narrative aspects of the SWPPP are detailed and site specific per permit requirements. In future sampling events Outfall 4 needs to be noted as the discharge point from the stormwater pond, not from the grate inside of the fence line. Keith Huffs information needs to be added to the spill response section of the SWPPP and SPCC. Stormwater Management Strategy Yes No Notes Does SWPPP incorporate the nine baseline controls: X X Feasibility Study (technical & economic review to minimize pollutant exposure) Secondary Containment (table summary of tanks, stored materials, release records) X Single 250 gallon diesel fuel tank outside X BMP Summary (listing of site structural/nonstructural practices) PM & GH (inspection of material handling areas & regular cleaning schedules) X Facility Inspections (biannual inspections of facility and all stormwater systems, X Facility inspections are were the inspections completed during separate parts of the year?) completed monthly with regular monitoring done weekly Employee Training (annual basis for staff who perform SPRP and GH functions) X Responsible Party (specific position(s)/person(s)-developing, implementing, & X General Manager, Safety revising SWPPP) Manager, and Maintenance Amendment& Annual Update (of major spills, non-swflows, BMPs,sampling data) Superintendent listed. X Does SWPPP contain completed routine inspection reports/records X regarding reportable implementation of the nine baseline controls e.. SWPPP Implementation)? Does the Spill Response Procedures (SPRP) document all spills and X releases? Does the entity properly dispose of contaminated materials used in the clean up? Is the disposal of materials documented? Has a contact person(s) and contact information been identified and documented for each facility? Analytical Monitoring (V not applicable, please notate) Yes No Notes Are samples collected within 30 minutes of the first discharge from N/A — Not Required a measurable rain event and at least 72 hours since the last storm event? Are sampling events 60 days apart? (EXCEPTION: Tier 2 & 3 responses) N/A — Not Required Is analytical monitoring complete (including schedule) for each N/A — Not Required SDO? (EXCEPTION: REPRESENTATIVE OUTFALL STATUS) N/A — Analytical sampling Any exceedances of pollutant parameters when compared against not required per the the permit benchmark values? If yes, have they documented their NCG05 permit due to the response to the Department of Environmental Quality? facility not performing vehicle maintenance on -site. N/A — Not Required Has the facility implemented appropriate, selected actions to reduce pollutant concentrations, in response to benchmark exceedances (if applicable)? Qualitative Monitoring Yes No Notes Is qualitative monitoring being performed during measurable storm X Qualitative monitoring events? being completed at all outfalls Is qualitative monitoring complete (including schedule) for each X SDO? Are monitoring events 60 days apart? (EXCEPTION: Tier 2 & 3 responses) X X No potential pollutants Any observable, excessive amounts of pollutant indicators in were noted in monitoring stormwater discharge at SDOs? records. Part 5 —Required Actions to be completed by Facility: Items to be completed 3 months from receipt of this letter: 1) Cigarette butts built up around the catch basin up gradient of the temporary employee parking need to be cleaned up. Signage needs to be put in place stating "No Cigarette Butts in the storm drain". (See Photo 1) 2) A USGS map with the facility and receiving waters identified must be added to the S WPPP. 3) The site map in the S WPPP must be updated to show the topography of the site and percentage of impervious surface for each outfall. 4) Signage must be added to the waste containers stating "Prohibited - No Hazardous Waste, No Recyclable Materials, No Liquids" 5) Add Keith Huff's contact information to the spill reporting list. Keith's contact info is: Keith Huff Director of Field Operations 336-747-6962 KeithHI@CityofWS.org Entity Representatives) that participated in inspection: Vance Vaughn &Daryl Bryant Title(s): Safety Manager & Maintenance Superintendent Start of Inspection: 8:50am Completion of Inspection: 11:OOam Date: February 24, 2021 Signature of Inspector: Title: Stormwater Inspector Photo 1—Cigarette butts in and around the storm drain located up gradient of the temporary employee parking. Cigarette butts built up around the catch basin up gradient of the temporary employee parking need to be cleaned up. Signage needs to be put in place stating "No Cigarette Butts in the storm drain".