Loading...
HomeMy WebLinkAboutNCG070098_COMPLETE FILE - HISTORICAL (CHECK ORIG FILE)_20130320STORMWATER DIVISION CODING SHEET RESCISSIONS PERMIT NO. l.� DOC TYPE ❑COMPLETE FILE -HISTORICAL DATE OF RESCISSION ❑ 02.6 f,3 D 3�0 YYYYMMDD --�. `� NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P.E. Governor Director March 20, 2013 Mr. Thomas J. Wainwright Triangle Brick Company -Merry Oaks Mine 6523 N. Highway 55 Durham, NC 27713 Subject: Rescission of NPDES Stormwater Permit Certificate of Coverage Number NCG070098 294 King Road Moncure, NC Chatham County Dear Mr. Wainwright: John Skvarla, III Secretary Please accept this letter as documentation that the originally -issued stormwater permit Certificate of Coverage for the Triangle Brick Company's Merry Oaks Mine, No. NCG070098, is rescinded as of this date. As you know, this facility's stormwater coverage was changed to Certificate of Coverage number NCGO20806 in February of 2012. Unfortunately, the earlier -issued permit was not rescinded. I apologize for the mistake and hope that the inconvenience was not too costly. Thanks for your patience and let us know if we can help in any way. If you have questions about this matter, please contact Boyd DeVane at (919) 807-6373, or the Water Quality staff in our Raleigh Regional Office. Sincerely, for Charles Wakild, P.E., Director cc: Raleigh Regional Office Stormwater Permitting Unit DWQ Central Files Fran McPherson, DWQ Budget Office - please waive applicable fees Wetlands and Stormwater Branch 1617 Mail Service Center, Ralegh, North Carolina 27699-1617 Location: 512 N. Salisbvry St. Ralegh, North Carolina 27604 Phone: 919-807-63001 FAX: 919a7-5494 Internet: www.nmaterquality.org An Equal Opportunity 1 Arfrmalive Action Employer NorthCarolina Natura!!r, Mr. Howard Brown 1'riangle Brick Cornpany February 3, 2012 Session Law 2006-246 to mines located in Phase II Post -Construction areas. You may be required to apply for a separate Post -Construction stormwater permit from the State or local government. Please contact Jennifer Jones in the Central Office at 919-807-6379 if you need assistance to determine if you must apply for a Post -Construction Permit. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. If you have any questions concerning this permit, please contact Jennifer Jones at telephone number (919) 807-6379. Sincerely, ORIGIML SIGNED 8) for CharldMSHMP.E. cc: Raleigh Regional Office, Danny Smith Central Files Stormwater Permitting Unit Files NCDENR North Carolina Department of Environment and Beverly Eaves Perdue Governor Division of Water Quality Charles Wakild, P.E. Director February 3, 2012 Mr. Howard Brown, VP of Production and Engineering Triangle Brick Company 6523 N. Highway 55 Durham, NC 27713 Dear Mr. Brown: Natural Resources Dee Freeman Secretary Subject: General Permit No. NCG020000 Triangle Brick Company COC NCG020806 Chatham County In accordance with your application for a discharge permit received on June 7, 2006, we are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina I' General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agcncy dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice, to the Division of' Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. Please be aware that mine dewatering at your site has the potential to impact adjacent wetlands. The specific requirements for mine dewatering at facilities near wetlands can be found in Part III, Section E of your permit. Ifyour site has the potential to impact adjacent wetlands,! you must have an approved Operation and Monitoring Plan before mine dewatering discharges occur at your facility. Discharging mine dewatering wastewater without Plan approval will be subject to enforcement action. An Operation and Monitoring Plan for your facility must be submitted to the Raleigh Regional Office within 60 days of your receipt of this permit. Contact Danny Smith at the Raleigh Regional Office for more information about the approval process. This general permit allows the discharge of stormwater and certain types of wastewater' From your facility. In your application, you specified that only mine dewatering water would be discharged from this facility. If separate point -source discharges of stormwater occur (i.e., stormwater not combined with mine dewatering water), you will be required to adhere to the conditions in this permit for stormwater discharges. Additionally, pleasc see guidance on our website (http://portal.ncdenr.org/web/wq/ws/su/) for mines located in Phase It Post -Construction areas. This guidance clarifies the applicability of Wetlands and Stcrmwater Branch One 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 NorthCar�olina Location: 512 -8 N.300Salisbury 5t, Ra-eigh, North Carolina 27604 �a���li rY� Phone: 919-807-63DD 1 FAX: 919-8D7-64941 Customer Service: 1-$77-623 674$ blL/L/ Internet: wvv,v.ncwaterquality org An Equal Opportunity 1 Affirmative Action Employer STATE OF NORTH CAROLINA 1)E13AR"I'MEN'1' 01- ENVIRONMENT AND NATURAL RLSOURCES DIVISION OF WATER QUAI-1.1-Y GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020806 STORMWATER AND MIND DE -WATERING DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina larnvironmental Management Commission, and the Federal Water Pollution Control Act, as amended, Triangle Brick Company is hereby authorized to discharge stormwater and mine dewatering wastewater from a facility located at Triangle Brick Company — Merry Oaks 294 King Road Moncure Chatham County to receiving waters designated as a UT to Shaddox Creek, a class WS-IV water in the Cape Fear River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set Forth in Parts I, 11, III, IV, V, and VI of General Permit No. NCG020000 as attached. This certificate of�coverage shall become effective February 3, 2012. This Certificate ofCoverage shall remain in effect for the duration ofthe General Permit. Signed this day February 3, 2012. ORIGINAL SIGNED Bl fr)i Charles Wakild, P.E. irector Division of Water Quality By the Authority ofthe Environmental Management Commission NCG020806 Map Scale 1: 46,199 Triangle Brick Company Moncure, NC Latitude: 350 38' 32" N Longitude: 791 00' 04" W County: Chatham Receiving Stream: UT to Hicks Branch Stream Class: WS-IV Sub -basin: 03-06-07 (Cape Fear River Basin) Facility Location Permit Number NCG020806 Program Category NPDES SW Permit Type Mining Activities Stormwater Discharge COC Primary Reviewer jennifer.jones Coastal SW Rule Permitted Flow Facilit Facility Name Triangle Brick Co -Merry Oaks Location Address 294 King Rd Moncure NC 27559 Owner Owner Name Triangle Brick Company Dates/Events Central Files: AP5 SWP 02/02/12 Permit Tracking Slip Status Project Type In draft New Project Version Permit Classification COC Permit Contact Affiliation Major/Minor Region Minor Raleigh County Chatham Facility Contact Affiliation Owner Type Non -Government Owner Affiliation Scott D. Mollenkopf 6523 NC Hwy 55 Durham NC 27713 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 10/24/11 11/17/11 2 /til "— 2/*j1 I-'-�7- f Regulated Activities Requested/Received Events 1 !' Mine dewatering RO staff report requested 11 /17/11 Mining activities - stormwater discharges RO staff report received 02/02/12 Outfall 001 Waterbody Name Stream Index Number Current Class Subbasin Shaddox Creek 16-43 WS-Iv 03-06-07 NCG02 Stormwater Permit: Mining Permit Review Permit Number: NCG020806 Reviewer: JMJ Mine Name: Triangle Brick Company — Merry Oaks 1 Summary • Receiving Stream: UT to Shaddox Creek • Classification: WS-iy • River Basin: Cape Fear • County: Chatham • Notes: Regional Information • Office: o ❑ARO Contact: o ❑FRO Contact: o ❑MRO Contact: o ®RRO Contact: Lauren Witherspoon o ❑WaRO Contact: o ❑WiRO Contact: o ❑WSRO Contact: • Dates: o Approval requested: 1 l/ 17/ 1 1 o Approval received: o "No wetland impact" determination, (15A NCAC 02B .0231(b)(5)(Q requires the Division to preserve the water levels of wetlands. We can require engineering plans to ensure that this is the case.) o Inspection: Recent - previous • Notes: Other Agency Information • DLR o Have a valid Mining Permit? ®yes ❑no o is our application owner the same name as the DLR permit? (This is a requirement and a permit condition). ®yes ❑no o Permit Number 19-10 o Application submitted date: 10/24/11 — I Rcd 1 / /11 o Approved date: 3/ 1 /2001 o Have you added the DLR permit # to BIMS under 'Related Permits"? ®yes Ono o DWQ/DLR review sheet reviewed? ®yes Ono (see S:\SrormwarerPeymitring Uuit\Mitres - DWQ Rp Mute ReviewsJor DLR) o DWQ/DLR review sheet stipulates holding DLR permit? ®yes Ono . utt—? v— — t —t xrr�nrn 1`1Vt VGL —JLlll VAL NWVY J U aft aJ Vl 1\UV 4L. • DEH (if WS) o Needed? ®yes ❑no o Application submitted date: o Approved date: • Shellfish Sanitation (if SA) o Needed? Oyes ®no o Application submitted date: Page l of 9 It • NCG02 Stormwater Permit: Mining Permit Review o Approved date: 401/404 Certification / Wetlands Info o Ka 401Beg it 0 401 Written Concurrence Required? o Are there ofFske wetlands? o If 404, Application submitted & approved date: na 0 1f 401 Approved submitted & approved date: na o Have you requested a USAGE wetlands delineation? (—]yes Ono 6, -Notes: Possible 'streams:on'site =Need RRO to comment if they need O&M Application Review a) The permit application • Signed: ®yes ❑no • Is signature by correct person? ®yes ❑no • Complete: ®yes ❑no • SIC Code: SIC 1459 i. Describes activities: ®yes ❑no ii. Covered by permit: ®yes Ono b) Miine Type: • Quarry: ❑ • Sand: ❑ • Clay: ❑ • Are there other activities at site (i.e. asphalt or concrete)? ®es ❑no *Notes: IMb Iieve otheraetivities are making bricks-IRRO;please oEMO c) Mine Size: • Pit Acreage (estimate if not known) • Screening Acreage • Concrete Acreage • Asphalt Acreage • Screening / Processing Acreage • Tailings/Sediment Pond Acreage • Stockpile Acreage • Waste pile Acreage • Haul Roads • LCID • OTHER • Total Acreage + Notes: d) New Coastal Rules: unknown from application • Is the mine in one of the 20 Coastal Counties? ❑yes Ono • Does the mine have > 10,000 square feet of BUA? ❑yes ❑no [If the answer is "Yes" to both of the above, please notify permittee they will need a state SW permit and notify the Wi or Wa Regional Office]. e) Buffers: Page 2 of 4 ;Comment []]lj: L'W~pleus'• a ant, Comment [LCW2]: We are not sure whethcr a 401 is r '! �—' egsi�ed or not. 1 need to conduct a site inspection to determine if streams are within the limit",ardisw ance. This UU1dbedone pnorto ' 6Wthe permit I haven°t I>ncd anytfiiag from them requesting a site visit as discus`,cd in our, meeting. � TPmment[]]3]• URLA�EN-pleaewmmcnt.. ' Omment[LM4]• I don't believe that wet]ands acts asaiesull of'dew'nteringivrn hedo believe a,s-w rrmtted. e - COmmertt [L'C1N5]: Cunently,tf^ey have un NCGO7 bxausc thay��aiimg bricks. 1 don't see the need rar them to have a NCG07 end am NCG02 but I think this is s decision that should fx made by the stormwater.kgoup for wnsistency,purposes. � ��E NCG02 Stormwater Permit: Mining Permit Review • Is the mine in the Neuse, Tar -Pam, Randleman, Catawba River Basin or Jordan Lake watershed? Eyes ®no f) Phase ll • , Is the mine in a Phase 11 area? Eyes ®no • Does the permtttee need a Phase 11 permit from DWQ? Eyes ❑no • State or Local? Water supply — meets phase Il requirements • Have you sent this to the appropriate permitting authority? Oyes []no ©NA — will SEND TO DEH for their review. g) Wastewater: • Type Mine dewatering: Stamped by PE? If clay & dewatering, ATC? Process wastewater produced: Stamped by PE? If recycle & not closed, ATC? • Wastewater and ORW Waters Requirements New/expanding wastewater to ORW? New/expanding wastewater to upstream of OR W7 Notes: • Wastewater HWQ/PNA water requirements What is the flow rate? NA PNA has special limits for W W TSS. ®yes Eno ©yes Eno Eyes ®no (required Eyes ®no Eyes ®no ❑yes ®no (required) Oyes ®no (not allowed) Eyes ®no (special limits) h) Dewaterirr : • s the pgrrnittee ifflpacting wetlands / Mguire and O&M agreement? Ayes ®__ • Date request letter sent • Date sent to the RO • Date approved • Did the RO request an O&M before approval? Eyes ❑no i) ()ther: • Does this facility have other NPDES permits? ®yes Ono • Hazardous waste activities onsite? ❑yes ®no i Is there an LCID or other landfall on site? ❑yes ER _ _ _ _ - _ o Notes: Stal h — need to c if have wa t w t ischar eg from thaA Signatory Requirements Ail applications, reports, or information submitted to the Director shall be signed and certified. a. All notices of intent to be covered under this General Permit shall be signed as follows: Page 3 of 4 Comment [LCW6]: Currently:lhere are no ➢WQ buirer requirements in this portion of the Cape fear River Basin so yes. ➢LR may, however, still require their $0 A buffer which they may riot be in Complilutce with. `CRttnnlGnt 1337]7 RRO/ Lauren - please comment ` CMIIM& t [118], Lauren —Plena comment Comment [LCW9]_ 1 do pot chime that an O&M ag ccment is necessary. Comment [LCW10]: I am not aware ofan L.CI➢ or other landfill on the site Comment [LCW11]: Titus is one outlet to waters from the brick plant that is not in the same vicinity as the mine NCGO? Stormwater Perm(; Minim Permit Revievt, (1) For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. b. All reports required by the General Permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that person. A person is a duly authorized representative only if: (1) The authorization is made in writing by a person described above; (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant manager, operator of a well or well field, superintendent, a position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.); and (3) The written authorization is submitted to the Director. Communication logs Date Item 2/2/12 Lauren has been there, ok to issue. Page 4 of 4 ��� q;"L aCCP 6w:aO�C:v a'a •Dc �.�9�_at Jones, Jennifer From: Witherspoon, Lauren Sent: Thursday, February 02, 2012 9:17 AM To: Jones, Jennifer Subject: RE: Triangle Brick Merry Oaks Yes. Thanks, Lauren From: Jones, Jennifer Sent: Thursday, February 02, 2012 9:17 AM To: Witherspoon, Lauren Subject: RE: Triangle Brick Merry Oaks Ok great. Ok to issue the permit? Jennifer Jones Environmental Engineer NCDENR I DWQ j Stormwater Permitting Unit 1617 Mail Service Center; Raleigh, NC 27699-1617 512 N. Salisbury St, Raleigh, NC 27604 Phone: (919) 807-6379 Fax: (919) 807-6494 Email: jennifer.iones@ncdenr.gov Website: http:lZportal.ncdenr.ug/web/wg/ws/su ** Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulations.** From: Witherspoon, Lauren Sent: Thursday, February 02, 2012 9:17 AM To: Jones, Jennifer Subject: Triangle Brick Merry Oaks Jen, l went out yesterday and confirmed that there is a stream where I had thought but the origin is down -gradient from the basin. Therefore, they will not need a 401. 1 have no further requests. Lauren A� NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Environmental Health Terry L. Pierce Director MEMORANDUM TO: Jennifer Jones Stormwater Permitting Unit Division of Water Quality FROM: Michael L. Douglas, F.E., Regional Engineer Public Water Supply Section Division of Water Resources SUBJECT: Draft National Pollutant Discharge Elimination System Permit NCG020806 Triangle Brick company — Merry Oaks Mine 1 294 King Road Moncure, North Carolina 27559 Chatham County DATE: November 30, 2011 Dee Freeman Secretary [E��R V 9 0 DEC - 2 2011 DENR - WATER QUACIiY WEXMDSAND STORMWATtER PMC14 Reference is made to the above -mentioned Draft National Pollutant Discharge Elimination System Permit. Upon review of this permit application, it appears that no adverse effect on water quality will occur to the existing public water supply intakes. We concur with the issuance of this permit provided this facility is operated and maintained property; the stated effluent limits are met, prior to discharge into an unnamed tributary to Shaddox Creek in the Cape Fear River Basin; and the discharge does not contravene the designated water quality standards. 1f we can be of further assistance, please contact me at 919-791-4200. cc: Rebecca Sadosky Ph.D., Public Water Supply Section, Central Office Public Water Supply Section -- Jessica G. Miles, Chief 0110 Raleigh Regional office North Carolina 3800 Barrett Drive, 1628 Mail Service Center, Ra#sigh, North Carolina 27699-1628 J� ]Quai//� Phone: 919-791.42001 FAX: 919-788.53491 Internet: ncdrinkingwater.state.nc.us ,� y An Equal Opporlunity 1 Affirmative Action Employer North Carolina Beverly Eaves Perdue Governor Memorandum Jam An NCDENR Department of Environment and Natural Division of Water Quality Coleen H. Sullins Director November 18, 2011 To: Regional Water Supply Supervisor, DWR Public Water Supply Section From: Jennifer Jones, DWO Stormwater Permitting Unit Subject: Review of the discharge location for the following: Resources Triangle Brick Company — Merry Oaks Mine 1 294 King Road Moncure, NC 27559 Chatham County NCG020806 Reported receiving water: UT to Shaddox Creek, WS-IV (Index #: 16-43) Dee Freeman Secretary Please indicate your agency's position on the facility listed above. Attached is the staff report or other application information for this facility. We cannot issue the permit without your concurrence. Please return this form at your earliest convenience. RESPONSE: This agency has reviewed the draft permit and determined that the proposed discharge will not be sufficiently close to any existing or known proposed public water supply intake so as to create an adverse effect on water quality. We concur with the issuance of this permit, provided the facility is operated and maintained properly, the stated effluent limits are met prior to discharge, and the discharge does not contravene the designated water quality standards. Concurs with issuance of the above permit, provided the following conditions are met: Opposes the issuance of the above permit, based on reasons stated below (or attached): Signed ffDate: d cc: Stormwater Permitting Unit Files Attachments 1617 Mail Service Center, Raleigh, North Carolina 27699.1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919.807.64921 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org One NorthCarolina Naturally Division of Water. Quality / Surface Water Protection NCDENKNational Pollutant Discharge Elimination System NCG020000 NOTICE OF INTENT National Pollutant Discharge Elimination System application for coverage under General Permit NGG020000: STORMWATER DISCHARGES associated with.activitles classified as: SIC (Standard Industrial Classification) Code - 14XX Mineral Mining Industry (except as specified below) The following activities are also Included: Active or inactive mining operations (including borrow pits —except for NCDOT borrow pits) that discharge stormwater contaminated with or that has come in contact with, any overburden, raw material, intermediate products, finished products, byproducts or waste products located on the site of such operations; • Stormwater front vehicle maintenance activities at mining operations; • Overflow from facilities that recycle process wastewater; and/or • Mine dewatering (wastewater) The following activities are specifically excluded from coverage under this General Permit: • Stormwater discharges associated with peat mining, coal mining, and metal mining; • Stormwater discharges from mining operations which are intermixed on site with stormwater from asphalt operations andfor concrete operations; • Stormwater discharges associated with oil and gas extraction operations; and • Stormwater discharges associated with tourist gem mines • NCDOT borrow pits are covered under NCS000150 The following discharges are covered by NPDES general permit NCG520000 instead of NCG020000: r • Point source discharges of stormwater and wastewater from in -stream sand mining operations (i.e.. sand dredging or dipping operations) For new m1hing sites that require an authorization to construct (ATC) wastewater treatment facilities: This NOI is also an APPLICATION FOR an ATC for new wastewater treatment facilities. ATC requests must be submitted at least 90 days prior to construction'. For exist mining sites that require an Authorization to Operate (ATO) wastewater treatment facilities: This NOI Is also an APPLICATION FOR an ATO for wastewater treatment facilities in place. Construction, modification, or installation of any new treatment components at an existing site requires an ATC. (If the site is already covered by NCG020000, the ATC request may be submitted without an NOI). Some wastewater treatment facilities used to treat or recycle wastewater at mining sites will require an ATC aEiQE to construction per 15A NCAC 2H .0138. Please see the NCG020000 General Permit for details about which treatment facilities require an ATC (summarized in Table 1 below), The authorization to construct or continue to operate will be issued at the same time as -the Certificate of Coverage (COC) for the NCG02 permit. Design of treatment facilities must comply with requirements of 15A NCAC 2H .0138 & .0139. Construction of wastewater treatment facilities subject to the ATC/ATO requirements in the NCG02 permit at new or existing mining sites requires submission of three (3) sets of plans and specifications signed Page 1 of 9 'As per 15A NCAC 21-1.0106 2Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such work for their respective companies in accordance with General Statutes,.89C•25 (7), plans and specifications must be signed and soated by a P.E. NCG020000 N.O.I. and sealed by a Professional Engineer (P.E.) or qualified staff2 along with this application. A copy of the design calculations should be included. Please see questions 18 & 19 ..Table 1: Summary of Wastewater Permit:Requirements .. :, . _, Quarterly` Requires Monitoring? A to C? Mine Dewatering (M13) Yes No Yes, No MD Discharges that do not need treatment other than E&5C to meet permit conditions MD Discharges that need treatment other than E&SC to meet permit conditions Process Wastewater. . Other Recycle ✓ Closed Loop Recycle Any Other Process WW �' ✓ For questions, please contact the 0010 Regional Office. for your 6rea. (See page 7) - NN (Please print or type) 1) Mailing address of owner/operator (address to which all permit correspondence will be mailed): Owner Name Triangle Brick Company Owner Contact Howard Brown - VP of Production and Engineering Street Address 6523 N. Highway 55 City Durham — __..... .. State NCZIP Code 27713 Telephone No. (919) 387 925a -, Fax: E-mail Address 2) Location of facility producing discharge: Facility Name Triangle Brick Company _Merry Oaks Facility Contact Street Address City County Telephone No. Contact E-mail Brent Cox 294 King Road "Y•••�� - - -___. Mancure Chatham State NC ZIP Code 27559 (919) 387-9258 Fax: 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). Located at the intersection of King Road and Christian Chapel Church Road, just off of US-1 in Moncure 4) Latitude 35d38'32" Longitude-790'4" (degrees, minutes, seconds) r3-n n .,r o NCG020000 NA L Permits: 5) This NPDES Permit Application applies to which of the following: ❑ New or Proposed Facility Date operation is to begin ....... ... El Existing ❑ New Permit not applicable -- ATC request only. NPDES Permit Number 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that, describes the primary industrial activity at this facility SIC Code: 1 4 5 9 7) Provide a narrative description of the types of minerals mined at this facility: Clay B) Is this mine an inactive mine site? 0 No O Yes If yes, do you posses an "Inactive Renowal" from DLR and notified the DWO Regional Office or have you certified to the DWO that the site has been stabilized? ❑ No ❑ Yes 9) Does this facility already have a valid Mining Permit from the Division of Land Resources (DLR)? Q No If No, please indicate the status of the Mining Permit application:...__. .............. _......._......._....._. �_ El Yes If yes, please provide the Mining Permit number: Please also provide a copy of your DLR Mining Permit with this DWO application. Note: DWO cannot issue a COC for the NCGO20000 General Permituntil Mining Permit Is issued or renewed by the Division of Land Resources (DLR}. 10) Does this facility have any other NPDES permits? ❑ No O Yes If yes, list the permit numbers for all current NPDES permits for this facility: NCG070098 11) Does this facility have any Non -Discharge permits (ex: recycle permits)? CI No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 12) Does total area of this mine site include ready -mix and asphalt areas? O No ❑ Yes if yes, do they have DWO stormwater permits (if owned by the same company)? ❑ No ❑ Yes (provide permit number j If not owned by the same company, who is the owner? 13) Will this mining operation precede development activities at this site? U) No Ci Yes 14) Is this mine located within one of the 20 Coastal Counties and will 11 add more than 10,000 ft2 of Impervio, surface? El No NCG020000 N.o:l. ❑ Yes If yes, you may be required to apply for an additional state stormwater permit. Check with your focal Regional Office. See contact information and checklist below. 15) Is this mine located the Neuse, Tar -Pamlico, or Catawba River Basin, or the Randleman or Jordan Water supply Watersheds? 0 No © Yes If yes, what size stream buffers are included on site? ft. Please show buffers in site plans. Discharge Points Receiving Waters & Wetlands; 16) Receiving waters: What is the narne of the body or bodies of water (creek, stream, river, -lake, etc.) that the facility stormwater and/or wastewater discharges end up in? Shaddox Creek which drains into the Haw River If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e_g_ City of Raleigh municipal storm sewer). NIA Receiving water classification (if known): WS-IV _.....��..�.:...�....... _........... ____ .. __._. ..,.,,,...gym -_.� �...._..__.., ___ __..._.... .._..M._ Note: Discharge of process wastewater to receiving waters classified as WS-fl to WS-V or SA must be approved by the N.C. Dept. of Environmental Health. If DEH does not approve, coverage under NCG020000 cannot be granted. No new discharges of wastewater are permitted in receiving waters classified as WS-I or freshwater ORW. Wastewater discharges to Saltwater ORW will not be approved under the NCG02 General Permit. 17) If your facility has wastewater discharges and they are to HWO, PNA waters (Primary Nursery Areas) waters, what Is the flow rate? N/A(See_.._.._�__.a,�inufcxiittl, for mat 18) Discharge Points: Number of discharge points (ditches, pipes, channels, etc. that convey discharges from the property): Onsite: Stormwater: 17 Mine dewatering: 3 Process Wastewater Overflow: Offsite: Stormwater: ___ Mine dewatering:..,... M, Process Wastewater Overflow:_..._____ _ Discharge points should be clearly marked on the submitted site plan. Please provide short narrative description of discharges: 1 Planned Stormwater bXpass discharge located in M6 , 16 stormwater discharges from previously .Permitted temporary sediment traps, 3 Discharges sediment and erosion control permanent sediment flonds ._ .� _ „—.. .� a) Is your mine dewatering and discharging? (Answer only if you are dewatering) Q No Mine will discharge; to sediment trap prior to discharginej upstream of possible wetlands. Yes If yes, where to? Surface Waters and/or Wetlands (on -site or off -site) X Other (on -site or off -site) Describe: Sediment trap prior to leaving the site. b) Are you dewatering but not discharging? (Answer only if you are dewatering) ID No 0 Yes If Yes, please explain how you are dewatering, and where that water will be directed: _ _. NCG020000 N.O.I. 19) Will mining operations require dewatering near wetlands or impact any stream, groundwater, or wetlands? ID No Potential wvllands are shown on plans. No wellands have been detineared by USACE. ❑ Yes (Vote: Wetlands must be CLEARLY DELINEATED on the site plan. Mine dewatering activities that have the potential to drain wetlands or otherwise impact surface water or groundwater MUST develop and implement a Pumping Operation and Monitoring (O&M) Plan that has been approved by the Division, For sites that may drain wetlands — apArov_al of a Pumping O&M plan ma be required _ rior to coverage under this,general permit. The Pumping O&M Plan should be submitted to the appropriate Regional Office and must be approved prior too e� ration. The plan shall include, but is not limited to: (1) Groundwater monitoring strategies to demonstrate the effect of pumping and to establish any pumping regime necessary to reduce impacts, and (2) Detailed plans to maintain surrounding hydrology and respective monitoring to demonstrate compliance. See checklist at end of document. Contact your local Reqional Office for questions specific to your mine, 20) If you are dewatering, are there wetlands or surface waters within 400' of the mine pit perimeter? a No ❑ Yes If yes, what distance are they from the mine pit perimeter? feet. 21) Have you been required to obtain a 404f401 Certification permits? 121 No ❑ Yes If yes, please briefly describe below (include information such a required mitigation, BN1Ps, setbacks, and/or O&k plans for on or off -site wetlands or other pertinent information). Attach other sheets as necessary: 4 22) Have -you been required to obtain a wetland delineation certified by the US Army Corps of Engineers? ID No ❑ Yes It yes, please attach to application submission. Stormwater BMPs: 23) Does this facility employ any best management practices for Stormwater control? !] No ❑ Yes If yes, please briefly describe: 24) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No O Yes If yes, when was it implemented?. _. #q..........__.._ 25) Will vehicle maintenance activities occur at this facility? ❑ No ID Yes NCG020000 N.O.I. Wastewater Treatment Facilities- 26) Will mine dewatering discharges occur? (An ATC/ATO is required for wastewater treatment facilities' dewatering discharges where E&SC devices alone will not meet effluent limits and/or protect water quality standards). ❑ No CAI Yes 27) Will discharges of overflows from process wastewater treatment systems occur? (ATC or ATO. required, unless closed -loop recycle system) El No 0 Yes If yes, answer the following questions for each wastewater treatment system: a. Please describe the type of process used to treat and/or recycle the process wastewater. Give design specifics (i.e. design volume, retention time, surface area, etc.). Existing treatment facilities should be described in detail, and design criteria or operational data should be provided (including calculations) to ensure that the facility can comply with requirements of the General Permit. [Use separate sheet(s)] b, Does this facility employ chemical additives to flocculate suspended solids? ❑ No ❑ Yes If yes, please state the name, manufacturer and the quantity of average daily usage of the chemical additive Note_ Please see our website for a list of evaluated of acr amide PAMS roducts for use in _ p y y ( ) p North Carolina. C. Does this facility overflow only during rainfall events exceeding the 10-yr, 24-hr rainfall event? ❑ No ❑ Yes 28) Are wastewater treatment facilities (including recycle systems) planned in the 100-year flood plain? 0 No ❑ Yes If so, include information to demonstrate protection from flooding. (Minimum design requirements for treatment works include protection from the 100-year flood, per 15A NCAC 2H .0219,) Other: 29) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? El No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? 0 No ❑ Yes . c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? B No - ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: NCG020000 M.O.I. How is material stored: Where is material stored: w.,... _ ., _..�_ Flow many disposal shipments per year: _ —------ _.. Name of transport / disposal vendor: Vendor address: 30) Are you applying for a mining permit in the same location as a previously permitted mine? 0 N�, a Yes If yes, specify permit number and name if known: 19-10 Merry Oaks Site #11 31) Does your site have an active landfill within the mining permit boundary? © No ❑ Yes If yes, specify type: ❑ L,CID ❑ Other: 32) Is your facility providing appropriate secondary containment for bulk storage of liquid materials? See permit text online for secondary containment requirements. ❑ NO El Yes Final Checklist-, This appllcat-ion %4111 be returned as incomplete unless all of the following items have been Included_ and Initialed tot'. Please show that the following required information has been included by initialing in each space be(6iv. �.-- i t=r;b 1$100 made payable to NCDENR , }Co�npietecl application and all supporting documents �•../(;o , of the valid approved mining permit MP for the facility or indication of MP application status L__ l i pp g p ( ) Y Pp -�JCopy of a county map or other general location map that shows the mining site and nearest major roads of USGS topographic map showing the mining site and surrounding areas, or other map that clearly shows site location in relation to nearby streams, wetlands, and other waters, etc, ?'�2 cuires ct large -scalp silo Man a1ith topograishi'aI lines with atl outfalls, applicable t5ulir.rs and weiiands clearly delineated -2S,t-)A copy of your DLR mining permit A copy of your US Army Corps -approved wetland delineation if you marked "yes" to question 22 above. If mine site is in one of the 20 Coastal Counties, • Applicant has checked with the appropriate regional office to verify the need for a Coastal State Stormwater permit. Regional Office Contact: _-. • Applicant has included a detailed list of impervious surface areas and percentages, sub -drainage areas and total drainage area. It the mine is dewatering and near wetlands, or may otherwise impact surface waters or groundwater, include the following and contact your local regional office about a. Pumping O&M Plan (see below for contact information). You maybe regu€red to provide an approved Pumping O&M plan prior to NCG02 Issuance. —2 copies of detailed Fuff Size Plans delineating areas on the plans and listing acreag (including: wetlands, ditches, well -placements, pits, borrow areas, overburden storage, sormwater controls/BMPs, vehicle maintenance areas, settling basins, product process (such as screening, stockpiles, waste piles), total drainage area, impervious surface percentages (if state sw programs apply), applicable butlers, and access and/or haul roads). .Well information (design, depths, maintenance) Physical monitoring for the wetlands areas _Settling pond sizing information, if applicable NCG020000 N.0.1. -.,,,.-.Level spreader design, it applicable __—Details about dewatering method Cone of influence calculations _._,.,.,_Description of measures to prevent erosion and flooding Description & information about 401/404 permits that have been obtained _ ___Copy of US Army Corps of Engineers wetland delineations or approved wetland delineation (if applicable) I have contacted my local regional office about a Pumping O&M Plan, Regional Office Contact: � � Date contacted: -OR. � will not any impact nearby wetlands, surface waters or groundwater by dewatering. If an ATC or ATO is required, three (3) sets of plans, specifications, and design calculations, signed, sealed, and dated by a P.E. ATC and ATO requirements in NCG02000 are summarized in Table 1 on Page 2 of this NO] (see the permit text for more details). Plans shall show all pertinent design features, including the location of the outfall(s). 11 stormwater is flowing off -site, the plan must show that stormwater will not be mixed with wastewater. Certification: North Carolina General Statute 143-215.6 b (i) provides chat: Any person who knowingly makes any false statement, representation, or certification in any application, record,,report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding of contested case under this Article; or who falsifles, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the (Environmental Management) Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a line not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I agree to abide by the following as a part of coverage under this General Permit: 1 _ I agree to abide by the approved Mining Permit for this mining activity. (A copy of the valid mining permit must be attached to this request. 2. 1 agree to not discharge any sanitary wastewater from this mining activity except under the provisions of another NPOES permit specifically issued therefore, 3. 1 agree that bulk storage of petroleum products and other chemicals shall have adequate protection so as to contain all spills on the site. 4. 1 agree that solid wastes will be disposed of in accordance with N.C. statutes and rules governing solid waste disposal. `s_ 1 agree that maintenance activities for vehicles and heavy equipment will be performed so as to not result in contamination of the surface or ground waters. t --- 0 ,; n TB Merry Oaks SW and Wastewater Ponds POND NUMBER MINE AREA IUSE YEAR CONSTRUCTED !UPSTREAM COND, iRECLAIMED (MONITORING CLASS 'PHOTO Haul Road Pond Upper M1 -PERM 1993 ? Unmined NA Wu SW No M1-5B4, .. _ M1 PERM 1996 Mined Out No - Wastewater Yes., SED TRAP R-TB1 M3 TEMP 2064 =`' ~fig Unmined NA SW No SED TRAP M3-TB1 M3 TEMP 2004 Pond Higher than Mine No SW Yes, M3-S62 M3 PERM .2004 Mined (Not Out) No Wastewater Yes SED TRAP R-TB4 M3 TEMP -2005 Road Runoff No Sw Yes M3-S83 M3 PERM 2005 Pond Higher than Mine No 5W Yes M3-5B1 M3 PERM' 2005 Pond Higher/Dry No 5W Yes SED TRAP R-TB1 M4 TEMP 2006 Road Runoff No' SW Yes SED TRAP M4-TBI M4 TEMP 2006 Road Runoff No SW Yes M4-SB2 M4 PERM 2006 Mining ( pond gone) No NA Yes SED TRAP M4TB2 M4 TEMP 2006 Pumping Pond( dewater) No : NA -No discharge possible Yes M4-SBI M4 PERM 2006 Dewatering Discharge No Wastewater Yes` SED TRAP R TB2 M5 TEMP 2008 Parking Lot Runoff No SW = No , SED TRAP M5 TBl M5 TEMP 2008 C&Grubbed No _. SW = -- No M5-5B1 M5 PERM -.2008 .',.-: C&Grubbed No SW M5-SB2 _ _-" M5 -;-PERM -2008 `. C&Grubbed Na.. 51N _ Yes.." 5B-M6-1 M6. PERM Not Constructed, Undisturbed NA -°SW No SR-M6-2 M6 PERM Not Constructed Undisturbed NA 5W No SS-M6-3 M6 PERM Not Constructed Undisturbed NA' SW No SW BY Pass Ditch M6 TEMP Not Constructed Undisturbed NA 5W No October 21, 2011 NCDFNR Division of Water quality 512 N. Salisbury St. 91h Floor Raleigh, NC 27604 Attn: Ms. Jennifer Jones Subject: Triangle Brick Company -- Merry Oaks I Mining Permit No. 19-10 NCG 020000 Permit Application Jacobs No. EIX10200 Dear Ms. Jones, 1 1 1 Corning Road Suite 200 Cary, North (orofina 27518 USA 1.119.853.i000 ,Xx'I �11;1.;3iJ.:il51 UENR -WATER QOAL1TY KTLbNDSAN0STORPfif►'1 R600�i Jacobs Engineering, on behalf of Triangle Brick Company, hereby submits two ( 2) copies of a request for a NPDES Permit NCG 020000 along with the $100 application fee. This permit will take the place of the current NCG070000 Permit. We have attempted to show (see attached drawings) which discharges will be considered stormwater and which ones will be considered wastewater. The thought was that any flow over "product" , ie. clayey material, would be considered wastewater discharge and would be subject to those monitoring requirements. Many of the structures, even though "downstream" of the mining, sit essentially above the mining area due mining being conducted now at a lower surface elevation. I have included a spread sheet. that keys into the pond numbering at the mine site. Should you have any questions regarding this application, please don't hesitate to call me at 919-859-5767. Sincere , UJO 1 Tom Wainwright, P.E. Project Manager cc. Howard Brown — Triangle Brick Company �....r..�r k ��:A� v � � � Spy _ _ � � — _ _-^_ J 1 �- � 1� •y, � 14. AD .i ' � &-Iki ,j,-.. ���,��.y �/� ,ram,•='� �_-� �•'y}}'' ti �. jr 1. -'Yr�� •,t. i =T'.' fd fJ.� ra 4 �- � I I',' ry '�"V �T 1 ] a J .r•i �� .\-; 2 Y.l . � Jam.°� �` - �f JJ �`r 4 it ��xS _r 1 'L � 7 � � ,t+-�-.�-����if��•� �- f , JJ�f 5. �� v- ^ •�f •r }'FJ ` 5i ' `J • �'�,!��'�� `ram r � Syr �y4•� �; �:. � ..��� '--+ �' � -rh.� i � !/ . �i� ', Ar +f - r'.i�' � •~ t:� 4 ,�� ,fir I " ++ 1.�.1 , ..• ..�.,�,�i `• "•'r ••' MALL 1 f/ W r�anrwc�t:r bAiN.1c [if _ 1i.� ; �. — r r�.� .-. 11�r►rl �� '- Q}.r = - :• ,rig �•- 'gof13�aY Wrz { is +-�- •, i _��; _ era. � ��:�' iy v`- ' ` ' ,� � r ���' � �' `yam � r _ a r � "'+, e+-� -.. , T - -- 11r�. • ` v t •� kk - ,..i��axr., �}. - ev, ,,,h�. `•; ^- - �,�fl�� �`.fw�y't'�'. V f ti.{ � +��' J���.. -�,r � f� la�� .. y` e�"' i - ..� Y _'> • 1 _ Y i a.. E- •aC'�lQ_ `r „ �.s^-^ _ r'r""'` i�: :'�S.ita Y- ._4 c'n�'#'..¢r'F. _y. �•' �}• ".:c: - . ` ..:•�.., _ _ ''�''bix-� - { : ��� 5.s +rr .c ems s-. 3�i,"•�- +i1'!;pol '' 3r, ' - •..'�=w - 3 - .g ;, • rizh�._s_ .atrl�w. C` •.tA i_ �-.+ f-v'- _.! . _.'�' :'.Merry Oak 1•� 's r� ,n•.C" � ~-T.. t ` r - ��� Q�i� �'<', .+l ' � ,,,rt:,�. , � F _ � `'"+'a.,�r }r°i � "i' ' .. . r •� r lr -•'y : r'J � .. _ `' '"""^•"^""� ���d ` 3- x• �.� �y .. 'F� '`r. , � } .fir. - . � . �+f:,.:9', •• `� S • .a! r"' r 'kf+.'�. i •� �I1.--' - ma's' :- -�. � ' a - 'fit.;- � = �_ -y - � ^,� ��: ; -,�._ {'.. k • z, $ s' ;� r• _ •ski � t _ _ •.. _ '• � y '�. .( +. R}*1 a' __ t — Yam. - � r -rr " ; r�: A. - mac: '�•ar %S -�� a` `' F __ � �.� w � �' c - �'j. «,ice^ .'/1 • r -'' �- •�•� ""i'� �, -•_ � ye%,�cfr -�.- .. +, u ,';; � '�' i`�': ` _ - _''' µ'".'F "C'.� { -' S ,• ,d, F f. -.i'�� ram- - �,�-'_�y�, .� "•'� ._-`•--�a�ix`'�`�' �,,.. �'.?', ; � �fi � ti` '' -•- a 't - -, .. !� � � . t' �`t -# _ s ` .r.,� . _ •+- _ ^fir.. sY ;C�� s.-. - _ - - - �. r• -� NCG020000 N.0.I. I agree to abide by the provisions as listed above and recognize that the provisions are to be considered as enforceable requirements of the General Permit. i certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person S Title: (Signature of Applicant) (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR. Mail the entire package to: Stormwater and General Permits Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPI}ES permit. For questions, please contact the DWQ Regional Office for your area. T �� DWQ Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 4 Page 9 of 9 1 —1 —A-4 R/717nin JACOBS" TO: Jennifer Janes LETTER OF TRANSMITTAL DATE: 10/21 /2011 NCDENR — Division of Water Quality FAX 512 N. Salisbury St. _ 91h Floor Raleigh, NC 27604 919.783,5882 FROM: Thomas Wainwright — Jacobs PHONE: 919-859-5000 M � ��Q v � fj PROJECT: Triangle Brick Com an — Mer Oaks I —Mining Perrmit No 19-10 U PROJECT#: Jacobs Project Number EIX10200 UC T 2 4 2011 MWDIANo STORMWA�TER swwcH Please find the following items for: Transmitted via: Review and Comment 0 Fax # Of Fax pages �X Approval ED Mail r7 Pick-up X� Delivery 0 Your Use 0 Fed -Ex COPIES DATE DESCRIPTION 2 10/21/11 Permit Application and Support Documents 2 10121 /11 Mining Area M-6 Site Plan (C-EP.01) 2 Previously Approved Overall Mining Site Plans (Drawings 3 & 4) REMARKS: JACOBS ENGINEERING GROUP INC., 111 CORNING ROAD, SUITE 200, CARY, NC 27518 TELEPHONE (919) 859-5000 FAX (919) 859-5151 JACOBS' October 21, 2011 NCDENR Division of Water Quality 512 N. Salisbury St. 9`h Floor Raleigh, NC 27604 Attn: Ms. Jennifer Janes Subject: Triangle Brick Company — Merry Oaks I Mining Permit No. 19-10 NCG 020000 Permit Application Jacobs No. EIX10200 Dear Ms. Jones, 111 Corning Road Suite 200 Cary, North Carolina 27518 USA 1,919,859.5000 Fax 1,919,859.5151 21D�p oi:f ? 4 loll DENR- WATER QUALITY MM05 AND STORMWATER I3 MG4 Jacobs Engineering, on behalf of Triangle Brick Company, hereby submits two ( 2) copies of. a request for a NPDES Permit NCG 020000 along with the $100 application fee. This permit will take the place of the current NCG070000 Permit. We have attempted to show (see attached drawings) which discharges will be considered stormwater and which ones will be considered wastewater. The thought was that any flow over "product" , ie. clayey material, would be considered wastewater discharge and would be subject to those monitoring requirements. Many of the structures, even though "downstream" of the mining, sit essentially above the mining area due mining being conducted now at a lower surface elevation. I have included a spread sheet that keys into the pond numbering at the mine site. Should you have any questions regarding this application, please don't hesitate to call me at 919-859-5767. Sincere , 1 Tom Wainwright, P.E. Project Manager cc. Howard Brown — Triangle Brick Company Jacobs Engineering Group Inc. TB Merry Oaks SW and Wastewater Ponds POND NUMBER IMINE AREA ]USE I YEAR CONSTRUCTED ]UPSTREAM COND. ]RECLAIMED IMONITORING CLASS IPHOTO Haul Road Pond Upper M1 -- PERM 1993 ? Unmined---� NA SW No MI-SB4 Ml PERM 1996 Mined Out No Wastewater Yes SED TRAP R-TB1 M3 TEMP 2004 Unmined NA SW No SED TRAP M3-TB1 M3 TEMP 2004 Pond Higher than Mine No SW Yes M3-SB2 M3 PERM 2004 Mined (Not Out) No Wastewater Yes SED TRAP R-TB4 M3 TEMP 2005 Road Runoff No SW Yes M3-SB3 M3 PERM 2005 Pond Higher than Mine No SW Yes M3-SB1 M3 PERM 2005 Pond Higher/Dry No SW Yes SED TRAP R-TB1 M4 TEMP 2006 Road Runoff No SW Yes SED TRAP M4-T81 M4 TEMP - 2006 Road Runoff No SW Yes M4-S82 M4 PERM 2006 Mining ( pond gone) No NA Yes SED TRAP M4-TB2 M4 TEMP 2006 Pumping Pond( dewater) No NA -No discharge possible Yes M4-5131 M4 PERM 2006 Dewatering Discharge No Wastewater Yes SED TRAP R-TB2 M5 TEMP 2008 Parking Lot Runoff No SW No SED TRAP M5-TBl M5 TEMP 2008 C&Grubbed No SW No M5-SBl Ms PERM 2008 C&Grubbed No SW No M5-SB2 MS PERM 2008 C&Grubbed No SW Yes SB-M6-1 M6 PERM Not Constructed Undisturbed NA SW No SB-M6-2 M6 PERM Not Constructed Undisturbed NA SW No SB-M6-3 M6 PERM Not Constructed Undisturbed NA SW No SW By Pass Ditch M6 TEMP Not Constructed Undisturbed NA SW No f Division of Water Quality / Surface Water Protection NCDENRNational Pollutant Discharge Elimination System EnV 0R r.NI _D NATURAL Rr,s .c C5 NCG020000 NOTICE OF INTENT FOR AGNNCY USF ONLY Date Reecaled Year Month Du Cerd Flc.ale of Coverage 2 10 1210111 Check H 1 Armxurt 13Aaq lbo Permit A,signed to a" National Pollutant Discharge Elimination System application for coverage under General Permit NCG020000: STORMWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code - 14XX Mineral Mining Industry (except as specified below) The following activities are also included: • Active or inactive mining operations (including borrow pits —except for NCDOT borrow pits) that discharge stormwater contaminated with or that has come in contact with, any overburden, raw material, intermediate products, finished products, byproducts or waste products located on the site of such operations; • Stormwater from vehicle maintenance activities at mining operations; • Overflow from facilities that recycle process wastewater; and/or • Mine dewatering (wastewater) The following activities are specifically excluded from coverage under this General Permit: • Stormwater discharges associated with peat mining, coal mining, and metal mining; • Stormwater discharges from mining operations which are intermixed on site with stormwater from asphalt operations and/or concrete operations; • Stormwater discharges associated with oil and gas extraction operations; and • Stormwater discharges associated with tourist gem mines • NCDOT borrow pits are covered under NCS000150 The following discharges are covered by NPDES general permit NCG520000 instead of NCG020000: • Point source discharges of stormwater and wastewater from in -stream sand mining operations (i.e., sand dredging or dipping operations) For new mining sites that require an authorization to construct (ATC) wastewater treatment facilities: This NOI is also an APPLICATION FOR an ATC for new wastewater treatment facilities. ATC requests must be submitted at least 90 days prior to construction'. Far existin,.g mining sites that require an Authorization to Operate (ATO) wastewater treatment facilities: This NOI is also an APPLICATION FOR an ATO for wastewater treatment facilities in place. Construction modification or installation of anZ new treatment components at an existing site requires an ATC. (It the site is already covered by NCG020000, the ATC request may be submitted without an NOI). Some wastewater treatment facilities used to treat or recycle wastewater at mining sites will require an ATC rP for to construction per 15A NCAC 2H .0138. Please see the NCG020000 General Permit for details about which treatment facilities require an ATC (summarized in Table 1 below). The authorization to construct or continue to operate will be issued at the same time as the Certificate of Coverage (COC) for the NCG02 permit. Design of treatment facilities must comply with requirements of 15A NCAC 2H .0138 & .0139. Construction of wastewater treatment facilities subject to the ATC/ATO requirements in the NCG02 permit at new or existing mining sites requires submission of three (3) sets of plans and specifications signed Page 1 of 9 'As per ISA NCAC 2H .0106 Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such work for their respective companies in accordance with General Statutes, 89C-25 (7), plans and specifications must be signed and sealed by a P.E. SWU-NCG02-NOI Last revised 06/07/2010 NCG020000 N.O.I. and sealed by a Professional Engineer (P.E.) or qualified s1aft2 along with this application. A copy of the design calculations should be included. Please see auestions 18 & 19. Table 1: Summary of Wastewater Permit Requirements Quarterly Monitoring? Requires A to C? Mine Dewatering (MD) Yes No Yes No MD Discharges that do not need treatment other than E&SC to meet permit conditions MD Discharges that need treatment other than E&SC to meet permit conditions ✓ ✓ Process Wastewater Other Recycle ✓ ✓ Closed Loop Recycle ✓ ✓ Any Other Process WW ✓ ✓ vo For questions, please contact the DWQ Regional Office for your area- (See page 7) (Please print or type) 1) Mailing address of owner/operator (address to which all permit correspondence will be mailed): Owner Name Triangle Brick Company Owner Contact Howard Brown - VP of Production and Engineering Street Address 6523 N. Highway 55 City Durham State NC ZIP Code 27713 Telephone No. (919) 387-9258 Fax: E-mail Address 2) Location of facility producing discharge: Facility Name Triangle Brick Company - Merry Oaks Facility Contact Brent Cox Street Address 294 King Road City Nioncure State NC ZIP Code 27559 County Chatham Telephone No. (919) 387-9258 Fax: Contact E-mail 3) Physical Location Information: Please provide a narrative description of how to got to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). Located at the intersection of King Road and Christian Chapel Church Road, just off of US-1 in Moncure 4) Latitude 35d38'32" Longitude-79do'4" (degrees, minutes, seconds) Page 2 of 9 SWU-NCG02-NOI Last revised 6/7/2010 NCG020000 N.4.1. Permits: 5) This NPDES Permit Application applies to which of the following: ❑ New or Proposed Facility Date operation is to begin M Existing ❑ New Permit not applicable — ATC request only. NPDES Permit Number 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: 1 4 5 9 7) Provide a narrative description of the types of minerals mined at this facility: Clay 8) Is this mine an inactive mine site? El No ❑ Yes If yes, do you posses an "Inactive Renewal" from DLR and notified the DWO Regional Office or have you certified to the DWO that the site has been stabilized? ❑ No ❑ Yes 9) Does this facility already have a valid Mining Permit from the Division of Land Resources (DLR)? ❑ No If No, please indicate the status of the Mining Permit application: 0 Yes if yes, please provide the Mining Permit number: 19-10 . Please also provide a copy of your DLR Mining Permit with this DWO application. Note: DWO cannot issue a COC for the NCGO20000 General Permit until a Mining Permit is issued or renewed by the Division of Land Resources (DLR). 10) Does this facility have any other NPDES permits? ❑ No El Yes If yes, list the permit numbers for all current NPDES permits for this facility: NCG070098 11) Does this facility have any Non -Discharge permits (ex. recycle permits)? 0 No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 12) Does total area of this mine site include ready -mix and asphalt areas? El No ❑ Yes If yes, do they have DWO stormwater permits (if owned by the same company)? ❑ No (provide permit number ) If not owned by the same company, who is the owner? 13) Will this mining operation precede development activities at this site? ❑ Yes 0 No ❑ Yes 14) Is this mine located within one of the 20 Coastal Counties and will it add more than 10,000 ftz of impervious surface? El No Page 3 of 9 SWU-NCG02-NOI Last revised 6f7f2010 NCG020000 N.O.I. ❑ Yes If yes, you may be required to apply for an additional state stormwater permit. Check with your local Regional Office. See contact information and checklist below. 15) Is this mine located the Neuse, Tar -Pamlico, or Catawba River Basin, or the Randleman or Jordan Water supply Watersheds? El No ❑ Yes If yes, what size stream buffers are included on site? ft. Please show buffers in site plans. Discharge Points, Receiving Waters & Wetlands: 16) Receiving waters: What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges end up in? Shaddox Creek which drains into the Haw River If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). N/A Receiving water classification (if known): WS-IV Note: Discharge of process wastewater to receiving waters classified as WS-II to WS-V or SA must be approved by the N.C. Dept. of Environmental Health. It DEH does not approve, coverage under NCG020000 cannot be granted. No new discharges of wastewater are permitted in receiving waters classified as WS-I or freshwater ORW. Wastewater discharges to Saltwater ORW will not be approved under the NCG02 General Permit. 17) If your facility has wastewater discharges and they are to HWO, PNA waters (Primary Nursery Areas) waters, what is the flow rate? N/A (See httg://www.ncdrnf.net/rnaps/FNA mapslindex.html, for map) 18) Discharge Points: Number of discharge points (ditches, pipes, channels, etc. that convey discharges from the property): Onsite: Stormwater: 17 Mine dewatering: 3 Process Wastewater Overflow: Offsite: Stormwater: Mine dewatering: Process Wastewater Overflow: Discharge points should be clearly marked on the submitted site plan. Please provide short narrative description of discharges: 1 Planned Stormwater bypass discharge (located in M6), 16 stormwater discharges from previously permitted temporary sediment traps, 3 Discharges from sediment and erosion control permanent sediment ponds a) Is your mine dewatering and discharging? (Answer only if you are dewatering) ❑ No Mine will discharge to sediment trap prior to discharging upstream of possible wetlands. El Yes If yes, where to? Surface Waters and/or Wetlands (on -site or off -site) Other (on -site or off -site) Describe: Sediment trap prior to leaving the site. b) Are you dewatering but not discharging? (Answer only if you are dewatering) Cl No ❑ Yes If Yes, please explain how you are dewatering, and where that water will be directed: Page 4 of 9 SWU•NCG02-NOI Last revised 6/7/2010 NCG020000 N.O.I. 19) Will mining operations require dewatering near wetlands or impact any stream, groundwater, or wetlands? 10 No Potential wetlands are shown on plans. No wetlands have been delineated by USACE. ❑ Yes Note: Wellands must be CLEARLY DELINEATED on the site plan_ Mine dewatering activities that have the potential to drain wetlands or otherwise impact surface water or groundwater MUST develop and implement a Pumping Operation and Monitoring (O&M) Plan that has been approved by the Division. For sites that may drain wetlands — approval of a Pumping O&M plan may be required prior to coverage under this general permit. The Pumping 0&M Plan should be submitted to the appropriate Regional Office and must be approved prior to operation. The plan shall include, but is not limited to: (1) Groundwater monitoring strategies to demonstrate the effect of pumping and to establish any pumping regime necessary to reduce impacts, and (2) Detailed plans to maintain surrounding hydrology and respective monitoring to demonstrate compliance. See checklist at end of document. Contact your local Regional Office for questions specific to your mine. 20) If you are dewatering, are there wetlands or surface waters within 400' of the mine pit perimeter? 13 No ❑ Yes If yes, what distance are they from the mine pit perimeter? feet. 21) Have you been required to obtain a 404f401 Certification permits? 0 No ❑ Yes if yes, please briefly describe below (include information such a required mitigation, BMPs, setbacks, and/or O&M plans for on or off -site wetlands or other pertinent information). Attach other sheets as necessary: 22) Have you been required to obtain a wetland delineation certified by the US Army Corps of Engineers? ICI No ❑ Yes If yes, please attach to application submission. Stormwater BMPs: 23) Does this facility employ any best management practices for stormwater control? 0 No ❑ Yes If yes, please briefly describe: 24) Does this facility have a Stormwater Pollution Prevention Plan? ❑No 0Yes If yes, when was it implemented? 25) Will vehicle maintenance activities occur at this facility? ❑ No 0 Yes Page 5 of 9 SWU•NCG02•NOI Last revised 617l2010 NCG020000 N.O.I. Wastewater Treatment Facilities: 26) Will mine dewatering discharges occur? (An ATC/ATO is required for wastewater treatment facilities' dewatering discharges where E&SC devices alone will not meet effluent limits and/or protect water quality standards). ❑ No El Yes 27) Will discharges of overflows from process wastewater treatment systems occur? (ATC or ATO required, unless closed -loop recycle system) El No ❑ Yes If yes, answer the following questions for each wastewater treatment system: a. Please describe the type of process used to treat and/or recycle the process wastewater. Give design specifics (i.e. design volume, retention time, surface area, etc.). Existing treatment facilities should be described in detail, and design criteria or operational data should be provided (including calculations) to ensure that the facility can comply with requirements of the General Permit. [Use separate sheet(s)] b. Does this facility employ chemical additives to flocculate suspended solids? ❑ No ❑ Yes If yes, please slate the name, manufacturer and the quantity of average daily usage of the chemical additive Note: Please see our website for a list of evaluated polyacrylamide (DAMS) products for use in North Carolina. C. Does this facility overflow only during rainfall events exceeding the 10-yr, 24-hr rainfall event? ❑ No ❑ Yes 28) Are wastewater treatment facilities (including recycle systems) planned in the 100-year flood plain? Ell No ❑ Yes If so, include information to demonstrate protection from flooding. (Minimum design requirements for treatment works include protection from the 100-year flood, per 15A NCAC 2H .0219.) Other: 29) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? ❑ No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? 0 No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? 0 No ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: Page 6 of 9 SW U-NCG02-NOI fast revised 6l7I20 t 0 NCG020000 N.O.I. How is material stored: Where is material stored: How many disposal shipments per year: Name of transport / disposal vendor: Vendor address: 30) Are you applying for a mining permit in the same location as a previously permitted mine? ❑ No El Yes If yes, specify permit number and name if known: 19-10 Merry Oaks Site #1 31) Does your site have an active landfill within the mining permit boundary? 0 No ❑ Yes If yes, specify type: ❑ LCID ❑ Other: 32) Is your facility providing appropriate secondary containment for bulk storage of liquid materials? See permit text online for secondary containment requirements. ❑ No El Yes Final Checklist: This application will be returned as incomplete unless all of the following items have been included and initialed for. Please show that the following required information has been included by initialing in each space below. Fee of $100 made payable to NCDENR lCompleted application and all supporting documents �� Copy of the valid approved mining permit (MP) for the facility or indication of MP application status �;�Copy of a county map or other general location map that shows the mining site and nearest major roads �r;? Copy of USGS topographic map showing the mining site and surrounding areas, or other map that clearly shows site location in relation to nearby streams, wetlands, and other waters, etc. _1�i�2 copies of large-scale site plan with topographical lines with all outfalls, applicable buffers and wetlands clearly delineated ��A copy of your DLR mining permit A copy of your US Army Corps -approved wetland delineation if you marked "yes" to question 22 above. If mine site is in one of the 20 Coastal Counties, • Applicant has checked with the appropriate regional office to verify the need for a Coastal State Stormwater permit. Regional Office Contact: • Applicant has included a detailed list of impervious surface areas and percentages, sub -drainage areas and total drainage area. It the mine is dewatering and near wetlands, or may otherwise impact surface waters or groundwater, include the following and contact your local regional office about a Pumping O&M Plan (see below for contact information). You may be required to provide an approved Pumping O&M plan priorto NCG02 issuance. 2 copies of detailed Full Size Plans delineating areas on the plans and listing acreage (including: wetlands, ditches, well -placements, pits, borrow areas, overburden storage, stormwater controlslBMPs, vehicle maintenance areas, settling basins, product process (such as screening, stockpiles, waste piles), total drainage area, impervious surface percentages (if state sw programs apply), applicable buffers, and access and/or haul roads). Well information (design, depths, maintenance) Physical monitoring for the wetlands areas Settling pond sizing information, if applicable Page 7 of 9 5WU-NCG02-NOI Last revised 6/7/2010 NCG020000 N.O.I. Level spreader design, if applicable Details about dewatering method Cone of influence calculations Description of measures to prevent erosion and flooding Description & information about 401/404 permits that have been obtained Copy of US Army Corps of Engineers wetland delineations or approved wetland delineation (if applicable) I have contacted my local regional office about a Pumping 0&M Plan. Regional Office Contact: Date contacted: OR- will not any impact nearby wetlands, surface waters or groundwater by dewatering. If an ATC or ATO is required, three (3) sets of plans, specifications, and design calculations, signed, sealed, and dated by a P.E. ATC and ATO requirements in NCG02000 are summarized in Table 1 on Page 2 of this NOI (see the permit text for more details). Plans shall show all pertinent design features, including the location of the outfall(s). if stormwater is flowing off -site, the plan must show that stormwater will not be mixed with wastewater. Certification: North Carolina General Statute 143-215.6 b (1) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. agree to abide by the following as a part of coverage under this General Permit: 1. 1 agree to abide by the approved Mining Permit for this mining activity. (A copy of the valid mining permit must be attached to this request. 2. 1 agree to not discharge any sanitary wastewater from this mining activity except under the provisions of another NPDES permit specifically issued therefore. 3. 1 agree that bulk storage of petroleum products and other chemicals shall have adequate protection so as to contain all spills on the site. 4. 1 agree that solid wastes will be disposed of in accordance with N.C. statutes and rules governing solid waste disposal. 5. 1 agree that maintenance activities for vehicles and heavy equipment will be performed so as to not result in contamination of the surface or ground waters. Page 8 of 9 SWU-NCG02-NOI Last revised 6/7/2010 NCG020000 N.O.I. I agree to abide by the provisions as listed above and recognize that the provisions are to be considered as enforceable requirements of the General Permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Title: V p (Signature of Applicant) /v -ZO-lf (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR. Mail the entire package to: Stormwater and General Permits Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DWO Regional Office for your area. DWO Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office .'.. (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Page 9 of 9 SWU NCG02-NOI Last revised 6/7/2010 ,North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor William G. Ross Jr., Secretary Charles H. Gardner, P.G., P.E. Director and State Geologist March 1', 2001 Triangle Brick Company Attention: Mr. Howard P. Brown, President 6523 NC Hwy 55 - Durham, -North Carolina 27713=9413 - RE: Permit No. 19-10 Merry Oaks No. 1 Mine Chatham County Cape Fear River Basin Dear Mr. Brown: ern DENR Division of Land Resources Your application for renewal and modification of the above referenced mining permit has been approved. The modification is to increase the total affected area to 109.9 acres, which includes mining areas M-3, M-4, M-5, and M-6 as indicated on the mine maps last revised October, 2000. A copy of the renewed and modified permit is enclosed. The conditions in the renewed and modified permit were based primarily upon the initial application. Modifications were made as indicated by the renewal and modification requests and as required to insure compliance with The Mining Act of 1971. The new expiration date is February 28, 2011. 1 would like to draw your particular attention to Operating .Condition No- 4 of the enclosed permit as it contains specific requirements for adjusting erosion and sedimentation control measure locations in order to prevent disturbing the "ESTIMATED 50' WETLANDS BUFFER (TYP)" as depicted on the mine maps last revised October, 2000. The issuance of a mining permit and/or any modification to it does not supersede local zoning regulations. The responsibility of compliance with any applicable zoning regulations lies with you. As a reminder, your permitted acreage at this site is 350 acres and the amount of land you are allowed to disturb is 109.9 acres. Land Quality Section (919) 733-4574 Fox (919) 733-3876 Geological Survey Swim (919) 733-2423 For (919) 7334)900 1612 Nhil Service Censer, Raleigh, N»rth Cnrolinn 27099-1612 IjMsionol'Land Rcsuurces (9)1)) 733-3833 Fax: (919) 715-`Z801 Mr. Howard P. Brown March 1, 2001 Page 2 Please review the renewed and modified permit and advise this office at (919) 733-4574 should you have any questions concerning this matter. Sinc ely, Tracy E. avis, P.E., C.P.M. State,_Mining Specialist_. Land Quality Section TE D/ch Enclosures cc: Mr. John Holley, P.E., w/ copy of the sediment basin detail revision dated January 10, 2001 Ms. Monika Sharma-WRC, w/enclosures Mr. Bradley Bennett-DWQ, wlenclosures Mr. William Gerringer-DOL, Mine and Quarry Bureau, w/o enclosures Mr. Charles Horne, Chatham County Manager DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF LAND RESOURCES LAND QUALITY SECTION PERMIT for the operation of a mining activity In accordance with the provisions of G.S. 74-46 through 68, "The Mining Act of 1971," Mining Permit Rule 15A NCAC 5 B, and other applicable laws, rules and regulations Permission is hereby granted to: Triangle Brick Company Merry Oaks Site #1 Chatham County - Permit No. 19-10 for the operation of a Clay Mine which shall provide that the usefulness, productivity and scenic values of all lands and waters affected by this mining operation will receive the greatest practical degree of protection and restoration. T C Page 2 In accordance with the application for this mining permit, which is hereby approved by the Department of Environment and Natural Resources, hereinafter referred to as the Department, and in conformity with the approved Reclamation Plan attached to and incorporated as part of this permit, provisions must be made for the protection of the surrounding environment and for reclamation of the land and water affected by the permitted mining operation. This permit is expressly conditioned upon compliance with all the requirements of the approved Reclamation Plan. However, completed performance of the approved Reclamation Plan is a separable obligation, secured by the bond or other security on file with the Department, and may survive the expiration, revocation or suspension of this permit. This permit is not transferable by the permittee with the following exception: If another operator succeeds to the interest of the permittee in the permitted mining operation, by virtue of a sale, lease, assignment or.otherwise._the_Department.may_release the_ permittee_from_the duties imposed upon him by the conditions of his permit and by the Mining Act with reference to the permitted operation, and transfer the permit to the successor operator, provided that both operators have complied with the requirements of the Mining Act and that the successor operator agrees to assume the duties of the permittee with reference to reclamation of the affected land and posts a suitable bond or other security. In the event that the Department determines that the permittee or permittee's successor is not complying with the Reclamation Plan or other terms and conditions of this permit, or is failing to achieve the purposes and requirements of the Mining Act, the Department may give the operator written notice of its intent to modify, revoke or suspend the permit, or its intent to modify the Reclamation Plan as incorporated in the permit. The operator shall have right to a hearing at a designated time and place on any proposed modification, revocation or suspension by the Department. Alternatively and in addition to the above, the Department may institute other enforcement procedures authorized by law. Wherever used or referred to in this permit, unless the context clearly indicates otherwise, terms shall have the same meaning as supplied by the Mining Act, N.C.G.S. 74-49. 0TA.. . •1 December , 1997: This permit has been modified to allow the expansion of the existing brick production facility and associated storage, offices, parking, new gravel asphalt road south of the existing facility, and associated erosion and sedimentation control measures (totaling approximately 20.23 acres) as indicated on the mine maps dated October 15, 1997. F_ehrtLar_2$,.2_0_01: This permit has been modified to increase the total affected area to 109.9 acres, which includes mining areas M-3, M-4, M-5, and M-6 as indicated on the mine maps last revised October, 2000. Page 3 ExpiratisiLRate This permit shall be effective from the date of its issuance until February 28, 2011. This permit shall be subject to the provisions of the Mining Act, N.C.G.S. 74-46, et. seq., and to the following conditions and limitations. C_ ;Tk1Z .�x����OP►IOU�L� A. Any wastewater processing or mine dewatering shall be in accordance with the permitting requirements_and.rules promulgated by the-N.C.-Environmental Management Commission. B. Any stormwater runoff from the affected areas at the site shall be in accordance with any applicable permit requirements and regulations promulgated by the Environmental Protection Agency and enforced by the N.G. Environmental Management Commission. It shall be the permittee's responsibility to contact the Stormwater Section, Division of Water Quality, to secure any necessary stormwater permits or other approval documents. 2. A. Any mining process producing air contamination emissions shall be subject to the permitting requirements and rules promulgated by the N.C. Environmental Management Commission and enforced by the Division of Air Quality. B. During mining operations, water trucks or other means that may be necessary shall be utilized to prevent dust from leaving the permitted area. 3. A. Sufficient buffer (minimum 50 foot undisturbed) shall be maintained between any affected land and any adjoining waterway or wetland to prevent sedimentation of that waterway or wetland from erosion of the affected land and to preserve the integrity of the natural watercourse or wetland. B. Any mining activity affecting waters of the State, waters of the U. S., or wetlands shall be in accordance with the requirements and regulations promulgated and enforced by the N. C. Environmental Management Commission. Page 4 4. A. Adequate mechanical barriers including but not limited to diversions, earthen dikes, silt check dams, silt retarding structures, rip rap pits, or ditches shall be provided in the initial stages of any land disturbance and maintained to prevent sediment from discharging onto adjacent surface areas or into any lake, wetland or natural watercourse in proximity to the affected land. B. All erosion and sedimentation control measures shall be constructed and maintained to prevent offsite sedimentation as follows: 1) Measures shall be implemented as indicated in the previous permit and as provided on the mine maps last revised October, 2000 (including the sediment basin detail revision dated January 10, 2001) ; and 2) Where proposed erosion and sedimentation control measures are encroaching into the "ESTIMATED 50' WETLANDS BUFFER (TYP)" depicted on the mine maps last revised October, 2000, said measures shall be reasonably adjusted at the site so as to remove them from said buffer zone while still providing the same degree of protection against sedimentation of the buffers and neighboring wetlands or watercourses. 5. All mining permit boundaries (350 acres) shall be permanently marked at the site on 100 foot intervals unless the line of sight allows for larger spacing intervals. 6. The angle for graded slopes and fills shall be no greater than the angle which can be retained by vegetative cover or other adequate erosion control measure, structure, or device. In any event, exposed slopes or any excavated channels, the erosion of which may cause off -site damage because of siltation, shall be planted or otherwise provided with ground cover, devices or structures sufficient to restrain such erosion. 7. The affected land shall be graded so as to prevent collection of pools of water that are, or likely to become, noxious or foul. Necessary structures such as drainage ditches or conduits shall be constructed or installed when required to prevent such conditions. 8. Existing vegetation or vegetated earthen berms shall be maintained between the mine and public thoroughfares whenever practical to screen the operation from the public. 9. A. Sufficient buffer shall be maintained between any excavation and any mining permit boundary or right-of-way to protect adjacent property- B. A minimum 100 foot undisturbed buffer shall be maintained along SR 1912. In addition, a minimum 50 foot undisturbed' buffer shall be maintained along the remaining mining permit boundaries. 10. A physical barrier consisting of a fence or earthen berm, etc., shall be maintained around the perimeter of any highwali. -"° Page 5 11. Refuse Disks 1 A. No on -site disposal of refuse or other solid waste that is generated outside of the mining permit area shall be allowed within the boundaries of the mining permit area unless authorization to conduct said disposal has first been obtained from both the Division of Waste Management and the Land Quality Section, Department of Environment and Natural Resources. The method of disposal shall be consistent with the approved reclamation plan. B. Mining refuse as defined by G.S. 74-49 (14) of The Mining Act of 1971 generated on -site and directly associated with the mining activity may be disposed of in a designated refuse area. All other waste products must be disposed.of-in a.disposal facility. approved -by-.the-Division-of-Waste Management. No petroleum products, acids, solvents or their storage containers or any other material that may be considered hazardous shall be disposed of within the permitted area. C. For the purposes of this permit, the Division of Land Resources considers the following materials to be "mining refuse" (in addition to those specifically listed under G.S. 74-49 (14) of the N.C. Mining Act of 1971): 1) 2) 3) 4) 5) 6) on -site generated conveyor belts wire cables v-belts land clearing debris steel reinforced air hoses drill steel D. If mining refuse is to be permanently disposed within the mining permit boundary, the following information must be provided to and approved by the Division of Land Resources pri-Q to commencement of such disposal: 1. the approximate boundaries and size of the refuse disposal area; 2. a list of refuse items to be disposed; 3. verification that a minimum of 4 feet of cover will be provided over the refuse; 4. verification that the refuse will be disposed at least 4 feet above the seasonally high water table; and 5. verification that a permanent vegetative groundcover will be established. y Page 6 12. An Annual Reclamation Report shall be submitted on a form supplied by the Department by February 1 of each year until reclamation is completed and approved. 13. The operator shall notify the Department in writing of the desire to delete, modify or otherwise change any part of the mining, reclamation, or erosion/sediment control plan contained in the approved application for a mining permit and any approved revisions to it. Approval to implement such changes must be obtained from the Department prior to on -site implementation of the revisions. 14. The security which was posted pursuant to N.C.G.S. 74-54 in the form of a $500,000.00 blanket bond is sufficient to cover the operation as indicated in the approved application. This security must remain in force for this permit to be valid. The total affected land shall not -exceed _the..bonded. acreage. _ 15. A. Authorized representatives of the Division of Archives and History shall be granted access to the site to determine the presence of significant archaeological resources. B. Pursuant to N. C. G. S. 70 Article 3, "The Unmarked Human Burial and Human Skeletal Remains Protection Act," should the operator or any person in his employ encounter human skeletal remains, immediate notification shall be provided to the county medical examiner and the chief archaeologist, North Carolina Division of Archives and History. Page 7 The Mining Permit incorporates this Reclamation Plan, the performance of which is a condition on the continuing validity of that Mining Permit. Additionally, the Reclamation Plan is a separable obligation of the permittee, which continues beyond the terms of the Mining Permit. The approved plan provides: Minimum-S-tarid.ar_d_s-As P_rovideday--G—S Z4_U The final slopes in all excavations in soil, sand, gravel and other unconsolidated materials shall be at such an angle as to minimize the possibility of slides and be consistent with the -future use.of the land.. 2. Provisions for safety to persons and to adjoining property must be provided in all excavations in rock. 3. All overburden and spoil shall be left in a configuration which is in accordance with accepted conservation practices and which is suitable for the proposed subsequent use of the land. 4. No small pools of water shall be allowed to collect or remain on the mined area that are, likely to become noxious, odious or foul. 5. The revegetation plan shall conform to accepted and recommended agronomic and reforestation practices as established by the North Carolina Agricultural Experiment Station and the North Carolina Forest Service. 6. Permittee shall conduct reclamation activities pursuant to the Reclamation Plan herein incorporated. These activities shall be conducted according to the time schedule included in the plan, which shall to the extent feasible provide reclamation simultaneous with mining operations and in any event, provide reclamation at the earliest practicable time after completion or termination of mining on any segment of the permit area and shall be completed within two years after completion or termination of mining. Provided further, and subject to the Reclamation schedule, the planned reclamation shall be to regrade and satisfactorily revegetate any disturbed areas. Page 8 2. The specifications for surface gradient restoration to a surface suitable for the planned future use are as follows: A. All sideslopes shall be graded to a 2 horizontal to 1 vertical or flatter slope B. Any settling ponds or sediment basins shall be backfilled and stabilized. C. The processing, stockpile, and other disturbed areas neighboring the mine excavation shall be leveled and smoothed. D. Compacted surfaces shall be disced, subsoiled or otherwise prepared before revegetation. E. No contaminants shall be permanently disposed of at the mine site. On -site disposal of waste shall be in accordance with Operating Condition Nos. 11.A. through D. F. The affected land shall be graded to prevent the collection of noxious or foul water. After site preparation, all disturbed land areas shall be revegetated as per the seeding schedule included on the mine maps last revised October, 2000. In addition, the permittee shall consult with a professional wildlife biologist with the N.C. Wildlife Resources Commission to enhance post -project wildlife habitat at the site. Reclamation shall be conducted simultaneously with mining to the extent feasible. In any event, reclamation shall be initiated as soon as feasible after completion or termination of mining of any mine segment under permit. Final reclamation, including revegetation, shall be completed within two years of completion or termination of mining. This permit, issued June 4, 1990 and modified December 9, 1997, is subsequently renewed and modified this 28th day of February, 2001 pursuant to G.S. 74-52. B / G . Charles H. Gardner, Director Division of Land Resources By Authority of the Secretary Of the Department of Environment and Natural Resources I lei 3y� . 4 Ir S 1 v/�y'' I�r • �i @�j���M, ���N/ K .nay 1tw s4 Slat"."a4579P!'4!`iii+�i.,.. �:1'�. _:: NCDENR - Division of Land Res. Land Quality Section 1612 Mail Service Center Raleigh, NC 27699-1612 Date A/c Code 17-Oct-2011 16006 Transaction Cash Date Code Discount ----------- -------------- IN USD 0.00 14-OCT-2011 Our,Ref 225062 REMITTANCE ADVICE SUNTRUST BANK' DURHAi 66-46 531 m I. Di - WATER uuAary WETLANDS AND STORMWATER BRANCH Cash A110C Cash Alloc Amount Amount USD -------------- -------------- 100.00 100.00 Supp Ref PERMIT - MERRYOAKS I Total Remittance USD Triangle Brick Co. - 6523 NC HWY 55 - DURHAM, N.C. 27713-9436 Triangle Brick Co ' ;:6523'.NC- HWY 55 ':DURHAIi 27713-9436 17-OCT-2011 ONEHIJINDR--------- ------- D'AND 100 DOLLARS Triangle Brick Co. NCDENR - bivision of Land Res., T'OT' HE Lfand ua Secti6n 612 Mail Service hter' Or Raleigh, INC 27699-1612 100.00 CHECK NO. 068999 CHECK NO. 068999 NET AMOUNT $100,00 es w if the amount Of this check exceeds $2000 two signatures are required. 15) SECURITY FEATURES INCLUDED, DETAILS ON BACK. aj9 m f i, Mil; oe Z Trtrr — .�I4 zD m $as a1-P At ^gym 4w - 1 d m a. 1 1 P s = €' £= 4A °� � Q ?' gg`g g6 9 4 4= S`d §T _ �P= _ f �8a 4 ) i a� a �s O I �p s � s "sue ! z 4 nas�m a �m �� r h � -o f4HUN / I ��xgm Fi s3 - Z �® %r E 5 '6 l I �� m i. A� m r e,� 3 - ! 3 nR - g � — I 1 f � /I J I D r $ 1 . I a O F sxi° qq 1 J iI 9�i �Yb z gg3 ` Q ti \ is � e 1 9z 1- A i� $ a a=a any C r .x"i= [) ; r4 I 9 & 85 Z m�� $- m m Aga s Z a €� m d r 1 \ - II ¢_ I - m O � - ; , �.fi 7 l , , 44 o �. I i / , 9 { 4, � 8 r r ¢ / 1 - sl I 1 � k �g pp m� � �s ,B •i 7 � 5 L `7 ED ➢ !D 3 �� :3 Z 8�%w egY x� $5% 1 I 1 I.i I In n { 31 � m m '31 OCi rz+2011 06. g p� x Z m m 0 �i § 3m 3 a a cop M. 1 $ - r 98> �A t g; a f: - � s �9 a3 5 l i \ N E Mix -�,�� ti , i i 6� I' - m ': y M ow g °$ a — a a ago - %:. O - i 'e= Im� {� ffi z 'r rg R s '3 ! o i I as i � F J r l 8 m9 t p 3 - 1 - � a f i �. f�! r^ f: I {ilk fi a� O � f F V I F � z � 8 �Asaa L�. Q I� av p,�.: 541.o , a- Z t co 2$w =sw s m W i� r it I � o �Qe� �_- C m I 1 \ mm t y s� JI \ I m _ I a yS I a, I t t S? R d 8 I � - I 1 1 l{ , g 1 I I 11 L 0-1 s l 1 /= �, �♦ 1 •` al N;il , 1 n �® as Tif IMIT I 4 8 P O 7 w ➢ M { C C�7;40wlgD 3 � � :r- IIL` 24 IDt1 CI7 S��$ - 3 �J d Winco 00-1 $ so�r� �.�� '� art►-- — _"; m$ax,aA 0 fqin m ! D r r. � � 9 O � ;1 -g a� gg Z z f -- �a 't f -- Sa- go�n s- s m6 D � - �� Z 1 Ur a� € a� m� i r ar I �€ 2 �. �o TO r r � - 1 o� i r — L Iv \� C z F� m _� P= - €m a 'i g a li a' g' c mg a o ^� r 4 d.� •�� ! g D saa gid €'ec= o �$ o are=g RI I I �� �• v `. J. t r ! li ! I m 1 / z 0 ( 1 �f d` 4 � T A - F - 4 yam, 1 Y rr` { B w� $ s d - \ i f E � � E I Mr r 5, g� � �e lm ,"V } - i � t €F Silk, S ` r i 1 �o (ll y5 V7 (I) - i F E 9 'fTl [ mf�l Sri 4 �Zs 9 � - s$'� (/7 EJ3 - _ 1 Z a8Y __ mY L & � ➢ W C; I E 4 2011 5 m 07 cou - m CrTI z m- 0 T 4 � m 4 N as E zya 0C:-4 Alc — s OE i �o r� r 0_ -. I I EX x �I go 10 ago ilia! II I I dYg� =m ilia! 11I! I II �!Big! =g gFm" � - q jj -i--1 1_��4NIH HIasz - �a .- N.��o�a�a0.�5�� Sods "���� og�k8$��<wa° FZFFFF[+111110111 Z Q J J N X1 O 0 Z � O UW �uj :Ocu XO LLI T E Its U 2 w 3 Al Y L � 0 � T L e� g S -ailia a eq OIL"` i I I 'H,YibEY C a E >s� _ i t- - \ i — + - f - - I e I I l \ �I 11l \ \ �\ a ti + _ 1 t� 1 \ 1 I , I 1 e\ \ r- i , - 1 e 1 / \ 1 ram-- r' 4� / 4 _ 11 \ is '! V t - \ I :- r / xa s f l/ f / - i. \X tee/ - \ I { / 1 1 / � f v i✓ �\ / i r � d L, / \ 4� t - / ! a� t_r � I, rf •r / Y_•'' 4 f L'r ! i 4 r / \ S / vd L l 1 f� tl k \\ v \ I t I ! J / f \ / / I I I I tl - - 1 5 t r 1 \ l / J' i - i /'/ d:� •mot .. I - ' f( ALLI M.dig IM5 UGGA MR 01 ell �9 1 e1Fa II; 1 I1 II �I� >x � �8ams ow�-����Y}LL�' W al - Vill/ FIN jk rT im n 0 9 NEI N-f S NIM p A Al: LiU 4t Al 9 't/ �� I 11 i1� ` Ml ice/ � ,/ j r �� J� 4 l u �go-�Y\ `�\\ 3 �8 � - /i ml CD aw L W.0 z ffi m 0 NI h-T, ILI H IMMUNHUNHUgggg U9 P. 91 Wo un. Hsi 77, 9 STORMWATER DIVISION CODING SHEET RESCISSIONS PERMIT NO. DOC TYPE ❑COMPLETE FILE -HISTORICAL DATE OF RESCISSION p c),6 3�)3� YYYYMMDD NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, RE, Governor Director March 20, 2013 Mr. Thomas J. Wainwright Triangle Brick Company -Merry Oaks Mine 6523 N. Highway 55 Durham, NC 27713 Subject: Rescission of NPDES Stormwater Permit Certificate of Coverage Number NCG070098 294 King Road Moncure, NC Chatham County Dear Mr. Wainwright: John Skvarla, Ill Secretary Please accept this letter as documentation that the originally -issued stormwater permit Certificate of Coverage for the Triangle Brick Company's Merry Oaks Mine, No. NCG070098, is rescinded as of this date. As you know, this facility's stormwater coverage was changed to Certificate of Coverage number NCG020806 in February -of 2012. Unfortunately, the earlier -issued permit was not rescinded. 1 apologize for the mistake and hope that the inconvenience was not too costly. Thanks for your patience and let us know if we can help in any way. If you have questions about this matter, please contact Boyd DeVane at (919) 807-6373, or the Water Quality staff in our Raleigh Regional Office. Sincerely, for Charles Wakild, P.E., Director cc: Raleigh Regional Office Stormwater Permitting Unit DWQ Central Files Fran McPherson, DWQ Budget Office - please waive applicable fees Wetlands and Stormwater Branch O1,I 1617 Mail Service Center, Raleigh, North Carolina 27599-1617 1 N of th at of ina Location: 512 N. Salisbury St, Raleigh, North Carolina 27604 T�T Phone: 919-807-63001 FAX 919-807-6494 ;Vaturallw Internet: www.n[waterquality.org i/ An Equal Opportunity 4 Affirmative Action Employer NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P.E. Governor Director March 207 2013 Mr. Thomas J. Wainwright Triangle Brick Company -Merry Oaks Mine 6523 N. Highway 55 Durham, NC 27713 Subject: Rescission of NPDES Stormwater Permit Certificate of Coverage Number NCG070098 294 King Road Moncure, NC Chatham County Dear Mr, Wainwright: John Skvarla, III Secretary Please accept this letter as documentation that the originally -issued stormwater permit Certificate of Coverage for the Triangle Brick Company's Merry Oaks Mine, No. NCG070098, is rescinded as of this date. As you know, this facility's stormwater coverage was changed to Certificate of Coverage number NCG020806 in February of 2012. Unfortunately, the earlier -issued permit was not rescinded. I apologize for the mistake and hope that the inconvenience was not too costly. Thanks for your patience and let us know if we can help in any way. If you have questions about this matter, please contact Boyd DeVane at (919) 807-6373, or the Water Quality staff in our Raleigh Regional Office, Sincerely, for Charles Wakild, P.E., Director cc: Raleigh Regional Office Stormwater Permitting Unit DWQ Central Files Fran McPherson, DWQ Budget Office - please waive applicable fees Wetlands and Stormwater Branch 0110 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 NOrthCaf011na Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 91 M07-6494 , %1 %a'tumllJ/ Internet, www.ncwaterquality.org v i% An Equal Opportunily 4 Affirmalive Action Employer � Divisions of Water Quality I Surface Water Protection AMA— National Pollutant Discharge 11 imination System NCDENR RESCISSION REQUEST FORM £+nnro�wun ,u+n r+avui reaouncea FOR AGENCY USE ONLY Date Received Year Month Day Please fill out and return this form if you no longer need to maintain your NPDES stormwater permit. 1) Enter the permit number to which this request applies: Individual Permit (or) Certificate of Coverage N1�C'+ 5,' 'iV.j6 ,'G 0 7 0 0 9 8 2) Owner/Facility Information: " Final correspondence will be marled to the address noted below Owner/Facility Name Triangle Brick Company— Merry Oaks Mine Facility Contact Howard Brown , Jr. Street Address 6523 N. Highway 55 City Durham StateNC ZIP Code 27713 County Durham E-mail Address howardbi2trianglebrick.com _ Telephone No. 919-544-1796 Fax: 3) Reason for rescission request (This is required information. Attach separate sheet if necessary): ❑ Facility closed or is closing on F--"7 . All industrial activities have ceased such that no discharges of stormwater are contaminated by exposure to industrial activities or materials. ❑ Facility sold to T-7--7= on , i r, . If the facility will continue operations under the new owner it may be more appropriate to request an ownership change to reissue to permit to the new owner. ® Other: This permit has been replaced by Permit Number COC NCG020806 4) Certification: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Signature �` - Date '[Janmac 1_ Wainwrij Print or type name of person signing above Title Please return this completed rescission request form to: 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location, 512 N. Sa€isbury St. Raleigh, North Carolina 27604 Phone: 9IM07-6300 l FAX: 91"07-64M Customer Service: 1-877-623.6748 Internet: www.acwaterquality-019 An Equal Opportunity 1 Affirmative Aeon Employe SW NPDES Permit Coverage Rescission Stormwater Permitting Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 £t { (t! t 3 oneNhCarolina'��turally Devane, Boxd From: Bennett, Bradley Sent: Tuesday, March 19, 2013 11:23 AM To: Devane, Boyd Subject: FW: Triangle Brick Merry Oaks Mine - Industrial Stormwater Permit Renewal Attachments: Rescission Request.pdf Boyd, I think I talked with you about this one and gave you the permit folders for it. Bradley Bennett Stormwater Permitting Unit Phone: (919) 807-6378 NC Division of Water Quality Fax: (919) 807-6494 1617 Mail Service Center Email: brad ley. bennett(a)ncdenr.gov Raleigh, NC 27699-1617 Web: http:llportal.nrdenr.org/web/wglwslsu Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Wainwright, Thomas 3.[mailto:Thomas.Wainwright@jacobs.com] Sent: Tuesday, March 19, 2013 11:13 AM To: Bennett, Bradley Cc: RickyMcbtriangiebrick.com Subject: RE: Triangle Brick Merry Oaks Mine - Industrial Stormwater Permit Renewal Bradley, Attached please find the request as discussed. Please let me know that you have received this request. Thanks, Tom From: Bennett, Bradley [ma ilto:brad ley. ben nett@ncdenr.gov] Sent: Wednesday, March 13, 2013 3:09 PM To: Wainwright, Thomas 3, Cc: Devane, Boyd; Montalvo, Sheri A Subject: RE: Triangle Brick Merry Oaks Mine - Industrial Stormawater Permit Renewal Mr. Wainwright, As we just discussed, here is the link to some of our forms. On the table at this link the Rescission form is third from the bottom. Just fill it out and return with information that the permit was replaced with NCG020806 and we will handle the rescission. Sorry we missed that in the earlier NCG02 issuance. http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-2 Bradley Bennett Stormwater Permitting Unit j Phone: (919) 807-6378 1 Print this form to PDF Return PDF of this form to DLR CO by email. cc DLR RO and DWQ SPU r -- N MINING PERMIT APPLICATION REVIEW FORM for the DIVISION OF WATER QUALITY I U Eit I•ILLtU UU I by ULK: Project Name: Merry Oaks ! DLR Permit #: 19-10 County: Chatham Address:- Thimas.wainwright:iacobs.com YES NO Date Commencing Is this mine a new mine? r 1990 Have land disturbing activities started? Date? r r 1990 Latitude:35.6354 Longitude:-78.9993 Please return comments to (at DLR CO): Judy Wehner Comments due b : 4118111 SECTION BELOW TO BE FILLED OUT BY DWQ: Is the RO concerned that the operation, as proposed, would violate standards of water quality? Yes Comments: based on the plans and aerial ohotoaraohs. minina has not commenced on cells M-5 and M-6 There are crenualations on the topo maps that indicates streams may be present in these two cells. Stream determinations should be made prior to performing work in these areas Watershed/Stream Name & Classification: UT to Cape Fear River DWQ Compliance Status of Mine: compliant YES NO E. CG020000 r NPDES permit required? NPDES permit existing? (Permit #NCG07) IJ If an NPDES permit is not required, is DWQ still concerned about nd degradation wetla r by dewatering? Should permittee contact DWQ RO RO Contact Name: Lauren immediately? (e.g. to schedule a site visit if Witherspoon Contact Reason: Check to see if i j mine has already begun digging or is wastewater is bein_- dischara_ed in dewatering without DWQ permit) existin_-,--g pits 401 Wetland Cart. required? ossible if the. Ian to im act Preams r 401 Wetland Cert. existing? r Permit # Rev 5eptembei 2010 Print this form to PDF Return PDF of this form to DLR CO by &marl. cc DLR RO and DWQ SPU Rev September 2010 Print this form to PDF Return PDF of this form to DLR CO by email. cc DLR RO and DWQ SPU YES NO Are wetlands distu"rbed at this site? Does DWQ RO suspect or know of nearby 17. FV_ wetlands to the site? Is a wetland delineation required prior to r By: r D or E,nWtant r DWQ issuing the permit? nsite?° Or ffsite? Stream Determination Needed? t✓ r Stream Determination Completed? Does DWQ RO need a statement that no wetlands/streams are disturbed r r for this project from applicant? Buffer Determination Needed? r fi Buffer Determination Completed? r r - r bWQ is not Recycle system permit existingr : r, ermit # award a recycle system -for mining_ activities New Recycle System permit required?* r- r- Enough information to determine? Non -discharge permit existing?* hermit # E_ Will wastewaters discharge to HQW waters r , r 7Q10 Unknown (permittee determine): r with a 7Q10=0? ** Flow: 1 1, Has Violation I J _ O&M Requirements Does DWQ require DLR to hold the permit r ' HQW17010 Concerns (e.g. so DWQ can review it further or r Other. Reason: need.to obtain an r a because DWQ requires more information)? NCG02 and most likely rescind the NCG07 RO contact: Lauren Witherspoon r ) Hold Until: Mine must wait to dewater until an O&M M,, plan is approved? 'The NPDES SW and WW permit NCG020000 covers closed -loon recycle systems, designed to exclude all stormwater run-off from the. system and operate at or below_two-feet of freeboard. These systems may be permitted by aNan-discharge Recycle System Permit from the Aquifer Protection Section (APS), OR ma y instead be permitted under NCG020000 to eliminate an additional permit. Recvcle systems that do not meet those criteria are considered discharoina systems. and are subiect to the NCG020000 discharge permit. **To obtain 7Q10 flows, permittees must contact the DWQ Stormwater Permitting Unit. if DWQ does not have a flow estimate fora specific stream, permittees will be asked to obtain one. Permittees should contact J. Curtis Weaver at the USGS: 919-571-4043, for more information on obtaining a 7Q10 flow. USGS will not determine a 7Q10 flow for tidally influenced water bodies. Reviewed by: DWQ RO Surface Water: LCW Regional Office: Raleigh Date: 4/21/11 Rev September 2010 Print this form to PDF RO Aquifer Protection Section: Regional Office SPU DWQ Central Office Reviewer (if applicable): Return PDF of this form to DLR CO by email. cc DLR RC and DWQ SPU Date: Rev September 2010 F W A TF Michael F. Easley, Governor 0 9pG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality ❑ `C April 28, 2003 Ronald A Cardwell Triangle Brick Co -Merry Oaks 6523 Apex Rd Durham, NO 27713 Subject: NPDES Stormwater Permit Renewal Triangle Brick Co -Merry Oaks COO Number NCG070098 Chatham County Dear Permittee: In response to your renewal application for continued coverage under general permit NCG070000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: • A new Certificate of Coverage A copy of General Stormwater Permit NCG070000 • A copy of the Analytical Monitoring Form (DMR) • A copy of the Qualitativel Monitoring Form • A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Department of Environment and Natural Resources, or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Mack Wiggins of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 542. cc: Central Files Stormwater & General Permits Unit Files Raleigh Regional Office Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit Cf]6NR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-8053 Customer Service 1 800 623-7748 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG070000 CERTIFICATE OF COVERAGE No. NCG070098 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Triangle Brick Co is hereby authorized to discharge stormwater from a facility located at Triangle Brick Co -Merry Oaks Sr 1912 At Merry Oaks Morrisville Chatham County to receiving waters designated as Shaddox Creek, a class WS-IV stream, in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, 111, IV, V, and VI of General Permit No. NCG070000 as attached. This certificate of coverage shall become effective May 1, 2003. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day April 28, 2003. ", . for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission of WA co © 'C RONALD A CARDWELL TRIANGI,13- BRICK CO -MERRY OAKS 6523 APEX RD DURHAM, NC 27713 Dcar Permittec: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment -and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality September 4, 2002 Subject: NPDES Stormwater Permit Coverage Renewal Triangle Brick Co -merry Oaks COC Number NCG070098 Chatham County Your facility is currently covered for storruwater discharge under General Permit NCG07(XM. This permit expires on March 31, 2003. The Division staff is currently in the process of rewriting ibis permit and is scheduled to have the permit reissued by early sprint; of 2003, Once the permit is reissued, your facility would be eligible for confinued coverage under the reissued permit.. In order to assure your continues) coverage under the general permit, you trust apply to the Division of Water Quality (DWQ) for renewal ol' your permit coverage. To make this renewal process easier, we are inforining you in advance that your permit coverage will be expiring. Enclosed you will find a Permit Coverage Renewal Application Form. The application must N. completed and returned by October 2, 2002 in order to assure continued coverage under the general permit. Due to staff and budget constraints, letters confirming our receipt of the completed application will not be sent. Failure to request renewal within the time period specified, may result in a civil assessment of at ]cast $250.t0. Larger penaities may be assesses) depending on the delinquency of the request. Discharge of stormwatcr from your facility without coverage under a valid storrnwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $10,000 per day. Please note that recent federal legislation has extended the "no exposure exclusion" 10 all operators cif industrial facilities in any of the 1 1 categories of "storm water discharges associated with industrial activity," (excep( construction activities). If you fed your facility can certify a condition of "no exposure", i.e. the facility industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact the Central Office Stormwater Staff member listed below or check the Stormwater & General Permits Unit Web Site at http:/lh2o.eiir.state.iie.u,,/su/storinwater.btnll Ville subject slormwater discharge to waters of the state has been terminated, please complete the encloses) Rescission Request Form. Mailing instructions are listed on the bottom of the form. You will be notilwd when the rescission process has been completes). lf'you have any questions regarding the permit renewal procedures please contact Joe Alhiston of the Raleigh Regional Office at 919-571-4700 or Muck Wiggins of the Central Oflice Stormwater knit at (919) 733-5083. exi. 542 r- - Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Stormwater and General Permits Unit Files Raleigh Regional Office N. C Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 © A* NCDENR Customer Service 1-800-623.7748 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director April 30, 1998 RONALD A. CARDWELL TRIANGLE BRICK CO-CHATHAM 6523 APEX ROAD DURHAM, NC 27713 A " )A C) E N R Subject: Reissued Stormwater General Permit for Certificate of Coverage No. NCG070098 Chatham County Dear Permittee: In response to your renewal application for continued coverage under the subject permit, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. The following information is included with your permit package: ■ A copy of the stormwater general permit. ■ A Stormwater Pollution Prevention Plan Certification Form. This form certifies that you have - developed and implemented the Stormwater Pollution Prevention PIan (SPPP) required in your permit. This form must be completed and returned to the Division within 30 days of receipt of this letter. DO NOT send the SPPP with the signed form. ■ Five copies of Analytical Monitoring forms. ■ Five copies of Qualitative Monitoring forms. ■ A copy of a Technical Bulletin on the stormwater program which outlines program components and addresses frequently asked questions. ■ A corrected Certificate of Coverage if you indicated a name or address change on the Renewal Form returned to the Division. Your certificate of coverage is not transferable except after notice to DWQ. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DWQ or permits required by the Division of Land Resources, Division of Air Quality, Coastal Area Management Act or any other Federal or Local governmental permits that may be required. If you have any questions concerning this permit or other attached documents, please contact the Stormwater and General Permits Unit at telephone number (919) 733-5083 Sincerely, b y foA. Preston Howard, Jr., P. E. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer .50% recycled/ 10%v post -consumer paper State of North Carolina, Department of Environment, P r)JO Health and Natural Resources L Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary N A. Preston Howard, Jr., P.E., Director October 28, 1994 Mr. Ronald A. Cardwell Triangle Brick Company 6523 Apex Road Durham, NC 27713 Subject: General Permit No. NCG070000 Merry Oaks Plant COC NCGO70098 Chatham County Dear Mr. Cardwell: In accordance with your application for discharge permit received on June 10, 1994, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .I and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting; an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management. The Division of Environmental Management may require modification or revocation and reissuance of the certificate of coverage. The stormwater staff of the Water Quality Section is currently looking into the issue of colloidal materials. This includes clay mining sites and brick manufacturing facilities. Upon completion of the review, DEM may choose to reopen the general permit or require coverage under another individual or general permit if the existing permit is determined not to be sufficient to protect water quality. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director October 28, 1994 page 2 If you have any questions concerning this permit, please contact Steve Ulmer at telephone number 919/733- 5093. Sincerely, Originaly Qavid A. Goradrich A. Preston Howard, Jr., P. E. cc: Raleigh Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT GENERAL PERMIT NO.NCG070000 CERTIFICATE OF COVERAGE NO. NCG070098 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Triangle Brick Company is hereby authorized to discharge stonnwater from a facility located at Merry Oaks Plant SR 1912 Moncure Chatham County to receiving waters designated as an Shaddox Creek in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV of General Pennit No. NCG070000 as attached. This Certificate of Coverage shall become effective October 28, 1994. This Certificate of Coverage shall remain in effect for the duration of the General Pennit. Signed this day October 28, 1994. A. Preston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission i z� t-�2j!11 ,yY 177 21�011 678 _ 'NiSYWODU 2.1. M1, 879 I its 6- INTERIOR—GEOLGGIG L' SlIRV EY�•RE}T ON,'VIp GINIA-19" —" " — 0— �,o �lJvll r �Bg�m E. .e jai. 79 �� ROAD CLASSI F1~CATION 4 s`•a,, - �Y� • - �� `P'rimaly hiahwau + h' _,.: �a ,�rriX COUNTY'"', NPDES ASAP # DSN FLOW 4 LAT-(� I'I!UE LON 1.0r UDE R�,C', VINO.STREAM cep e,.LASS cukss AFC IA c r A/ (Z C-1 t> 157 2Z KI 1,4� :7q Z>00► If 5 STvam W ATL—r, 09-3l--`7---,