Loading...
HomeMy WebLinkAboutSW6180604_CEI_20210823ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality I 1� August 23, 2021 Thomas Family Business, Inc. Attn: CarrollThomas, President PO Box 43036 Fayetteville, NC 28309 Subject: Compliance Evaluation Inspection State Stormwater Management Permit SW6180604 Wedgefield Phase IV Subdivision Hoke County Dear Mr. Thomas`_ In response to the submittal of a State Stormwater: Permit Transfer Application Form received by our office on August 16, 2021, a Compliance. Evaluation Inspection was conducted on August 20, `2021 at, the Wedgefeld Phase IV Subdivision located off US Highway 401 in Hoke County. The purpose of the inspection was to ensure compliance with State Stormwater Management Permit SW6180604, which was issued to Thomas Family Business, Inc. on August 7, 2018.. A copy of the Compliance Inspection Report is enclosed for your review. As a result of the inspection and subsequent file review, it has been determined that the facility is compliant with the conditions of the subject permit` and approved stormwater management plans. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. If you have any questions or this office can be of any assistance, please contact me at (910) 433-3394 or via e-mail atmike.lawyer@ncdenr.gov. Sincerely, Michael Lawyer, CPSWQ Environmental Program Consultant Division of Energy, Mineral and Land Resources Enclosure: Compliance Inspection Report ec: Carroll Thomas, President — Wedgefield Owners Association Diane Loes — Thomas Family Business, Inc. Radford Brown, Manager - Southeastern HOA Management, LLC cc: FRO — DEMLR, State Stormwater Files Q> North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 NC_ CAROLINA.. uepetlnbnt or 910,433.3300 Compliance Inspection Report Permit: SW6180604 Effective:08/07/18 Expiration: 08/07/26 Project: Wedgefield Phase IV Subdivision Owner: Thomas Family Business Inc County: Hoke Adress: End Of Weston Woods St Off Of Region: Fayetteville US Highway 401 City/State/Zip: Raeford NC 28376 Contact Person: Carroll Thomas Title: Phone: 910-487-5900 Directions to Project: north 1790 ft on carolina dr from the intersection of carolina dr and us hwy 401, turn west on wexford st, go 1958 ft to the end of wexford st, turn west on weston woods st, project is 148 ft from intersection. Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Puppy Creek) (03-06-15) ( C) On -Site Representative(s): Related Permits: Inspection Date: 08/20/2021 Entry Time 09:OOAM Primary Inspector: Mike Lawyer Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: Compliant ❑ Not Compliant Question Areas: State Stormwater (See attachment summary) Exit Time: 09:20AM Phone: 910-433-3394 Inspection Type: Compliance Evaluation page 1 Permit: SW6180604 Owner - Project: Thomas Family Business Inc Inspection Date: 08/20/2021 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection conducted in response to submittal of a permit transfer application, which was initially received on 8/16/2021 A requested revised page 6 with correct signature for the proposed permittee was received via email on 8/17/2021 with hard copy original received on 8/20/2021. At the time of inspection, the associated built -upon area (BUA) and the stormwater control measure (wet pond) appeared to be constructed/maintained per the permit and approved stormwater, management plans. A few maintenance items that were observed during a previous site visit conducted on 8/10/2021, where the inspector met with Mr. Carroll Thomas and Mr. Radford Brown, had been addressed. This included repair of some erosion on the forebay berms, removal of accumulated sediment from the main pond and additional stabilization some bare areas. This inspection report will be sent to the current permittee (Thomas Family Business, Inc.) with a copy provided to the proposed permittee (Wedgefield Owners Association). Permit will be transferred to the proposed permittee under separate letter. File Review Yes No NA NE Is the permit active? 0 ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? 0 ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? E ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? 0 ❑ ❑ ❑ Comment: Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? 0 ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? 0 ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? E ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? 0 ❑ ❑ ❑ Are the inlets located per the approved plans? 0 ❑ ❑ ❑ Are the outlet structures located per the approved plans? M ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ E DWQ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? N ❑ ❑ ❑ Comment: page 2