HomeMy WebLinkAboutSW6180604_CEI_20210823ROY COOPER
Governor
DIONNE DELLI-GATTI
Secretary
BRIAN WRENN NORTH CAROLINA
Director Environmental Quality
I
1�
August 23, 2021
Thomas Family Business, Inc.
Attn: CarrollThomas, President
PO Box 43036
Fayetteville, NC 28309
Subject: Compliance Evaluation Inspection
State Stormwater Management Permit SW6180604
Wedgefield Phase IV Subdivision
Hoke County
Dear Mr. Thomas`_
In response to the submittal of a State Stormwater: Permit Transfer Application Form received by our office on August 16,
2021, a Compliance. Evaluation Inspection was conducted on August 20, `2021 at, the Wedgefeld Phase IV Subdivision
located off US Highway 401 in Hoke County. The purpose of the inspection was to ensure compliance with State
Stormwater Management Permit SW6180604, which was issued to Thomas Family Business, Inc. on August 7, 2018.. A
copy of the Compliance Inspection Report is enclosed for your review. As a result of the inspection and subsequent file
review, it has been determined that the facility is compliant with the conditions of the subject permit` and approved
stormwater management plans.
Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the
inspection. If you have any questions or this office can be of any assistance, please contact me at (910) 433-3394 or via
e-mail atmike.lawyer@ncdenr.gov.
Sincerely,
Michael Lawyer, CPSWQ
Environmental Program Consultant
Division of Energy, Mineral and Land Resources
Enclosure: Compliance Inspection Report
ec: Carroll Thomas, President — Wedgefield Owners Association
Diane Loes — Thomas Family Business, Inc.
Radford Brown, Manager - Southeastern HOA Management, LLC
cc: FRO — DEMLR, State Stormwater Files
Q>
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
NC_ CAROLINA..
uepetlnbnt or 910,433.3300
Compliance Inspection Report
Permit: SW6180604 Effective:08/07/18 Expiration: 08/07/26
Project: Wedgefield Phase IV Subdivision
Owner: Thomas Family Business Inc
County: Hoke Adress: End Of Weston Woods St Off Of
Region: Fayetteville US Highway 401
City/State/Zip: Raeford NC 28376
Contact Person: Carroll Thomas Title: Phone: 910-487-5900
Directions to Project:
north 1790 ft on carolina dr from the intersection of carolina dr and us hwy 401, turn west on wexford st, go 1958 ft to the end of
wexford st, turn west on weston woods st, project is 148 ft from intersection.
Type of Project: State Stormwater - HD - Detention Pond
Drain Areas: 1 - (Puppy Creek) (03-06-15) ( C)
On -Site Representative(s):
Related Permits:
Inspection Date: 08/20/2021 Entry Time 09:OOAM
Primary Inspector: Mike Lawyer
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: Compliant ❑ Not Compliant
Question Areas:
State Stormwater
(See attachment summary)
Exit Time: 09:20AM
Phone: 910-433-3394
Inspection Type: Compliance Evaluation
page 1
Permit: SW6180604 Owner - Project: Thomas Family Business Inc
Inspection Date: 08/20/2021 Inspection Type Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Inspection conducted in response to submittal of a permit transfer application, which was initially received on 8/16/2021
A requested revised page 6 with correct signature for the proposed permittee was received via email on 8/17/2021 with
hard copy original received on 8/20/2021. At the time of inspection, the associated built -upon area (BUA) and the
stormwater control measure (wet pond) appeared to be constructed/maintained per the permit and approved stormwater,
management plans. A few maintenance items that were observed during a previous site visit conducted on 8/10/2021,
where the inspector met with Mr. Carroll Thomas and Mr. Radford Brown, had been addressed. This included repair of
some erosion on the forebay berms, removal of accumulated sediment from the main pond and additional stabilization
some bare areas. This inspection report will be sent to the current permittee (Thomas Family Business, Inc.) with a copy
provided to the proposed permittee (Wedgefield Owners Association). Permit will be transferred to the proposed
permittee under separate letter.
File Review
Yes
No NA NE
Is the permit active?
0
❑ ❑ ❑
Signed copy of the Engineer's certification is in the file?
0
❑ ❑ ❑
Signed copy of the Operation & Maintenance Agreement is in the file?
E
❑ ❑ ❑
Copy of the recorded deed restrictions is in the file?
0
❑ ❑ ❑
Comment:
Built Upon Area
Yes
No NA NE
Is the site BUA constructed as per the permit and approval plans?
0
❑ ❑ ❑
Is the drainage area as per the permit and approved plans?
0
❑ ❑ ❑
Is the BUA (as permitted) graded such that the runoff drains to the system?
E
❑ ❑ ❑
Comment:
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? 0 ❑ ❑ ❑
Are the inlets located per the approved plans? 0 ❑ ❑ ❑
Are the outlet structures located per the approved plans? M ❑ ❑ ❑
Comment:
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ E
DWQ upon request?
Comment:
Other Permit Conditions Yes No NA NE
Is the site compliant with other conditions of the permit? N ❑ ❑ ❑
Comment:
page 2