Mr. Greg Stutts, Environmental Engineer
Division of Environmental Management
North Carolina Department of Environment,
Health, and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
4918 Main Street
Post Office Box 2927
Monday, January 16, 1995
Subject: Oyster Point H - Sea Trail Plantation
(formerly Oyster Bay Phase Four)
Brunswick County, North Carolina
Submittal of Revised Stormwater Plan
e,1L'L5
Dear ��_iutts:
ST000"I'ATER
p ECEOV
DD
.)AN 1 8 1995
DEM
PRol # 9 / O CQ 03
1Ie , 5,'oh
- Density Limits Option
On behalf of Sea Trail Corporation, we are pleased to submit for your
review and approval three (3) copies of stormwater plans that have been
revised for the subject project. Also enclosed, are three (3) originals of the
following documents that have been revised and executed by the Owner:
1) DEM Stormwater Forms,
2) Compliance with Stormwater Regulations, and,
3) Statement Concerning Areas Reserved by Sea Trail.
This project was originally submitted as Oyster Bay Phase 4 - Sea Trail
Plantation on May 30, 1991. The final name of this project is Oyster Point II
- Sea Trail Plantation as recorded in Map Cabinet W, Page 81 of the
Brunswick County Register of Deeds' Office. We received approval from your
department on July 5, 1991 (DEM project number 910603). The approved
stormwater plans were based on a total project area of 28.4 acres with a total
built -upon area of 7.10 acres (25.0% built -upon area). The enclosed plans
are based on a revised project area of 50.62 acres with the total built -upon
area of 12.39 acres (24.48% built -upon area) .
Since the existing drainage features have not changed from that which
was originally approved by your department, the original hydrologic and
hydraulic design calculations still apply.
We trust that you will find our submittal package to be in order and that
this project, as revised, warrants approval from your department.
'Mr. Stutts Page Two Sea Trail Plantation
January 16, 1995 Oyster Point U
As always, we appreciate your attention in this matter. Should you
require any additional information, or have any comments, please do not
hesitate to contact our office at your convenience.
Sincerely,
eC
,Alas, ce-President
Houston and Associates, P.A.
Enclosures
pc: Mr. Dean Walters, General Manager, Sea Trail Corporation
File; 91-0423 [Sea Trail, Oyster Point II ECP & Stormwater
(formerly Sea Trail, Oyster Bay Phase 4)]
STATEMENT CONCERNING AREAS RESERVED BY SEA TRAIL
Sea Trail Corporation hereby agrees that no construction of any structure(s)
and/or paved surfaces including walkways or patios of brick, stone or similar
materials will neither by initiated nor allowed by Sea 'frail Corporation
within any area designated "Reserved by Sea Trail" unless such structure(s)
and/or paved surfaces are are as shown on design plans titled "Revised
Stormwater Plan - Oyster Pointe H - Sea Trail Plantation" prepared by
Houston and Associates, P.A., dated January 9, 1995 or unless Sea Trail
Corporation, prior to any construction of such structure(s) and/or paved
surfaces, submits revised plans with the required supporting documentation
and calculations and has obtained the required approval from the North
Carolina Department of Environment, Health and Natural Resources -
Division of Environmental Management.
Paul D. Dennis, President
Sea Trail Corporation
211 Clubhouse Road
Sunset Beach, North Carolina
Phone: (910) 287-1106
STATE OF NORTH CAROLINA
COUNTY OF BRUNSWICK
(signature)
a
(date)
I, T.e `c ,%J•iyr� , a Notary Public of the State of North
Carolina, County of Brunswick, hereby certify that Paul D. Dennis personally
appeared before me this day and executed the above certification.
Witness my hand and notarial seal, this day of L/r► , 1995.
01
My Commission expires ,//..z7
(Notary Public)
RE cE g "
-
D
JAN 1 8 1995
0EM
PxoJ�03
Rev+'S1 on
COMPLIANCE WITH STORMWATER REGULATIONS
In accordance with Title 15 NCAC 2H.1003(a)(2), the following DEED
RESTRICTIONS AND PROTECTIVE COVENANTS shall be recorded in the
Brunswick County Registry prior to the further conveyance of lots. Said
Deed Restrictions and Protective Covenants shall apply to the Oyster Pointe
II Subdivision project in Sunset Beach, North Carolina as shown on design
plans titled "Revised Stormwater Plan - Oyster Point II - Sea Trail
Plantation" prepared by Houston and Associates, P.A. dated January 9, 1995
and as also shown on a ' subdivision plat prepared by Allen Surveying titled
"Map of Oyster Pointe II at Sea Trail Plantation", said map signed by Patrick
A. Allen, R.L.S. on November 13, 1991 and recorded in Map Cabinet W,
Page 81 of the Brunswick County Register of Deeds' Office.
(This represents a revision to previous design plans titled "Erosion
Control/Stormwater Plan - Oyster Bay Phase 4 - Sea Trail Plantation"
prepared by Houston and Associates, P.A., dated May 21, 1991.)
'No more than the following listed square feet of any lot, inclusive of
the roadway right-of-way, shall be covered by structures and/or paved
surfaces, including walkways or patios of brick, stone, slate, or similar
materials.
ftloffl`
-"U?ATER
S�
�)l �' l
r
p ECEC VE
UD
,BAN 1 8 1995
D E M
PROI
Maximum Allowable Built -Upon
Lot Number Area per Lot (Square Feet)
69................... 6,000
70...................6.000
71 9.99........9...9..6,000
72...................6.000
73...................6,000
74................... 6,000
75................... 6,000
76...................6,000
77...................6.000
78...................6,000
79 ................ . .. 6,000
80................... 6,000
81... I..............10,000
82...................9,500
83...................9,500
84...................8,500
85...................89500
86................... 9,500
87...................9,500
88................... 8,500
89...................8,500
90................... 89500
91. 8.500
92...................89500
93................... 81500
94................... 9,500
95 ................... 9,500
96................... 9,500
97...................5,000
98................... 5,000
99................... 5,000
100..................5,000
101..................5,000
102..................5,000
103..................6,000
104..................5,000
105..................5,000
106..................6,000
107..................6.000
Page 1 of 2
Sea Trail Plantation Page 2 of 2
Oyster Point II
108..................5,000
109..................6,000
110..................6,000
111.................5,000
112.................:5,000
113 ............... s • 69000
114.................:6,000
115..................51500
116...................5,000
117..................5,000
118..................5.000
119.................5,000
120.................:6,000
121•.•.•.vs. ...... •..51500
122 ................. • 5, 000
123..................5,000
124 • • . • • • • . . . . . so . . .. 59500
125..................51500
126 ............... • .. 6,000
127................ .5,000
128..................5,000
129..................5,000
130 ................. • 5,000
131..................5,500
Total Allowable = 403,000
Compliance with
Stormwater Regulations
This covenant is intended to insure continued compliance with
stormwater runoff rules adopted by the State of North Carolina and
therefore benef is may be er}forced by the State of North Carolina. This
covenant is to run with the land and shall be binding on all parties and all
persons claiming under them."
Paul D. Dennis, President
Sea Trail Corporation
211 Clubhouse Road
Sunset Beach, North Carolina
Phone: (910) 287-1106
STATE OF NORTH CAROLINA
COUNTY OF BRUNSWICK
(signature)
/ /G 9S
(crate)
a Notary Public of the State of North
Carolina, County of Brunswick, hereby certify that Paul D. Dennis personally
appeared before me this day and executed the above certification.
Witness my hand and notarial seal, this Za day of Manylr,
1995.
(Notary Public)
My Commission expires //- -?l i 9