Loading...
HomeMy WebLinkAboutSW8910603_Historical File_19950118Telephone (910) 754-6324 Facsimile (910) 754-2121 HOUSTON and ASSOCIATES, P.A. Consulting Engineers SHALLOTTE, NORTH CAROLINA 28459 JAN 181995 �) wwwwswwwwwwwwwww,�wpwMOwwlw Mr. Greg Stutts, Environmental Engineer Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 4918 Main Street Post Office Box 2927 Monday, January 16, 1995 Subject: Oyster Point H - Sea Trail Plantation (formerly Oyster Bay Phase Four) Brunswick County, North Carolina Submittal of Revised Stormwater Plan e,1L'L­5 Dear ��_iutts: ST000"I'ATER p ECEOV DD .)AN 1 8 1995 DEM PRol # 9 / O CQ 03 1Ie , 5,'oh - Density Limits Option On behalf of Sea Trail Corporation, we are pleased to submit for your review and approval three (3) copies of stormwater plans that have been revised for the subject project. Also enclosed, are three (3) originals of the following documents that have been revised and executed by the Owner: 1) DEM Stormwater Forms, 2) Compliance with Stormwater Regulations, and, 3) Statement Concerning Areas Reserved by Sea Trail. This project was originally submitted as Oyster Bay Phase 4 - Sea Trail Plantation on May 30, 1991. The final name of this project is Oyster Point II - Sea Trail Plantation as recorded in Map Cabinet W, Page 81 of the Brunswick County Register of Deeds' Office. We received approval from your department on July 5, 1991 (DEM project number 910603). The approved stormwater plans were based on a total project area of 28.4 acres with a total built -upon area of 7.10 acres (25.0% built -upon area). The enclosed plans are based on a revised project area of 50.62 acres with the total built -upon area of 12.39 acres (24.48% built -upon area) . Since the existing drainage features have not changed from that which was originally approved by your department, the original hydrologic and hydraulic design calculations still apply. We trust that you will find our submittal package to be in order and that this project, as revised, warrants approval from your department. 'Mr. Stutts Page Two Sea Trail Plantation January 16, 1995 Oyster Point U As always, we appreciate your attention in this matter. Should you require any additional information, or have any comments, please do not hesitate to contact our office at your convenience. Sincerely, eC ,Alas, ce-President Houston and Associates, P.A. Enclosures pc: Mr. Dean Walters, General Manager, Sea Trail Corporation File; 91-0423 [Sea Trail, Oyster Point II ECP & Stormwater (formerly Sea Trail, Oyster Bay Phase 4)] STATEMENT CONCERNING AREAS RESERVED BY SEA TRAIL Sea Trail Corporation hereby agrees that no construction of any structure(s) and/or paved surfaces including walkways or patios of brick, stone or similar materials will neither by initiated nor allowed by Sea 'frail Corporation within any area designated "Reserved by Sea Trail" unless such structure(s) and/or paved surfaces are are as shown on design plans titled "Revised Stormwater Plan - Oyster Pointe H - Sea Trail Plantation" prepared by Houston and Associates, P.A., dated January 9, 1995 or unless Sea Trail Corporation, prior to any construction of such structure(s) and/or paved surfaces, submits revised plans with the required supporting documentation and calculations and has obtained the required approval from the North Carolina Department of Environment, Health and Natural Resources - Division of Environmental Management. Paul D. Dennis, President Sea Trail Corporation 211 Clubhouse Road Sunset Beach, North Carolina Phone: (910) 287-1106 STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK (signature) a (date) I, T.e `c ,%J•iyr� , a Notary Public of the State of North Carolina, County of Brunswick, hereby certify that Paul D. Dennis personally appeared before me this day and executed the above certification. Witness my hand and notarial seal, this day of L/r► , 1995. 01 My Commission expires ,//..z7 (Notary Public) RE cE g " - D JAN 1 8 1995 0EM PxoJ�03 Rev+'S1 on COMPLIANCE WITH STORMWATER REGULATIONS In accordance with Title 15 NCAC 2H.1003(a)(2), the following DEED RESTRICTIONS AND PROTECTIVE COVENANTS shall be recorded in the Brunswick County Registry prior to the further conveyance of lots. Said Deed Restrictions and Protective Covenants shall apply to the Oyster Pointe II Subdivision project in Sunset Beach, North Carolina as shown on design plans titled "Revised Stormwater Plan - Oyster Point II - Sea Trail Plantation" prepared by Houston and Associates, P.A. dated January 9, 1995 and as also shown on a ' subdivision plat prepared by Allen Surveying titled "Map of Oyster Pointe II at Sea Trail Plantation", said map signed by Patrick A. Allen, R.L.S. on November 13, 1991 and recorded in Map Cabinet W, Page 81 of the Brunswick County Register of Deeds' Office. (This represents a revision to previous design plans titled "Erosion Control/Stormwater Plan - Oyster Bay Phase 4 - Sea Trail Plantation" prepared by Houston and Associates, P.A., dated May 21, 1991.) 'No more than the following listed square feet of any lot, inclusive of the roadway right-of-way, shall be covered by structures and/or paved surfaces, including walkways or patios of brick, stone, slate, or similar materials. ftloffl` -"U?ATER S� �)l �' l r p ECEC VE UD ,BAN 1 8 1995 D E M PROI Maximum Allowable Built -Upon Lot Number Area per Lot (Square Feet) 69................... 6,000 70...................6.000 71 9.99........9...9..6,000 72...................6.000 73...................6,000 74................... 6,000 75................... 6,000 76...................6,000 77...................6.000 78...................6,000 79 ................ . .. 6,000 80................... 6,000 81... I..............10,000 82...................9,500 83...................9,500 84...................8,500 85...................89500 86................... 9,500 87...................9,500 88................... 8,500 89...................8,500 90................... 89500 91. 8.500 92...................89500 93................... 81500 94................... 9,500 95 ................... 9,500 96................... 9,500 97...................5,000 98................... 5,000 99................... 5,000 100..................5,000 101..................5,000 102..................5,000 103..................6,000 104..................5,000 105..................5,000 106..................6,000 107..................6.000 Page 1 of 2 Sea Trail Plantation Page 2 of 2 Oyster Point II 108..................5,000 109..................6,000 110..................6,000 111.................5,000 112.................:5,000 113 ............... s • 69000 114.................:6,000 115..................51500 116...................5,000 117..................5,000 118..................5.000 119.................5,000 120.................:6,000 121•.•.•.vs. ...... •..51500 122 ................. • 5, 000 123..................5,000 124 • • . • • • • . . . . . so . . .. 59500 125..................51500 126 ............... • .. 6,000 127................ .5,000 128..................5,000 129..................5,000 130 ................. • 5,000 131..................5,500 Total Allowable = 403,000 Compliance with Stormwater Regulations This covenant is intended to insure continued compliance with stormwater runoff rules adopted by the State of North Carolina and therefore benef is may be er}forced by the State of North Carolina. This covenant is to run with the land and shall be binding on all parties and all persons claiming under them." Paul D. Dennis, President Sea Trail Corporation 211 Clubhouse Road Sunset Beach, North Carolina Phone: (910) 287-1106 STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK (signature) / /G 9S (crate) a Notary Public of the State of North Carolina, County of Brunswick, hereby certify that Paul D. Dennis personally appeared before me this day and executed the above certification. Witness my hand and notarial seal, this Za day of Manylr, 1995. (Notary Public) My Commission expires //- -?l i 9