HomeMy WebLinkAboutNCC214775_ESC Approval Submitted_20210823ROY COOPER
Governor
DIONNE DELLI-GATTI
Secretary
BRIAN WRENN
Director
Eastwood Constriction Partners, LLC
Attention: Marls Battiste, VP Constniction
2857 Westport Road
Charlotte, North Carolina 28208
J w: ni
NORTH CAROLINA
Environmental Quality
May 27, 2021
LETTER OF APPROVAL
RE: Project Name: Farmingdale aka Harmony (Lots 1-182)
Acres Approved: 44.64
ProjectID: CABAR-2021-060
County: Cabarius
City: Harrisburg
Address: 3550 Stallings Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Eastwood Construction Partners, LLC
Date Received by LQS: May, 20,2021
Plan Type: Revised
Dear Mr. Battiste:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby
issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval
shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 413 .0129.
As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit.
This form MUST be submitted prior to the commencement of any landdisturbing activity on the above named project.
The NOT form may be accessed at deq.nc.gov/NCGOl. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@nedenr.gov or Paul Clark at Paul. clack@ncdenr.gov. After you submit a complete and correct NOI Form,
a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the
NCGO 1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to b e sent to the
DEMLR Stormwater Central Office in Raleigh.
Title 15A NCAC 4B .0118(a) and theNCG01 permit require that the following documentation be kept on file at th e j ob
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
North Carolina Department of Fuvi East
enf a Quality J Division ofMoore, ill,, al and Land Resources
Mooresville Regional Office 16 10 Eas[ Center Avenue, Suite 3011 Mooresvillo, North Carolina 29115
704-663-1699
6E"I'3L•_LSa^
Letter of Approval
Eastwood Construction Partners, LLC
May 27, 2021
Page 2 of 2
Also, this letter gives the notice required by G.S. I I3A-61.l(a) of ourright of periodic inspection to insure compliance
with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Po llution Control Act of 1973 (North Carolina General
Statute I13A-51 through 66), this office mayrequire revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditionedupon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity.
This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility
Form, which you provided. You are requested to file an amended form if there is any change in the information inc lode d
on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCGOI Fact Sheet
c: Inspection Department
i