Loading...
HomeMy WebLinkAboutNCC214775_ESC Approval Submitted_20210823ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director Eastwood Constriction Partners, LLC Attention: Marls Battiste, VP Constniction 2857 Westport Road Charlotte, North Carolina 28208 J w: ni NORTH CAROLINA Environmental Quality May 27, 2021 LETTER OF APPROVAL RE: Project Name: Farmingdale aka Harmony (Lots 1-182) Acres Approved: 44.64 ProjectID: CABAR-2021-060 County: Cabarius City: Harrisburg Address: 3550 Stallings Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Eastwood Construction Partners, LLC Date Received by LQS: May, 20,2021 Plan Type: Revised Dear Mr. Battiste: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any landdisturbing activity on the above named project. The NOT form may be accessed at deq.nc.gov/NCGOl. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@nedenr.gov or Paul Clark at Paul. clack@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO 1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to b e sent to the DEMLR Stormwater Central Office in Raleigh. Title 15A NCAC 4B .0118(a) and theNCG01 permit require that the following documentation be kept on file at th e j ob site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. North Carolina Department of Fuvi East enf a Quality J Division ofMoore, ill,, al and Land Resources Mooresville Regional Office 16 10 Eas[ Center Avenue, Suite 3011 Mooresvillo, North Carolina 29115 704-663-1699 6E"I'3L•_LSa^ Letter of Approval Eastwood Construction Partners, LLC May 27, 2021 Page 2 of 2 Also, this letter gives the notice required by G.S. I I3A-61.l(a) of ourright of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Po llution Control Act of 1973 (North Carolina General Statute I13A-51 through 66), this office mayrequire revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditionedupon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information inc lode d on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCGOI Fact Sheet c: Inspection Department i