HomeMy WebLinkAboutNCC203585_NOT Closeout Documents_20210820North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
Eastover North, Sec One, Ph Two —
County: Cumberland Project: Lots 23,24,27, 44, 54 & 83
Person financially responsible: H&H Constructors, Inc. —
Brian Walker, Division Manager & Agent
Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC
1. Project Location: Eastover North Dr/Buckley Dr/I, Eastover
Pictures: No
2. Weather and soil conditions: sunny, workable soils
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
River basin: Cape Fear
Project #: CUNME-2021-009
COC: NCC203585
Initial inspection: Yes
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: August 20, 2021
10. Comments:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or
self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage
under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the
permittee via a Notice of Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded
as part of completing the NOT process.
Yes
Reported by: Lori Britt Others present:
Date of inspection: August 10, 2021 Time arriving on site: 12:16 PM Time leaving site: 12:25 PM
cc: Jennifer Gardner, H & H Homes (via email)