HomeMy WebLinkAboutNC0032808_Compliance Evaluation Inspection_20210820
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED.
August 20, 2021
William Hammonds
Western Valley Properties LLC
Email: mrngstar1206@aol.com
SUBJECT: Compliance Inspection Report
Morningstar of Jackson
NPDES WW Permit No. NC0032808
Jackson County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Morningstar of Jackson
on 8/20/2021. This inspection was conducted to verify that the facility is operating in compliance with
the conditions and limitations specified in NPDES WW Permit No. NC0032808. The findings and
comments noted during this inspection are provided in the enclosed copy of the inspection report
entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact me at 828-296-4500 or via email at
stephanie.williams@ncdenr.gov.
Sincerely,
Stephanie Williams, Environmental Specialist
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: Laserfiche
Williams Mills (ORC)
DocuSign Envelope ID: 89B6C75F-7DA9-4830-96BC-EB58A05DAD0A
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0032808 21/08/20 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Morningstar of Jackson
505 Raching Cove Rd
Sylva NC 28779
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:00AM 21/08/20 18/05/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
11:00AM 21/08/20 22/10/31
Name, Address of Responsible Official/Title/Phone and Fax Number
William Hammonds,505 Racking Cove Rd Sylva NC 28779//828-586-1556/Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Operations & Maintenance Records/Reports Self-Monitoring Program
Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Stephanie A Williams DWR/ARO WQ/828-296-4500/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: 89B6C75F-7DA9-4830-96BC-EB58A05DAD0A
8/20/2021
8/20/2021
NPDES yr/mo/day
21/08/20
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Stephanie Williams, with the Asheville Regional Office, conducted a Compliance Evaluation Inspection
of the Morningstar of Jackson Wastewater Treatment Plant on August 20, 2021. This inspection was
conducted to determine if the system is being operated and maintained in compliance with permit no.
NC0032808. Williams Mills (ORC) was present during the inspection. No deficiencies were noted
during the inspection.
The facility consists of two septic tanks, two aeration basins that operate in sequence, one secondary
clarifier, and UV disinfection. The septic tanks were initially used as equalization basins which became
unnecessary after plumbing fixtures in the rest home were replaced with low flow fixtures. The tanks
were repurposed as septic tanks. Tank one is currently in use and tank two has not been used for
several years.
This facility does not contain a digester and solids are pumped from the septic tank and aeration
basins as needed – at least annually. At the time of the inspection, solids were found to be very high.
The ORC stated that the solids need to be pumped soon. The 30-minute settleability was measured at
95% in aeration basin one and 92% in aeration basin two.
NC0032808 17 (Cont.)
Page#2
DocuSign Envelope ID: 89B6C75F-7DA9-4830-96BC-EB58A05DAD0A
Permit:NC0032808
Inspection Date:08/20/2021
Owner - Facility:
Inspection Type:
Morningstar of Jackson
Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
The permit became effective 5/1/2018 and expires 10/31/2022.Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Process controls measured include pH, temperature, and DO.Comment:
Septic Tank Yes No NA NE
(If pumps are used) Is an audible and visual alarm operational?
Is septic tank pumped on a schedule?
Are pumps or syphons operating properly?
Are high and low water alarms operating properly?
Comment:
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
The ORC keeps very good records which indicate that the DO is kept around 1.7 mg/L.
During the inspection the 30-minute settleability was measured at 95% in aeration
basin one and 92% in aeration basin two. See summary for details.
Comment:
Page#3
DocuSign Envelope ID: 89B6C75F-7DA9-4830-96BC-EB58A05DAD0A
Permit:NC0032808
Inspection Date:08/20/2021
Owner - Facility:
Inspection Type:
Morningstar of Jackson
Compliance Evaluation
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
A sludge judge could not be used to evaluate the sludge blanket because a low awning
covers the plant. At least 4 - 5 feet of clear supernatant was observed visually.
Comment:
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site?
Are UV bulbs clean?
Is UV intensity adequate?
Is transmittance at or above designed level?
Is there a backup system on site?
Is effluent clear and free of solids?
The UV system consists of two banks with one bulb each, which operate in tandem.
Flow can be directed to either bank individually or both banks simultaneously.
Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment:
Standby Power Yes No NA NE
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Page#4
DocuSign Envelope ID: 89B6C75F-7DA9-4830-96BC-EB58A05DAD0A
Permit:NC0032808
Inspection Date:08/20/2021
Owner - Facility:
Inspection Type:
Morningstar of Jackson
Compliance Evaluation
Standby Power Yes No NA NE
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
The generator at the rest home powers the WWTP.Comment: