Loading...
HomeMy WebLinkAbout20200469 Ver 1_Sediment Loss Report_202108201 Sprinkle, Hannah H From:Westphal, Anneliese Sent:Thursday, August 19, 2021 5:49 PM To:Shaver, Brad E CIV USARMY CESAW (USA); Sprinkle, Hannah H Cc:Farrell, Sean C; Herndon, T. Mason Subject:RE: [External] RE: Duplin Bridge 36 Attachments:photo 1.jpg; photo 2.jpg; photo 3.jpg; photo 4.jpg; photo 5.jpg Brad and Hannah,  We reviewed the sediment loss areas on Duplin Bridge 36 today.       They have pulled the fabric up over the slope and have installed slope drains (photos 1, 2, and 3)   They are still working on removing material inside the silt fence (within the hand clearing area) and still have silt  fence to repair and wattles to replace.   We had hoped that the standing water in loss Area 3 would have receded, but it has not gone down much (see  photo 4 – you can see the higher sand area where they have removed some material from the top of the deposit  on the left side of the photo).  We were hoping that the water would go down enough to be able to see if there  was any new sediment in this “ditch,” but I think this area will remain wet since there is a natural berm between  this area and the creek.   We asked them to remove additional material at Area 2 (photo 5).      Let me know if you have any questions or suggestions.  I’d be interested in your thoughts about how to reclaim any  material from the “ditch” section near loss area 3.  We aren’t sure how much could have washed into it, and are  considering pumping the water down a few inches to see if this helps us assess the situation.      Thank you,  Anneliese     Anneliese Westphal  Environmental Senior Specialist  Division 3  NCDOT- Division of Highways     910 341 2000 office 910 604 1330 mobile  910 675 0143 fax  awestphal@ncdot.gov    5501 Barbados Blvd  Castle Hayne, NC 28429-5647       From: Westphal, Anneliese   Sent: Monday, August 16, 2021 11:13 AM  To: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil>; Sprinkle, Hannah H  2 <hannah.sprinkle@ncdenr.gov>  Cc: Farrell, Sean C <scfarrell@ncdot.gov>; Herndon, T. Mason <tmherndon@ncdot.gov>  Subject: RE: [External] RE: Duplin Bridge 36    Brad,  Thanks, we can keep you updated.  We’ll be in contact with the inspector and we will contact you and Hannah when  they are finished.    Thanks,  Anneliese     Anneliese Westphal  Environmental Senior Specialist  Division 3  NCDOT- Division of Highways     910 341 2000 office 910 604 1330 mobile  910 675 0143 fax  awestphal@ncdot.gov    5501 Barbados Blvd  Castle Hayne, NC 28429-5647       From: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil>   Sent: Monday, August 16, 2021 7:32 AM  To: Westphal, Anneliese <awestphal@ncdot.gov>; Sprinkle, Hannah H <hannah.sprinkle@ncdenr.gov>  Cc: Farrell, Sean C <scfarrell@ncdot.gov>; Herndon, T. Mason <tmherndon@ncdot.gov>  Subject: [External] RE: Duplin Bridge 36    CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  Report Spam.    AW,     Lets touch base when they have finished cleaning this site and see if a site visit is warranted to assure cleanup is done  satisfactorily. Looks like a fair amount of material and work.    Brad    From: Westphal, Anneliese <awestphal@ncdot.gov>   Sent: Thursday, August 12, 2021 7:20 PM  To: Sprinkle, Hannah H <hannah.sprinkle@ncdenr.gov>; Shaver, Brad E CIV USARMY CESAW (USA)  <Brad.E.Shaver@usace.army.mil>  Cc: Farrell, Sean C <scfarrell@ncdot.gov>; Herndon, T. Mason <tmherndon@ncdot.gov>  Subject: [Non‐DoD Source] FW: Duplin Bridge 36    3 Hannah and Brad,  Yesterday Sean and I reviewed the subject project (B‐5639) and reviewed the sediment losses that occurred after this  past weekend’s rain events and were originally reported on Monday, 8/9.  The contractor had been placing borrow on  the detour alignment.  The silt fence and fabric (which will eventually encapsulate the detour fill) contained most of the  sediment but there were losses to the hand clearing areas and wetlands.     The areas are identified as:  Area 1: Approximately 10’ x 10’ and 6” deep in the vicinity of Sta. ‐L_DET‐Sta. 21+50.  This has been removed by hand  tools.  Area 2: Approximately 10’ x 15’ and 6” deep in the vicinity of Sta. ‐L_DET‐Sta. 21+50.  This has been partially removed by  hand tools (the higher places) but is still partially flooded, so we asked them to wait until the water recedes to reassess  to determine if more needs to be removed.  Area 3: Approximately 15’ x 8’ and up to 6” deep in the vicinity of Sta. ‐L_DET‐Sta. 20+00.  They had not started removal  of this area yet.  We discussed how much they would need to remove.  We asked them to wait until the water recedes  before starting in the areas where the water is standing (and also because it is difficult to assess how much needs to be  removed).  This is to avoid creating turbidity during removal.    I update you both as removal continues.  If either of you would like to make a site visit at any stage of removal, please  let me know.    Please let me know if you have any questions.      Thank you,  Anneliese    Anneliese Westphal  Environmental Senior Specialist  Division 3  NCDOT- Division of Highways     910 341 2000 office 910 604 1330 mobile  910 675 0143 fax  awestphal@ncdot.gov    5501 Barbados Blvd  Castle Hayne, NC 28429-5647       From: Westphal, Anneliese   Sent: Monday, August 9, 2021 11:48 AM  To: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil>; Sprinkle, Hannah H  <hannah.sprinkle@ncdenr.gov>  Cc: Farrell, Sean C <scfarrell@ncdot.gov>; Herndon, T. Mason <tmherndon@ncdot.gov>  Subject: Duplin Bridge 36    Brad and Hannah,  4 The project inspector at the subject bridge reported this morning that the project received 4 inches of rain this past  weekend.  The water is still high and therefore it is difficult to access the extent of sediment losses.  They plan to provide  an update when they are able.      Thanks,  Anneliese     Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.  • • y • may" -_��,- • tiliAtm: 'It 'Cast purr;