Loading...
HomeMy WebLinkAboutNCG140210_DMR_20210429PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0I 10 FACILITY NAME: Chandler Concrete Company - HARnjSbERp## 6A9_ PERSON COLLECTING SAMPLES: No Flow CERTIFIED LABORATORY:Pace Analytical Lab #633 MAY 10 2021 LIMIT VIOLATIONS? YES ❑ NO ® CENT t�L FILES DV✓R SECTION Part A: Wastewater Monitoring Requirements 1 QTR 0 Ong — State 0 Copy — State 0 Copy — Plant 0 Copy - File SAMPLE COLLECTION YEAR: 2021 SAMPLE QUARTER: ®Jan -March ❑April -June ❑Jul -Sept ❑Oct -Dec COUNTY: ALAMANCE PHONE NO. (336) 226-1181 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQw ❑PNA ❑Trout ®Other: WS-V NSW OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater RM (VE, , MD) n (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) Non -Polar Oil &Grease usingmethod 1664SGT-HEM6 (mg/L) Discharge Duration (minutes) Total Flow (gallons/day) ' - - - 6-93.4 3035 53 (15)6 - - 1 NO FLOW VE RM MD N/A N/A N A Page No Discharge this Period - Note 2. ' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. `Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring. " pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HOW waters,10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VIVA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 'Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HOW waters shall beset to 50%of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Permit Date:8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 Note: The Haw River Plant has been dismantled and is being updated and relocated to a new site. A NO1 is in the process of being submitted for the Spruce Pine location when infrastructure plans are finalized. A closure letter will be submitted when the Haw River site is fully vacated. YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. lam aware that there are significant penalties for submitlse information, including the possibility of fines and imprisonment for knowing violations." of Permit Date:8/1/2017-06/30/2022 ( ate) Last Revised 07/27/17 Page 2 of 2