HomeMy WebLinkAbout20201148 Ver 1_More Info Received_20210818Strickland, Bev
From: Dan McCauley <dmccauley@harthickman.com>
Sent: Wednesday, August 18, 2021 10:20 AM
To: Johnson, Alan
Cc: Perez, Douglas J; Matt Bramblett
Subject: RE: [External] Proposed Hambright Industrial (SAW-2021-00094 / DWR # 21-1148)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Alan,
The proposed impacts were corrected from the last submittal (dated July 23, 2021). In addition, the site plan was re-
evaluated by the civil design engineer and now includes a redesign to the proposed retaining wall (updated submittal
dated August 12, 2021). The retaining wall was shifted to the east to directly abut the driveway and truck court area,
which has resulted in a reduction to the overall stream impact by 69 linear feet from the previously submitted (and
corrected) site plan. The corrected site plan proposed 521 linear feet of stream impact, and the current updated site
plan proposes 452 linear feet of stream impact.
The developer explored implementing underground stormwater controls or constructing multiple smaller retention
ponds to reduce impacts to the on -Site stream and wetland. However, due to the size of the development, amount of
impervious area, and planned use for heavy truck traffic, underground stormwater management is very costly and
impractical. In addition, relocating or shifting the building and/or parking areas into the current location of the
proposed BMP in the western portion of the Site would not result in an additional reduction to on -Site Waters of the
U.S. due to: 1) the presence of the Duke Energy high tension powerlines located in the eastern portion of the Site; 2)
industry -required dimensions of the Site building; and 3) parking constraints. These points are discussed in more detail
below:
• Duke Energy high tension powerlines are located in the eastern portion of the Site. Based on the Duke power
right-of-way, parking is the only possible use below and in the vicinity of the powerlines. Because of the
presence of the powerlines, the proposed location of the building is fixed, and the entirety of the building must
be located to the west and outside of the powerline right-of-way. The proposed building has been pushed as
close as possible to the powerline right-of-way. Parking has been located in the eastern portion of the Site
because parking uses are allowed below the powerlines. In addition to the Duke Energy Powerline right-of-way,
a sanitary sewer easement exists in the west -central portion of the Site. The developer is proposing to relocate
the sanitary sewer along the western Site boundary to maximize developable upland area on the Site.
• Due to industry -specific requirements, a further reduction in building size is not economically feasible. The
building has been reduced to the industry minimum of 225,000 square feet that includes a required 240-ft depth
of building and 130-ft depth of truck court. The building has been reduced from the originally proposed 285,000
square feet to the currently proposed 225,000 square feet to reduce impacts to on -Site Waters of the U.S.
• The developer explored reducing parking areas along the frontage of the proposed building in order to shift the
development toward Hambright Road to further reduce impacts to on -Site Waters of the U.S. However, tenants
require access to the front of the building in the case of multi -tenant leases, which are likely for this
development. Additionally, due to the length and width of the building, the Americans with Disabilities Act and
fire department require access points and parking along the building frontage. The developer has included
parking spaces based on market demand.
i
Let's discuss these points during our site meeting tomorrow. Please let me know if we can provide any further
information. By the way, we just received the NWP 39 verification for the proposed impacts.
Thanks!
Dan
Ilmtts
Dan W. McCauley, Project Environmental Scientist
Hart & Hickman, PC
3921 Sunset Ridge Road, Ste 301 • Raleigh, NC 27607
Direct: 919-723-2510 • Mobile: 704-998-1864
www.harthickman.com
We've launched a new website! Follow the link above to see what's changed...
From: Johnson, Alan <alan.johnson@ncdenr.gov>
Sent: Thursday, August 12, 2021 1:15 PM
To: Dan McCauley <dmccauley@harthickman.com>
Cc: Perez, Douglas J <doug.perez@ncdenr.gov>
Subject: RE: [External] Proposed Hambright Industrial (SAW-2021-00094 / DWR # 21-1148)
An updated site layout? Or just a correction of proposed impacts. I believe I asked about the
siting plan and utilization of underground stormwater controls that would allow more room
for parking. There was no response to the potential avoidance and minimization regarding
alternative site layout.
We need to confirm the intermittent stream calls for our mitigation purposes. What about
August 19th, after lunch?
Thanks
Alan
DWR
Division of Water Resources
Alan D Johnson — Senior Environmental Specialist
NC Dept. of Environment & Natural Resources (NCDENR)
Division of Water Resources - Water Quality Regional Operations
610 East Center Ave., Suite 301, Mooresville, NC 28115
Phone: (704) 235-2200 Fax: (704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
From: Dan McCauley [mailto:dmccauley@harthickman.com]
Sent: Thursday, August 12, 2021 10:15 AM
To: 'Roden Reynolds, Bryan K CIV (USA)' <Bryan.K.RodenReynolds@usace.army.mil>; Johnson, Alan
2
<alan.johnson@ncdenr.gov>
Cc: Sherrie Chaffin<sls@trinitycapitaladvisors.com>; msclapp6@yahoo.com; Matt Bramblett
<MBramblett@harthickman.com>; Chris Fleck @ D&A <chris@dnawolverine.com>
Subject: [External] Proposed Hambright Industrial (SAW-2021-00094 / DWR # 21-1148)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Bryan and Alan,
Please find the attached documents associated with an updated Pre -Construction Notification for the proposed
Hambright Industrial project. The documents have been updated to address comments received from you via email on
August 5, 2021.
Please let me know if you have questions or if we can provide additional information.
Thank you!
Dan
Dan W. McCauley, Project Environmental Scientist
Hart & Hickman, PC
3921 Sunset Ridge Road, Ste 301 • Raleigh, NC 27607
Direct: 919-723-2510 • Mobile: 704-998-1864
www.harthickman.com
We've launched a new website! Follow the link above to see what's changed...
3