Loading...
HomeMy WebLinkAboutSW8160501_Historical File_20161107Energy, Mineral & Land .Resources ENVIRONMENTAL QUALITY November 7, 2016 PAT McCRORY Governor DONALD R. VAN DER VAART Secretary TRACY DAVIS Director Purchaser/Permittee: Property Owner: Volker Heimeshoff, Vice President John Pierce, Manager Wal-Mart Real Estate Business Trust Swansboro Investors, LLC c/o Barri Tulgetske, Director of Project Management and Design 405 Johnson Boulevard 2001 SE 10ffi Street, Mail Stop 0550 Jacksonville, NC 28540 Bentonville, AR 72116 Subject: State Stormwater Management Permit No. SW8 160501 Walmart Supercenter Swansboro #7179-000 High Density Commercial with Outparcels Wet Detention Pond Projeci Onslow County Dear Mr. Heimeshoff: The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for Walmart Supercenter Swansboro #7179-000 on October 27, 2016. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding modified Permit No. SW8 160501 dated November 7, 2016, for the construction, operation and maintenance of the BMP's and built -upon area associated with the subject project. This permit shall be effective from the date of issuance until June 6, 2024, and shall be subject to the conditions and limitations as specified therein. The designated permit holder, Wal-Mart Real Estate Business Trust, shall be responsible for meeting the conditions and limitations specified therein. As required for compliance, a copy of the purchase agreement between Wal-Mart Real Estate Business Trust and Swansboro Investors, LLC, must be kept with the permit and maintenance activity records. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, and the procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to -transfer the permit, or to renew the permit, will result in future compliance problems. The following modifications are included and covered by this permit: 1. The drainage area and built -upon area associated with Drainage Area 1 are both increasing due to the reduction in drainage area and built -upon area associated with Drainage Area 2. 2. Within Drainage Area 2, the wet detention pond orifice and the infiltration trench length are both being reduced accordingly. Please be aware that it is the responsibility of the permit holder to notify the Division of any changes in ownership and request an ownership/name change for the stormwater permit. However, please be reminded that if the sales contract between Wal-Mart Real Estate Business Trust and Swansboro Investors, LLC, is dissolved, cancelled or defaulted, and the Division is not notified by Wal-Mart Real Estate Business Trust to transfer the permit, then the responsibility for permit compliance reverts back to the property owner, Swansboro Investors, LLC. The property owner must notify the Division immediately of the permit ownership change and submit a completed Name/Ownership form to the Division within 30 days. Otherwise, Swansboro Investors, LLC, will be operating a stormwater treatment facility without a valid permit. This is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties. State of North Carolina I Environmental Quality I Energy, Mineral and Land )resources Wilmington Regional Office ' 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 746 State Stormwater Permit No. SW8 160501 Page 2 of 2 If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and . must be filed with the OAH within thirty (30) days of receipt of this pen -nit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Hall in the Wilmington Regional Office, at (910) 796-7215. Sincerely, AA ,`-Tracy Da is, P.E., Director Division of Energy, Mineral and Land Resources GDS/canh: \\\Stormwater\Permits & Projects\2016\160501 HD\2016 11 permit 160501 cc: - Michael Theberge, P.E., Bohler Engineering Andrea Correll, Town of Swansboro Building Inspections Onslow County Engineering Wilmington Regional Office Stormwater Permit rile State of North Carolina I Environmental Qualtty i Ener- gy; Mineral and Land Resources Wilmington Regional Office 11.27 Cardinal Drive Extension I Wilmington, NC 2W5 910 796 7215 State Stormwater Management Systems Permit No. SW8 160501 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT w/OUTPARCELS In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Wal-Mart Real Estate Business Trust Walmart Supercenter Swansboro #7179-000 1121 West Corbett Avenue, Swansboro, Onslow County FOR THE construction, operation and maintenance of three (3) wet detention ponds within Y mile of and draining to Class SA waters in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (hereafter the Division or DEMLR) and considered a part of this permit. This permit shall be effective from the date of issuance until June 6, 2024 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The project is a commercial shopping center with 2 outparcels. Each outparcel is limited to a maximum amount of built -upon area as indicated in Schedule of Compliance Condition 11.3 (f) of this permit and as shown in the application documents. 3. This stormwater system has been approved for the management of stormwater runoff as described in Design Standards Conditions 1.8 and 1.9 of this permit. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control measures. The stormwater control measures labeled Pond 1, Pond 2 and Pond 3, have been designed to handle the runoff from 384,765 square feet; 98,200 square feet; and 123,910 square feet of built -upon area, respectively. 4. The drainage areas will be limited to the amounts of built -upon area indicated in Design Standards Condition 1.8 of this permit, and per approved plans. There is no allocation of built -upon area for any future development. 5. All runoff being directed into wetlands shall flow into and through those wetlands at a non -erosive velocity. Page 1 of 10 State Stormwater Management Systems Permit No. SW8 160501 6. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 7. Prior to the discharge of stormwater runoff from any outparcel into the approved stormwater system, the permittee shall have recorded the necessary deed restrictions such that the owner is aware of the built -upon area limit and must apply for and receive a separate Offsite Stormwater Management Permit. 8. The following design criteria have been permitted for the wet detention ponds and they must be provided and maintained at the permitted design condition. Pond #1 Pond #2 Pond #3 a. Drainage Area, acres: Onsite, ft2: Offsite, ft2: 11.00 446,000 33,365 2.94 1 88,200 0 3.67 160,000 0 b. Total Impervious Surfaces, ft2: Onsite, ft2: Offsite, ft2: Outparcels, ft2: 384,765 351,400 33,365 0 98,200 98,200 0 0 123,910 78,690 0 45,220 c. Average Pond Design Depth, feet: 7.5 5.0 7.5 d. TSS Removal Efficiency: 90% 90% 90% e. Design Storm, inches: 3.65 3.65 3.65 f. Permanent Pool PP Elevation, FMSL: 29.0 29.25 29.0 g.Permitted PP Surface Area, ftz: 51,625 12,935 14,305 h. Temporary Storage Elevation, FMSL: 31.0 31.05 31.0 i. Permitted Storage Volume, ft3: 115,393 30,953 34,776 j. Predev. r-24 hr. discharge rate, cfs: 1.45 0.136 0.14 k. Controlling Orifice, inch 0pipe: 5.0 1.75 2.0 I. Orifice Flow Rate, cfs: 0.51 .08 .08 m. PP Volume, ft3: 408,848 48,999 109,249 n. Foreba Volume, ft3: 74,850 8,912 23,368 o. Maximum Fountain Horsepower: 1.0 1/6 1/3 p. Receiving Stream/River Basin: Hall's Creek / WOK01 Cartwheel Branch / WOK01 q. Stream Index Number: 19-41-16-3 20-26-1 r. Classification of Water Body: SA HQW SA HQW 9. Per the "no direct discharge" requirements in Section 2.(b)(1) c.3. of SL 2008-211, the design storm discharged from a wet detention pond must be directed into a secondary BMP. The following design criteria have been provided in the permitted secondary BMP's and must be maintained at this design condition: (A) VEGETATED FILTER STRIP (POND #1 secondary BMP/effective infiltration) a. Peak Discharge: Design Storm, cfs: 0.51 10-yr Storm, cfs: 0.7 b. Length of Level Spreader, ft: 20 C. Width of Vegetated Filter Strip, ft: 50 d. Slope of Vegetated Filter Strip: 2% (B) INFILTRATION TRENCHES (secondary BMP's) Units Pond #2 Pond #3 a. Dimensions, LxWxH: ft 55 x 24 x 2.0 76 x 24 x 1.75 b. Perforated pipe D / L: In/ft 12" / 71.5 12" / 76 c. Bottom Elevation: fmsl 29.0 28.75 d. Overflow Elevation: fmsl 30.5 30.25 Page 2 of 10 State Stormwater Management Systems Permit No. SW8 160501 II. SCHEDULE OF COMPLIANCE The stormwater management BMP shall be entirely constructed, vegetated and operational for its permitted use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 3. Prior to the sale of any outparcel, the permittee shall cause the following deed restrictions to be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 160501, as issued by the Division of Energy, Mineral and Land Resources under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the Division. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. f. The maximum built -upon area for OP #1319-81 is 21,705 square feet and the maximum built -upon area for OP# 1319-79 is 23,515 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff from the built -upon areas on the outparcel must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the pond or street, grading the lot to drain toward the street or directly into the pond, or grading perimeter swales and directing them into the pond or street. h. Built -upon area in excess of the permitted amount will require a permit modification. i. Each outparcel shall maintain a 50' wide vegetative buffer adjacent to surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of each side of streams and rivers and the mean high water line of tidal waters. j. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the Stormwater Rules is subject to enforcement procedures as set forth in G.S. 143, Article 21. k. Each outparcel whose ownership is not retained by the permittee, must submit a separate Offsite Stormwater Management Permit application package to the Division and receive a permit prior to any construction on the lot. 4. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. Page 3of10 State Stormwater Management Systems Permit No. SW8 160501 5. No component of the approved stormwater management BMP's or the stormwater runoff conveyance system shown on the approved plans shall be altered, modified, resized, relocated or regraded unless and until the Division has approved of a revised plan. 6. If the sales contract between Wal-Mart Real Estate Business Trust and Swansboro Investors, LLC, is dissolved, cancelled or defaulted, the permit holder shall notify the Division of this change of ownership and shall request a Name/Ownership change for the stormwater permit. If the Division is not notified by Wal-Mart Real Estate Business Trust to transfer the permit, then the responsibility for permit compliance reverts back to the property owner, Swansboro Investors, LLC. The property owner must notify the Division immediately of the permit ownership change and submit a completed Name/Ownership form to the Division within 30 days. Otherwise, Swansboro Investors, LLC, will be operating a stormwater treatment facility without a valid permit, which is a violation of NC General Statue 143-215.1. 7. A copy of the final deed listing Wal-Mart Real Estate Business Trust as the property owner must be submitted within 30 days of the property being purchased. 8. The permittee shall review all new and modified outparcel plans for compliance with the conditions of this permit. The permittee shall not approve any outparcel plans where the maximum allowed built -upon area has been exceeded, or where modifications, alternations, resizing, relocating or regrading of any component of the storm drainage system are proposed unless and until a permit modification has been approved by the Division. 9. The permittee is responsible for the routine monitoring of the project for compliance with the built -upon area limits, grading, and the maintenance of the storm drainage system and BMP established by this permit, the permit documents, the approved plans, and the recorded deed restrictions. The permittee shall notify any outparcel owner that is found to be in noncompliance with the conditions of this permit in writing, and shall require timely resolution. 10. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 11. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 12. If the permanent pool volume is greater than 30,000 cubic feet, a decorative spray fountain will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain pump in each pond is listed in Design Standards Condition 1.8 of this permit. Page 4 of 10 State Stormwater Management Systems Permit No. SW8 160501 13. If permeable pavement BUA credit is desired, the permittee must submit a request to modify this permit to incorporate such language as required by the Division. 14. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 15. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from an appropriate designer for the system installed to be submitted, certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 16. All stormwater collection and treatment systems must be located in either public rights - of -way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such rights -of -way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 17. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, the stormwater runoff collection system, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area as reported on the application. d. Altering, modifying, resizing, relocating or regrading any runoff conveyance measure shown on the approved plan. e. The construction of any future BUA reported on the application. 18. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The project and the stormwater facility must be in substantial compliance with all permit conditions. Any items not in substantial compliance must be repaired, replaced or restored to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 19. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. Any individual or entity found to be in noncompliance with the provisions of a stormwater manaaement permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 2. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. Page 5of10 State Stormwater Management Systems Permit No. SW8 160501 3. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Additional or replacement stormwater management systems shall receive a permit from the Division prior to construction. 4. This permit is ^ot transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division of Energy, Mineral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the cancellation, dissolution or default of the sales contract, or the sale or conveyance of the project area in whole or in part, except in the case of an individual outparcel sale that is made subject to properly recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; C. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121, e. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e) and NCGS 57D-6-07; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 5. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 6. The permittee grants DEMLR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Approved plans, calculations, supplement forms, operation and maintenance agreements and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater control measure must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. Page 6 of 10 State Stormwater Management Systems Permit No. SW8 160501 11. The permittee shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee. Permit modified and re -issued this the 7tn day of November, 2016. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSiON 'Z4A ��� D-1�Ccv , racy D2Ktis, P.E., Director . Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 7of10 State Stormwater Management Systems Permit No. SW8 160501 Master Permit No. SW8 160501 Lot # from Master Permit Drains to Pond # Offsite Permit No. Date Issued Offsite Project Name Allocated BUA Proposed BUA 1319-79 3 23,515 1319-81 3 21,705 Page 8of10 State Stormwater Management Systems Permit No. SW8 160501 Walmart Supercenter Swansboro #7179-000 Page 1 of 2 Stormwater Permit No. SW8 160501 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 9 of 10 State Stormwater Management Systems Permit No. SW8 160501 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the.built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required components of the system are provided, such as a vegetated shelf, a forebay, a vegetated filter and the secondary BMP. 15. The required dimensions of the system are provided, per the approved plan. 16. All.components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDEQ-DEMLR Regional Office Andrea Correll, Town of Swansboro Building Inspections Page 10 of 10 Permit No. • 5 g �D'�5 0/ (to be provided by DWQ) �OWINA7G WDENRCT STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. Project name 7179-000 Walmart Supercenter Swansboro, NC Y Contact person Michael A Theberge Phone number 980-272-3400 Date 3-Oct-16 Drainage area number Wet Pond 1 ,a Site Characteristics Drainage area 479,365 fe Impervious area, post -development 384,765 ff % impervious 80.27 % Design rainfall depth 3.7 in Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1.5" runoff volume 46,282 ft3 Pre -development 1-yr, 24-hr runoff 7,290 ft3 Post -development 1-yr, 24-hr runoff 112,620 ft3 Minimum volume required 105,329 ft3 Volume provided 115,393 ft3 Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.7 in Rational C, pre -development 0.15 (unitless) Rational C, post -development 0.79 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.15 in/hr OK Pre -development 1-yr, 24-hr peak flow 1.45 ft3/sec Post -development 1-yr, 24-hr peak flow 25.00 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 23.55 ft3/sec Elevations Temporary pool elevation 31.00 fmsl Permanent pool elevation 29.00 fmsl SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation 29.50 fmsl 29.50 fmsl ECEIVE Bottom of 1Oft vegetated shelf elevation 28.50 fmsl Sediment cleanout, top elevation (bottom of pond) 14.00 fmsl /� e OCT 2 l 2016 Sediment cleanout, bottom elevation 13.00 fmsl Sediment storage provided 1.00 ft BY: Is there additional volume stored above the state -required temp. pool? Y (Y or N) Elevation of the top of the additional volume 31.0 fmsl OK Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 3 Permit (to be provided by DWQ) ,F w Surface Areas Area, temporary pool 61,780 its Area REQUIRED, permanent pool 13,422 ft SAIDA ratio 2.80 (unitless) Area PROVIDED, permanent pool, • p. m-poul 51,625 ft2 OK Area, bottom of 1 Oft vegetated shelf, Abot_shWf 46,590 ft' Area, sediment cleanout, top elevation (bottom of pond), AboL_,nd 11,935 fe Volumes Volume, temporary pool 115,393 ft3 OK Volume, permanent pool, Vpe._j.ol 408,848 fe Volume, forebay (sum of forebays if more than one forebay) 74,850 ft' Forebay % of permanent pool volume 18.3% % OK SAIDA Table Data Design TSS removal 90 Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 2.80 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, VPermyod 408,848 fe Area provided, permanent pool, I p._Pnnl 51,625 e Average depth calculated N/A ft OK Average depth used in SAIDA, d,v, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, • pemLPWI 51,625 fe Area, bottom of 1Oft vegetated shelf, Ahm e.W 46,590 ft2 Area, sediment cleanout, top elevation (bottom of pond), AbuLpond 11,935 ft2 "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 14.50 ft Average depth calculated 9.58 ft OK Average depth used in SAIDA, d. (Round to down to nearest 0.5ft) 7.5 ft Insufficient. Check calculation. Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 5.00 in Area of orifice (if -non -circular) in Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 0.60 ft Drawdown through weir? N (Y or N) Weir type NIA (unitless) Coefficient of discharge (C„,) N/A (unitless) Length of weir (L) NIA ft Driving head (H) NIA ft Pre -development 1-yr, 24-hr peak flow 1.45 ft3/sec Post -development 1-yr, 24-hr peak flow 25.00 felsec Storage volume discharge rate (through discharge orifice or weir) 0.51 ft3/sec Storage volume drawdown time 2.40 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width Length of flowpath to width ratio 10.0 ft 3.1 :1 OK OK ECEIVE Length to width ratio 3.1 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK OCT Z 7 2016 Freeboard provided 1.0 It F6 OK Vegetated filter provided? N (Y or N) OK BY: Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: PUMP Form SW401-Wet Detention Basin-Rev.9-4/18/12 oar's I. $ H. Design Summary, Page 2 of 3 Permit �, . (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the foiiowing design requirements have been met. It the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. _MT C-6-C-8_ 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, - High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and - Filter strip. 3. Section view of the wet detention basin (1" 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. —SW-2— 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. _MT _Appendix_ 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. _MT SW-2 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. _MT Appendix_ 7. The supporting calculations. _MT Appendix_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. _MT Appendix___ 9. A copy of the deed restrictions (if required). _MT Appendix_ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9-4/18/12 ECEIVE OCT 272016 Part III. AW61MC118133a Checklis Pestle of 3 Permit No. �(/" F105 (to be provided by DWQ) �r■ � O��F NC ENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Project name 7179-000 Walmart Supercenter Swansboro, NC Contact person Michael A Theberge Phone number 980-272-3400 Date 3-Oct-16 Drainage area number Wet Pond 2 � :.,... ., w Site Characteristics Drainage area 128,200 fe Impervious area, post -development 98,200 ft2 % impervious 76.60 % Design rainfall depth 3.7 in Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1.5' runoff volume 11,849 ft3 Pre -development 1-yr, 24-hr runoff 4,757 ft3 Post -development 1-yr, 24-hr runoff P8,832 ft3 Minimum volume required 24,075 ft3 Volume provided 30,953 ft3 Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.7 in Rational C, pre -development 0.21 (unitess) Rational C, post -development 0.76 (unitless) Rainfall intensity:1-yr, 24-hr storm 0.15 in/hr OK Pre -development 1-yr, 24-hr peak flow 0.40 ft3/sec Post -development 1-yr, 24-hr peak flow 9.69 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 9.29 ft3/sec Elevations Temporary pool elevation 31.05 fmsl Permanent pool elevation 29.25 fmsl SHWT elevation (aoorox. at the norm. nool elevatinnl 29.00 fmsl Top of 1 Oft vegetated shelf elevation 29.75 fmsl Bottom of 10ft vegetated shelf elevation 28.75 fmsl Sediment cleanout, top elevation (bottom of pond) 20.00 fmsl � � � � �� Sediment cleanout, bottom e!evatior, 19.00 fmsl Sediment storage provided 1.00 ft OCT 2 7 2016 Is there additional volume stored above the state -required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl BY. Form SW401-Wet Detention Basin-Rev.94/18/12 Parts I. & II. Design Summary, Page 1 of 3 Permit ,to be provided by DWQ) 1 Surface Areas Area, temporary pool 20,130 ft2 Area REQUIRED, permanent pool 6,641 ft2 SAIDA ratio 5.18 (unitless) Area PROVIDED, permanent pool, Apsr pa,i 12,935 ft OK Area, bottom of 1 Oft vegetated shelf, Ab t_,,,g;f 9,705 e Area, sediment cieanout, top elevation (bottom of pond), AeoLixind 1,105 ft2 Volumes Volume, temporary pool 30,953 ft3 OK Volume, permanent pool, Vperr pool 48,999 ft3 Volume, forebay (sum of forebays if more than one forebay) 8,912 ft3 Forebay % of permanent pool volume 18.2% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 5.18 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, VpyrrrLpool 48,999 ft3 Area provided, permanent pool, Apex ,,ol 12,935 ft2 Average depth calculated N/A ft OK Average depth used in SAIDA, d. , (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool,' yermyod 12,935 ft2 Area, bottom of 1 Oft vegetated shelf, AboLshelf 9,705 ft2 Area, sediment cleanout, top elevation (bottom of pond), ^eoLVa.d 1,105 f? "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 8.75 ft Average depth calculated 5.31 ft OK Average depth used in SAIDA, d,,, (Round to down to nearest 0.5ft) 5.3 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 1.75 in Area of orifice (if -non -circular) in Coefficient of discharge (CD) 0.60 (unitless) Driving head (He) 0.58 ft Drawdown through weir? N (Y or N) Weir type N/A (unitless) Coefficient of discharge (C„,) N/A (unitless) Length of weir (L) NIA ft Driving head (H) N/A ft Pre -development 1-yr, 24-hr peak flow 0.40 Osec Post -development 1-yr, 24-hr peak flow 9.69 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.06 ft3/sec Storage volume drawdown time 4.57 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width Length of Sowpath to width ratio 10.0 It 6 :1 OK OK IT E C E I V E Length to width ratio a •1 OK $ f Trash rack for overflow & orifice? Y (Y or N) OK OCT 2 7 2016 Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Bi. Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: PUMP Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 3 Permit No. (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design require, rents have been met. If the applicant has designated an agent, the agent may initial below, If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. _MT C-6-C-8_, 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, - Vegetation specification for planting shelf, and Filter strip. _MT 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. _MT 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. _MT Appendix_ 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, to verify volume provided. _MT SW-2 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. _MT Appendix_ 7. The supporting calculations. _MT Appendix_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. _MT Appendix 9. A copy of the deed restrictions (if required). _MT Appendix_ 1 U. A soils report that is based upon an actual field investigation, soil borin s, and infiltration tests. County soil maps are not an acceptable source of soils information. E C E I V E ACT 2 7 2016 RY. Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 3 of 3 Permit (to be provided by OWQ) MCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checldist (Part lll) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name 7179-000 Walmart Supercenter Swansboro, NC Contact person Michael A Theberge Phone number 980-272-3400 Date 1-Jun-16 Drainage area number Wet Pond 3 II DESIGN INFORMATION Site Characteristics Drainage area 160,000 fe Impervious area, post -development 123,910 f? %impervious 77.44 % Design rainfall depth 3.7 in Storage Volume: Non•SA Waters Minimum volume required if Volume provided fl? Storage Volume: SA Waters 1.5' runoff volume 14,940 fe Pre -development 1-yr, 24-hr runoff 5,937 it' Post -development 1-yr, 24-hr runoff 36,354 ft Minimum volume required 30,416 fe Volume provided 34,776 ft Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.7 in Rational C, pre -development 0.21 (unitless) Rational C, post -development 0.77 (unitless) Rainfall intensity: I-yr, 24-hr storm 0.15 inthr OK Pre -development 1-yr, 24-hr peak flow 0.27 felsec Post -development 1-yr, 24-hr peak flow 9.56 fe/sec Pre/Post 1-yr, 24-hr peak flow control 9.29 fe/sec Elevations Temporary pool elevation 31.00 fmsl � Permanent pod elevation 29.00 fmsl � � 1 �� SHWT elevation (approx. at the perm. pool elevation) 28.75 fmsl Top of 10ft vegetated shelf elevation 29.50 fmsl JUN 0 3 2016 Bottom of 1 Oft vegetated shelf elevation 28.50 fmsl Sediment cleanout, top elevation (bottom of pond) 13.00 fmsl Sediment cleanout, bottom elevation 12.00 frnsl QY: Sediment storage provided 1.00 It Is there additional volume stored above the state -required temp. pool? N (Y or N) Elevation of the top of the additional volume fins) Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 3 Permit (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 19,430 if Area REQUIRED, permanent pool 4,240 fe SAIDA ratio 2.65 (unitless) Area PROVIDED, permanent moor, A..,,., 14,305 f? OW Area, bottom of 1 Oft vegetated shelf, AbaL her 12,090 if Area, sediment cleanout, top elevation (bottom of pond), Abotp M 2,290 ft Volumes Volume, temporary pool 34,776 f? OK Volume, permanent pod, Vwm_„oo, 109,249 f Volume, forebay (sum of forebays if more than one forebay) 23,306 it Forebay % of permanent pool volume 213% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y . (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 2.65 (unidess) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vp._,,,,, 109,249 il? Area provided, permanent pod, Ap.f _y,,, 14,305 ft Average depth calculated N/A ft OK Average depth used in SAIDA, dN, (Round to nearest 0.5ft) It Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, Ap.- ,,, 14,305 f? Area, bottom of 1 Oft vegetated shelf, AboLsben 12,090 ft Area, sediment cleanout, top elevation (bottom of pond), Aw o,ra 2,290 f(2 "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 15.50 ft Average depth calculated 9.68 It OK Average depth used in SAIDA, d. (Round to down to nearest 0.5ft) 7.5 it Insufficient. Check calculation. Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.00 in Area of orifice (if -non -circular) in' Coefficient of discharge (Co) 0.60 (unitless) Driving head (H,) 0.64 ft Drawdown through weir? N (Y or N) Weir type NIA (unitless) Coefficient of discharge (Q NIA (unitless) Length of weir (L) N/A It Driving head (H) N/A ft Pre -development 1-yr, 24-hr peak flow 0.27 fe/sec Post -development 1-yr, 24-hr peak flow 9.56 f0/sec Storage volume discharge rate (through discharge orifice or weir) 0.08 fOlsec Storage volume drawdown time 4.19 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK rreeboard provided 1 ^ ft OK JUN 0 3 lutti Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK BY, Drain mechanism for maintenance or emergencies is: PUMP ' Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 3 Permit tIk R EiLIiEE� I1TV IBC-GPCE{ F „ ...4 (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. _MT_ C-6-C-8_ 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, - Basin cross-section, Vegetation specification for planting shelf, and Filter strip. _MT _D-1 3. Section view of the wet detention basin (1" 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. _MT SW-2_ 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. _MT Appendix_ 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. _MT Appendix_ 7. The supporting calculations. _MT Appendix_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. _MT_____Appendix_ 9. A copy of the deed restrictions (if required). MT Appendix_ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9-4/18/12 EGEIVF- !UN 0 9 2016 III. Required Items Checklis age 3 of 3 BY:--- Operation & Maintenance Agreement #7179-000 Walmart Supercenter Swansboro, NC Swansboro, NC ONSLOW County Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set locatio Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: Soil Amendments Present: O&M tables will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): aaaea I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. " Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Barr! Tulgetske Director of Project Management & Design, Wal-Mart 2001 S.E. 10th Street, Mail Stop 0650 Bentonville, AR 72716 (479) 204-3147 Barri.Tulgetske@walmart.com Signature: da4'- . Date: a Notary Public for the State of I-R. 1el-NSA-6 County of f do hearby certify that 64pap. j TZ-f q e'+-9kd- personally appeared before me this 4044 day of MO-4 , � l b and acknowledge the due execution of the Operations and Maintenan a Agr ement . Witness my hand and official seal, , Sea! SHEILA J. WARD MY COMMISSION # 12350WO n ` ' EXPIRES: September 24, 2016 :� Benton County My commission expires 6)/qw16 ? EC E IVE MAY 0 5 2016 BY: STORM-EZ 4/2712016 Version 1.4 O&M Manual Page 1 of 7 Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tali as 12 inches depending on aesthetic requirements (NIPC, 1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How to remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The flow splitter device (If The flow splitter device is Unclog the conveyance and dispose of any sediment off site. applicable) clogged. The flow splitter device is damaged. Make any necessary repairs or replace if damage is too large for repair. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). ECEIVE MAY 19 2013 BY: STORM-EZ 5/17/2016 Version 1.4 O&M Manual Page 3 of 9 The Swale and the level lip The swale is clogged with Remove the sediment and dispose of it off -site. sediment. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the ,endof the level spreader that shows stormwater has Regrade the soil to create a berm that is higher than the level lip, and then plant a ground cover and water until it is established. (Provide lime and a one-time fertilizer application. bvi2assed it. Trees or shrubs have begun Remove them. to grow on the swale or just downslope of the level lip. The bypass channel Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then reestablish proper erosion control. Turf reinforcement is damaged or ripap is rolling Study the site to see if a larger bypass channel is needed (enlarge if necessary). After this, reestablish the erosion control material. downhill. The filter strip Grass is too short or too long (if applicable). Maintain grass at a height of approximately three to six inches. Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one- time fertilizer application. Sediment is building up on the filter strip. Remove the sediment and restabilize the soil with vegetation if necessary. Provide lime and a one-time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is choking out desirable Remove vegetation by hand if possible. If pesticide is used, do not allow it to get into the receiving water. species. The receiving water Erosion or other signs of damage have occurred at the Contact the NCDENR local Regional Office, or the 401 Oversight Unit at 919-733-1786. outlet. ECEIVF MAY 19 2T) BY: STORM-EZ 5/17/2016 Version 1.4 O&M Manual Page 4 of 9 Infiltration System Maintenance Requirements Importarit maintenance procedures: - The drainage area will be carefully managed to reduce The sediment load to The infiltration basin. _ Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). _ No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. - The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it shall be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the infiltration basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one- time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the sediment off -site. swale applicable). The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the swale (if applicable). Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated land reduced the depth to 75% Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it of the original design depth. will not cause impacts to streams or the BMP. Erosion has occurred or riprap is displaced. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the sediment and remedy the problem if has accumulated. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter media and see if this corrects the 5 days after a storm event. standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are growing in the main Remove the plants by hand or by wiping them with pesticide (do not spray). treatment area. The embankment Shrubs or trees have started Remove shrubs or trees immediately. to grow on the embankment. .An annual inspection by an hake all needed repairls_ appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dis a of the sediment off e. The outlet device is damaged Repair or replace the outlet devic%,y;_ STORM-EZ 5/17/2016 Version 1.4 O&M Manual Page 5 of 9 The receiving Water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. EGEIVE MAY 19 20 " BY: STORM-EZ 5/17/2016 Version 1.4 O&M Manual Page 6 of 9 Wet Detention Pond Maintenance Requirement:; The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. _ Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if In a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too long. Maintain vegetation at a height of approximately six inches. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the swale. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The forebay Sediment has accumulated to a depth greater than the original design depth for Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices show that pruning is needed Prune according to best professional practices to maintain optimal plant health. Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates io necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. VEIN STORM-Fl Version 1.4 O&M Manual MAY 19 2016 BY: 5/17/2016 Page 7 of 9 The main treatment area Sediment has accumulated to a depth greater than the Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% of the area. Consult a professional to remove and control the algal growth. Cattails, phragmites or other invasive plants cover 50% of I Remove the plants by wiping them with pesticide (do not spray). the basin surface. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. The measuring device used to determine the sediment elevation shall be such that ii will give an accurate depth reading and not readily penetrate into accumulated sediments. ECEIVE MAY 19 2016 BY: STORM-EZ 5/17/2016 Version 1.4 O&M Manual Page 8 of 9 Wet Detention Pond Design Summary { WET POND ID FOREBAY MAIN POND Wet Pond 1 Normal Pool El. 29 Normal Pool El. 29 Temporary Pool El: 31 Temporary Pool El: 31 Pretreatment other No Clean out depth: 1 Clean out depth: 1 than forebay? Sediment Storage El: 24 Sediment Storage El: 14 Has Vag. Filter? Yes Bottom El: 23 Bottom El: 13 WET POND ID FOREBAY MAIN POND Wet Pond 2 Normal Pool El. 29.25 Normal Pool El. 29.25 Temporary Pool El: 31.05 Temporary Pool El: 31.05 Pretreatment other No Clean out depth: 1 Clean out depth: 1 than forebay? Sediment Storage El: 20 Sediment Storage El: 20 Has Vag. Filter? No Bottom El: 19 Bottom El: 19 WET POND ID FOREBAY MAIN POND Wet Pond 3 Normal Pool El. 29 Normal Pool El. 29 Temporary Pool El: 31 Temporary Pool El: 31 Pretreatment other No Clean out depth: 1 Clean out depth: 1 than forebay? Sediment Storage El: 13 Sediment Storage El: 13 Has Vag. Filter? No Bottom El: 12 Bottom El: 12 JEC IIE M'r MAY p 5 2016 BY: STORM-EZ 4/27/2016 Version 1.4 O&M Manual Page 7 of 7 Hall, Christine From: Hall, Christine Sent: Thursday, October 27, 2016 10:26 AM To: 'Brett Buckland'; Weaver, Cameron Cc: Wyatt Bone; Hall, Rhonda B; Michael Theberge; NCC138078@NF.BOHLERENG.COM Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Brett, I just looked through the package to modify the Stormwater permit and the fee is correct. This submittal will be logged in as accepted today. Thanks, Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 K. Z.. -I `Nothing Compares -. Ernaii conesrondence to an ` irom this address is subject io the 1;'c!th Caiulina Public keccrds Low and r7ay he discic ed to thin.I panie;3. From: Brett Buckland[mailto:bbuckland@bohlereng.com) Sent: Tuesday, October 25, 2016 11:01 AM To: Weaver, Cameron <cameron.weaver@ncdenr.gov> Cc: Wyatt Bone <wbone@bohlereng.com>; Hall, Rhonda B <rhonda.hall@ncdenr.gov>; Michael Theberge <MTheberge@bohlereng.com>; NCC138078@NF.BOHLERENG.COM; Hall, Christine <Christine.Hall@ncdenr.gov> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Cameron, Just wanted to confirm everything with you all on this that we sent in last week. Per my discussions with Rhonda, we are just planning a typical (non -Express) review of the EC as that is an expected fairly quick review time. For Stormwater, we are going to do the Express review, and I believe we sent in the correct fee amount. Please let us know ifvou received everything and if you need anything else. Rhonda — For the previous approval (ONSLO-2016-041), we have the Letter of Approval, but this did not include the Certificate of Approval and the contractor for the site is requesting it so that it can be placed on their sign at the construction entrance. Can you please provide this? (we realize it will probably need to be updated with the new reapproval, but just wanted to get this to them as soon as we could) Please let us know if you have any questions or need anything else from us. Thanks! Brett Buckland Bohler Engineering NC, PLLC Office: 980-272-3400 From: Weaver, Cameron [mailto:cameron.weaver@ncdenr.eovl Sent: Thursday, October 13, 2016 5:16 PM To: Brett Buckland <bbuckland@bohlereng.com> Cc: Wyatt Bone <wbone@bohlerene.com>; Hall, Rhonda B <rhonda.hall ncdenr�nv_> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) I'll have a date for SW Express, and will check with Rhonda since it sounds like you now want EC Express as well. Cameron Weaver Environmental Assistance Coordinator -Wilmington Regional Office NCDEQ-Division of Environmental Assistance and Customer Service 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7303 NCDEQ NEW WEBSITE: http:/Ideg.nc.gov/­ DEACS NEW WEBSITE: http://deg.nc.gov/about/divisions/environmental-assistance-customer-service E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Brett Buckland [mailto:bbuckland@bohlereng.com] Sent: Thursday, October 13, 2016 5:04 PM To: Weaver, Cameron <cameron.weaver@ncdenr.gov>; Hall, Christine <Christine.Hal_l@ncdenr.gov> Cc: Wyatt Bone <wbone@bohlerena.com>; Michael Theberge <MTheberee@bohlerene.com>; NCC138078@NF.BOHLERENG.COM; Hall, Rhonda B <rhonda.hall@ncdenr.gov> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Cameron, Wyatt had the meeting last week, and I believe we were going in for express again, as they are trying to get this approved as soon as they can. Please let us know if this changes anything that you need from us. Thanks! Brett Buckland Bohler Engineering NC, PLLC Office: 980-272-3400 From: Weaver, Cameron [mailto:cameron.weaver@ncdenr.eovl Sent: Thursday, October 13, 2016 4:20 PM To: Brett Buckland <bbuckland@bohlerene.com>; Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Wyatt Bone <wbone@bohlereng.com>; Michael Theberge <MTheberee@bohlereng.com>; NCC138078@NF.BOHLERENG.COM; Hall, Rhonda B <rhonda.hall@ncdenr.eov> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Hi all. I will get with Christine tomorrow to get you a mail -in date for SW on this project and be back in touch; and you are submitting this through the regular Erosion Control process, correct? Let me know of any issues. Cameron Cameron Weaver Environmental Assistance Coordinator -Wilmington Regional Office NCDEQ-Division of Environmental Assistance and Customer Service 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7303 NCDEQ NEW WEBSITE: http://deg.nc.gov/ DEACS NEW WEBSITE: http://deg.nc.gov/about/divisions/environmental-assistance-customer-service E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Brett Buckland[mailto:bbuckland@bohlerene.com] Sent: Thursday, October 13, 2016 2:08 PM To: Weaver, Cameron <cameron.weaver@ncdenr.gov>; Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Wyatt Bone <wbone@bohlerene.com>; Michael Theberge <MTheberee(c@bohlerene.com>; NCC138078@NF.BOHLERENG.COM Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Cameron/Christine, We have the original siened application from WM, and we have addressed the concerns that Wyatt noted from his meeting with you all last week. We will be sure to include a check for the $2,000 review fee mentioned below. How many copies of the plans and stormwater narrative/calculations would you like us to send in? Also, Wyatt mentioned that there may be a specific mail -in date that you would like us to meet. Is there a specific date that you would like to receive the plans and to begin the review? Please let us know if there is anything else that you will need from us. Thanks! Brett Buckland Bohler Engineering NC, PLLC Office: 980-272-3400 From: Weaver, Cameron[mailto:cameron.weaver(a@ncdenr.gov] Sent: Thursday, August 25, 2016 4:30 PM To: Brett Buckland <bbuckland@bohlerene.com> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8160501) Corporations Division Page 1 of 1 North Carolina Elaine F. Marshall DEPARTMENT OF THE . Secretary SECRETARY OF STATE PO Box 29622 Raleigh, IWC V6 2 (919)907-20M Axo::^t Login Click Here To: Register View Document Filings File an Annual Report Amend a Previous Annual Report Print a Pre -Populated Annual Report form Corporate Names Legal: SWANSBORO INVESTORS, LLC Limited Liability Company Information Sosld: 1324440 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 6/21/2013 Fiscal Month: December State of Incorporation: Registered Agent: Bullock, Betty Corporate Addresses Principal Office: 405 Johnson Blvd Jacksonville, NC 28541 Reg Office: 405 Johnson Blvd Jacksonville, NC 28541 Reg Mailing: P O Box 1685 Jacksonville, NC 28541 Mailing: PO Box 1685 Jacksonville, NC 28541 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager: Betty Bullock PO Box 1685 Jacksonville NC 28541-1685 Manager: John L Pierce ' PO Box 1685 Jacksonville NC 28541-1685 ht ps://www.sosnc.gov/Search/profcorp/10279998 6/7/2016 SOSID: 1324440 Date Filed: 3/28/201611:59:00 PM Elaine F. Marshall 0 LIMITED LIABILITY COMPANY ANNUAL REP(North Carolina Secretary of State CA2016 088 05234 NAME OF LIMITED LIABILITY COMPANY: SWANSBORO INVESTORS, LLC SECRETARY OF STATE ID NUMBER: 1324440 REPORT FOR THE YEAR: 2016 SECTION A: REGISTERED AGENT'S INFORMATION STATE OF FORMATION: NC 1. NAME OF REGISTERED AGENT: BETTY BULLOCK 2. SIGNATURE OF THE NEW REGISTERED AGENT: 3. REGISTERED OFFICE STREET ADDRESS S COUNTY 405 Johnson Blvd Jacksonville, NC 28540 Onslow SECTION B: PRINCIPAL OFFICE INFORMATION Filing Mce Lisa Only Changes SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 4. REGISTERED OFFICE MAILING ADDRESS P O Box 1685 Jacksonville, NC 28541 .Onslow 1. DESCRIPTION OF NATURE OF BUSINESS: Real Estate Investments 2. PRINCIPAL OFFICE PHONE NUMBER: (910) 346-9800 4. PRINCIPAL OFFICE STREET ADDRESS 8 COUNTY 405 Johnson Blvd Jacksonville, NC 28540 Onslow 3. PRINCIPAL OFFICE EMA Privacy Redaction M 5. PRINCIPAL OFFICE MAILING ADDRESS - 0. ') PO Box 1685 Jacksonville, NC 28541 Onslow SECTION C: COMPANY OFFICIALS (Enter additional Company Officials in Section E.) NAME: Betty Bullock NAME: John L Pierce NAME: TITLE: Manager TITLE: Manager TITLE: ADDRESS: ADDRESS: ADDRESS: PO Box 1685 PO Box 1685 Jacksonville, NC 28541-1685 Onslov Jacksonville, NC 28541-1685 Onslov SECTION D: CERTIFICATION OF ANNUAL REPORT, Section D must be completed in its entirety by a person/business entity. SIGNATURE Form must be sl y a Company Official listed under Section C of this form. � b6- h DATE Print or Type Name of Company Official Print or Type The Title of the Company official 91. SUBMIT THIS ANNUAL REPORT WITH THE REQUIRED FILING FEE OF $200 1� MAIL TO: Secretary of State, Corporations Division, Post Once Box 29625. Raleigh. NC 27626-0525 trS�Lj General Project Description and Stormwater Management Calculations ,.�■�. _- Project: Proposed Wal-Mart (Store #7179-000) W. Corbett Avenue & Hammock Beach Road Town of Swansboro Onslow County, NC Project Number: NCC138078 Client: Wal-Mart Real Estate Business Trust 2001 S.E. 10"h Street Bentonville, AR 72716 Date: October 13, 2016 CAR w No.043610 � w �ri 0 ij ` 11 A1111 tyt• Professional Engineer: Michael Theberge NC License #043610 EIVF OCT 2 7 2016 BOFILER E:NGINI FRIN G ♦ 1927 S. TRYON STRI'ET ♦ �LlITL 31U ♦ ('I-I:,,RLOTTF, NC: 2S203 * 980.272.3400 Table of Contents General Project Description/ Stormwater Management....................................................1 General Project Description...............................................................................................1 Stormwater Management.................................................................................................I StormwaterManagement Analysis.....................................................................................2 BMP Design / Calculations Storm Drainage Calculations Reference Information Genera! Project Description/Stormwater Management GENE! PROJECT DESCRIPTION Wal-Mart Real Estate Business Trust proposes to develop the existing land located along the south side of West Corbett Avenue (NC Highway 24) and the west side of Hammock Beach Road in Swansboro, North Carolina. This site currently consists of vacant land and an existing pond/stream. The proposed project area is approximately 20.7 acres and will include a ±159,000 square foot Walmart Supercenter building, fuel station, two outparcels, and t 623 parking spaces. The development will also include the construction of landscaping, lighting, stormwater management facilities, the installation of all utilities to support the development, including a water tank and pump house, and access driveways to NC Highway 24 and Hammock Beach Road. Pertinent data characterizing the existing and proposed site conditions are shown on the accompanying Site Plan Documents. STORMWATER MANAGEMENT The pre -development condition of the site consists of two primary drainage areas. The southern portion of the site drains to an existing pond and drainage feature at the south of the site. The northern portion of the site drains to the existing stormwater network in Corbett Avenue and to the drainage feature to the west of the property that ultimately drains to the existing stormwater network in Corbett Avenue. Hydrographs have been generated for the 2, 10, and 100-year storm events for the pre- and post - development conditions. The post -development conditions maintain the same relative Drainage Treatment Areas, however to provide water quality measures and rate control, three wet ponds have been designed to intercept flow from the impervious surfaces created by the development. Wet pond 1 discharges to the existing drainage feature at the south of the property, and wet ponds 2 and 3 discharge to the existing network in W. Corbett Ave. Due to the proximity of potential Shellfish Area (SA) waters, after discharging from the pond, the water flows through underground infiltration trenches in order to infiltrate the required storm volume for Wet Ponds 2 and 3. Wet Pond 1 discharges into a level spreader and vegetated filter strip in order to provide "effective infiltration." The wet ponds have been designed in accordance with the NCDENR Stormwater BMP Manual to provide 90% TSS removal for the water quality volume (WQV). The water quality volume for this project is required to be the greater of 1.5" or the difference in the runoff from the pre- and post -development conditions for the 1-yr, 24-hr storm depth. The wet ponds will also serve as a means of stormwater rate control, and have been designed to reduce the post -development release rates for the 2 and 10-year storm events to be at or below the corresponding pre -development rates. Infiltration of the WQV after discharge from the wet ponds is provided through underground infiltration trenches. The Dekalb Rational Method was utilized for calculating the peak runoff rates and generating hydrographs for the pre- and post -development conditions as defined in the computer watershed software "Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2016". The hydrographs were generated based on the precipitation amounts dictated by the NOAA Atlas 14 for the project site in Swansboro, NC for each storm event. The storm drainage system has been designed to intercept runoff at topographic low points and areas of significant runoff quantities and convey stormwater to the stormwater management basins. The Hyrdaflow StormSewers Extension was utilized for designing the storm conveyance system. Conveyance design precipitation amounts are based on the 10-year storm event. Spread calculations are provided for the inlets based on the 4"/hr rainfall intensity. Some spreads in the parking lot are excessively high, because the proposed trench drain is not modeled in these calculations. Per "Revised Final Geotechnical Exploration Report" by S&ME, Inc., the subject site lies in an area consisting mostly of Onslow series soils. The survey indicated that the Onsiow series consists of moderately well -drained soils that transition from a loamy fine sand to sandy and clayey loam with depth. The subsoil is formed from loamy and sandy marine deposits. St®rmwater Management Analysis The tables below show the calculations of the Water Quality Volume (WQV) for the three ponds that must be discharged within 2-5 days and then effectively infiltrated as secondary treatment. Wet Pond 1 WQV: The proposed road work on Corbett Ave and Hammock Beach Rd result in an increase in impervious area of approximately 33,365 sf, which also includes the impervious area of the pump house and water tank, which do not flow to the wet ponds. Additional water quality treatment storage volume is provided in Wet Pond 1 to account for this additional increase in impervious area. For calculation purposes, the drainage area and impervious area draining to Wet Pond 1 have been increased by the 33,365 sf value to account for the additional treatment being provided by the pond. Total Treatment by Wet Pond 1: Off -site Treatment Provided by Wet Pond 1 (included in Total Treatment calculation): Design Runoff (Pre) = 7,290 ft' Design Runoff (Pre) = 507 ft' Design Runoff (Post) = 112,620 ft' Design Runoff (Post) = 9,641 'ft' Volume required = 105,329 ft' Volume required = 9,134 ft A level spreader with vegetated filter strip is used for "effective infiltration" after Wet Pond 1. Due to the storage volume of Wet Pond 1, the resulting outflow for the 10-year storm is very small and results in the required length of the level spreader being relatively small. In our engineering judgment, the length of the level spreader has been increased to provide a more conservative, constructible, and maintainable system. Wet Pond 2 WQV: Design Runoff (Pre) 4,757 ft' Design Runoff (Post) = 28,632 ft' Volume required = 24,075 ft' Wet Pond 3 WQV: Design Runoff (Pre) = 5,937 ft' Design Runoff (Post) = 36,354 ft' Volume required = 30,416 ft' Wet Pond 2 Infiltration Area Needed: V 24075 cf K 2.00 in/hr T 4.57 days A 1318 sf W 24 ft L 54.9'ft Wet Pond 3 Infiltration Area Needed: V 30416'cf K 2.00:in/hr T 4.19'days A 1814'sf W 24 ft L 76'ft BMP Sizing: For all 3 wet ponds, equation Option 2 from Figure 10-2b is used. The values used for each variable can be found in the Wet Pond Supplement for each pond. For Wet Pond 1, the two forebays have been designed to provide approximately 20% of the permanent pool storage volume. The forebays are also sized proportionally to the drainage area flowing to each. Forebay #1 receives flow from approximately 43% of the drainage area, while it is approximately 8.4% of the permanent pool volume (or approximately 42% of the total forebay volume). Forebay #2 receives flow from approximately 57% of the drainage area, while it is approximately 11.6% of the permanent pool volume (or approximately 58% of the total forebay volume). For all 3 wet ponds, a water quality orifice is used at the base of the riser structure to draw down the water quality volume within 2-5 days. The next available outlet on the riser structure is placed above the required water quality volume. The elevation of this next available outlet is considered the temporary pool volume, and this elevation (and resulting pressure head value used for the orifice equation) was used when determining the drawdown times through the water quality orifices. The infiltration trenches proposed after Wet Ponds 2 and 3 were sized based on the drawdown times of the water quality volume through the water quality orifice in the riser structures, as discussed above. The infiltration trenches were sized based on the water quality volume, infiltration rate (based on soil borings and infiltration estimates from a geotechnical engineer), and drawdown time of the upstream wet pond. List of Important Modifications since Previous Approval: • Pre- and post -development drainage areas have changed due to NCDOT comments. • Two inlets have been added in the front of the store to convey water to the rear of the site to Wet Pond 1. • Infiltration trench from Wet Pond 2 has been resized due to smaller drainage area. • The water quality orifice in the outlet structure from Wet Pond 2 has been resized due to smaller drainage area. • There have been no significant changes to the E&SC plans, calculations, or narrative since the previous submission. o Drainage areas in Phase 1 E&SC plans have been not been updated to match stormwater drainage areas due to the addition of the basins and diversion ditches during erosion control that will direct water towards the basins, but the calculations for S131 have been updated. o No additional limits of disturbance is proposed with the modifications, and the area of disturbance matches the previously approved area. BMP Design/Calculations WET POND 91 WALMART SUPERCENTER BMP DESIGN CALCULATIONS $}A WATER QUALITY TO MEET 90% TSS REMOVAL DRAINAGE AREA TO FACILITY = 11.00 Ac. (Includes 33,365 sf of impervious area not draining to pond) LAND USE = Walmart Supercenter ESTIMATED PERCENT IMPERVIOUS = 80% AVERAGE POOL DEPTH = 9.58 PERCENT IMPERVIOUS = 80% SAIDA = 2.80 % = 0.0280 SA REQUIRED = 11.00 Ac. X 0.31 Ac. = 13,504 SF 2) 719W13RARY WATER QUAD ITY''POM R♦ QUIR.eMENT8-',:. Pre % Impervious = 0% Post % Impervious = 80% Rv = 0.05 + 0.9(1) Rv(pre)= 0.05 in/in Rv(post)= 0.772 in/in Design Rainfall = 3.65 in (1 yr, 24 hr) Design Runoff (Pre) 0.183 in Design Runoff (Post) = 2.819 in Drainage Area = 11.00 Acres Design Runoff (Pre) = 7,290 ft' Design Runoff (Post) = 112,620 ft' Volume required = 105,329 ft' Total (including off -site)= WON ' Pond Height above Orifice = Orifice Invert Elevation = FEET (Assumed to be 7.5' for SAIDA) 0.0280 105,329 ft' 31.00 feet 29.00 feet Orifice Diameter (D) = 5.00 inches 0.42 feet Orifice Area (a) = 0.1364 square feet Gravitational Constant (g) = 32.2 ft/sec' Head (H) = 1.79 feet Driving Head (Ho) = 0.597 feet Discharge Coefficient (Co) = 0.6 Drawdown rate (Q) = 0.507 cfs Time (t) = 207,597 seconds = 2.40 days Note: The above calculation is based on the orifice equation where: Q=C.A 2fiHo 10/3/2016 6:46 PM Page 1 of 2 Wet Pond 1 Design Wet Pond 1 Treatment Volume - Main Pool Elev Area (sf) Inc Storage (cf) Total Storage (cf) 29.00 51,625 0 u 29.50 56,180 26,941 26,941 30.00 58,050 28,553 55,494 31.00 61,780 59,899 115,393 32.25 75,585 85,700 201,093 Wet Pond 1 Permanent Pool Volume - Main Pool Elev Area (sf Inc Storage (cf) Total Storage (cf) 14.00 11,935 0 0 21.00 21,190 115,938 115,938 23.00 24,070 45,260 161,198 28.00 31,715 139,463 300,660 28.50 32,515 16,058 316,718 29.00 36,605 17,280 333,998 Wet Pond 1 - Forebay#1 Elev Area (sf) Inc Storage (cf) Total Storage (cf) 20.00 1,345 0 0 23.00 2.510 5,783 5,783 26.00 3,930 9,660 15,443 28.50 6,120 12,563 28,005 29.00 6,560 3,170 31,175 Wet Pond 1 - Forebay#2 Elev Area (sf) Inc Storage (cf) Total Storage (cf) 20.00 2,315 0 0 23.00 3,750 9,098 9,098 26.00 5,420 13,755 22,853 28.50 7,955 16,719 39,571 29.00 8,460 4,104 43,675 Project Name: Swansboro Ballast Pad Design for Detention Basin Wet Pond 1 Box Width: 72.00 in Box Length 72.00 in Barrel Size: 18.00 in Top of Basin: 32.25 ft. Inv. Out of Pipe 29.00 ft. Spillway Height: 0.75 ft. Top of Riser Elev. 31.00 ft. 29 ft. Uplift @ Peak Elevation: Peak Elevation =32.25 ft. Peak Elevation = 3.25 ft. Uplift Force= (62.4)(3.25 ft.)(6'6) Uplift Force= 7300.8 Ibs 32.25 ft. Top of Basin 0.75 ft. Spillway Height 31.5 ft. Spillway Elev. 2.00 of Basin Volume of Concrete Required to Stabilize Riser: 7300.8 Ibs X 1/150 Ibs/ft^3= 48.672 cubic feet Ballast Pad Dimensions: Try Volume of: 9 ft. X 9 ft. X 1 ft. 81 cubic feet Ok 81 c.f. > or equal to 48.672 c.f. True 72 in.BOX Pad 18 in. RCP 3.25 1. 72 in.BOX Ballast Pad i i� 9 ft. Ballast Pad Dimensions: 9 ft. X 9 ft. X 1 ft. WET POND #2 WALMART SUPERCENTER BMP DESIGN CALCULATIONS J . WATER QUALITY TO MEET 90% TSS REMOVAL DRAINAGE AREA TO FACILITY = 2.94 Ac. LAND USE = Walmart Supercenter ESTIMATED PERCENT IMPERVIOUS = 77% �Q A RA1'@ AVERAGE POOL DEPTH - 5.31 FEET PERCENT IMPERVIOUS = 77% SA/DA = 5.18 % = 0.0618 SA REQUIRED = 2.94 Ac. X 0.0518 0.15 Ac. 6,641 SF TAMPORWY ti1iAT 4V ALITY N.OL "ggQU�){L31N MT Pre % Impervious = 8% Post % Impervious 77% Rv = 0.05 + 0.9(I ) Rv(pre)= 0.122 in/in Rv(pre)= 0.739 in/in Design Rainfall = 3.65 in (1 yr, 24 hr) Design Runoff (Pre) = 0.445 in Design Runoff (Post) = 2.699 in Drainage Area = 2.94 Acres Design Runoff (Pre) = 4,757 ft3 Design Runoff (Post) = 28,832 ft3 Volume required = 24,075 ft3 Other Impervious Area to be Treated = 0 sf Other Runoff Depth to be Treated = 3.47 in Other WQV to be Treated = 0 ft3 Total (including off -site)= 24,075 ft3 F,9 prowda" Tfrr1B. _ :. .. , . .... Pond Height above Orifice = 31.05 feet Orifice Invert Elevation = 29.25 feet Orifice Diameter (D) = 1.75 inches 0.15 feet Orifice Area (A) _. 0.0167 square feet Gravitational Constant (g) = 32.2 ft/sec, Head (H) = 1.73 feet Driving Head (Ho) = 0.576 feet Discharge Coefficient (Co) = 0.6 Drawdown rate (Q) = 0.061 cfs Time (t) = 394,518 seconds 1.57 days Note: The above calculation is based on the orifice equation where: Q=CDA 2SH, 10/3/2016 6:46 PM Page 1 of 2 Wet Pond 2 Design Wet Pond 2 Treatment Volume - Total Elev Area (sf) Inc Storage (cf) Total Storage (cf) 29.25 12,935 0 0 29.75 16,330 7,299 7,299 31.05 20,130 23,654 30,953 31.50 20,950 9,241 40,194 31.75 22,925 5,482 45,676 Wet Pond 2 Permanent Pool Volume - Total Elev Area (sf) Inc Storage (cf) Total Storage (cf) 20.00 1,105 0 0 23.00 2,495 5,400 5,400 28.00 7,230 24,313 29,713 28.75 8,005 5,713 35,426 29.25 10,640 4,661 40,087 Wet Pond 2 - Forebay Elev Area (sf) Inc Storage (cf) Total Storage (cf) 20.00 255 0 0 23.00 620 1,313 1,313 28.00 1,535 5,388 6,700 28.75 1,700 1,213 7,913 29.25 2,295 999 8,912 Project Name: Swansboro Ballast Pad Design for Detention Basin Wet Pond 2 31.75 ft. Top of Basin 0.5 ft. Spillway Height 31.25 ft. Spillway Elev. Rnx Width: 72.00 in Box Length 72.00 in Barrel Size: 15.00 in o" .. 72 in.BOX Top of Basin: 31.75 ft.4�: Inv. Out of Pipe 29.25 ft. 1.80 ' :ice 2.5 . Spillway Height: 0.50 ft. Top of Riser Elev. 31.05 ft. : <P 29.25 ft. Bottom of Basirm'+' r Uplift @ Peak Elevation: Peak Elevation =31.75 ft. Peak Elevation = 2.5 ft. Uplift Force= (62.4)(2.5 ft.)(6*6) Uplift Force= 5616 Ibs Volume of Concrete Required to Stabilize Riser: 5616 Ibs X 1/150 Ibs/ft"3= 37 dd cubic feet Ballast Pad Dimensions: Try Volume of: 9 ft. X 9 ft. X 1 ft. 81 cubic feet Ok 81 c.f. > or equal to 37.44 c.f. True Pad 15 in. RCP 72 in.BOX Ballast Pad 9 ft. 9 ft. Ballast Pad Dimensions: 9 ft. X 9 ft. X 1 ft. WET POND #3 WALMART SUPERCENTER BMP DESIGN CALCULATIONS D fQt4(` WATER QUALITY TO MEET 90%TSS REMOVAL 4R DRAINAGE AREA TO FACILITY = 3.67 Ac. LAND USE = Walmart Supercenter ESTIMATED PERCENT IMPERVIOUS = 77% AVERAGE POOL DEPTH 9.37 FEET (Assumed to be 7.5' for SAIDA) PERCENT IMPERVIOUS = 77% SAIDA = 2.65 % = 0.0265 SA REQUIRED = 3.67 Ac. X 0.0265 0.10 Ac. 4,240 SF T9MPORARY1f4iMERQUAL171f P004, QUAPM tI -0 Pre % Impervious = 8% Post % Impervious = 77% Rv = 0.05 + 0.9(I) Rv(pre)= 0.122 in/In Rv(pre)= 0.747 in/in Design Rainfall = 3.65 in (1 yr, 24 hr) Design Runoff (Pre) = 0.445 in Design Runoff (Post) = 2.727 in Drainage Area = 3.67 Acres Design Runoff (Pre) = 5,937 ft' Design Runoff (Post) = 36,354 it' Volume required = 30,416 ft' Other Impervious Area to be Treated = 0 sf Other Runoff Depth to be Treated = 3.47 in Other WQV to be Treated = 0 ft' Total (including off -site)= 30,416 ft' 41,PAn¢ f3iswdownlRt# Pond Height above Orifice = 31.00 feet Orifice Invert Elevation = 29.00 feet Orifice Diameter (D) = 2.00 inches = 0.17 feet Orifice Area (a) = 0.0218 square feet Gravitational Constant (g) = 32.2 ftisec2 Head (H) = 1.99 twat Driving Head (Ho) = 0.639 feet Discharge Coefficient (CD) = 0.6 Drawdown rate (Q) = 0.084 cis Time (t) = 362,254 seconds 4.19 days Note: The above calculation is based on the orifice equation where: Q = Ci,A 2gHo 10/3I2016 6:47 PM Page 1 of 2 Wet Pond 3 Design Wet Pond 3 Treatment Volume Elev Area (sf) Inc Storage (cf) Total Storage (cq 29.00 14,305 0 0 29.50 16,665 7,734 7,734 31.00 19,430 27,042 34,776 31.50 20,270 9,923 44,700 31.75 21,700 5,245 49,944 Wet Pond 3 Permanent Pool Volume Elev Area (sf) Inc Storage (co Total Storage (cf) 13.00 2,290 0 0 21.00 5,165 29,820 29,820 23.00 6,010 11,175 40,995 28.00 8,400 36,025 77,020 28.50 8,655 4,264 81,284 29.00 9,980 4,659 85,943 Wet Pond 3 - Forebay Elev Area (sf) Inc Storage (cf) Total Storage (co 15.00 130 0 0 21.00 1,250 4,140 4,140 23.00 1,750 3,000 7,140 28.00 3,270 12,550 19,690 28.50 3,435 1,676 21,366 29.00 4,325 1,940 23,306 Project Name: Swansboro Ballast Pad Design for Detention Basin Wet Pond 3 0 ft. Spillway Height 31.75 ft. Bailiwav Elev. Box Width: 72.0n in Box Length 72.00 in Barrel Size: 18.00 in Top of Basin: 31.75 ft. Inv. Out of Pipe 29.00 ft. Spillway Height: 0.00 ft. Top of Riser Elev. 31.00 ft. 29 ft. Uplift @ Peak Elevation: Peak Elevation =31.75 ft. Peak Elevation = 2.75 ft. Uplift Force= (62.4)(2.75 ft.)(6"6) Uplift Force= 6177.6 Ibs Volume of Concrete Required to Stabilize Riser: 6177.6 Ibs X 1/150 Ibs/ft^3= 41.184 cubic feet Ballast Pad Dimensions: Try Volume of: 9 ft. X 9 ft. X 1 ft. 81 cubic feet Ok 81 c.f. > or equal to 41.184 c.f. True 31.75 ft. Top of Basin 18 in. RCP 75 . 72 in.BOX Ballast Pad 9 ft. 9 ft. Ballast Pad Dimensions: 9 ft. X 9 ft. X 1 ft. 1 Watershed Model Schematic Hydraflow Hydrographs Extension forAutoCAD® Civil 3D®2016 byAutodesk, Inc. v10.5 Legend HygL Origin Descri to Ion 1 Dekalb Pre South 2 Dekalb Pre North 3 Dekalb Post to Pond 1 4 Dekalb Post to Pond 2 5 Dekalb Post to Pond 3 6 Dekalb Pond Bypass South 7 Dekalb Pond Bypass North 8 Reservoir Out Pond 1 9 Reservoir Out Pond 2 10 Reservoir Out Pond 3 11 Combine Post Combined South 12 Combine Post Combined North 13 SCS Runoff SCS Post to Pond 2 14 Reservoir SCS Through Pond 2 15 SCS Runoff SCS Post to Pond 3 16 Reservoir SCS Through Pond 3 17 SCS Runoff SCS Post to Pond 1 18 Reservoir SCS Through Pond 1 Project: H:\2013\NCC138078\Technical\Stormwater\161003 - Stormwater Ponds Design[goihonday, 10 / 3 / 2016 2 Hydrograph Return Period ReHr y rap a ow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 11 IDekalb I ----- I 0.000 I 5.389 I------- I ------ I 7.555 I 8.808 I 9.857 I 11.13 I Pre South 2 Dekalb ---- 0.000 3.411 ------ ------- 4.781 5.574 6.238 7.045 Pre North 3 Dekalb ------ 0.000 59.94 ------- 77.83 87.74 96.46 105.98 Post to Pond 1 4 Dekalb - --- 0.000 15.41 ------ ----- 20.01 22.56 24.80 27.25 Post to Pond 2 5 Dekalb ------ 0.000 19.49 ----- ------ 25.31 28.53 31.37 34.46 Post to Pond 3 6 Dekalb ------ 0.000 2.081 ------ ----- 2.742 3.098 3.401 3.751 Pond Bypass South 7 Dekalb ---- 0.000 0.517 ----- ------- 0.672 0.757 0.832 0.915 Pond Bypass North 8 Reservoir 3 0.000 0.525 ----- ------ 0.616 0.661 0.698 0.738 Out Pond 1 9 Reservoir 4 0.000 0.069 - ------ 0.079 0.083 0.087 0.092 Out Pond 2 10 Reservoir 5 0.000 0.099 -- ------- 0.113 0.121 0.127 0.133 Out Pond 3 11 Combine 6, 8, 0.000 2.606 ---- ---- -- 3.358 3.758 4.099 4.489 Post Combined South 12 Combine 7, 9, 10, 0.000 0.639 ----- ---- 0.810 0.905 0.987 1.077 Post Combined North Proj. file: H:\2013\NCC138078\Technical\Stormwater\161003 - Storrnwater PoddA@ed*.gP03 / 2016 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2016 by Autodesk, Inc. v10.5 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Dekalb 5.389 1 225 30,411 ----- ------ ------ Pre South 2 Dekalb 3.411 1 225 19,246 ----- ----- ------ Pre North 3 Dekalb 59.94 1 25 53,765 ----- ------ - Post to Pond 1 4 Dekalb 15.41 1 25 13,824 ------ ----- ------ Post to Pond 2 5 Dekalb 19.49 1 25 17,484 ------ ----- ---• Post to Pond 3 6 Dekalb 2.081 1 50 3,733 ----- ----- Pond Bypass South 7 Dekalb 0.517 1 25 464 ----- ---- ----- Pond Bypass North 8 Reservoir 0.525 1 50 44,782 3 29.96 52,931 Out Pond 1 9 Reservoir 0.069 1 50 9,314 4 30.10 13,701 Out Pond 2 10 Reservoir 0.099 1 50 12,753 5 30.03 17,307 Out Pond 3 11 Combine 2.606 1 50 48,514 6, 8, ------ ------ Post Combined South 12 Combine 0.639 1 25 22,530 7, 9, 10, ------ ------ Post Combined North Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.° Hyd. No. 1 Pre South Hydrograph type = Dekalb Storm frequency = 2 yrs Time interval = 1 min Drainage area = 13.750 ac Intensity = 2.450 in/hr IDF Curve = Swansborol.IDF * Composite (Area/C) = [(13.550 x 0.15) + (0.200 x 0.95)] / 13.750 Pre South 4 Monday, 10 / 3 / 2016 Peak discharge = 5.339 cfs Time to peak = 225 min Hyd. volume = 30,411 cuft Runoff coeff. = 0.16* Tc by User = 45.00 min Asc/Rec limb fact = n/a Q cfs Hyd. No. 1 -- 2 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 60 120 180 240 300 360 420 480 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.'. Hyd. No. 2 Pre North Hydrograph type = Dekalb Storm frequency = 2 yrs Time interval = 1 min Drainage area = 6.630 ac Intensity = 2.450 in/hr OF Curve = Swansborol.IDF * Composite (Area/C) = [(6.130 x 0.15) + (0.500 x 0.95)] / 6.630 Q (cfs; 4.00 3.00 2.00 1.00 M 0 60 120 180 Hyd No. 2 240 Peak discharge Time to peak Hyd. volume Runoff coeff. Tc by User Asc/Rec limb fact 300 a Monday, 10 / 3 / 2016 = 3.411 cfs = 225 min = 19,246 cuft = 0.21 * = 45.00 min = n/a 420 Q (cfs) 4.00 3.00 2.00 W11I17 480 Time (min) Hydrograph Report 6 Hydraflow Hydrographs Extension for AutoCAD® Civil 3136 2016 by Autodesk, Inc. v10.5 Hyd. No. 3 Post to Pond 1 Hydrograph type = Dekalb Peak discharae Storm frequency = 2 yrs Time to peak - Time interval = 1 min Hyd. volume Drainage area = 11.000 ac Runoff coeff. Intensity = 6.897 in/hr Tc by User OF Curve = Swansborol .IDF Asc/Rec limb fact Composite (Area/C) = [(2.170 x 0.15) + (8.830 x 0.95)] / 11.000 Q (cfs) 60.00 50.00 40.00 30.00 20.00 `1 1TI Post to Pond 1 Hyd. No. 3 -- 2 Year Monday, 10 / 3 / 2016 = 59.94 r_.f-s = 25 min = 53,765 tuft = 0.79* = 5.00 min = n/a Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 V ' ' ' ' ' ' ' ' I I I I I I I I I I I I I I I I N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hyd No. 3 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2016 by Autodesk, Inc. v10.f Hyd. No. 4 Post to Pond 2 Hydrograph type = Dekalb Storm frequency = 2 yrs Time interval = 1 min Drainage area = 2.940 ac Intensity = 6.897 in/hr OF Curve = Swansborol.IDF * Composite (Area/C) = [(2.250 x 0.95) + (0.690 x 0.15)] / 2.940 Monday, 10 / 3 / 2016 Peak discharge = 15.41 cfs Time to peak = 25 min Hyd. volume = 13,824 cuft Runoff coeff. = 0.76* Tc by User = 5.00 min Asc/Rec limb fact = n/a Post to Pond 2 Q (cfs) Hyd. No. 4 -- 2 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31D® 2016 by Autodesk, Inc. v10.E Hyd. No. 5 Post to Pond 3 Hydrograph type = Dekalb Storm frequency = 2 yrs Time interval = 1 min Drainage area = 3.670 ac Intensity = 6.897 in/hr OF Curve = Swansborol.IDF * Composite (Area/C) = [(2.840 x 0.95) + (0.830 x 0.15)] / 3.670 Q (cfs) 21.00 18.00 15.00 12.00 • m .M 3.00 8 Monday, 10 / 3 / 2016 Peak discharge = 19.49 cfs Time to peak = 25 min Hyd. volume = 17,484 cult Runoff coeff. = 0.77* Tc by User = 5.00 min Asc/Rec limb fact = n/a Post to Pond 3 Hyd. No. 5 -- 2 Year I I -Is Q (cfs) 21.00 18.00 15.00 12.00 M 6.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hyd No. 5 Time (min) Hydrograph Report 9 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.f Hyd. No. 6 Pond Bypass South Hydrograph type = Dekaib Storm frequency = 2 yrs Time interval = 1 min Drainage area = 2.500 ac Intensity = 5.549 in/hr OF Curve = Swansborol.IDF Q (cfs) 3.00 rM 1.00 Monday, 10 / 3 / 2016 Peak discharae = 2.031 cfs Time to peak = 50 min Hyd. volume = 3,733 tuft Runoff coeff. = 0.15 Tc by User = 10.00 min Asc/Rec limb fact = n/a Pond Bypass South Hyd. No. 6 -- 2 Year Q (cfs) 3.00 2.00 1.00 w� 0 10 20 30 40 50 60 70 80 90 100 Hyd No. 6 Time (min) Hydrograph Report 10 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 7 Pond Bypass North Hydrograph type = Dekalb Peak discharae Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.500 ac Runoff coeff. Intensity = 6.897 in/hr Tc by User OF Curve = Swansborol.IDF Asc/Rec limb fact Monday, 10 / 3 / 2016 = 0.517 cfs = 25 min = 464 cult = 0.15 = 5.00 min = n/a Pond Bypass North Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 9.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 O.1 O 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hyd No. 7 Time (min) Hydrograph Report 11 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 8 Out Pond 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 3 - Post to Pond 1 Max. Elevation Reservoir name = Pond 1 Max. Storage Storage Indication method used. Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 300 Hyd No. 8 Out Pond 1 Hyd. No. 8 -- 2 Year 600 900 1200 1500 Hyd No. 3 Monday, 10 / 3 / 2016 = 0.525 cfs = 50 min = 44,782 cult = 29.96 ft = 52,931 cuft Q (cf.. 60.0( 50.0( 30.0( 20.0( 10.0( 0.00 1800 2100 2400 2700 3000 Total storage used 52,931 cult Time (min) Pond Report 12 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Pond No. 1 - Pond 1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation 29.00 ft Stage / Storage Table stave (ft) Elevation (ft) Contour ?ree (sgft) Incr. Storage (cuft) Tct?I storage (cuft) 0.00 29.00 51,625 0 0 0.50 29.50 56,180 26,941 26,941 1.00 30.00 58,050 28,553 55,494 2.00 31.00 61,780 59,899 115,393 3.25 32.25 75,585 85,700 201,093 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] Rise (in) = 18.00 5.00 Inactive 0.00 Crest Len (ft) = 24.00 24.00 Span (in) = 18.00 5.00 18.00 0.00 Crest Ell. (ft) = 31.00 31.50 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 Invert El. (ft) = 29.00 29.00 30.00 0.00 Weir Type = 1 Rect Length (ft) = 150.00 0.00 0.00 0.00 Multi -Stage = Yes No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Monday, 10 / 3 12016 [C] [D] Inactive 0.00 30.75 0.00 3.33 3.33 Rect -- Yes No Note: UulvertlOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Civ A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cis cfs cfs cfs cis cfs cfs cfs cfs 0.00 0 29.00 0.00 0.00 0.00 --- 0.00 0.00 0.00 -- 0.000 0.50 26,941 29.50 0.33 is 0.33 is 0.00 --- 0.00 0.00 0.00 0.331 1.00 55,494 30.00 0.55 is 0.54 is 0.00 -- 0.00 0.00 0.00 --- 0.542 2.00 115,393 31.00 0.84 is 0.83 is 0.00 --- 0.00 0.00 0.00 --- --- 0.831 3.25 201,093 32.25 10.92 oc 0.03 is 0.00 --- 10.71 s 51.91 0.00 --- 62.64 Hydrograph Report 13 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. A 0.5 Hyd. No. 9 Out Pond 2 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 4 - Post to Pond 2 Max. Elevation Reservoir name = Pond 2 Max. Storage Storage Indication method used. 15.00 12.00 9.00 6.00 3.00 0.00 0 300 600 900 Hyd No. 9 Out Pond 2 Hyd. No. 9 -- 2 Year Monday, 10 / 3 / 2016 = 0.059 cfs = 50 min = 9,314 cuft = 30.10 ft = 13,701 cult Q (cf.. 18A 15A 12A MWIIIIIIIIIIIIII CY�I�>• 3.00 0.00 1200 1500 1800 2100 2400 2700 3000 No. 4 Total storage used = 13,701 cult Time (min) Pond Report 14 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 10 / 3 / 2016 Pond No. 2 - Pond 2 Pond Data Contours -User-defined contour areas. Conic method used for volume calcu!ation. Begining Elevation = 29.25 ft Stage / Storage Table Stage (ft) E1aya!!0M (ft) Contour area (sqft) !nw. Storage- (cuf:) Total storage (cult) 0.00 29.25 12,935 0 0 0.50 29.75 16,330 7,299 7,299 1.80 31.05 20,130 23,654 30,953 2.25 31.50 20,950 9,241 40,194 2.50 31.75 22,925 5,482 45,676 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 1.75 0.00 0.00 Crest Len (ft) = 24.00 15.00 0.00 0.00 Span (in) = 15.00 1.75 0.00 0.00 Crest El. (ft) = 31.05 31.25 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 29.25 29.25 0.00 0.00 Weir Type = 1 Rect --- --- Length (ft) = 240.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.60 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (a). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 29.25 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 0.50 7,299 29.75 0.05 is 0.05 !c -- 0.00 0.00 - --- -- --- 0.051 1.80 30,953 31.05 0.11 is 0.10 is --- -- 0.00 0.00 --- --- --- - 0.103 2.25 40,194 31.50 5.79 oc 0.01 is --- --- 5.76 s 6.24 -- --- 12.01 2.50 45,676 31.75 6.09 oc 0.00 is - 6.05 s 17.66 --- -- --- 23.72 Hydrograph Report 15 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 10 Out Pond 3 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 5 - Post to Pond 3 Max. Elevation Reservoir name = Pond 3 Max. Storage Storage Indication method used. 18.00 15.00 12.00 • 11 . 11 3.00 300 600 Hyd No. 10 Out Pond 3 Hyd. No. 10 -- 2 Year Monday, 10 / 3 / 2016 = n.naaCLO VVV GV = 50 min = 12,753 cult = 30.03 ft = 17,307 cuft Q (cf.. 21A 18.0( 15.0( 12A • 11 . 11 K 11 0.00 900 1200 1500 1800 2100 2400 2700 3000 No. 5 Total storage used 17,307 tuft Time (min) Pond Report 16 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Pond No. 3 - Pond 3 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 29.00 ft Stage / Storage Table Monday, 10 / 3 / 2016 Stage /ft1 Elevation (ft) Contour area (sgft) !ncr. Storage (tuft) Total storcga (tuft) 0.00 29.00 14,305 0 0 0.50 29.50 16,665 7,734 7,734 2.00 31.00 19,430 27,042 34,776 2.50 31.50 20,270 9,923 44,700 2.75 31.75 21,700 5,245 49,944 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 2.00 0.00 0.00 Crest Len (ft) = 24.00 Inactive 100.00 0.00 Span (in) = 15.00 2.00 0.00 0.00 Crest El. (ft) = 31.00 30.70 31.50 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 29.00 29.00 0.00 0.00 Weir Type = 1 Rect Red --- Length (ft) = 250.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 0.88 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Civ B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft tuft ft cfs cfs cfs cis cfs cfs cfs cfs cfs cfs cfs 0.00 0 29.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- -- 0.000 0.50 7,734 29.50 0.07 Ic 0.07 is --- -- 0.00 0.00 0.00 -- 0.065 2.00 34,776 31.00 0.15 is 0.14 is --- 0.00 0.00 0.00 --- 0.142 2.50 44,700 31.50 6.78 oc 0.01 is --- 6.74 s 0.00 0.00 --- --- --- 6.752 2.75 49,944 31.75 7.03 oc 0.01 is --- 6.94 s 0.00 41.63 --- --- --- 48.57 Hydrograph Report 17 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2016 by Autodesk, Inc. 00.5 Hyd. No. 11 Post Combined South Hydrograph type = Combine Peak discharge Storm frequency = 2 yrs Time to peak - Time interval = 1 min Hyd. volume Inflow hyds. = 6, 8 Contrib. drain. area 2.00 1.00 Post Combined South Hyd. No. 11 -- 2 Year 300 600 900 1200 Hyd No. 11 — F.). No. 6 1500 1800 — Hyd No. 8 Monday, 10 / 3 / 2016 = 2.606 rfs = 50 min = 48,514 cuft = 2.500 ac 2100 2400 2700 Q (Cf, 3.00 2.00 1.00 0.00 3000 Time (min) Hydrograph Report 18 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.: Hyd. No. 12 Post Combined North Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 7, 9, 10 Monday, 10 / 3 / 2016 Peak discharge = n.539 cfs Time to peak = 25 min Hyd. volume = 22,530 cuft Contrib. drain. area = 0.500 ac Post Combined North Q WS) Hyd. No. 12 -- 2 Year 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 V. 1 V 0.00 0 300 600 900 1200 Hyd No. 12 Hyd No. 7 1500 1800 Hyd No. 9 2100 2400 2700 Hyd No. 10 0.00 3000 Time (min) 28 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Dekalb 7.555 1 225 42,634 ------ ------ Pre South 2 Dekalb 4.781 1 225 26,982 ----- ----- ----- Pre North 3 Dekalb 77.83 1 25 69,816 ----- ------ ---- Post to Pond 1 4 Dekalb 20.01 1 25 17,951 ---- Post to Pond 2 5 Dekalb 25.31 1 25 22,704 ----- Post to Pond 3 6 Dekalb 2.742 1 50 4,919 — ------ ------ Pond Bypass South 7 Dekalb 0.672 1 25 603 ----- ----- ----- Pond Bypass North 8 Reservoir 0.616 1 50 58,702 3 30.22 68,805 Out Pond 1 9 Reservoir 0.079 1 50 11,005 4 30.33 17,809 Out Pond 2 10 Reservoir 0.113 1 50 15,243 5 30.32 22,498 Out Pond 3 11 Combine 3.358 1 50 63,621 6, 8, ---- ----- Post Combined South 12 Combine 0.810 1 25 26,851 7, 9, 10, ---- ---• Post Combined North H:\2013\NCC138078\Techn ERdWR Bimbil vMhYRands Desig�-Wmday, 10 / 3 / 2016 Hydrograph Report 29 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 1 Pre South Hydrograph type = Dekalb Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 13.750 ac Runoff coeff. Intensity = 3.434 in/hr Tc by User IDF Curve = Swansboro1.IDF Asc/Rec limb fact " Composite (Area/C) = [(13.550 x 0.15) + (0.200 x 0.95)] / 13.750 WE 4.00 2.00 Pre South Hyd. No. 1 -- 10 Year 60 120 180 240 300 360 Hyd No. 1 Monday, 10 / 3 / 2016 = 7.555 cfs = 225 min = 42,634 tuft = 0.16* = 45.00 min = n/a 420 Q (cfs) 8.00 . �� 4.00 2.00 0.00 480 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.: Hyd. No. 2 Pre North Hydrograph type = Dekalb Storm frequency = 10 yrs Time interval = 1 min Drainage area = 6.630 ac Intensity = 3.434 in/hr OF Curve = Swansborol.IDF Composite (Area/C) = [(6.130 x 0.15) + (0.500 x 0.95)j / 6.630 Pre North 30 Monday, 10 / 3 / 2016 Peak discharge = 4.781 cfs Time to peak = 225 min Hyd. volume = 26,982 cult Runoff coeff. = 0.21 * Tc by User = 45.00 min Asc/Rec limb fact = n/a Hydrograph Report 31 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 10 / 3 / 2016 Hyd. No. 3 Post to Pond 1 Hydrograph type = Dekalb Peak discharge = 77.83 efs Storm frequency = 10 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 69,816 cuft Drainage area = 11.000 ac Runoff coeff. = 0.79* Intensity = 8.957 in/hr Tc by User = 5.00 min OF Curve = Swansborol .IDF Asc/Rec limb fact = n/a * Composite (Area/C) = [(2.170 x 0.15) + (8.830 x 0.95)] / 11.000 Q (cfs) 80.00 70.00 C.101us la 50.00 40.00 30.00 0111I11 10.00 Post to Pond 1 Hyd. No. 3 -- 10 Year Q (cfs) 80.00 70.00 91-01LIT11 50.00 40.00 30.00 WkIK1I61 10.00 0.00 6' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.; Hyd. No. 4 Post to Pond 2 Hydrograph type = Dekalb Storm frequency = 10 yrs Time interval = 1 min Drainage area = 2.940 ac Intensity = 8.957 in/hr OF Curve = Swansborol.IDF * Composite (Area/C) = [(2.250 x 0.95) + (0.690 x 0.15)] / 2.940 Q (cfs) 21.00 18.00 15.00 12.00 9.00 .m 3.00 32 Monday, 10 / 3 / 2016 Peak discharae = 20.01 cfs Time to peak = 25 min Hyd. volume = 17,951 tuft Runoff coeff. = 0.76* Tc by User = 5.00 min Asc/Rec limb fact = n/a Post to Pond 2 Hyd. No. 4 -- 10 Year Q (cfs) 21.00 18.00 15.00 12.00 M � 3.00 0.00 v i i i i i i I I I I I I I I I I I I I I I I I I N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hyd No. 4 Time (min) Hydrograph Report 33 Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2016 by Autodesk, Inc. v10.E Hyd. No. 5 Post to Pond 3 Hydrograph type = Dekalb Storm frequency = 10 yrs Time interval = 1 min Drainage area = 3.670 ac Intensity = 8.957 in/hr OF Curve = Swansborol.IDF " Composite (Area/C) = [(2.840 x 0.95) + (0.830 x 0.15)] / 3.670 Q (cfs) 28.00 24.00 20.00 ill-YIDE 12.00 8.00 4.00 Monday, 10 / 3 / 2016 Peak discharge = 25.31 cfs Time to peak = 25 min Hyd. volume = 22,704 cuft Runoff coeff. = 0.77* Tc by User = 5.00 min Asc/Rec limb fact = n/a Post to Pond 3 Hyd. No. 5 -- 10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 Jc i i i i i I I I I I I I I I I I I I I I I I I I N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hyd No. 5 Time (min) Hydrograph Report 34 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.E Hyd. No. 6 Pond Bypass South Hydrograph type = Dekalb Storm frequency = 10 yrs Time interval = 1 min Drainage area = 2.500 ac Intensity = 7.312 in/hr OF Curve = Swansborol.IDF Q (cfs) 3.00 r M Monday, 10 / 3 / 2016 Peak discharge = 2.742 cfs Time to peak = 50 min Hyd. volume = 4,919 cuft Runoff coeff. = 0.15 Tc by User = 10.00 min Asc/Rec limb fact = n/a Pond Bypass South Hyd. No. 6 -- 10 Year Q (cfs) 3.00 2.00 1.00 0.00 v ' ' ' ' 1 1 1 1 1 N 0.00 0 10 20 30 40 50 60 70 80 90 100 -- Hyd No. 6 Time (min) Hydrograph Report 35 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 7 Pond Bypass North Hydrograph type = Dekalb Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.500 ac Runoff coeff. Intensity = 8.957 in/hr Tc by User IDF Curve = Swansborol.IDF Asc/Rec limb fact Q (cfs) 1.00 Pond Bypass North Hyd. No. 7 -- 10 Year Monday, 10 / 3 / 2016 = 0.672 cfs = 25 min = 603 cuft = 0.15 = 5.00 min = n/a Q (cfs) 1.00 Hydrograph Report 36 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 8 Out Pond 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 3 - Post to Pond 1 Max. Elevation Reservoir name = Pond 1 Max. Storage Storage Indication method used. Q (cfs; 80.00 70.00 50.00 40.00 011I17 10.00 IIIIIIIIIIIIIIIIIIA Monday, 10 / 3 / 2016 _ 0.616 cfs = 50 min = 58,702 cuft = 30.22 ft = 68,805 cuft 300 600 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 8 Hyd No. 3 Total storage used = 68,805 cuft Time (min) Hydrograph Report 37 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. A0.5 Hyd. No. 9 Out Pond 2 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 4 - Post to Pond 2 Max. Elevation Reservoir name = Pond 2 Max. Storage Storage Indication method used. 18.00 15.00 12.00 9.00 Aff 3.00 300 Hyd No. 9 Out Pond 2 Hyd. No. 9 -- 10 Year Monday, 10 / 3 / 2016 = 0.079 cfs = 50 min = 11,005 cuft = 30.33 ft = 17,809 cuft 18.0( 15.0( 12.0( 3.00 0.00 600 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 4 Total storage used = 17,809 cult Time (min) Hydrograph Report 38 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. A 0.5 Hyd. No. 10 Out Pond 3 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 5 - Post to Pond 3 Max. Elevation Reservoir name = Pond 3 Max. Storage Storage Indication method used. Q (cfs) 28.00 24.00 20.00 12.00 F. 11 CUiI7 0.00 0 300 600 Hyd No. 10 Out Pond 3 Hyd. No. 10 --10 Year Monday, 10 / 3 / 2016 = 0.113 cfs = 50 min = 15,243 cuft = 30.32 ft = 22,498 cuft Q (cf.- 28.0( 24.0( 20.0( 16.0( 12.0( 111MIIIIIIIIIIIIII 4.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) H No. 5 Total storage used = 22,498 cult Hydrograph Report 39 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 11 Post Combined South Hydrograph type = Combine Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyds. = 6, 8 Contrib. drain. area Post Combined South Monday, 10 / 3 / 2016 = 3.358 cfs = 50 min = 63,621 cult = 2.500 ac Q (cfs) cf.. Hyd. No. 11 -- 10 Year Q ( 4.00 4.00 3.00 3.00 ■ 2.00 2.00 I 1.00 1.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 -- Hyd No. 11 H No. 6 Hyd No. 8 Time (min) Hydrograph Report 40 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc, v10.E Hyd. No. 12 Post Combined North Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 7, 9, 10 Monday, 10 / 3 / 2016 Peak discharae = 0.810 cfs Time to peak = 25 min Hyd. volume = 26,851 cuft Contrib. drain. area = 0.500 ac Post Combined North Hyd. No. 12 -- 10 Year Q (cf.. 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 _..._._ 0.20 0.20 0.10 0.10 0.00 0 00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 12 H No. 7 Hvd No. 9 Hyd No. 10 85 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Dekalb 11.13 1 225 62,820 ----- ------ ---- Pre South 2 Dekalb 7.045 1 225 39,756 ----- ----- ----- Pre North 3 Dekalb 105.98 1 25 95,062 ---- ---- ------ Post to Pond 1 4 Dekalb 27.25 1 25 24,443 ------ ------ ------ Post to Pond 2 5 Dekalb 34.46 1 25 30,913 ------ --- Post to Pond 3 6 Dekalb 3.751 1 50 6,730 ---- -- Pond Bypass South 7 Dekalb 0.915 1 25 820 ---- --- ------ Pond Bvnass North 8 Reservoir 0.738 1 50 79,251 3 30.64 93,813 Out Pond 1 9 Reservoir 0.092 1 50 13,240 4 30.68 24,273 Out Pond 2 10 Reservoir 0.133 1 50 18,588 5 30.77 30,669 Out Pond 3 11 Combine 4.489 1 50 85,981 6, 8, Post Combined South 12 Combine 1.077 1 25 32,649 7, 9, 10, ----- Post Combined North H:120131NCC1380781T ERdWR RohmIANUR Reads Desig�-Nnday, 10 / 3 / 2016 Hydrograph Report 86 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.1 Hyd. No. 1 Pre South Hydrograph type = Dekalb Storm frequency = 100 yrs Time interval = 1 min Drainage area = 13.750 ac Intensity = 5.060 in/hr OF Curve = Swansboro1.IDF * Composite (Area/C) = [(13.550 x 0.15) + (0.200 x 0.95)] 113.750 Monday, 10 / 3 / 2016 Peak discharge = 11.13 cfs Time to peak = 225 min Hyd. volume = 62,820 cuft Runoff coeff. = 0.16* Tc by User = 45.00 min Asc/Rec limb fact = n/a Pre South Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0 00 0 60 120 180 240 300 360 420 480 Hyd No. 1 Time (min) Hydrograph Report 87 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.; Hyd. No. 2 Pre North Hydrograph type = Dekalb Storm frequency = 100 yrs Time interval = 1 min Drainage area = 6.630 ac Intensity = 5.060 in/hr OF Curve - Swansborol.IDF * Composite (Area/C) = [(6.130 x 0.15) + (0.500 x 0.95)] / 6.630 Q (cfs) 8.00 2.00 Monday, 10 / 3 / 2016 Peak discharge = 7.045 efs Time to peak = 225 min Hyd. volume = 39,756 cuff Runoff coeff. = 0.21* Tc by User = 45.00 min Asc/Rec limb fact = n/a Pre North Hyd. No. 2 --100 Year Q (cfs) 8.00 4.00 2.00 0 00 0 60 120 180 240 300 360 420 480 — Hyd No. 2 Time (min) Hydrograph Report 88 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 10 / 3 / 2016 Hyd. No. 3 Post to Pond 1 Hydrograph type = Dekalb Peak discharge = 1 n5.96 cfs. Storm frequency = 100 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 95,062 tuft Drainage area = 11.000 ac Runoff coeff. = 0.79* Intensity = 12.195 in/hr Tc by User = 5.00 min OF Curve = Swansborol.IDF Asc/Rec limb fact = n/a * Composite (Area/C) = [(2.170 x 0.15) + (8.830 x 0.95)] / 11.000 Q (cfs) 120.00 100.00 80.00 C:%IiI�I 40.00 20.00 Post to Pond 1 Hyd. No. 3 -- 100 Year Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 , I I I I I I I I I I I I I I I I I I I I I I 1 1 2 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hvd No. 3 Time (min) Hydrograph Report 89 Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2016 by Autodesk, Inc. v10.: Hyd. No. 4 Post to Pond 2 Hydrograph type = Dekalb Storm frequency = 100 yrs Time interval = 1 min Drainage area = 2.940 ac Intensity = 12.195 in/hr OF Curve = Swansborol.IDF * Composite (Area/C) = [(2.250 x 0.95) + (0.690 x 0.15)] / 2.940 Q (cfs) 28.00 24.00 20.00 16.00 12.00 : M 4.00 Monday, 10 / 3 / 2016 Peak discharge = 27.25 cfs Time to peak = 25 min Hyd. volume = 24,443 cuft Runoff coeff. = 0.76* Tc by User = 5.00 min Asc/Rec limb fact = n/a Post to Pond 2 Hyd. No. 4 -- 100 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 Y 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hyd No. 4 Time (min) Hydrograph Report 90 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 10 / 3 / 2016 Hyd. No. 5 Post to Pond 3 Hydrograph type = Dekalb Peak discharge = 'A As cfs Storm frequency = 100 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 30,913 cult Drainage area = 3.670 ac Runoff coeff. = 0.77* Intensity = 12.195 in/hr Tc by User = 5.00 min OF Curve = Swansborol.IDF Asc/Rec limb fact = n/a " Composite (Area/C) = [(2.840 x 0.95) + (0.830 x 0.15)] / 3.670 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Post to Pond 3 Hyd. No. 5 --100 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 W, I I I I I I I I I I I I I I I I I I I I I I I I N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hyd No. 5 Time (min) Hydrograph Report 91 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.; Hyd. No. 6 Pond Bypass South Hydrograph type = Dekalb Storm frequency = 100 yrs Time interval = 1 min Drainage area = 2.500 ac Intensity = 10.004 in/hr OF Curve = Swansborol.IDF Q (cfs) 4.00 3.00 MOM 1.00 in 01 Monday, 10 / 3 / 2016 Peak discharge = 3.751 cfs Time to peak = 50 min Hyd. volume = 6,730 cuft Runoff coeff. = 0.15 Tc by User = 10.00 min Asc/Rec limb fact = n/a Pond Bypass South Hyd. No. 6 --100 Year Q (cfs) 4.00 3.00 2.00 1.00 0 00 0 10 20 30 40 50 60 70 80 90 100 Hyd No. 6 Time (min) Hydrograph Report 92 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 7 Pond Bypass North Hydrograph type = Dekalb Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.500 ac Runoff coeff. Intensity = 12.195 in/hr Tc by User OF Curve = Swansborol.IDF Asc/Rec limb fact Monday, 10 / 3 12016 = n.015 cfs = 25 min = 820 cuft = 0.15 = 5.00 min = n/a Pond Bypass North Q (cfs) Hyd. No. 7 -- 100 Year Q (CfS) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hvd No. 7 Time (min) Out Pond 1 Hyd. No. 8 -- 100 Year Hydrograph Report 93 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2016 by Autodesk, Inc, v10.5 Monday, 10 13 / 2016 Hyd. No. 8 Out Pond 1 Hydrograph type = Reservoir Peak discharge = n.738 cfs Storm frequency = 100 yrs Time to peak = 50 min Time interval = 1 min Hyd. volume = 79,251 cuft Inflow hyd. No. = 3 - Post to Pond 1 Max. Elevation = 30.64 ft Reservoir name = Pond 1 Max. Storage = 93,813 cult Storage Indication method used. Q (cfs) 120.00 _ Q (cf; 120.0 100.0 80A 60A 40A 20A 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) H No. 3 Total storage used = 93,813 cuff Hydrograph Report 94 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Monday, 10 / 3 / 2016 Hyd. No. 9 Out Pond 2 Hydrograph type = Reservoir Peak dicrharQe = n.nQ2 cfs Storm frequency = 100 yrs Time to peak = 50 min Time interval = 1 min Hyd. volume = 13,240 cult Inflow hyd. No. = 4 - Post to Pond 2 Max. Elevation = 30.68 ft Reservoir name = Pond 2 Max. Storage = 24,273 cult Storage Indication method used. Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0 300 600 Hyd No. 9 Out Pond 2 Hyd. No. 9 -- 100 Year Q (cf.. 28A 24.0C 20.0C 16.0( 12.0C 4.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 4 Total storage used = 24,273 cult Hydrograph Report 95 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 10 Out Pond 3 Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 5 - Post to Pond 3 Max. Elevation Reservoir name = Pond 3 Max. Storage Storage Indication method used. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 -s 0 300 600 Hyd No. 10 Out Pond 3 Hyd. No. 10 --100 Year Monday, 10 / 3 / 2016 _ n.133 cfs = 50 min = 18,588 cuft = 30.77 ft = 30,669 cuft Q (cf., 35.0( 30.0( 25.0( 20.0( 15.0( 10.0( 5.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) H No. 5 Total storage used 30,669 cult Hydrograph Report 96 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v101 Hyd. No. 11 Post Combined South Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 1 min Inflow hyds. = 6, 8 Peak discharge = a.489 cfs Time to peak = 50 min Hyd. volume = 85,981 cuft Contrib. drain. area = 2.500 ac Post Combined South Hydrograph Report 97 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.E Hyd. No. 12 Post Combined North Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 1 min Inflow hyds. = 7, 9, 10 we Peak discharge Time to peak Hyd. volume Contrib. drain. area Post Combined North Hyd. No. 12 -- 100 Year 300 600 900 1200 1500 1800 2100 Hyd No. 12 No. 7 Hyd No. 9 Monday, 10 / 3 / 2016 = ..077 cfs = 25 min = 32,649 cult = 0.500 ac 2400 2700 Hyd No. 10 Q (cf.. 2.00 1.00 0.00 3000 Time (min) Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 ----- -- 2 86.6430 12.8000 0.8789 ------- 3 0.0000 0.0000 0.0000 -------- 5 0.0000 0.0000 0.0000 -------- 10 88.8151 12.4000 0.8031 ------ 25 78.2208 11.0000 0.7384 ------- 50 71.0036 9.7000 0.6904 ------ 100 69.6549 9.2000 0.6567 -------- File name: Swansboro1.IDF Intensity = B / (Tc + D)"E 104 Monday, 10 / 3 / 2016 Return Period (Yrs) Intensity Values (In/hr) 5 min 10 do 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 6.90 5.55 4.66 4.03 3.56 3.19 2.89 2.65 2.45 2.28 2.13 2.00 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 8.96 7.31 6.22 5.44 4.84 4.38 4.00 3.69 3.43 3.21 3.02 2.85 25 10.10 8.26 7.05 6.20 5.55 5.04 4.63 4.29 4.00 3.76 3.55 3.36 50 11.10 9.07 7.76 6.83 6.13 5.59 5.15 4.79 4.48 4.22 3.99 3.79 100 12.20 10.00 8.59 7.60 6.85 6.26 5.79 5.39 5.06 4.78 4.53 4.31 Tc = time in minutes. Values may exceed 60. Pranin fain namc• N•19f11'3WCC•14A117A�Tcnhni..�l\C4..rw...,�re�c..e..�1...... ...... Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.65 4.44 0.00 0.00 6.86 8.53 9.98 11.60 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 T O ch O N cl � N 0 � M 0 co m A c _O if L Oct r/ E L O -W co m U) N_ H C N (M V m m a0 m O CO m m m _M m D O m O O O m N 4 0 Q Q Q Q J N ao CO to CO cQy m m m m m m m m m m m M m m m m Q ¢ Q Q Q Q (O O N > O It CO ao n O O an co Ir m In Wi (D O_ O (D C) O I- N N M Oo h cM O N N I- N h I' M ao O N f� O W C• $ M M V d' V V '�t M sf M M N M M 7 M M M N r E M M M M M M M co M M M M M M M M M cM M (M M a o v 0 N OO N V M v O U O n In ",q' m N v 1� w M M O 0 O O LO 0 N m VM N N h N M r O O N � ccoo M co m co om) M co Cl)M co M co N 0 M M cMn M N I,- N �_ �_ O O O N O M an an Lo N_ O N N CO O I� (M O) O tD h a'D cq O (D I� ap O) N h CO CL o o N CV N o o O N N r r 0 0 o O 0 O M co M M M co M M M C') co M M co M M N co (o C') co M d J Il O CO F- LO d' M O O v N O � w v r-- O O V' f+ I� Co (o O an 01 r r O n n r f0 m an 0 M M r r C1 LO r S C O) N O co O M M M N M N M O M O M 0 N N O O O O O O O Q M M M M M (q M N M M M M M V co M h v M O (n O cn T N Cp O M M O N r v M w N 0) N O I- N O an N M CM OR (p N 110: ll� n M cq OD an C C LO O cq r 0) O O 0) 0) O O N CA O N � � $ N N N N N N N M coM N N M N N N (N N N N N N N N N N N N 0 W � S O co M !- 't an M (n <n O V O f+ O M I- O a0 O CM r a0 r.-:O M M O q N O n M QD an CO sf' Q) 0> > > C m co co r- h O CD O O O m w r h w M v R aD N O Z N N N N N M M N N M N N N N CV N N N N N N N C C N co O O M N O r O O T r an O O O O O • O an U? an an CO CO O O O � In O O O O )f) (D an (n an M a O 0 O O O 0 o r r r o O T r r T 0 O O O o O d C• O O O V N N O O O V CO 0 CD CO O O (D O O O O ILN M M M N N T T r r T N r T r r T P7 (+) M M M C') N CO M N "It M M ar N t0 O M 1, N I. M N r O O an N M I� O O Cn 01 r N O an Cl (D In 1q: Cl? d1 '� C') (V U CJ 0 C) r M N 0 N N r N N N N N N V LO M N _ CO O w w co cM I� O CD M O In N ao r x O Q a_ an a O O r N r CD 0T d' V � � (O r (M O r O T II I� Cl) O Cl) N f0 r CO r V' �t O CO N I� (O O O (O V V N N N N r T r r -0 d rO r O N m O OOD r CrD V 7 N N O N CO CND 0 Lq In O O M r- co N N r r f� O O r O O 07 mil' r M M N P r C t ' q: (I) (D O r N O N N O N N T N N O O O O N M U II S C C 0 o M LO an co 1- co I` � fl- r- P v M ao 0 ao U C h an O (O N T O M O O N Cl •� N N N r O O r O O CD O O In r O 0 r, r T T r T r OD an (D Ln an 0 an LLD 0 (n N r 12 t) ~ m C •� O O O O O O O O O O O co O O O O O O O O O O O C — M O O an In an an an an In an 1n an tt) (n In (O an N an 6 6 .0 a c +� W O (O h 01 10 N O cn Cl) CO T h I-- M co M CN N coM U) O " t O O r r O co CO 00 ( N V It Cl) M N- 0 0 0 0 0 r o 0 0 O 0 M M N N N N x N an O Cl) M O O Cl) O I_ M M O O M M O N O M V r O O ap O O O O O N co r C) r N O a c 0 0 0 0 0 6 0 0 o 0 6 0 o 0 0 0 0 0 0 0 0 0 LO O O O O O O O an an co N LO O an N LO O an an an LO N M C O O 0) 0) O O W O 0) O O W O O O O O O O m W O (V (V V (,� 0 0 0 0 O O O O O O o 0 O 0 0 0 0 0 O O O O c r + O CO Q) I�0 an O M M M M O N h O O f` CD CD f0 d' N O f� an E C r O) aA O O r r O (O r N Ip M O Ih CD h 1n M ILI v '� et M N r O O O O O r O O O 0 O 't of N N N N 4) O! co O N N O O m O N h 0) 0) I+ O N O It O N Cl) N O 0 V V T O 0) O) O O O O r Cl h CO r O N M r O r r N N n C v O 0 0 0 O O O O O O o O O O 0 0 0 O O O o o W (07 0 I� N O O co r M (M CC) M CDr C) r--U7 N O 07 W CD M N an CO O I' O M O T C)O r) N C '�t 0) O 1 M co N CD M O an CO (M U) N O co O ^ U II J M M N M In N O Or vi w LO r 1] ODD aN' W W ^ N Z C C W 'Q T r C - W N LL C) C H J r N M O O r CO M to r N M W - N 16 M o_ ) w �+ C 0 T N Cl) v LO O I, co 0) O r r r N T M r v T to r co T I- r CD 0) r O N r N N N a Z � J O M F- F- �" m Q ¢ fA ¢ N Q ¢ Q = ❑ N Q Q Q 0 O W w W O ❑ ❑ O O' O 0,Q J n aD LA r C7 N_ y LO N M I I N M '� N M Q Q Q Q Q Q Q Q W W W W U U C7 O N > m O u) u) O co O m v co O (M C'9 LA Lf) m O (p I� M N m N M CV (D O N sr Ln OR N N cq N O W CL d' OM r N V N (V r N M N N N r r E M cn M M M M M Cl) (M (M M Cl) M M Cl) M Cl) M M M M Cl) R l0 v' t` G (D r f` i>✓ OM M h lJ r r 8) N r O co N CD m CD Lo N co N O V: M Ln O Un r N ❑ C G N V' a M co It N N O N m N w N N r OmD 3 Q' (' Cl) M Cl) co Cl) M M M M ('o M (o N M M ('7 N N co M N OD Ln co Ln LO 0 Oo V N 0o 0 M O N m co M 1, m tp m O M (V CD M � (p t• OR r O m N CM � d. Ln (p OD m a C M M M 0 M O M c'7 O M M M O Cl) M N N O eo O 0 0 o I, co co M ('O M Cl) Cl) M Cl) N m W J Cl) N Cl) O N Cl) m a a ; O 1` 1- co N M LO0 N M M r r r r P n r M In W O N (D _ C O CM r M CM O (M O M M O M r M cnM O M N O r M O CDO O I� ❑ M M M Cl) M M M co Cl) N LO (o O 0 Lo co O v m 00 I- m Ln O O O O Lp O O 0 LO y m cM N m M N O CO OR r N O OM OR O0 V� O N M m O N C C L I- m of o m 0 CA Di CO 00 of of (o I-- OD o Lri I� r w > > N N M N M N M N N N N N N N N N N N N N N N m W N M LO O O O tp ao Cl) CD OD I-- m O O O O O O O O O E CD CD N O co r M O N O co Lp N N N N O N r N N Go O N O co O co 00 N O co O O 1l O co O > Z C (M N N N N N N O O CoI� O O O CD O M CD r O O Lo m W to Lp O O LO n Ln Ln Lo LO Ln Ln CD LO LO O r O O N o 0 o r .= m O O N 00 O V' C> O 0o It 0 OD W tf' u) Lp N 0 co 00 Go 00 dC' C Cl) M r r r N r r r N r r r N r r e- r r r r r U) r 7 Cl) N 'Md' N m M O O M N O� M y N N r r r (OD, (OD ((P fMp O m O m (,.) co O m f� m N N Ol) M f` m Ln Ln Co co I, Ln Ln � O M 0 X a W O m v 0o O d; Ln m I, O n! un 1- II N M st N N ti n t` �i f� f+ Ci a a m NLO V: (D m f+ tLD M f- 1+ Ln fp M It m N 'It CD N CO Co co O O o O O O r M � (P m CD M N r M V) V:O r Ln O NCR O r O O 0 t- ui V N r P� M I- N N O N (M N M M C Z m N N N m m r N r Lp m N N (D m N N V II G C Ln Lri I� t` t• co n O ID I� n (o (D CD N I- (o (D h I- U +r '' C E O (r O (p O m O O r r O n Ln u; Ln Ln (n ui o co Lori Lro) ONi IMF uoi foci cmo coo Lon L6 y u m •E 0 0 0 O O 0 C. 0 O 0 0 O O 0 0 0 0 0 O 0 0 0 0 C Ln Ln Lci (n Lri Ln o ui Ln Ln 6 ui Ln Ln Ln Ln Ln ui Ln Ln Ln ui a E (D O M N I� O Cl) Lp M LC) It O N _ _ ti m m N N o m m O r O r O (p M m O 9 LD N M M O N Ln O o 0 r r r O r O O O O O O O O x IWO O Cl) M CD I� Ln M M M O v O O a N m t` O N 000 O 00 O O O It 0 Cl? M OD O Ln Lo W O N O N O O Q C o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O C. O Ln Ln O O Cl) M LO O M Cl) M C m 0 m m m m m m m m m O CD OR m O OR m m m O W Ln a. V (j O O O O O O O O O O O 0 0 o o o 0 o o O o O + o (p m LY6 Ln Lp M Cl) Il- O N O LO O LO LA O co co co co N f� m m O E o V r r O r O N m I, cl r N N Cp M M m O M Ln M � m L aLo „�„ N N O O O r O O O CV r r O r O G O U O O O O N (n __ co ` O N co Co h O N LA Ln LO O LO O O O O OD N 00 O m O G O m O O O Lp m M M W O q CD O O M O M O O � m C A O 0 C.O o 0 0 0 O O o o C) r O O O O 0 0 0 O n O CO O 0n LO CD O OOM~O MU M O N O 0 O C7 v: N O O 0 Cl) co C J e Cl) N 0 N N 0 M NO m O 'N � �oi N N O) N NCp Z L NM It I� (o V CD co O T7 C N m It 't3 C (o I- 00 L� C TJ C N C 0) C w C F J N N N r N N r N M W M M M W M M m W W IT W LL C CO o m W C Cl) v Lp CD � 0o m 0 r N CO V Ln (p P CD m O N M o ~ N J N N N N N N N Cl) cn M M co M M CM M M d' d Z u L CL m m J Z � � � � � � � = t � 4- � C.,. O O O O O O O O O O O O O O O O O O O O O O O m� Q'r. O O O O O O 0 0 O O 0 0 0 0 O 0 0 O O O O 0 0 O r O O O O O o O O Na O^ N O O O O O O (O O O M O O O O O O O O O O (C O 0 r t` O (C ti r O O 01 (O N O M _O C.F LO 0 O O 0 0 0 0 LO o r LO 0 (O 00 Nn o v (D (0 0 O O O O O o IO O (O LO O M r O O O O M M o 0 o 0 o O o 0 o O 0 0 o O o 0 0 O O O O O O CD N O r- N O O O O O O LO O O uO O ` IO O O O O O O O (D O o i` O q N r O (O O (O N O ' N E LO 0 O O O O O 0 IO O r r in 0 co00 Iri O 'T (D 0 0 00 L •.+ r O O O O O O O LO O 0 0 O M O O O> O M M O a. _ 0 00 0 0 0 0 O 0 o O r r r o m^ o O 0 O O O O O O O O O O O O O O O O O O O O N Q � N _N O O O O O O O O O O O O O O O O O o O O O O O C O O O O O O O O O O O O O O O O O O O O O o 0 O O O O O O O O O O O O O O O O O O O O O O O L C 0 0 O 0 0 O O O 0 O O 0 O O 0 0 0 0 0 0 0 0 0 V _ O O O O O O O O O O O O O O O O O O O O O O O d $ O O O O O O O O O O O O O O O O O Cl O O O O O C U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o O o 0 0 0 0 0 0 0 0 0 0 0 0 o O O o O N 0 O 0 O 0 O 0 O 0 O 0 O 00 O (o O O o N N 0 N O N N N O N N N N o d E Ci 3 N 0 0 0 0 0 0 0 0 0 0 O 0 0 O 0 0 0 0 0 O 0 0 0 0 0 Co 0 0 0 0 0 0 0 o o Z 0 O O O O O O O o O o 0 o O O O o 0 o O O O C. O c Y O O O O O O O r O O r r r O r r O m I6 U O ' D7 Cf iA d1 CA CA Ol 01 D) CA O CA O m Ol O CA O [A O Cl CA 01 C y , 03 (6 16 f0 O f6 lC N O] N (0 N [6 N N l0 l6 07 (6 07 (q O7 /0 t O O O O O O O O O O O O O O O O O C. O O O O O N r `$ N r O o O 0 O 0 O 0 O 0 O 0 O O In N O O IO N (O N O r O O IQ r In r Ui r O O In r Ui r ICJ r Un O O r 01 O O O O O O O O O O O O O C. O 0 O 0 0 O O O O 0 - �� C O O O O O O O O O O O O O O O O O O O ClO O O m J$ O O O o O O O Iq o ui ui v O �! O et sr O C. 1�9 C9 O O O O O O O O IO O IO IO O O O o O O O o O O O a O O O O O O O O N O N N O O O O O O O O O O O a, a co 0 0 0 0 0 0 0 0 r r (0 0 co co 0 0 (o (o o (0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 °D O O O O O O O O O O O O O O O O O O O O O O O co v O O 0 0 0 0 0 0 0 0 o v o v It v o v v It v O O G .g O O O O O O O O O O O O O O O O O O O O O O O O co o O O O O O O O O O O co O 00 00 O O c0 0 o co o N + v m r C a E E E E E n E E r E a E E - C T o = _ _ _ _ _ _ � U U U U U U U U � c a o 0 0 o r o 0 0 0 0 0 0 00 0 0 0 0 0 0 0 O O M M CD r O O O O O O O O O O O O O O O O O O m co 0 0 o O O o 0 o O o o O o O o 0 0 0 0 O O O In ++ w (O O O O O O O O O O O O O 0 O 0 1q' P N V IO In O o O � OR N M M IO O O O st o lo: 't OD 0 h O O 0)O. 0) (y V .U.. 0 0 0 0 0 0 0 0 O o N N o O O r 0 0 0 0 O 0 O NO E (on Z+ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o w II O O O o O O O O O O O O O O O O O O O O O O O cV A (� V O 0 O O 0 0 O 0 Cl 0 0 0 0 0 0 O 0 o O O 0 0 0 0 co :!:! (Op m O O O r O (O f` 't In O sr N M O (D O t0 O O o 0 0 0 0 N lO N (C O O Cl? IO O 14: 14: n O (.a-.? v (M ri 0 0 0 0 0 r O O O O O O O O O !! O to m co M � C U U z m z co 0 r N CO It LO aM- 00 m co f` r vN- r N M In 9 1 N c m m m m m m lit m m m m m m m m m Q Q Q a aQ a Q LL co w m = O r O N N N 0 J z r N M � lO M � co r r r r - r r r r r N a z d Ik Ik m J Z d O O O O O O o O o O O O O O O O O O O O O C r7 ,v O 0 O O 0 O 0 0 0 O O O O O 0 O 0 0 0 0 0 O V R O o O O DO O M M LO o co GOD [O'/ O N O O O O O 0 O N i O O N O O h h C; O Qj co CD O O O O r-O (O M ^. O O M O r O M Cf) r O r r r O In O QD M O h r O C fn r L O O (O O N O m O Cl) o h (D Cl) O M 0 CO h O O (M +R• a O O O O r O r r M O r r Cl) O r O r O O r N R � O O O O O O O O O O O O O O O O O O O O O OC f7 @ O C) In C)O co M M V O r- GOD 0 m O N O O O O 0 It O 0 Cl) 0 r O 0 0 r O r r r O M O M M O C+ r O fCL w O O CO O N O m m (M 0 h co Cl) O LO O to h O LO M N C O O O 9 r o r r M O r r eo O r O r O O r N O O O O O O O O O O O O O O O O O O O O O N Q$ O O O O o o O O O O O O o O O O o O O O O _N C O O O O O O O O O O O O O O O O O O O O O ' O O O O O O O O O O O O O O O O O O O O O C O O O O 0 O O 0 O O 0 0 0 o O O O O O 0 0 U O O O O O O O O O O O O O O O O O 0 O O O CDQ `� O O N Cl N C) N N N C) N N Na M O N N C)N N Q1 K O O O 0 O 0 O 0 O O O O O O 0 O O O O O 0 O 0 O O O O O O O •C .� 3 Cn o O O O O C) O 0 0 O O O 0 m a O O O o O C)O O O O O O O O O o O O C)O O N co $ O O NC) N O Ln Cn N O N N N O Cl) O N N O N N Ui o 0 O 0 o 0 O 0 o 0 0 0 0 0 0 0 0 0 o 0 O 0 O 0 o 0 0 0 0 0 0 0 0 o O o E rn 0 0 0 0 0 0 Z 0 c 0 0 O O o 0 0 o O 0 0 O 0 o Y 3$ O O O O O O O O O O O o O O O O O O o O O O O O O m r O N N r O N N r O r r O r l0 V C' m m m m m m m m m m m 0 m m m m m m m m m :a � R R R R R R R R R R R R R R R R R R s N (N CO O O O O O O Cl O O O O O O O O O O O O O O i O O O O o O U? O O O O (A O O o O O U( o (n U? } O 0 0 0 0 0 0 0 O O O O O o 0 0 0 0 0 0 0 o a 'm c CD 0 0 0 0 0 0 0 0 LO LO 0 0 0 0 0 0 0 0 i y J O O O Ur O v v 4 O N CV a lY0 E C9 (� O O O C)N O O O O O N Lo O O O O O O O O O �+ O O O O N O O O O O N N O O O O O O O N O M O r O fL) (p O (p tp (p O CO O CO CO o r w G O O O O O O O C. O O O O C. O O O O O O O O O O O O O O O O O O O O O O o o O O O O O O Cl) d J O 0 v O O O 4 O O O O 'cP C; C O_ O O O O o O O co 00 O O O O O O O co co O co co N U S:. + E m c a = = E E E E E E E E E H U'a=i o U o a U= c U 2 C iU 2 U L )C m c a w CD 0 0 0 0 0 0 0 0 0 0 o m o 0 0 C)O M O O O M O O O O O o O O O N O o O O O O m M O O O O M O C7 0 0 O O O 0 0 0 0 O O 0 CD O O O In ++ C O O M h O O O o M O CO m It O (D O to O O h O m w d IOU � O 0 O C] N C)0 N CO r O 0 07 r M r N M O o r N m r w M O O m 0 O 0 r � M O O C)r CO O N m NO E ce) _ O O O O O O Cl O O O O O O O O 0 O O O O O N II O O O O O O o O O O O O O O O o O O O O O N (� V .V. O O O O O O o O O O O o o O O O C; C) C)O O C Go N 0 N II Q 'V (M 7 N N 00 cl M M N O r 0� (9 O m N r 09 O CO O Cl) o O O r M co h o M 0 aD M_ � O U m > Z Z m C o r r 00 CA r r � r N M (V M � r r N M c _ Q Q Q Q Q Q Q Q W W W W ❑ ❑ ❑ ❑ LL U U U b U1 Lu v N W H 41 V N O N co N h N c0 N m 04 O M M N M IT un co h CO m O N M � 0 JZ co M M co M M M M �t v � 4. Z Storm Drainage Calculations Reference Information 1/26/2016 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Swansboro, North Carolina, US* Latitude: 34.7006*, Longitude:-77.14960 Elevation: 31 W ' source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yelda, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I klaos & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)l Average recurrence interval (years) Duration 1 ���7�� 2 5 10 25 50 100 200 500 1000 6.489 0.575 0.663 0.747 0.843 0.921 0.996 1.07 1.17 1.25 5-min (0.452-0.531) (0.532-0.623) (0.612-0.718) (0.687-0.809) (0.771-0.911) (0.840-0.996) (0.905-1.08) (0.966-1.16) (1.04-1.27) (1.11-1.37) 0.781 0.919 1.06 1.19 F 1.47 1.58 7F 1.70 1.85 1.98 10-min (0.722-0.848) (0.850-0.996) (0.980-1.15) 1 (1.10-1.29) 1 (1.34-1.59) (1.44-1.72) (1.53-1.84) (1.65-2.01) (1.75-2.15) 0.976 1.76 1.34 1.51 1.70 1.86 2.00 2.15 2.33 2A8 15-min (0.902-1.06) 1 (1.07-1.25) 11 (1.24-1.45) 1 (1.39-1.64) 1 (1.56-1.84) 1 (1.69-2.01) (1.82-2.17) (1.93-2.33) (2.08-2.53) (2.19-2.70) 1.34 1.60 1.97 2.79 2.52 2.80 3.06 3.34 3.70 4.01 30-min (1.24-1.45) (1.48-1.73) (1.76-2.07) (2.01-2.37) (2.31-2.73) (2.55-3.02) (2.78-3.32) (3.01-3.62 ) ( 3.31-4.03) (3.55-4.37) 1.67 2.00 F 2.45 IF 2.85 3.36 3 97F 4.22 4.68 5.31 5.86 60-min (1 .54-1.81) (1.85-2.17) (2.26-2.65) (2.62-3.09) (3.07-3.63) (3.46-4.10) (3.83-4.57) (4.22.5.08) ( 4.74-5.78 ) ( 5.19-6.39 ) 2.04 2.47 3.09 3.67 4.45 5.13 5.85 6.63 7.73 8.70 2-hr (1.87-2.23) (2.27-2.69) (2.83-3.37) (3.36-4.00) (4.04-4.84) (4.64-5.58) (5.26-6.36) (5,92-7.21) (6.83-8.43) (7.63-9.52 ) 2.20 2.66 3.35 4.01 4.92 5.74 6.62 7.59 9.00 10.3 3-hr (2 .02.2.43) (2.44-2.93) (3.07-3.69) (3.66-4.41) (4.46-5.39) (5.17-6.29) (5.91-7.24) (6.72-8.30) (7.87-9.87) ( 8.89-11.3) 2.67 3.24 4.08 4.90 6.03 7.05 8.16 9.38 17 2 12.8 6-hr (2.44-2.98) 1 (2.95-3.60) 11 (3.70-4.54) 11 (4.43-5.44) (5.42-6.67) (6.29-7.80) (7.22-9.01) (8.22-10.4) (9.66-12.3) (10.9-14.2) 3.16 3.83 4.85 5.85 7.25 8.53 9.93 11.5 13.8 16.0 12-hr (2.86-3.55) (3.46-4.29) (4.37-5.44) (5.25-6.55) (6.45-8.09) (7.53-9.50) (8.69-11.0) (9.95-12.8) ( 11.B-15.4) (13.4-17.8) 3.65 4.44 5.75 6.86 8.53 9.98 11.6 13,4 16.1 18.5 [24-hr (3.34-4.05) (4.06-4.93) (5.24-6.36) (6.23-7.58) (7.67-9.40) (8.90-11.0) (10.2-12.8) (11.7-14.8) ( 13.8-17.8) (15.6-20.5) 4.25 5.15 6.62 7,88 9.79 11.5 13.3 15.4 18.6 21.4 2�lay (3.87-4.72) 1 (4.68-5.72) 11 (5.99-7.35) (7.10-8.73) 11 (8.75-10.8) 1 (10.2-12.7) (11.7-14.8) (13.3-17.1) (15.8-20.8) (17.8-24.0) 4.51 5.46 6.98 8.26 10.2 11.8 13.6 15.7 18.8 21.5 3•day (4.11-4.99) 1 (4.98-6.04) 11 (6.34-7.72) (7.48-9.13) 1 (9.14-11.2) 11 (10.5-13.0) (12.0-15.1) (13.7-17.4) (16.1-20.9) (18.1-24.1) 4,78 5.78 7.34 8.657F70.6 12.27F14.0 15.9 19.0 21.6 4ttay (4 .36-5.26) (5.28-6.36) (6.69-8.09) (7.86-9.52) (9.53.11.6) (10.9.13.4) (12.4-15.4) (14.0-17.6) 1(9.0 (18.4-24.2) 5.54 6.67 8.39 9.82 11.9 13.6 15A 77.5 20A 22.8 7-day (5.09-6 06) (6.13-7.31) (7.69-9.18) (8.97-10.7) (10.8-13.0) (12.3-14.9) (13.8 16.9) (15.5 19.2) (17.8-22.5 ) ( 19.6.25.4) 6.22 7.45 9.23 10.7 12.8 14.6 16.5 18.5 27.5 23.9 10-day (5.72-6.79) (6.86-8.14) (8.49-10.1) (9.81-11.7) (11.7-14.0) (13.2-15.9) (14.8 18.0) (16.5-20.3) (18.8-23.7 ) ( 20.7-26.5) 8.30 9.88 12.0 13.8 16.3 18.3 20.5 22.8 26.0IF 28.6 20ilay (7.71-8.97) (9.19-10.7) (11.2-13.0) (12.8-14.9) (15.0-17.6) (16.8-19.8) (18.6-22.2) (20.5-24.8) (23.1-28.4) (25.1-31.5 ) 10.2 12.1 14.6 16.5 19.3 21 A 23.7 26.0 29.1 37.6 30-day (9.53-11.0) (11.3-13.0) (13.6-15.7) (15.4-17.8) 1 (17.9-20.7) (19.8-23.0) (21.7 25.5) (23.7-28.1) (26.3-31.6) (28.3-34.5) 12.7 15.1 78.0 20.4 23.7 26A 29.2 32.1 36.1 39.4 45-day (11.9 13.7) (14.1-16.2) (16.8-19.3) (19.0-21.9) (22.0-25.5) (24.4-28.4) (26.8-31.5) (29.2-34.7) (32.5-39.3) (35.0-43.0) 15.5 18.3 21.5 24.1 27.7 30.5 33.3 36.1 40.0 43.0 SW- day (14 5 16.5) (17.1-19.5) (20.2-23.0) (22.6-25.8) (25.6-29.6) (28.3-32.6 ) ( 30.8-35.6) (33.2-38.8 ) ( 36.4-43.2) (38.8-46.7 ) t Precipitation frequency (PF) estirnates in this table are based on frequency analysis of partlal duration series (PDS). Numbers In parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) w ill be greater than the upper bound (or less than the low er bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PlvPvalues. Reese refer to NOAA Atlas 14 document for more information. Back to Top http://hdsc.nm.noaa.g oxftsc/ptds/pfds_printpag e.html?lat--34.7006&Ion=-77.1496&data=depth&units=eng lish&series=pds 1/4 1/26/2016 Precipitation Frequency Data Serer 0 NOAA Atlas 14, Volume 2, Version 3 Location name: Swansboro, North Carolina, US* Latitude: 34.70060, Longitude:-77.14960 Elevation: 31 ft* source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. ParzyboK M.Yelda, and D. Riley NOAA, Natinnal Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Mags & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) Duration 1 ����� 2 5 10 25 50 L 10�0 200 500 1000 5.87 6.90 7.96 8.96 10.1 11.1 12.0 12.9 14.0 1 F-15.0 5-min (5.42-6.37) 1 (6.38-7.48) (7.34-8.62) (8.24-9.71) (9.25-10.9) (10.1-12.0) (10.9-12.9) (11.6-13.9) 1 (12.5-15.3) 11 (13.3-16.4) 4.696.37 7.16 8.06 8.80 9.50 10.2 11.1 10-min 11.8 (4.33-5.09) (5.10-5.98) (5.88-6.90) (6.59-7.76) (7.37-8.71) (8.02-9.52) (8.62-10.3) (9.19-11.1) 1 (9.91-12.1) 1 (10.5-12.9) 3.90 4.62 5.38 6.04 6.81 7.43 8.00 8.58 15-min 9.31 9.92 (3.61-4.24) 11 (4.28-5.01) 1 (4,96-5.82) 1 (5.56-6.54) (6.23-7.36) (6.77 8.03) (7.27 8.67) 1 (7.73 9.30) 1 (8.31 10.1) (8.78 10.8) 2.68 3.19 3.82 4.38 5.04 5.59 6.13 6.68 30-min 7.41 8.03 (2.47-2.91) 11 (2.95-3.46) 1 (3.52-4.13) 1 (4.03-4.74) (4.62-5.45) (5.10-6.05) 1 (5.57-6.64) 1 (6.02-7.24) 1 (6.61-8.05) (7.11-8.75) 1.67 2.00 2A5 2.85 3.36 3.79 4.22 4.68 5.31 60-min 5.86 (1.54-1.81) (1.85-2.17) (2.26-2.65) (2.62-3.09) (3.07-3.63) (3.46-4.10) (3.83-4.57) (4.22-5.08) (4.74-5.78) (5.19-6.39 ) 1.02 1.23 1.54 1.84 2.22 2.57 2.92 3.31 3.86 4.35 2-hr (0.934-1.11) (1.13-1.35) 1 (1.42-1.69) 1 (1.68-2.00) 1 (2.02-2.42) (2.32-2.79) (2.63-3.18) (2.96-3.60) (3.41-4.21) (3.81-4.76) 0.733 0.887 1.12 1.34 1.64 1.91 2.20 2.53 3.00 3.42 3-hr 0 ( .671-0.809) (0.814-0.976) (1.02-1.23) (1.22-1.47) (1.49-1.80) (1.72-2.09) (1.97-2.41) (2.24-2.77) (2.62-3.29) (2.96-3.76 ) 0.447 0.541 7F 0.682 0.818 1.01 1.18 1.36 1.57 1.87 2.14 6-hr (0.407-0.497) (0.492-0.601) 0.317 (0.619.0.758) OA03 (0.740-0.908) (0.904-1.11) 1 (1.05-1.30) 0.486 0.601 0.708 1 (1.21-1.50) 1 (1.37-1.73) 0.824 0.955 1 (1.61-2.06) 1.15 1.33 0.262 12-hr (0.237-0.294) (0.287-0.356) (0.363-0.451) (0.436-0.544) (0.535-0.671) (0.625-0.788) (0.721-0.917) (0.826-1.06) (0.978-1.28) 0.152 6.185 6.240 0.286 0.355 0.416 0.483 0.558 1 0.671 0.769 24-hr (0.139-0.169) (0.169-0.205) (0.218-0.265) (0.259-0.316) (0.320-0.392) (0.371-0.458) (0.426-0.532) (0.486-0.615) (0.574-0.743) (0.648-0.856) 0.089 0.107 0.138 0.164 0.204 0.239 0.277 0.321 0.387 0.445 2ilay (0.081-0.098) (0.097-0.119) (0.125-0.153) (0.148-0.182) (0.182-0.226) (0.212-0.264) (0.243-0.308) (0.278-0.357) (0.329-0.433) (0.371-0.501) 0.063 0.076 0.097 0.115 0.141 0.164 0.190 0218 0.261 0.298 3-day (0.057.0.069) (0.069-0.084) (0.088-0.107) (0.104-0.127) (0.127-0.156) (0.146-0.181) (0.167-0.209) (0.190-0.241) (0.223-0.291) (0.251-0.335) 0.050 0.060 0.076 0.090 0.110 0.127 0.146 0.166 F 0.198 0225 4t1ay (0.045-0.065) (0.055-0.066) 0.040 (0.070-0.084) 0.050 (0.082-0.099) (0.099-0.121) (0.114-0.140) 0.058 0.071 0.081 (0.129-0.160) (0.146-0.183) 0.092 0.104 (0.171-0.219) 0.121 (0.191-0.252) 0.136 0.033 7-day (0.030-0.036) (0.036-0.043) (0.046-0.055) (0.053-0.064) (0.064-0.077) (0.073-0.088) (0.082-0.101) (0.092-0.114) (0.106-0.134) (0.117-0.151) 0.026 0.031 0.038 0.045 0.053 0.061 0.069 0.077 0.089 0.100 10-da y (0.024-0.028) (0.029-0.034) (0.035-0.042) (0.041-0.049) (0.049-0.058) (0.055-0.066) (0.062-0.075) (0.069-0.085) (0.079-0.099) (0.086-0.110) 0.017 0.021 0.025 0.029 0.034 0.038 0.043 0.047 0.054 0.060 20-da y (0.016-0.019) (0.019-0.022) (0.023-0.027) (0.027-0.031) (0.031-0.037) (0.035-0.041) (0.039-0.046) (0.043-0.052) (0.048-0.059) (0.052-0.066) -14 0.017 0.020 0.023 0.027 0.030 0.033 0.036 0.040 0.044 30-da y (0.013-0.015) (0.016-0.018) (0.019-0.022) (0.021-0.025) (0.025-0.029) (0.027-0.032) (0.030-0.035) (0.033-0.039) (0.036-0.044) (0.039-0.048) 0.012 0.014 0.017 0.019 0.022 0.024 0.027 0.030 0.033 0.036 45-da y (0.011-0.013) (0.013-0.015) (0.016.0.018) (0.018-0.020) (0.020-0.024) (0.023-0.026) (0.025-0.029) (0.027-0.032) (0.030-0.036) (0.032-0.040) 0.011 0.013 0.015 0.017 0.019 0. 221 0- 23 0.025 0.028 0.030 ff0-day (0.010-0 011) (0.012-0.014) (0.014-0.016) (0.016-0.018) (0.018-0.021) (0.020-0.023) on frequency analysis of partial duration (0.021-0.025) (0.023-0.027) series (PDS). (0.025-0.030) (0.027-0.032) Precipitation frequency (PF) estimates in this table are based Numbers in parenthesis are PF estlmates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) w ill be greater than the upper bound (or less than the low er bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PIvP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atias 14 documerA for more information. Back to Top http://hdsc.rtws.noaa.g owbdsc/pfds/pfds_printpag e.html?lat=34.7006&Ion=-77.i496&data=intensityi&units=eng lish&series=pds 114 34' 42' 14" N 34° 41' 42" N Hydrologic Soil Group—Onslow County, North Carolina 3 to 302800 302900 303000 303100 303200 3 Map Scale: 1:4,880 i printed on A portrait (8.5" x 11") sheet. Meters N 0 so 1^0 200 300 Feet 0 200 400 800 1200 Map projecdon: Web Mercator Comer 000rd'nates: WGS84 Bdge tics: U IM Zone 18N WGS84 VSD Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Q 34° 4Y ION r7f N f"1 a O� rl rl r1 .-I Q rl 34° 41' 42" N 303300 303400 303500 3 m 2l512016 Page 1 of 4 0 LL Z a Z W 0 W J a v c � = C O O y y N U O C �O(pp G U 8 f] V f6 U C a CD 0 d G U R ._ N L M d CL U O L a Ems w ° S w E CD 'n io m a as S w E 3 is ' a O O c t 3 a) p - rn O c `� o h c o Op G c A as-oo a0i n. momd m E C E L p C L a O C 7 0 8 c a) vl c E R G N R'O 3: w E afn m O O @ a) O V D1 al r W M 0 = d 16 ' E ;i aai a p N f6 C m « d N awe a c �� -° U)aZiao a) R O y W w c 0 0 0 t wm p O acata) N N jQ o m m R U c c0 N G o y pag Z'vgo� L U)_ Z o ao O en c C fah MJ Z� E a) Q O 0 aa) aR o O. N R N U e yy O G (n L a O O' O cn 0 mm ao CL. a12i0 QI m a E O m p (� U W O y a - M CAB cRi I C I I U d L C O CD N O` •F L ~ (0 0.0 O a) O N i aL-• w r 3 v r o LD 1 CD CL W 0 L R c a i tm .9 m 0 o• aa) i 0 E � R a m ao01° 0aoE 3 m In 1 1 L N c N O O fC }�-, 0:_aa 3 1 I O a (a O ' L C as N i (D a f0 C piEmE :o 1 «�� 0 0 aIM C O ri O ❑ N H- U .E O m B R 10 R M. L o U ; f1 mc M C W �Np U TM N 11 -5.. ° O O L a U U ❑ Z E u� cc N U) C Ir Q' 7 O l0 ; ,O C 3 0 G Y 13� 0 *t 3 � u m a� a� a R a R Q R R N O C O C C C OI N ryl N a d 'o o t¢ a e❑ z 3 =a a m e❑ z 0a a m m U m U m °� El 11 3 13❑[I❑ s N o 0 0) o H S 1 o H a v� CD Z y Hydrologic Soil Group—Onslow County, North Carolina Hydrologic Soil Group Hydrologic Soil Group-- Summary by Map Knit -- Onslow County, North Carolina (NC133) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Baymeade fine sand, 0 to 6 percent slopes A 10.3 8.4% Ln Leon fine sand A/D 7.9 6.4% NoB Norfolk loamy fine sand, 2 to 6 percent slopes A 5.3 4.3% On Onslow loamy fine sand A 99.5 80.4% Ra Rains fine sandy loam, 0 to 2 percent slopes, Atlantic Coast Flatwoods B/D 0.7 0.6% Totals for Area of Interest 123.7 100.0% USDA Natural Resources Web Soil Survey 2/5/2016 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Onslow County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method. Dominant Condition Component Percent Cutoff: None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 2/5/2016 Conservation Service National Cooperative Soil Survey Page 4 of 4 June 6, 2014 Bohler Engineering 800 West Hill Street, Suite 101 Charlotte, North Carolina 28208 Attention: Mr. Chris Capellini, P.E. ccapellini(a7 bohlereng.com Reference: Report for Additional Soil Evaluation / Seasonal High Water Table (SHWT) Estimation for Stormwater Best Management Practices (BMP's) Proposed Walmart Store #7179-00 Hwy 24 (West Corbett Avenue) Swansboro, Onslow County North Carolina S&ME Project No. 1051-13-378G Dear Mr. Capellini: S&ME, Inc. (S&ME) has conducted a soil evaluation including Seasonal High Water Table (SHWT) estimation in general accordance with S&ME Proposal P231-13E dated November 11, 2013. Our evaluation was conducted to provide information for the design of an appropriate stormwater Best Management Practice (BMP) device and a Stormwater Management Permit Application to the North Carolina Department of Environment and Natural Resources (NCDENR) — Division of Energy, Minerals, & Land Resources (DEMLR). A soil scientist evaluated the soil conditions within the proposed stormwater BMP areas. PROJECT BACKGROUND We understand that a Walmart Neighborhood Market (Store No. 7179-00) is planned for construction southwest of the intersection of Hwy 24 and Hammock Beach Road, in Swansboro, Onslow County, North Carolina. The original site plan for the proposed development included a Walmart building, associated paved parking and access drive (primarily north of the proposed building), and a stormwater pond along the southern property boundary.S&ME conducted a stormwater soil evaluation in the wet detention pond area depicted in the original site plan in general accordance with S&P.4E Proposal P231-13E dated November 11, 2013 and issued stormwater soil evaluation report and map dated April 7, 2014. The most current site plan depicts additional stormwater BMP's for evaluation including three proposed bioretention areas. SWE, INC. / 3201 Spring Forest Road / Raleigh, NC 27616 / p 919.872,2260 f 919.790.8909 / www-r.smeinc.com Soil Evaluation for Stormwater BMP SWE Project No. 1051-13-378G Walmart Store, Hwy 24, Swansboro, North Carolina June 8, 2014 As a result of the proposed construction and associated impervious surface, a stormwater BMP is required to treat stormwater generated from the site to comply with State stormwater management requirements. Use of stormwater BMP's are subject to the suitability of site soils and regulatory approval. Regulatory guidance on requirements for permitting of stormwater BMP's are provided in the DEMLR— Stormwater BMP Manual (NCDENR-SW-BMP), dated July 2007 (Revised September, 2009). There are three additional bioretention areas proposed as depicted on the attached Stormwater Soil Evaluation Map (Figure 1). FINDINGS The soil evaluation was performed with hand auger borings at three locations (B-1 through B-3) within the proposed bioretention areas as shown on the attached Figure 1. Our evaluation consisted of identifying and recording the soil morphological conditions at these locations in order to develop soil profile descriptions, which are also shown on the attached Figure 1. Permeability/Hydraulic Conductivity Estimation Under current DEMLR requirements for various stormwater devices, the in -situ soil permeability/conductivity is an important design factor. Therefore, the soil profile descriptions on the attached Figure 1 show the soil morphological conditions including texture, estimated United States Department of Agriculture (USDA) permeability and estimated USDA hydraulic conductivity (Ksat) for the different soil horizons found on - site. In the area of Boring Location B-1 within the proposed bioretention area, the soil surface layer consisted of loamy sand material which has an estimated USDA permeability range of 6 to 20 inches/hour and USDA estimated Ksat of>14 inches per hour. The underlying soil material to a depth of 48+ inches consisted of sandy clay loam which has an estimated USDA permeability range of 0.6 to 2 inches/hour and USDA estimated Ksat range of 0.14 to 1.4 inches per hour and sandy loam which has an estimated USDA permeability range of 2 to 6 inches/hour and USDA estimated Ksat range of 1.4 to 14 inches per hour. In the area of Boring Location B-2 within the proposed bioretention area, the soil surface layer consisted of loamy sand material which has an estimated USDA permeability range of 6 to 20 inches/hour and USDA estimated Ksat of > 14 inches per hour. The underlying soil material to a depth of 48+ inches consisted of sandy clay loam which has an estimated USDA permeability range of 0.6 to 2 inches/hour and USDA estimated Ksat range of 0.14 to 1.4 inches per hour and sandy clay which has an estimated USDA permeability range of 0.06 to 0.2 inches/hour and USDA estimated Ksat range of 0.014 to 0.14 inches per hour. 2 Soil Evaluation for Stormwater BMP SWE Project No. 1051-13-378G Walmart Store, Hwy 24, Swansboro, North Carolina June 6, 2014 In the area of Boring Location B-3 within the proposed bioretention area, the soil surface layer consisted of loamy sand material which has an estimated USDA permeability range of 6 to 20 inches/hour and USDA estimated Ksat of>14 inches per hour and sandy loam which has an estimated USDA permeability range of 2 to 6 inches/hour and USDA estimated Ksat range of 1.4 to 14 inches per hour. The underlying soil material to a depth of 48+ inches consisted of sandy clay loam which has an estimated USDA permeability range of 0.6 to 2 inches/hour and USDA estimated Ksat range of 0.14 to 1.4 inches per hour, sandy clay which has an estimated USDA permeability range of 0.06 to 0.2 inches/hour and USDA estimated Ksat range of 0.014 to 0.14 inches per hour, and sandy loam which has an estimated USDA permeability range of 2 to 6 inches/hour and USDA estimated Ksat range of 1.4 to 14 inches per hour. Please refer to the enclosed map and soil profile descriptions, for more information. These estimates were obtained from one or more of the following: Onslow County Soil Survey "Physical & Chemical Properties of the Soil - Permeability"; and/or USDA- NRCS (United States Department of Agriculture - Natural Resource Conservation Service) official series description, and/or "NRCS Field Book for Describing & Sampling Soils" the permeability estimates were converted to conductivity on the profile description tables. SHWT Estimation and OWT Measurement Under current DEMLR regulations, the depth of various stormwater BMP devices from the SHWT is an important design consideration. For example, current regulations for bioretention areas require that bottom of the planting media be at least 2 foot from the SHWT. Therefore, S&ME evaluated the SHWT by advancing hand auger borings and evaluating the soil for evidence of SHWT influence. This evaluation involved looking at the actual moisture content in the soil and observing the matrix and mottle colors. Depending on the soil texture, the soil color will indicate processes that are driven by SHWT fluctuations, such as iron reduction and oxidation and organic matter staining. See Table 1 below and the soil profile descriptions on Figure 1 for the estimated SHWT depths based on soil color. In addition, S&ME recorded the observed water table (OWT) level below existing ground level (EGL) at each indicated hand auger boring location if applicable. The OWT was measured as the static water level in each of the temporary hand auger boring locations. It should be noted that the static water level/OWT measured in the auger holes is a measurement of the water table at that moment and does not represent an average water level or the highest point at which the water table may rise to. Furthermore, it is expected that groundwater elevations in the study area will likely be influenced by factors such as precipitation and proximity to surface water discharge/recharge features. See Table 1 below and the attached soil profile descriptions for the estimated SHWT depths based on soil color and measured OWT depths. 3 Soil Evaluation for Stormwater BMP SWE Project No. 1051-13-378G Walmart Store, Hwy 24, Swansboro, North Carolina June 6, 2014 Table 1: SHWT & OWT Information e,aflOt� enw Yy y0I YN `.l ;4 Rx� �" 1 ,nhS"I�VI�alk wa t. !1�1?w . . B-1 34 >48 B-2 32 >48 B-3 24 >48 CONCLUSION The NCDENR-SW-BMP Manual requires that the bottom of the planting media of a bioretention area be greater than 2 feet from the SHWT. In the proposed bioretention area represented by Boring Location B-1 the SHWT estimation was to 34 inches below the EGL, and therefore the planting media should be no more than 10 inches below EGL. In the proposed bioretention area represented by Boring Location B-2 the SHWT estimation was to 32 inches below the EGL, and therefore the planting media should be no more than g inches below EGL. In the proposed bioretention area represented by Boring Location B-3 the SHWT estimation was to 24 inches below the EGL, and therefore the planting media should be no deeper than the EGL. Also, based on the NCDENR-SW-BMP Manual, underdrains will most likely be needed at the three bioretention areas since the estimated conductivity in some of the soil horizons is less than the 2 inches per hour threshold. LIMITATIONS • Data only from hand auger borings, where performed, and conditions may vary in other areas. 4 Soil Evaluation for Stormwater BMP S&ME Project No. 1051-13-378G Walmart Store, Hwy 24, Swansboro, North Carolina June 6, 2014 CLOSING S&ME appreciates the opportunity to provide these services to you. If you have any questions, please contact us. Sincerely, S&ME, Walter Cole, L.S.S. Environmental Scientist (919) 801-3798 wcole@smeinc.com 7,0-fy Rob Willcox, L.S.S. Natural Resources Team Leader Attachments: Figure 1: Stormwater Soil Evaluation Map S:1Projects11051-13-378G1Swansboro WalmarflReports\StormwaterSoil Evaluation.doc 5 rwia— awes WASCIa. w.e 41" gomJ�1 mH3NI0AB �11 ON "O'JMOISNO'OHOSSNVMS l'3AV 1135MOO 1SRw 4Z AMH ata 0 exx�vaa WOJ•ONI-WS'MMM 00-61 U# M101S 121VWlVM O3S0d0Nd OAA 'JBL£ EL W0L tmKw o :Monm Loud $ r 140a adv :AM 3NON 3WIRS 4 dt/W N0Il'dfllt/A3 IIOS 2131'dMW2101S o 4 4 S X c e 4 r S S o Sc 1�1 fs S a a'Sa5 as a s s s s ml «I oI al n� 3 7 T +C •i a m 86 E! fl B � "P H F€F i� A O aJ O Z , _e w mo �w me �a OR mW �U H ♦ I - I — 1 1 lMS 9L5LZON'H9131VH'@11S3'dOdONWdS LOZE VN1l0aV3 H.LHON 'Oa013SNVMS :A5 O3M33HO :kBQWnN aNlmvua BLLO-JO 35Nd O1l LI33NION3 ON 4WD'ON13WS',l'IM)"A 6L61#3aOlS laVWIVM WOa `JBL£-£l-LS ::),a Nmvua :tlwrm 103Pa11d 3W'8!3Nb'-ld N011t/OOl JNIN08 i f - sLoaHOavw :31Ya ,091=A :31tlaS 0 r� m= O U Z p Q J F v a 0 Z O a 0 U 4 w J O Z = Z — m a �, a a Zz Of c� U 5 Z W W W o w d ~ = W W J Z co m N PROJECT: Walmart Swansboro Swansboro, NC BORING LOG SP- 4 SBME Project No. 1051-13-378G DATE DRILLED: 313114 ELEVATION: 32.5 ft NOTES: Boring location is approximate. * emporary PVC standpipe Installed. Bag sample 1-6 DRILL RIG: CME 55DX BORING DEPTH: 15.0 ft DRILLER: R. Norwood WATER LEVEL: T ATD, 2.7' 24 hr HAMMER TYPE: Automatic LOGGED BY: F. Wright SAMPLING METHOD: Split spoon NORTHING: 350474 EASTING: 2555612 DRILLING METHOD: 31/4" H.S.A. = U UJ � j w z a BLOW COUNT /CORE DATA STANDARD PENETRATION TEST DATA w w = o MATERIAL DESCRIPTION w w a w a- as � .. � ., a.1REWIARI(s as a a. co H 5 M 10 20 30 6080 z TOPSOIL (4 inches) COASTAL PLAIN: CLAYEY SAND (SC) loose, gray, fine, moist 2 2 3 e COASTAL PLAIN: CLAYEY SAND (SCEz loose, dark gray, fine to medium, wet 2 1 1 5 27.5 :very 2 Q OH WOH 2 2 COASTAL PLAIN: CLAYEY SAND (SCE very loose, dark gray, fine to medium, wet 2 2 1 3 10 22.5 COASTAL PLAIN: CLAYEY SAND (So medium dense, tan, fine to medium, wet 15 17.5 5 7 6 13 Boring terminated at 15 ft I P;u[ Z" 1. THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. I BORING SAM LI IN AND PENETRATION DS TEST DATA IN GENERAL ACCORbANC6. 3. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 4. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. Page 9 of 1 BOHLER ENGINEERING NC, PLLC 1927 South Tryon Street Suite 310, Charlotte, NC 28203 Professional Engineering Services Telephone: (980)272-3400 Fax: (980)272-3401 VIA: FedEx Delivery TO: NCDEQ RE: Land Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405 ATTN: Christine Hall DATE: JOB NO: LETTER OF TRANSMITTAL WM #7170 Swansboro, NC Express Stormwater Permit Revision Permit: SW8 160501 October 19, 2016 NCC 13 8078 WE ARE SENDING YOU ❑ Shop drawings ❑ Copy of letter ®Attached ❑ Prints ❑ Change order These Are Transmitted: REMARKS: Christine, COPIES DESCRIPTION Plans 2 Stormwater Calculations Original Signed Application Fee ($4,000) ❑ For approval ❑For your use ® For review and comment ❑Approved as submitted ❑ Returned for corrections ®As requested ❑Approved as noted This permit revision is regarding changes to the drainage areas associated with the 7179 Swansboro Walmart project and associated modifications to the proposed BN[Ps. These changes are detailed in the narrative and revised calculations have been provided for Wet Ponds 1 and 2, and the Sand Filter from Wet Pond 2. If you have any questions or require additional information, please do not hesitate to contact this office at (980) 272-3400. COPY TO: SIGNED: File Michael Theberge, P.E. • • <<�a•i S's Jimmy Mills Sr. Construction Manager Construction 2001 SE 10th Street Bentonville, AR 72716-5515 L.) N' on T 980.229.7262 ne I- dpam jimmy.mills0@walmart.com ,«xim Wane, For DEO Use ONLY North Carolina Department of Environmental Quality Submit: %ic+ lv �p Request for Express Permit Review r Time: Ora' Confine: G` FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan IPDF file) and vicinity map (same items expected in the application `1 ap ckage of the project location. Please include this form in the application package. • Asheville Region Alison Davidson 828-296-4698;alison.davidson(cDncdenr glov • Fayetteville or Raleigh Region -David Lee 919-7914203; david.lee(6)ncdenrgov • Mooresville or Winston Salem -Marcia Allocco 704-235-2107; mare/a.allocco@ncdenroov • Washington Region -Lyn Hardison 252-948-3842 or Ivn.hardison(Mmcdenrgov • Wilmington Region -Cameron Weaver 910-796-7303 or camero_n.weave►6incdenr gov NOTE; Project application received after 12 noon will be stamped in the following work day. Provided Existing Permits J/ ;'Elated to this Project Sth' .C.vt''---. N DES Project Name: WALMART SUPERCENTER STORE #7179 County: ONSLOW WQ Applicant: MARK GOLDSMITH Company: WALMART REAL ESTATE BUSINESS TRUST 6. s Address: 2001 SE TENTH STREET City: BENTONVILLE, State: AR Zip: 72716-_ E&S Phone: 479-204-3314, Fax: 479-204-0937, Email: MARK.GOLDSMITH@WALMART.COM Other n/ �l Physical Location:W. CORBETT AVE (NC HWY 24) & HAMMOCK BEACH ROAD Project Drains into SA waters — Water classification HQW (DWR Surface Water Classificatons Map) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N, within '/z mile and draining to class SA waters Y. or within 1 mile and draining to class HQW waters? Y Engineer/Consultant: WYATT BONE Company: BOHLER ENGINEERING, NC. PLLC Address: 4011 WESTCHASE BLVD, SUITE 290 City: RALEIGH, State: NC Zip: 27607- Maw 12 Phone: 919-578-9000, Fax: 919-703-2665, Email: WBONE@BOHLERENG.COM PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE $20000000.00#300 JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ® DWR, ❑ DCM, ® DEMLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ElOff-site[SW (Provide permit #)] ® High Density -Detention Pond 3 # Treatment Systems ® High Density -Infiltration 2 #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ® MOD:E-a4a'u %Minor E Plar. R^:{c;ca ❑ Redev. Exclusion SW 8160501 (Provide permit #) ❑ Coastal'Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 22 acres to be disturbed. (CK # & Amt. (for DEQ use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoging and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ® Yes ❑ No US ACOE Approval of Delineation completed: E Yes LJ No Received from US ACOE ® Yes ❑ No -For DLQ use Fee Split for multiple permits: (Check# 1 Buffer Impacts: ® No ❑ YES: _acre(s) Isolated wetland on Property ❑ Yes ® No 404 Application in Process wl US ACOE: ® Yes ❑ No Permit Total Fee Amount S SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ LQS $ Stream Deter,_ $ NCDEQ EXPRESS March 2016 Wal-Mart Supercenter Store #7179 Narrative Wal-Mart Real Estate Business Trust proposes to develop a portion of the undeveloped land located near the intersection of Hammock Beach Road and W. Corbett Ave. in Swansboro, North Carolina. The site will include a proposed ±158,583 SF Supercenter. The project consists of approximately 22.0 acres of disturbance. This project includes associated parking, water, sewer, electrical and other utility improvements. This project includes a proposed gas station and two outparcel properties that are not being developed at this time. Roadway improvements are required by NCDOT to address increased traffic being generated by the proposed project. The south side of Corbett Avenue is being widened to include right turn lanes into the proposed store. Hammock Beach Road is being widened along the length of the project. A turn around bulb is being constructed at the intersection of Hammock and Corbett. The site discharges to the following outfalls: Outfall #1: Halls Creek, the receiving waters for the southern portion of the site, is located approximately 4500 feet to the south of the discharge point for the south side of the site and follows an approximate flow path length of 1 mile. Outfall #2: Cartwheel Creek, the receiving waters for the northern portion of the site, is located approximately 2,300 feet to the north of the discharge point for the north side of the site and follows an approximate flow path length of 0.57 miles. Outfall #3: Cartwheel Creek, the receiving waters for the northern portion of the site, is located approximately 2,050 feet to the north of the discharge point for the north side of the site and follows an approximate flow path length of 0.44 miles. No work is proposed outside of the permitted project area. The proposed roadway improvements have been included in the disturbed area but will not be treated in the onsite stormwater facilities. The facilities on site will be oversized to account for the increased impervious area in the roadway which cannot be collected and treated. There are wetlands located on site. The impacts to these wetlands have been permitted by the current property owner. �yy �L n� RgY1 'O € MEAN 0 - ! SE 111 282.2 211 P2 F838 a€F 48 ii 4Yi Its I M. � aaa��sie.sai�a d a '� �A ■ P -= P , �: , � 8 11 t VIM 4$$i i}n 6ll pp Ep 4 QJ p$ WIII a 1 11 11,EHIM. �i N HI 3 Mae i iii� it�� P3F g� g!�P 3�Egg�� gg a SWPPP NOTES ire •. � gP � i�a n WALNIARTSUPERCENTER#7179-000 1�112ggWggSTTCORBEifA NUE SWANSBORO, ONSLOW COUNTY, NORTH CAROLiNA '^m� _ gi� g� "? °� a� "■� ; � z$ c o WAL-MIARTREAL ESTATE BUSINESS :;•"�_ :� °A TRUST BENTONVILLE, AR Walmart:;: �,Aoca, ,.:. �� :' lammillinumn --i I w �i 'D 1 0 1 z G) I m a 1 0 m q I PIN W 11-H S SIR -go 0 z El ❑ in a NMI p ❑ rn ]l rn 0 lin Big �zo o IN! 24 XG-) I I' Jill r z-------- I CIV08 HOV38 MOCININVIA 9 .9 OVERALL SITE PLAN WALMART SUPERCENTER # 71794)00 SWANSBOR8�0NIM4A%,M CAROLINA .1131 0�0 GNP$ 0 WAL-MART REAL ESTATE BUSINESS TRUST tBENTONVILLE, AR Walmart�%'* Weaver, Cameron From: Brett Buckland <bbuckland@bohlereng.com> Sent: Monday, September 12, 2016 11:24 AM To: Weaver, Cameron Cc: Michael Theberge; Wyatt Bone; NCC138078@NF.BOHLERENG.COM Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Attachments: 6030 - SW-1 - SWPPP NOTES - 7179.pdf; 6050 - C-3 - OVERALL SITE PLAN - 7179.pdfi Narrative.pdf, REQUEST FOR EXPRESS form FINAL.pdf Cameron, Please find the attached files for your review. On the application, I noted this as a major modification with a nlan revision. Is that how it should be marked, or should I mark that in another way? Please let us know if you need anything more. Thanks! Brett Buckland Bohler Engineering NC, PLLC Office: 980-272-3400 From: Weaver, Cameron [mailto:cameron.weaver@ncdenr.gov] Sent: Thursday, August 25, 2016 4:30 PM To: Brett Buckland <bbuckland@bohlereng.com> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Send me the Express Request and accompanying information described in the form instructions and I'll get you on the schedule. Cameron Weaver Environmental Assistance Coordinator -Wilmington Regional Office NCDEQ-Division of Environmental Assistance and Customer Service 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7303 NCDEQ NEW WEBSITE: http://deg.nc.gov/ DEACS NEW WEBSITE: http://deci.nc.gov/about/divisions/environmental-assistance-customer-service E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Brett Buckland [mailto:bbuckland@bohlerene.com] Sent: Thursday, August 25, 2016 3:38 PM To: Weaver, Cameron <cameron.weaver@ncdenr.eov> Cc: Lewis,Linda <linda.lewis@ncdenr.eov>; Michael Theberge <MTheberee@bohlerena.com>; Wyatt Bone <wbone@bohlerene.com>; NCC138078@NF.BOHLERENG.COM Subject: RE: WM Swainsboro (7179) - Express Stormwater Review (SW8 160501) Cameron, Speaking with my manager, we would like to get a meeting on your schedule for whenever you have available. We're waiting on the signed applications to be returned from our client, but that should occur well before your meeting availability, based on what you just told me. Wyatt from our Raleigh office would hopefully be able to make the trip down to cover the meeting. Please let us know when you may have any availability for this meeting. Thanks! Brett Buckland Bohler Engineering INC, PLLC Office: 980-272-3400 From: Weaver, Cameron [mailto:cameron.weaver@ncdenr.gov] Sent: Wednesday, August 10, 2016 2:41 PM To: Brett Buckland <bbuckland@bohleren com> Cc: Lewis,Linda <linda;lewis@ncdenr.gov> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Hi Brett. If you are looking to get a permit modification through Express for this, please send in the Express Request packet -form, narrative, vicinity map and overall site plan so that I can put you on the Express schedule. It is not guaranteed that Linda will be the reviewer, but I will do my best based on her availability. Cameron Cameron Weaver Environmental Assistance Coordinator -Wilmington Regional Office NCDEQ-Division of Environmental Assistance and Customer Service 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7303 NCDEQ NEW WEBSITE: http://deg.nc.gov/ DEACS NEW WEBSITE: http•//deg nc gov/about/divisions/environmental-assistance-customer-service E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Brett Buckland [mailto:bbuckland@bohlereng.com] Sent: Thursday, August 04, 2016 8:20 AM To: Lewis,Linda <linda.lewis@ncdenr.gov> Cc: Scott, Georgette <georgette.scott@ncdenr.sov>; Michael Theberge <MTheberge@bohleren com>; NCC138078@NF.BOHLFRENG.COM; Hall, Christine <Christine. Hall@ ncdenr.gov>; Wyatt Bone <wbone@bohlereng.com>; Weaver, Cameron <cameron.weav_er@ncdenr.gov> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Thank you for the information Linda. Cameron, when you get back, we would like to set up a meeting as soon as possible. Please let us know what is available. We have the application updated, and are working to get the original signatures. We have also updated all of our calculations, the supplements, etc. per the new design. Do we need to have the O&M Agreements or deed restrictions updated and signed since no changes are being made to any of the values on there at this time? Thanks! Brett Buckland Bohler Engineering NC, PLLC Office: 980-272-3400 From: Lewis,Linda [malito:linda.lewis@ncdenr.gov Sent: Wednesday, August 03, 2016 8:39 AM To: Brett Buckland <bbuckland bohlereng.com> Cc: Scott, Georgette <georgette.scott@ncdenr.gov>; Michael Theberge <MTheberge@bohlereng.com>; NCC138078_@NF,.BOHLERENG.COM Hall, Christine <Christine.Hall@ncdenr. 0, >; Hall, Rhonda B <rhonda.hall@ncdenr.gov>; Wyatt Bone <wbone@bohlereng.com>; Weaver, Cameron <cameron.weaver ncdenr.gov> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8160501) Brett: No, this is more than a plan revision for stormwater because we'll have to review new design calculations. You'll need to complete the full application form SWU-101 and provide a new wet pond supplement reflecting the changes to the drainage areas, BUA's, minimum SA and minimum volume that is reported on each supplement for each pond. If you go express, it will be considered a minor modification which is reviewed at 1/2 of the original fee, or in this case, $2000.00 since the permit is high density. Be sure to contact Cameron Weaver to schedule the express review — he's out on vacation until next Wednesday. Signature requirements for new permits, plan revisions and modifications are the same. Only the permittee can sign, unless he/she has authorized another person to sign on their behalf. If that is the case, then a copy of that authorization letter must be included. The signature on the application must be original, not a photocopy. Linda From: Brett Buckland Imailto:bbuckland bohlereng.com) Sent: Tuesday, August 02, 2016 5:47 PM To: Lewis,Linda <linda.lewis@ncdenr.gov> Cc: Scott, Georgette <georgette.scott@ncdenr.gov>; Michael Theberge <MTheberge@bohlereng.com>; NCC138078@NF.BOHLEREk QM- Hall, Christine <Christine.Hall ncdenr.go—v>; Hall, Rhonda B <rhonda.hall@ncdenr.gg.com ov>; Wyatt Bone <wbone@bohleren> Subject: RE: WM Swansboro (7.179) - Express Stormwater Review (SW8 160501) Linda, It's taken a little longer than anticipated due to some other things that we have been working on with our client and some moving parts between our client and the seller. I am currently working on making the revisions that we discussed previously. The changes that are occurring are: • Change to the pre -development drainage areas (due to discussions with DOT) • Due to the pre -development shifts and DOT requirements (equal or less area flowing to DOT R/W), area from Pond 2 (up front) shifted to Pond 1(at rear) • Because Pond 1 is so over -sized, the treatment volume is still contained in the previous temporary pool (peak control went up slightly, but is still significantly below pre) • Required surface areas for Ponds 1 and 2 changed slightly, but existing designs were still adequate so no pond design changes made to any of the ponds • No changes to design of infiltration basins (drawdown flowrate leaving Pond 2 stayed the same, so infiltration sizing stayed the same) We are planning to submit for a revision to an approved permit. I have found the attached application online forthis. Is that all that is needed, plus the narrative of changes, revised plans and calculations, and $500 fee (if we decide to go Express)? We will we need an original signature on the application from Wal-Mart, or can we sign as their agent? Do you all need anything else? Rhonda — we also made a slight change to the erosion control plans: • Shift in location of soil stockpile from the building pad (including clarification to contractor on sequencing of stockpiling and importing of materials) Do we need to do a permit revision for this, or is this considered a minor revision and we can just send you a copy of the revised sheets? Thanks for all of your help, and please let us know if you need any more information! Brett Buckland Bohler Engineering INC, PLLC Office: 980-272-3400 From: Brett Buckland Sent: Monday, June 06, 2016 3:07 PM To: Lewis,Linda <linda.lewis@ncdenr.gov> Cc: Scott, Georgette <georgette.scott@ncdenr.gov>; Michael Theberge (MTheberge@bohlereng.com) <MTheber a bohlereng.com>; NCC138078@NF.BOHLERENG.COM Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Linda, After talking it through here, I think it is going to be best for our client to just get the approval for the current set that you all have, and then we will be submitting for a modification of an approved permit here within the next couple of weeks. Once you take a look through everything and make sure that we are good, can you please send us a scanned copy of the approval? 4 Please let us know if you have any questions or need anything else. Thanks! Brett Buckland Bohler Engineering NC, PLLC Office: 980-272-3400 From: Lewis,Linda [mailto:linda.lewis@oRde!2r.gov Sent: Monday, June 06, 2016 12:25 PM To: Brett Buckland <bbuckland.(@bohlereng.com> Cc: Scott, Georgette <georgette.scott@ncdenr.gov> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8160501) I was going to look at it today. I don't think there is any time left on the 30 day clock to accommodate your request, unless you are willing to waive the 30 day permit time. Linda From: Brett BucklandfmaiIto: bbuckland@bohlereng.com] Sent: Monday, June 06, 201612:10 PM To: Lewis,Linda <linda.lewis@ncdenr.gov> Cc: NCC138078t?« NF.BONLFRENG_COM Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8160501) Linda, Not sure if you have started the review on this yet or not. We have received some comments from the NCDOT hydraulics division about changing drainage areas to the right of way, so we have made a few small revisions to the plans over the last couple of days since submitting. If possible, can you please hold off on reviewing everything and we will plan on getting you another set within the next couple days? If you can't, I understand, and we will work with you to get whatever else we need to get done. Thanks! Brett Buckland Bohler Engineering NC, PLLC Office: 980-272-3400 From: Brett Buckland Sent: Wednesday, June 01, 2016 10:57 AM To: 'Lewis, Linda' <linda.lewis@ncdenr.gov> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Understood. We'll get everything over to you within the next couple days. Thanks! Brett Buckland Bohler Engineering NC, PLLC Office: 980-272-3400 From: Lewis,Linda mailto:linda.lewis@ncdenr.eovi Sent: Wednesday, June 01, 2016 10:32 AM To: Brett Buckland <bbuck!andbohlereng.com> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) B rett: Just go ahead and submit the information. Since I am picking up this review during Christine's vacation, I just don't have the time to do a review to make sure it's right before you actually submit the information. In Express, you just have to take your chances that you've done it right. That is the premise of express — it has to be right. Linda From: Brett Buckland[mailto:bbuckland@bohlereng.com] Sent: Wednesday, June 01, 2016 10:15 AM To: Lewis,Linda <linda.lewis ncdenr.gov> Cc: Michael Theberge <VlTheberee@bohlerene.com>; NCC138078@N1F.BOHLERENG.COM Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Linda, I have attached a comment response letter and our updated stormwater report. The link below will allow you to download the modified plans. Download all associated files Please let us know if you have any questions or comments, and we will plan to send you everything (hopefully for approval) so that you receive it by the end of the week. Thanks! Brett Buckland Bohler Engineering NC, PLLC Office: 980-272-3400 From: Lewis,Linda [mailto:linda.lewis@ncdenr.eov] Sent: Thursday, May 26, 2016 4:56 PM To: Brett Buckland <bbuckland@bohlerenggcom> Cc: Michael Theberge <MTheberge@bohleren, com>; NCC1380782NF.BOHLERENG.COM Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Sorry- I'll be out of the office until next Wednesday, June 1. 1 won't be able to review or provide feedback on anything that you submit until June 1. Linda From: Brett Buckland Imailto:bbuckland@bohlereng.com] Sent: Thursday, May 26, 2016 4:47 PM To: Lewis,Linda <linda.lewis@ncdenr.gov> Cc: Michael Theberge <MTheberge@bohlereng.com>; NCC138078@NF.BOHLERENG.COM Subject: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) Linda, As we discussed today, it seems we had an issue and didn't receive the 2"d round of comments from the review until today, so it will be very difficult for us to get it to you tomorrow by the submission deadline. We would like to request an extension until next Wednesday (6/1), so that we can hopefully issue you all the final package for approval on Tuesday (to be received Wednesday): Would it be possible for us to send you a comment response letter tomorrow with maybe a few pictures and/or pages (or a full submission electronically) to support our changes to make sure that we are on the same page? We just want to minimize the chance that there won't be an approval on the next submission, because I believe that will push us out of the express review, and our client is pushing us heavily on this permit for them to close on the property. Please let me know if you would like to see anything in particular or have any questions. 1 have reached out to our Raleigh office to see if they have any emails from Christine regarding the off -site area being accounted for in the pond, and I believe we have addressed everything else that you commented on. Thanks! Brett Buckland ,,*7 BOHLLR 1927 South Tryon Street, Suite 310 1 Charlotte, NC 28203 P:980-272-3400 1 bbuckland@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mailfrom your system. Hall, Christine From: Hall, Christine Sent: Wednesday, September 14, 2016 3:42 PM To: Brett Buckland; Wyatt Bone Cc: Weaver, Cameron Subject: Express Request WM Swansboro (7179), SW8 160501 Brett / Wyatt, I've had a chance to look at the express request for the Walmart in Swansboro. Heads up — you will need to update the narrative that will be provided with the submittal to be more specific on the modifications being requested. This e-mail chain is enough to at least get it scheduled. Cameron will be in touch as soon as we work out the schedule. Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 177 Cardinal Drive Ext. Wilmington, NC 28405 Email rorrespni-dence to &nd firm this address is •ub ecf to tine A!forth Carolina Public Records LaLv and may be disclosed Ito thin-! pa Ves. From: Lewis,Linda Sent: Thursday, August 04, 2016 8:41 AM To: Brett Buckland <bbuckland@bohlereng.com> Cc: Scott, Georgette <georgette.scott@ncdenr.gov>; Michael Theberge <MTheberge@bohlereng.com>; NCC138078@NF.BOHLERENG.COM; Hall, Christine <Christine.Ha11@ncdenr.gov>; Wyatt Bone <wbone@bohlereng.com>; Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: WM Swansboro (7179) - Express Stormwater Review (SW8 160501) If the deed restrictions remain unchanged, they will not need to be updated. If the pond parameters, i.e., surface area, volume, elevations, orifice size are unchanged, then we do not need a new signed 4&M agreement. Linda From: Brett Buckland [mailto:bbuckland@bohlerene.com] Sent: Thursday, August 04, 2016 8:20 AM 'OA II&A bJA MAPS