HomeMy WebLinkAboutSW8160501_Current Permit_20190802ROY COOPER
Governor
MICHAEL S. REGAN
Secretory
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
August 2, 2019
Wal-Mart Real Estate Business Trust
Attn: John Clarke, Vice President
C/o Mark S. Goldsmith, Director EH & S Compliance
2001 SE 10th Street, Mail Stop 0550
Bentonville, AR 72716-0505
Subject: State Stormwater Management Permit No. SW8 160501
Walmart Supercenter Swansboro #7179-000
High Density Project
Onslow County
Dear Mr. Clarke:
The Wilmington Regional Office received a complete, modified State Stormwater Management Permit
Application for the subject project on July 26, 2019. Staff review of the plans and specifications has
determined that the project, as proposed, complies with the Stormwater Regulations set forth in Title 15A
NCAC 02H.1000 as amended by Session Law (SL) 2008-211, and subsequently amended on January 1,
2017 (2017 Rules). We are hereby forwarding modified Permit No. SW8 160501 dated August 2, 2019,
for the construction of the built -upon areas (BUA) and stormwater control measures (SCMs) associated
with the subject project.
This permit shall be effective from the date of issuance until June 6, 2024 and the project shall be subject
to the conditions and limitations as specified therein and does not supersede any other agency permit that
may be required. Failure to comply with these requirements will result in future compliance problems.
Please note that this permit is not. transferable except after notice to and approval by the Division.
Please refer to Attachment C for a detailed description of the current proposed major modification and a
list of all the past modifications approved during the effective period of the permit.
This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this
permit and is herein incorporated by reference. Please add the attached plans to the previously approved
plan set. Please replace the previous application (SWU-101), proposed deed restrictions and protective
covenants, supplement, operation and maintenance agreement with the attached modified versions.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings
(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and
must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH
with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process
at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their
website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Christine Hall in the Wilmington
Regional Office, at (910) 796-7215 or christine.hall@ncdenr.gov.
Sinceely,
e
-4�; S. DanieY Smith, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment B — Built -upon Area Allocations
Attachment C — Permitting Histc:y
Application Documents
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources E 0- •/ Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
NORTH CAR '
910.796.7215
State Stormwater Permit No. SW8 160501
GDS/cash: 111StormwaterlPermits & Projects120161160501 HD12019 08 permit 160501 Page 2 of 2
cc: Michael Theberge, PE; Bohler Engineering NC, PLLC
Town of Swamsboro Inspections
Onslow County Engineering
Wilmington Regional Office Stormwater File
State Stormwater Management Systems
Permit No. SW8 160501
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT WITH OUTPARCELS
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Wal-Mart Real Estate Business Trust
Walmart Supercenter Swansboro #7179-000
1121 West Corbett Avenue, Swansboro, Onslow County
FOR THE
construction, operation and maintenance of three (3) wet detention ponds within % mile of
and draining to Class SA waters in compliance with the provisions of 15A NCAC 2H .1000 as
amended by Session Law (SL) 2008-211 and subsequently amended on January 1, 2017
(2017 Rules) (hereafter the "stormwater rules') the approved stormwater management plans
and specifications and other supporting data as attached and on file with and approved by
the Division of Energy, Mineral and Land Resources (hereafter the Division or DEMLR) and
considered an enforceable part of this permit.
This permit shall be effective from the date of issuance until June 6, 2024 and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data. The maximum amount of built -
upon area (BUA) allowed for the entire project is 620,398 square feet.
2. This stormwater system has been approved for the management of stormwater runoff
as described in Design Standards Conditions 1.8 and 1.9 of this permit. The runoff from
all built -upon area within the permitted drainage areas of this project must be directed
into the permitted stormwater control measures (SCM). The SCMs labeled Pond 1,
Pond 2 and Pond 3, have been designed to handle the runoff from 398,7718, 98,200,
and 123,480 square feet of built -upon area, respectively.
3. The drainage areas will be limited to the amounts of built -upon area indicated in
Section 1.8 of this permit and per approved plans. This permit does not provide any
allocation of built -upon area for any future development.
4. The project is a commercial shopping center with a single outparcel, which is limited to
38,685 square feet of built -upon area, as indicated in the approved plans and
specifications. Prior to the discharge of stormwater runoff from any outparcel into the
approved stormwater system, the permittee shall. have recorded the necessary deed
restrictions such that the owner is aware of the built -upon area limit.
Page 1 of 10
State Stormwater Management Systems
Permit No. SW8 160501
5. Each commercial lot whose ownership is not retained by the permittee shall submit a
separate off -site stormwater permit application to the Division and receive approval
prior to construction. Prior to the discharge of stormwater runoff from any lot into the
approved stormwater system, the permittee shall ensure that the owner of the
commercial lot has obtained the separate off -site stormwater management permit.
6. All runoff being directed into wetlands shall flow into and through those wetlands at a
non -erosive velocity.
7. A 50' wide vegetative buffer must be provided and maintained adjacent surface
waters, measured horizontally from and perpendicular to the normal pool of
impounded structures, the top of bank of both sides of streams and rivers and the
mean high water line of tidal waters.
8. The following design criteria have been permitted for the wet detention ponds and they
must be provided and maintained at the permitted design condition.
Pond #1
Pond #2
Pond #3
a. Drainage Area, acres:
Onsite, ft2:
Offsite, ft2:
11.22
446,000
43,020
2.94
128,200
0
3.65
158,811
0
b. Total Impervious Surfaces, ft2:
Subject to SL 2008-211, ft2:
Subject to 2017 Rules, ft2:
Outparcels, ft2:
398,718
391,300
7,418
0
98,200
98,200
0
0
123,480
84,795
0
38,685
c. Average Pond Design Depth, feet:
7.5
3.0
7.5
d. TSS Removal Efficiency:
90%
90%
90%
e. Design Storm, inches:
3.65
3.65
3.65
f. Permanent Pool PP Elevation, FMSL:
29.08
29.36
29.16
g. Permitted PP Surface Area, ft2:
49,637
14,123
14,318
h. Temporary Storage Elevation, FMSL:
31.01
31.19
31.12
i. Permitted Storage Volume, ft3:
109,670
29,445
32,486
j. Predev. r-24 hr. discharge rate, cfs:
1.45
0.4
0.27
k. Controlling Orifice, inch 0 pipe:
5.0
1.75
2.0
I. Orifice Flow Rate, cfs:
0.49
0.06
0.08
m. PP Volume, ft3:
334,067
39,660
104,986
n. Foreba Volume, ft3:
60,782
7,537
19,434
o. Maximum Fountain Horsepower:
1.0
1/8
1/3
p. Receiving Stream/River Basin:
Hall's Creek / WOK01
Cartwheel Branch / WOK01
q. Stream Index Number:
19-41-16-3
20-26-1
r. Classification of Water Body:
SA HQW
SA HQW
9. Per the "no direct discharge" requirements in Section 2(b)(1) c.3. of SL 2008-211, the
design storm discharged from a wet detention pond must be directed into a secondary
stormwater control measure (SCM). The following design criteria have been provided
in the permitted secondary SCM and must be maintained at this design condition:
a. VEGETATED FILTER STRIP (POND #1 secondary SCM/effective infiltration)
i. Peak Discharge:
Design Storm, cfs: 0.51
10-yr Storm, cfs: 0.7
ii. Length of Level Spreader, ft: 20
iii. Width of Vegetated Filter Strip, ft: 50
iv. Slope of Vegetated Filter Strip: 2%
Page 2 of 10
State Stormwater Management Systems
Permit No. SW8 160501
b. INFILTRATION TRENCHES (secondary SCMs)
Units
Pond #2
Pond #3
i. Dimensions, LxWxH:
ft
55 x 24 x 2.0
76 x 24 x 1.75
ii. Perforated pipe D / L:
In / ft
12" / 71.5
12" / 76
iii. Bottom Elevation:
fmsl
29.0
28.75
iv. Overflow Elevation:
fmsl
30.5
30.25
II. SCHEDULE OF COMPLIANCE
1. The stormwater management control measure shall be entirely constructed, vegetated
and operational for its permitted use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately. If the stormwater system is used as an Erosion
Control device, it must be restored to design condition prior to operation as a
stormwater treatment device, and prior to occupancy of the facility.
3. Recorded deed restrictions and protective covenants for the outparcel must be
recorded with the Office of the Register of Deeds, will be incorporated into this permit
by reference, and must include, at a minimum, the following statements related to
stormwater management:
a. Stormwater Management Permit Number SW8 160501, as issued by the Division
of Energy, Mineral and Land Resources under NCAC 2H.1000.
b. The State of North Carolina is made a beneficiary of these covenants to the extent
necessary to maintain compliance with the Stormwater Management Permit.
c. These covenants are to run with the land and be binding on all persons and parties
claiming under them.
d. The covenants pertaining to stormwater may not be altered or rescinded without
the express written consent of the Division.
e. Alteration of the drainage as shown on the approved plans may not take place
without the concurrence of the Division.
f. The maximum built -upon area for the outparcel is 38,685 square feet. This allotted
amount includes any built -upon area constructed within the lot property boundaries,
and that portion of the right-of-way between the front lot line and the edge of the
pavement. Built upon area includes, but is not limited to, structures, asphalt,
concrete, gravel, brick, stone, slate, coquina and parking areas, but does not
include raised, open wood decking, or the water surface of swimming pools.
g. All runoff from the built -upon areas on the outparcel must drain into the permitted
system. This may be accomplished through providing roof drain gutters, which
drain to the pond or street, grading the lot to drain toward the street or directly into
the pond, or grading perimeter swales and directing them into the pond or street.
h. Built -upon area in excess of the permitted amount will require a permit
modification.
i. Each outparcel shall maintain a 50' wide vegetative buffer adjacent to surface
waters, measured horizontally from and perpendicular to the normal pool of
impounded structures, the top of bank of each side of streams and rivers and the
mean high water line of tidal waters.
j. Any individual or entity found to be in noncompliance with the provisions of a
stormwater management permit or the requirements of the Stormwater Rules is
subject to enforcement procedures as set forth in G.S. 143, Article 21.
k. Each outparcel whose ownership is not retained by the permittee, must submit a
separate Offsite Stormwater Management Permit application package to the
Division and receive a permit prior to any construction on the lot.
4. A copy of the recorded deed restrictions must be submitted to the Division within 30
days of the date of recording the plat, and prior to selling lots. The recorded copy must
contain all of the statements above, the signature of the Permittee, the deed book
number and page, and the stamp/signature of the Register of Deeds.
Page 3 of 10
State Stormwater Management Systems
Permit No. SW8 160501
5. The maximum built -upon area assigned to each lot via this permit and the
recorded deed restrictions and protective covenants may not be increased or
decreased by either the individual lot owner or the permittee unless and until the
permittee notifies the Division and obtains written approval from the Division.
6. The permittee shall review all new and modified outparcel plans for compliance with
the conditions of this permit. The permittee shall not approve any outparcel plans
where the maximum allowed built -upon area has been exceeded, or where
modifications, alternations, resizing, relocating or regrading of any component of the
storm drainage system are proposed unless and until a permit modification has been
approved by the Division.
7. The permittee is responsible for the routine monitoring of the project for compliance
with the built -upon area limits, grading, and the maintenance of the storm drainage
system and SCM established by this permit, the permit documents, the approved
plans, and the recorded deed restrictions. The permittee shall notify any outparcel
owner that is found to be in noncompliance with the conditions of this permit in writing
and shall require timely resolution.
8. The permittee shall at all times provide and perform the operation and maintenance
necessary to assure that all components of the permitted stormwater system function
at design condition. The approved Operation and Maintenance Agreement is
incorporated by reference into this permit and must be followed in its entirety and
maintenance must occur at the scheduled intervals.
9. Records of maintenance activities must be kept and made available upon request to
authorized personnel of the Division. The records will indicate the date, activity, name
of person performing the work and what actions were taken.
10. If the permanent pool volume is greater than 30,000 cubic feet, a decorative spray
fountain will be allowed in the stormwater treatment system, subject to the following
criteria:
a. The fountain must draw its water from less than 2' below the permanent pool
surface.
b. Separated units, where the nozzle, pump and intake are connected by tubing, may
be used only if they draw water from the surface in the deepest part of the pond.
c. The falling water from the fountain must be centered in the pond, away from the
shoreline.
d. The maximum horsepower for the fountain pump in each pond is listed in Design
Standards Condition 1.8 of this permit.
11. The facilities shall be constructed, operated and maintained in accordance with the
conditions of this permit, the approved plans and specifications, and other supporting
data.
12. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, the permittee shall cause a certification from
an appropriate designer for the system installed to be submitted, certifying that the
permitted facility has been installed in accordance with this permit, the approved plans
and specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A modification
may be required for those deviations.
13. All stormwater collection and treatment systems must be located in either public rights -
of -way, dedicated common areas or recorded easements. The final plats for the
project will be recorded showing all such rights -of -way, common areas and
easements, in accordance with the approved plans. Access to the stormwater
facilities for inspection and maintenance shall be maintained via appropriate recorded
easements at all times.
Page 4 of 10
State Stormwater Management Systems
Permit No. SW8 160501
14. No person or entity, including the permittee, shall alter any component shown in the
approved plans and specifications. Prior to the construction of any modification to the
approved plans, the permittee shall submit to the Director, and shall have received
approval for modified plans, specifications, and calculations including, but not limited
to, those listed below:
a. Any modification to the approved plans and specifications, regardless of size
including the stormwater control measures, built -upon area, details, etc.
b. Redesign or addition to the approved amount of built -upon area or to the drainage
area.
c. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading or resizing of any
component of the approved stormwater control measure, stormwater collection
system and/or vegetative conveyance system shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement for BUA credit that was not included
in the approved plans and specifications.
g. The construction of any #57 stone area, public trails, or landscaping material to be
considered a permeable surface that were not included in the approved plans and
specifications.
h. Other modifications as determined by the Director.
15. Prior to transfer of the permit, the stormwater facilities will be inspected by Division
personnel. The project and the stormwater facility must be in substantial compliance
with all permit conditions. Any items not in substantial compliance must be repaired,
replaced or restored to design condition prior to the transfer. Records of maintenance
activities performed to date will be required.
16. The Director may notify the permittee when the permitted site does not meet one or
more of the minimum requirements of the permit. Within the time frame specified in the
notice, the permittee shall submit a written time schedule to the Director for modifying
the site to meet minimum requirements. The permittee shall provide copies of revised
plans and certification in writing to the Director that the changes have been made.
III. GENERAL CONDITIONS
1. Any individual or entity found to be in noncompliance with the provisions of a
stormwater management permit or the requirements of the Stormwater rules is subject
to enforcement procedures as set forth in NCGS 143 Article 21.
2. The issuance of this permit does not preclude the Permittee from complying with any
and all statutes, rules, regulations, or ordinances, which may be imposed by other
government agencies (local, state, and federal) having jurisdiction.
3. If the facilities fail to perform satisfactorily, the permittee shall take immediate
corrective actions. This includes actions required by this Division and the stormwater
rules such as the construction of additional or replacement on -site stormwater
systems. These additional or replacement measures shall receive a permit from the
Division prior to construction.
Page 5 of 10
State Stormwater Management Systems
Permit No. SW8 160501
4. Permit Transfer: This permit is not transferable to any person or entity except after
notice to and approval by the Director. The permittee shall submit a completed and
signed "Permit Transfer Application Form" (available on the Division website)
accompanied by the required fee and supporting documentation as listed on the form,
to the Division at least 60 days prior to any one or more of the following events:
a. The sale or conveyance of the project area in whole or in part, except in the case of
an individual lot sale that is made subject to the recorded deed restrictions and
protective covenants;
b. The assignment or conveyance of declarant rights to another individual or entity;
c. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2);
d. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05
or NCGS 57D-6-07 and 08;
e. Bankruptcy;
f. Foreclosure, subject to the requirements of Session Law 2013-121;
5. Current Permittee Name or Address Changes: The permittee shall submit a
completed "Permit Information Update Application Form" (available on the Division
website) to the Division within 30 days to making any one or more of the following
changes:
a. A name change of the current permittee;
b. A name change of the project;
c. A mailing address change of the permittee;
6. The permittee is responsible for compliance with all terms and conditions of this permit
until the Division approves the transfer request. Neither the sale of the project, in
whole or in part, nor the conveyance of common area to a third party constitutes an
approved transfer of the permit.
7. The permittee grants DEMLR Staff permission to enter the property during normal
business hours to inspect all components of the permitted project.
8. The permit issued shall continue in force and effect until the permittee files a request
with the Division for a permit modification, transfer, renewal, or rescission; however,
these actions do not stay any permit conditions.
9. Approved plans, calculations, supplement forms, operation and maintenance
agreements and specifications for this project are incorporated by reference and are
enforceable parts of the permit. A copy of the approved plans and specifications shall
be maintained on file by the Permittee at all times.
10. Unless specified elsewhere, permanent seeding requirements for the stormwater
control measure must follow the guidelines established in the North Carolina Erosion
and Sediment Control Planning and Design Manual.
11. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit as
allowed by the laws, rules and regulations contained in Session Law 2006-246, Title
15A NCAC 2H.1000, and NCGS 143-215.1 et.al.
Page 6 of 10
State Stormwater Management Systems
Permit No. SW8 160501
12. A permit renewal request must be submitted at least 180 days prior to the expiration
date of this permit. The renewal request must include the appropriate application,
documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3).
Permit modified and re -issued this the 2nd day of August 2019.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
,J;; S. Daryl Smith, Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 7 of 10
State Stormwater Management Systems
Permit No. SW8 160501
Walmart Supercenter Swansboro #7179-000 Page 1 of 2
Stormwater Permit No. SW8 160501
Onslow County
Designer's Certification
I, , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/weekly/full time) the
construction of the project,
(Project)
for (Project Owner) hereby state that, to the best
of my abilities, due care and diligence was used in the observation of the project construction
such that the construction was observed to be built within substantial compliance and intent
of the approved plans and specifications.
The checklist of items on page 2 of this form is a part of this Certification.
Noted deviations from approved plans and specifications:
Signature
Registration Number
Date
SEAL
Page 8 of 10
State Stormwater Management Systems
Permit No. SW8 160501
Certification Requirements: Page 2 of 2
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount
of built -upon area.
3. All the built -upon area associated with the project is graded such that the runoff
drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-circuiting
of the system.
11. The permitted amounts of surface area and/or volume have been provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required components of the system are provided, such as a vegetated shelf,
a forebay, a vegetated filter and the secondary SCM.
15. The required dimensions of the system are provided, per the approved plan.
16. All components of the stormwater SCM are located in either recorded common
areas, or recorded easements.
cc: NCDEQ-DEMLR Regional Office
Town of Swansboro Building Inspections
Page 9 of 10
State Stormwater Management Systems
Permit No. SW8 160501
Attachment B
Built -upon Area (BUA) Allocations
Master Permit No. SW8 160501
Outparcel Lot
Drains to
# from
Pond #
Offsite Permit No.
Date Issued
Offsite Project Name
Allocated
Proposed
Master Permit
BUA
BUA
1
3
38,685
Page 10 of 10
Attachment 1- Permitting History
Walmart Supercenter Swansboro #7179-000
Permit No. SW8 160501
Approval Date
Permit Action
VeersirsiSon
Descripum of the Changes6/6/2016
Original Approval
1.0
Subject to Session Law 2008-211
1. The drainage area (DA) and built -upon area (BUA) associated with Pond 1
are both increasing due to the reduction in DA and BUA associated with Pond
11/7/2016
Modification
1.1
2.
2. Within the DA of Pond 2, the wet detention pond orifice and the infiltration
trench length are both being reduced accordingly.
Approving the as -built pond designs. Documenting that the sale has been
8/10/2018
Minor Modification
1.2
finalized and that Wal-Mart Real Estate Business Trust now owns the project
and SCMs. No changes to the drainage area or built -upon area.
1. The adjacent permit, SW8 121110, has agreed to swap an equal amount of
property and project area with this permit for the construction of an access
road serving both sites. The runoff from a majority of the relocated project
area for the proposed access road will included in Drainage Area 3 directed to
Pond 3. The previously approved and constructed access road will be
8/2/2019
Major Modification
1.3
removed and is included in the area that will be swapped with SW8 121110.
These changes result in decreasing both the DA and BUA to Pond 3.
2. Pond 1: The DA and BUA is increasing due to the addition of a truck
access turn around, which also impacts the shape and size of forebay 1.
Additional road improvements being made as part of the common plan of
development of this site are increasing, which have been included in the DA to
Pond 1.
DEMLR USE ONLY
Date Received Fee Paid Permit Number
J
is G �1� e-, * -
-_
ACM Its
Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction
(select rill that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan
❑ Other WQ Mjzmt Plan:
State of North Carolina
Department of Environment and Natural Resources
Division of Energy, Mineral and Land Resources
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied fir use as an original
I. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
#7179-000 Walmart Su ercenter Swansboro
2. Location of Project (street address):
1121 West Corbett Avenue
City:Swansboro County:Onslow ZiP 28584
3. Directions to project (from nearest major intersection):
At the southwest corner of the intersection of Hammock Beach Road and West Corbett Avenue
4. Latitude:341 42' 05.6" N Longitude:-770 08' 56.9" W of the main entrance to the project.
II. PERMIT INFORMATION:
].a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modifications
tRene-zvals with modifications also requires SIIVU-102 - Renezoal Application Forst
b.If this application is being submitted as the result of a modification to an existing permit, list the existing
permit numberSW8160501 , its issue date (if known)160606 and the status of
construction: ❑Not Started ❑Partially Completed* ® Completed* *provide a designer's certification
2. Specify the type of project (check one):
❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other
3. If this application is being submitted as the result of a previously returned application or a letter from
DEMLR requesting a state stormwater management permit application, list the stormwater project number,
if assigned, SW8 160501 and the previous name of the project, if different than currently
proposed,
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑LAMA Major ®Sedimentation/Erosion Control 1.84 ac of Disturbed Area
❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts
b.If any of these permits have already been acquired please provide the Project Name, Protect/Permit Number,
issue date and the type of each permit: Walmart SupercPnter lmprnve n.ents, Store #7179-000 Swansboro [Express]
_Project ID: ONSLO-2020-004, ISSUED: 7/17/19, erosion and sedimentation control plan approval
5. is the project located within 5 miles of a public airport? ®No ❑Yes
If yes — see S.L. 2012-200, Part Vl: htt -1://t)ortal.nccieiir.org/web/]r/rules-and-regulations
JUL 2 6 2019
Fora S W U- i 01 Version Oct. 31, 2U 13 Page I of 6
III. CONTACT INFORMATION
a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee,
designated government official, individual, etc. who owns the project):
Applicant/ Organization:Wal- Mart Real Estate Business Trust
Signing Official & Title:Mark S Goldsmith CPESC Director EH&S Compliance
b. Contact information for person listed in item 1a above:
Street Address: 2001 SE 10th Street, Mail Stop 0550
City: Bentonville
Mailing Address (if applicable):
City:
Phone: (479 ) 204-3314
Email:mark.goldsmitll@walmart.com
State:AR Zip:72716-0505
State: Zip:
Fax: ( 1
c. Please check the appropriate box. The applicant listed above is:
® The property owner (Skip to Contact Information, item 3a)
❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below)
❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and
2b below)
❑ Developer* (Complete Contact Information, item 2a and 2b below.)
2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the
person who owns the property that the project is located on):
Property Owner/Organization:Wal-Mart Real Estate Business Trust
Signing Official & Title:Mark S Goldsmith CPESC• Director EH&S Compliance
b. Contact information for person listed in item 2a above:
Street Address:2001 SE 10th Street, Mail Stop 0550
City: Bentonville State:AR Zip:72716-0505
Mailing Address (if applicable):
City: State: Zip:
Phone: (479 ) 204-3314 Fax: (
Email:mark.goldsmith@walmart.com
3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other
person who can answer questions about the project:
Other Contact Person/Organization:
Signing Official & Title:
b. Contact information for person listed in item 3a above:
Mailing Address:
City:
Phone:
Email:
State: Zip:
Fax:
4. Local jurisdiction for building permits: Swansboro Point of Contact:Andrea Correll Phone #: 910 326-44 ECEI
JUL 2 6 2019
Fonn S W U-101 Version Oct. 31, 2013 Page 2 of 7 �'
IV. PROJECT INFORMATION
1. In the space provided below, briefly summarize how the storm water runoff will be treated.
Three (3) wet ponds with secondary "effective infiltration" treatment Two (2) secondary infiltration trenches
and one 1) level spreader and vegetative filter strip.
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development PIan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW -1995 ❑ Ph 11- Post Construction
Stormwater runoff from this project drains to the White Oak River basin.
4. Total Property Area: 20.66 acres
5. Total Coastal Wetlands Area: acres
6. Total Surface Water Area: acres
7. 'Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Area' : 20.66 acres
' Total project area shall be calculated to exclude tyre following the normal pool of impounded stnrctures, the area
between the hanks t f streams and rivers, the area below the Normal Hr it Water (NHW) line or Mean HiXh Water
(MHIN) line, and coastal wetlands landward from the NHW (or MHI line. Tire resultant project area is used to
calculate overall percent built upon area (BUA). Non -coastal wetlands laridzoard of the NHW (or MHW) line rrray
be inchtded in the total project area.
8. Project percent of impervious area: ('Total Impervious Area / Total Project Area) X 100 = 69 %
9. How many drainage areas does the project have? 3 (For high deusihj, cowit 1 for each proposed engineered
stormwater BMP. For Iwo deusitil and other projects, use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information
Drop4geAreai
Drainage Area 2
Drainage Area 3
Drains a Area
Receiving Stream Name
Halls Creek
Cartwheel
Branch
Cartwheel
Branch
_
Stream Class
SA/HQW
SA/HQW
SA/HQW
Stream Index Number *
19-41-16-3
20-26-1
20-26-1
Total Drainage Area (sf)
489/020
128,200
158,811
On -site Drainage Area (so
446,000
128,200
158,811
Off -site Drainage Area (so
43,020
0
0
Proposed Impervious Area (sf)
355,698 + 43,020
off -site
98,200
123,480
% Impervious Area** (total)
81.5%
76.6%
77.7%
Impervious" Surface Area
Drainage Area 1
Drains a Awa 2
Dra a Area 3
Draina Area
On -site Buildings/Lots (so
158,583
3,994
0
_
On -site Streets (sf)
0
0
On -site Parking (sf)
197,115
94,206
84,795
On -site Sidewalks (so
0
1 0
0
Other on -site (sf)
0
0
0
Future (sf)
0
0
38,685-outparcel
Off -site (sf) 1
43,020
0
0
Existing BUA*** (sf) 1
0
0
0
Total (sf):
398,718
98,200
123,480
. teltin Chiss tual lracex rvitlnver can ve determined at: i1ttt7://ltortat.ncdelir.oY,/Z(teb/ZVl]/pS/e'tirt/CIaSSifiCaticse�
Form SWU-101 Version Oct. 31, 2013 Page 3 of 7
Impervious area is defined as the built upon area including, but not Iimited to, buildings, roads, parking areas,
. sidewalks, gravel areas, etc.
***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that
is to be removed and which will be replaced by new B 1.IA.
11. How was the off -site impervious area listed above determined? Provide documentation.
Wet Pond #1 is sized to treat the equivalent of the runoff from the additional impervious area from the
proposed road work on Corbett Ave and existing road work on Hammock Beach Road
Proiects in Union County: Contact DEMLR Central Office staff to check ifthe project is located within a Threatened &
Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCA C 02B . 0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from http://poi,tal..iicdenr.org/web/wq/ws/su/bnip-manual.
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and
Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application
instruction sheet and BMP checklists are available from
http://Liortal.iicdenr.org/web/wq/ws/su/statesw/forms--docs. The complete application package should be
submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the
interactive online map at h!!p://portal.ncdenr.org/web/wq/ws/su/maps.)
Please indicate that the following required information have been Rrovided by initialing in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms dots.
1. Original and one copy of the Stormwater Management Permit Application Form. Initials
2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants
Form. (if required as per Part VII below)
3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M
agreement(s) for each BMP.
4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to
hgp://www.envhelp.org/12a&es/onestopexpress.html for information on the Express program
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional information and to schedule the required application meeting.)
5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor
the project. This is required in addition to the brief summary provided in the Project
Information, item 1.
6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the
receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2
mile radius on the map.
7. Sealed, signed and dated calculations (one copy).
8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:
a. Development/Project name.
b. Engineer and firm.
c. Location map with named streets and NCSR numbers.
d. Legend.
e. North arrow.
f. Scale.
g. Revision number and dates. EGIV
it. identify all surface waters on the plans by delineating the normal pool elevation of
impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal JUL 1 2 2019
waters, and any coastal wetlands landward of the MHW or NHW lines. 9
• Delineate the vegetated buffer landward from the normal pool elevation of impounded By.
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/project boundary with bearings & distances.
j. Site Layout with all BUA identified and dimensioned.
k. Existing contours, proposed contours, spot elevations, finished floor elevations.
Form SWU-101 Version Oct. 31, 2013 Page 4 of
1. Details of roads, drainage features, collection systems, and stormwater control measures.
m! Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a
qualified person. Provide documentation of qualifications and identify the person who
made the determination on the plans.
n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
p. Vegetated buffers (where required).
9. Copy of any applicable soils report with the associated SHWT elevations (Please identify
elevations in addition to depths) as well as a map of the boring locations with the existing
elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs, the report should also
include the soil type, expected infiltration rate, and the method of determining the infiltration rate.
(Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior
to submittal, (910) 796-7378.)
10. A copy of the most current property deed. Deed book: 4527 Page No: 803
11. For corporations and limited liability corporations (LLC): Provide documentation from the NC
Secretary of State or other official documentation, which supports the titles and positions held
by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e).
The corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
h!!p://www.secretary.state.nc.us/Corvorations/CSearch.asl2
VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided
as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and
protective covenants forms can be downloaded from littp://12ortal.ncdenr.org/web/Ir/state-stormwater-
forms does. Download the latest versions for each submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot.
VIII. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a
consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as
addressing requests for additional information).
Consulting Engineer:Michael Theberge
Consulting Firm: Bohler Engineering NC PLLC
Mailing Address:1927 South Tryon Street Suite 310
City:Charlotte
Phone: (980 ) 2723400
Email:mtheberge@bohlereng.com
State:NC Zip:28203
Fax: (980 ) 2723401
IECI ,a
Hit
JUL 12 2019
BY:
Form SWU-101 Version Oct. 31, 2013 Page 5 of 7
IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this
st=cho►i)
I, (print or type name of person listed in Contact Information, item 2a) Mark S Goldsmith. CPESC certify that I
own the property identified in this permit application, and thus give permission to (print or hjpe name of person
listed in Contact Information, item la) Mark S Goldsmith, CPESC with (print or
hype name of organization listed in Contact Information, item 1a) Wal-Mart Real Estate Business Trust to develop the
project as currently proposed. A copy of the lease agreement or pending property sales contract has been
provided with the submittal, which indicates the parts) responsible for the operation and maintenance of the
stormwater system.
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back
to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and
submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater
treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility
without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement
action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
I, /�iatl h� v✓ /^''o p P a Notary Public for the State of 4,k,,n s r- f , County of
W0L 6111 �a t ev% do hereby certify that /far K vd(o( S w► ; t 1, personally appeared
before me this 06ay of J u, I 014 and acknowledge the due execution of the application for
a stormwater permit. Witness my hand and official
SEAL
My commission expires
r
CI�E
JUL 19E
Form SWU-101 Version Oct. 31, 2013 Page 6 of
X. APPLICANT'S CERTIFICATION
I, (print or type name of person listed in Contact Information, item 1a) Mark S Goldsmith, CPESC
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of the
applicable stormwater rulesA ndeerr 15A�NCAC 2H .1000 and any other applicable state stormwater requirements.
Signature: ��'� Date: .7 -
r�
I, vwl P. P e a Notary Public for the State of r K& � r- County of
\�sb rw 4 �a ✓t do hereby certify that r1C t9rl o��rvi �'t�
personally anneared
before me this jl!�day of
a stormwater permit. Witness
J. l Y 2014 and acknowledge the due execution of the application for
my hand and official seal, ? - •�-- r AL ly .' 1-",-.Oe
SEAL
My commission expires_�z�� 2 O 2
�ECElVE�
JUL 12 2019
sr•
Form SWU-101 Version Oct. 31, 2013 Page 7 of 7
Permit No. SU" u l to 0 -50 l
(to be provided by DWC)
WWI
oa�F IA'r
g9QG
NCDENR
STORMINATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out printed and submitted.
The Required Items Checklist (Part ill) must be printed, filled out and submitted along with all of the required information.
I. PROJECT INFORMATION
Project name
Contact person
Phone number
Date
Drainage area number
U. DESIGN INFORMATION
Site Characteristics
Drainage area
Impervious area, post -development
% impervious
Design rainfall depth
Storage Volume: Non -SA Waters
Minimum volume required
Volume provided
Storage Volume: SA Waters
1.5" runoff volume
Pre -development 1-yr, 24-hr runoff
Post -development 1-yr, 24-hr runoff
Minimum volume required
Volume provided
Peak Flow Calculations
Is the pre/post control of the 1 yr 24hr storm peak flow required?
1-yr, 24-hr rainfall depth
Rational C, pre -development
Rational C, post -development
Rainfall intensity: 1-yr, 24-hr storm
Pre -development 1-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak flow
Pre/Post 1-yr, 24-hr peak flow control
Elevations
Temporary pool elevation
Permanent pool elevation
SHWT elevation (approx. at the perm. pool elevation)
Top of 1 Oft vegetated shelf elevation
Bottom of 1 Oft vegetated shelf elevation
Sediment deanout, top elevation (bottom of pond)
Sediment deanout, bottom elevation.
Sediment storage provided
is there additional volume stored above the state -required temp. pool?
Elevation of the top of the additional volume
7179-000 Walmart 5upercenter Swansboro, NC
Michael A Theberge
980-272-3400
24-Jul-19
Wet Pond 1
489,020 fe
398,718 fe
81.53 %
3.7 in
f?
ft3
47,912 f?
7,437 fe
116,653 ft3
109,216 f?
109,670 ft
Y (Y or N)
3.7 in
0.15 (unitless)
0.80 (unitless)
0.15 in/hr OK
1.45 fe/sec
25.00 fe/sec
23.55 ft /sec
31_01 fmsl
29.08 fmsl
29.50 fmsl
29.58 fmsl
28.58 fmsl
18.00 fmsl
17.00 fmsl
11_00ft
ECEIVE
(Y or N)
31.0 fmsl OK
JUL 2 6 2019
BY:
Form SW401-Wet Detention Basin-Rev.0-4/18/12 Parts I. & It. Design Summary, Page 1 of 2
Permit
(to be provided by DWQ)
t DESIGN INFORMATION
Surface Areas
Area, temporary pool 61,859 fe
Area REQUIRED, permanent pool 13,693 fe
SAIDA ratio 2.80 (unitless)
Area PROVIDED, permanent pool, Ape„_wol 49,637 fe OK
Area, bottom of 1 Oft veaetated shelf, Ab Lshajt 45,320 ft
Area, sediment cleanout, top elevation (bottom of pond), Abt,ond 16,426 ft'
Volumes
Volume, temporary pool
109,670 ft3
OK
Volume, permanent pool, VPemywi
334,067 ft3
Volume, forebay (sum of forebays if more than one forebay)
60,782 ft3
Forebay % of permanent pool volume
18.2% %
OK
SAIDA Table Data
Design TSS removal
90 %
Coastal SAIDA Table Used?
Y (Y or N)
Mountain/Piedmont SAIDA Table Used?
N (Y or N)
SAIDA ratio
2.80 (unitless)
Average depth (used in SAIDA table):
Calculation option 1 used? (See Figure 10-2b)
N (Y or N)
Volume, permanent pool, VpB/m_paol
334,067 ft3
Area provided, permanent pool, Apemtp,d
49,637 ft
Average depth calculated
N/A ft
OK
Average depth used in SAIDA, deY, (Round to nearest 0.5ft)
ft
Calculation option 2 used? (See Figure 10-2b)
Y (Y or N)
Area provided, permanent pool, • peim_pod
49,637 ft
Area, bottom of 1 Oft vegetated shelf, AboLeheH
45,320 fe
Area, sediment cleanout, top elevation (bottom of pond), Ab,Lp„nd
16,425 ftz
"Depth" (distance b/w bottom of 10ft shelf and top of sediment)
10.58 ft
Average depth calculated
7.67 ft
OK
Average depth used in SAIDA, deY, (Round to down to nearest 0.5ft)
7.5 ft
OK
Drawdown Calculations
Drawdown through orifice?
Y (Y or N)
Diameter of orifice (if circular)
5.00 in
Area of orifice (If -non -circular)
In'
Coefficient of discharge (CD)
0.60 (unitless)
Driving head (Ho)
0.57 ft
Drawdown through weir?
N (Y or N)
Weir type
N/A (unitless)
Coefficient of discharge (C,v)
N/A (unitless)
Length of weir (L)
N/A ft
Driving head (H)
N/A ft
Pre -development 1-yr, 24-hr peak flow
1.45 fe/sec
Post -development 1-yr, 24-hr peak flow
25.00 felsec
Storage volume discharge rate (through discharge orifice or weir)
0.49 fe/sec
Storage volume drawdown time
2.54 days
OK, draws down in 2-5 days.
Additional Information
Vegetated side slopes
3 :1
OK
Vegetated shelf slope
10 :1
OK
Vegetated shelf width
10.0 ft
OK
Length vi flowpath to width ratio
3.2 Al
OK ��
Length to width ratio
3.2 :1
OK ���
Trash rack for overflow & orifice?
Y (Y or N)
OK
Freeboard provided
1.0 ft
OK JUL Y C���
Vegetated filter provided?
N (Y or N)
OK
Recorded drainage easement provided?
Y (Y or N)
OK
Capures all runoff at ultimate build -out?
Y (Y or N)
OK ----i
Drain mechanism for maintenance or emergencies is:
PUMP
Form SW401-Wet Detention Basin-Rev.9-4118112 Parts I. & It. Design Summary, Page 2 of 2
Permit No.
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below, if a
requirement has not been met, attach justification.
Page/ Plan
Initials Sheet No.
MT C-6-C-8_ 1. Plans (1" - 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
Basin dimensions,
Pretreatment system,
- High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW),
Overflow device, and
Boundaries of drainage easement.
MT i, ' 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing:
- Outlet structure with trash rack or similar,
- Maintenance access,
- Permanent pool dimensions,
Forebay and main pond with hardened emergency spillway,
Basin cross-section,
Vegetation specification for planting shelf, and
Filter strip.
_MT _D-1_ 3. Section view of the wet detention basin (1" 20' or larger) showing:
- Side slopes, 3:1 or lower,
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
_MT SW-2_ 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified
on the plans prior to use as a wet detention basin.
_MT Appendix_ 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay,
to verify volume provided.
_MT SW-2_ 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the
entire drainage area is stabilized.
MT Appendix_ 7. The supporting calculations.
_MT Appendix_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
_MT Appendix _ 9. A copy of the deed restrictions (if required).
_MT Appendix_ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information.
Form SW401-Wet Detention Basin-Rev.9-4/18/12
ILGF,IV�
JUL 2 6 2019
Part III. Requireg�iet e(f ec is —`clot, Pg 118 of 18
Permit No. W a l 60L a `
(to be provided by DWQJ
0 W AAMA
TF9QG
y r
WDENR
STORMI AT, ER MANAGEMENT PERMIT APPUCATK'N FORM
ICA� i +�• c
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information.
t PRO1il:C1'tNIF()RlklATtON
Project name _ 7179-000 Walmart Supercenter Swensboro, NC
Contact person Michael A Theberge
Phone number 980-272-3400
Date 30-Jul-18
Drainage area number Wet Pond 2
H, MANN INFONAWN
Site Characteristics
Drainage area
128,200 ftZ
Impervious area, post -development
98,200 fe
% impervious
76.60 %
Design rainfall depth
3.7 in
Storage Volume: Non -SA Waters
Minimum volume required
ft3
Volume provided ft3
Storage Volume: SA Waters
1.5' runoff volume 11,849 ft3
Pre -development 1-yr, 24-hr runoff 4,757 ft3
Post -development 1-yr, 24-hr runoff 28,832 ft3
Minimum volume required 24,075 ft3
Volume provided 29,445 ft3
Peak Flow Calculations
Is the oreloost control of the 1vr 24hr storm peak flow required?
Y (Y or N)
1-yr, 24-hr rainfall depth
3.7 in
Rational C, pre -development
0.21 (unitless)
Rational C, post -development
0.76 (unitless)
Rainfall intensity. 1 -yr, 24-hr storm
0.15 in/hr OK
Pre -development 1-yr, 24-hr peak flow
0.40 ft3/sec
Post -development 1-yr, 24-hr peak flow
9.69 felsec
Pre/Post 1-yr, 24-hr peak flow control
9.29 ft3/sec
Elevations
Temporary pool elevation
31.19 fmsl
Permanent pool elevation
29.36 fmsl
SHWT elevation (approx. at the perm. pool elevation)
29. 00 fmsl
Top of 1 Oft vegetated shelf elevation
29.86 fmsl
Bottom of 10ft vegetated shelf elevation
28.86 fmsl
Sediment cleanout, top elevation (bottom of pond)
25.00 fmsl
Sediment cleanout, bottom elevation
24.00 fmsl
Sediment storage provided
1.00 ft
Is there additional volume stored above the state -required temp. pool?
N (Y or N)
Elevation of the top of the additional volume
fmsl
RECEIVED
JUL 2 8 2019
sr
Form SW401-Wet Detention Basin-Rev.94/18/12 Parts I. & It. Design Summary, Page 1 of 2
Permit
(to be provided by DWQ)
SiNFal�MATION
Surface Areas
Area, temporary pool
19,621 ft'
Area REQUIRED, permanent pool
11,666 ft
SAIDA ratio
9.10 (unitless)
Area PROVIDED, permanent pool, Apa„_,ol
14,123 ft
OK
Area, bottom of 1Oft vegetated shelf, Aboi_ehelf
12,408 ft
Area, sediment cleanout, top elevation (bottom of pond), AWLPMd
4,261
Volumes
Volume, temporary pool
29,445110
OK
Volume, permanent pool, Vpmmed
39,660 ft3
Volume, forebay (sum of forebays if more than one forebay)
7,637 ft3
Forebay % of permanent pool volume
19.0% %
OK
SAIDA Table Data
Design TSS removal
90 %
Coastal SAIDA Table Used?
Y
(Y or N)
Mountaln/Piedmont SAIDA Table Used?
N
(Y or N)
SAIDA ratio
9.10 (unftless)
Average depth (used in SAIDA table):
Calculation option 1 used? (See Figure 10-2b)
N
(Y or N)
Volume, permanent pool, Vpene_pool
39,660 1`0
Area provided, permanent pool, Ap.. pool
14,123 If
Average depth calculated
NIA It
OK
Average depth used in SAIDA, de,,, (Round to nearest 0.5ft)
ft
Calculation option 2 used? (See Figure 10-2b)
Y
(Y or N)
Area provided, permanent pool, Apu ,,d
14,123 fe
Area, bottom of 1 Oft vegetated shelf, Abot sher
12,408 ft2
Area, sediment cieanout, top elevation (bottom of pond), Ah,U,,,,d
4,261 ft2
"Depth" (distance b/w bottom of 1 Oft shelf and top of sediment)
3.86 ft
Average depth calculated
3.06 ft
OK
Average depth used in SAIDA, d. (Round to down to nearest 0.5ft)
3.0 ft
OK
Drawdown Calculations
Drawdown through orifice?
Y
(Y or N)
Diameter of orifice (If circular)
1.75 in
Area of orifice (If -non -circular)
in'
Coefficient of discharge (Co)
0.60 (unitless)
Driving head (Ho)
0.59 It
Drawdown through weir?
N
(Y or N)
Weir type
NIA
(unitless)
Coefficient of discharge (C)
NIA
(unitless)
Length of weir (L)
NIA
ft
Driving head (H)
N/A
ft
Pre -development 1-yr, 24-hr peak flow
0.40 ft3/sec
Post -development 1-yr, 24-hr peak flow
9.69 ft3/sec
Storage volume discharge rate (through discharge orifice or weir)
0.06 felsec
Storage volume drawdown time
4.53 days
OK, draws down In 2-5 days.
Additional Information
Vegetated side slopes
3 :1
OK
Vegetated shelf slope
10 :1
OK
Vegetated shelf width
10.0 ft
OK
E� ���
Length of flowpath to width ratio
6 A
OK
Length to width ratio
6 :1
OK
JUL 6��g
Trash rack for overflow & orifice?
Y
(Y or N)
OK
Freeboard provided
1.0 It
OK
Vegetated filter provided?
N
(Y or N)
OK
BY:
Recorded drainage easement provided?
Y
(Y or N)
OK
Capures all runoff at ultimate build -out?
Y
(Y or N)
OK
Drain mechanism for maintenance or emergencies is:
PUMP
Form SW401-Wet Detention Basin-Rev.9-4/1 e/12 Parts I. d li. Design Summary, Page 2 of 2
Permit No.
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
_MT C-6-C-8_ 1. Plans (1" - 50' or larger) of the entire site showing:
Design at ultimate build -out,
Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
Basin dimensions,
Pretreatment system,
High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW),
Overflow device, and
Boundaries of drainage easement.
_MT_ 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing:
- Outlet structure with trash rack or similar,
Maintenance access,
- Permanent pool dimensions,
Forebay and main pond with hardened emergency spillway,
Basin cross-section,
Vegetation specification for planting shelf, and
Filter strip.
3. Section view of the wet detention basin (1" = 20' or larger) showing:
Side slopes, 3:1 or lower,
- Pretreatment and treatment areas, and
Inlet and outlet structures.
_MT —SW-2— 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified
on the plans prior to use as a wet detention basin.
MT Appendix_ 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay,
to verify volume provided.
_MT SW-2 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the
entire drainage area is stabilized.
_MT Appendix_ 7. The supporting calculations.
_MT Appendix_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
_MT Appendix_ 9. A copy of the deed restrictions (if required).
_MT Appendix_ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information. EC L JVE
JUL 2 6 2019
BY.
Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 18 of 18
Permit No. S QJ O 1(, D61) `
(to be provided by DWQ)
COG
o6oF wArF9Q�
WDENR
y
STORMti"LATER MANACEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information.
I. PRQJLCT tyIrORMA'ilC'fp!
Project name
7179-000 Walmart Supercenter Swansboro, NC
Contact person
Michael A Theberge
Phone number
980-272-3400
Date
24-Jul-I9
Drainage area number
Wet Pond 3
p. DESIGN *FORMATION
Site Characteristics
Drainage area
158,811 ftz
Impervious area, post -development
123,480 ft
% impervious
77.75 %
Design rainfall depth
3.7 in
Storage Volume: Non -SA Waters
Minimum volume required ft3
Volume provided fe
Storage Volume: SA Waters
1.5" runoff volume 14,884 ft i
Pre -development 1-yr, 24-hr runoff 5,893 ft3
Post -development 1-yr, 24-hr runoff 36,218 ft3
Minimum volume required 30,325 ft3
Volume provided 32,486 ft3
Peak Flow Calculations
Is the pre/post control of the 1 yr 24hr storm peak flow required?
Y (Y or N)
1-yr, 24-hr rainfall depth
3.7 in
Rational C, pre -development
0.21 (unitiess)
Rational C, post -development
0.77 (unitless)
Rainfall intensity: I-yr, 24-hr storm
0.15 Whir OK
Pre -development 1-yr, 24-hr peak flow
0.27 ft3/sec
Post -development 1-yr, 24-hr peak flow
9.56 ft3/sec
Pre/Post 1-yr, 24-hr peak flow control
9.29 ft3/sec
Elevations
Temporary pool elevation
31.12 fmsl
Permanent pool elevation
29.16 fmsl
SHWT elevation (soorox. at the perm. pool elevation)
28.75 f m a I
Top of 10fl vegetated shelf elevation
29.66 fmsl
Bottom of 1(Nt vegetated shelf elevation
28.66 fmsl
Sediment cleanout, top elevation (bottom of pond)
15.00 fmsl
Sediment cleanout, bottom elevation
14.00 fmsl
Sediment storage provided
1.00 ft
Is there additional volume stored above the state -required temp. pool?
N (Y or N)
Elevation of the top of the additional volume
fmsl
ECOV�
JUL 25 2019
BY: --
Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & It. Design Summary, Page 1 of 2
Permit No.
(to be provided by DWQ)
f , DESIGNINFORMATION
Surface Areas
Area, temporary pool 17,882 fe
Area REQUIRED, permanent pool 4,256 fe
SAIDA ratio 2.68 (unitless)
Area PROVIDED, permanent pool, Apeaa-p001
14,318 ftz
OK
Area, bottom of 10ft vegetated shelf, Aba ehCr
12,690 ft'
Area, sediment deanout, top elevation (bottom of pond), AboLMM
3,418 ft'
Volumes
Volume, temporary pool
32,486 ft3
OK
Volume, permanent pool, Vpeao pool
104,086 ft3
Volume, forebay (sum of forebays if more than one forebay)
19,434 ft3
Forebay % of permanent pod volume
18.5% %
OK
SAIDA Table Data
Design TSS removal
90 %
Coastal SAIDA Table Used?
Y (Y or N)
Mountaln/Piedmont SAIDA Table Used?
N (Y or N)
SAIDA ratio
2.68 (unitless)
Average depth (used in SAIDA table):
Calculation option 1 used? (See Figure 10-2b)
N (Y or N)
Volume, permanent pool, Vpeaayoa,
104,986 ft3
Area provided, permanent pool, Apef1a_pad
14,318 If
Average depth calculated
N/A ft
OK
Average depth used in SAIDA, deV, (Round to nearest 0.5ft)
ft
Calculation option 2 used? (See Figure 10-2b)
Y (Y or N)
Area provided, permanent pool, • perm ed
14,318 fe
Area. bottom of 10ft vegetated shelf, AboLehelf
12,690 ft'
Area, sediment deanout, top elevation (bottom of pond), AboLpoad
3,418 fe
"Depth" (distance b/w bottom of 10ft shelf and top of sediment)
13.66 ft
Average depth calculated
9.14 ft
OK
Average depth used in SAIDA, deV, (Round to down to nearest 0.5ft)
7.5 ft
Insufficient. Check calculation.
Drawdown Calculations
Drawdown through orifice?
Y (Y or N)
Diameter of orifice (W circular)
2.00 in
Area of orifice (if -non -circular)
in'
Coefficient of discharge (Co)
0.60 (unitless)
Driving head (Ha)
0.63 ft
Drawdown through weir?
N (Y or N)
Weir type
N/A (unitless)
Coefficient of discharge (Cj
N/A (unitless)
Length of weir (L)
N/A ft
Driving head (H)
WA ft
Pre -development 1-yr, 24-hr peak flow
0.27 fe/sec
Post -development 1-yr, 24-hr peak flow
9.56 ft3/sec
Storage volume discharge rate (through discharge orifice or weir)
0.08 fe/sec
Storage volume drawdown time
4.22 days
OK, draws down in 2-5 days.
Additional Information
Vegetated side slopes
3 :1
OK
Vegetated shelf slope
Vegetated shelf width
10 :1
10.0 ft
OK
OK
CIEW
Length of flowpath to width ratio
3 :1
OK
Length to width ratio
2 :1
OK
JUL �Y
Trash rack for overflow & orifice?
Y (Y or N)
OK
Y
Freeboard provided
1.0 ft
OK
Vegetated filter provided?
N (Y or N)
OK
Recorded drainage easement provided?
Y (Y or N)
OK
Capures all runoff at ultimate build -out?
Y (Y or N)
OK
Drain mechanism for maintenance or emergencies is:
PUMP
Form SW401-Wet Detention Basin-Rev.B4/18/12 Parts 1. & II. Design Summary, Page 2 of 2
Permit
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below, If a
requirement has not been met, attach justification.
Page/ Plan
Initials Sheet No.
_MT C-6-C-8_
1. Plans (1" - 50' or larger) of the entire site showing:
Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
Basin dimensions,
- Pretreatment system,
High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW),
Overflow device, and
Boundaries of drainage easement.
_
2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing:
- Outlet structure with trash rack or similar,
Maintenance access, ONO
- Permanent pool dimensions, FECEIVE
Forebay and main pond with hardened emergency spillway,
��
Basin cross-section, i
Vegetation specification for planting shelf, and
Filter strip. BY'
_MT _D-1_
3. Section view of the wet detention basin (1" 20' or larger) showing:
Side slopes, 3:1 or lower,
Pretreatment and treatment areas, and
- Inlet and outlet structures.
_MT SW-2_
4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified
on the plans prior to use as a wet detention basin.
_MT _Appendix_
5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay,
to verify volume provided.
_MT-SW-2
6. A construction sequence that shows how the wet detention basin will be protected from sediment until the
entire drainage area is stabilized.
_MT Appendix_
7. The supporting calculations.
_MT Appendix_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
_MT Appendix_ 9. A copy of the deed restrictions (if required).
_MT Appendix_ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information.
Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 18 of 18
� areR
o�
.*
14CDENR
Y
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT
This form must be completely filled out, printed, initialed, and submitted.
!, PROJECT INFORMATIC)E
Project name
7179-000 Walmart Supercenter Swansboro, NC
Contact name
Michael A Theberge
Phone number
980-272-3400
Date
May 18, 2016
Drainage area number
From Wet Pond 1
{l. DESIGN W. ORMATION
The purpose of the LS-VFS
Other: Explained below
Stormwater enters LS-VFS from
A BMP
Type of VFS
Engineered filter strip (graded & sodded, slope < 8%)
Explanation of any "Other" responses above
Purpose: "Effective infiltration' after 90% TSS wet pond due to proximity to SA Waters
If Stormwater Enters the LS-VFS from the Drainage Area
Drainage area
ge Do not complete this section of the form.
Impervious surface area
ft? Do not complete this section of the form.
Percent impervious
% Do not complete this section of the form.
Rational C coefficient
Do not complete this section of the form.
Peak flow from the 1 inlhr storm
cfs Do not complete this section of the form.
Time of concentration
min Do not complete this section of the form.
Rainfall intensity, 1 0-yr storm
inlhr Do not complete this section of the form.
Peak flow from the 10-yr storm
cfs Do not complete this section of the form.
Design storm
Other: Explained below
Maximum amount of flow directed to the LS-VFS
cfs Do not complete this section of the form.
Is a flow bypass system going to be used?
(Y or N) Do not complete this section of the form.
Explanation of any "Other" responses above 3.65" (1-yr, 24-hr storm) due to proximity to SA Waters
If Stormwater Enters the LS-VFS from a BMP
Type of BMP
Peak discharge from the BMP during the design storm
Peak discharge from the BMP during the 10-year storm
Maximum capacity of a 100-foot long LS-VFS
Peak flow directed to the LS-VFS
Is a flow bypass system going to be used?
Explanation of any "Other" responses above
Wet detention pond
0.51 cfs
0.7 cfs
10 cfs
0.7 cfs
N (Y or N)
ECEIVF
JUL 2 5 2019
8Y:
Form SW401 - LS-VFS - 29June2012 - Rev.10 page 1 of 3
LS-VFS Design
Forebay surface area
A BMP
sq ft No forebay is required.
Depth of forebay at stormwater entry point
in
Depth of forebay at stormwater exit point
in
Feet of level lip needed per cis
10
fticfs
Computed minimum length of the level lip needed
7
ft Ten feet is the minimum level spreader length.
Length of level lip provided
20
ft
Width of VFS
50
ft
Elevation at downslope base of level lip
29.00
fmsl
Elevation at the end of the VFS that is farthest from the LS
28.00
fmsl
Slope (from level lip to the end of the VFS)
2.00
%
Are any draws present in the VFS?
N
(Y or N) OK
Is there a collector swale at the end of the VFS?
N
(Y or N)
Bypass System Design (if applicable)
Is a bypass system provided?
N (Y or N)
Is there an engineered flow splitting device?
N (` or N)
Dimensions of the channel (see diagram below):
M
ft
B
ft
W
ft
y (flow depth for 10-year stone)
ft
freeboard (during the 10-year storm)
ft
Peak velocity in the channel during the 10-yr storm
ft/sec
Channel lining material
Pick one:
Does the bypass discharge through a wetland?
(Y or N)
Does the channel enter the stream at an angle?
, r or „q
Explanation of any "Other" responses above
IVA
t
r
JECEIVE
JUL 2 6 2019
Form SW401 - LS-VFS - Mune2012 - 4ev.10 page 2 of 3
EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result
in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the
following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met,
attach justification.
Requried Item: Initials 'Page or plan sheet number and any notes:
1. Plans (1" - 50' or larger) of the entire site showing: j
Design at ultimate build -out,
Off -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
Forebay (if applicable),
High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW), and
Boundaries of drainage easement.
2. Plan details (1" = 39 or larger) for the level spreader showing: MT
- Forebay (if applicable),
High flow bypass system,
One foot topo lines between the level lip and top of stream bank,
- Proposed drainage easement, and
Design at ultimate build -out.
3. Section view of the level spreader (1" = 20' or larger) showing: MT
- Underdrein system (if applicable),
- Level lip,
- Upslope channel, and
- Downslope filter fabric.
4. Plan details of the flow splitting device and supporting calculations (if applicable).
5. A construction sequence that shows how the level spreader will be protected from MT
sediment until the entire drainage area is stabilized.
6. If a non -engineered VFS is being used, then provide photograph of the VFS showing
that no draws are present.
7. The supporting calculations. MT
8. A copy of the signed and notarized operation and maintenance (0&M) agreement. MT
ECEIVE
JUL 2 6 2Q19
•`y:
Form SW401 - LS-VFS - 2QJune2012 - Rev.10 page 3 of 3
Permit No. �W, D ("6 0501
(to be provided by DWQ)
NCDEhIR STORMWATER MANAGEMENT PERMIT APPLICATION FORM D�VR ,"",M
401 CERTIFICATION APPLICATION FORM
INFILTRATION TRENCH SUPPLEMENT
T his form must be filled out', printed and submitted.
The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information.
1. PROJECT INFORMATION
Project name 7179-000 Walmart Supercenter Swansboro, NC
Contact person Michael A Theberge
Phone number 980-272-3400
Date 7124/2019
Drainage area number From Wet Pond 2
11. DES16N INFOMUT10N
Site Characteristics
Drainage area
128,200.00
fe
Impervious area
98,200.00
ft2
Percent impervious
76.6%
%
Design rainfall depth
3.65
in
Peak Flow Calculations
1-yr, 24-hr rainfall depth
3.65
in
1-yr, 24-hr intensity
0.15
in/hr
Pre -development 1-yr, 24-hr discharge
0.40
ft3/sec
Post -development 1-yr, 24-hr discharge
0.06
ft3/sec
Pre/Post 1-yr, 24-hr peak flow control
-0.34
ft3/sec
Storage Volume: Non -SA Waters
Minimum volume required
ft3
Volume provided
ft3
Storage Volume: SA Waters
1.5" runoff volume
11849.00
ft3
Pre -development 1-yr, 24-hr runoff volume
4,757.00
ft3
Post -development 1-yr, 24-hr runoff volume
28,832.00
ft3
Minimum volume required
24075.00
ft3
Volume provided
29,445.00
ft3 OK
Solis Report Summary
Soil type
A
Infiltration rate
2.00
in/hr
SHWT elevation
29.00
fmsl
Trench Design Parameters
Drawdown time
4.53
days OK
Perforated pipe diameter
12.00
in
Perforated pipe length
55.00
ft
Number of laterals
0
Stone type (if used)
#57
Stone void ratio
Stone is free of fines?
Y
(Y or N) OK
ECEIVE
JUL 2 6 2111
BY.
Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2
Permit No.
(to be provided by DWQ)
Trench Elevations
Bottom elevation
29.00
fmsl
Raise basin bottom, Must be at least 2-ft above SHWT
Storage/overflow elevation
30.50
fmsl
Top elevation
31.00
fmsl
Trench Dimensions
Length (long dimiension)
55.00
ft
Width (short dimension)
24.00
ft
Height (depth)
2.00
ft
OK
Additional Information
Maximum volume to each inlet into the trench?
actin
Length of vegetative filter for overflow
N/A
ft
OK
Number of observation wells
1
OK
Distance to structure
15.00
ft
OK
Distance from surface waters
1,000.00
ft
OK
Distance from water supply well(s)
N/A
ft
OK
Separation from impervious soil layer
N/A
ft
OK
Depth of naturally occuring soil above SHWT
0.00
ft
Minimum of atleast 1-ft of naturally occuring soil above shwt
Bottom covered with 4-in of clean sand?
N/A
(Y or N)
OK
Proposed drainage easement provided?
Y
(Y or N)
OK
Capures all runoff at ultimate build -out?
Y
(Y or N)
OK
Bypass provided for larger storms?
Y
(Y or N)
OK
Trench wrapped with geotextile fabric?
Y
(Y or N)
OK
Pretreatment device provided
Y
Wet Pond
ECEIVE
JUL 2 6 2019
6Y.
Form SW401-infiltration Trench-Rev.4 Parts I. 3 II. Design. Summary, Page 2 of 2
Permit No.
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
MT_ _C-6-C-8_ 1. Plans (1" - 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Trench dimensions,
- Pretreatment system,
- High flow bypass system,
- Maintenance access,
Proposed drainage easement and public right of way (ROW),
- Overflow device, and
Boundaries of drainage easement.
MT D-1_ 2. Partial plan (1" = 30' or larger) and details for the infiltration trench showing:
- Bypass structure,
Maintenance access,
Basin bottom dimensions, ECEIVE
Basin cross-section with benchmark for sediment cleanout,
- Flow distribution detail for inflow, Jul?
Vegetated filter, and 8
Pretreatment device. BY:
MT D-1 3. Section view of the infiltration trench (1" 20' or larger) showing:
Pretreatment and treatment areas, and
- Inlet and outlet structures.
_MT_ _D-1_ 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
MT _Appendix_ 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
MT _SW-2, D-1_ 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the
entire drainage area is stabilized.
_____MT___ Ammendix 7. The supporting calculations.
MT _Appendix_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
_MT_ _Appendix_ y. A copy of the deed restrictions (it required).
Form SW401-Infiltration Trench-Rev.4 Part III. Required Items Checklist, Page 3 of 3
Permit No. Sri b ( (O�Q f
(to be provided by DWQ)
�� L?1,R
NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM DMOMo„yatmXm"Um,x
401 CERTIFICATION APPLICATION FORM
INFILTRATION TRENCH SUPPLEMENT
This form must be filled out, p,tmted and submitted.
The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information.
!. PROJECT INFORMATION
Project name 7179-000 Walmart Supercenter Swansboro, NC
Contact person Michael A Theberge
Phone number 980-272-3400
Date 7/24/2019
Drainage area number From Wet Pond 3
II, DESIGN XFO:RMATION
Site Characteristics
Drainage area
158,811.00
fe
Impervious area
123,480.00
ft
Percent impervious
77.8%
%
Design rainfall depth
3.65
in
Peak Flow Calculations
1-yr, 24-hr rainfall depth
3.65
in
1-yr, 24-hr intensity
0.15
in/hr
Pre -development 1-yr, 24-hr discharge
0.27
elsec
Post -development 1-yr, 24-hr discharge
0.08
fe/sec
Pre/Post 1-yr, 24-hr peak flow control
-0.19
fts/sec
Storage Volume: Non -SA Waters
Minimum volume required
i
Volume provided
i
Storage Volume: SA Waters
1.5" runoff volume
14884.00
fe
Pre -development 1-yr, 24-hr runoff volume
5,893 fO
Post -development 1-yr, 24-hr runoff volume
36,218 ft
Minimum volume required
30325.00
f?
Volume provided
32,486.00
ft OK
Soils Report Summary
Soil type
A
Infiltration rate
2.00
in/hr
SHWT elevation
28.75
fmsl
Trench Design Parameters
Drawdown time
4.22
days OK
Perforated pipe diameter
12.00
in
Perforated pipe length
76.00
ft
Number of laterals
0
Stone type (if used)
#57
Stone void ratio
40%
'
Stone is free of fines?
Y
(Y or N) OK
JUL2 6 2019
Form SW401-infiltration Trench-Rev.4 Parts I. & II. Design Summary. Page 1 of 2
Permit No.
(to be provided by DWQ)
Trench Elevations
Bottom elevation
Storage/overflow elevation
Top elevation
Trench Dimensions
Length (long dimension)
Width (short dimension)
Height (depth)
Additional Information
Maximum volume to each inlet into the trench?
Length of vegetative filter for overflow
Number of observation wells
Distance to structure
Distance from surface waters
Distance from water supply well(s)
Separation from impervious soil layer
Depth of naturally occuring soil above SHWT
Bottom covered with 4-in of clean sand?
Proposed drainage easement provided?
Capures all runoff at ultimate build -out?
Bypass provided for larger storms?
Trench wrapped with geotextile fabric?
Pretreatment device provided
26.75 fmsl Ramse be a eas - T
30.25 fmsl N1A '50-c°-Aa`16
30.50 fmsl
76.00 n
24.00 ft
1.75 ft OK
ac-in
NIA
ft
OK
1
OK
25.00
ft
OK
1,000.00
ft
OK
N/A
ft
OK
N/A
ft
OK
0.00
ft
Minimum of atleast 1-ft of naturally occuring soil above shwt
N/A
(Y or N)
OK
Y
(Y or N)
OK
Y
(Y or N)
OK
Y
(Y or N)
OK
Y
(Y or N)
OK
Y
Wet Pond
ECEIVE
JUL 2 6 2019
8Y.
Form SW401-Infiltratlon Trench-Rev.4 Parts I. R II. Design Summary, Page 2 of 2
Permit No.
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
MT _C-6-C-8_ 1. Plans (1" 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
Trench dimensions,
Pretreatment system,
High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW),
Overflow device, and
- Boundaries of drainage easement.
2. Partial plan (1" = 30' or larger) and details for the infiltration trench showing:
Bypass structure,
Maintenance access,
Basin bottom dimensions,
Basin cross-section with benchmark for sediment cleanout,
Flow distribution detail for inflow,
- Vegetated filter, and
- Pretreatment device.
3. Section view of the infiltration trench (1" = 20' or larger) showing:
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
_ 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
_MT_ _Appendix_ 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
_MT_ —SW-2, D-1_ 6. A construction sequence that shows how the infittration basin will be protected from sediment until the
entire drainage area is stabilized.
_MT_ _Appendix_ 7. The supporting calculations.
_MT_ _Appendix_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
—MT— _Appendix_ 9. A copy of the deed restrictions (if required).
ECEIVE
JUL 2 6 2019
8Y.
Form SW401-Infiltration Trench-Rev.4 Part III. Required Items Checklist, Page 3 of 3
High Density Develoaments with Outparcels
Deed Restrictions & Protective Covenances
In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Stormwater Management
Regulations, deed restrictions and protective covenants are required for High Density Developments
with Outparcels where outparcel lots will be subdivided from the main tract and sold. Deed restrictions
and protective covenants are necessary to ensure that the development maintains a "built -upon" area
consistent with the design criteria used to size the stormwater control facility.
I, Will Tirmins , acknowledge, affirm and agree by my signature below,
that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any
outparcel or future development area:
1. The following covenants are intended to ensure ongoing compliance with State Stormwater
Management Permit Number SW8 160501 , as issued by the Division of Energy, Mineral
and Land Resources under the Stormwater Management Regulations.
2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to
maintain compliance with the stormwater management permit.
3. These covenants are to ran with the land and be binding on all persons and parties claiming
under them.
4. The covenants pertaining to stormwater may not be altered or rescinded without the express
written consent of the State of North Carolina, Division of Energy, Mineral and Land Resources.
5. Alteration of the drainage as shown on the approved plan may not take place without the
concurrence of the Division of Energy, Mineral and Land Resources.
6. The maximum built -upon area for the outparcel(s) shown on the approved plans is as follows:
Oulparcel # BUA Outparcel # BUA
1319-79 38,685 SF
These allotted amounts include any built -upon area constructed within the property boundaries,
and that portion of the right-of-way between the lot lines and the edge of the pavement. Built
upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate,
coquina and parking areas, but does not include raised, open wood decking, or the water
surface of swimming pools.
7. The runoff from all built -upon area within the outparcel or future development area must be
directed into the permitted stormwater control system.
8. Built -upon area in excess of the permitted amount will require a permit modification.
9. The connection from the outparcel(s collection system into the stormwater control shall be made
such that short-circuiting of the system does not occur.
10. For those outparcels or future development areas whose ownership is not retained by the
permittee, the new owner shall submit a separate offsite stormwater permit application to the
Division of Energy, Mineral and Land Resources and receive a permit prior to construction.
11. The project and each outparcel will maintain a 30** foot wide vegetated buffer between all
impervious areas and surface waters.
**50 foot for projects located in the 20 coastal counties. ECEIVE
9 JUL 16 2W
Form DRPC-2 Rev.2 05Nov2009 Page 1 of 2�
Si
High Density Developments with Outparcels
Deed Restrictions & Protective Covenances
a Notary Public in the
State of X AgVlsa_� I ' r� 7� , County of IPAVl�D� ,
do hereby certify that (,1�� < < I 1 Dt_h Q personally appeared
before me this the day of 4v 20) '7 , and acknowledge
the due execution of the foregoing instrument. Witness my hand and official seal,
Q!SCV* a � i ) I A Alk
Signature
My Commission expires 7 17 Z02o
SEAL
OFFICIAL SEAL.
SARA J. WHITLOCK
BENTON COUNTY
NOTARY PUBLIC - ARKANSAS
My Commission Expires 7117/2M
Commission No. 12377234
Form DRPC-2 Rev.2 05Nov2009 Page 2 of 2
Operation & Maintenance Agreoment
Project Name:
Project Location:
#7179-00 Walmart Supercenter Swansboro, NC
Swansboro, NC ONSLOW County 9J e 050
Cover Page
Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location.
Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
attest the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s).
The BMP(s) on this project include (check all that apply & corresponding O&M tables will I
Bioretention Cell Quantity:
Dry Detention Basin Quantity:
Grassed Swale Quantity:
Green Roof Quantity:
Infiltration Basin Quantity:
Infiltration Trench Quantity:
Level SpreaderNFS Quantity:
Permeable Pavement Quantity:
Proprietary System Quantity:
Rainwater Harvesting Quantity:
Sand Filter Quantity:
Stormwater Wetland Quantity:
Wet Detention Basin Quantity:
Disconnected Impervious Area Present:
User Defined BMP Present:
0
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
0
0
0
2
1
0
0
0
0
0
0
3
No
No
)e aaaea automaticai
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to
the system or responsible party.
Signatu
* Responsible Party:
Title & Organization:
Street address:
City, state, zip:
Phone number(s):
Email:
Will Tippins
Sr. Director - Realty Operations
2001 S.E. 10th Street, Mail Stop 0550
Bentonville, AR 72716
(479) 204-2496
FKa—ryn.dodson@walmart.com
_ Date: / �—/
a Notary Public for the State of A&AVISAI
County of '}pV� , do hearby certify that
U', 11 jvt
personally appeared before me this day of 011`"A _ (Q1 and
acknowledge the due execution of the Operations and Maintenance Agreement.
Witness my hand and official seal, 3a/11t3k
IV
OFFICIAL SFJ�1.
my Com:B
SARA J. WHITL OCK
NOTAR P BLIC- UNT
ARKANSAS ECE IV'E
cocn No1�2377234 20
JUL 16 zoo
My commission expires 2W)0 7/11/2019
Page 1 of 7
_ liiietZ r L `� i?1ia:iyit7r1BrlCB KBCEUIf8ri1Br1LS
Important maintenance procedures:
- The drainage area will be carefully managed to reduce The sediment load to The infiltration basin.
-'Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until
the plants become established (commonly six weeks).
No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the
vegetation.
- The vegetation in and around the basin will be maintained at a height of approximately six inches.
After the infiltration basin is established, it shall be inspected once a quarter and within 24 hours after every storm event greater
than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set
location and shall be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
BMP element: Potential problem: How to remediate the problem:
The entire BMP Trash/debris is present. Remove the trash/debris.
The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a
Infiltration basin erosive gullies have formed. ground cover and water until it is established. Provide lime and a one-
time fertilizer application,
Inlet device: pipe or
forebay
pipe is clogged (if
pipe is cracked or
rwise damaged (if
n is occurring in the
(if applicable).
Sediment has accumulated
and reduced the depth to 75%
of the original design depth.
nclog the pipe. Dispose of the sediment
pipe.
rade the swale if necessary to smooth it over and provide erosion
:rol devices such as reinforced turf matting or riprap to avoid future
))ems with erosion.
rch for the source of the sediment and remedy the problem if
Bible. Remove the sediment and dispose of it in a location where it
not cause impacts to streams or the BMP.
Erosion has occurred or riprap Provide additional erosion protection such as reinforced turf matting or
is displaced. riprap if needed to prevent future erosion problems,
are present. Remove the weeds, preferably by hand. If pesticides are used, wipe
them on the plants rather than spraying.
main treatment area A visible layer of sediment has Search for the source of the sediment and remedy the problem if
accumulated. possible. Remove the sediment and dispose of it in a location where it
will not cause impacts to streams or the BMP. Replace any media that
was removed in the process. Revegetate disturbed areas immediately.
Water is standing more than 5 lReplace the top few inches of filter media and see if this corrects the
days after a storm event. standing water problem. If so, revegetate immediately. If not, consult
Ian appropriate professional for a more extensive repair.
Veeds and noxious plants aregRemove the plants by hand or by wiping them with pesticide (do not
rowing in the main treatment Ispray).
embankment Shrubs or trees have started (Remove shrubs or trees
to grow on the embankment. i
e outlet device
annual inspection by an
iropriate professional
ws that the embankment
:ds repair.
gging has occurred.
outlet device is damaged
all needed repairs.
8V.-
JUL 2 6 2019
out the outlet device. Dispose of the sediment off -site.
or replace the outlet device.
ersion 1 A
O&M Manual
Page 3 c
The recelving water
Erosion or other signs of
Contact the local NC Department of Environment and Natural
damage have occurred at the
Resources Regional Office.
outlet.
ECEIVE
JUL 2 6 2019
it
i3Y:—.
)RM-EZ 7/11/201 c
ainn 1 d O&M Manual Pane 4 of 1
wat uatention Puna Maintenance Hec}uirements
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one
is provided.
important mamtenance proceaures:
Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the
basin should be watered twice weekly if needed, until the plants become established (commonly six weeks).
No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to
establish the plants on the vegetated shelf.
Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention
basin.
If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the
emergency drain should be minimized to the maximum extent practical.
- Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event
greater than 1.0 inches (or 1.6 inches if in a Coastal County). Records of operation and maintenance should be kept in a known'
set location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
BMP element:
Potential problem:
How I will remedlate the problem:
The entire BMP
Trash/debris is present,
Remove the trash/debris.
The perimeter of the BMP
Areas of bare soil and/or
Regrade the soil if necessary to remove the gully, and then plant a
erosive gullies have formed.
ground cover and water until it is established. Provide lime and a one-
time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of approximately six inches.
long.
The inlet device
The pipe is clogged.
Unclog the pipe. Dispose of the sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
is occurring in the
Regrade the swale if necessary to smooth it over and provide erosion
,Erosion
swale.
control devices such as reinforced turf matting or riprap to avoid future
problems with erosion.
Stone verge is clogged or
Remove sediment and replace with clean stone.
covered in sediment (if
applicable).
The forebay
Sediment has accumulated to
Search for the source of the sediment and remedy the problem if
a depth greater than the
possible. Remove the sediment and dispose of it in a location where it
original design depth for
will not cause impacts to streams or the BMP.
sediment storage.
Erosion has occurred.
Provide additional erosion protection such as reinforced turf matting or
nprap if needed to prevent future erosion problems,
Weeds are present.
Remove the weeds, preferably by hand. If pesticide is used, wipe it on
the plants rather than spraying.
The vegetated shelf
Best professional practices
Prune according to best professional practices
show that pruning is needed to
maintain optimal plant health.
Plants are dead, diseased or
Determine the source of the problem: soils, hydrology, disease, etc.
dying.
Remedy the problem and replace plants. Provide a one-time fertilizer
application to establish the ground cover if a soil test indicates it is
necessary.
Weeds are present.
Remove the weeds, preferably by hand. If pesticide is used,
wipe it on
the plants rather than spraying. V
rJUL 2019
rORM-EZ
irsion 1.4
m V20
O&M Manual ' "-- page 5 c
et' @nt ion POY! WaInAMMa tilt@ri3F31ii�, Gt�filiriUBC�
The main,treatment area
Sediment has accumulated to
a depth greater than the
Search for the source of the sediment and remedy the problem if
possible. Remove the sediment and dispose of it in a location where it
original design sediment
will not cause impacts to streams or the BMP.
storage depth.
Algal growth covers over 50%
Consult a professional to remove and control the algal growth,
of the area.
Cattails, phragmites or other
Remove the plants by wiping them with pesticide (do not spray).
invasive plants cover 50% of
the basin surface.
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or beaver
Use traps to remove muskrats and consult a professional to remove
activity is present,
beavers.
A tree has started to grow on
Consult a dam safety specialist to remove the tree.
the embankment.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. (if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Department of Environment and Natural
damage have occurred at the
Resources Regional Office.
outlet.
The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not
readily penetrate into accumulated sediments.
)RM-EZ 7/11/201 E
-1— 1 A nP U Manual
Panty R of 7
V41et Detenti n P 4 and Oesian Summary
POND ID FORESAY MAIN POND
Wet Pond 1 Permanent Pool EI, 29.08 Permanent Pool El. 29.08
Temporary Pool EI_ 31.01 Temporary Pool EC 31.01
Pretreatment other No Clean Out Depth: 9.08 Clean Out Depth: 11.08
than forebay? Sediment Removal El: 20 Sediment Removal El: 18
Has Vag. Filter? Yes Bottom Elavation: 19 Bottom Elevation: 17
WET POND ID FOREBAY MAIN POND
`Itfst Pond? Permanent Pool E!. 29.36 Permanent Pool El, 28.38
Q
Temporary Pool EI: 31.19 Temporary Pool El: 31.19
Pretreatment other Clean Out Depth: 9.36 Clean Out Depth: 4.36
than forebay? Sediment Rams vai El: 20 Sediment Removal El: 25
Has Vag. Filter? Bottom Elevation; -iLj Bottom Elevation: 24
WET POND ID FOREDAY MAIN POND
Wet Pond Permanent Pool El. 29.16 Permanent Pool El. 29.16
Temporary Pool El: 31.12 Temporary Pool El: 31.12
Pretreatment other No Clean Out Depth: 11.16 Clean Out Depth: 14.16
than forebay? Sediment Removal El: 18 Sediment Removal El. 15
Has Vag. Filter? Yes Bottom Elevation:. 17 Bottom Elevation; 14
ECEIVE
JUL 2 6 2019
$Y,—
"ORM-Ez
7111 /201
irsion 1.4 O&M Manual Page 7 of
State Stormwater Management Systems
Permit No. SW8 160501
Walmart Supercenter Swansboro #7179-000 Page 1 of 2
Stormwater Permit No. SW8 160501
Onslow County
Designer's Certification
I, c 44+C' / he- �P�c�as a duly registered t� P�� in the
State of North Carolina, having been authorized to observe (periodical) eekly/full time) the
construction of the project,
(Project)
for l)Ct IM cc ` L (Project Owner) hereby state that, to the best
of my abilities, due care and diligence was used in the observation of the project construction
such that the construction was observed to be built within substantial compliance and intent
of the approved plans and specifications.
The checklist of items on page 2 of this form is a part of this Certification.
Noted deviations from approved plans and specifications:
Signature
Registration Number 34
Date � � 2_ / 2-4- (�
�ECEIVED
MAR 0 3 2020
C Ai/�ipa•
h
�2Q
L
SE9JL3610 W
F � r21 c�
2
A. TH
1111111 il"00
Page 8 of 10
State Stormwater Management Systems
Permit No. SW8 160501
Certification Requirements: Page 2 of 2
The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the s;�stem contains no more than the permitted amount
/ of built -upon area.
V 3. All the built -upon area associated with the project is graded such that the runoff
drains to the system.
4. All roof drams are located such that the runoff is directed into the system.
The outlet/bypass structure elevations are per the approved plan.
c,,-�6. The outlet structure is located per the approved plans.
/ 7. Trash rack is provided on the outlet/bypass structure.
'/.8. All slopes are grassed with permanent vegetation.
_._ 9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-circuiting
of the system.
--,�1 i . The permitted amounts of surface area and/or volume have been provided.
X"I2. Required drawdown devices are correctly sized per the approved plans.
,,-'l 3. All required design depths are provided.
-- 4. All required components of the system are provided, such as a vegetated shelf,
a forebay, a vegetated filter and the secondary SCM.
✓15. The required dimensions of the system are provided, per the approved plan.
6. All components of the stormwater SCM are located in either recorded common
areas, or recorded easements.
cc: NCDEQ-DEMLR Regional Office
Town of Swansboro Building Inspections
Page 9 of 10