Loading...
HomeMy WebLinkAboutSW8160501_Approved Plans_20190802ONWASA PROJECT SUMMARY # OF LOTS SERVED 2 8" SANITARY SEWER MAIN 210 LF # OF SANITARY SEWER MANHOLES 1 UTILITY RESPONSIBILITY MATRIX FOR THIS PROJECT FUTILITY/ GOVERNING AGENCIES CONTRACTOR RESPONSIBILITY- OTHERS RESPONSIBILITY- CTS 1121 WEST CORBETT AVENUE ONSLOW COUNTY, TOWN OF SW..ANSBORO, WALMART UTILITY CONTACT - NORTH CAROLINA 28584 CONTA SANITARY ♦ ONSLOW WATER AND -PROVIDE AND INSTALL SANITARY SEWER LINES AND ASSOCIATED -ENERGY MANAGEMENT DEPARTMENT SEWER SEWER AUTHORITY APPURTENANCES PER THE PLANS AND SPECIFICATION. (479) 204-0452 228 GEORGETOWN ROAD -ALL PUBLIC AND PRIVATE SANITARY SEWER LINES SHALL BE JACKSONVILLE, NC 28540 SCHEDULE 35 PVC, C900, OR DIP, SERVICE LINES MUST BE - CONTACT: WYNNE RAY SCHEDULE 40 PVC OR DIP. (910) 537-7526 (P) -COORDINATE REQUIRED INSPECTION SERVICES WITH ENGINEER OF RECORD AND ONSLOW WATER AND SEWER AUTHORITY. SEE UTILITY PLAN FOR REQUIREMENTS: -PER ONWASA MSSD, ONLY A UTILITY CONTRACTOR LICENSED BY THE STATE OF NORTH CAROLINA MAY INSTALL PUBLIC WATER AND SEWER MAINS AND SERVICES. STORM ♦ NCDEQ -PROVIDE AND INSTALL ALL STORM SEWER LINES AND ASSOCIATED -P -ENERGY MANAGEMENT DEPARTMENT SEWER WILMINGTON REGIONAL OFFICE APPURTENANCES PER THE PLANS AND SPECIFICATION. (479) 204-0452 127 CARDINAL DRIVE EXT. -REFER TO GRADING PLAN FOR INFORMATION ON ALLOWABLE WILMINGTON, NC 28405 STORM SEWER MATERIALS. CONTACT: CHRISTINE HALL (910) 796-7215 THIS MATRIX HAS BEEN PROVIDED FOR INFORMATIONAL PURPOSES. THE CONTRACTOR SHALL PROVIDE ANY AND ALL APPURTENANCES, TRENCHING AND BACKFILL, AND OTHER INCIDENTALS TO MEET OR EXCEED THE SPECIFICATIONS OF THE ITEMS LISTED. CONTRACTOR SHALL VERIFY THE RESPONSIBILITIES LISTED ABOVE PRIOR TO BID AND START OF CONSTRUCTION. 0 �ORR'S RpP LOCATION MAP SCALE: N.T.S. J PLAN REFERENCE: OWNER/ DEVELOPER WAL-MART REAL ESTATE BUSINESS TRUST 2001 S.E. 10TH STREET BENTONVILLE, AR 72716-5570 OWNER CONTACT (479) 204-1195 GENERAL NOTE: 'HE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PR( SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELA PECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF REC( ING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONST TANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS FULL CONFORMANCE WITH LOCAL REr,LIIL ATIOncg AND CODES. m N S SHEET INDEX SHEET TITLE SHEET NUMBER COVER SHEET C-1.0 GENERAL NOTES AND LEGEND C-1.1 - C-1.2 ALTA SURVEY (BY OTHERS) C-2.0 SWPPP NOTES SW-1 SWPPP IMPLEMENTATION SEQUENCE AND LIMITS OF WORK SW-2 PHASE I EROSION AND SEDIMENTATION CONTROL PLAN SW-3 PHASE II EROSION AND SEDIMENTATION CONTROL PLAN SW-4 PHASE III EROSION AND SEDIMENTATION.CONTROL PLAN SW-5 E AND SC SCHEDULES INFORMATION AND SUMMARY TABLES SW-6 SWPPP DETAILS SW-7 - SW-9 OVERALL SITE PLAN C-2.1 EXISTING CONDITION AND DEMOLITION PLAN C-2.2 SITE PLAN C-3.0 - C-3.1 CONSTRUCTION DETAILS -. C-3.2 GRADING AND DRAINAGE PLAN C-4.0 PRE DEVELOPMENT DRAINAGE AREA DA-1 POST DEVELOPMENT DRAINAGE AREA DA-2 WET POND DETAILS DA-3 DRAINAGE DETAILS C-4.1 UTILITY PLAN C-5.0 UTILITY DETAILS C-5.1 LANDSCAPE PLAN C-6.0 LANDSCAPE NOTES AND DETAILS C-6.1 LIGHTING PLAN C-7.0 - C-7.1 TYPICAL ROAD SECTIONS RW-1 DRIVEWAY PROFILES RW-2 VEHICLE CIRCULATION PLAN RW-3 SIGNAL PLANS SIG - 1 - SCP - 1.1 ALERT TO CONTRACTOR: 1: THE SITEWORK FOR THE WALMART PROJECT SHALL MEET OR EXCEED THE STANDARD SITE WORK SPECIFICATIONS. 2. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL CONNECTION OF SERVICES. mj p 1 E ;offr<. cl REVISIONS BY ") NCDOT REVISIONS RJB 1 4/2/19 NCDOT REVISIONS RJB 2 5/21 /19 3 TRC REVISIONS RJB 6/7/19 TRC REVISIONS RJB 4 6/19/19 5 BID SUBMISSION RJB 6/21/19 6 SWPPP SUBMISSION RJB 6/26/19 APPROVED FOR CONSTRUCTION co THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'$ SURFACE ANYWHERE IN THE STATE. CALL - 811 BOHLER ENGINEERING 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering.com CAR r w AL r ;4 uj 04,3610 ; Qmama I� iiimiiiiiiii DRAWN BAB CHECKED MAT DATE 4/2119 SCALE AS NOTED JOB No. NCC138078 SHEET KV0131NCC1380780RAWINGSIPLAN SETSIPLAN SET (DRIVEWAY EXTENSI0N)1NCC138078SD0.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:47 AM LAST SAVED BY: RBRELAND 24. SANITARY SEWER PIPE MUST BE POLYVINYL CHLORIDE (PVC) SDR 35 EXCEPT WHERE INDICATED OTHERWISE. GENERAL NOTES: WHICH DEVIATES FROM THE PLANS, ALL FINES AND/OR PENALTIES ASSESSED WITH RESPECT THERETO AND ALL GENERAL GRADING & UTILITY ITY NOTES SANITARY LATERAL MUST BE PVC SCHEDULE 40 OR PVC SDR 26 UNLESS INDICATED, IN WRITING, OTHERWISE. COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM AND, FURTHER, SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS THE ENGINEER, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, IN ACCORDANCE WITH PARAGRAPH 19 25. STORM AND SANITARY SEWER PIPE LENGTHS INDICATED ARE NOMINAL AND MEASURED CENTER OF INLET AND/OR CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH THE NOTES AND SPECIFICATIONS CONTAINED HEREIN. CONTRACTOR HEREIN, FOR AND FROM ALL FEES, ATTORNEYS' FEES, DAMAGES, COSTS, JUDGMENTS, PENALTIES AND THE LIKE RELATED 1. LOCATIONS OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE AND MUST BE INDEPENDENTLY MANHOLES STRUCTURE TO CENTER OF STRUCTURE. IS RESPONSIBLE TO ENSURE THAT ALL SUBCONTRACTORS FULLY AND COMPLETELY CONFORM TO AND COMPLY WITH THESE TO SAME. CONFIRMED WiTH LOCAL UTILITY COMPANIES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OR EXCAVATION. REQUIREMENTS. SANITARY SEWER AND ALL OTHER UTILITY SERVICE CONNECTION POINTS MUST BE INDEPENDENTLY CONFIRMED BY 26. STORMWATER ROOF DRAIN LOCATIONS ARE BASED ON PRELIMINARY ARCHITECTURAL PLANS. CONTRACTOR IS 22. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE AND PROTECTION OF TRAFFIC PLAN FOR ALL WORK THAT AFFECTS THE CONTRACTOR IN THE FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ALL DISCREPANCIES MUST RESPONSIBLE TO AND FOR VERIFYING LOCATIONS OF SAME BASED ON FINAL ARCHITECTURAL PLANS. 1. THE FOLLOWING DOCUMENTS ARE INCORPORATED BY REFERENCE AS PART OF THIS SITE PLAN: PUBLIC TRAVEL EITHER IN THE R.O.W. OR ON SITE. THE COST FOR THIS ITEM MUST BE INCLUDED IN THE CONTRACTOR'S IMMEDIATELY BE REPORTED, IN WRITING, TO THE ENGINEER... CONSTRUCTION -MUST COMMENCE BEGINNING AT THE PRICE. LOWEST INVERT (POINT OF CONNECTION) AND PROGRESS UP GRADIENT. PROPOSED INTERFACE POINTS (CROSSINGS) 27. SEWERS CROSSING STREAMS AND/OR LOCATION WITHIN 10 FEET OF THE STREAM EMBANKMENT, OR WHERE SITE • "JOHN L. PIERCE &ASSOCIATES, P.A. BOUNDARYITOPOGRAPHIC SURVEY PREPARED FOR BOHLER ENGINEERING 23. ALL SIGNING AND PAVEMENT STRIPING MUST CONFORM TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES OR LOCALLY WITH EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED BY TEST PIT PRIOR TO COMMENCEMENT OF CONDITIONS SO INDICATE, MUST BE CONSTRUCTED OF STEEL, REINFORCED CONCRETE, DUCTILE IRON OR OTHER JOB #: 2017-1849 APPROVED SUPPLEMENT. CONSTRUCTION. SUITABLE MATERIAL. DATE: 10-24-17 2. CONTRACTOR MUST VERTICALLY AND HORIZONTALLY LOCATE ALL UTILITIES AND SERVICES INCLUDING, BUT NOT 28. SEWERS CONVEYING SANITARY FLOW, COMBINED SANITARY AND STORMWATER FLOW, OR INDUSTRIAL FLOW MUST BE 24. ENGINEER IS NOT RESPONSIBLE FOR ANY INJURY OR DAMAGES RESULTING FROM CONTRACTOR'S FAILURE TO BUILD OR LIMITED TO, GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. SEPARATED FROM WATER MAINS BY A DISTANCE OF AT LEAST 10 FEET HORIZONTALLY. IF SUCH LATERAL SEPARATION PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR MUST VERIFY THAT HE/SHE HAS THE LATEST EDITION OF THE CONSTRUCT IN STRICT ACCORDANCE WITH THE APPROVED PLANS. IF CONTRACTOR AND/ORSE OWNER FAIL BUILD OR WITHIN THE LIMITS OF DISTURBANCE OR WORK SPACE, WHICHEVER IS GREATER. THE CONTRACTOR MUST USE, REFER IS NOT POSSIBLE, THE PIPES MUST BE IN SEPARATE TRENCHES WITH THE SEWER AT LEAST 18 INCHES BELOW THE DOCUMENTS REFERENCED ABOVE. THIS IS CONTRACTOR'S RESPONSIBILITY. CONSTRUCT IN STRICT ACCORDANCE WITH APPROVED PLANS, THEY AGREE TO JOINTLY AND SEVERALLY INDEMNIFY AND TO, AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE BOTTOM OF THE WATER MAIN, OR SUCH OTHER SEPARATION AS APPROVED BY THE GOVERNMENT AGENCY WITH HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE TO ANY EXISTING JURISDICTION OVER SAME. 2. ALL ACCESSIBLE A/K/A ADA PARKING SPACES MUST BE CONSTRUCTED TO MEET AT A MINIMUM, THE MORE STRINGENT OF ( ) INCURS. UTILITIES DURING CONSTRUCTION, AT NO COST TO THE OWNER.. CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED THE REQUIREMENTS OF THE "AMERICANS WITH DISABILITIES ACT" (ADA) CODE (42 U.S.C. § 12101 et seq. AND 42 U.S.C. § 4151 25.OWNER MUST MAINTAIN AND PRESERVE ALL PHYSICAL SITE FEATURES AND DESIGN FEATURES DEPICTED ON THE PLANS WITH DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION. • WHERE APPROPRIATE SEPARATION FROM A WATER MAiN IS NOT POSSIBLE THE SEWER MUST BE ENCASED IN ' et se 4R THE REQUIREMENTS OF THE JURISDICTION WHERE THE PROJECT IS TO BE CONSTRUCTED, AND ANY AND ALL q) AMENDMENTS TO BOTH WHICH ARE IN EFFECT WHEN THESE PLANS ARE COMPLETED. .AND RELATED. DOCUMENTS, IN STRICT ACCORDANCE WITH THE APPROVED PLAN(S) AND DESIGN AND, FURTHER ENGINEER 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO .REVIEW ALL CONSTRUCTION .CONTRACT. DOCUMENTS INCLUDING, BUT CONCRETE, OR CONSTRUCTED OF DUCTILE IRON PIPE USING MECHANICAL OR SLIP-ON JOINTS FOR A'DISTANCE OF AT LEAST 10 FEET ON EITHER SIDE OF THE CROSSING. IN ADDITION; ONE FULL LENGTH OF SEWER PIPE SHOULD BE IS NOT RESPONSIBLE FOR ANY FAILURE TO SO MAINTAIN OR PRESERVE SITE AND/OR DESIGN FEATURES. IF OWNER FAILS NOT LIMITED TO, ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR LOCATED SO BOTH JOINTS WILL BE AS FAR FROM THE WATER LINE AS POSSIBLE. WHERE A WATER MAIN CROSSES 3. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL REQUIRED PERMITS AND TO MAINTAIN AND/OR PRESERVE ALL PHYSICAL SITE FEATURES AND/OR DESIGN FEATURES DEPICTED ON THE PLANS AND TO THE INITIATION AND .COMMENCEMENT OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A .CONFLICT AND/OR UNDER EWER- ADEQUATE PPORT FOR THE SEWER MUST BE PROVIDED.. UN E A S QU E SU APPROVALSHA E BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS V RELATED DOCUMENTS, OWNER AGREES TO INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES DISCREPANCY BETWEEN THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE OR APPLICABLE RECEIVED AND THOROUGHLY REVIEWED THE COMMENTS TO ALL PLANS AND. OTHER DOCUMENTS REVIEWED AND RE THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS AS A RESULT OF SAID FAILURE. CODES,REGULATIONS, LAWS, RULES, .STATUTES AND/OR ORDINANCES, IT IS THE CONTRACTOR'S. SOLE 29. WATER MAIN PIPING MUST BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS AND SPECIFICATIONS OF THE APPROVED BY THE PERMITTING AUTHORITIES AND CONFIRMED THAT ALL NECESSARY OR REQUIRED PERMITS HAVE BEEN 26. ALL DIMENSIONS MUST BE TO FACE OF CURB, EDGE OF PAVEMENT, OR EDGE OF BUILDING, UNLESS NOTED OTHERWISE. RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD, IN WRITING, OF SAID CONFLICT AND/OR DISCREPANCY PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR'S FAILURE TO NOTIFY THE PROJECT LOCAL WATER PURVEYOR. IN THE ABSENCE OF SUCH REQUIREMENTS, WATER MAIN PIPING MUST BE CEMENT -LINED DUCTILE IRON (DIP) MINIMUM CLASS 52 THICKNESS. ALL PIPE AND APPURTENANCES MUST COMPLY WITH THE OBTAINED. CONTRACTOR MUST HAVE COPIES OF ALL PERMITS AND APPROVALS ON SITE AT ALL TIMES. ENGINEER SHALL CONSTITUTE CONTRACTOR'S FULL AND COMPLETE ACCEPTANCE OF ALL RESPONSIBILITY TO APPLICABLE AWWA STANDARDS iN EFFECT AT THE TIME OF APPLICATION. THE OWNER/CONTRACTOR MUST BE FAMILIAR WITH AND RESPONSIBLE FOR THE PROCUREMENT OF ANY AND ALL 4 O 27. ALL CONSTRUCTION AND MATERIALS MUST COMPLY WITH AND CONFORM TO APPLICABLE FEDERAL, STATE AND LOCAL COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE WITH ALL FEDERAL, STATE . CERTIFICATIONS REQUIRED FOR THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY. REGULATIONS, LAWS, ORDINANCES, RULES AND CODES, AND ALL APPLICABLE OSHA REQUIREMENTS. AND LOCAL REGULATIONS, LAWS, STATUTES, ORDINANCES AND CODES AND, FURTHER, CONTRACTOR SHALL BE 30. CONTRACTOR MUST ENSURE THAT ALL UTILITY TRENCHES LOCATED IN EXISTING PAVED ROADWAYS INCLUDING. 28. CONTRACTOR AND OWNER MUST INSTALL ALL ELEMENTS AND COMPONENTS IN STRICT COMPLIANCE WITH AND RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH SAME. SEWER, WATER AND STORM SYSTEMS, MUST BE REPAIRED IN ACCORDANCE WITH REFERENCED MUNICIPAL, COUNTY A WORK MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS SPECIFICATIONS AND CONDITIONS OF APPROVAL 5. ALL O S � ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDED INSTALLATION CRITERIA AND SPECIFICATIONS. IF 4. THE CONTRACTOR MUST LOCATE AND CLEARLY AND UNAMBIGUOUSLY DEFINE VERTICALLY AND HORIZONTALLY ALL AND/OR; STATE DETAILS AS APPLICABLE. CONTRACTOR MUST COORDINATE INSPECTION AND APPROVAL OF COMPLETED WORK WITH THE AGENCY WITH JURISDICTION OVER SAME. AND ALL APPLICABLE REQUIREMENTS, RULES, REGULATIONS, STATUTORY REQUIREMENTS, CODES, LAWS AND STANDARDS CONTRACTOR OWNER FAIL TO DO SO, THEY ACRE E TO JOINTLY AND SEVERALLY INDEMNIFY AND HOLD ENGINEER ACTIVE AND INACTIVE UTILITY AND/OR SERVICE SYSTEMS THAT ARE TO BE REMOVED. THE CONTRACTOR IS OF ALL GOVERNMENTAL ENTITIES WITH JURISDICTION OVER THiS PROJECT. HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS AS A RESULT ALL IN RESPONSIBLE TO PROTECT AND MAINTAIN ALL ACTIVE AND INACTIVE SYSTEMS THAT ARE NOT BEING 31. WHERE BASEMENTS ARE TO BE PROVIDED FOR PROPOSED DWELLING UNITS, THE DEVELOPER SHALL, BY BORING OR 6. THE GEOTECHNICAL REPORT AND RECOMMENDATIONS SET FORTH HEREIN ARE A PART OF THE REQUIRED CONSTRUCTION OF SAID FAILURE. REMOVED/RELOCATED DURING SITE ACTIVITY. BY TEST PIT, DETERMINE THE DEPTH TO GROUNDWATER AT THE LOCATION OF THE PROPOSED DWELLINGS. WHERE T AND, IN CASE OF CONFLICT DISCREPANCY OR AMBIGUITY THE MORE STRINGENT REQUIREMENTS AND/OR DOCUMENTS A RECOMMENDATIONS CONTAINED IN THE PLANS AND THE GEOTECHNICAL REPORT AND RECOMMENDATIONS SHALL TAKE 29. CONTRACTOR IS RESPONSIBLE TO MAINTAIN ON -SITE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN -WITH- 5. THE CONTRACTOR MUST FAMILIARIZE ITSELF WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND GROUNDWATER IS ENCOUNTERED IN THE BASEMENT AREA, BASEMENTS WILL NOT BE INSTALLED UNLESS SPECIAL CONSTRUCTION METHODS VIEWED AND APPROVED BY THE MUNICIPAL CONSTRUCTION CODE CONS RUCT ON ME HO S ARE UTILIZED, TO BE RE PRECEDENCE UNLESS SPECIFICALLY NOTED OTHERWISE. ON THE PLANS. THE CONTRACTOR MUST NOTIFY THE ENGINEER, EPA REQUIREMENTS FOR. SITES -WHERE ONE 1 ACRE. OR MORE UNLESS THE LOCAL JURISDICTION COMPLIANCEQ O ( LIRE THAT ALL REQUIRES FEWER) IS DISTURBED BY CONSTRUCTION ACTIVITIES. CONTRACTOR IS RESPONSIBLE TO ENS T IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AS IDENTIFIED OR REQUIRED FOR THE OFFICIAL. IF AND WHERE SUMP PUMPS ARE INSTALLED ALL DISCHARGES MUST BE CONNECTED TO THE STORM ' IN WRITING, OF ANY SUCH CONFLICT, DISCREPANCY OR AMBIGUITY BETWEEN- THE GEOTECHNICAL REPORTS AND PLANS ACTIVITIES, INCLUDING THOSE OF SUBCONTRACTORS, ARE IN COMPLIANCE WiTH THE SWPPP, INCLUDING BUT NOT LIMITED PROJECT. THE CONTRACTOR MUST PROVIDE THE OWNER WITH WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES I D T SEWER. A CLEANOUT MUST BE PROVIDED PRIOR TO THE CONNECTION TO THE STORM DRAIN IN ER THAT AND SPECIFICATIONS PRIOR TO PROCEEDING WITH ANY FURTHER WORK. TO LOGGING ACTIVITIES (MINIMUM ONCE PER WEEK AND AFTER RAINFALL EVENTS) AND CORRECTIVE MEASURES, AS AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH THE JURISDICTION AND UTILITY COMPANY REQUIREMENTS AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND BLOCKAGES CAN BE ADDRESSED. 7. THESE PLANS ARE BASED ON INFORMATION PROVIDED TO BOHLER ENGINEERING BY THE OWNER AND OTHERS PRIOR TO APPROPRIATE. CODES. 32. FOR SINGLE AND TWO-FAMILY RESIDENTIAL PROJECTS, WHERE THE PROPOSED DWELLING AND ADJACENT SPOT PREPARATION. CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS AND NOTIFY BOHLER THE TIME OF PLAN D VERI E ENGINEERING IN WRITING, IMMEDIATELY IF ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLAN, OR IF 30. AS CONTAINED IN THESE DRAWINGS AND ASSOCIATED APPLICATION DOCUMENTS PREPARED BY THE SIGNATORY 6. THE CONTRACTOR MUST INSTALL ALL STORM SEWER AND SANITARY SEWER COMPONENTS WHICH FUNCTION BY ELEVATION(S) ARE SCHEMATIC FOR GENERIC BUILDING FOOTPRINT, GRADES MUST BE ADJUSTED BASED ON FINAL ARCHITECTURAL 'PLANS TO PROVIDE A MINIMUM OF SiX (6) INCHES BELOW TOP OF BLOCK AND /OR SIX (6) INCHES THE PROPOSED WORK CONFLICTS WITH ANY OTHER SITE FEATURES. PROFESSIONAL ENGINEER, THE USE OF THE WORDS CERTIFY OR CERTIFICATION CONSTITUTES AN EXPRESSION AL "PROFESSIONAL OPINION" REGARDING THE INFORMATION WHICH IS THE SUBJECT OF THE UNDERSIGNED PROFESSIONAL GRAVITY PRIOR TO THE INSTALLATION OF ALL OTHER UTILITIES. o BELOW SIDING, WHICHEVER IS LOWEST, AND MUST PROVIDE POSITIVE DRAINAGE (2 /o MIN.) AWAY FROM DWELLING. 8. ALL DIMENSIONS SHOWN ON THE PLANS MUST BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO THE START OF KNOWLEDGE OR BELIEF AND IN ACCORDANCE WITH COMMON ACCEPTED PROCEDURE CONSISTENT WITH THE APPLICABLE 7. CONTRACTOR iS RESPONSIBLE FOR COORDINATION OF SITE PLAN DOCUMENTS AND ARCHITECTURAL DESIGN FOR ALL CONSTRUCTION, INCLUDING GRADING, MUST COMPLY WITH THE LATEST LOCAL AND STATE BUILDING CODE AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES, CONSTRUCTION. CONTRACTOR MUST NOTIFY ENGINEER, IN WRITING, IF ANY CONFLICTS, DISCREPANCIES, OR AMBIGUITIES STANDARDS OF PRACTICE, AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE, EITHER EXPRESSED OR IMPLIED. EXACT BUILDING UTILITY CONNECTION LOCATIONS, GREASE TRAP REQUIREMENTS/DETAILS, DOOR ACCESS, AND EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION. NO EXTRA COMPENSATION WILL BE PAID TO THE CONTRACTOR FOR EXTERIOR GRADING. THE ARCHITECT WILL DETERMINE THE UTILITY SERVICE SIZES. THE CONTRACTOR MUST 33. LOCATION OF PROPOSED UTILITY POLE RELOCATION IS AT THE SOLE DISCRETION OF UTILITY COMPANY. WORK WHICH HAS TO BE REDONE OR REPAIRED DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS COORDINATE INSTALLATION OF UTILITIES/SERVICES WITH THE INDIVIDUAL COMPANIES, TO AVOID CONFLICTS AND TO PRIOR TO CONTRACTOR GIVING ENGINEER WRITTEN NOTIFICATION OF SAME AND ENGINEER, THEREAFTER, PROVIDING ENSURE THAT PROPER DEPTHS ARE ACHIEVED. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT 34. CONSULTANT IS NEITHER LIABLE NOR RESPONSIBLE FOR ANY SUBSURFACE CONDITIONS AND FURTHER, SHALL HAVE CONTRACTOR WITH WRITTEN AUTHORIZATION TO PROCEED WITH SUCH ADDITIONAL WORK. INSTALLATION OF ALL IMPROVEMENTS COMPLIES WITH ALL UTILITY REQUIREMENTS WITH JURISDICTION AND/OR NO LIABILITY FOR ANY HAZARDOUS MATERIALS, HAZARDOUS SUBSTANCES, OR POLLUTANTS ON, ABOUT OR UNDER CONTROL OF THE SiTE, AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND THE PROPERTY. 9. CONTRACTOR MUST REFER TO THE ARCHITECTURAL/BUILDING PLANS "OF RECORD" FOR EXACT LOCATIONS AND CODES AND, FURTHER, IS RESPONSIBLE FOR COORDINATING THE UTILITY TIE-INS/CONNECTIONS PRIOR TO DIMENSIONS OF ENTRY/EXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY CONNECTING TO THE EXISTING UTILITY/SERVICE, WHERE A CONFLICT(S) EXISTS BETWEEN THESE SITE PLANS AND THE LOCATIONS. NOTIFOYT ENGINEER,WHERE CONNECTION TS DIFFER, THE CONTRACTOR �������� �����° ADA INSTRUCTIONS TO CONTRACTOR MUST IMMEDIARCHITECTUATELY HE IN WRITING, AND PRIOR TORESOLVE SAME 10. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR MUST COORDINATE THE BUILDING LAYOUT BY CAREFUL PLAN AND THE LATEST ARCH (INCLUDING, BUT NOT LIMITED TO REVIEW OF THE ENTIRE SITE ARCHITECTURAL PLANS (NCLU G, 8. WATER SERVICE MATERIALS, BURIAL DEPTH, AND COVER REQUIREMENTS MUST BE SPECIFIED BY THE LOCAL UTILITY 1. THE LIGHTING PLAN DEPICTS PROPOSED SUSTAINED ILLUMINATION LEVELS CALCULATED USING DATA PROVIDED STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION PLAN, WHERE APPLICABLE). CONTRACTOR CONTRACTORS SHALL EXERCISE APPROPRIATE CARE AND PRECISION IN CONSTRUCTION OF ADA (HANDICAP) COMPANY. CONTRACTOR'S PRICE FOR WATER SERVICE MUST INCLUDE ALL FEES, COSTS AND APPURTENANCES BY THE NOTED MANUFACTURER(S). ACTUAL SUSTAINED SITE ILLUMINATION LEVELS AND PERFORMANCE OF MUST IMMEDIATELY NOTIFY OWNER, ARCHITECT AND SITE ENGINEER, IN WRITING; OF ANY CONFLICTS, DISCREPANCIES OR ACCESSIBLE COMPONENTS AND ACCESS ROUTES FOR THE SITE. THESE COMPONENTS, AS CONSTRUCTED, MUST REQUIRED BY THE UTILITY TO PROVIDE FULL AND COMPLETE WORKING SERVICE. CONTRACTOR MUST CONTACT THE LUMINAIRES MAY VARY DUE TO VARIATIONS IN WEATHER, ELECTRICAL VOLTAGE, TOLERANCE IN LAMPS, THE AMBIGUITIES WHICH EXIST COMPLY WITH THE CURRENT ADA STANDARDS AND REGULATIONS' BARRIER FREE ACCESS AND ANY MODIFICATIONS, APPLICABLE MUNICIPALITY TO CONFIRM THE PROPER WATER METER AND VAULT, PRIOR TO COMMENCING SERVICE LIFE OF EQUIPMENT AND LUMINAIRES AND OTHER RELATED VARIABLE FIELD CONDITIONS. REVISIONS OR UPDATES TO SAME. FINISHED SURFACES ALONG THE ACCESSIBLE ROUTE OF TRAVEL FROM PARKING CONSTRUCTION. U T NOT BE BURIED ON THE SUBJECT SITE AND ALL UNSUITABLE EXCAVATED MATERIAL AND DEBRIS SOLID 11. DEBRIS MUST PINT F SPACE, PUBLIC TRANSPORTATION, PEDESTRIAN ACCESS, INTER -BUILDING ACCESS, TO POINTS O ACCESSIBLE 2. THE LIGHT LOSS FACTORS USED IN THESE LIGHTING CALCULATIONS ARE 0.90 FOR ALL LED LUMINAIRES, 0.80 FOR WASTE) MUST BE DISPOSED OF IN ACCORDANCE WITH THE REQUIREMENTS OF ANY AND ALL GOVERNMENTAL AUTHORITIES BUILDING ENTRANCEiEXIT, MUST COMPLY WITH THESE ADA CODE REQUIREMENTS. THESE INCLUDE, BUT ARE NOT 9. ALL NEW UTILITIES/SERVICES, INCLUDING ELECTRIC, TELEPHONE, CABLE TV, ETC.. ARE TO BE INSTALLED ALL HiGH PRESSURE SODIUM LUMINAIRES OR 0.72 FOR ALL METAL HALIDE LUMINAIRES UNLESS OTHERWISE WHICH HAVE JURISDICTION OVER THIS PROJECT OR OVER CONTRACTOR. LIMITED TO THE FOLLOWING: UNDERGROUND. ALL NEW UTILITIES/SERVICES MUST BE INSTALLED IN ACCORDANCE WiTH THE UTILITY/SERVICE SPECIFIED. THESE FACTORS ARE INDICATIVE OF TYPICAL LIGHTING INDUSTRY MODELING STANDARDS. PROVIDER INSTALLATION SPECIFICATIONS AND STANDARDS. TOR IS RESPONSIBLE FOR IDENTIFYING WHEN SHORING IS REQUIRED AND FOR INSTALLING ALL SHORING 12. THE CONTRACTOR • PARKING SPACES AND PARKING AISLES - SLOPE SHALL NOT EXCEED 1:50 (2.0%) IN ANY DIRECTION. - 3. THE LIGHTING VALUES AND CALCULATION POINTS DEPICTED ON THE PLAN ARE ALL ANALYZED ON A HORIZONTAL REQUIRED DURING EXCAVATION (TO BE PERFORMED IN ACCORDANCE WITH CURRENT .OSHA STANDARDS) AND ANY 10. SITE GRADING MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE` GEOMETRIC PLANE AT ELEVATION ZERO (GROUND LEVEL) UNLESS OTHERWISE NOTED. THE VALUES. DEPICTED. ADDITIONAL PRECAUTIONS TO BE TAKEN TO ASSURE THE STABILITY OF ADJACENT, NEARBY AND CONTIGUOUS 0 • CURB RAMPS - SLOPE SHALL NOT EXCEED 1:12 (8.3 /o) FOR A MAXIMUM OF SIX (6) FEET. RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT REFERENCED IN THIS PLAN SET. THE CONTRACTOR IS ON THE PLAN ARE IN FOOTCANDLES. STRUCTURES AND PROPERTIES. RESPONSIBLE FOR REMOVING AND REPLACING UNSUITABLE MATERIALS WITH SUITABLE MATERIALS AS SPECIFIED IN • LANDINGS - SHALL BE PROVIDED AT EACH END OF RAMPS, MUST PROVIDE POSITIVE DRAINAGE, AND MUST NOT THE GEOTECHNICAL REPORT. ALL EXCAVATED OR FILLED AREAS MUST BE COMPACTED AS OUTLINED IN THE 4. THE LUMINAIRES, LAMPS AND LENSES MUST BE REGULARLY INSPECTED/MAINTAINED TO ENSURE THAT THEY 13. THE CONTRACTOR IS TO EXERCISE EXTREME CARE WHEN PERFORMING ANY WORK ACTIVITIES PAVEMENT, EXCEED 1:50 (2.0%) IN ANY DIRECTION. GEOTECHNICAL REPORT. MOISTURE CONTENT AT TIME OF PLACEMENT MUST BE SUBMITTED IN A COMPACTION FUNCTION PROPERLY. THIS WORK SHOULD INCLUDE, BUT NOT BE LIMITED TO, FREQUENT VISUAL INSPECTIONS, RADJACENTASPTO STRUCTURES, ETC. WHICH ARE TO REMAIN EITHER FOR AN INITIAL lAL PHASE OF THE PROJECT OR AS PART OF THE FINAL REPORT PREPARED BY A QUALIFIED GEOTECHNICAL ENGINEER, REGISTERED WITH THE STATE WHERE THE WORK IS CLEANING OF LENSES, AND RELAMPING (IF NECESSARY) AT LEAST ONCE EVERY SIX (6) MONTHS. FAILURE TO L CONDITION. CONTRACTOR IS RESPONSIBLE FOR TAKING AL APPROPRIATE MEASURES REQUIRED TO ENSURE THE • PATH OF TRAVEL ALONG ACCESSIBLE ROUTE - MUST PROVIDE A 36-INCH OR GREATER UNOBSTRUCTED WIDTH OF PERFORMED, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS FOLLOW THE ABOVE STEPS COULD CAUSE THE LUMINARIES, LAMPS AND LENSES TO FAIL OR PROPERLY STRUCTURAL STABILITY OF SIDEWALKS AND PAVEMENT, UTILITIES, BUILDINGS, AND INFRASTRUCTURE WHICH ARE TO TRAVEL (CAR OVERHANGS AND/OR HANDRAILS CANNOT REDUCE THIS MINIMUM WIDTH). THE SLOPE MUST BE NO TO BE PAVED HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS AND THE FUNCTION, I P THE REMAIN, AND TO PROVIDE A SAFE WORK AREA FOR THIRD PARTIES, PEDESTRIANS AND ANYONE INVOLVED WITH H GREATER THAN 1:20 (5.0%) IN THE DIRECTION' OF TRAVEL, AND MUST NOT EXCEED 1:50 (2.0%) IN CROSS` SLOPE. RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES, PROJECT WHERE PATH OF TRAVEL WILL BE GREATER THAN 1:20 (5.0%), ADA RAMP REQUIREMENTS MUST BE ADHERED TO. STATUTES, LAWS, ORDINANCES AND CODES. SUBBASE MATERIAL FOR SIDEWALKS, CURB, OR ASPHALT MUST BE FREE 5. WHERE APPLICABLE, THE <EXISTING CONDITION LIGHT LEVELS ILLUSTRATED ARE REPRESENTATIVE OF AN A MAXIMUM SLOPE OF 1:12 (8.3%), FOR A MAXIMUM RISE OF 2.5 FEET, SHALL BE PROVIDED. THE RAMP MUST HAVE OF ORGANICS AND OTHER UNSUITABLE MATERIALS. SHOULD SUBBASE BE DEEMED UNSUITABLE BY APPROXIMATION UTILIZING LABORATORY DATA FOR SIMILAR FIXTURES, UNLESS ACTUAL FIELD MEASUREMENTS 14. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE DONE TO ANY NEW OR EXISTING CONSTRUCTION OR ADA HAND RAILS AND "LEVEL" LANDINGS ON EACH END THAT ARE CROSS SLOPED NO MORE THAN 1:50 (2.0%) IN OWNER/DEVELOPER, OR OWNER/DEVELOPER'S REPRESENTATIVE, SUBBASE IS TO BE REMOVED AND FILLED WITH ARE TAKEN WITH A LIGHT METER AND ARE, CONSEQUENTLY, APPROXIMATIONS ONLY. DUE TO FACTORS SUCH PROPERTY DURING THE COURSE OF CONSTRUCTION, INCLUDING BUT NOT LIMITED TO DRAINAGE, UTILITIES, PAVEMENT, o ANY DIRECTION 2.0 to FOR POSITIVE DRAINAGE. APPROVED FILL MATERIAL COMPACTED AS DIRECTED BY THE GEOTECHNICAL REPORT. EARTHWORK. ACTIVITIES MAINTENANCE AS FIXTURE EQUIPMENT TOLERANCES, WEATHER CONDITIONS, ETC, ACTUAL LIGHT LEVELS MAY STRIPING, CURB, ETC. AND SHALL ALL COSTS ASSOCIATED WITH SAME TO INCLUDE, BUT NOT BE LIMITED TO, NOT LIMITED TO EXCAVATION 1 MUST L WITH TH INCLUDING, BUT N , BACKFILL, AND COMPACTING US COMPLY E DIFFER.EXISTING LIGHT LEVELS DEPICTED ON THIS PLAN SHOULD BE CONSIDERED APPROXIMATE. .BEAR RE -PERMITTING AND CONSTRUCTION. TFiE CONTRACTOR IS RESPONSIBLE FOR AND MUST REPLACE REDESIGN, RE-SURVEY,G SLOPED AWAY •DOORWAYS -MUST HAVE A LEVEL. LANDING AREA ON THE EXTERIOR SiDE OF THE DOOR THAT IS O RECOMMENDATIONS IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ALL SIGNAL INTERCONNECTION CABLE, WIRING CONDUITS, AND ANY UNDERGROUND ACCESSORY EQUIPMENT DAMAGED 0 T BE LESS ! AREA MUST O FROM THE DOOR NO MORE THAN 1:50 (2.0 /o) FOR POSITIVE DRAT NAGS. THIS LANDING A CODES. ACTIVITIES STANDARD STATE DOT SPECIFICATIONS ORDINANCES AND CO S S MUST COMPLY WITH THE S N S O O 'P N I T LIGHTING LA S INTENDED T CAT! 6. HE G O SHOW THE LOCATIONS AND TYPE OF LUMINAIRES, ONLY. POWER SYSTEM, T BEAR ALL COSTS ASSOCIATED H SAME. THE REPAIR OF ANY SUCH NEW OR DURING CONSTRUCTION AND MUST ATED WITH S T RNATIVE THAN 60 INCHES (5 FEET) LONG, EXCEPT WHERE OTHERWISE PERMITTED BY ADA STANDARDS FOR ALE FOR ROADWAY CONSTRUCTION (LATEST EDITION) AND ANY AMENDMENTS OR REVISIONS THERETO. W CONDUITS, WIRING, VOLTAGES AND OTHER ELECTRICAL COMPONENTS ARE THE RESPONSIBILITY OF THE EXISTING CONSTRUCTION OR PROPERTY MUST RESTORE SUCH CONSTRUCTION OR PROPERTY TO A CONDITION DOORWAY OPENING CONDITIONS. SEE iCC/ANSI A117.1-2009 AND OTHER REFERENCED INCORPORATED BY COD.) ( ARCHITECT,. MEP AND/OR LIGHTING CONTRACTOR, AS INDICATED IN THE CONSTRUCTION CONTRACT EQUIVALENT TO OR BETTER THAN THE CONDITIONS PRIOR TO COMMENCEMENT OF THE CONSTRUCTION, AND IN 11. ALL FiLL, COMPACTION, AND BACKFILL MATERIALS REQUIRED FOR UTILITY INSTALLATION MUST BE AS PER THE DOCUMENTS. THESE ITEMS MUST BE INSTALLED AS REQUIRED BY STATE AND LOCAL REGULATIONS. CONFORMANCE WITH APPLICABLE CODES, LAWS RULES, REGULATIONS, STATUTORY REQUIREMENTS AND STATUTES. OF REVISION OR EXTENSIONTECHNIC M DIFICATION SR RUCTION OECO WHEN THE PROPOSED CONSTRUCTION INVOLVES RECONSTRUCTION, I THE APPLICABLE COORDINATED WITH T AND MUST BE COOCONTRACTOR RECOMMENDATIONS PROVIDED IN THE GEOTECHNICAL REPORT OINSTALLING I RESPONSIB S LE FOR IN LIGHTING FIXTURES G G AND APPURTENANCES IN ACCORDANCE P BLE TO DOCUMENT ALL CONTRACTOR MUST BEAR ALL COSTS ASSOCIATED WITH SAME. CONTRACTOR IS RES ONSI CT OR TO ADA COMPONENTS FROM EXISTING DOORWAYS OR SURFACES, CONTRACTOR MUST VERIFY EXISTING E UTILITY COMPANY SPECIFICATIONS. WHEN THE PROJECT DOES NOT HAVE GEOTECHNICAL RECOMMENDATIONS, FILL WITH ALL APPLICABLE BUILDING AND ELECTRICAL CODES AND ALL OTHER APPLICABLE RULES, REGULATIONS, EXISTING DAMAGE AND TO NOTIFY THE OWNER AND THE CONSTRUCTION MANAGER PRIOR TO THE START OF ELEVATIONS SHOWN THE PLAN. NOTE THAT TABLE 405.2 OF THE DEPARTMENT JUSTICE'S ADA STANDARDS AND COMPACTION MUST, AT A MINIMUM, COMPLY WITH THE STATE DOT REQUIREMENTS AND SPECIFICATIONS AND LAWS AND STATUTES. FOR ACCESSIBLE DESIGN ALLOWS FOR STEEPER RAMP SLOPES, IN RARE CIRCUMSTANCES. THE CONTRACTOR CONSULTANT SHALL HAVE NO LIABILITY OR RESPONSIBILITY FOR OR AS RELATED TO FILL, COMPACTION AND BACKFILL. CONSTRUCTION. MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER OF ANY DISCREPANCIES AND/OR FIELD CONDITIONS THAT FURTHER, CONTRACTOR IS FULLY RESPONSIBLE FOR EARTHWORK BALANCE. 7. CONTRACTOR MUST BRING TO DESIGNER'S ATTENTION, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, 15. ALL CONCRETE MUST BE AIR ENTRAINED AND HAVE THE MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI AT 28 DAYS DIFFER IN ANY WAY OR ANY RESPECT FROM WHAT IS SHOWN ON THE PLANS, IN WRITING, BEFORE ANY LIGHT LOCATIONS THAT CONFLICT WITH DRAINAGE, UTILITIES, OR OTHER STRUCTURES. UNLESS OTHERWISE NOTED O N THE PLANS DETAILS AND/OR GEOTECHNICAL REPORT. COMMENCEMENT OF WORK. CONSTRUCTED IMPROVEMENTS MUST FALL WITHIN THE MAXIMUM AND MINIMUM 12. THE CONTRACTOR MUST COMPLY, TO THE FULLEST EXTENT, WITH THE LATEST OSHA STANDARDS AND REGULATIONS, LIMITATIONS IMPOSED BY THE BARRIER FREE REGULATIONS AND THE ADA REQUIREMENTS. AND/OR ANY OTHER AGENCY WITH JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR 8. IT IS LIGHTING CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE PROJECT ARCHITECT OR OWNER 16. THE ENGINEER IS NOT RESPONSIBLE FOR CONSTRUCTION METHODS MEANS TECHNIQUES OR PROCEDURES, GENERALLY IS RESPONSIBLE FOR DETERMINING THE "MEANS AND METHODS" REQUIRED TO MEET THE INTENT AND PERFORMANCE REGARDING THE POWER SOURCE(S) FROM WITHIN THE BUILDING, AND TIMING DEVICES NECESSARY TO MEET OR FOR THE CONSTRUCTTIONION MEANs, METHODS, TECHNIQUES OR PROCEDURES FOR COMPLETION OF THE WORK DEPICTED . THE CONTRACTOR MUST VERIFY THE SLOPES OF CONTRACTOR'S FORMS PRIOR TO POURING CONCRETE. IF ANY CRITERIA OF OSHA, AS WELL AS ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION AND/OR TRENCHING THE DESIGN INTENT. BOTH ON THESE PLANS, AND FOR ANY CONFLICTS/SCOPE REVISIONS WHICH RESULT FROM SAME. CONTRACTOR IS WEER PRIOR Y NOTIFY THE ENGINEER MUST IMMEDIATELY IS OBSERVED OR EXISTS CONTRACTOR US NON-CONFORMANCE, T TO T HALL HAVE NO A RELATED FOROR AS RELATED D AND CONSULTANT S RESPONSIBILITY FOR OR S PROCEDURES S RESPONSIBLE F R DETERMINING THE METHODS/MEANS FOR COMPLETION OF THE WORK PRIOR TO THE COMMENCEMENT TO POURING CONCRETE. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS TO REMOVE, REPAIR AND REPLACE EXCAVATION AND TRENCHING PROCEDURES. 9. THE LIGHTING CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CONTRACTOR REQUIREMENTS INDICATED IN OF CONSTRUCTION. NON -CONFORMING CONCRETE. THE SITE PLAN, INCLUDING BUT NOT LIMITED TO, GENERAL NOTES, GRADING AND UTILITY NOTES, SITE SAFETY, 13. PAVEMENT MUST BE SAW CUT IN STRAIGHT LINES, AND EXCEPT FOR EDGE OF BUTT JOINTS, MUST EXTEND TO THE AND ALL GOVERNMENTAL RULES, LAWS, ORDINANCES, REGULATIONS AND THE LIKE. 17. THE ENGINEER OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY. THE ENGINEER OF RECORD HAS NOT BEEN WITH THE LOCAL INTENDEDCONSTRUCTIONFULL IT IS STRONGLY RECOMMENDED THAT THE CONTRACTOR -REVIEW THE T BE REMOVED FROM THE DEBRIS MUST O F THE EXISTING PAVEMENT ALL IS FROM REMOVAL OPERATIONS DEPTH O H S RETAINED TO PERFORM OR BE .RESPONSIBLE .FOR JOB SITE SAFETY, SAME BEING WHOLLY OUTSIDE OF ENGINEERS BUILDING CODE PRIOR TO COMMENCEMENT OF CONSTRUCTION. T SITE ATTHETIME OF EXCAVATION. STOCKPILING OF DEBRIS WILL NOT BE PERMITTED 1 . THE CONTRACTOR MUST VERIFY THAT INSTALLATION 0 OF LIGHTING FIXTURES. COMPLIES WITH THE SERVICES AS RELATED TO THE PROJECT. THE ENGINEER OF RECORD IS NOT RESPONSIBLE TO IDENTIFY OR REPORT ANY REQUIREMENTS FOR SEPARATION FROM OVERHEAD ELECTRICAL WIRES AS INDICATED IN THE HIGH VOLTAGE JOB SITE SAFETY ISSUES, AT ANY TIME. 14. THE TOPS OF EXISTING MANHOLES, INLET STRUCTURES, AND SANITARY CLEANOUT TOPS MUST BE ADJUSTED, AS PROXIMITY REGULATIONS N.J.A.C. 12-186. NECESSARY, TO MATCH PROPOSED GRADES iN ACCORDANCE WITH ALL APPLICABLE STANDARDS, REQUIREMENTS, 18. ALL CONTRACTORS MUST CARRY THE SPECIFIED STATUTORY WORKER'S COMPENSATION INSURANCE, EMPLOYER'S RULES, STATUTES, LAWS, ORDINANCES AND CODES. 11. WHEN A BANK ATM IS INCLUDED IN THE PLAN, THE LIGHTING DESIGN REPRESENTS BOHLER'S UNDERSTANDING LIABILITY INSURANCE AND LIMITS OF COMMERCIAL GENERAL LIABILITY INSURANCE (CGL). ALL CONTRACTORS MUST HAVE AND INTERPRETATION OF THE REGULATORY LIGHTING LEVELS INTENDED BY PUBLISHED STANDARDS. THEIR CGL POLICIES ENDORSED TO NAME BOHLER ENGINEERING, AND ITS PAST, PRESENT AND FUTURE OWNERS, 15. DURING THE INSTALLATION OF SANITARY SEWER, STORM SEWER, AND ALL UTILITIES, THE CONTRACTOR MUST SERVANTS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVA MAINTAIN A CONTEMPORANEOUS AND THOROUGH RECORD OF CONSTRUCTION TO IDENTIFY THE AS -INSTALLED 12. UPON OWNER'S ACCEPTANCE OF THE COMPLETED PROJECT, THE OWNER SHALL BE RESPONSIBLE FOR ALL EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTAVA AS LOCATIONS OF ALL UNDERGROUND INFRASTRUCTURE. THE CONTRACTOR MUST CAREFULLY NOTE ANY MAINTENANCE, SERVICING, REPAIR AND INSPECTION OF THE LIGHTING SYSTEM AND ALL OF ITS COMPONENTS ADDITIONAL NAMED INSURED AND TO PROVIDE CONTRACTUAL LIABILITY COVERAGE SUFFICIENT TO ENSURE THIS HOLD INSTALLATIONS THAT DEVIATE FROM THE INFORMATION CONTAINED IN THE UTILITY PLAN. THIS RECORD MUST BE KEPT AND RELATED SYSTEMS, TO ENSURE ADEQUATE LIGHTING LEVELS ARE PRESENT AND FUNCTIONING AT ALL HARMLESS AND INDEMNITY OBLIGATIONS ASSUMED BY THE CONTRACTORS. ALL CONTRACTORS MUST FURNISH BOHLER GENERAL DEMOLITION NOTES.- A CLEAN COPYTHE SITE PLAN, WHICH CONTRACTOR MUST PROMPTLY PROVIDE TO THE OWNER AT THE TIMES. ENGINEERING WITH CERTIFICATIONS OF INSURANCE AS EVIDENCE OF THE REQUIRED INSURANCE PRIOR TO COMMENCING CON OMPLETION O WORK. WORK AND UPON RENEWAL OF EACH POLICY DURING THE ENTIRE PERIOD OF CONSTRUCTION AND FOR ONE YEAR AFTER THE COMPLETION OF CONSTRUCTION. IN ADDITION, ALL CONTRACTORS WILL, TO THE FULLEST EXTENT PERMITTED UNDER 1. THIS PLAN REFERENCES DOCUMENTS AND INFORMATION BY: 16. WHEN THE SITE IMPROVEMENT PLANS INVOLVE MULTIPLE BUILDINGS, SOME OF WHICH MAY BE BUILT AT A LATER DATE, THE LAW, INDEMNIFY, DEFEND AND HOLD HARMLESS BOHLER ENGINEERING AND ITS PAST, PRESENT AND FUTURE THE CONTRACTOR MUST EXTEND ALL LINES, INCLUDING BUT NOT LiMITED TO .STORM SEWER, SANITARY SEWER, OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, • "JOHN L. PIERCE & ASSOCIATES, P.A. UTILITIES, AND IRRIGATION LINE, TO A POINT AT LEAST FIVE (5) FEET BEYOND THE PAVED AREAS FOR WHICH THE SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND „ I RINCONTRACTOR BOUNDARY/TOPOGRAPHIC SURVEY PREPARED FOR BOHLER ENG NEE G WITH A X AND ION W 2 4 MUST AS APPROPRIATE, MARK LOCATIONS T R I RE PONSIBLE. CAP ENDS, CONTRACTOR S S SUBCONSULTANTS FROM AND AGAINST ANY DAMAGES, INJURIES, CLAIMS, ACTIONS, PENALTIES, EXPENSES, PUNITIVE JOB #: 2017-1849 MUST NOTE THE LOCATION OF ALL OF THE ABOVE ON A CLEAN COPY OF THE SITE PLAN, WHICH CONTRACTOR MUST DAMAGES, TORT DAMAGES, STATUTORY CLAIMS, STATUTORY CAUSES OF ACTION, LOSSES, CAUSES OF ACTION, LIABILITIES DATE: 10-24-17 PROMPTLY PROVIDE TO THE OWNER UPON COMPLETION OF THE WORK. OR COSTS, INCLUDING, BUT NOT LIMITED TO, REASONABLE ATTORNEYS FEES AND DEFENSE COSTS, ARISING OUT OF OR IN 2. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY 17. THE CONTRACTOR IS FULLY RESPONSIBLE FOR VERIFICATION OF EXISTING TOPOGRAPHIC INFORMATION AND UTILITY ANY WAY CONNECTED WITH OR TO THE PROJECT, INCLUDING ALL CLAIMS BY EMPLOYEES OF THE CONTRACTORS, ALL HEALTH ACT OF 1 7 29 U.S.C. 651 et s AS AMENDED AND ANY MODIFICATIONS AMENDMENTS OR REVISIONS AND HEA 9 0, ( eq }, INVERT ELEVATIONS PRIOR TO COMMENCING ANY CONSTRUCTION. CONTRACTOR MUST CONFIRM AND ENSURE 0.75% CLAIMS BY THIRD PARTIES AND ALL CLAIMS RELATED TO THE PROJECT. CONTRACTOR MUST NOTIFY ENGINEER, IN TO SAME. MINIMUM SLOPE AGAINST ALL ISLANDS, GUTTERS, AND CURBS; 1.0% ON ALL CONCRETE SURFACES; AND 1.5% MINIMUM WRITING, AT LEAST THIRTY (30) DAYS PRIOR TO ANY TERMINATION, SUSPENSION OR CHANGE OF ITS INSURANCE ON ASPHALT (EXCEPT WHERE ADA REQUIREMENTS LIMIT GRADES), TO PREVENT PONDING. CONTRACTOR MUST HEREUNDER. 3. BOHLER ENGINEERING HAS NO CONTRACTUAL, LEGAL, OR OTHER RESPONSIBILITY FOR JOB SITE SAFETY OR JOB SITE IMMEDIATELY IDENTIFY, !N WRITING TO THE ENGINEER, ANY DISCREPANCIES THAT MAY OR COULD AFFECT THE PUBLIC 19. BOHLER ENGINEERING WILL REVIEW OR TAKE OTHER APPROPRIATE ACTION ON THE CONTRACTOR SUBMITTALS, SUCH AS SUPERVISION, OR ANYTHING RELATED TO SAME. SAFETY, HEALTH OR GENERAL WELFARE, OR PROJECT COST. iF CONTRACTOR PROCEEDS WITH CONSTRUCTION SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND OTHER DATA, WHICH THE CONTRACTOR IS REQUIRED TO SUBMIT, BUT 4. THE DEMOLITION PLAN IS INTENDED TO PROVIDE GENERAL INFORMATION ONLY, REGARDING ITEMS TO BE WITHOUT PROVIDING PROPER NOTIFICATION, MUST BE AT THE CONTRACTOR'S OWN RISK AND, FURTHER, CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS THE DESIGN ENGINEER FOR ANY DAMAGES, COSTS, ONLY FOR THE LiMiTED PURPOSE OF CHECKING FOR CONFORMANCE WITH THE DESIGN INTENT AND THE INFORMATION DEMOLISHED AND/OR REMOVED. THE CONTRACTOR MUST ALSO REVIEW THE OTHER SITE PLAN DRAWINGS AND INJURIES, ATTORNEY'S FEES AND THE LIKE WHICH RESULT FROM SAME. SHOWN IN THE CONSTRUCTION CONTRACT DOCUMENTS. CONSTRUCTION MEANS AND/OR METHODS AND/OR TECHNIQUES INCLUDE IN DEMOLITION ACTIVITIES ALL INCIDENTAL WORK NECESSARY FOR THE CONSTRUCTION OF THE NEW. SITE OR PROCEDURES, COORDINATION OF THE WORK WITH OTHER TRADES AND CONSTRUCTION SAFETY PRECAUTIONS ARE IMPROVEMENTS. 18. PROPOSED TOP OF CURB ELEVATIONS ARE GENERALLY 6" ABOVE EXISTING LOCAL ASPHALT GRADE UNLESS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND BOHLER HAS NO RESPONSIBILITY OR LIABILITY FOR SAME OTHERWISE NOTED. FIELD ADJUST TO CREATE A MINIMUM OF 0.75% GUTTER GRADE ALONG CURB FACE. IT IS HEREUNDER. BOHLER ENGINEERING'S SHOP DRAWING REVIEW WILL BE CONDUCTED WITH REASONABLE PROMPTNESS 5. CONTRACTOR MUST RAISE ANY QUESTIONS CONCERNING THE ACCURACY OR INTENT OF THESE PLANS OR CONTRACTOR'S OBLIGATION TO ENSURE THAT DESIGN ENGINEER APPROVES FINAL CURBING CUT SHEETS PRIOR TO WHILE ALLOWING SUFFICIENT TIME TO PERMIT ADEQUATE REVIEW. REVIEW OF A SPECIFIC ITEM MUST NOT INDICATE THAT SPECIFICATIONS, CONCERNS REGARDING THE APPLICABLE SAFETY STANDARDS, OR THE SAFETY OF THE INSTALLATION OF SAME. BOHLER ENGINEERING HAS REVIEWED THE ENTIRE ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. BOHLER CONTRACTOR OR THIRD PARTIES. IN PERFORMING THE WORK. ON THIS PROJECT, WITH BOHLER ENGINEERING, IN ENGINEERING WILL NOT BE RESPONSIBLE FOR ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS NOT PROMPTLY WRITING, AND RESPONDED TO BY BOHLER, IN WRITING, PRIOR TO THE INITIATION. OF ANY SITE ACTIVITY AND ANY 19. REFER TO SITE PLAN FOR ADDITIONAL NOTES. AND IMMEDIATELY BROUGHT TO ITS ATTENTION, IN WRITING, BY THE CONTRACTOR. BOHLER ENGINEERING WILL NOT BE DEMOLITION ACTIVITY. ALL DEMOLITION ACTIVITIES MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS REQUIRED TO REVIEW PARTIAL SUBMISSIONS OR THOSE FOR WHICH SUBMISSIONS OF CORRELATED ITEMS HAVE NOT BEEN OF THESE PLANS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, RULES, 20. IN THE EVENT OF DISCREPANCIES AND/OR CONFLICTS BETWEEN PLANS OR RELATIVE TO OTHER PLANS, THE SITE PLAN RECEIVED. REQUIREMENTS, STATUTES, ORDINANCES AND CODES. WILL TAKE PRECEDENCE AND CONTROL. CONTRACTOR MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER, IN 20. NEITHER THE PROFESSIONAL ACTIVITIES OF BOHLER ENGINEERING, NOR THE PRESENCE OF BOHLER ENGINEERING 6. PRIOR TO STARTING ANY DEMOLITION, CONTRACTOR IS RESPONSIBLE FOR/TO: WRITING, OF ANY DISCREPANCIES AND/OR CONFLICTS. AND/OR ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, 21. CONTRACTOR IS REQUIRED TO SECURE ALL NECESSARY AND/OR REQUIRED PERMITS AND APPROVALS FOR ALL OFF PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND A.OBTAINING ALL REQUIRED PERMITS AND MAINTAINING THE SAME ON SITE FOR REVIEW BY THE ENGINEER AND SITE MATERIAL SOURCES AND DISPOSAL FACILITIES. CONTRACTOR MUST SUPPLY A COPY OF APPROVALS TO ITS SUBCONTRACTORS AND SUBCONSULTANTS AT A CONSTRUCTION/PROJECT SITE, SHALL RELIEVE THE GENERAL OTHER PUBLIC AGENCIES HAVING JURISDICTION THROUGHOUT THE DURATION OF THE PROJECT, SITE WORK AND ENGINEER AND OWNER PRIOR TO INITIATING WORK. CONTRACTOR OF ITS OBLIGATIONS, DUTIES AND RESPONSIBILITIES INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION DEMOLITION WORK. MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING, OVERSEEING, SUPERINTENDING AND COORDINATING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND COMPLIANCE 22. WHERE RETAINING WALLS (WHETHER OR NOT THEY MEET THE JURISDICTIONAL DEFINITION) ARE IDENTIFIED ON PLANS, ANY HEALTH OR SAFETY PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES WITH JURISDICTION OVER THE ELEVATIONS IDENTIFIED ARE FOR THE EXPOSED PORTION OF THE WALL. WALL FOOTINGS/FOUNDATION ELEVATIONS PROJECT .AND/OR PROPERTY. BOHLER ENGINEERING AND ITS PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY ARE NOT IDENTIFIED HEREIN AND ARE TO BE SET/DETERMINED BY THE CONTRACTOR BASED ON FINAL STRUCTURAL CONTROL OVER ANY CONSTRUCTION CONTRACTOR OR ITS EMPLOYEES IN CONNECTION WiTH THEIR WORK OR ANY HEALTH DESIGN SHOP DRAWINGS PREPARED BY THE APPROPRIATE PROFESSIONAL LICENSEE IN THE STATE WHERE THE OR SAFETY PROGRAMS OR PROCEDURES. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETY. CONSTRUCTION OCCURS BOHLER ENGINEERING SHALL BE INDEMNIFIED BY THE GENERAL CONTRACTOR AND MUST BE NAMED AN ADDITIONAL . INSURED UNDER THE GENERAL CONTRACTOR'S POLICIES OF GENERAL LIABILITY INSURANCE AS DESCRIBED ABOVE IN 23. STORM DRAINAGE PIPE: NOTE 19 FOR JOB SITE SAFETY. 21. IF THE CONTRACTOR DEVIATES FROM THE PLANS AND SPECIFICATIONS, INCLUDING THE NOTES CONTAINED HEREIN, UNLESS INDICATED OTHERWISE, ALL STORM SEWER PIPE MUST BE REINFORCED CONCRETE PIPE (RCP) CLASS III WITH ISILT TIGHT JOINTS. WHEN HIGH -DENSITY POLYETHYLENE PiPE (HDPE) IS CALLED FOR ON THE PLANS, IT MUST WITHOUT FIRST OBTAINING THE PRIOR WRITTEN AUTHORIZATION OF THE ENGINEER FOR SUCH DEVIATIONS, THE CONFORM TO AASHTO M294 AND TYPE S (SMOOTH INTERIOR WiTH ANGULAR CORRUGATIONS) WITH GASKET FOR SILT CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PAYMENT OF ALL COSTS INCURRED IN CORRECTING ANY WORK DONE TIGHT JOINT. PVC PIPE FOR ROOF DRAIN CONNECTION MUST BE SDR 26 OR SCHEDULE 40 UNLESS INDICATED OTHERWISE. GENERAL NOTE: T IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJEC' ORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE FHE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD I' WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTI �CEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND FULL CONFORMANCE 11NS AND CODES. REVISIONS BY *) 1 NCDOT REVISIONS RJB 4/2/19 2 NCDOT REVISIONS RJB 5/21/19 3 TRC REVISIONS RJB. 6/7/19 4 TRC REVISIONS RJB 6/19/1911 5 BID SUBMISSION RJB 6/21 /19 6 SWPPP SUBMISSION RJB 6/26/19 .APPROVED FOR ��l CONSTRUCTION AO______13 ft . lz.� �• THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 BOHLER ENGINREItING 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering.com g® / cv L rn �" - � u 043610 z - ' `.. ' �: I _ ` (qp� . 4N " .,`/ A IV 111111,, cn�H`.as �" - �) I % F� ow I� hm ® &H P4 uJ ) 0 ft!� c �ii 0 �) 0 4 -m �1 �= �,r t �n � � � 6;� ��� l�J� `it �O �� �7 �� A e-It 6;n� fl�l ��40C-A 0!!� �pq� �go H &,-'It 4� 6;m� ry 4 pml��: " �) �4 &H® �4 ft�l &M4 � ,--,, ��'t &'_'t rv��:4 wm� 6 " g �M4 ��5E00 �M4 r-4 A � �"-� 0!� rve� �: �4rmm* g ��, fl!� �� ^O� �n" �� 0 cn ,E H 4 �n4 �'r I : �m" DRAWN r. -) BAB CHECKED MAT DATE 4l2/19 SCALE AS NOTED JOB No. NCC138078 SHEET M2013WCC138078\DRAWINGS\PLAN SETS\PLAN SET (DRIVEWAY EXTENSION)WCC138078SDO.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:47 AM LAST SAVED BY: RBRELAND REVISIONS BY ") 1 NCDOT REVISIONS RJB 4/2/19 NCDOT REVISIONS Z 5/21/19 RJB TRC REVISIONS 3 6/7/19 RJB 4 TRC REVISIONS RJB 6119/19 5 BID SUBMISSION RJB 6/21/19 SWPPP SUBMISSION 6 6/26/19 RJB APPROVED FOR CONSTRUCTION o - e r THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 BOHLER E NGIN RERING 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering.com ui 043610 am as Lf -Na ^0e ^000 ^000 o DRAWN BAB CHECKED MAT DATE 4/2/19 SCALE AS NOTED JOB No. NCC138078 SHEET 1-1:12013WCC138078\DRAWINGS\PLAN SETSIPLAN SET (DRIVEWAY EXTENSION)WCC13807800.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:47 AM LAST SAVED BY: RBRELAND 5-4- I - - I . I I REVISIONS BY GENERAL NOTES NCDENR STANDARD NOTES HAZARDOUS MATERIAL MANAGEMENT & SPILL REPORTING 1 NCDOT REVISIONS RJB - A. PROJECT OFFICE WALL SWPPP POSTINGS: I . 4/2/19 THE FOLLOWING ITEMS MUST BE POSTED TOGETHER IN A SINGLE, ORGANIZED LOCATION'ON A WALL INSIDE THE PROJECT OFFICE: 1) 1. ON -SITE BURIAL PITS ARE NOT ALLOWED AT ANY LOCATION WITHIN THE TOWN OF SWANSBORO. ANY HAZARDOUS OR POTENTIALLY HAZARDOUS MATERIAL THAT IS BROUGHT ONTO THE CONSTRUCTION SITE SHALL BE HANDLED PROPERLY SWPPP SITE MAPS (ALL PHASES); 2) SV\lPPP DETAIL SHEETS; 3) MAP SHOWING LOCATION OF OFFSITE IMPORT OR EXPORT FACILITY; 4) TO REDUCE THE POTENTIAL FOR STORMWATER POLLUTION. ALL MATERIALS USED ON THIS CONSTRUCTION SITE SHALL BE PROPERLY 1 2 1 NCDOT REVISIONS RJI3 REVISIONS TO DETAILS, SITE MAPS, OR SWPPP-RELATED RFIS; 5) SITE SVvPPP BINDER; 6) SWCT PLACARD; 7) CURRENT OWNER 2. ANY GRADING BEYOND THE LIMITS OF CONSTRUCTION SHOWN ON THIS PLAN IS SUBJECT TO A FINE. STORED, HANDLED, DISPENSED AND DISPOSED OF FOLLOWING ALL APPLICABLE LABEL DIRECTIONS. FLAMMABLE AND COMBUSTIBLE LIQUIDS 5/21/19 I- STORMWATER COMPLIANCE TRAINING CERTIFICATES FOR SUPERINTENDENT(S) AND COMPLIANCE OFFICER(S); AND 8) CERTIFICATIONS SHALL BE STORED AND HANDLED ACCORDING TO APPLICABLE REGULATIONS, AND, AT A MINIMUM, ACCORDING TO 29 CFR 1926.152. ONLY AND/OR TRAINING CERTIFICATES REQUIRED TO PERFORM INSPECTIONS BY THE APPLICABLE CONSTRUCTION GENERAL PERMIT OR 3. GRADING I ACRE OR MORE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION AND SUBJECT TO A FINE. APPROVED CONTAINERS AND PORTABLE TANKS SHALL BE USED FOR STORAGE AND HANDLING OF FLAMMABLE AND COMBUSTIBLE LIQUIDS. 3 TRC REVISIONS RJB AUTHORITY HAVING JURISDICTION. I 1 4. GROUND STABILIZATION MUST OCCUR WITHIN 7 DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3: 1, AND GROUND MATERIAL SAFETY DATA SHEETS (MSDS) INFORMATION SHALL BE KEPT ON SITE FOR ANY AND ALL APPLICABLE MATERIALS. HOWEVER, MSDS 6/7/19 B. PERMITTED PROJECT AREA: STABILIZATION MUST OCCUR WITHIN 7 DAYS ON OTHER AREAS. MAY ALSO BE ACCESSED VIA TELEPHONE OR OTHER ELECTRONIC MEANS OR APPARATUS. 4 TRC REVISIONS RJI3 FOR PURPOSES OF THIS SWPPP AND ASSOCIATED STORMWATER PERMIT, 'PERMITTED PROJECT AREN IS DEFINED AS ANY AND ALL AREAS 5. BASIN OUTLET STRUCTURES WITH DRAINAGE AREAS EQUAL OR GREATER THAN ONE ACRES MUST WITHDRAW WATER FROM THE IN THE EVENT OF AN ACCIDENTAL SPILL, IMMEDIATE ACTION SHALL BE TAKEN BY THE GC TOCONTAIN AND REMOVE THE SPILLED MATERIAL. 6/19/19 WITHIN THE PROJECT LIMITS OF DISTURBANCE, AS SHOWN ON THE SWPPP SITE MAPS AND IDENTIFIED IN THE NOTICE OF INTENT TO THE BID SUBMISSION � AGENCY. ALL GROUND -DISTURBING AND CONSTRUCTION -RELATED ACTIVITIES (MATERIAL STORAGE, DUMPSTERS, PARKING AREAS, SURFACE. THE SPILL SHALL BE REPORTED TO THE APPROPRIATE AGENCIES IN THE REQUIRED TIME FRAMES. AS REQUIRED UNDER THE PROVISIONS OF 5 RJI3 PROJECT OFFICE TRAILER, ETC.) MUST BE INCLUDED WITHIN THE PERMITTED PROJECT AREA LIMITS OF DISTURBANCE. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY THE NCDENR EROSION CONTROL INSPECTOR. THE CLEAN WATER ACT, ANY SPILL OR DISCHARGE ENTERING WATERS OF THE UNITED STATES SHALL BE PROPERLY REPORTED. 6/21/19 OFFSITE AREA(S) TO BE DISTURBED AS PART OF THIS PROJECT (NOT ON OWNER PROPERTY): � ALL HAZARDOUS MATERIALS, INCLUDING CONTAMINATED SOIL AND LIQUID CONCRETE WASTE, SHALL BE DISPOSED OF BY THE CONTRACTOR 6 SWPPP SUBMISSION RJB ROADWAY IMPROVEMENTS TO WEST CORBETT AVENUE AND HAMMOCK BEACH ROAD. 7. ALL ELEVATIONS ARE IN REFERENCE TO THE SURVEYORS BENCHMARK WHICH MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR IN THE MANNER SPECIFIED BY FEDERAL, STATE AND LOCAL REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS. 6/26/19 TO GROUND BREAKING. ALL AREAS OUTSIDE THE PERMITTED PROJECT AREA (I.E., LIMITS OF DISTURBANCE) ACQUIRED FOR USE BY THE GC OR A � E A WRITTEN RECORD OF ANY SPILL AND ASSOCIATED CLEAN-UP ACTIVITIES OF PETROLEU SUBCONTRACTOR OF THE GC (BORROW SOURCES, DISPOSAL AREAS, ETC.) MUST BE MANAGED IN ACCORDANCE WITH APPENDIX E - TAB 8. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL HAZARDOUS MATERIALS IN EXCESS OF 1 GALLON OR REPORTABLE QUANTITIES, WHICHEVER IS LESS, ON THE DAY OF THE SPILL. THE GC . PLANNING AND DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, AND ANY APPLICABLE LOCAL LAWS AND CODES. SHALL PROVIDE NOTICE TO OWNER, VIA THE ONLINE CRITICAL INCIDENT REPORT, IMMEDIATELY UPON IDENTIFICATION OF ANY SPILL. SPILL 21 OF THE 02370 SPECIFICATION. THE CONTRACTOR IS REQUIRED TO LOCATE OFFICE TRAILERS AND MATERIAL STORAGE AREAS FOR THE I PROJECT WITHIN THE LIMITS OF DISTURBANCE. THE CONTRACTOR MAY REQUEST USE OF OFF -SITE LOCATIONS FOR OFFICE TRAILERS OR REPORT FORMS ARE AVAILABLE IN THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER. COPIES OF SPILL CRITICAL INCIDENT NON -ERODIBLE MATERIAL STORAGE; HOWEVER, APPROVAL MUST BE OBTAINED FROM THE CONSTRUCTION MANAGER, THE CEC AND THE 9. PERMANENT CUT AND FILL SLOPES PLACED ON A SUITABLE FOUNDATION SHOULD BE CONSTRUCTED AT 2:1 (HORIZONTAL TO VERTICAL) REPORTS SHALL BE PRINTED AND MAINTAINED IN THE JOBSITE BINDER. m - I WAL-MART SWCT PRIOR TO THEIR USE. REQUESTS WILL BE REVIEWED ON A CASE BY CASE BASIS AND IF APPROVED, LIMITATIONS ON USE OR FLATTER. PERMANENT SLOPES OF 3:1 SHOULD BE CONSTRUCTED WHERE MOWING IS DESIRABLE AND AS INDICATED. IF FILL I � WILL BE PROVIDED BY THE CEC. MATERIAL IS BROUGHT ONTO THE PROPERTY OR IF WASTE MATERIAL IS HAULED FROM THE PROPERTY THEN THE CONTRACTOR SHALL ANY SPILLS OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN EXCESS OF REPORTABLE QUANTITIES AS DEFINED BY EPA OR THE DISCLOSE THE LOCATION OF ANY ON -SITE AND/OR OFF -SITE BORROW LOCATION AND/OR WASTE BURIAL LOCATION TO THE EROSION STATE OR LOCAL AGENCY REGULATIONS, SHALL BE IMMEDIATELY REPORTED TO THE EPA NATIONAL RESPONSE CENTER (1-800-424-8802) AND C. SPECIAL PROJECT AREAS: CONTROL INSPECTOR. NCDENR (910) 796-7215 APPROVED FOR THERE ARE NO SPECIAL PROJECTS, LOCATED BEYOND THE OWNER PERMITTED PROJECT AREA, REQUIRING INSPECTION AND 10. ANY REPORT SUBMITTED TO NCDENR MUST ALSO BE SENT TO THE TOWN OF SWANSBORO ENGINEERING DEPARTMENT ATTENTION THE STATE REPORTABLE QUANTITY FOR PETROLEUM PRODUCTS IS: MAINTENANCE ASSOCIATED WITH THIS CONSTRUCTION PROJECT. � . � � DIRECTOR INCLUDING ANY SELF INSPECTION REPORTS. IF THE PETROLEUM DISCHARGED, RELEASED OR SPILLED: �� -- , D.1 NON-STORMWATER DISCHARGES: 11. LIMITS OF CLEARING SHOWN ARE BASED ON CUT AND FILL SLOPES OR OTHER GRADING REQUIREMENTS. � THE GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES PROHIBITS MOST IS 25 GALLONS OR MORE, OR CAUSES A SHEEN ON NEARBY SURFACE WATERS, OR IS 1000 FEET OR LESS FROM SURFACE WATER BODIES; NON-STORMWATER DISCHARGES DURING THE CONSTRUCTION PHASE. THE DISCHARGES ALLOWED BY THIS GENERAL PERMIT SHALL NOT 12. CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURES AS INDICATED PRIOR TO GRADING OPERATIONS. NO DEVICE MAY BE THEN THE PERSON OWNING OR HAVING CONTROL OVER THE OIL MUST IMMEDIATELY TAKE MEASURES TO COLLECT AND REMOVE THE 0 CAUSE OR CONTRIBUTE TO VIOLATIONS OF NORTH CAROLINA WATER QUALITY STANDARDS FOR SURFACE WATERS AND WETLANDS {I 5A REMOVED WITHOUT APPROVAL OF EROSION CONTROL COORDINATOR. DISCHARGE, AND REPORT THE DISCHARGE TO NCDENR WITHIN 24 HOURS OF DISCHARGE, AND BEGIN TO RESTORE AREA AFFECTED BY NCAC 2B .0200). DISCHARGES ALLOWED BY THIS PERMIT MUST MEET ALL APPLICABLE WATER QUALITY CERTIFICATION OR PERMIT DISCHARGE. REQUIREMENTS AS OUTLINED IN 15A NCAC 2H .0500 AND 2H . 1 300. 13. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY WITH EXISTING CONTOURS. ALLOWABLE NON-STORMWATER DISCHARGES THAT OCCUR DURING CONSTRUCTION ON THIS PROJECT ARE INCLUDED IN THE FOLLOWING IS 25 GALLONS OR LESS, DOES, NOT CAUSE A SHEEN ON NEARBY SURFACE WATERS, OR IS 1000 FEET OR MORE FROM SURFACE WATER LIST FROM THE US EPA CONSTRUCTION GENERAL PERMIT: 14. ALL DISTANCES ARE HORIZONTAL GROUND. BODIES; THEN THE PERSON OWNING OR HAVING CONTROL OVER THE OIL MUST IMMEDIATELY TAKE MEASURES TO COLLECT AND REMOVE THE . . DISCHARGE. IF IT CAN NOT BE CLEANED UP WITHIN 24 HOURS OF THE DISCHARGE, THE OWNER MUST REPORT THE DISCHARGE TO NCDENR, I THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION 0 DISCHARGES FROM EMERGENCY FIRE -FIGHTING ACTIVITIES 15. TOTAL DENUDED AREA = 1.84 AC AND BEGIN TO RESTORE AREA AFFECTED BY DISCHARGE. BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE 0 FIRE HYDRANT FLUSHINGS 16. ANCHOR SILT FENCE WITH COMPACTED BACKFILL ON TREE PROTECTION ZONES. DO NOT BURY. THE REPORTABLE QUANTITY FOR HAZARDOUS MATERIALS CAN BE FOUND IN 40 CFR 302 AND STATE. * LANDSCAPE IRRIGATION WVWV. NCGA.STATE.NC. US/STATUTRES-IN-HTMUCH P430. HTML. THE ACTS STARTS AT ARTICLE 21A, 143-21.75 CALL - 811 0 WATER USED TO WASH VEHICLES AND EQUIPMENT, PROVIDED THAT THERE IS NO DISCHARGE OF SOAPS, SOLVENTS, OR DETERGENTS 17. ALL EROSION CONTROL DEVICES SHOULD BE CHECKED PERIODICALLY AND AFTER EVERY MAJOR STORM EVENT. IF ANY FAILURES ARE k, j USE FOR SUCH PURPOSES FOUND, THEY SHOULD BE REPAIRED AS SOON AS POSSIBLE. TO MINIMIZE THE POTENTIAL FOR A SPILL OF PETROLEUM PRODUCT OR HAZARDOUS MATERIALS TO COME IN CONTACT WITH STORMWATER, � 0 WATER USED TO CONTROL DUST THE FOLLOWING STEPS SHALL BE IMPLEMENTED: I 9 POTABLE WATER INCLUDING CONTAMINATED WATER LINE FLUSHINGS 18. ANY ASSOCIATED DEMOLITION PERMITS AND METHODS OF DEMOLITION ARE TO BE OBTAINED AND ARRANGED BY THE CONTRACTOR 0 ROUTINE EXTERNAL BUILDING WASHDOWN THAT DOES NOT USE DETERGENTS PRIOR TO CONSTRUCTION. 1) ALL MATERIALS WITH HAZARDOUS PROPERTIES, SUCH AS PESTICIDES, PETROLEUM PRODUCTS, FERTILIZERS, SOAPS, DETERGENTS, BOHLER 0 PAVEMENT WASH WATERS PROVIDED SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE NOT OCCURRED (UNLESS ALL SPILL CONSTRUCTION CHEMICALS, ACIDS, BASES, PAINTS, PAINT SOLVENTS, ADDITIVES FOR SOIL STABILIZATION, CONCRETE, CURING MATERIAL HAS BEEN REMOVED) AND WHERE DETERGENTS ARE NOT USED. YOU ARE PROHIBITED FROM DIRECTING PAVEMENT WASH 19. SEDIMENT TRAPS AND BASINS NEED TO BE STABILIZED IMMEDIATELY AFTER INSTALLATION. COMPOUNDS AND ADDITIVES, ETC., SHALL BE STORED IN A SECURE LOCATION, UNDER COVER AND IN APPROPRIATE, TIGHTLY SEALED . WATERS DIRECTLY INTO ANY SURFACE WATER, STORM DRAIN INLET, OR STORMWATER CONVEYANCE, UNLESS THE CONVEYANCE IS CONTAINERS WHEN NOT IN USE. I I CONNECTED TO A SEDIMENT BASIN, SEDIMENT TRAP, OR SIMILARLY EFFECTIVE CONTROL 20. STONE OUTLETS SHOULD BE INSTALLED AT LOW POINTS OF THE SILT FENCING, BASED ON FIELD CONDITIONS. . 1927 S. TRYON STREET, SUITE 310 0 UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE 2) THE MINIMUM PRACTICAL QUANTITY OF ALL SUCH MATERIALS SHALL BE KEPT ON THE JOB SITE AND SCHEDULED FOR DELIVERY AS CLOSE CHARLOTTE, NC 28203 0 UNCONTAMINATED, NON -TURBID DISCHARGES OF GROUND WATER OR SPRING WATER 21. EFFECTIVE OCTOBER 1, 2010, PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT A PROJECT AFTER EACH PHASE TO TIME OF USE AS PRACTICAL. Phone: (980) 272-3400 * FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS SUCH AS SOLVENTS OR OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. Fax: (980) 272-3401 CONTAMINATED GROUNDWATER SELF -INSPECTION REPORTS ARE REQUIRED. A SAMPLE SELF -INSPECTION REPORT, AS WELL AS DETAILS OF THE SELF -INSPECTION 3) A SPILL CONTROL AND CONTAINMENT KIT (CONTAINING FOR EXAMPLE, ABSORBENT MATERIAL SUCH AS KITTY LITTER OR SAWDUST, ACID, 0 CONSTRUCTION DEWATERING WATER THAT HAS BEEN TREATED BY AN APPROPRIATE CONTROL PROGRAM, CAN BE FOUND ON THE LAND QUALITY WEBSITE. IF, YOU HAVE QUESTIONS OF THE SELF -INSPECTION PROGRAM, PLEASE BASE, NEUTRALIZING AGENT, BROOMS, DUST PANS, MOPS, RAGS, GLOVES, GOGGLES, PLASTIC AND METAL TRASH CONTAINERS, ETC.) www.BohlerEngineering.com BEST MANAGEMENT PRACTICES (BMPS) MUST BE, IMPLEMENTED FOR THE GENERAL PERMIT ALLOWABLE DIS( ,'HARGES FOR THE DURATION CONTACT (910) 796-7215. SHALL BE PROVIDED AT THE CONSTRUCTION SITE AND ITS LOCATION(S) SHALL BE IDENTIFIED WITH LEGIBLE SIGNAGE AND SHOWN ON OF THE PERMIT. THE TECHNIQUES DESCRIBED IN THIS SWPPP FOCUS ON PROVIDING CONTROL OF POLLUTANT DISCHARGES WITH SITE MAPS. � PRACTICAL APPROACHES THAT UTILIZE READILY AVAILABLE EXPERTISE, MATERIAL, AND EQUIPMENT. a. THE SPILL CONTROL AND CONTAINMENT KIT SUPPLIES SHALL BE OF SUFFICIENT QUANTITIES AND APPROPRIATE CONTENT TO % k, % j I I I I I , " CONTAIN A SPILL FROM THE LARGEST ANTICIPATED PIECE OF EQUIPMENT AND FROM THE LARGEST ANTICIPATED QUANTITIES OF -.%%% ///11 " .1 I PRODUCTS STORED ON THE SITE AT ANY GIVEN TIME. 11 , , , NON-STORMWATER COMPONENTS OF SITE DISCHARGES MUST BE UNCONTAMINATED, NON -TURBID WATER. ALL NON-STORMWATER b. CONTENTS SHALL BE INSPECTED DAILY DURING THE DAILY STORMWATER INSPECTION. , A , I DISCHARGES MUST BE ROUTED TO A STORMWATER CONTROL PRIOR TO DISCHARGE. WATER USED FOR CONSTRUCTION WHICH , � - - DISCHARGES FROM THE SITE MUST ORIGINATE, FROM A PUBLIC WATER SUPPLY OR PRIVATE WELL APPROVED BY THE STATE HEALTH 4) ALL PRODUCTS SHALL BE STORED IN AND USED FROM THE ORIGINAL CONTAINER WITH THE ORIGINAL PRODUCT LABEL. CONTAINERS - T11 * I .: DEPARTMENT. WATER USED FOR CONSTRUCTION THAT DOES NOT ORIGINATE FROM AN APPROVED PUBLIC SUPPLY MUST NOT MUST BE STORED IN A MANNER TO PROTECT THEM FROM THE ELEMENTS AND INCIDENTAL DAMAGE. �4 w m - DISCHARGE FROM THE SITE; IT CAN BE RETAINED IN RETENTION PONDS UNTIL IT INFILTRATES OR EVAPORATES. WHEN NON-STORMWATER - Lu 043610 z W: IS DISCHARGED FROM THE SITE, IT MUST BE DONE IN A MANNER SUCH THAT IT DOES NOT CAUSE EROSION OF THE SOIL DURING 5) ALL PRODUCTS SHALL BE USED IN STRICT COMPLIANCE WITH INSTRUCTIONS ON THE PRODUCT LABEL. - 0.4 V-1 0 0-- DISCHARGE. � n z 9 --, A�: , �� I 'k- ,QV, - I 6) THE DISPOSAL OF EXCESS OR USED PRODUCTS SHALL BE IN STRICT COMPLIANCE WITH INSTRUCTIONS ON THE PRODUCT LABEL AND ,��,y & ,as'-> '0,2 %1, D.2 POWER WASHING: REGULATIONS. , X % " PROCESS WATER SUCH AS POWER WASHING WATER AND CONCRETE CUTTING EFFLUENT, AMONG OTHERS, MUST BE COLLECTED FOR , t '* %, TREATMENT AND DISPOSAL. IT MUST NOT BE FLUSHED INTO THE SITE STORM DRAIN SYSTEM OR DISCHARGED OFF -SITE. dl��/,A - 'IV '* -_ 11111"01 I E. DISCHARGE POINTS: ALL DISCHARGE POINTS MUST BE INSPECTED TO DETERMINE WHETHER EROSION AND SEDIMENTATION CONTROL MEASURES ARE � I I I - I EFFECTIVE IN PREVENTING DISCHARGE OF SEDIMENT FROM THE SITE AND/OR IMPACTS TO RECEIVING WATERS. SEDIMENT E!nH % .* ACCUMULATION DOWNGRADIENT OF DISCHARGE LOCATIONS SHALL BE REPORTED AS A SEDIMENT DISCHARGE (SEE APPENDIX E - TAB 11 4, � so go SEDIMENT RELEASES, OF THE 02370 SPECIFICATION) AND THE POTENTIAL UPSTREAM CAUSE SHALL BE INVESTIGATED TO PREVENT cn E. CONTACT THE CM, CEC AND SWCT TO DETERMINE APPROPRIATE ACTION FOR CLEANUP OF DISCHARGED fl� #4 % � SEDIMENT THAT MAY BE OUTSIDE OF THE LIMITS OF DISTURBANCE. SEE SAMPLING AND MONITORING OF EFFLUENT PLAN (IF APPLICABLE). 4 �� ow SITE STORMWATER OUTFLOW DESCRIPTION: . I I 0___-A hm F. THE SITE HAS THREE DISCHARGE POINTS. THE SOUTHERN PORTION OF THE SITE IS ROUTED TO A WET POND AND DISCHARGED TO THE � - �4 9 STREAM THAT EXITS THE SITE TO THE SOUTHEAST. THE NORTHERN SECTION OF THE SITE IS SPLIT INTO TWO DRAINAGE AREAS BY A � � I 0 �H tv RIDGE IN THE PARKING LOT THAT DIRECTS FLOW TO ONE OF TWO WET PONDS WHICH DISCHARGE INTO THE EXISTING STORM SEWER NORTH OF THE SITE. I 1 P4 �n E � �­_� 11 ,,, ,�,� - �l ;''__"�, _ = vl� cn I I I �_ I �­l - ll',� ­ '' _- " lll_��l �1'11 I � ��''l __1 I- I I �,�'111'11111_1­ , ­�,, , .1 ,�,,'�� " — ) I- �­ __ �11­ 11 I _: - ��,_ I I I I '­_�,,,­ ,� I ,­ I,- � , 0 !��_� -, I I -I'---,'- 1 ­,`442�,Z,'_ _"_11�11`�'_ , , '"' - 01-11 _Qc ", , ­ -11, , I I I ,, I � I 1/0 __1 � _ _rjl I'll, X �­ 11 ­� �) �� � ��t�,,'�-,,,--""",�',',-,',�,-,-,�'�',',,�,�,��",,,3,�P���"', ,--,,,�, l'­l"'l'­` ',�."A, I I " ��a � ; 0 ­1 � ­1 1­1­111 __, -11, - �­ ,1111, � � �, � 11, __ I __ I , 1 ...... _ - ­­­- I I - , - : _11� ''I'll, - ­_ , 11 ­ 0 �"� 11; I I _� I., ­ - I PIG-,,",�",'�,'��'l�""",�',-,,-,-,',,,,'�-, I 0 1 -""""I '_� ,,, r-11 , ,,,, � m- i- I" _', ",_,'' - I 1, ,� . - I 'I'll. I '\ * " ­111­ I I I f_�7 I - I _: "I�"-,-,-,"�'-"�-"-,Ir��'I'�,� 11 EROSION AND SEDIMENT CONTROL NOTES Lil, I . 1� ,� �11­ I �111 ,�;11,-,�'lm� I I 11 _ � I 11 I � ­ � I .,A 111. ­­ I',, I "I', - I I � I'l-, �­­ I �­` I'll C�44 . I , , -, _,�o I �, , _�' - I z 4 ,� ��, �O.R.'&'o " Li -k , `,�,,��'11� ��­ I > 0. .110 ­ , '_ " ��,', 01 _'l 11_1�_ I- 11 I ­--;�)EMej �m� , I . _,,,_--, �� 7-"- 1, "I - "I 11 �:1'11'1 I ti_>_ X. �­ - '"'". 11 11 -k, I --I'- , "" I I r , I, _ 11 1-11, 1 ��,­��,'�`, I � - . ­ I I ­­- �_ '"'' , I 11 1� ,�� I 11 I � I 11", 11 ­�� , '11, .... .. ­�� -1 , , , e I 117 "I'' , CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THIS STORM WATER POLLUTION PREVENTION PLAN. � Z� ` , 1, I � I I >� , " , 11-111, - ll!�,_,_5�i I'�,'��'lli,�,���r��'I'll'��,,��-11 ,, , � I A. , - , - - I ", - I I ��_, - , I _,�-: I I - .19IR -,,,, " I �zl,_� ­q " �,,�_Xl��,V��Zl , -1- �' --- 4 P4 cn I I , - - - : ­ , I - �0 I "I 11 ,�,_ - -,""�""_'�'�'.� r � , i I I I 1� ,� .11_1�_�_� I - ��,�-""��""",--,��,�,,,,;,�;��,,��-- "' ­;�l " ,4 - _�, ED BY CONDITIONS AT NO ADDITIONAL COST OF OWNER ,- : . . .... ,,.,� ,tvw . I I �zt'� I -, I 1 714 1 �,,,2,',',-,',�,,_`,,, , -Z :� �,"i",",�,"""',", _.,,,n,� " - -, � I'll- - , ­­�l ' , I : I . : , -" - -11 _" '' �,_,�'___*5 , 1�� � - I ,1� I I Iq I I , I ", �_,_ 1�r� ��_ I'll - . " _ �,� � F�� A � mg�'_,'. cv , ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTAT ,,�� , ��� ,.',',�, �`11`11 ".111111 : - I ""I'�,�."",",�""",�"",�"", "_n, � i , '' " I I .11" . I � I I I I _ , � ,_,� -:, ­­­_- '�,"l - , , "�_ I � I - - ", � : I 11 - �=l M, , - - I '�,-'-'­--�­-M­­,, ­5� "',­�-%'� `._­-��,�11�1; ­ 11 1- I 11 ­ ,, I �,,-�-111,,�,-,---,�,n",-�,�"",-,(,,-', , , ',- ----nu --- - - 20 , , , �, -;."""-��""��,'�"-",-�,����",-,�,,,,�,,,�--,,",�� __�,,,_,_,,__,,_, , I e-1vi , "' , ,___� " , I , - , _,� I " _-, ,,, ,� , " ,__ I � I ,,,__,_ ___,�-,R� _,","; , , - �,_ � ­ -1 11 _ ... � " I I ,;P;, _� � - _­ ", � I 11 'j, - " z 'i ',, -�!, , :: j ­ �' `�, '-',, -----,,---, "'i"', � THROUGHOUT ALL PHASES OF CONSTRUCTION. - t:R, N-11 � I 11 , _llf� I 1� � - '�' _ cn .4 , , 11 I I - ,, 1� " i -, . I , ,14 I � I - �_ll i I � 4 � �ju,� I _ �,, �,Nk'�.��,,� : " ,,,�,' - , �,',�,',' " ;4z 4� 1 1 �l I -, I , I r � '' ,_ 0 �� , x I I - ,- - � ` 1�' ­ 9 I " ll� I 1--,,�R,,"�-,-,- , , �', , " , " �y � I 1� - � I , , , I I - , � ` _�' -1, - I �� ; , i � 1 _,J�e5, "I", " �',,,',�, "I I """,_ - I �,`;__- - - �� I_A�" � 1, , , ... .. ... I I , - -,� , - ,��'_'..1_1'110' I , ''I _­,_,� if -_ ,�,z ,",�,,,!,,, � " F I �`,�,­��,� " -�, _ �, __ , B. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL � ,,�,,,,, I # I I I - , ___ � ,,,,,,� ­0 ?. ­� I I ­- " " � - _-, rV�N , , � 1�2 , "',_'­ I �, �� 4 ,­­ "­_! _, I - ", "" ,�­ : , ", � ��,,_,,",� I - -5 ,�,, �' _�i " : �_, � . ....... _', , - '� , - " - I _', ",I � -1 I 11 ;,�, � , , 1� ,�_ ",", � '',*-"--,,- ��,� -1 1­1'��'�,_�___ ��15`�,`,`,��_' ,� - ,­,- I " " - � m "�'111'1" �,� :, �o,��,,,,,,_ 11 ­�-_, - F; r _ I , � OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR , I � I , '' ,�l " � I 4zr_,-;QS " ­� _11�3111`111­, , - ,,,,, �-,�,,�"I'��l,'�,,�,,�,,���,;,-""7,��,., ��;lll I � 11--l-, "`,,,-,­-,,%,�- ­ _', I �� � �­,'�111'_l �, , -k-,­ -­-�k, --,,,i, IMAH � [ I . 1� ��' "I, �-?, � :,,� -, ", 1�1 llll,� ifi",� -,---,�,�,�---,,,,,,����,,,�""",,;"""","".-""""","",�,�, .1- -71 , �, ��, - ll:_;�� ­ - �, , , "" - � :��,­ "I -1 " v - '- -, �,­, , , 'IT I ­ � N 34042'26.68"1111 1_' _� 11- �`,�_�_"` -.-'-�l-,�ll'�"-l'�--�-",�,-�,,,',�",�,-"-",.-""�,,,�""",",��,!�,',"", I , ,I - ll� -1 � ­,� - " �_, . - �11 1_1,111 - 1, _ __ ��l �___� , I - f,:�� ... �l 11 I - I I ` ,I 11 �­ "'' , �_ 1'111'11'1'1�,,"� ""'�,�'�""-�,--"t�'ll�""II-�e�'�, , - - m Em"I r CN OWNER. ��,-�,�l',�'l""Ill,",�",�'I",","�""""""", - - , , " _m��` � � "', < ", - "'' N 34042'26.68" OR N 34.7074 A 11­­ - �11, - ­ I "", ­ 'I, "I"ll, " ­t,- , , - - �l I ��,:� '.. ,111- :v� �' I I - , , " � , 0 , , PH rTl f,�� __ I ,,�:� ,,�:� ,,�:� ,,�:� ,,�:� ,,�:� - I ,,�:� - �, I ,�,�,�_�'�,�� I I I - �,,�"1,1'1`711`%, , _'�`k_16_"lll2lll_` - " _1 i��,� ­�,,,, , � - , _­;� I - - ,,',',', W 77'8'57.49-W _6�m __`,"__"��l , ", ,`,"','�`,,',',',�' - : - 7708'57.49"W OR W 77.1493c % i ,� "�, ��Yl�,, _�I�j� I ­ :�"'�`,,,,!�-� I - ff I , I - ,-", -_ , .. I I - I _� -"- "I , - , I -1-1 "I �'_'_ I " __ , lll��'3 N P" lil", ­'-,;,"," , 11 ",".il"', �,,­ I ,� ,,,,,-_;.,,�5l"_l', - , � , �ff - __ ��`,,A""r , _,,k �:_ ��­ 1, I N � " I �'_�:l ,�,;,l,"'I'll!5 -, , , ''. �l , , C . SITE MAP MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR , I ­0 I'll, ',��,''­f"­.'­�_ � A� , '' : �& ��,,,,�,��,,_,, I �^ I 1, I I � `v--",-, ,,.��-"�,,.'-,�""","",""�,;�.,,-',��,'- j �y , I I , _� , - ,_,, ',,�,, " 4 4 &!�H &H , - , __-_ , ,.,,,� ��, I , -_ "'01F ALL TIMES. - ,z , __,�_ ,� I � � 1--__ � -� , , , REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT �;l ili,,�,­ _N. llll� - STORMWA __ I : I � " - ­ - ,, - "i , - - " , -11." %kA� � "I - , . ., STORMWATER OUTFALL #2 ;� I _ $� 1 ��,,�:.� - � __1111"", I �11_1'11_' ,�,�_-,� - - " - - ,_ , lX* , � � ,,-.,- I � ""I . STORMWATER FROM THE PROPOSED SITE % % , -1 ; "ll, STORMWATER FROM THE I , I :� -_ I ­ � - I �g ­ " - , I I - I I ,� - ­ ­11­�, � , "', - -- I I � . I - , I ENTERS A CLOSED STORM SYSTE I I I I , - ,'. , ,�ll - ly, , , ,� �4 11-11 ,,,, "I , , ,�,�",,�-,,,�',> ` , zl­ � - , " I " ­1`1_� �_'­ll "I" ­ , � A " _,,,,�,, ­ �1, � I ­11, -11 �­­_ r , I I � , ­ �, ­� " nl_�,,�'��1'11" ill""', I " I I ','__ll'l___'l2_l_,_ "", , ,�,,_1_51 I ,�i',�,'l , , D. CONTRACTOR TO LIMIT DISTURBANCE OF SITE IN STRICT � � , -- ,:,7 ; � i,l, I �,4,�� - Kz� I ,_,-, -,-, , - ACCORDANCE WITH SWPPP IMPLEMENTATION SEQUENCE, OR AS REQUIRED BY �� �,,',��N -- `l`-""l,_'l,� ,,,�',,,� 4 ENTERS A CLOSED STORM SYSTEM TO THE 11 ""' 1�� r M TO THE _�,' �1. I 1 '7k� � - - 1-11 , -, ­ _­,_ � - - , " ,,, " ", . _-,k� � , - - .1 ' '14'"', .­­ � " ,-,,- ��.�,,�,� , �-- , [�'5,, 0!!� I , " I , , ­ I 1111.1--­ - ­_ � , , � , ,-`��--;­`,,­ �-�,­, I ` - 1 4 1 : 1 '4, z ��.-_-,,,, 49 ,"", I � __4 -",'�,'��'-,,,',,��,' � I 11 11 111 I , :� 7 t!:�­�­- ""�-�-11�"11","".-��'I'l�'�"1"""-",;,.,-",-"l, , � �)pq .1 I ­ _- "'" � _-,_,-­�,�,,-,,-,-,-,_ 2 " , I I ; �_ I -, NORTH, ULTIMATELY ENTERING il, � I , . " " � / � I I I , - '. , r',� ," ,,�7�, " ,"_ _,,- """', I I 1_1�,� i �, , - ; , - , - , - I : , ; , - .. .. .. - I '� " - -1 I � - - � I , � I I _'_�� "I �1�; I i �_ I I I � , �,, , _,,�,,-, r�_�� 11 ��,�. k ,- , -1 I I CARTWHEEL BRANCH APPROXIMATELY : 'I" r , I I - � CARTWHEEL BRANCH APPROXIMATELY �� __ :.1 I , I . THE APPLICABLE GENERAL PERMIT. NO UNNECESSARY OR IMPROPERLY SEQUENCED CLEARING AND/OR GRADING SHALL BE PERMITTED. I NORTH, ULTIMATELY ENTERING �:` , ,�"'­,, i-� " .1 _ - I � I "" � � 'I-, I 11 �l 11 � ,�""-,�"-"",""�,,,,�,'.�,-�-,,'�,,��",-,F �"",,��,-,�l-,��-""�,�-,l-""�,�', � :�,, �`� " -, � , , , � I'll, , � ''I , � ­` - ,::-- __­ , " I I I -- `­_� ��:: �'a"""I'l-.1,11-l"", �_,_ - I ­`� , - _11-1 � � � k�lll'l � - I '­ "' - I - I I, ---- I I'll Z, ", - I I ,,,, I Al-, I I , , � - I � , , _:'l - "I'l-11-:1� I I '' � - � _,� - ­ ... �­­`�-� 4� ", � .1111RI, -, " 11 I I . I , , I ( ' �n , , ,,�,,�,,--,-�,,­ - A I , PH ��) _,,]�,i� ',,'I�i / I i�,� ", - I , ", " ��_ "'ll.'i'l-_ � _,�.2 E""� 1� , '��' -, ''. - 1� � � , - �1: _: ____ , , , "'I" "� �`l _� , � , : ., � I - "'. R,, , 11"', E. ALL DENUDED/BARE AREAS THAT WILL BE INACTIVE FOR 7 DAYS OR MORE, MUST BE STABILIZED IMMEDIATELY UPON COMPLETION OF I 1'1_11`�_"� I � I I i'-,. ` I I I - NF "' ,',_ , " ; : �ll-I'�'ll,"�"I'�"Ill""".,� ,l PH P4 P4 1��) ) 2,050 FEET TO THE NORTH. STORMWATER ... , "i I I ` " 710�j ��,�,,�""",,�,,,,,,,"",�,,,,,,.".",�-,--"', 1 2,050 FEET TO THE NORTH. STORMWATER : '' � , _Q I I , - , __�11'11" ", , , , I I'll __'l_��, " I r, " , , � I,V_­11�`�; - ­ I - " -_ , '' I �_ , , , " , �,, - 11 I �,� ", ''I I " I , �" , '. �`, I I 1� I , - I 1- I 11 I 11 I I � ", ��­­ � I - � �, f - " , � ", " ,� ''I ,,, -, , I eom,N I - �._, __�� E USE OF FAST -GERMINATING ANNUAL GRASS/GRAIN VARIETIES, STRAWMAY MULCH, WOOD I " : ll,� ��111', - 4 � - I - - - I I I - I ­'- -�::� "__,"�'_ I ''I - ,�""Z'_ , , , ;111'1�1 - `�, - ­ , .... �� "', :� i,�' I �- , �,`,,-,,,,�,'�`,,,, ,,--,,',, ,", \ A-1, ",", xe�i � _� ..... . . , . 4 _'i ,��,',� - - " ­'-­,-,-`;`7.. , " ,,_-, �, MOST RECENT GRADING ACTIVITY, WITH TH I `,, �_­,�,� 1.11, : EXITS THE SITE AT THE APPROXIMATE , I-' ��,)" � � -_ ��_ �_,E"",,�,, , "",',��,-,,- , " ,_,,u','s-,,-'�', '� I 7 .... V, - ,,",,, ,,,-,,'��",��,,,,�,,',,�,,��,,� � � I I - � ­ _ _,��_,. _�, : I � -, , � � , , "I ''. I , _` 11, � ,_-, , - I - , , ­­"­'_',­­­­ . "I I , __r '' � - ­ I __ ­ ��` �� N - - " . - , , '' , , , I 'k :1114?" I . _/ - _� ,_ , , cn I - ­, , I :;���,�,�,,',',,��"."",."�"""�,�"P",-,"",""�,,,','- - '' I __�x_ ��; ,,, , ­,`-, ` , " , I - - �, ''. �,, , -­,­­b,­-- - I __-, I ,_ , , �_____ , I , _,�', I �� �, 1� j ,*�,,,��-��,, , .... �__­__, " ,,��,,'�",-",""�-"""�,�,�""","-","","��,�-""", , __ . .. .. .. �, 1, , - '' ,_, 11, I �' ��, I _­ , ��l I I,: I'll `,": __�,���',"�&r 1,1�',,Ql� , fl: "I'll"n," I - I , ,�,c�,-:��,, I I _ �� I 11 -, ",;", ',­---­­, - -'­,'% � � . I , ,,,, ,,"� f, .. ... _'__ _ , ,�,��'I'l _ - - �,� CELLULOSE FIBERS, TACKIFIERS, N , , , , ..... . _ , " 11 I �;�,­, ll�_;",� '� _,�__�,, COORDINATES OF f , ­,�� 'I."-.---,"��,,��_-,,,�",."-�-""-�f"", _11�� I", '' .- �__ , "",- , � � �,� __ ""' - ` l-,,_11 �- �,' 0 L , ,, " __ _11',�,��',� zl'� ""', ,,� �,­­,--­-- , , I - � 1,----��,',�,,, 1, - ,,,, �i--,,,--.-,��,�,-,���',',,,,�---,�,,,'-,,",:,; _', ­­­­ �­--� --- , ,, , ", , - � __-��,�.�� ',,',, - `41,,�---,i , --, ,,--. - , , - 11 � � , , _�,,;,,�%*­ , ""'z,", .,,,_,,,,_, I ";", - - I � - _ "" - , , - PH �) �: COORDINATES OF 9-1111,171-1-1 I --.,-,,,,�""-,!"�'-,',,�-�"-""�,,,,,,�', '111.,_".�­ ...... _', � ,___ """ - , " , , __', ,�,, _'.� ____ �"""., "� � , ��,/,_�""",��,,',, � - " - ',_ . ... .... _ ­­ ­­ , �_��'_,_ - 1­11 ,"____ � , , , - �-- -- -��, ,_'n.- I , ,��, ,,,, �__­ t­ " , -, "", - - ,Z"`_�,,�,T :� ,,", "'' I ''I � - I llll�', 34 " ,,, _,________ - �, - ETTING AND/OR BLANKETS. COMPLETION MU I I EXITS, THE SITE AT THE APPROXIMATE -) , , ,� LAT: N 34*42'06.63" OR N ,701842 _ 1- I I I I I I , ­-� , Q ...... . .. ��z PH �) _;;� ST BE ACHIEVED WITHIN 7 DAYS. _;�.S-1 �­ e-111 , � I _ , __ - - - � , ­-, 6 , ,,, , ''", - , -, " , - - - 11 - ­� LAT: N 34*42'06.63" OR N 34.701842 "N' �_, , - - '' - " - -, 11 `1 - tftM`­`,", � -, `�`, I _'_ I � I " � -- -­ `- - -, I -i", I , � 1� I 11 , � - , �_� , t I , .,",,,-: ,,,­­:i��, - ­­­­� �_, I 1 , ,: 1-11 _- ,� - . � :_ ;­­, ,,, A: -­�­, , __� � - �'­' -, �, 11 �- � "' --,`��­, -,-,,', -,,,-,z� I I I ,-�­ , , , ­­­ � _�'2­,�, ",',-,?P',',-,��,��, - " , - , , 0,�I,_"" ----',, ", :, , -.1 - , ,,��,`��­,'_�,",.,�,' , ;��,,,,,_:� i,,,-_,,,-,,,,,,,,,, LONG: W 77'08'58.31"OR W 77,149531 �i',-,�g,,o,,,_ ,l - I I " F. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY ��0'11��;,,,,,�-", ,5 `3�� � , , I - � "�,"""""""", """ LONG: W 77'08'58.31 "OR W 77.149531 -- , , Z, �--l'�",--"��ll-""""�,�""I",-,"��,'�-."".��lI � , , ?4 ,,,, I I N P4 �,, __ I ,,,,,, - ­&� .. .... __ - �-�,,,�?, ;R,,,,_,,"'��",,�,� 1, � �­ , , _,,�_,�, - , ", � I � I " ", - , I �,1.11111­� �!"-,-,",-�-,�'I'l�I'l",T,�l,., , �, � - "--- __ , , _-, 11 _ - 1, - I " I "I I , - - _�r ", .. ... .. �1`1'1"`,'�"­, � - , I _ _,� � , �� .... .... " -, - , ��,, �_ ", -, �, �',ff,_ � , - ,, , ,_� �x �� - ... ��_ lS,,'5__, _1 ,,,,,, I I -_ - , " , " '111, - - _ 1: " I , - -, """' - '�' 'I; Q, '��",--�,�"'�--���',',Z�-�',,�', ,� "" I 1111, ==='�� STABILIZED AS SHOWN ON THE PLANS. THESE AREAS SHALL BE SEEDED, SODDED, AND/OR VEGETATED IMMEDIATELY, AND COMPLETED I , I , "'. �i,-��,,"��,�--�,,�,,,"f,�,",,,'--",�-',-,-'-,"',,� -,�-`,`,_` ,� .1 I : �� , ­­ I ,'_� `­ - � � e : ,, " __,r - k'�.�7 ,"-"-" ,��",--�,�,�- � I , I ­��__,,,��11,1'_�� I "', - ", , , , " - , , 11 � I - f - t �",',,��, I ;, "" "�, I I", - 1�__ _,,�1'11 -1, ,_ - " , I I , - :,,, - .� '1� I � " 0- � '' ,'_5;,: , "'A "I � 4 �,,-, _�, , I � I �'�l _,�', - ,­ - , _ - I , ', '_ � " I K - ", "' .1 __A� -, � ��­,,',��. 4�� __ ll�"._-_l"', , - " �1_ ,�--�,��,-'��,�""I"Ii��"""�-11,11,1��l''I I I , , I rn r ,� "I'll, , ,, , - - I ""', _:",, ""I'�l',�-""",�"""�"l'-.""'-��,11-�l""I",,�,111""-,-- '' lllo�l - ,111, "', ",',,� �� 1, 18 - 'A _ �4 - ,� ,::: -:t"", -­-,�', ;,',,,,'� -,­,-,_, '' -,i -, It, '�,'��,_ 5, ­ " - '' , ''R " � , I ­­ "' I'll -11 I '4_5 _ ,Y ',-'i��,-�,,-�?"",�,,,�,,�,,,�,,,, 340422 - ­­ lll;r I - 0 " � -', `� -1" S 9) NO LATER THAN 7 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS. REFER TO THE GRADING PLAN AND/OR "_ � I - " � - ,, '_ F N I �_,,, �,,1,11'6'1'11,Q,511 I I 0!!� '' - - "At"""'r ",,5��, , I � ' - - - . - �� I ; '_ I � ""r ­- I ,�` ,,, , ,,`��:i, " _ I �`,,`��,�.:M�, :, , - " -z��,�,,�­ � , ,_ "' " , "" " " "I - � I I � , ", " " `­`­­""' �'­'- � � I , �_ I , , , I , ­ -, ,,, � ­� � '��,'-,","',",",',�',r��"",�,,, ­,�;­"�'�,..', ', ,,',,,- I - , "_ ­,� ,_� , I -�",', ­� I 7� �_,�� � - ,-,-, ,,� �,- - " I I I N 34042'2.47" OR N 34.70068 IN I , 'I'll-, � �� -, X� 0 � -1 I �, � (j.j ''I I I , �___I_l "I'' -4,6�'�;,,,�",-.'�ll,�,'�,11,,,,-, � I � � 11 �� , , � � � 11 1, 11 �­1­1_11`�� I 1� __111 , I I I �t�� , : I � �. , � I , - � " ,,'�,,,:.,,�����-,���-,,�.""-, �"­l I _ , � n al,�,l �1'1 - _� 11 , - ll�� , H4 , , " ,­-,�,­, ­­�­­ ", W77-8,57.33,'W OR W n.149258 4 ",",�,5,R-z' �`,,� ,, ,,, LANDSCAPE PLAN. ­ I "I'll, ­­-,?'­,,�,,­', e�l , " -, � - 1, 1­1 - ­1111 ,." , I �, , , "' , - ­,­�,� � - - I 1� I I """", ,,, ,?�11` 11' ��'11�` ^�.`_l _11, - I- . -,��g��,�"",-".""-,",�',',','-�"",-"",--,��,���,--�,,�*,,,,,- I'll - --- W7708'57.33"W OR W 77.149258 t � I 11 �­�, �,,,�� ,,,�,l - ,,, - � � ��'­"�' . ,",�,"",�,"",", - -, --, �_.�, �,_� , I , , 1:,"-, I 0!!� \ I , , , , �­ I I V "�',',_�_,"­ � ... , - ��, 'El,"N' 11 1,vll'-�,, I '1� I I , , , "" I I I ��­ ­ w , -, � " , 'I" g�,_,, -, I 7�r�,, ,`��,"` � -",-","";,,�,:"",;-..,��,,,-,"'�,��'�',��,�""","���,�';',--�",,',,��,,�"", � � � 1, "', I'll, � ,,_", ,- 1, �111, "E�,,��,­,�__­ � ­ I I I I I'll 11,­ ­­, �:;a, - _ ,_ R"O"'. I , I I 1, I I 1, "I I � "I - , I I , , , I " I , � �, , I I -, I I ry �: " " � I '%l "I ":�­ '11111,�11,�'l ,,�""",�,-- �# �' - 4__4 - ,,,,,,,, ., � ,�-,-,,,,-,,,--,,,,,,�,-,-,,�""","","",,�"-"��� �4rn r'l er—.1 �,, 11 , ­; � ,_,­�, "';'. ,_ I , ,,�.�,,,,--,,,�-�,,,�,,,,�,,,.,,-,- 1-11" 1�', 'I, - : " "I'l- I I I � v, — :,�� 1, _,­,� G. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. -1, I I I - ,,, - ­111 , " __ � - 1- ,, ,,,, � - 1 ',,',�2��,�, ,��­- �,- N� - , ,- - _�,,,�t��_�`��l - - ,,, � �: ,:, . I 'T I ­, I I I 1-1 I '� , "', - �_,`X­l 11, '5111"?, e _1`11�"_'ll I , ��i�,�,, ��; , , - I I I I "I'll - "" - 1, , , TEMPORARY AND/OR PERMANENT STABILIZATION SHALL BE APPLIED PER REQUIREMENTS IN THESE E&S CONTROL NOTES. ''I ­ -, 1 ��: , ___ , - I ­�1'1, , , � I - , , _ " �� - �'­l ", -, � , Im" __4__ 1 1 " ,z,�,"� '' 4, - ,­ - " - � - , "I'­­1 .. . 11-l-", I 11 v�,�r,A_/ 11, ___'_ , I " " - � , , � , , ,,, - � , , e - I -, - 2�,X,� E ,,, i,,�­��,� ­_ ,,, 9� - - - _­ �1: ��,, I - I 1, , � , , , - - ­ ", , � N I I . �,,z`_-,,,','�,,,_ ': - �k I - r '' I � _, � - ­1�11",��`­�­KI'1_111 ,. 11- -­ - , - ___ - �11 J�_ - " , `--­`,�� "_ -1 _��, ""�ll_`,-l'_'_l' ",, I �l � , , � , A, ", -1 . , �­_, -l""', , �­�� 11 , �Pl�,',,_,_' , - _­�,,­_ V�l� , 111"I" ",,',"""",�,��"��,�,'��'I'll,fl�"I I 1 4 - -1, I ,,, �\'_' ,,,,o�,,, �,11,111 , " I ­1 .", '0 I ,��,,,,��-"���,,,,�,,�,-��,,,�,', I __ ,,,, _ I - - " 11 , �_ . I ." - _%, I �,'­ � , ", - � _ ,, 1'11?�l - \ _11 "c", �­­­,"l-,11- g imm!4 , % , I __,,, I , "ll .,� �,� 1� li��,, - "," , '1111".- A� , I I rz, 11 111-v - - � .. ... - k _'�, . 4�� 1 - I - � 1: __ ", �`��,, , _-­ ,�,�',',�,l I I I - I I I—, �� 1: _�. ,,�,, _,�,",__l,'l,ll_ - I ': r, - --l'­1-1- ,� I I ''I � � I � Z, f-l-l."', '_ I � , - - , - . I -, ­�, , , I , �,_�___ "PI'A ` - -11 - I �,lv , " - " 11 11 . . - - _1'1� -, fl!� � � ", �__ 1, ­7� , r---- �, �- - ��,,,,� _ �, � � - , _,r;, " � - \ , l ,�111','� 1�� , " � - - ,'�,�,,,,,'. 11'1141� - W_11` "I", : I , I - , I I , ,� I ", 'I�'ll.,�,�"-�,-,"���'I'�,,,_-_��, fil , - '�,,�,,-��_'� I 11 � 11 I ... ; - P� ", I , � �­_ I , , I 1� "'' I I - - � ;,�� I I I - ", - , " - 'A "" - - I , � I , , li�l - � I I H. DUE TO THE GRADE CHANGES DURING T " �,�_�­­`­:�`�,l ",�_`,�,.,`�,,�'l , - �, I I I _. , ��--,�-�,-,,',,��,�,-�,,,�f-,--,_,-_,��-,�,;�,,,,,-,,��--,-','I�"",�,-, _ ,��-",;""-.,�"""�,��,,���,--"","�,���,,�"."""�� � I O'� � �, W. �; ­ � I I I , '. ­� . , , -�,O��yr , �,��-,,��-�__ , I ,,,,-- _` , � � - I "X­,,:!�,_ , I I __ �­ ­�� - - ',­',"��l ON, %1, 11 I -1 , � ,,, ,,, - - " . �_ I - `- -, � �, -��­,­,,­��_ , "I I __ , , - 'A ...... -,-,,-- -,""", , , _� ,4- "I " ,, � , "I , ___l THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR -`�',,��,,,�',,-,�,�7 , ,,,��_ remmlo ,� ,; -i 6 , , I ­­,,_"l'_ , � ,, -, "' �,� � - "'ll""'N' ,�� � I " '' -- � -��`-,M,,,,�,�­� 1-1111 , _ ,�_ __ I � , - _ ­,"I'l,", ­ �,,,,,, � ,_e �� , , T - ,F?"'u?, 11""I" - I - 1� _ , ­1`11�_111­_` I" , , I �� �, I '""''' - �, ,�%­, �" . - _I._,',",-", '1� z , � � 11 , 1�4'1,�11,�"1`114'110' ADJUSTING THE EROSION AND SEDIMENT CONTROL MEASURES (SILT FENCES, ETC.) TO PREVENT EROSION AND POLLUTANT DISCHARGE I : I - -"""�,,-�-,���",�,�"",-"�'-i,,',,��,,'�,,,, �, ,,� - - 1 �4 �_lll 'N`�,,�, � , - � - ,-,, _,� ,�,,��,---��"%-"-"�-""",�,�-�� _,,_,,,,,,,0__, , I, , �,,, , , �_ , --- - , - -- "I ': ­�l I 1, -, ��" , " I , - - , - � " I " , '' , ll',.,'M_I'li�,�_ 11 - tt7�; _'�_ , �,,����,,.�,,,,,,,,�"""��,���,,-��,, ,-"-�",�",-�ll,�,"-�"",--'�,��,',�'l""I'��,"�l--,-:,,�_:�, - w I � Z � I EV " "I 1.1t14. -,r - , t, I , " 1. I 1; I ___,",/,-_-,,,-,,�', , ""","","",,�,�,,�,',,',,",, �H I"mm"I OFF -SITE. , - - " 'i""", -f_-,',,,-,�,-��',-�� -".�'�,""""i ... .. . , -,", rmM4 - ... �", , , , ��"'r�`,""_ " ,0,�NW ,]--�-" , I I ­­� I I - , , , "_", - ,,, I I ", "',�`-,"­': "I" . - , , I -A" �'-,,`N`- "I-,", ,,,,., - ,,, -,,-,-,,- -,, -, 11 - ,,,,, ,,,,, i, ,, �,,, , 1­1 - " - , __ __,_ � ,,, - - _-N - . , 'I'll , � i'�'-"�.��,'�'>,�--��,�,,,,',��""",�"�--',,�"",,�,-,,','�,��,,,'�,'� ... .... �_ - , , �� I '1111;­,_,�­,_�i' 1, : ,­,,,e�`,� """", .. f`,Y'�,��,�" - I 'r I 11 n'5____,__ - ""', - ,���, ; I ­ , ", , , .... � ­_� - ,� A­�,`,,,��`�,� , ­?,� I I - ,_,,I, �_,__' llll� ��',,-�""",,.",,�'�,/"�-,,�,.,�,,,��,�-,,���, - - � , - 1111111111 1­1 I _ , el", 1, -- '_ , `­ ", , I" �_� i,,�tl ,,���—�,-�,�,;""",�""",",�,-""�'�, "" , , , "' , " - I ," .� � I I � I .. I ,_�, , � 11- 11'11�1 ... � - - -I":, ,� , - " �__­` �� _ln�.'_ � . ....... I , I �',­ ­­­ , , I 1 4b,,'Ae�'1'1�11­ 1 1 11 : � - I - 1`­1_1 �l -- "I" -- - - , '_�', ,, I I , ", - I I 11 111_11,­ - - - I- , I _, �g l,"ll, "', , " -, -, , __" _Xf - ik , - - I - ,� " " I , I ` �lxl'l -_ __ 1, 11 � ,,�,­,­- - , 1, I ,_ �, ,�­�E­1­�-_, '' , I ­ -1 , " - - � - - I I �, , - I -A ____ , " _�, " """"""""] '�' �"" -, � - I I , , ----�,�ll'��-�'ll""�"Ilf",�'I'l""""i�,-�-,�,."�� -, - � I -, ', I � � , , , . I -:,��-�,'�lle--,���l-i�-"�.,�""-��,,�����il,�'l",�'��,,���ll""""",��,-1-11,��1--�""""","'�� , 11 , I "- �-��,� ��`,­,,` ,,',,,,,',,' `,� ,,,�,,�,,�, , , ­t I "I ", 1�'--- �4 0 1 _," ,�� , remll � : - , I'll � 4_ A I � \_ , - � ,­,, - ,- - - - - , _,_,�N,,,�,,,R, I - - ­ " -- ­ � -� - __ s,"'l, �, - � � ,,,� �_,,,.,,,,�.,,,,,�",--�,-,���-,-7, "", ", , , "'I'l - : ,� "," - - �_, ,�,,,i _ E - v I I _� I I , 1, , _� _ � ,, 1, I., lw- I c , -- - _�� I STORM WATER POLLUTION PREVENTION PLAN, SHALL BE MAINTAINED IN FULLY � , I , ��,", " - 1 -4 -ell " ^1� - �11� I 1�_v "I, ,r - �,,-��`o,-,­ -- ­ I " :," , ­ ,�;� ­,,,�,-�_,,�,'­�;9���l - " `1`1_,� , " -.1 , I 11" " I ­ - I I _� I " 1, , lll� I --- �71 'S,�,_ I "I , " 7 ­,141111,_11 -, L .... . ... - 1� - �1_111 ,_ - , , oii - WIV - , 5'-�' ., -­­­-­- , :,_,,''��,,','ez,,,�', �. ","': I ,. - --- ­t,,- .7 F I ­ - 1� I �� " �_-",",, ,� , � 141111 , , - I 11 .� I lw 7��;�,,;,� � , : - "I I - I I ­r 11 , I � 0 9 V Z_ , , -_-�f " I 11 "; - - , �: F�2mq - "' I �l I - �11 � , , '. - ­� ­11", tl�� , l ," 1��IfJl� N.i�lll­ �� I `�>,I'l ll,��; �_ �_ 11" I ""ll"ll" � ­�,�,�";�V' STORMWATER OUT I ­ " G,?qt_,> , , ­ - , "", rt? vl� 1. ALL MEASURES STATED ON THIS SITE MAP, AND N THE � , �, ... %, P4 �� le, S 4_ I , FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. ALL _Iax,,_w-� ", ,,,, -, ""' ,-, , #l­ 11 I ­ 11-1 I , , --,-, � ­, �i , - , I I I �0 `�,,',',-, , , - � �-'-- - - � �`-­, , , ��- ­�­ -­­, _-1,11 - N__ , , , 1�� - - ---,- � I I . - ­-, --, �� . 7 _s�, 1, ,� 11 ,,, - - � , --- -- � .__ , - ­ I " __ I ­� ��v ,�_ � , '' 11,11-11 �; ----.--,.-- � �, - SEDIMENTATION Y A QUALIFIED PERSON IN ACCORDANCE WITH THE I I I , ", ��,, ,,_,,,,_ I ___,>,11,1_� /, I � "'72?., _� , _k__, , ;�� T - ,� 2 _�_ ___ ­`­1 , , - - ­ , � "I ­1 I ir-- - f _ , I , - I I 2 _'____ � - :�', - - _� - -1 i , I I r - PROPOSED SITE " - , __ �16,_�,_'_; -1 , ­_ , ",_ � ��ln�-­l __-, �, N. CONTRACT DOCUMENTS OR THE ,,�-,�,-�,--",-"-�'i"�,�.,,,'�",'�,��"��',',,�",,',��,�',i ','�,"` ' , - ,�_', �, � __� I - I , I I ,_Z,� '� r%m �l _�� - I I -1111' - -r� I llll�­l z ­1 ­­ I ''I I � 11 ",,", � � I I 1 4 �, I � ' ' 51, � '� ''I , '� .... '57 � - - Z :Z .... �,,i 11v �� , W � - EROSION AND -, STORMWATER OUTFALL #1 1 � I--- 1-�,��0n,, STORMWATER FROM THE I I �___ " 0 - 1:11, I ,� -,�­'- � ---- � ,-,,,,;�� " ,_-, - I— t_`� - TH " , -F � ", . I - ���',-'-,-,'��,��-""",,�""r-,'�-,�.��� Z� " 1� - - 4 ,�', � J:w-�?, I , �1�_4;�,�_, -, ", I APPLICABLE PERMIT, WHICHEVER IS MORE STRINGENT, AND REPAIRED IN ACCORDANCE WITH THE -,:, - - __ SITE I - 1 - � lF ) STORMWATER FROM THE PROPOSED SI I t , -"-"-"' ENTERS AN OPEN CHANNEL TO THE SO �' , -1 I � -_ � � I - - - ­­ ` ' , 11 I I I - " I , , -�,,,-,,--,-,.,,,,"",-���,.,.', � __ ,l - 'J , I , I , , o , - I -- -­ - 7'� - - , "I `�,',,­, I I I I , � ., , :�-__, - ",�11--l-, , PLANS. ENTERS AN OPEN CHANNEL TO THE SOUTH � -� - � EAST, ULTIMATELY ENTERING HALLS "� _j � �� 11 � ,_,-�� � 0 - " - - ­ �Z `�112­,,�_1_4_1� ��,-, �' ,,,, _ , 11 , 1, , - -,- --�F�-� 1- � 11 WJ _-� -,,,`,,`,,',�,,'��,'�" 1- "­ , I . , - ­` �l �,P"",-;, ­ ­�� ��_� �, ..... . 2 , ,,, � - ­ ­ , -1 I �, � ,�, :��-��,,­7777;,�,_,I, �,E, I ��­ CREEK APPROXIMATELY 4,500 FEE I!r=q - - - I I . cn ", EAST, ULTIMATELY ENTERING HALLS � TO ... , """' __�' I � : ,�,�,�;�, �11'1 6�', .. .... . �­,,,�,, � - ''I , "',­,", ,l,,�V-__­­l I E �H '111­11,�, - ��;�? �, ,,,, -A", __ - , , ,��, 1�� -1 I .'', '', - zz, � !� _' ` '' � ,-�,,,,�,�,-,,,,,,-,,-,-.,,,,,,--,, , , -a--- , - , �'­ ­��, � I-, I - �,,�', "21" 'I-, " - liwffl!� yll ­� , - ­ , n"'_ ,�� �", N,­ /,`�� " � ­ J. STORM WATER POLLUTANT CONTROL MEASURES INSTALLED DURING CON �, ,- ,--" ­_ , -'THE ­­­;_ , ­­ , ,,,-,-,-,,, -­,��,,��- I ,-- - ,_,_�_ STRUCTION, THAT WILL ALSO PROVIDE STORM WATER CREEK APPROXIMATELY 4,500 FEET TO ,)l �l I I SOUTH. STORMWATER EXITS THE SITE' ; 11 ,� � �_,­�-s, - 11 �_ e­,,�_,�'�ll __:: , '' ' ,,,�,,,,,,,,,-�,,-��,,,���,,,,�',,�"",�,,--��,,, � - 2,_", 1 1511""' - I ��,,', - -1 ` _' - 11 'l-, � -1 _ ''" " - - "' I - , I _� - � , �, I � , - , -SPECIFIC POST CONSTRUCTION STORM _,:""��"," , "" , , �; � , - " I I ''I - I I I , __ q­' ,.-, 'A"', _ ,,,, - _ ­�� ,_ MANAGEMENT AFTER CONSTRUCTION, ARE INCLUDED IN THE CONTRACT DOCUMENTS. THE SITE ; � THE SOUTH. STORMWATER EXITS THE SITE I I 1­1 , '�_ � , , - �,�-i 4 �M4 ',�_ f 'i�', ,,,, AT THE APPROXIMATE COORDINATES OF -,�,,,,& """, I -�-""'A;M I I I i�,,,��_ ", 11 - , "I � � ...... . �,�'� I -, , , , I - I , , ­` ­­ I `_�' "I , _� - ­ I " -1 I WATER OPERATION AND MAINTENANCE (O&M) MANUAL IS INCLUDED IN THE CONTRACT DOCUMENTS. �� AT THE APPROXIMATE COORDINATES OF I I I I - �,-,�,,2--,,-�,-_r,�", �1-��`�,,,�:,"-"­ � I I'll - _ I& '­ I 11 A ,, -,,, LAT:N 34*41'54.64" OR N 34.69851 1'��', I I - -:-" �---,,-,,���-z,��,,,�,�""�,:,-,,,,,"', 1-1 1, I I , "' -l"", I I ­­_­__ I I- I - I I I ;"_--`­`, Wa , �11 - I , _'_'_n""��,'v I I --l", "" , I ­_1_111 �� `,,�`­ --,-",-,-�-"-"-"",���----,--,-",�,� I I -11 I 1�g�- - � _il,ll_,'l___ �,�x,,-_,,,,, ', '' -, llzl;ll,"ll,l I - I 1-2- ""'' '1,1.1�� , , , 'l,"-""�,,�""","�"-,-"""",,�,��,,�,,,,,,,,,��,�, vl� ,� �7 - - ­ - � �� , - ""'_ 1, - I I __ ,,, - - _-J", _11,11'_­�M " , _�l - - 1­�___,�,,�, - : , __4"""i"', I LAT:N 34*41'54.64" OR N 34,698511 ' - ­ � � "', ­`--­_,�. I I I "'IlE, " ,-1, 1, �, t�� , m__E�_ lia?,__ e-11 I I - , - - - _ �,,��,"��,���,��,�,,�",-",:,,�-�', - I- - I -�­�,`,,,��,Z"� - I -5 --- �­­ I I � '' il . �,;�,��."",��',,,�""",�,"�, - LONG:W 7709'1.29" OR W 77.1503580,,,,',',,_, � , ,� " ",`�-,R', Z'�,W,�,,�',���'�,'�,-,,.,",�,'�� " I ­ , -` -, , `�­"' -1. , X__­___ ­,` 11 __ I K - � TROLS AND SYSTEMS MUST BE INSTALLED AND FUNCTIONING AS DESIGNED AND FREE OF ACCUMULATED �l �,__ 11, 1; �, �,��,--"c",�,�,,',,�,,',.,,,-",�,�,. , __,�Zlm: — "' I'll I � IN `--;�- ­,�-,AN ,- I , -, , `­ , �­ , - I I , , - - ­ K. ALL PERMANENT CON I LONG:W 77091.29" OR W 77.150� _r 111. I I - , I " I , �1714,:_!w - 1��­ll I - - - I I I d ,­,�� ­11 , , I I ""I"', I'' ­ ­__ lllmi,-I'v�lll��.�,�� - I I - I ­ I'll I I ­lcw_�,­_ ­­­ ­ 6i� - 1� ',.11,�,- - I - - -,� -, M I � �� - I- ,',�' - � -:-W, -1 - I W, " _1­11'=* �� - �, - , ,_l_ ',�,�",-, - 11 - __�,�, __ , ", I , � : I , 8,;�,�Nll '', I I _� - , ,��,;', r ��_ -, _�,�, _�', __,, DIMENT AND DE 1�_ - ;,e: �� �� , -_ I , , _Nw � _,_"l-�;, ll__�l "I , �, - I - '' _,� SE � , 1, �,?,�� ... I , " - ,�� - " 1 -4,;�,'lff , el I I BRIS DURING FINAL PROJECT INSPECTION AND APPROVAL. 15- ,� , I �7� 1_1­ , , r-^ P-1 'f i­ I ` -1 � " - '111- "", - - , ��, I I -1, 1, �_ -,,�.-"� �l I 0_1��,,, ,% ___��_,' - 1- , I- " �� I �A', I , �� �_ � 1, , � �­� , ,we% ___,'��_l � - �"", _� - 11 � -, 1, I , I h �� cf) , - � - � -1 � � , ; I I N'lv 11 " ", 11 " I I I I - '' I 'I, I I I ­ __1�1, I IN i­­­' ­1, I - -1- � " 4 , , � I I I > - , - 11 I I I � "I I �, : H"I - - , � 11 . � - i, lil,�,',' 1�', - - I " I", I �; ,,,,- V, � ,�, ", 11 I 11 I .� ­­ - ­ -, � , , ___ I I I , I \� '7�1 "I" � '--' �q 11 � v --, I" __ - , , , ,��,gg , — � I I -, , , "­_ - 11 I - 1 ,7p, r, I I g 1�,__l I , � ­ ", - , "'! L. ALL MECHANIZED EQUIPMENT WILL BE REGULARLY INSPECTED AND MAINTAINED TO PREVENT CONTAMINATION OF WATERS AND I 1,; � - ­ �,� - --- I � I I � _­ i '' I - _t _111 _i - ­ ��_ I I - " � A, - , I" "�,�,,��' I I �� I ­­­, I I I �)W' - �_llvrl z , � ,� " I I I I �11'11_ I., ; I , 11,11111',":,� Al\,�. "" �'_,',"�,��,­_ 1`_� 51" , , I I 'lu - - : ", IN., , , I ,r �'�-,,g, � I WETLANDS FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS, OR OTHER TOXIC MATERIALS. IN THE EVENT OF A SPILL OF PETROLEUM �,-�:­"�-,,-,��--,�,:� I - , `11,'_��11!11`�,,� . I - - I b 4�___ "."'," I? , - `-, , ", , - , I I "I 1;.1 � - � , I '' - , I'v`-, �11'11'11k`�,_'���:�_ � I I 111; I - 11 ­ I _p I � ',--,�­'­�--, -, , "7__,,,�__ 1 � 11.1 I �_ - - -m;o , ­­��y .E_��"l ,`,�,` " ��,� _, , I _­_­_­lllll!, � �, '_.�, I I g - I I - �1' , � � ,_ 11 ��;�� ­11,llil - I I I I - ''I " I�T�P7_ �, , e. ��.�_ __ � , � �11_1'1111_ - - __ - ,% TTEE � I ""-�,- ;_ , , 11 - 'O 1 -0368 AND PROVISIONS OF THE N OLLUTION AND HAZARDOUS �, " I ju� ` . 1�1 - 11 I I 11 I �-,,"5.,',-,',,, -1 , ­�_ - I -,� , I I ,� RAWN I ,,,, I I - - � 1, 'N 1� I'll 1511' 1 11 - I I I I - q -A"� I I - - I I I 11 ''I '__ 11 � I -�;�,�.��, 'A, - - , ­­ 11 - , ___ � � m RESOURCES AT (919) 733-3300 OR (800) 858 . _ . ... I 1­1 ",f -� 7 "ll"", -14 - 11 , -1 , ll_,f,­ , - I � ,_,",,,�, ­_ , ­­� - �" , , " v" 'T!l;;l " W, _�,�,, "�"i,, k— 91 '�,,�, , , 1�1_1 'L --` - - , 'I'll — � - I � � __ 11 , � _�,,,�5'_,,' ",,S, __ 11 I �__o BAB , � I _��, A., E�` � ll,'�, `�_l I N34041'11.11 OR N 34.68641 __ � ... I � - - ­100"'e,", ­ , , , " _ I:- , iZ "I - - - - _­ '! ­­­­'�,�Y-,', I- �1'1 I - _�_�,' n­_111­1__,�_1'0*�� """"',"', I , "' _1 -r - �,­:,��__, "'� - i I 9' �­ � I �' - - "I _`��l _ - ., ­_ _, -_ - 1­1 I Lm I � e_S� --- I _', III,_- - -, I I - � , ._,�� I I _5 2? 2 - SUBSTANCES CONTROL ACT WILL BE FOLLOWED. ;�, , , �l I `�; "L0.""', - ','s_-,-"-_­','-"'.'o, S *�I_ill _1 �,_, - -, , I ") , __ ", . , k `�---- - v � _'__"�l'_'9y , PRODUCTS OR ANY OTHER HAZARDOUS WASTE, THE PERMI SHALL IMMEDIATELY REPORT IT TO THE NC DIVISION OF WATER � ,�,�, - - . N , , 1�1 4�1111 "I", / '. , � , ��,-,,,��*--,, N : �-'' f A-11 i_ D '_ 1,75' D c,�­',� I � m� , , , - .�­,,,,- - __ " , - '7',, & ,,, I 1 1, ,� �, -, 1 �`�IA4 " , " I - ,7, -� _4 " �, 1� " "I _��­'­'�:_�z,_::�_�, ", 17 "I'm , I : 1, m 1�1'111'��11'11, ''I it'' I 11 ,��,, ",.� ,,,, i , � 5 I - '' 11 I- , - _A� W 7708'48.45"W OR W 77.146792 1 I" ll`�',� _�,�� - , "" �,�,"�',,;i,,��'1111­�,;, I 111,1_ - _____ , , ­�_, 1 21 � A_�,R�A.-, - - ��­, I � � �,,, ,-'�-11�'I'�'I'��,,�-�,��l',�", ��­­ ��",, � _ , , I -­ -!���',�__ I �il� �, '' I 1� ­1 .z", i% --- ,'' , I 1, I I ", I , ­ I I 11 , ­­,ll " I - '­ ,�,�, �,�_ , , _�"_k - - I , , , , , " - " I 1� '' _ -, I � ,�"1'1�11",", 1-1-1-1 �p , , _'_ ; � � - I �� I ,� " - � "" " , �_ - - -jy I I t��: , '' A, �,,;�J'1'1'11'��'r" "�'_�, —, ��,� � , ,� ,,�:� .. ..... , � I 11 - '' ,�� , ; �� 1� - � I ­11- � ll'� " "; � 1__L,�Z -, , 10'', I , 1 -,,, ", I I I �"�� '�,,�;,_ `lm� L. - 7 - I i� ,, �,��­ ,� 11, I - I'll 11-11,11 _,_Z� -1 _1� _,�ll � �:,�,� - I I I I I , -11 I I , ." , '' ��, -­ ',��71'11��,�,, 1,��,� . � I I ...... 1'�111' - � , -I , � ,,, ­­­,­,�", '' - I , - I ,'A'E1.A ''I �,"l-J". /OWNER: MAT , ,""""'."', ,,-��,���:�""���,',�,���,,�,-,� ,'­­_,,­­­­l I I I I I I a �� I I - '. , I k - - I - ­L�, , , 6 - 1.11i ',,,� ��­ , '­ t "I" -1 _lj, I I I --- �_�JA ,�, - __ I "'I " - ,5 -, __ 6�' lt_',,'l'_l___, , "' , N3404111.11"O I I Ix I _10 -- -, -0 - ­ - ­1 I _lzk I �1. �_� � - -, - '­ - �­,n "" _,� " Rk 1 1�1,lol�,11�1_��'m ". ,,,,t, ,,,�,,,-,,,-,,��, I �1` 1.,:�, _�,_ ­ - I I I 1`11'�`,� '', - I -MART REAL ESTATE , , - ", , _� 1�1 " , - , � I'll 1­1 ­ I %At 7 � �� " I 1, - __Wvl,� 1 , ,,, WAL DATE '' I , "" - I , , ­-, I I ''W,r __ - 4, , ­_ � ",,",�,": �_:,��7 80�i�, �ln_,"� __ __ �A I __ ��Zl A-- � -, 1��,' ''' , , 7;;.., " ,, - �;,,�­ - . I ,� " "I"" _e� �Hz� I _ - ,,, �, � --- -- 11 " __ ; i 708'48,45"W Of - �_ - I I ,,, � j4­Pt::,;;, , ,; ,�_:,j ,,, " - � I- -, � - � ' - 11 I , - " � , X �,_ � ��,, , , , " m I - r7v- 1­1­1� - -0-1 I �yi�%:t. - " Ill,_-_ �_E_��ell ­ , Ir 1, 11 -1 1, ������ �, - � -, I BUSINESS TRUST 4/2/19 ,� ,,,'� I l,,`,�z;';,,,,, ­�'_'_;�� . . .. ... 2- �, F��tl� I/ r__� _flrtA�WmmlAlvl­ I'l- -, - 11 _1 ,, w I �_ USGS QUADRANGLE MAP SITE LOCATION MAP MAIL STOP 5570 SCALE NOT TO SCALE NOT TO SCALE 1 2001 SE 1 OTH STREET ASSHOWN � I JOB No. I 1 72716-5570 N CC 1 38078 - 479-204-3314 SHEET SITE OPERATOR /GENERAL CONTRACTOR: 44 � I �GENE AL �NOTE. - SUPERINTENDENT: S rm" IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT I - — .4 I I WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION, SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO SWID - P1 ] Du N 0 TEr" S - THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN I . WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE IMPORTANT: GC MUST SIGN ALL PLAN SHEETS I I ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. FULL CONFO WITH L - S AND DE . I ___ - I I - I - - I . - GEI . - FAR ( P THI . �Aj 13 (E - H 77, SWANS _7�1�4� 1 _­,­ �,_:,,,'­ I � ­11 - I - I'll ...... .�­, � � ��'i. le; - T I � H:IQ013\NCC138078\DRA\MNGS\PLAN SETMAN SET (DRIVEWAY EXTENSION)\NCC1380780PX.DWG PRINTED BY. RBRELAND 7.08.19 @ 9:49 AM LAST SAVED BY: RBRELAND I -,--' - I I ­ . . I ___ __ I � I - — , � � YPARCELS w. PHASE I LIMITS OF WORK 1 = 250' 0 � yb z 1 e r PHASE II LIMITS OF WORK 1" = 250' SwPPP IMPLEMENTATION SEQUENCE NOTE: UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING, LAY DOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, MASON'S AREA, FUEL AND MATERIAL STORAGE AREAS/CONTAINERS, SOLID WASTE CONTAINERS, ETC., IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES IN LOCATION AS THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS, IN ADDITION, NOTE ALL AREAS WHERE FILL IS IMPORTED FROM OR SOIL IS EXPORTED TO ON THE SITE MAPS. NOTE: DOWN SLOPE PROTECTIVE MEASURES MUST ALWAYS BE IN PLACE BEFORE SOIL IS DISTURBED. ACTIVITIES ARE PRESENT IN THE ORDER OR SEQUENCE IN WHICH THEY ARE REQUIRED TO BE COMPLETED. CONTRACTOR SMALL REFER TO THE PROJECT SPECIFICATIONS FOR DEWATERING RECOMMENDATIONS DURING CONSTRUCTION. PHASE I 1. CONTRACTOR TO HOLD PRE -CONSTRUCTION MEETING WITH NCDEQ PRIOR TO COMMENCING ANY ACTIVITIES ON SITE. ATTENDEES MUST BE NOTIFIED A MINIMUM OF 30 DAYS PRIOR TO MEETING. 2. INSTALL THE SWPPP INFORMATION SIGN AND POST REQUIRED DOCUMENTS NEAR THE PLANNED CONSTRUCTION EXIT ON WEST CORBETT AVENUE, AND WITHIN EASY ACCESS TO THE GENERAL PUBLIC WITHOUT ENTERING THE SITE. CONTRACTOR SHALL ENSURE THAT SIGHT VISIBILITY FOR ONCOMING TRAFFIC IS NOT IMPACTED. 3. STAKE/FLAG THE LOD (WHERE STAKING IS NOT POSSIBLE/PRACTICAL, THE LOD MUST BE CONSPICUOUSLY, AND PROMINENTLY, MARKED TO DENOTE THE BOUNDARY). LOD MUST REMAIN CONSPICUOUSLY MARKED THROUGHOUT THE ENTIRE CONSTRUCTION PROJECT. LOD SHALL BE STAKED AS CLOSE TO PROPERTY LINE AS POSSIBLE WHEN IN CLOSE PROXIMITY TO ALLOW FOR FULL AREA TO GRADE NEAR PROPERTY LINE. CONTRACTOR SHALL CONTACT CEC FOR FURTHER CLARIFICATION WHEN APPLICABLE. 4. INSTALL PERIMETER SEDIMENT CONTROL BMPS IN THE VICINITY OF, AND DOWN GRADIENT FROM, THE LOCATION OF THE PLANNED CONSTRUCTION EXIT, CONSTRUCTION OFFICE TRAILER, AND TEMPORARY PARKING AND STORAGE AREAS, AND ALL PUBLIC RIGHT-OF-WAY FRONTAGE. INSTALL PERIMETER SEDIMENT CONTROL BMPS ADJACENT TO EXISTING DRAINAGE FEATURES. CLEAR ONLY THE MINIMUM AREA ABSOLUTELY NECESSARY TO INSTALL THESE PERIMETER CONTROL BMPS. PERIMETER BMPS SHALL BE INSTALLED AS CLOSE TO LOD AS POSSIBLE TO ALLOW FOR CONSTRUCTION. 5. INSTALL STABILIZED CONSTRUCTION EXIT, AND SET THE PROJECT OFFICE TRAILER. TIRE WASH MAY BE REQUIRED IF CONSTRUCTION EXIT IS NOT SUFFICIENT TO RETAIN SOIL. 6. PREPARE TEMPORARY PARKING STORAGE AREA.. 7. INSTALL INLET PROTECTION ON EXISTING INLETS WITHIN THE LIMITS OF WORK AS IDENTIFIED ON PLANS. 8. HALT ALL ACTIVITIES CONTACT THE CEC TO PERFORM INSPECTION AND CERTIFICATION OF BMPS. BMP CERTIFICATION MUST OCCUR BEFORE STORMWATER PRE -CONSTRUCTION MEETING. (THIS SHOULD BE SCHEDULED IN ADVANCE, IN ANTICIPATION OF THE EXPECTED DATE WHEN THE ABOVE SEQUENCE ITEMS WILL BE COMPLETED.) ALL EXCEPTIONS NOTED ON THE BMP CERTIFICATION FORM MUST BE ADDED AS DEFICIENCIES WITHIN THE BMP CERTIFICATION FORM AND RESOLVED WITHIN 24-HOURS. BMPS MUST NOT BE CERTIFIED IF ONE OR MORE OF THE EXCEPTIONS WILL NOT BE RESOLVED WITHIN 24-HOURS OF THE BMP CERTIFICATION BY THE CEC. IF THE CEC IS UNABLE TO CERTIFY THAT SITE CONDITIONS ARE PER PLANS AND SPECIFICATIONS, THE CERTIFICATION OF BMPS MUST BE RESCHEDULED. THE STORMWATER PRE -CONSTRUCTION MEETING MAY ONLY OCCUR AFTER BMPS CAN BE CERTIFIED. GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT THE STORMWATER PRE -CONSTRUCTION MEETING WITH THE CEC, OWNER'S CONSTRUCTION MANAGER, AGENCY(IES) AND SUBCONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. DAILY STORMWATER INSPECTION REPORTS IN THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER MUST START ON THE NEXT BUSINESS DAY AFTER THE SITE BMPS & PRE -CONSTRUCTION MEETING CERTIFICATION IS SIGNED/CERTIFIED BY THE CEC. 9. BEGIN DURING STEP 9, DEWATER THE EXISTING DRAINAGE FEATURE AT AREA A (IF WET) AND THE EXISTING STORMWATER POND AT AREA B THROUGH SILT BAGS TO THE EXISTING DITCHES. INSTALL ANY REMAINING PERIMETER SEDIMENT CONTROL BMPS. CLEAR ONLY THE MINIMUM AREA NECESSARY TO INSTALL PERIMETER CONTROL BMPS AND STOCKPILE SUITABLE MATERIALS IN STOCKPILE AREAS SHOWN FOR CUT SOILS GENERATED DURING THE CONSTRUCTION OF THESE MEASURES (TO PROVIDE DRYING AND TREATMENT AS NECESSARY TO MAKE MATERIALS SUITABLE). EXISTING WET POND FOREBAY TO BE PUMPED AND BAFFLE INSTALLED AS SHOWN ON PLANS, BEFORE POND GRADING OPERATIONS MAY COMMENCE. EXISTING DRAINAGE FEATURE WITHIN AREA A TO BE PUMPED DOWN TO INSTALL PERMANENT CULVERT, WITH INLET AND OUTFALL PROTECTION AT EACH END, RESPECTIVELY. IF ANY UNSUITABLE SOILS ARE ENCOUNTERED, PRIOR TO BEING HAULED OFF, DIRT FOR FILL OPERATION MAY BE HAULED IN AND STOCKPILED. STOCKPILED MATERIALS SHALL BE STABILIZED IF NOT WORKED FOR 7 DAYS AND WRAPPED WITH SILT FENCE. 10. HALT ALL ACTIVITIES CONTACT THE CEC TO PERFORM INSPECTION AND CERTIFICATION OF BMPS. ALL EXCEPTIONS NOTED ON THE BMP CERTIFICATION FORM MUST BE ADDED AS DEFICIENCIES WITHIN THE BMP CERTIFICATION FORM AND RESOLVED WITHIN 24-HOURS. BMPS MUST NOT BE CERTIFIED IF ONE OR MORE OF THE EXCEPTIONS WILL NOT BE RESOLVED WITHIN 24-HOURS OF THE BMP CERTIFICATION BY THE CEC. IF THE CEC IS UNABLE TO CERTIFY THAT SITE CONDITIONS ARE PER PLANS AND SPECIFICATIONS, THE CERTIFICATION OF BMPS MUST BE RESCHEDULED. 11. CONTINUE TO DEWATER POND/DITCH WITH PUMP. 12. GRADE AND SHAPE PORTIONS OF POND FOREBAY IN AREA B, AS SHOWN ON THE PLANS, ONLY BEHIND BAFFLE AS SHOWN. 13. MAY START FILLING OPERATIONS IN ROADWAY AREA IF MATERIALS DRY BEFORE IMPORT IS COMPLETE. 14. INSTALL ADDITIONAL PROPOSED PIPES AS NOTED ON THE PLAN. PHASE Il 1. BEGIN CLEARING, GRUBBING, AND STRIPPING THE SITE AND ROADWAY AREAS. (PHASE CLEARING AND GRUBBING TO THE EXTENT PRACTICAL TO MINIMIZE THE AMOUNT OF AREA DISTURBED AT ANY POINT IN TIME) 2. BEGIN GRADING THE SITE WHILE ENSURING DRAINAGE IS CONTINUOUSLY ROUTED TO THE INSTALLED CONTROLS AND INLETS WITH INLET PROTECTION. 3. ONCE POND AREA FROM PHASE I IS GRADED AND STABILIZED, CONTRACTOR TO REMOVE PHASE I BAFFLE, INSTALL PHASE 11 BAFFLE, AND CONTINUE TO PUMP THIS FOREBAY AREA UNTIL FINAL GRADES ARE ACHIEVED. 4. BEGIN GRADING IN AREAS OF ROADWAY IMPROVEMENTS. 5. START CONSTRUCTION OF ROADWAY IN AREA A. CONTRACTOR SHALL KEEP EXISTING DRIVEWAY OPEN FOR ALL TRAFFIC UNTIL PHASE I11. CONTRACTOR SHALL NOT CONSTRUCT PROPOSED CURB ALONG CORBETT AVE. SO AS TO OBSTRUCT EXISTING DRIVEWAY ENTRANCE. CONTRACTOR SHALL INSURE THAT TURN CONSTRUCTION DOES NOT IMPEDE ON TRUCK ACCESS AND DOCK OPERATIONS. 6. TEMPORARILY STABILIZE, THROUGHOUT CONSTRUCTION IMMEDIATELY FOLLOWING THE COMPLETION OF THE MOST RECENT LAND DISTURBING/GRADING ACTIVITY, ANY DISTURBED AREAS, INCLUDING MATERIAL STOCKPILES THAT ARE SCHEDULED OR LIKELY TO REMAIN INACTIVE FOR 7 DAYS OR MORE. 7. IMMEDIATELY PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO FINAL GRADE. 8. INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, UTILITIES, CURBS AND GUTTERS. 9. INSTALL INLET PROTECTION AT ALL STORM SEWER STRUCTURES AS EACH INLET STRUCTURE IS INSTALLED. ` ARV N aj z� OUTPARCELS w t rr �. ,� -ram_ +� ' .�•., .. �" �' � '` _ _ t r f PHASE III LIMITS OF WORK 1 = 250' PHASE III 1. CONTINUE GRADING THE SITE WHILE ENSURING DRAINAGE IS CONTINUOUSLY ROUTED TO THE INSTALLED CONTROLS AND INLETS WITH INLET PROTECTION. 2. COMPLETE GRADING AND SHAPING AND IMMEDIATELY STABILIZE THE BANKS OF THE NEW POND FOREBAY IN AREA B. 3. DEWATERING EFFORT TO CONCLUDE AND TEMPORARY BAFFLES ARE TO BE REMOVED FROM NEW POND FOREBAY IN AREA B. 4. CONTINUE GRADING IN AREAS OF ROADWAY IMPROVEMENTS. 5. CONTINUE CONSTRUCTION OF ROADWAY IN AREA A. 6. TEMPORARILY STABILIZE, THROUGHOUT CONSTRUCTION IMMEDIATELY FOLLOWING THE COMPLETION OF THE MOST RECENT LAND DISTURBING/GRADING ACTIVITY, ANY DISTURBED AREAS, INCLUDING MATERIAL STOCKPILES THAT ARE SCHEDULED OR LIKELY TO REMAIN INACTIVE FOR 7 DAYS OR MORE. 7. IMMEDIATELY PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO FINAL GRADE. 8. INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, UTILITIES, CURBS AND GUTTERS. 9. INSTALL INLET PROTECTION AT ALL STORM SEWER STRUCTURES AS EACH INLET STRUCTURE IS INSTALLED. 10. STABILIZE AREAS TO BE PAVED WITH STONE BASE. 11. COMPLETE GRADING AND INSTALLATION OF PERMANENT STABILIZATION OVER ALL AREAS. THE SEDIMENT BASIN HALL BE DREDGED HAS BEEN ACHIEVED S S S DGED T 12. ONCE ALL LAND DISTURBING HAS BEEN COMPLETED AND FINAL STABILIZATIONO ORIGINAL ELEVATIONS AND VOLUMES, REPAIRED AS NECESSARY FOR THE POND TO FUNCTION AS PERMANENTLY DESIGNED. REMOVE SNORKEL, H RACKS. THE RISER STRUCTURE AND ALL PI INSTALL THE APPROPRIATE TRAS PES UNSEAL THE BMP ORIFICES AT THE BASE OF THE STRUCTURE, AND S MAIN FROM USE AS A SEDIMENT BASIN. E SHALL BE INSPECTED AND CLEANED IF NECESSARY TO ENSURE RESIDUAL SEDIMENTDOES NOT RE SEDIMENT SHALL NOT BE WASHED INTO RECEIVING CHANNEL AT END OF OUTLET PIPE. CONTRACTOR SHALL ENSURE THE POND MEETS PERMANENT STABILIZATION REQUIREMENTS. ONCE SITE IS STABILIZED, INSTALLATION MAY BEGIN ON INFILTRATION TRENCHES (SEE INFILTRATION TRENCH DETAIL REGARDING CONSTRUCTION AND MAINTENANCE REQUIREMENTS). 13. PAVE SITE. 14. ADJUST INLET PROTECTION DEVICES FOR PAVED AREAS AS WORK PROGRESSES, PER BMP DETAILS. 15. ONCE PROPOSED DRIVEWAY EXTENSION HAS BEEN COMPLETELY STABILIZED AND APPROVED BY INSPECTOR, CONTRACTOR MAY DEMO EXISTING DRIVEWAY AND REMOVE ALL DEBRIS. ONCE DEMOLITION OF EXISTING DRIVEWAY IS COMPLETE, CONTRACTOR SHALL COMPLETE CURB INSTALLATION ALONG CORBETT AVE. 16. OBTAIN CONCURRENCE FROM THE OWNER CONSTRUCTION MANAGER (CM) THAT THE SITE HAS BEEN FULLY STABILIZED AND ALL CONSTRUCTION HAS BEEN COMPLETED, THEN: A. REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS), B. STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF TEMPORARY BMPS, AND C. ASK THE CM TO CONTACT THE CEC TO COMPLETE THE CEC PRE -NOT SITE INSPECTION AND REPORT (ONLY CM MAY DO THIS). 15. CONTINUE DAILY INSPECTIONS AND REPORTS UNTIL THE CM FINAL DAILY INSPECTION REPORT, MARKED'READY TO TERMINATE PERMIT', IS SIGNED BY THE CONSTRUCTION MANAGER AND SUBMITTED VIA THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER. NOTE: THE GENERAL CONTRACTOR MAY COMPLETE CONSTRUCTION -RELATED ACTIVITIES CONCURRENTLY, ONLY IF ALL PRECEDING BMPS AND STABILIZATION ACTIVITIES HAVE BEEN COMPLETELY INSTALLED. BMP-RELATED STEPS IN THE ABOVE SEQUENCE ARE BOLDED FOR CLARITY. THE CEC MUST APPROVE, IN WRITING, ANY CHANGES IN THE ABOVE SWPPP IMPLEMENTATION SEQUENCE, BEFORE THEIR IMPLEMENTATION BEGINS. THE ESTIMATED DATES OF IMPLEMENTATION OF POLLUTION CONTROL MEASURES SHALL BE DOCUMENTED BY THE CONTRACTOR ON THE SOIL EROSION/SEDIMENATION CONTROL OPERATION TIME SCHEDULE ON SHEET SW-6. S W D "SEE'd1QUENCELIM ITS 0 11 "91A 110,1, MINIMIZATION OF DISTURBED AREAS: 1. CONTRACTOR SHALL MANAGE CONSTRUCTION ACTIVITIES TO REDUCE EROSION AND RETAIN SEDIMENT AND OTHER POLLUTANTS IN THE SOIL AT THE CONSTRUCTION SITE. 2. CONTRACTOR SHALL MINIMIZE THE TIME BARE SOIL IS EXPOSED. 3. CONTRACTOR SHALL MINIMIZE SITE DISTURBANCE BY MINIMIZING THE EXTENT OF GRADING AND CLEARING TO EFFECTIVELY REDUCE SEDIMENT YIELD. NOTE TO GC: OWNER HAS AUTHORITY AT ANY TIME TO LIMIT SURFACE AREA OF ERODIBLE EARTH MATERIAL EXPOSED BY CLEARING AND GRUBBING, EXCAVATION, BORROW AND EMBANKMENT OPERATIONS AND TO DIRECT THE GC TO PROVIDE IMMEDIATE PERMANENT OR TEMPORARY POLLUTION CONTROL MEASURES. DEVELOPER/OWNER: WAL-MART REAL ESTATE BUSINESS TRUST MAIL STOP 5570 2001 SE 10TH STREET BENTONVILLE, AR 72716-5570 479- 204- 3314 SITE OPERATOR/GENERAL CONTRACTOR: SUPERINTENDENT: IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. REVISIONS *) BY NCDOT REVISIONS 1 4/2/19 RJB NCDOT REVISIONS 2 5/21 /19 RJB TRC REVISIONS 3 6/7/19 RJB 4 TRC REVISIONS RJB 6/19/19 5 BID SUBMISSION RJB 6/21/19 6 SWPPP SUBMISSION RJB 6/26/19 APPROVED FOR CONSTRUCTION a ' THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 v BOHLER E N G I N E E R I N G 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering,com IN CA-Ro 043610 W - I/111A %'V\\\\ b moo P-H P, l�J � I� b DRAWN BAB CHECKED MAT DATE 4/2/19 SCALE As9 NOTED JOB No. NCC138078 SHEET V V rm"� H:\2013\NCC138078\DRAWINGS\PLAN SETSIPLAN SET (DRIVEWAY EXTENSI0N)1NCC1380780PX.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:49 AM LAST SAVED BY: RBRELAND REVISIONS B NCDOT REVISIONS. 1 4/2/19 RJB NCDOT REVISIONS 2 5/21/19 RJB TRC REVISIONS 3 6/7/19 RJB TRC REVISIONS 6/19/19 RJB BID SUBMISSION 5 6/21/19 RJB SWPPP SUBMISSION 6 6/26/19 RJB APPROVED FOR CONSTRUCTION n - o THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 w BOHLER ENGINEERING. 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www. Bohl erEngineering. com .) W 043610 z - ♦I DRAWN BAB CHECKED MAT DATE 4/2/19 SCALE 111=60' JOB No. NCC138078 SHEET e 2 4.wl 1-1:12013WCC1380781DRAWINGSIPLAN SETSIPLAN SET (DRIVEWAY EXTENSI0N)WCC1380788S0.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:51 AM LAST SAVED BY: RBRELAND DEMOLITION NOTES 1: THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSAL (IN A LOCATION APPROVED BY ALL GOVERNING AUTHORITIES) ALL gp� STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING, DRIVES, DRAINAGE, STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ON THE REMAINING PLANS CAN BE CONSTRUCTED. ALL. FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THE SPECIFICATIONS. w^ I 2. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING THE DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR IS I ! RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. I Q I 3. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF UTILITIES. THE F- CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES. ENUE �.4. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THIS PLAN HAVE BEEN DETERMINED FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN R13ET E��(NC HWY FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO THE START OF ANY I I I lo0' ww DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR ONSITE LOCATIONS OF EXISTING UTILITIES. Cn Q 35 MPH SPEED LIMIT (ADT: 27,000) 5. ALL EXISTING SEWERS, PIPING AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION; OR AS THE ONLY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY I 1 COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH THE WORK. UTILITIES T C 8 DETERMINED TO BE ABANDONED AND LEFT IN PLACE SHALL BE GROUTED IF UNDER BUILDING. P �BFP L �BFP LP Xo�s H® HOB HO - UP wM _ _ - _ _ _ -- -- _ (r� PP, 6. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BE REMOVED OR RELOCATED SHALL BE COORDINATED -�- `-' WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY -`~`� % � iI�- f - F t� f - F F F t IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN THE �� � -� � NB ® I I I I 7. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC., (AND OTHER APPROPRIATE BEST - ---- --- ---- _ I MANAGEMENT PRACTICES) AS APPROVED BY CONSTRUCTION MANAGER. zrz -- - -- = _� --- -- - -- - - -- - - -- -- - -- --- -- -- - - - - _ - - - - .- - - - -- -- - - - - - - - -- - - - - - - - -- - - 8. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE EXISTING FACILITIES. i I $ K' ` li •� 9. PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED. 7 I { K I I 10. SHOULD REMOVAL AND/OR RELOCATION ACTIVITIES DAMAGE FENCING, LIGHTING AND/OR STORM INLET STRUCTURES, THE CONTRACTOR SHALL PROVIDE NEW MATERIALS/ STRUCTURES IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. EXCEPT FOR MATERIALS DESIGNED TO BE RELOCATED ON THIS PLAN, ALL OTHER CONSTRUCTION MATERIALS SHALL BE NEW. _ _ -® _ 1.QII _ J.CI `� _J.aB_ _LAn,-----....� _.....L�, Q - - -_--_-_ -_ - - - _ `11. CONTRACTOR MAY LIMIT SAW -CUT AND PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE IT IS REQUIRED AS SHOWN ON THESE CONSTRUCTION T£L C1® -- 7m:aq 7 PLANS BUT IF ANY DAMAGE IS INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IT S REMOVAL 7 _-------------------- - C f ! F9 F� FM FOP FM f�A F�4 tr�9 F F# F, f�l ` F� F,I9 -FM - - - AND REPAIR. HO--- HO w HO - -HO MO NO HO HO HO HO HO HO H HD HO HO H HO HO I O = HO HO ' � PP JB 12. THE CONTRACTOR SHALL COORDINATE WATER MAIN WORK WITH THE FIRE DEPARTMENT AND ONWASA TO PLAN PROPOSED IMPROVEMENTS. P C I �� CW CONTRACTOR WILL BE RESPONSIBLE FOR ARRANGING/PROVIDING ANY REQUIRED WATER MAIN SHUT OFFS WITH ONWASA DURING CONSTRUCTION. ANY i C A COSTS ASSOCIATED WITH WATER MAIN SHUT OFFS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND NO EXTRA COMPENSATION WILL BE I M 1 \ I WAL T REAL T TE BUSINESS TRUST PROVIDED. I I I r 9 803 13. DAMAGE TO ALL EXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE. --�. I I �' MB. P.192 14. EX. WATER SERVICE LINES NOT TO BE REUSED SHALL BE ABANDONED AT THE MAIN. THE WATER SERVICE LINE SHALL BE DETACHED FROM THE CORPORATION STOP BY REMOVING A THREE 3 FOOT SECTION OF PIPE AT THE MAIN. - Ke tone � � � � (I ( ) i � , 1 N/F ` i Contractors, c. = C II Ali 15. SANITARY SEWER LATERALS SHALL BE ABANDONED AT THE MAIN LINE WYE. THE SANITARY SEWER LATERAL SHALL BE DETACHED FROM THE GRAVITY BENCHMARK DEVELOPMENT CORP. f A84494 P.9 y j 1 F i ( 0 1 r 1 � ^ � MAIN BY REMOVING A THREE (3) FOOT SECTION OF THE LATERAL PIPE AT THE MAIN. THE CONNECTION AT THE MAIN SHALL BE CAPPED OR PLUGGED 0.8.2139 P,747 N/ o Troct 1 ! CIRI BENCHMARK DEVELOPMENT CORP. ( i j o ( (� _ BASED UPON A METHOD APPROVED BY ENGINEER. THE SANITARY SEWER CLEANOUT AND LATERAL SHALL BE REMOVED FROM THE RIGHT-OF-WAY TO Tmct 2A D.B.2139 P.747 i 1 M.B. 72 P.43 I H' TOTAL LOD - .�� AC THE PAVEMENT/BACK OF CURB AND THEN THE REMAINING LATERAL SHALL BE CAPPED OR PLUGGED. M8.56 P,194 I N F 1 I 1.10 Ac. 1 i 1 I 8 56Tract P. BENCHMARK DEVELOPMENT CORP. C I ' 16. CONTRACTOR SHALL ACCOUNT FOR UTILITY CONNECTION/DISCONNECTION TIME FRAMES WHEN BIDDING PROJECT. M.D.B.2139 P.747 a I 1 H Tract 2 o I ( I 1 i I 17. CONTRACTOR SHALL BE RESPONSIBLE FOR BUILDING DEMOLITION PERMITS. MR 72 P.43 � I 1.15 Ac. I I 18. FOLLOW NCDOT PAVEMENT WEDGE DETAIL FOR WIDENING OF EX. ASPHALT. 19, GC TO COORDINATE CULVERT REPLACEMENTS WITH ADJACENT PROPERTY OWNERS, o i v I 1 I I 1 I 20. FOR LOCATIONS WHERE GRADING IS TO OCCUR AROUND UTILITY POLES AND GUY WIRES TO REMAIN, THE EXISTING ELEVATIONS SHOULD BE MATCHED WHERE POSSIBLE. IF REPLACEMENT OR RELOCATION IS NECESSARY, GC TO COORDINATE WITH UTILITY PROVIDERS. AR r n a 40 20 10 0 40 1 40' GENERAL NOTE: 'HE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PRI >COPE PRIOR TO THE INITIATION OF CONSTRUCTION, SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELA PECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RED ING PRIOR TO THE START OF CONSTRUCTION, FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSI TANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWING,' FULL CONFORMANCE WITH LOCAt REGULATIONSAND CODES. I 21. TELEPHONE, FIBER, UTILITY, ETC. ABOVE -GROUND BOXES, MANHOLES, ETC. ARE TO REMAIN WHEREVER POSSIBLE. IF LOCATED IN PROPOSED PAVEMENT, MANHOLE FRAME AND COVER TO BE TRAFFIC -RATED. GC TO COORDINATE WITH UTILITY PROVIDERS. I 22. EXISTING WATERLINE TO BE EXCAVATED FROM THE SHOULDER SIDE OF THE ROAD WITHOUT DISTURBING THE TRAVEL LANES. 23. ANY LANE CLOSURE MUST BE COMPLETED PER LATEST EDITION OF THE MUTCD. LANE CLOSURE SHOULD NOT BE IN PLACE BETWEEN THE HOURS OF 6AM-9AM AND 4PM-6PM. I I I 24. THE EXISTING ACCESS ROAD MUST REMAIN OPEN TO TRAFFIC UNTIL THE SIGNALIZED ACCESS IS OPEN TO TRAVEL AND THE TRUCK TURN BEHIND THE II BUILDING IS COMPLETE 25. GC TO REPLACE EXISTING PVC WATER MAIN WITH DIP WHERE PROPOSED STORM PIPE RUNS PARALLEL ALONG WEST CORBETT AVE. PROPOSED DIP WATERMAIN TO EXTEND 10' BEYOND PROPOSED STORM PIPE. DEMOLITION LEGEND III I I II I I EX. STORM PIPE TO BE REMOVED AND FILLED WITH NIF PLOWABLE FILL IN PLACE. t'IWAL-MART REAL f STAX BUSINESS TRUST I { 9.8.4527 P,803 I I O PORTION OF EX. DITCH TO REMAIN. LOT 1 I I ) EX. STORM STRUCTURE TOP TO BE REMOVED AND MB.73 P,192 C I I NOTE: CONTRACTOR TO PROTECT WIRE/POLE DURING CONSTRUCTION Iz EX. 60" MH .- -!- INV IN 2603 (30 LOD- INV IN 2835 (18") EX. 60" MH .:� � , INV OUT 25.93 (30� EX. CURB INLET INV IN 26.33 (30 C RIM- 33.000 INV OUT 29.46 15" o INV IN 28.60 (157 RIM' 32 7400 INV OUT 26.23 (307 H'' RIM. 3309 - H i I EX t8 RCP LOD X a i o EX. 52.43 - X 30" RCP i ® 0.829' o ! EX HW X o INV IN 25.50 (30� I t TOTAL LOD = 0.36 AC 0 REPLACED PER SHEET C-4.0 O SAWCUT OF EX.PAVEMENT. OEX. FENCE TO BE REMOVED AND REBUILT IN NEW LOCATION. O REMOVE EX. FENCE. EX. GRAVEL DRIVEWAY TO BE REMOVED. O EX. UTILITY TO BE PROTECTED. O EX. LIGHT POLE TO BE RELOCATED 0 EX. ASPHALT TO BE REMOVED. OREMOVE EXISTING STRIPING BY GRINDING. O EX.CURB AND GUTTER TO BE REMOVED. O APPROXIMATE LIMITS OF EX. DRIVEWAY TO BE REMOVED. O EX. SCHOOL ZONE FLASHER TO BE RELOCATED. DEMOLITION/REMOVAL ]LEGEND DEMOLITION/REMOVAL NOTE TYPICAL NOTE TEXT _-_.-------------_. EASEMENT LINE CONCRETE CURB & = s : =- i GUTTER 0 UTILITY POLE TYPICAL tZi) LIGHT ACORN LIGHT ---�---- TYPICAL SIGN SPOT TC 516.4 OR 516.4 ELEVATIONS -------w------ OVERHEAD WIRE STORM ■■■■■■■■■■■■■■■■■■■ SEWER HYDRANT res ins SANITARY 1 MANHOLE ��} STORM MANHOLE WATER 0 METER wv WATER m VALVE rl ELECTRIC OUTLET LIMIT OF - LOD . ,, � - L O DISTURBANCE CUT PATCH AREA (I8R) TO BE REMOVED (TBRL) TO BE RELOCATED REVISIONS BYr NCDOT REVISIONS 1 4/2/19 RJB NCDOT REVISIONS 2 5/21/19 RJB TRC REVISIONS 3 6/7/19 RJB TRC REVISIONS 4 6/19/19 RJB BID SUBMISSION 5 6/21/19 RJB 6 SWPPP SUBMISSION RJB 6/26/19 APPROVED FOR CONSTRUCTION o ' THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 BOHLER ENGINEERING 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering.com 010 w AL m w-4 043610 ; A CID b 8 r"MI® c, �4rm!!l vm!lo ^00 0 DRAWN BAB CHECKED MAT DATE 4/2/19 SCALE 1 "=30' JOB No. NCC138078 SHEET 0 H:@013WCC1380781DRAWINGS\PLAN SETSIPLAN SET (DRIVEWAY EXTENSION)WCC138078S86.DWG PRINTED 8Y: RBRELAND 7.08.19 @ 9:52 AM LAST SAVED BY: RBRELAND ml 100' RIW 35 MPH SPEED LIMIT (ADT: 27,000) 50' DECELERATION R" L 100' TAPER 159 STORAGE mmV yA a STOPa . j d A A nz-D SITE LEGEND (NOT ALL USED THIS SHEET APPROXIMATE LOCATION OF SCHOOL FLASHER TO BE BE COORDINATED BY GC. d PROVIDE NEW SHOULDER MOUNTED ASSEMBLY SITE NOTES �B PROP. 2' WIDE MONOLITHIC CONCRETE MEDIAN WITH 0.5' OFFSET TO SHY STRIPS. C� 18" CONCRETE CURB AND GUTTER TYPICAL. SEE DETAIL SHEET. (NOT TO BE USED IN ROW) 1. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL TOWN/COUNTY REGULATIONS AND CODES AND O.S.H.A. STANDARDS. OD ARROW PAVEMENT MARKINGS TYPICAL. SEE PLAN FOR TYPE, SEE DETAIL SHEET. 2. CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF VESTIBULES, SLOPE PAVING, SIDEWALKS, EXIT PORCHES, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. OE "STOP" SIGN. SEE DETAIL SHEET. 3: ALL DISTURBED AREAS ARE TO RECEIVE FOUR INCHES OF TOPSOIL, SEED, MULCH AND WATER UNTIL A HEALTHY STAND OF GRASS IS OF STOP BAR(SSWL/12"). SEE DETAIL SHEET. ESTABLISHED. G SSWU8" SINGLE SOLID WHITE LINE / 8" WIDE. CHEVRON/ GORE LINES PER NCDOT 1205.09. 4. ALL DIMENSIONS AND RADII ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. H PROP. RIGHT TURN LANE. 5. CURB AND GUTTER IS PROPOSED FOR ALL LOCATIONS OTHER THAN TO ALLOW SHEET FLOW INTO WET PONDS ON SITE. 6. EX. STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE ABANDONED, REMOVED OR RELOCATED AS NECESSARY. ALL COST SHALL O PROP. LEFT TURN LANE. BE INCLUDED IN BASE BID. O PROP. CURB TRANSITION. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, (UNLESS OTHERWISE NOTED ON PLANS) INCLUDING BUT NOT LIMITED TO, ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS & POLES, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE K O 30" CURB AND GUTTER. SEE DETAIL SHEET) WITH GOVERNING AUTHORITIES REQUIREMENTS AND PROJECT SITE WORK SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST SHALL BE INCLUDED IN BASE BID. O CONTRACTOR SHALL CONFIRM EX. PAVEMENT MARKING LOCATION. 8. SITE BOUNDARY, TOPOGRAPHY, UTILITY AND ROAD INFORMATION TAKEN FROM A SURVEY BY A LAND SURVEYOR. O PROP. SIGNAL EQUIPMENT BY OTHERS 9. THE SITE WORK FOR THIS PROJECT SHALL MEET OR EXCEED "THE SITE SPECIFIC SPECIFICATIONS". N O PROP. MONUMENT SIGN UNDER SEPARATE PERMIT. SEE DETAIL 10. SIGNS SHALL BE CONSTRUCTED BY OTHERS. PER TOWN OF SWANSBORO ORDINANCE(SEC. 16-13, PYLON SIGN ALONG W. CORBETT SHEET. (ELECTRIC SERVICE TO BE COORDINATED BY G.C.) AVENUE CAN BE NO LARGER THAN 64 SF AND 20' TALL. (SEE ARCH. PLANS) O PROP. THROUGH/RIGHT TURN LANE 11. REFER TO ARCHITECTURAL PLANS FOR SITE LIGHTING ELECTRICAL PLAN. OP PROP. THROUGH LANE 12. ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN �Q PROP. FLUSH CURB WITH PAVEMENT. PROJECT DOCUMENTS. � SBWU4" MINI -SKIP WHITE LINE / 4" WIDE. 13. VARIOUS TRAFFIC CONTROL DEVICES HAVE BEEN PROVIDED IN THIS PLAN. REFER TO DETAILS FOR ADDITIONAL INFORMATION. SO SSWU4" SINGLE SOLID WHITE LINE / 4" WIDE. 14. SEE DETAIL SHEETS FOR CONCRETE AND ISOLATION JOINTING DETAILS. 15. THE EXISTING ACCESS ROAD MUST REMAIN OPEN TO TRAFFIC UNTIL THE SIGNALLED ACCESS IS OPEN TO TRAVEL AND THE TRUCK O DSYU4" DOUBLE SOLID YELLOW LINE / 4" WIDE. TURN BEHIND THE BUILDING IS COMPLETE PROP SIDEWALK TO CONNECT TO FUTURE 16. CONTRACTOR TO NOTIFY OWNER OF PROPERTY PRIOR TO REMOVAL OF SCHOOL SIGNAL EQUIPMENT SIDEWALK IN RIGHT-OF-WAY 17. SIDEWALKS SHALL BE CONSTRUCTED BY THE DEVELOPER WHEN THE ADJACENT LOTS AREA DEVELOPED AND PROVIDED ON ALL Q PROP. POLY VINYL CHAIN LINK FENCE TO BE GREEN OR BLACK PER WALMART. SEE DETAIL SHEET FRONTAGES. RELOCATED LIGHT POLE 18. COORDINATE FINAL LOCATION OF INSTALLATION OF SHOULDER MOUNTED SCHOOL FLASHER WITH NCDOT, ROSS KIMBRO, 910-341-2200. SHOULDER MOUNTED SCHOOL FLASHER SHALL BE BEHIND SIDEWALK, AND WITHIN ROW UNLESS NCDOT OBTAINS AN EASEMENT FOR Q PROP. EDGE OF PAVEMENT AN ALTERNATE LOCATION PRIOR TO CONSTRUCTION. O EX. STRIPING AND ISLAND TO REMAIN APPROXIMATE LOCATION OF SHOULDER MOUNTED SCHOOL FLASHER. SEE NOTE 18. PROP. THROUGH/RIGHT/LEFT TURN LANE. BB PROP. LIGHT POLE V a A 1 Ev I M, 16) 4' STANDARD a A A CONCRETE a•' a A as a HATCH LEGEND d• ',fie. HEAVY DUTY CONCRETE ,a � r y ja re, NCDOT r / f / r PAVEMENT of rr fe-" e MILL AND // �, e f �, e/ I OVERLAY �iri� PAINTING STRIPING LEGEND y 41 GRAVEL AND VEGETATIVE STRIP y y SSWU4" - SINGLE SOLID WHITE LINE / 4 WIDE 30 15 7.5 0 30 SSYU4" - SINGLE SOLID YELLOW LINE / 4" WIDE DSYU4" - DOUBLE SOLID YELLOW LINE / 4" WIDE EACH SBWU4" - SINGLE BROKEN WHITE LINE / 4" WIDE 1 "= 30' SSWU24" - SINGLE SOLID WHITE LINE / 24" WIDE REVISIONS BY NCDOT REVISIONS 1 4/2/19 RJB NCDOT REVISIONS 2 5/21/19 RJB TRC REVISIONS 3 6/7/19 RJB TRC REVISIONS 4 6/19/19 RJB BID SUBMISSION 5 6/21 /19 RJB SWPPP SUBMISSION 6 6/26/19 RJB APPROVED FOR CONSTRUCTION THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 BOHLER E N GIN E E R IN G 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering.com 4` 11 i l 1 +t 1 `' w L, = � r 043610 � � b C44z t F�1 t� E F� DRAWN BAB CHECKED MAT DATE 4/2/19 SCALE 1''=30' JOB No. NCC138078 SHEET O 0 H:12013\NCC138078\DRAWINGS\PLAN SETS\PLAN SET (DRIVEWAY EXTENSION)WCC138078SKDWG PRINTED BY: RBRELAND 7.08.19 @ 9:52 AM LA81 sAVtu bY: Kt5Kt:LANU REVISIONS BY NCDOT REVISIONS 1 4/2/19 RJB NCDOT REVISIONS 2 5/21/19 RJB 3 TRC REVISIONS RJB 6/7/19 4 TRC REVISIONS RJB 6/19/19 BID SUBMISSION 5 6/21/19 RJB SWPPP SUBMISSION RJB 6 APPROVED FOR CONSTRUCTION 0 THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 BOH LER qGINEERING 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineerin L m W: Lu 043610 Z 0- 11A 1111111% A& Lm �� A ��® E if -It fell �4 0 DRAWN BAB CHECKED MAT DATE 4/2/19 SCALE 1 11=30' JOB No. NCC138078 SHEET Crmmq 3103 1-1,12011=1380780RAWINGSIPLAN SETSiR-AN SET (DRIVEWAY EXTENSION)\NCC138078SS0.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:52 AM LAST SAVED BY. RBRELAND r VEHICLE SIGNAL HEAD, UIRED BY PLANS S REQUIRED) MOUNTED BRACKET W/CENTERPOST /2" SLIP FITTER (TO IMBER OF SIGNAL FACES) OER BASE, IF REQUIRED METAL CAP -41/2" OD SCHEDULE 120 STEEL PIPE o PAVEMENT co SURFACE tr r rr 1/8tt RA fl. Srt Btt � tt RAD. 2" AD PAVEMENT 1/8t' RAp. trC Z� 1/2 RAD. 6 2 -O i %g11 RAD. 1/4" RAD. SURFACE 3 zcr=C (:.. rt A LL ,.,.I O H Q O cn = _ 3 RAD._ %8" RAD. o � � � • • O oo cn = � 1.5" ASPHALT SURFACE COURSE (S-9.5B) 1-WAY VEHICLE SIGNAL HEAD, w cc Q U„ tD �' a _ : c' O 4CO y :q , U.I d ` LL, AS REQUIRED BY PLANS k- U O , tV p D • rr rr 1— 0 CC O (AIM AS REQUIRED) H I- Z ;- •o• ; ° .' ;a•; �° II�, `°' ,� T- �,. p ''a• h CV a;a• N 13/ " RAD. j �_.. F- ` 2.5" ASPHALT INITIAL COURSE (I-19.OB) CONCRETE PAVEMENT SECTION 4 w c� �0 crr -611 13�" RAD. 1'-6"� � Z F -T POST -TOP 4-1/2" SLIP FITTER 1�•1 t.. " 1 t-8" CURB AND GUTTER 8'r 9" CL 6" COMPACTED STONE BASE AVEMENT SURFACE Iy a 2 fi CURB AND GUTTER p 8" X 12" OR 18" 91' X 1211 OR 18 f r UJ Q TACK COAT (SEE PAVEMENT DETAIL) 4r _ ar PROPOSED CONCRETE CURB CONCRETE CURB (APPLIED LO A RATE O O OF 0.2 GALLONS/S.Y.) x 2r-Otr 2t��tt EDGE OF o PAVEMENT 2r1 RAD. 21-01' C'S 8" 2t-$" MIN. 1`-O" 1'-O" �.;:':: 's.:•` �'.^ �i "•.r.a`.:' :.,4:...rx 0 1/8 RADIUS 11/ It in - - - - - _: }< . .° y ^I I ICI I I=111`I 11=1 � I ICI I M I I� 11=11 I-1 l I-111-1 I I_I I �! 11=11 I_111=1 11= _ Y : ae s A I- 12 tr o .. �'' --- �.---- .---r- e 44 a �1 III ;III- I I El I I=;1L1= 1, ,l : w ., pC v• a°~ ti o: A Q e.. 0 4 tr .- a•, 0. ,'�" n tt q..:b?';• C tti I� ��� i1 Itr 7 o O o v g p '� o 0 Err ;v• v, :a 7 c. .6..MN �,r LL 1 rr ;z,. �'';' xr. LL W COMPACTED SUBGRADE $rr 0r 1- (PER SITEWORK SPECIFICATIONS) z -� SSWAY G T R z W EXPRE U TB_._. SHOULDER BERM GUTTER �LLI B+r X 6" MEDIAN CURB VALLEY GUTTER Qcc: i� NOTE TRANSFORMER BASE, IF REQUIRED ®� G' +� � 1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF 11 PER GEOTECHNICAL REPORT W w SECTION VIEW OF CURBS OR CURBS AND GUTTERS pEt ©p a PREPARED BY S&ME, INC, ENTITLED INITIAL GEOTECHNICAL EXPLORATION REPORT; HANDHOLE ° ccIY = WALMART SUPERCENTER #86290 SWANSBORO, NC, DATED 4/18/13 (PROJECT „ 8 j co FILL 3/8 X 1 DEEP p !.� L7<,1 #1051-13-378G). REFER TO SPECIFICATIONS MANUAL FOR COMPACTION uj GENERAL NOTES: ..GROOVED OR SAWN cc Z J z -PLACE CONTRACTION JOINTS AT 10' INTERVALS, EXCEPT THAT JOINT WITH JOINT z uj cc REQUIREMENTS. H" m A 15` SPACING MAY BE USED WHEN A MACHINE IS USED OR WHEN fn w SATISFACTORY SUPPORT FOR THE FACE FORM CAN BE OBTAINEfl SEALER 1 tt JOINT SEALERuj >" to WITHOUT THE USE OF TEMPLATES AT 10 INTERVALS. 1 „ /8 RAD. GUTTER ?- cc 0 Q -JOINT SPACING MAY BE ALTERED IF REQUIRED BY THE ENGINEER. . 18 RAD. PAVEMENT SURFACE u -CONTRACTION JOINTS MAY BE INSTALLED WITH THE USE OF SURFACE C� Z 'Q �+ �+ TEMPLATES OR FORMED BY OTHER APPROVED METHODS. ":n :p ; . 9 ° ': o HEAVY DUTY ASPHALT PAVEMENT SECTION CONCRETE -TO -ASPHALT O-ASPHALT DETAIL u NOTE U CONSTRUCT NON -TEMPLATE FORMED JOINTS A MIN. OF 1%2" DEEP. a' r oC 1.., „ rt o; o; o• .p. _p,. NOT TO SCALE NOT TO SCALE 1 . IF PUSHBUTTONS ARE INSTALLED, CONNECT PUSHBUTTON TO CONTROLLER -FILL ALL CONSTRUCTION JOINTS, EXCEPT IN 8 X6 MEDIAN CURB, PROPOSED a q a �' v v ', w WITH JOINT FILLER AND SEALER. CABINET USING LEAD-IN CABLE. BOND PUSHBUTTON HOUSING TO y., r CURB & GUTTER PROP. rr CABINET GROUND USING CABLE GROUND, -SPACE EXPANSION .JOINTS- AT 90 INTERVALS AND ADJACENT TO PAVEMENT �� � JOINT FILLER ALL RIGID OBJECTS. JOINT 2. BOND PEDESTAL ASSEMBLY TO CABINET GROUND WITH #14 AWG LONGITUDINAL JOINTTRANSVERSE EXPANSION JOINT TYPE THWN. IN CURB AND GUTTER 3. REFER TO ROADWAY STANDARD DRAWING 1743 FOR PEDESTAL SHEET 6 OF 6 1 SECTION VIEW OF JOINTS SHEET 1 OF'3 TRUNCATED DOME PATTERN INFORMATION, ,+� +� 1 105 - V 846.01 i EDGE OF CURB cn NOTES: • 7 1. CONSTRUCT PEDESTALS ON FHWA APPROVED BREAKAWAY BASES OR ANCHORS. O W20.7a CENTER zLANE II6_4 = V •d .e� o t 4 : 2. CONSTRUCT PEDESTAL FOUNDATIONS IN ACCORDANCE WITH STANDARD DRAWING 1743.04. H O 0 . 46" X Ott" $ cwsm LL J tCi.I { ® a • a d' ° -4ILL e n e 3. HEAVY DUTY PEDESTALS ARE DESIGNED FOR USE IN ALL WIND ZONE REGIONS. !1 _ AHEAD 00 ( _ A 4 a' v d PEDESTAL BASE REACTIONS USING 41/2" OD SCHEDULE 120 GALVANIZED STEEL PIPE ARE: 0 (n WS-3 = LJ � •4 .0 ' a °• e ® G AXIAL LOAD: 600 LBS LLJ Q Q LL• JR4"2X 24" 48" X 46° (_ Q d 0 � < � 4 a 1- U O '•SLOPE• • SL®PdE SHEAR LOAD: 1,500 LBS V cr O (g 260'= 10:1 TAPER Q sO-� FULL HEIGHT CURB _' CURB TAPER „ e , a e MOMENT LOAD: 14,500 FT-LBS E,- I- t94" X 24" LLI G 3-2 Q F-- 1 RADIUS H25' 20' CONE }-- _ 12:1 MAX: d , 12:1 MAX. 4. BASE REACTIONS ARE BASED ON A DESIGN LOADING FOR 2 - 12" SIGNALS (n 1-. U O J MAX. SPACING 1-- ILL © -' 00000000 000000000 a d AND A 48 X 48" SIGN, DO NOT EXCEED DESIGN LOADING WITHOUT APPROVAL. (� O H 4� O O 2 S. ALL ELECTRICAL CONDUCTORS INSIDE OF BREAKAWAY SUPPORTS SHOULD SHEAR OR OZ = 3 " a 00000000 000000000 ea d 00000000 000000000 as BECOME DISCONNECTED AS CLOSE TO THE FOUNDATION BASE AS POSSIBLE DURING H A. a e 00000000 000000000 a ' A KNOCKDOWN. REFER TO ELECTRICAL CONDUCTOR SHEAR DEVICE DETAIL. I- 1-4� H IF ALTERNATIVES ARE AVAILABLE THEY CAN BE USED PER APPROVAL OF THE d L}J O ENGINEER. e © �« # aLLI6. DO NOT USE BREAKAWAY ANCHOR BOLTS WITH THIS TYPE OF PEDESTAL. % WELD 4142" OD PIPE TO CENTER I OF 1" X 11" X II" STEEL PLATE PLAN VIEW O I U- �t f z N ` 17" H i" \ ELEVATION VIEW] Q W cl cr HEAVY DUTY TRANSFORMER BASE TOP OF TRANSFORMER BASE W PROJECTION: SEE 1743.04 Z TOP OF FOUNDATION ' Q W t� TOP OF SIDEWALK FINISHED GARDE � 40 -a 4D a > 44 44 O D D D 4 D4 ,44 44 D4 4 P A II w FOR ANCHOR BOLT DETAILS BOTTOM OF Q SEE STANDARD DRAWING 1743.04 TRANSFORMER BASE �I# 0 I ELECTRICAL CONDUCTOR SHEAR DEVICE DETAIL SEE NOTE #5 TRANSFORMER BASE BOTTOM OF TRANSFORMER BASE SHEET 1 OF 1 - 1743. W z #4 STIRRUP NO I ES : 1-4 o cj) SOIL WHEREVER 1-- >- /'•'� .ANCHOR BOLT (TYP} PREMOLDED JOI 1. CAST FOUNDATION AGAINST UNDISTURBED ExeartsaoN JOINT FILLER CONDITIONS PERMIT. IN UNSTABLE SOIL, CAST -IN -PLACE Q p � . 3" CLEAR (TYP) N R IDEWALK TUBE FORMS ARE ALLOWED WITH APPROVAL. Z = INISHED GRADE - -H O C3 ... A SECTION 825 COMPLY WITH APPLICABLE PROVISIONS OF SEC IO A 2, Co LI I ILL H Z o tz. FOR CONCRETE CONSTRUCTION. O O Z I l vi l 3: USE CLASS "A" CONCRETE THAT MEETS THE REQUIREMENTS OF cc w <C Z D- \� SECTION 1000 WITH A COMPRESSION STRENGTH AT 28 DAYS 1- V = O C3 BOLT CIRCLE PEDESTAL FOUNDATION DETAILS FOR SIDEWALK OF F'C= 3000 PSI (MIN.) . Q ~ H 4, USE ASTM GRADE 60 DEFORMED BARS FOR ALL REINFORCING H = Z LL! cn (` #8 VERTICAL STEEL. LL O J REINFORCING (V BARS) CONDUIT AS REQUIRED 5. GRADE IS ASSUMED TO BE (8H:IV) OR FLATTER. FOUNDATION O O Cn � @ EQUAL SPACING Z H SIZE AND DEPTHS. ARE BASED ON THE FOLLOWING SOIL DESIGN PEDESTAL FOUNDATION - PLAN VIEW PARAMETERS: a- � A. SANDY TYPE SOIL W [� BREAKAWAY ANCHOR MEMBER (TYP) B. NO GROUND WATER WITHIN 5'-0" OF SURFACE ELEVATION X (SEE NOTE 8) X C. WIND SPEED NOT TO EXCEED 140 MPH � - IF ACTUAL CONDITIONS VARY SUBSTANTIALLY FROM THOSE ANCHOR DOLT (TYP) a ASSUMED, THE -FOUNDATION DEPTH MAY BE ADJUSTED. IN THIS - 1 HEAVY HEX NUT (TYP) 1" CHAMFER 1" CHAMFER CASE, CONTACT THE ENGINEER. 1 FLAT WASHER TOP - 6. MAINTAIN AT LEAST 3" COVER ON ALL REINFORCEMENT. a^ ,t"P, ' (TVP, 7. ORIENT CONDUIT AS REQUIRED BY THE DESIGN OR AS DICTATED BY FIELD CONDITIONS. ��.-.--.-�!�[• I9 a 4 0 8. USE ADHESIVE ANCHOR FOR THREADED COUPLING INSERT. FOR TYPE I MINIMUM DEPTH NECESSARY IS 0'-41t" AND FOR TYPE II MINIMUM DEPTH NECESSARY IS 0'-6h". FOLLOW = - MANUFACTURER'S INSTALLATION INSTRUCTIONS. O .. _____ �-• LL MIN DIA. CONDUIT FOR GROUNDING 2 HEAVY HEX NUTS I �, U. REFER TO PEDESTAL FOUNDATION CHART Z WITH FLAT WASHER (TYP) o � o DIA. X 10' COPPER CLAD 0jSTEEL GROUNDING ELECTRODE WITH EXOTHERMIC WELDING CONNECTIONH-H H-HQ z *-- 0 3"(•TYP} m 11 Q H-HDIAMETER "A" -°P Q w ..... ..,�.-. �..� TYPES I & I I ONLY 1 -O„ �� '�„� CONDUIT AS REQUIRED. < W 0 j (STUB AND CAP 3'( 2�� I I UNUSED CONDUIT) (� LL u- DIAMETER "a:; SECTION A -A O~h � 10" LAP TYPES I, II & III SECTION A -A GRQUNDING & CONDUIT DETAIL Q CLOSED HOOPS O C1C PEDESTAL FOUNDATION TYPE AND SIZE TYPE PEDESTAL DESCRIPTION SIZE ANCHOR i BOLT INSTALL GROUNDING SYSTEM (YES/NO). DIAMETER "A„ FT DEPTH "B" FT CONCRETE VOLUME CY DIAMETER (MIN.) IN LENGTH FT -IN I PEDESTRIAN PUSHBUTTON 2'.0" 3'-6" .41 % 1'-6" NO II NORMAL -DUTY -0" 21 5'-O" .58 � 2'-0" YES III HEAVY-DUTY 2'-6" 7'-0" 1.27 1 1 4'-0" YES GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION, SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN REINFORCING STEEL SCHEDULE V-BAR STIRRUP TYPE SIZE # OTY LENGTH WEIGHT LBS SIZE # QUANTITY VERTICAL SPACING TOTAL LENGTH DIAMETER ,r C OVERLAP MIN. WEIGHT LBS TOTAL STEEL WEIGHT LBS ON 6" CENTERS ON 12" CENTERS I 8 6 W-O" 1 56 4 0 1 d 1 4 5'-7" V-6" 0'-10" 15 71 II 8 6 4'-6" 86 4 5 3 8 5'-7" V-6" W-10" 30 116 III 1 8 1 6 6'-6" 1 122 1 4 1 7 1 4 1 11 7'-2" 1 2'-0- 1 W-10" 53 1 175 1743. .�• ♦ ♦ ♦ ♦ a' I mill,I 18' .�► iw ♦ AE�� • . �► b Ea 10:1 TAPER - - - DOWN STREAM 20' CONE R3 2 TAPER SPACING 24" X 24" 1G0' ® {�AYI APPROACH SHIFT 7RPER BUFFER 50' SHFT ITAPER TRAPRC %L SPACE MIN. b2 L SHIFT AHEAD W331-1 W24-1 L OR W24-1 R 48" X 48" 48" X 48" GENERAL NOTES 1- REFER TO RSD. 1101.11, SHEETS 1 & 4, FOR "L" DISTANCE AND SIGN SPACING. 2- INSTALL LANE CLOSURES WITH THE TRAFFIC FLOW BEGINNING WITH DEVICES ON THE UPSTREAM FLOW, BEGINNING WITH DEVICES SIDE OF TRAFFIC. REMOVE LANE CLOSURES AGAINST THE TRAFFIC ON THE DOWNSTREAM SIDE OF TRAFFIC. 3- PLACE CONES ADJACENT TO THE WORK AREA AT THE MAXIMUM SPACING EQUAL IN FEET TO 2 TIMES THE POSTED SPEED LIMIT. PLACE CONES SEPARATING OPPOSING TRAFFIC AT THE MAXIMUM SPACING OF 25 FEET, 4 SHEET 2).PROVIDED TOTTHE BEGINNINGUOFSTHE APPROACHESHIFTCTAPERH(REFERSTOPRSD. 1101.11, 5- TMAs ARE REQUIRED WHEN ADEQUATE BUFFER SPACE CANNOT BE ATTAINED. POSITION TMAS TO MAINTAIN A ROLL -AHEAD DISTANCE AS RECOMMENDED BY THE MANUFACTURER. 6 SROR SKINNYTDRUMS MAY BE USED IN LIEU OF CONES. REFER TO RSD. 1180.01 FOR SKINNY DRUMS 7- DO NOT EXCEED A 1 MILE LANE CLOSURE LENGTH UNLESS OTHERWISE SHOWN IN THE TMP OR AS DIRECTED BY THE ENGINEER. 8- USE FLAGGERS TO CONTROL TRAFFIC AT INTERSECTIONS AFFECTED BY THE LANE CLOSURE. SUPPLEMENT FLAGGERS LOCATED AT INTERSECTIONS WITH FLAGGER AHEAD SIGNS (W20-7a) PLACED APPROXIMATELY 250 FT. IN ADVANCE OF THE FLAGGER. FOR SIGNALIZED INTERSECTIONS, PLACE SIGNALS IN THE FLASH MODE AND USE LAW ENFORCEMENT. .i Ir LU PAVEMENT SURFACE cc O LLI t••- u- } ZCog W 1 I., X 24" (V cp UJ 1-4 0 H U a Z 3: UJ Z CURB TAPER DETAIL H >. Q NOT TO SCALE co 0 _ }- <0>- Q re 3! 1111 cv PAVEMENT DIMENSIONS ON PLAN VIEW REFER TO FACE OF CURB w 1 " LEGEND J 1� s-" FLAGGER cm 5'-0" j�� MIN. A V OT n�•V O- ADA ACCESSIBLE RAMP CONSTRUCTION SHALL CONFORM TO CURRENT ADA ACCESSIBLE GUIDELINES. AAA ACCESSIBLE RAMP DETAII, NOT TO SCALE PAVEMENT DIMENSIONS ON PLAN VIEW REFER TO FACE OF CURB 1'-0" 1" ♦ CONE 6" 1" 6" a PORTABLE SIGN SHEET 2 OF 14 + DIRECTION OF TRAFFIC FLOW 1 1 0 a * 02 I .. .• -1/2"R :. , .°'' 1-1/2„R Ld :•'': u, `~,;:.;:;:'.:'.• SEE NOTE 5 *; SEE NOTE 5 ' °. w'3 •' ♦ `A' ' A ..'1•.' 'r ♦.'..i ! :y:� .+� a' .'J� .d '4A ,,5• ,e,�. ,,e•. .;°.eo'`p4 .•i,. p°t A .1 Y' w Y . •j. Yeti* •'• 4 ;•.1 •.,•aSa ''..1• ¢ � i a°' Y4f'. `..4 .7.' 'e.. ••'ia .A: •f. .••. '..J •. ci SPILL CUR B3 & CLUTTER CO LECT0R C RB & C'UTTEIER NOTES: 1. CONCRETE FOR CURBING SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 P.S.I. @ 28 DAYS. 2. CONSTRUCTION STAKING FOR CURB INSTALLATION SHALL BE REFERENCED (CUT OR FILL) TO THE TOP OF CURB. 3. AT CONTRACTOR'S OPTION, THE GUTTER THICKNESS MAY BE INCREASED AT THE EDGE OF PAVEMENT TO MAKE BOTTOM OF GUTTER CONTIGUOUS WITH BOTTOM OF ASPHALT PAVEMENT. 4. CONTRACTION JOINTS SHALL BE PLACED @ 10'-0" O.C. TOOLED 1/4" (t1/16") WIDE, 1" DEEP. EXPANSION JOINTS SHALL BE PLACED @ 40'-0" INTERVALS, MAXIMUM, AND ALL P.C.'S' 5. GUTTER PAN SLOPE TO BE ADJUSTED TO MATCH SLOPE OF ADJACENT PAVEMENT. CONCRETE CURB & GUTTER DETAIL NOT TO SCALE CHAIN LINK FENCE DETAIL NOT TO SCALE REVISIONS *) BY 1 NCDOT REVISIONS RJB 4/2/19 NCDOT REVISIONS 2 5/21/19 RJB 3 TRC REVISIONS RJB 6/7119 4 TRC REVISIONS RJB 6/19/19 5 BID SUBMISSION RJB 6/21 /19 6 SWPPP SUBMISSION RJB 6/26/19 APPROVED FOR CONSTRUCTION O , i • THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTHS SURFACE ANYWHERE IN THE STATE. CALL - 811 BOHLER E N G I N E E R IN G 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering.com w' AL rn T 043610 C7 ` L I� CID, A r l DRAWN BAB CHECKED MAT DATE 4/2/19 SCALE AS NOTED JOB No. NCC138078 SHEET H:12013WC01380781DRAWINGSIPLAN SETSTLAN SET (DRIVEWAY EXTENSION)1NCC138078SDO.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:53 AM LAST SAVED BY: RBRELAND \ I ` 1 ` CD w ! 1I co CORBETTE AVENUE(NC HW Y 24)N-1 �o ! I goo' Rau Ol roP-2647 -'' � p (� L-- 0 ��35 MPH SPEED LIMtT (ADT: 27,000) NO NO Ho ,� --__-_4Z___ _ kX�-------1 f1'7-M = �y1-_-_ r--i- / - - - - 1 dY dl/ dY dt� - W - - _ - - - - - - G'B -------- ------------- __ _ TOP=3O.50i I CB LI - _ _ _ lN!/ 24.61 I I TOP-31.21 -_ o z> 000`oo - l/ V Y _ 2� U I I _ �\ p "'�^-----------3 -- ----.- -- t \� t I I I TC 31.8+l- EX. CB TO BE CONVERTED TO STORM 0 I t G 30.8+1- ^ - EX. MH TO BE CONVERTED STORM MH 19 �® MATCH EX. TRAFFIC RATED MH FRAMEICOVER � - - TO CURB INLET AND ADJUSTED t t rOP=30.30 02 AND ADJUSTED TO GRADE MH I I STM MATCH EX. - - "�-- STM " STM TO GRADE _ I I INV=2611 - TO_ 0.86_ XM -- TC 32.01 TC 31.73 T� TC 3L2fl A8 I I / 18 R P TC 30.85 XMH �2-PTO R 0�' NCSR CB o 1511 C20.. 1 : _1 _ I.QtL _. _ • _ _ .I,QGI .._ . _. ..I.Q . _ _!. ._ _ . L r9P=30.9 ®- -. - - - - - -®-- - .- - _. - - '- ' _ _ SEE NOTE 3 TC 30.79 -- -- ' ��- - - - - INV-26.55 - - - - - - _ - - - _ --- �- - - �- �- - - - - _ - -� _ _ �- - - - ---� - 6Y - 6Y W fN W W -.,.10, - W I _ _ TC 31.65- TC;31.22- �0 7-_____ - = 18" RCP SEE NOTE 4 - -- - \ _� ` -_ _ �� ff F e�> -�-- -Fibf Fed$ �--� FM Ftil _ _ H0 HD _ -_" NO----��d0 HO HO HO NO HD HO HO Al 0 0 HO H HO HO ` 0-- NO -', -' N'o HO H0 t TC 30.5+1- N ' ( t 3� MATCH EX. TM; EX. DI TO BE CONVERTED EX. DI TO BE CONVERTED 01SAIRBED R /�.� a<,��`- GOl,�-4 `+ TO CURB INLET AND ADJUSTED TO CURB INLET ADJUSTED ® ` \0 EX. CB TO BE CONVERTED I I T DE MONUMENT 0.73 Of�LINE `\ \ / �, \ ` _ _ TO MH AND AJUSTED ' TO GRADE 0 GRA , TC 32.05 - TO GRADE I TC 32.33 � I t t ►` `. TC 32.6513p I i fit t I t t I C7 I I 1> > IN , 33'' ! I ' ` TC 32.88 `\ I ' `',\ , ' 1 �.s' `♦♦ f 33 \ 1fi � I r`1 I ,., \ !a%hah i � 't ( I TC34.11 AU51632.523 I I _, 1I I t►, ', I r G D E 2556049.718 I 3 NUDE' 4°42'06.93 " � � I � \\ \ 1 tt ' I I { I t I I I I ,\ a NIf ` tI%T'08 59 22 I I 8EIVCHMARK IEVELOPMEiT CORP 2139 P. 747 i TC 35.22 IN_ -\-7 i I ' / N P TC 35.33 I l r I t Tract 2B I , 35 / 0 1 1 BENCHMARK Dfr 56 P.194 - 1 I -- YEL0AMENT CORP. 0 � t� I; I I I i - HP - TC 35.93 ' ' i i1 ' /' 08.2139. P. 747 _� HP - G 5.89 �1 t Tr�dt_2-------------- o M B. 72 P. 43 f t t- 1.15Ac. E >z Q 0cn O z LU WLU , ` y 1 1 ! PROP. LOT LINE M TC 35.70 w TC 35.60 I I I I a ,` I t i, I II r I 0 PROP. 18" RCP TO BE CAPED O i i i I fill t \ PROP. FLAT AND FLAGGED AT BOTH ENDS TIGHT C (NO DESIGN FOR CAPACITY) TC 35.35 TC 35,16 ` I 1 • I ! I I I I, f (SEE DETAIL SHEET C-5.1) ' - �'' ` s' .r Ir `INV 28.16 o 1 STM-LO M •• ; I I ' ! + �i A6 to ``♦' t I I I t' II 18" RCP STM ,'' !! STM STM ONSITE TEMPORARY DITCH ► I I V OUVIN 27.601 A7 /' I A3 A5 II r FUTURE 1$" RCP � I I MHN ROP. LOT LINE . t r' t11� SAN ` BY OTHERS TC ! 34.73 i - INV OUT 27.45 I TC 35.34 5--- -- 18 nRCP I !/'' TC 34.59 - --S ; f , 1 t \ S S S ----------------- , �r ,/ ' f i TC 32.81 r % COp ---------------- I I G 34.64 PROP. CULVERT TC 32.78 I ! PROP. 20 SANITARY A� r n n GENERAL NOTES 1. ALL CROSS SLOPES ALONG DRIVEWAY EXTENSION ARE TO BE 2% MAX. 2. THE EXISTING ACCESS ROAD MUST REMAIN OPEN TO TRAFFIC UNTIL THE SIGNALIZED ACCESS IS OPEN TO TRAVEL AND THE TRUCK TURN BEHIND THE BUILDING IS COMPLETE 3. GC TO TEST PIT AND PROVIDE TOP, SIZE, AND BOTTOM OF WATERLINE TO ENGINEER PRIOR TO CONSTRUCTION. GC TO BUDGET FOR VERTICAL RELOCATION OF WATERLINE WITH RESTRAINED JOINTS/450 BENDS AND PROVIDE 2' CLEARANCE TO NEW STORMWATER PIPE. 4. GC TO REPLACE EXISTING PVC WATER MAIN WITH DIP WHERE PROPOSED STORM PIPE RUNS PARALLEL ALONG WEST CORBETT AVE. PROPOSED DIP WATERMAN TO EXTEND 10' BEYOND PROPOSED STORM PIPE. 5. CONTRACTOR IS RESPONSIBLE FOR DEMOLITION OF EXISTING STRUCTURES INCLUDING REMOVAL OF ANY EXISTING UTILITIES. UTILITIES ARE TO BE REMOVED TO THE RIGHT-OF-WAY. 6. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACTOR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 7. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED. 8. PRECAST STRUCTURES MAY BE USED AT CONTRACTORS OPTION. 9. STORM PIPE SHALL BE AS FOLLOWS UNLESS OTHERWISE NOTED: CLASS III RCP (ASTM C76) WITH RUBBER O-RING GASKETS TO FORM WATER -TIGHT CONNECTIONS, 10. EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS. 11. EXISTING GRADE CONTOUR INTERVALS SHOWN AT 1'. 12. PROPOSED GRADE CONTOUR INTERVALS SHOWN AT V INTERVALS. 13. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 14. ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS - - - WATERTIGHT. 15. ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". 16. THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORM WATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND I I EASEMENT G 34.58 THE SPECIAL CONDITIONS, SECTION 8, ENVIRONMENTAL COMPLIANCE AND STORM WATER POLLUTION PREVENTION. G 32.3+/- - TC 35.07 TC 34.86 '\` TC 34.5f} � r ' '' 1 I �y '� MATCH EX. � t 17. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND ` M r' r y 1 CONTINUOUS GRADE. I I ��, TC 33.31 i i = - 18. CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS. I I Op TC 34.52 \ START OF 1 r t r, t I 1 G 322+1-- -- t ►tr ' °� t -T�--- - ! t f TC 33.45 � � tt STM , O l, /�\\ \ � r t STM i ,` r jr / / t t 'fit \ `� I ( , , , -----------7, '��`�`` _ ' r ' ; ; A4 f pi ,J i i LO -+_ I'll i i !I I' I "�`.'"`� ° t i i i I i �0� 1 , t , \ 1 _ EX 15 a , „ t �, t ��F , r / TC 32.7+1- \ Rf;P i,'t I---' _. EX. 60" 1�1H' =•= _z '-' I I `\ �% r r , / y SAL -MART REAL ESTATE BU51NESS TRUST MATCH EX. \ `OQ ° s _ 1= ----- _ . ' /NV IN 2603 30% ; \ ' `` 1r1------t I ( \ Till,► t 1 t . TC32.39LOD <r , 8 4527 P®3 LOD � LOD � INV /N 28.35 (18 � ' ' t / ! , . .... • L , '' , r r / t Op ! END OF LOT 1 t, / �. I I + / r EX. 60 MH \\ INV OUT 25.93 30 -- \ / , a r r \ `� A ,, r------ I I \ t r , SPILL CURB 1 e� , INV /N 26.33 (30� \ ' R/M.• 33.000 i B. 73 P.192 __J I EX. CURB INLET \ - _ - - - I / + TC 32.1+/- j %! INV DUT 29.46 (15) O ,\ '33 -'` INV IN 28.60 (15� \�O \ /------------ !' ` p t ' ! � t` MATCH EX RIM.- 32.740 INV OUT 26.23 (3030' RIM. 33.539 - _ - !'- _ _ it r r r' l lI i i 2' BENCH AT 5% �p EX. 18-v RCP // ALONG POND _ _ _ _ _ LP - TC 32.55 `, l % p� `� CONTRACTOR TO PROTECT AFH DURING CONSTRUCTION TC 32.72 /�� \\ 0 LOD TC 34.5+/- T MATCH EX. ! % /! toe !' OF POND 32.25 M I r I i �, , -------------- TOP It r ! /, /� i`i' , CONTRACTOR TO MAINTAIN c5 I I t ' ' i (-' / !''/' /! !/` J i' i' ,' EX. 52.43-,------------------- It r i'! { i i ELEV. ALONG PERIMETER OF POND I ca I N It It ------ i /`!'!' ! .'� ,' /` 30� RCP - it! i i I i Mrn` I i �. i i i �1 !/Z® 082% ----- EX. H6Y INV IN 25.50 \\ \ ♦\ f t r jit NN N'. IN-- `000 1 1N �. o0 0.1 t 1., 1 \ \ \ .o o` oN o` `o o 00 ov oo o0N-N.\ o `000`\ \\ ♦o oo' ,/ ,/ ` 00 0 00 `.o o o` \ \ \ 00 00 �' /' / / ' I / / ! / / / / / ! ' ! ! ! y•_ o I`\o`o�CQ> ``o `` \\ ♦ `♦ o`erO I t + ! I I/ I/ /!/ ! // o - o` oo\�`o\; \0 00 0♦ _ 000 `o 0 0 o` oo ��`` 0000\o0 0o f I t I I t ; ; , ti``o` o0 o N. oo ♦ o �o � oo to t, \ o; ` �♦ 000\o, i 000\ ♦ \ o 00 `000\�o o- - \ \ ♦ ♦ \ o ` `o 00 0 ♦� o ` .7>ao 00 0000 `o ` 1 1\ \ \ ♦ ♦ \ o 0 0 \ ♦ o v�000 000; `o o`o`o�o`oo `oo \\ \ `t_,_,\ 000 � ♦ o 0000 00 00 00� GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THEDOCUMENTS RELATIVE TO THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN STORM SEWER PIPE SCHEDULE FROM TO FROM INV TO INV PIPE LENGTH SLOPE (°lo) DIAMETER (IN.) MATERIAL EXMH2 A8 26.41' 26,72' 58.10' 0,53% 18" RCP EXMH1 Al 26,11' 26.17' 11.32' 0.53% 18" RCP A6 A7 27.60' 28.16' 112.36' 0.500/0 18" RCP A5 A4 26.37' 26.39 68.41' 0,02% 18" RCP A3 A2 26,37' 26.39' 68.29' 0.03% 18" RCP STORM STRUCTURE SCHEDULE NAME TYPE RIM ELEV.(FT) INVERTS Al CURB INLET NCDOT STD 840.16 30.30' INV OUT = 26.I T (18') A2 NCDOT DETAIL 838.80 28,10' INV OUT = 26.39' (18") A3 NCDOT DETAIL 838.80 28.08' INV IN = 26.37' (18') A4 NCDOT DETAIL 838.80 28.10' INV OUT = 26.39' (18') A5 NCDOT DETAIL 838.80 28.08' INV IN = 26.37' (18") A8 CURB INLET NCDOT STD 840.16 30.68' INV OUT = 26.72' (18") EXMH1 EXISTING MANHOLE 30.86' INV IN = 26.11' (18") EXMH2 EXISTING MANHOLE 30.44' INV IN = 26.41' (18") 19. TOPOGRAPHIC INFORMATION IS TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS. IF THE CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR TO THE OWNER FOR REVIEW. 20. ALL UNSURFACED AREAS DISTURBED BY GRADING OPERATION SHALL RECEIVE 4 INCHES OF TOPSOIL. CONTRACTOR SHALL APPLY STABILIZATION FABRIC TO ALL SLOPES 3HA V OR STEEPER. CONTRACTOR SHALL STABILIZE DISTURBED AREAS IN ACCORDANCE WITH GOVERNING SPECIFICATIONS UNTIL A HEALTHY STAND OF VEGETATION IS OBTAINED. 21. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODE AND BE CONSTRUCTED TO SAME. 22. ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR INVERT FROM INVERT IN TO INVERT OUT: 23. CONTRACTOR TO ADJUST ANY EXISTING STRUCTURES TO PROPOSED GRADE IN ANY AREA OF PROPOSED GRADING. 30 15 7.5 0 30 1 "= 30' ALERT TO CONTRACTOR. ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. DEWATE]RING NOTE-dol- WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE SPECIFICATIONS. 1 REVISIONS BY 1 NCDOT REVISIONS RJB 4/2/19 NCDOT REVISIONS 2 5/21/19 RJB 3 TRC REVISIONS RJB 6/7/19 4 TRC REVISIONS RJB 6/19/19 5 BID SUBMISSION RJB 6/21/19 6 SWPPP SUBMISSION RJB 6/26/19 APPROVED FOR CONSTRUCTION o THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 BOHLER E N G I N E E R I N G 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980} 272-3401 www.BohlerEngineering.com s,� t� UQ C) a DRAWN BAB CHECKED MAT DATE 4/2/19 SCALE 1 "=30' JOB No. NCC138078 SHEET 0 4 1-1:12013WCC138078MRAWINGSIPLAN SETSIPLAN SET (DRIVEWAY EXTENSION)1NCC138078SSO.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:54 AM LAST SAVED BY: RBRELAND REVISIONS BY 1 NCDOT REVISIONS RJB 4/2/19 2 NCDOT REVISIONS RJB 5/21/19 3 TRC REVISIONS RJB 6/7/19 4 TRC REVISIONS RJB 6/19/19 5 BID SUBMISSION RJB 6/21/19 6 SWPPP SUBMISSION RJB 6/26/19 mmoiiIIO APPROVED FOR CONSTRUCTION THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 r BOHLER EN G I N E E R I N G 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering.com 4, L m � r 043610 (P A ELIr ^000 I� reel r--.4 a 9 C ��4 ,, DRAWN BAB CHECKED MAT DATE 4/2/19 SCALE 1 "-60' JOB No. NCC138078 SHEET F"" .WD A H:12013WCC1380781DRAWINGSIPLAN SEMPLAN SET (DRIVEWAY EXTENSION)INCG138078HPO.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:56 AM LAST SAVED BY: RBRELAND REVISIONS BY NCDOT REVISIONS RJB 1 4/2/19 NCDOT REVISIONS RJB 2 5/21/19 3 TRC REVISIONS RJB 6/7/19 4 TRC REVISIONS RJB 6/19/19 5 BID SUBMISSION RJB 6/21 /19 SWPPP SUBMISSION RJB 6 6/26/19 APPROVED FOR CONSTRUCTION e o ' THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 BOHLER E N G I N E E R I N G 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering.com NO CAR, , u 043610 c A �if-It I� 40 DRAWN BAB CHECKED MAT DATE 4/2/19 SCALE 1 "=60' JOB No. NCC138078 SHEET WDAe 2 M20131=1380780RAWINGSIPLAN SETSIPLAN SET (DRIVEWAY EXTENSION)MC138078HP0.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:56 AM LAST SAVED BY: RBRELAND (�REVISIONS BY 1 NCDOT REVISIONS RJB 4/2/19 2 NCDOT REVISIONS RJB 5/21/19 3 TRC REVISIONS RJB 6/7/19 4 TRC REVISIONS RJB 6/19/19 5 BID SUBMISSION RJB 6/21/19 6 SWPPP SUBMISSION RJB 6/26/19 APPROVED FOR CONSTRUCTION o . THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 n BOHLER E N G I N E E R I N G 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering.com t o AL �= ,.� 043610 �? cp ♦I � I♦ UQ P FF�ii9 � o DRAWN BAB CHECKED MAT DATE 4/2119 SCALE AS NOTED JOB No. NCC138078 SHEET .WDA"Mmq 3 H:@013\NCC138078\DRAWINGS\PLAN SETS\PLAN SET (DRIVEWAY EXTENSION)\NCC138078SWO.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:57 AM LAST SAVED BY: RBRELAND r Y GENERAL NOTE; `HE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PR( SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELA PECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF REC( ING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONST TANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS F LL CONFORMANCE WITH LOCAL REG� II-ATIONS AND CODES. Y 0 12" CENTERS AS DIRECTED BY THE ENGINEER. O O � � z #4 BARS "V" 6 6 01 USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. (/) QUAL AC S STD. 840.03 FRAME 0 0 L1.. Z r cr_ 1r GRATE & HOOD z .•�- - - ;a• IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB W <[ LL = „ 1 �2 1 2 W Q < V- _ ca c:• :v AS SHOWN ON STD. NO. 840.00. I-•' 0 cc Q C!3 3 (- 0 CC O 6rr B :., Err = USE TYPE "E", "F" AND "Gf' GRATES UNLESS OTHERWISE INDICATED. Z LLI ` Q ~ LLJ v LLJ � ,r' (- � � LiJ q•, D o FOR 8'-0" IN HEIGHT OR LESS USE 6" WALLS AND BOTTOM SLAB. OVER L.i_ -� _ ''� U- ©~� 8'-0" TO 16'-0" IN HEIGHT USE 8" WALLS AND BOTTOM SLAB. ADJUST O C7 Q R -co c R co � O W .Q. cc QUANTITIES ACCORDINGLY. Z b LU u - 6'-O„ Z t-4 a'f'•`n• '• •'v *•p' ° CONSTRUCT WITH PIPE CROWNS MATCHING. Ir - ca PLAN CL I~ H Q. c °cco Lu PLAN `yrr SEE NOTE CHAMFER ALL EXPOSED CORNERS i", Lu C;� < Q ¢� J U- CURB AND GUTTER WITH CATCH $ASIN ON STEEP GRADES it a V SECTION X - X DRAWING NOT TO SCALE . © �r c TOP TOP ELEVATION . _ * Lu * w 6„ co co in i� (2,c.o ta, USE ON FLAT ELEVEXPANSION JOINT GRADES 2% AND UNDER TOP ELEVATION FRAME, GRATE AND HOOD _ _ tDEPRESSED SEE STD,NO, 840.03 STEPS - STD.�i10. 840.66 STEPS -STD. N0. 840.66 S 3,-Or,� � � rOrr GUTTER LINE 6 A 6" TOP ....- ,. _ _ EXPANSION JOINT 1 t~1 TOP ELEVATION PLAN OF TOP SLAB SECTION S-S O ELEVATION O .� I �'� a• ` A L.L. NORMAL CURB AND GUTTER ON LIGHT GRADES LL. z G1 6" Q.p' t>' p E is p.:°' o• p• :°' o' °' F-�►-I B ' v Z < uj NORMAL GUTTER LINE 2 'Q� UJ u Hcc CL EXPANSION JOINT 6++ m Lt. 6rr C • 611 6 G :: 6 6rr E #8 "W" BARS #4 BAR 8" TOP Q I -A SECTION Y-Y = o. p o'' 0 4 „V,1 ELEV. d ° D o ti BARS USE ON GRADES OVER 2� o,' d @ E AL S ACES �' RISER HT. ° p� p'• - °- -i, DEPRESSED GUTTER LINE} VARIES v• Q loll Q tt 6'-0" 6rr 1 r - O t1 1 MAX. CC. EXPANSION JOINT 0 6" O SECTION J -J o. Q _• �, �,',., a © 1 #�2° Q LLI F- DOWEL ELEVATION ;v uj SEE NOTE WHERE 30" TO 36" PIPE IS USED co SECTION M-iW �,, SECTION R-R NORMAL CURB AND GUTTER ON STEEP GRADES WHERE 42" TO 54" PIPE IS USED- WHERE 30" TO 36" PIPE IS USED Z '- -. RISER HT. in 0VARIES O v ----• --- 1 , M B 1 .. a■ _ tr o c A1 QI A N ¢ Q• WHERE 42 TO 54 PIPE IS USED �� ..co d DETAIL SHOWING METHOD MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN(BASED ON MIN. HEIGHT, H, WITH NO RISER) * DIMENSIONS OF BOX AND PIPE COVER DIMENSION CU.YDS. CONC. IN BOX DEDUCTIONS ONE PIPE PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT BARS-U NO. LENGTH BARS-V NO. LENGTH BARS-W NO. LENGTH TOTAL LBS. TOP SLAB BOTTOM SL TOT, CONC. NEGMHITNIMHUM D A B C G H E F C.M. R.C. 12, 31-O" 1 2,-21 2r-9" 0.235 0.772 0.015 0.026 15" W-0" 21.211 3'-0" 0.235 0.829 0.023 0.036 18" 31-0" 2'-211 31-3rr 0.235 0.887 0.033 0.049 2411 3r-01' 21-2" 3'-9/1 0.235 1.001 0.059 6.085 30'1 3'-0" 2'-211 W-4" 41-3" 11-211 41-011 4 V-5" 2 31-9't 3 W-9" 39 0.123 0.321 1.433 0.092 0.127 3611 3'-0" 2'-2" 3'-1011 41-9" 11-81t 4'-Olt 4 11-11" 3 31-9t2 3 3'-9" 43 0.161 0.358 1.714 0.132 0.178 42" 31-0'r 2'-211 41.5" 5'-311 1'-51t 31-211 4 1'-8" 2 2'-11" 3 2-117f 32 0.112 0.318 1.738 0.180 0.243 4811 31-011 2'-2" 5'-011 51-9t1 2'-0" 31-2" 4 2'-3" 3 2`-11" 3 2'-11" 35 0.145 0.352 2.052 0.235 0.317 54" 31-Orr 21-21t 51-711 61-3rr 2,-7r1 31-2" 1 4 21-10" 5 2'-11" 3 2'-11" 1 41 1 0.180 10.386 12.387 0.297 0.401 0 Z 0 Q V 0 SHEET 2 OF 2 OF RISER CONSTRUCTION PLAN PLAN SHEET 1 OF 2 840.02 * RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT 840.02 - �7 VG Vz VG QO 23/" o>- 43" NOTE: USE TYPE "Elf, "F" AND "G" GRATE - _ �" ¢ DETAIL SHOWING TYPES OF GRATES r 3 4 ¢ ©C `� 3/ " Q H � USE ACCORDING TO WATER FLOW . 2 -11 1 / 11 < h_ � . UNLESS OTHERWISE NOTED. N p �\ p z a� v B 2 "O � v I-.1-j- f 0 0 O_ cl) w Qcr_ U_ _ TYPE IV' TYPE "Err TYPE 11 F 11 A A +r 1' 7 'r Imo- U < G7 = 21j$rl 21j ¢ c� F- �� l 9/g Q r- -, r n■ - SECTION LL SECTION - MM C�.7 = Ca Wt-iiq Q z CO aC -- -- WATER FLOW -�-- SAG --rt- WATER FLOW -�-- I 9f8" z oc \ A cr)�_____,�,� A ALIGN FRAME WITH INSIDE 13/g" CL -- _-_- --_ CL EDGE OF WALL TO ALLOW Lu © 1 tt Lu FOR VERTICAL ADJUSTMENT;o: r, = c ' p B-/ /2 13/4 tr WALL SECTION - 1 SECTION BB •-� •_._ _._. - -�. - - - - - - - - - •--• _....� .__...� `...-...._ 1 %2 5/9 SECTION - PP SECTION NN SECTION B-B ------• -- - - - - PLAN n 3� It 21/4 `► H 3cc & HOOD ASS`Y v `co / �-' q � --' WATER FLOW -�- SAG E WATER FLOW -- Q Q FRAME,GRATE,� m ._....- I U- t� m SECTION A -A I� i GENERAL NOTES: Z z FRAME GRATE AND HOOD SEE STD.NO. 840.03 USE CLASS "B" CONCRETE THROUGHOUT. O S O BACK OF CURB (1)I.. mo--- EXPANSION JOINTS %'- X PROVIDE ALL CATCH BASINS OVER W-6" IN DEPTH WITH STEPS 12" Q Q Q Q §,8„ ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. 61t E 4, -61r 41-6,1 • TOP ELEVATION OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT cc 7tom-! _ ■ Ir tt � r v'. A o m ° . o• Off_ - O z a TYPE "F" TYPE "E" TYPE IV' TYPE = , E 0 Iv- soco Z I-- Z Q Q U a v RAISED FLOW ARROW 3/,4/ © Io ' 13, +, _ Q Q• 3 %6 HIGH 2-`- �'-i �- ,, A Q N N a, o tJ} RAISED FLOW ARROW 2 /4 " � W `t %6" HIGH ��-- C) et Lu a j 0 F- z I U '�r �N a~ Q T t L_ L m col gi4_ I f U) 11/2 .�.,,, r Z cmi -,)I - - FRAME PLAN ¢ X% O "\ ./$„ :! V 1 rs\ < Lu L.0 SECTION - JJ Lu W /81, $/ n 3/ r► 3` O%$+r rJ$rr A .� 3� tt � ,r 11_6 T� 1 16_i 11If m 11 < 5_ � rj / 1�2„ \ 2rt � cc riL i I((� - ---- R - 3rr R C? nr i 1i I n,„ 1 1 8't 1 �/ R 1 I rt z _TO 2' -113/4 " 2' -113/4 " L- d > 6rr 21-Ott 6n �2t7 1 N L` 1 �2,t �-- rf it r� T+j 6rr r n 6jr +r 112 rr 3/`r T' T /2rt '� 1 �2tt 1 /21 /$r, 3 i2 3 - o 3 i2 3� ,r 014:3/ - 1/2 If - �--- r r ++ 11 13/ " SECTION A -A I f '_ 7j /$" SECTION - KK 2`-111✓2,t 'i6 45�$rr R SHEET 1 OF 2 TYPE F �\ SECTION A -A SHEET 2 OF 2 HOOD ELEVATION SECTION - RR 840. 03 TYPE G 840 , 03 Z GENERAL NOTES lie 2/-O" d W T AS z O 0O GENERAL NOTES: i- USE 4000 PSI MINIMUM COMPRESSIVE STRENGTH CONCRETE. �• INTERNAL MIN. MIN. MIN. CIRCUMFERENTIAL I•--� 2 WEEP HOLES Q <C Y USE CLASS "B" CONCRETE THROUGHOUT. Q y CONCENTRIC DIAMETER iNALL TOPlBOTTOM AREA OF STEEL < i- USE ASTM A615 GRADE 60 REINFORCING STEEL. USE ASTM A1064 h- _ ■ = CONE SECTION 0 PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" H CC 0 WELDED WIRE FABRIC (WWF). (FT•) THICKNESS SLAB THICKNESS PER VERTICAL FT. C� ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. LL " O H OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR #4 BAR DOWELS AT O O co = CL z FABRICATE, ASSEMBLE AND DESIGN PRECAST MANHOLE COMPONENTS (IN.) IN {SQ. IN.0 0Ca3 12" CENTERS AS DIRECTED BY THE ENGINEER, LLi Q Z ACCORDANCE WITH AASHTO M199. I USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. 0 c O H ASSEMBLE RISER AND GRADE RINGS WITH THE STEPS SPACED 12" 4 4 6 0.12 Q U = O IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB � =F-• © LLJ FROM THE TOP TO THE BOTTOM OF THE MANHOLE. 5 5 8 0.15 (-- _ Z LUJ AS SHOWN ON STD. NO. 840.00. s• CO F-- - - --- -}- - - - = U- � J WHERE THE MANHOLE IS EXPOSED TO ROAD TRAFFIC, CONSTRUCT 6 6 8 0.18 V- < CONSTRUCT WITH PIPE CROWNS MATCHING, O Q 0 O C0 Q � U} = THE TOP OF THE MANHOLE FLUSH WITH THE GROUND AND A MINIMUM cr -- I SEE STANDARD DRAWING 840,25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. Z ,1-•1 OF 9 ABOVE THE GROUND AT OTHER LOCATIONS. • s r Z .� INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. i- > D p.. E-'i LIMIT DEPTH OF FILL TO 30'-0" FROM FINISH GRADE TO TOP OF GL I--t INSTALL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO. 78M STONE IN A LU 0 BOTTOM SLAB. 21-011 I< L1! i POROUS FABRIC BAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER. 0 ALTERNATE CONE SECrTION GRADE RING �"" a I CHAMFER ALL EXPOSED CORNERS 1". THE MIN. SLAB THICKNESS 'T' IS THE DIMENSION OF THE „ MIN. AREA OF STEEL THINNEST PORTION OF THE TOP/BOTTOM SLAB. ao IS 0.07 in.2 Y DRAWING NOT TO SCALE, PLAN * TOP MAT OF REINFORCEMENT MAY BE NEGLECTED IF TOP SLAB HAS ECCENTRIC CONE A DISTINGUISHABLE TOP AND BOTTOM. 11- LV uj WITH GRATE & FRAME REMOVED 6" MAX. SPACING LV LOCATE WALL REINFORCEMENT ° QF CIRGUM. RIF 'D' + 2 'W' IN MIDDLE THIRD OF WALL •v BRICK COPING(INCIDENTAL) = FRAME AND GRATES STD. NO. cu 1-"1 ADDITIONAL TRAFFIC BEARING 840.37 1" MIN, T- cc ELEVATION d Lu NDNTRAFFIC BEARING: 84a.22 �- � CLR. #4 REBAR �>• 0A`t STD. 840.16 FRAME - ■" STEP STD. & GRATE 0 ,.Ij s4a.24 •,�•. a . .o,• a . NO. 840.66 Z Z LU a4O.2a AS Z uj #4 BAR H IZ S4a.29 T 1" MIN. USE MIN. AREA OF STEEL IN TOP (CIRCUMFERENTIALCL I; If A 6rr � 84a.33 F CLR. Q1 AR nF: #dd'.q` a R11 I T..q RFTN9nRnP1APNT1 tP Z 1-4 6.. ti- CL ili. a. EACHWAY! EACH FACE * , © '�' r = FLAT TOP SLAB LONGITUDINAL ADDITIONAL #4 EACH I ADDITIONAL #4 EACH REINFORCEMENT Q to co cr-SIDE OF OPENING (1 RISER CC .+ c.[ CLEAR OF BOTTOM FACE SIDE OF OPENING (1 Q PLACE BARS DIAGONAL CLEAR OF BOTTOM FACE)cc _ 1 Z W _ TO CORNERS (TYP.) Q _ t +D1 l r DOWEL ate~ -_ W w nJ_ 0- cc N` FRAME & GRATE � >- SEE NOTE DOWEL{SEE NOTE} MAX. PIPE THIS SIDE - 18" +� t- SEE STD. $40.54 Q �` s- i BASE _ _ ♦ . FOR MANHOLE z SECTION X-X SECTION Y-Y j = =_ - a ► 4'' _ '�I ?' RING AND COVER oc d DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX & PIPE CUBIC YARDS CONC. IN BOX DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH MIN. HEIGHT D A B BOTTOM SLAB WALL PER FT. HT. CONCR TE FOR MINI�1D,n HEIGHT, H C.M. R.C. 12" 3r-0t1 21-0" 21-0" 0.222 0.222 0.592 0.015 0.026 151, 2' - 3" 0.648 0.023 0.036 18'r 2' - 611 0.703 0.033 0.049 24 f� 31- 011 0.814 0.059 0.085 30 + " 3 -0 r 1 2 -0 3- V 0.222 0.222 0.925 1 0.092 0.127 Li I _JL_�! ► A itz ry I` 1 I i cc ,. .. • .. cli Ilr _ -Ji- _ _!i !► • -. ` i } USE MIN.. AREA OF STEEL Q IN BASE SLAB OF 0.12 in 2 PER LINEAR Lu 0 FOOT EACH WAY TYPICAL MANHOLE SECTION SHEET 1 OF 1 SHEET 1 OF 1 GRATED INLET OPTION MANHOLE OPTION 84Ua1 84O.a2 1 REVISIONS BY *) NCDOT REVISIONS RJB 1 4/2/ 19 2 NCDOT REVISIONS RJB 5/21 /19 3 TRC REVISIONS RJB 6/7/19 4 TRC REVISIONS RJB 6/19/19 5 BID SUBMISSION RJB 6/21/19 SWPPP SUBMISSION 6 6/26/19 RJB APPROVED FOR CONSTRUCTION o - THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 BOHLER ENGINEERING 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering.com r AL M I 043610 `'l+r111`�```` �r C) b ® �) �if-It. W It DRAWN BAB CHECKED MAT DATE 4/2/19 SCALE AS NOTED JOB No. NCC138078 SHEET H:12013NC0138078TRAWINGSIPLAN SETSIPLAN SET (DRIVEWAY EXTENSION)1NCC1380788DO.DWG PRINTED BY: RBRELAND 7.08.19 @ 9:57 AM LAST SAVED BY: RBRELAND W. A ANQWE� 'lup A g. WF tifol r"i A CA M]R 'Wad, ED ;Vr EPP) m ;IF W ri 0 w A S1;4_ , '02 'V, X EIS "IS iblr 2 0,V'O .14 M,- 4 R R VV IV` 7 65 a .4 17', itr 0, `411,vw M NA m Am"TTE N' I- E i:4 F ItYr, I, I S­, 41-4_40 M Ael AP OV W "o, 'IMS'sk 41: 0 NOW is pp Ri:! W N RU1401". um. g�, 5. WWI— J/ , nti OF f N am V On . ..... ... ... JIM041 Uill: Uill: A. "A will Doc 10: 013720510001, TVpe- C4W A­w 'Rocordod,: 11/Z2/2,017 -at 02,.* is *-as pri, f _�,Ptormwiater Access IT, PA V W`- �Au _U I 74�17 "me - 1 W�r r 11111100v. (s 0 1, ON w, 77"Wv I.W5 C MXRY'SY, OMEZ RAWLS' G 3 WAR.Al"T P�884 E .. ...... .. F"Ir % k CA- . . .. . .. .. 5 A, Z "MAAU 1`5 A, V�r 0 4 P111 01 w-ow UPER. EASEP El TS, ,E 4 i,5 111. zl_� T 3 -R. CIP11, F, r- -8F ATO 41b, MM "U UU rVITIMM TI, F XT, JE R 0 I "YALI Y' T f�N. 556, + f, ff'N I N, zvlu.� + +taga X i 29.96\. 2S84 + + 27Z6 +T, -30.02 32!70 28,91 30,22 :3024 32,79N,,� 28t4 20,47 CONC. LEVEL SP�EADER EL-28 72. 2817 4 26;33 pai 91 a 4 28.5 9.95 32 8!5��7 27,93 00 + 74�1 29-00 31. + 31W N 32-54 2812 CS + INV=27,95 /+ +29-06 TOP=3147 29.73 +32,40 2919 32,83 88,$7 < PSA IN-V=XX,.XX + 28.76 EDCE , /259� 32-31 / f 629 + WA TE if I -,,+32.34 2. Za25 31,93 32.% 4 32,34 f ao '>6 .04 STORM MH "'+3232 TOP ­312 + 3R-'O-- + 2.63 -WA TER, EDGjE 9F 3 ab .----+ 29,38 + .94 v\ + �La4 31.90 V+ 9,94 32 �6 32.27 j + at5o Woo 2917 SP 04 A + is E D GE (IF y 3a14 32 29.9t 3228 26 + + ...... Is 9; �10� t Aw! 043. A t 12 .18 '067 /X, I I I I I I /* +,32.20 .96 v +,pAO f NOD pk, 1, 9,7 j A, 919 00.19\ / / i 'I f as 25 04 1 + -TNV� �gz 2 + =7 11 30,06 4� + 71k 1Z A +28.64 i I , 'I i , 1 1, f �1. t e I 32i,4 I / / // ll�_ �,,e �Z / ,,, "', I--- 1--- 11-11 1 1 1 ll� , I , 1, 1 , 'I �/ e --, N j I I 1 0 1 1 1 i I - I f k, ib 4.> /r, .1 2919E ep Nbc t2a3 gy 4�0 t , lio A n0 \ 'IN + 9.87 A 4 p A 0,42 7 STORM MH 2%56 TOP=31-72 +11-93 eLxft " 32-50, .74' + Q_ 25 3 A 32,33 7 9.93 f !;,90 442 A t 'JiL�7' Jf + /18.551 ji, �p 18,70 1 "1 1- e A�,Jr ,, � , k I "I y 1 ( j j + tar 35 3z k 3244 3 X J + \11, 78 i I i I I I ,, + 12.37 2 JI 29,69,1 `44-2-08- 32 A j,l tp .43--7-0-+l .4 f < 32-26 2936 + It.83 x fl) 30-03 -1+ 2847 9.9�j T 29.9 aam 4�319.00 +,28.22 OUTLET STRUCTURE 1-v N 'v + TOP' 3227 IN" -RCP)-29.03 =30.97 INV OUT (18 /* x I ry INV 4'OWFtC .42 N, 32-19 EL34 CN I I I / l' "+ t4.38 N. \+ I ! f C14 38A .27 1 29.96 + 1.2AE bi -+32,39 71N 9�5 + 17 31.06 14.75 3216 N V -32.11 -RAP 32-09 RIP 2996 \29-98 T*PICAIL 3t 70 31.57 .90 31,74 29 9,91- _7 - - - - - - li�3 16, + 30,949 17 .89 2%go 32,18 "41 1 c 31-54 29,19 29 - - - - - - - - - - - - 20 32.74 cS- - - - - - - - - - - 21 R ------ 22 411 CDC +26.68 �/ f E OF 29.96 WA TE 7 23 29.87 -_7 24 + i,73 + 4% +'le,'34 25 - 11 1(' 814 26 - 32,19, 29-89 -- 27 e�+ 32.46 28 3010t 29 3�.35 05 000 32-50 Trash Rack ?64Z , , 30,22 AL 0=30.97 6 f1pvc RECORD DRAWING CERTIFICATION: THIS DOCUMENT IS :ISSUED FOR THE SOLE PURPOSE OF DEPICTING "AS -BUILT" FIELD CONDITIONS OF THE FACIPTY(S) AND IS NOT INTEND , ED TO CONFIRM,,OR N011111111i, VERIFY COMPLIANCE WITH NCDENR. THE INFORMATION' SHOWN IS BASED UPON A LOCATION SURVEY UKDER MY SUPERVISION PERFORMED ON 11/21/1:7 THRU CA& /* P n o/ _% *0 N 121/12/17. * 0 Ono SEAL 400 4m TE­ JOHN L-�7E, PLS L 259,6 L-2896 A ek 9 STORM STRUCTURE INV (A)=29-22 INV (8)-M26 INV (C,)-UN:ABLE TO ACCESS t0P "IR WALL-30.46 *C D A + ­1 + 31.39 40 + 29-ft 29,69 .01 —OUTLET STRUCTURE TOP=31.19 "A \ INV OUT (15"RCP)-29.28 `,?624 80TTOM- 28-74 -W. 'v' 25 26,44 elk lltx I I I "a"�\ .1 }\y4',�� CLEAN -OUT .35+ TOP=32.87 +31.34 INV=29.8l 30 (A + \+ V\ INV 2"ORtFrtCE=29.36 u 31,22 2663 + + 28,23 v I 8,0 X7 N" C .17 + + 31,41 TRENC14 DRAW o 26AZ 26, 0 .22 +,�qhk, % 78 4- �,53 29-79 ll,�, N \1 3 G\r* 1 11 \ \ \ + % th % Co29.6z4� 28.4 31-89 + 3169 TRENCH DRAIN 3 36 INV-50-06 31.88 + 31,64 A 246 \ N ti Co + xw �9. + + 19s.+ 31,169 TRENCH DRAIN INV=30.00 J35 4- 89 4A 31.79 X\ '29 21 X vi + 21 '95 420 + 4 a4 % % % Co N1, CO TRENCH DRAIN INV=30.01 8,04 6Z4 9.61 % 291 +A�e 2� 45 % '3127 W 49 2,3 % 24SJ42 29 of 31.72 A A 28. + 28,54 % 4 A �4 yu 29,07 1 TRENCH DRAIN, 22z 71841—, 4+ + QA� + P-9,43 INV=27 �65 ---, - % .6- 1 , ?.; + +\ 26, 6,64,"- % +29,7 26.69 V 28,6r� 2 S,;� 8 1 + 'Rage— % +* E9.91 U60 ZOO 941. 76 +31.45 !N� 10 00 jw A 31-50 + 3029 ,A + + 31,74 32,47 Etz RECORD DRAWING CERTIFICATION: THIS DOCUMENT IS ISSUED FOR THE SOLE PURPOSE OF DEPICTING "As -BUILT" FIELD CONDITIONS OF THE FACILITY(S) AND IS NOT INTENDED TO CONFIRM OR VERIFY COMPLIANCE WITH N,,CDENR. THE INFORMATION SHOWN IS BASED UPON A LOCATION SURVEY UNDER MY SUPERVISION PE ,RFO,RMED ON 11/21/17 THRU 5/4/18. 10 GAR Z JOHN L. P`IlERCff-,-fDVT1!'-2'596 -k[TAgE Is E A L Mw as 59c) 40 %e" 40 tl Trash Rack OUTLET STRUCTURE POND 2 NOT TO SCALE VICINITY SKETCH NOT TO SCALE 1.75"Orifice EL= 28-02 co co M txs 2 to ,ul �; c m If, z tun 2 d 'O REFERENCES ♦ BOUNDARY & TOPOGRAPHIC SURVEY: "ALTA/ACSM LAND TITLE SURVEY FOR WAL-MART REAL ESTATE BUSINESS TRUST, W. CORBETT AVENUE, Z OWN OF SWANSBORO, ONSLOW COUNTY, NORTH CAROLINA" PREPARED BY JOHN L. PIERCE AND ASSOCIATES DATED: 04/07/16 ARCHITECTURE: ARCHITECTURAL PLANS PREPARED BY MASSA MONTALTO ARCHITECTS DATED: 06/08/16 REFERENCES NOT A PART OF CONTRACT DOCUMENTS ♦ GEOTECHNICAL INVESTIGATION REPORT: "FINAL GEOTECHNICAL EXPLORATION REPORT PROPOSED WALMART SUPERCENTER #7179" PREPARED BY S&ME, INC. S&ME PROJECT NO. 1051-13-378G DATED: 03/24/16 ♦ ENVIRONMENTAL SITE ASSESSMENT - PHASE I: "PHASE 1 ENVIRONMENTAL SITE ASSESSMENT PROPOSED WALMART STORE #7179-00" PREPARED BY S&ME, INC. S&ME PROJECT NO. 4035-15-229 DATED: 02/26/16 ♦ ENVIRONMENTAL SITE ASSESSMENT - PHASE II: "LIMITED PHASE II ASSESSMENT PROPOSED WALMART STORE #7179-00" PREPARED BY S&ME, INC. S&ME PROJECT NO. 4035-15-229 DATED: 06/13/16 ♦ WATER REPORT: "WATER SUPPLY SITE SURVEY, STORE #7179" PREPARED BY RICK TERRELL, BENCHMARK GROUP DATED: 4/27/16 FAGENCIES TOWN OF SWANSBORO 601 W. CORBETT AVENUE SWANSBORO, NC 28584 CONTACT: JENNIFER HOLLAND (910) 326-4428 (P) ♦ NCDEQ WILMINGTON REGIONAL OFFICE 127 CARDINAL DRIVE EXT. WILMINGTON, NC 28405 CONTACT: GEORGETTE SCOTT (910) 796-7339 ♦ NCDOT DISTRICT 1 295A WILMINGTON HIGHWAY JACKSONVILLE, NC 28540 CONTACT: ROBERT VAUSE (910) 346-2040 ♦ ONSLOW WATER AND SEWER AUTHORITY (ONWASA) 228 GEORGETOWN ROAD JACKSONVILLE, NC 28540 CONTACT: WYNNE RAY (910) 537-7526 (P) ONWASA PROJECT SUMMARY # OF LOTS SERVED 4 # OF BACKFLOW PREVENTERS 5 8" WATER MAIN 857 LF 8" SANITARY SEWER MAIN 1,267 LF # OF SANITARY SEWER MANHOLES 8 I T'1f41T1T, TTY RESPONSIBILITY MATRIX FOR THIS PROTECT UTILITY/ GOVERNING AGENCIES CONTRACTOR RESPONSIBILITY- OTHERS RESPONSIBILITY- DOCUM-F.NTS 1"WeGgIvEl, SUPERCF__,_.NTF__,.R LOCATION OF SITE RBIETT AVENUE,AND HAMMOCK BEACH ROAD IN# 5355046027141 535504508906, 535504600803 ONSLOW COUNTY, SWANSBORO, NORTH CAROLINA WALMART UTILITY CONTACT- GAS VVIY ♦AMERIGAS GAS CO -COORDINATE CONSTRUCTION ACTIVITIES WITH GAS COMPANY TO -GAS COMPANY WILL PROVIDE AND INSTALL ALL PROPANE LINES -ENERGY MANAGEMENT DEPARTMENT (PROPANE) 5301 HIGH ST. ENSURE INSTALLATION OF UNDERGROUND LINES ARE FROM THE TANKS UP TO THE EXTERIOR BUILDING METER (479) 204-0452 MOREHEAD CITY, NC 28557 COMPLETED PRIOR TO ASPHALT OR CURB PLACEMENT. -GAS COMPANY WILL INSTALL LIQUID PROPANE TANKS AT THE REAR CONTACT: KEITH PADGETT OF BUILDING INCLUDING THE RISER PADS (910) 232-6462 (P) -PRESENT RESPONSIBLE PARTIES. TELEPHONE *CENTURY LINK 112 REA ST. -COORDINATE CONSTRUCTION ACTIVITIES WITH TELEPHONE COMPANY TO ENSURE INSTALLATION OF UNDERGROUND LINES -TELEPHONE COMPANY WILL PROVIDE AND INSTALL ALL TELEPHONE CABLES FROM THE POINT OF CONNECTION UP TO -TELECOM DEPARTMENT (479) 277.9597 JACKSONVILLE,NC 28546 ARE COMPLETED PRIOR TO ASPHALT OR CURB PLACEMENT. THE BUILDING CONTACT: ANTHONY MELINILLI -COORDINATE RELOCATION OF PHONE BOXES WITH TELEPHONE -PRESENT RESPONSIBLE PARTIES. (910) 577-9339 (P) COMPANY WITHIN 10 DAYS OF AWARD OF CONTRACT. -ANY RELOCATION OF EX. LINES WILL BE DONE BY PROVIDER. -PROVIDE AND INSTALL. 1-4" SCHEDULE 40 PVC CONDUITS WITH PULL ROPES, INCLUDING ALL TRENCHING AND BACKFILLING, FROM THE RISER POLE UP TO THE BUILDING. -PROVIDE AND INSTALL PULL BOXES AS PER TELEPHONE COMPANY REQUIREMENTS. -COORDINATE CONSTRUCTION ACTIVITIES WITH TELEPHONE COMPANY TO ENSURE THAT DIAL -TONE IS PRESENT 2 WEEKS PRIOR TO POSSESSION. FIBER OPTIC *CENTURY LINK 112 REA ST. -COORDINATE CONSTRUCTION ACTIVITIES WITH TELEPHONE COMPANY TO ENSURE INSTALLATION OF UNDERGROUND LINES -TELEPHONE COMPANY WILL PROVIDE AND INSTALL ALL TELEPHONE CABLES FROM THE POINT OF CONNECTION UP TO -TELECOM DEPARTMENT (479) 277-9597 JACKSONVILLE,NC 28546 ARE COMPLETED PRIOR TO ASPHALT OR CURB PLACEMENT. THE BUILDING CONTACT: ANTHONY MELINILLI -PROVIDE AND INSTALL 14' SCHEDULE 40 PVC CONDUITS WITH -PRESENT RESPONSIBLE PARTIES. (910) 577-9339 (P) PULL ROPES, INCLUDING ALL TRENCHING AND BACKFILLING, FROM -ANY RELOCATION OF EX. LINES WILL BE DONE BY PROVIDER. THE RISER POLE UP TO THE BUILDING. -PROVIDE AND INSTALL PULL BOXES AS PER TELEPHONE COMPANY REQUIREMENTS. -COORDINATE CONSTRUCTION ACTIVITIES WITH TELEPHONE COMPANY TO ENSURE THAT T1 (FIBER OPTIC SERVICES) IS PRESENT 2 WEEKS PRIOR TO POSSESSION. ELECTRIC ♦JONES ONSLOW -COORDINATE CONSTRUCTION ACTIVITIES WITH ELECTRIC -ELECTRIC COMPANY WILL PROVIDE AND INSTALL ALL MATERIALS -ENERGY MANAGEMENT DEPARTMENT ELECTRIC COMPANY TO ENSURE INSTALLATION OF UNDERGROUND LINES NEEDED TO EgTABLISH PRIMARY OVERHEAD SERVICE FROM (479) 204-0452 ARE COMPLETED PRIOR TO ASPHALT OR CURB PLACEMENT. POINT OF CONNECTION AT THE EX. LINE UP TO THE 259 WESTERN BLVD -COORDINATE RELOCATION OF UTILITY POLES WITH ELECTRIC TRANSFORMER. JACKSONVILLE, NC 28546 COMPANY WITHIN 10 DAYS OF AWARD OF CONTRACT. -ELECTRIC COMPANY WILL PROVIDE AND INSTALL PRIMARY CABLE CONTACT: ROBERT LANIER -CONSTRUCT TRANSFORMER PAD AS PER THE ELECTRIC FOR ALL UNDERGROUND LINES UP TO THE TRANSFORMER. (910) 330-2073 (P) COMPANY'S SPECIFICATIONS. -ANY RELOCATION OF EX. LINES OR POLES WILL BE DONE BY -PROVIDE AND INSTALL ALL SECONDARY SERVICE AND MATERIALS. JONES ONSLOW ELECTRIC. -ELECTRIC COMPANY WILL PROVIDE TRANSFORMER. SANITARY ♦ONSLOW WATER AND -PROVIDE AND INSTALL SANITARY SEWER LINES AND ASSOCIATED -ENERGY MANAGEMENT DEPARTMENT SEWER SEWER AUTHORITY APPURTENANCES PER THE PLANS AND SPECIFICATION. (479) 204-0452 228 GEORGETOWN ROAD -ALL PUBLIC AND PRIVATE SANITARY SEWER LINES SHALL BE JACKSONVILLE, NC 28540 SCHEDULE 35 PVC, C900, OR DIP. SERVICE LINES MUST BE CONTACT: WYNNE RAY SCHEDULE 40 PVC OR DIP. -COORDINATE REQUIRED INSPECTION SERVICES WITH ENGINEER (910) 537-7526 (P) OF RECORD AND ONSLOW WATER AND SEWER AUTHORITY. SEE UTILITY PLAN FOR REQUIREMENTS. -PER ONWASA MSSD, ONLY A UTILITY CONTRACTOR LICENSED BY THE STATE OF NORTH CAROLINA MAY INSTALL PUBLIC WATER AND SEWER MAINS AND SERVICES. WATER ♦ ONSLOW WATER AND -PROVIDE AND INSTALL ALL WATER MAINS AND ASSOCIATED -PROVIDE AND INSTALL WATER METERS. -ENERGY MANAGEMENT DEPARTMENT SEWER AUTHORITY APPURTENANCES PER THE PLANS AND SPECIFICATION. (479) 204-0452 228 GEORGETOWN ROAD -ALL PRIVATE WATER MAINS SHALL BE DIP CLASS 52. JACKSONVILLE, NC 28540 -ALL PUBLIC WATER MAINS SHALL BE DiP CLASS 350. CONTACT: WYNNE RAY -ALL PORTIONS OF THE FIRE PROTECTION WATER SYSTEM SHALL (910) 537-7526 (P) BE INSTALLED BY A LICENSED FIRE SPRINKLER CONTRACTOR. -PER ONWASA MSSD, ONLY A UTILITY CONTRACTOR LICENSED BY THE STATE OF NORTH CAROLINA MAY INSTALL PUBLIC WATER AND SEWER MAINS AND SERVICES. -COORDINATE REQUIRED INSPECTION SERVICES WITH ENGINEER OF RECORD AND DEPARTMENT OF PUBLIC UTILITIES. SEE UTILITY PLAN FOR REQUIREMENTS. STORM ♦ NCDEQ -PROVIDE AND INSTALL ALL STORM SEWER LINES AND ASSOCIATED -ENERGY MANAGEMENT DEPARTMENT SEWER WILMINGTON REGIONAL OFFICE APPURTENANCES PER THE PLANS AND SPECIFICATION. (479) 204-0452 127 CARDINAL DRIVE EXT. -REFER TO GRADING PLAN FOR INFORMATION ON ALLOWABLE WILMINGTON, NC 28405 STORM SEWER MATERIALS. CONTACT: CHRISTINE HALL (910) 796-7215 THIS MATRIX HAS BEEN PROVIDED FOR INFORMATIONAL PURPOSES. THE CONTRACTOR SHALL PROVIDE ANY AND ALL APPURTENANCES, TRENCHING AND BACKFILL, AND OTHER INCIDENTALS TO MEET OR EXCEED THE SPECIFICATIONS OF THE ITEMS I-ISTED. CONTRACTOR SHALL VERIFY THE RESPONSIBILITIES LISTED ABOVE PRIOR TO BID AND START OF CONSTRUCTION. GENERAL NOTE: -HE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PR( SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELA SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF REC( ING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONST TANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAVVING: FULL CONFORMANCE WITH I OCAI REGUI ATIONS AND CODES. w LOCATION MAP NTS Dlr"`V7r OP7r WAL-MART REAL ESTATE BUSINESS TRUST 20- -01 S.E. 10TH STREET ANSAS 72716-5570 BENTONVILLE, ARr\ TEL: (479) 204-1195 CONTACT: DESMOND ANYANWU P�EPX_nKEDl3v._ B '. 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NORTH CAROLINA 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineering.com CONTACT: MICHAEL A. THEBERGE SHEET INDEX SHEET TITLE SHEET NUMBER COVER SHEET C-1 GENERAL NOTES C-2 ALTA SURVEY (BY OTHERS) - SWPPP NOTES SW-1 SWPPP IMPLEMENTATION SEQUENCE AND LIMITS OF WORK SW-2 PHASE I EROSION AND SEDIMENTATION CONTROL PLAN SW-3 PHASE It ERGS GIN AND SEDIMENTATION CONTROL PLAN SW-4 E AND SC SCHEDULES INFORMATION AND SUMMARY TABLES SW-5 SWPPP DETAILS SW-6 - SW-8 DEMOLITION PLAN DM-1 OVERALL SITE PLAN C-3 OVERALL GRADING AND DRAINAGE PLAN C-6 SOUTH GRADING AND DRAINAGE PLAN C-7 NORTH GRADING AND DRAINAGE PLAN C-8 PRE -DEVELOPMENT DRAINAGE AREAS DA-1 POST -DEVELOPMENT DRAINAGE AREAS DA-2 OVERALL UTILITY PLAN C-9 OVERALL LANDSCAPE PLAN LD-1 SOUTH LANDSCAPE PLAN LD-2 NORTH LANDSCAPE PLAN LD-3 ,ANDSCAPE DETAILS LD-4 CONSTRUCTION DETAILS D-1 - D-11 M ' fN'l l F l 3 c f\�k ��b ALERT TO CONTRACTOR: 1. THE SITEWORK FOR THE WALMART PROJECT SHALL MEET OR EXCEED THE STANDARD SITE WORK SPECIFICATIONS, 2. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POS S'O AND THE FINAL CONNECTION OF SERVICES T r, p , FrSSUED FOR C�ONSTRUC� SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE THIS DOCUMENT IS NOT ISSUED BY BOHLER ENGINEERING FOR CONSTRUCTION WITHOUT (3) SIGNATURES BEPC PROJECT # REVISION DATE: rw"mR�EEVISIONS BY NCDENR REVISIONS 7 BAB 5/18/16 NCDENR REVS/OTB REV 8 BAB 5/31/16 NCDOT/NCDENR REVS 9 BAB 6/6/16 QA/QC, OTB REVISIONS 10 6/20/16 ATZ NCDEQ REVISIONS 11 8/3/16 BAB BID ADDENDUM 1 12 9/21 /16 BAB NCDEQ REVISIONS 13 10/3/16 BAB NCDEQ REVISIONS 14 BAB 10/19/16 DRAWN BAB CHECKED MAT DATE 7/11 /14 SCALE NTS JOB No. NCC138078 SHEET C:\USERS\BBUCKLAND\APPDATA\LOCAL\TEMP\ACPUBLISH_4152\NCC138078SDX.DWG PRINTED BY: BBUCKLAND 10.19.16 @ 9:00 AM LAST SAVED BY: BBUCKLAND GENERAL NOTES.- 21.IF THE CONTRACTOR DEVIATES FROM THE PLANS AND SPECIFICATIONS, INCLUDING THE NOTES CONTAINED HEREIN, WITHOUT FIRST OBTAINING THE PRIOR WRITTEN AUTHORIZATION OF THE ENGINEER FOR SUCH DEVIATIONS, THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH THE NOTES AND SPECIFICATIONS CONTAINED HEREIN. CONTRACTOR CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PAYMENT OF ALL COSTS INCURRED IN CORRECTING ANY WORK DONE IS RESPONSIBLE TO ENSURE THAT ALL SUBCONTRACTORS FULLY AND COMPLETELY CONFORM TO AND COMPLY WITH THESE WHICH DEVIATES FROM THE PLANS, ALL FINES AND/OR PENALTIES ASSESSED WITH RESPECT THERETO AND ALL REQUIREMENTS: - I COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM AND, FURTHER, SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS THE ENGINEER, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, IN ACCORDANCE WITH PARAGRAPH 19 1. THE FOLLOWING DOCUMENTS ARE INCORPORATED BY REFERENCE AS PART OF THIS SITE PLAN: HEREIN, FOR AND FROM ALL FEES, ATTORNEYS' FEES, DAMAGES, COSTS, -JUDGMENTS, PENALTIES AND THE LIKE RELATED TO SAME. • SEE THE COVER SHEET FOR THE DOCUMENTS THAT ARE AND ARE NOT A PART OF THE CONTRACT DOCUMENTS. 22. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE AND PROTECTION OF TRAFFIC PLAN FOR ALL WORK THAT AFFECTS PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR MUST VERIFY THAT HE/SHE HAS THE LATEST EDITION OF THE PUBLIC TRAVEL EITHER IN THE R.O.W. OR ON SITE. THE COST FOR THIS ITEM MUST BE INCLUDED IN THE CONTRACTOR'S DOCUMENTS REFERENCED ABOVE. THIS IS CONTRACTOR'S RESPONSIBILITY. PRICE. . 2. ALL ACCESSIBLE (A/K/A ADA) PARKING SPACES MUST BE CONSTRUCTED TO MEET, AT A MINIMUM, THE MORE STRINGENT OF 23. ALL SIGNING AND PAVEMENT STRIPING MUST CONFORM TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES OR LOCALLY THE REQUIREMENTS OF THE "AMERICANS WITH DISABILITIES ACT" (ADA) CODE (42 U.S,C. § 12101 et seq. AND 42 U.S.C. § 4151 APPROVED SUPPLEMENT. et seq.) OR THE REQUIREMENTS OF THE JURISDICTION WHERE THE PROJECT IS TO BE CONSTRUCTED, AND ANY AND ALL AMENDMENTS TO BOTH WHICH ARE IN EFFECT WHEN THESE PLANS ARE COMPLETED. I I I I I . , .24. ENGINEER IS NOT RESPONSIBLE FOR ANY INJURY OR DAMAGES RESULTING FROM CONTRACTOR'S FAILURE TO BUILD OR CONSTRUCT IN `STRICT ACCORDANCE WITH THE APPROVED PLANS. IF CONTRACTOR AND/OR OWNER FAIL BUILD OR 3. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL REQUIRED PERMITS AND CONSTRUCT IN STRICT ACCORDANCE WITH APPROVED PLANS, THEY AGREE TO JOINTLY AND SEVERALLY INDEMNIFY AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER RECEIVED AND THOROUGHLY REVIEWED THE COMMENTS TO ALL PLANS AND OTHER DOCUMENTS REVIEWED AND INCURS. APPROVED BY THE PERMITTING AUTHORITIES AND CONFIRMED THAT ALL NECESSARY OR REQUIRED PERMITS HAVE BEEN OBTAINED. CONTRACTOR MUST HAVE COPIES OF ALL PERMITS AND APPROVALS ON SITE AT ALL TIMES. 25. OWNER MUST MAINTAIN AND PRESERVE ALL PHYSICAL SITE FEATURES AND DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS, IN STRICT ACCORDANCE WITH THE APPROVED PLAN(S) AND DESIGN AND, FURTHER ENGINEER 4. THE OWNER/CONTRACTOR MUST BE FAMILIAR WITH AND RESPONSIBLE FOR THE PROCUREMENT OF ANY AND ALL IS NOT RESPONSIBLE FOR ANY FAILURE TO SO MAINTAIN OR PRESERVE SITE AND/OR DESIGN FEATURES. IF OWNER FAILS CERTIFICATIONS REQUIRED FOR THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY. TO MAINTAIN AND/OR PRESERVE ALL PHYSICAL SITE FEATURES AND/OR DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS, OWNER AGREES TO INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES 5. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS,. SPECIFICATIONS AND CONDITIONS OF APPROVAL, THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS AS A RESULT OF SAID FAILURE. AND ALL APPLICABLE REQUIREMENTS, RULES, REGULATIONS, STATUTORY REQUIREMENTS, CODES, LAWS AND STANDARDS OF ALL GOVERNMENTAL ENTITIES WITH JURISDICTION OVER THIS PROJECT. 26. ALL DIMENSIONS MUST BE TO FACE OF CURB, EDGE OF PAVEMENT, OR EDGE OF BUILDING, UNLESS NOTED OTHERWISE. 6. THE SITE WORK SPECIFICATIONS SET FORTH HEREIN ARE A PART OF THE REQUIRED CONSTRUCTION DOCUMENTS AND, IN 27. ALL CONSTRUCTION AND MATERIALS MUST COMPLY WITH AND CONFORM TO APPLICABLE FEDERAL, STATE AND LOCAL CASE OF CONFLICT, DISCREPANCY OR AMBIGUITY, THE MORE STRINGENT REQUIREMENTS AND/OR RECOMMENDATIONS REGULATIONS, LAWS, ORDINANCES, RULES AND CODES, AND ALL APPLICABLE OSHA REQUIREMENTS. CONTAINED IN THE PLANS AND THE SITE WORK SPECIFICATIONS SHALL TAKE PRECEDENCE UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS. THE CONTRACTOR MUST NOTIFY THE ENGINEER, IN WRITING, OF ANY SUCH CONFLICT, 2g. CONTRACTOR AND OWNER MUST INSTALL ALL ELEMENTS AND COMPONENTS IN STRICT COMPLIANCE WITH AND DISCREPANCY OR AMBIGUITY BETWEEN THE PLANS AND THE SITE WORK SPECIFICATIONS PRIOR TO PROCEEDING WITH ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDED INSTALLATION CRITERIA AND SPECIFICATIONS. IF ANY FURTHER WORK. CONTRACTOR AND/OR OWNER FAIL TO DO SO, THEY AGREE TO JOINTLY AND SEVERALLY INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS AS A RESULT 7. THESE PLANS ARE BASED ON INFORMATION PROVIDED TO BOHLER ENGINEERING BY THE OWNER AND OTHERS PRIOR TO OF SAID FAILURE. THE TIME OF PLAN PREPARATION. CONTRACTOR MUST FIELD VERIFY EX. CONDITIONS AND NOTIFY BOHLER ENGINEERING, IN WRITING, IMMEDIATELY IF ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLAN, OR IF THE PROP. WORK 29. CONTRACTOR IS RESPONSIBLE TO MAINTAIN ON -SITE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN CONFLICTS WITH ANY OTHER SITE FEATURES. COMPLIANCE WITH EPA REQUIREMENTS FOR SITES WHERE ONE (1) ACRE OR MORE (UNLESS THE LOCAL JURISDICTION REQUIRES FEWER) IS DISTURBED BY CONSTRUCTION ACTIVITIES. CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL 8. ALL DIMENSIONS SHOWN ON THE PLANS MUST BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO THE START OF ACTIVITIES, INCLUDING THOSE OF SUBCONTRACTORS, ARE IN COMPLIANCE WITH THE SWPPP, INCLUDING BUT NOT LIMITED CONSTRUCTION. CONTRACTOR MUST NOTIFY ENGINEER, IN WRITING, IF ANY CONFLICTS, DISCREPANCIES, OR AMBIGUITIES TO LOGGING ACTIVITIES (MINIMUM ONCE PER WEEK AND AFTER RAINFALL EVENTS) AND CORRECTIVE MEASURES, AS EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION. NO EXTRA COMPENSATION WILL BE PAID TO THE CONTRACTOR FOR APPROPRIATE. WORK WHICH HAS TO BE REDONE OR REPAIRED DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS PRIOR TO CONTRACTOR GIVING ENGINEER WRITTEN NOTIFICATION OF SAME AND ENGINEER, THEREAFTER, PROVIDING 30. AS CONTAINED IN THESE DRAWINGS AND ASSOCIATED APPLICATION DOCUMENTS PREPARED BY THE SIGNATORY CONTRACTOR WITH WRITTEN AUTHORIZATION TO PROCEED WITH SUCH ADDITIONAL WORK. PROFESSIONAL ENGINEER, THE USE OF THE WORDS CERTIFY OR CERTIFICATION CONSTITUTES AN EXPRESSION OF "PROFESSIONAL OPINION" REGARDING THE INFORMATION WHICH IS THE SUBJECT OF THE UNDERSIGNED PROFESSIONAL 9. CONTRACTOR MUST REFER TO THE ARCHITECTURAL/BUILDING PLANS "OF RECORD" FOR EXACT LOCATIONS AND KNOWLEDGE OR BELIEF AND IN ACCORDANCE WITH COMMON ACCEPTED PROCEDURE CONSISTENT WITH THE APPLICABLE DIMENSIONS OF ENTRY/EXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY STANDARDS OF PRACTICE, AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE, EITHER EXPRESSED OR IMPLIED. LOCATIONS. 31. ALL CONSTRUCTION IS TO CONFORM TO THE SITE PLAN APPROVED BY THE PUBLIC WORKS AND PLANNING DIRECTOR. 10. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR MUST COORDINATE THE BUILDING LAYOUT BY CAREFUL REVIEW OF THE ENTIRE SITE PLAN AND THE LATEST ARCHITECTURAL PLANS (INCLUDING, BUT NOT LIMITED TO, 32. A "COMPETENT" CARD CARRYING INDIVIDUAL MUST BE PROVIDED FOR OSHA REGULATIONS. STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION PLAN, WHERE APPLICABLE). CONTRACTOR MUST IMMEDIATELY NOTIFY OWNER, ARCHITECT AND SITE ENGINEER, IN WRITING, OF ANY CONFLICTS, DISCREPANCIES OR AMBIGUITIES WHICH EXIST. 11. DEBRIS MUST NOT BE BURIED ON THE SUBJECT SITE AND ALL UNSUITABLE EXCAVATED MATERIAL AND DEBRIS (SOLID WASTE) MUST BE DISPOSED OF IN ACCORDANCE WITH THE REQUIREMENTS OF ANY AND ALL GOVERNMENTAL AUTHORITIES WHICH HAVE JURISDICTION OVER THIS PROJECT OR OVER CONTRACTOR. 12. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING WHEN SHORING IS REQUIRED AND FOR INSTALLING ALL SHORING REQUIRED DURING EXCAVATION (TO BE PERFORMED IN ACCORDANCE WITH CURRENT OSHA STANDARDS) AND ANY - ADDITIONAL PRECAUTIONS TO BE TAKEN TO ASSURE THE STABILITY OF ADJACENT, NEARBY AND CONTIGUOUS - STRUCTURES AND PROPERTIES. 13. THE CONTRACTOR IS TO EXERCISE EXTREME CARE WHEN PERFORMING ANY WORK ACTIVITIES ADJACENT TO PAVEMENT, STRUCTURES, ETC. WHICH ARE TO REMAIN EITHER FOR AN INITIAL PHASE OF THE PROJECT OR AS PART OF THE FINAL CONDITION. CONTRACTOR IS RESPONSIBLE FOR TAKING ALL APPROPRIATE MEASURES REQUIRED TO ENSURE THE STRUCTURAL STABILITY OF SIDEWALKS AND PAVEMENT, UTILITIES, BUILDINGS, AND INFRASTRUCTURE WHICH ARE TO - REMAIN, AND TO PROVIDE A SAFE WORK AREA FOR THIRD PARTIES, PEDESTRIANS AND ANYONE INVOLVED WITH THE PROJECT, GENERAL DEMOLITION NOTES: 14. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE DONE TO ANY NEW OR EX. CONSTRUCTION OR - - 1. THIS PLAN REFERENCES DOCUMENTS AND INFORMATION BY: PROPERTY DURING THE COURSE OF CONSTRUCTION, INCLUDING BUT NOT LIMITED TO DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC. AND SHALL BEAR ALL COSTS ASSOCIATED WITH SAME TO INCLUDE, BUT NOT BE LIMITED; TO, SURVEY - "ALTA/ACSM LAND TITLE SURVEY WALMART REAL ESTATE BUSINESS TRUST" REDESIGN, RE -SURVEY, RE -PERMITTING AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR AND MUST REPLACE ALL SIGNAL INTERCONNECTION CABLE, WIRING CONDUITS, AND ANY UNDERGROUND ACCESSORY EQUIPMENT DAMAGED DURING CONSTRUCTION AND MUST BEAR ALL COSTS ASSOCIATED WITH SAME. THE REPAIR OF ANY SUCH NEW OR EX. ADDRESS - JOHN L. PIERCE AND ASSOCIATES, P.A. CO INSTRUCTION OR PROPERTY MUST RESTORE SUCH CONSTRUCTION OR PROPERTY TO A CONDITION EQUIVALENT TO OR 405 JOHNSON BLVD BETTER THAN THE CONDITIONS PRIOR TO COMMENCEMENT OF THE CONSTRUCTION, AND IN CONFORMANCE WITH JACKSONVii_LE, NC 28540 I APPLICABLE CODES, LAWS RULES, REGULATIONS, STATUTORY REQUIREMENTS AND STATUTES. CONTRACTOR MUST BEAR 2. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY ALL COSTS ASSOCIATED WITH SAME. CONTRACTOR IS RESPONSIBLE TO DOCUMENT ALL EX. DAMAGE AND TO NOTIFY THE AND HEALTH ACT OF 1970, (29 U.S.C. 651 et seq.), AS AMENDED AND ANY. MODIFICATIONS AMENDMENTS OR REVISIONS OWNER AND THE CONSTRUCTION MANAGER PRIOR TO THE START OF CONSTRUCTION. TO SAME. DAYS 15. ALL CONCRETE MUST BE AIR ENTRAINED AND HAVE THE MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI AT 28 D 3. BOHLER ENGINEERING HAS NO CONTRACTUAL, LEGAL, OR OTHER RESPONSIBILITY FOR JOB SITE SAFETY OR JOB SITE UNLESS OTHERWISE NOTED ON THE PLANS OR DETAILS. SUPERVISION, OR ANYTHING RELATED TO SAME. 16. THE ENGINEER IS NOT RESPONSIBLE FOR CONSTRUCTION METHODS, MEANS, TECHNIQUES OR PROCEDURES, GENERALLY 4. THE DEMOLITION PLAN IS INTENDED TO PROVIDE GENERAL INFORMATION, ONLY, REGARDING ITEMS TO BE PROCEDURES FOR COMPLETION OF THE WORK DEPICTED OR FOR THE CONSTRUCTION MEAN, METHODS, TECHNIQUES OR CO DEMOLISHED AND/OR REMOVED. THE CONTRACTOR MUST ALSO REVIEW THE OTHER SITE PLAN DRAWINGS AND BOTH ON THESE PLANS, AND FOR ANY CONFLICTS/SCOPE REVISIONS WHICH RESULT FROM SAME. CONTRACTOR IS INCLUDE IN DEMOLITION ACTIVITIES ALL INCIDENTAL WORK NECESSARY FOR THE CONSTRUCTION OF THE NEW SITE RESPONSIBLE FOR DETERMINING THE METHODS/MEANS FOR COMPLETION OF THE WORK PRIOR TO THE COMMENCEMENT IMPROVEMENTS. OF CONSTRUCTION. 17. THE ENGINEER OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY. THE ENGINEER OF RECORD HAS NOT BEEN 5. CONTRACTOR MUST RAISE ANY QUESTIONS CONCERNING THE ACCURACY OR INTENT OF THESE PLANS OR SAFETY STANDARDS, OR THE SAFETY OF THE BEING WHOLLY TIDE OF ENGINEER'S RETAINED TO PERFORM OR BE RESPONSIBLE FOR JOB SITE SAFETY, SAME NG WHO L OUTSIDE SPECIFICATIONS, CONCERNS REGARDING THE APPLICABLE CONTRACTOR OR THIRD PARTIES IN PERFORMING THE WORK ON THIS PROJECT: WITH BOHLER ENGINEERING, IN SERVICES AS RELATED TO THE PROJECT. THE ENGINEER OF RECORD IS NOT RESPONSIBLE TO IDENTIFY OR REPORT ANY WRITING, AND RESPONDED TO BY BOHLER, IN WRITING, PRIOR TO THE INITIATION OF ANY SITE ACTIVITY AND ANY JOB SITE SAFETY ISSUES, AT ANY TIME. DEMOLITION ACTIVITY. ALL DEMOLITION ACTIVITIES MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS 18. ALL CONTRACTORS MUST CARRY THE SPECIFIED STATUTORY WORKER'S COMPENSATION INSURANCE, EMPLOYER'S OF THESE PLANS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, RULES, LIABILITY INSURANCE AND LIMITS OF COMMERCIAL GENERAL LIABILITY INSURANCE (CGL). ALL CONTRACTORS MUST HAVE REQUIREMENTS, STATUTES, ORDINANCES AND CODES. THEIR CGL POLICIES ENDORSED TO NAME BOHLER ENGINEERING, AND ITS PAST, PRESENT AND FUTURE OWNERS, 6. PRIOR TO STARTING ANY DEMOLITION, CONTRACTOR IS RESPONSIBLE FOR/TO: OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AS ALL REQUIRED PERMITS AND MAINTAINING THE SAME ON SITE FOR REVIEW BY THE ENGINEER AND ADDITIONAL NAMED INSURED AND TO PROVIDE CONTRACTUAL LIABILITY COVERAGE SUFFICIENT TO INSURE THIS HOLDA.OBTAINING OTHER PUBLIC AGENCIES HAVING JURISDICTION THROUGHOUT THE DURATION OF THE PROJECT, SITE WORK AND HARMLESS AND INDEMNITY OBLIGATIONS ASSUMED BY THE CONTRACTORS. ALL CONTRACTORS MUST FURNISH BOHLER DEMOLITION WORK. ENGINEERING WITH CERTIFICATIONS OF INSURANCE AS EVIDENCE OF THE REQUIRED INSURANCE PRIOR TO COMMENCING WORK AND UPON RENEWAL OF EACH POLICY DURING THE ENTIRE PERIOD OF CONSTRUCTION AND FOR ONE YEAR AFTER THE COMPLETION OF CONSTRUCTION. IN ADDITION, ALL CONTRACTORS WILL, TO THE FULLEST EXTENT PERMITTED UNDER E ITSA ST THE LAW, INDEMNIFY, DEFEND AND HOLD BOHLEROWNERS, AGENT, PRESENT AND S, ADA INSTRUCTIONS TO C0������0� EIMBERS,GPR NCIPALS,AND OFFICERS, DIRECTORS, PARTNERS,RMLESS SHAREHOLDERS, COMMISSIONERS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS FROM AND AGAINST ANY DAMAGES, INJURIES, CLAIMS, ACTIONS, PENALTIES, EXPENSES, PUNITIVE CONTRACTORS MUST EXERCISE APPROPRIATE CARE AND PRECISION IN CONSTRUCTION OF ADA (HANDICAP) DAMAGES, TORT DAMAGES, STATUTORY CLAIMS, STATUTORY CAUSES OF ACTION, LOSSES, CAUSES OF ACTION, LIABILITIES ACCESSIBLE COMPONENTS AND ACCESS ROUTES FOR THE SITE. THESE COMPONENTS, AS CONSTRUCTED, MUST OR COSTS, INCLUDING, BUT NOT LIMITED TO, REASONABLE ATTORNEYS' FEES AND DEFENSE COSTS, ARISING OUT OF OR IN COMPLY WITH THE CURRENT ADA STANDARDS AND REGULATIONS' BARRIER FREE ACCESS (ICC/ANSI A117.1 - 2009 ANY WAY CONNECTED WITH OR TO THE PROJECT, INCLUDING ALL CLAIMS BY EMPLOYEES OF THE CONTRACTORS, ALL EDITION) AND ANY MODIFICATIONS, REVISIONS OR UPDATES TO SAME. FINISHED SURFACES ALONG THE CLAIMS BY THIRD PARTIES AND ALL CLAIMS RELATED TO THE PROJECT. CONTRACTOR MUST NOTIFY ENGINEER, IN ACCESSIBLE ROUTE OF TRAVEL FROM PARKING SPACE, PUBLIC TRANSPORTATION, PEDESTRIAN ACCESS, WRITING, AT LEAST THIRTY (30) DAYS PRIOR TO ANY TERMINATION, SUSPENSION OR CHANGE OF ITS INSURANCE INTER -BUILDING ACCESS, TO POINTS OF ACCESSIBLE BUILDING ENTRANCE/EXIT, MUST COMPLY WITH THESE ADA HEREUNDER. CODE REQUIREMENTS. THESE INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: 19. BOHLER ENGINEERING WILL REVIEW OR TAKE OTHER APPROPRIATE ACTION ON THE CONTRACTOR SUBMITTALS, SUCH AS . PARKING SPACES AND PARKING AISLES - SLOPE SHALL NOT EXCEED 1:50 (1/4" PER FOOT OR NOMINALLY 2.0%) IN SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND OTHER DATA, WHICH THE CONTRACTOR IS REQUIRED TO SUBMIT, BUT ANY DIRECTION. ONLY FOR THE LIMITED PURPOSE OF CHECKING FOR CONFORMANCE WITH THE DESIGN INTENT AND THE INFORMATION SHOWN IN THE CONSTRUCTION CONTRACT DOCUMENTS. CONSTRUCTION MEANS AND/OR METHODS AND/OR TECHNIQUES • CURB RAMPS - SLOPE MUST NOT EXCEED 1:12 (8.3%) FOR A MAXIMUM OF SIX (6) FEET. OR PROCEDURES, COORDINATION OF THE WORK WITH OTHER TRADES, AND CONSTRUCTION SAFETY PRECAUTIONS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND BOHLER HAS NO RESPONSIBILITY OR LIABILITY_FOR SAME . LANDINGS - MUST BE PROVIDED AT EACH END OF RAMPS, MUST PROVIDE POSITIVE DRAINAGE, AND MUST NOT HEREUNDER. BOHLER ENGINEERING'S SHOP DRAWING REVIEW WILL BE CONDUCTED WITH REASONABLE PROMPTNESS EXCEED 1:50 (1/4" PER FOOT OR NOMINALLY 2.0%) IN ANY DIRECTION, WHILE ALLOWING SUFFICIENT TIME TO PERMIT ADEQUATE REVIEW. REVIEW OF A SPECIFIC TEM MUST NOT INDICATE THAT . BOHLER ENGINEERING HAS REVIEWED THE ENTIRE ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. BOHLER . PATH OF TRAVEL ALONG ACCESSIBLE ROUTE - MUST PROVIDE A 36-INCH OR GREATER UNOBSTRUCTED WIDTH OF ENGINEERING WILL NOT BE RESPONSIBLE FOR ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS NOT PROMPTLY TRAVEL (CAR OVERHANGS AND/OR HANDRAILS CANNOT REDUCE THIS MINIMUM WIDTH). THE SLOPE MUST BE NO AND IMMEDIATELY BROUGHT TO ITS ATTENTION, IN WRITING, BY THE CONTRACTOR. BOHLER ENGINEERING WILL NOT BE I GREATER -THAN 1:20 (5.0%) .IN THE DIRECTION OF TRAVEL, AND MUST NOT EXCEED 1:50 (1/4" PER FOOT OR REQUIRED TO REVIEW PARTIAL SUBMISSIONS OR THOSE FOR WHICH SUBMISSIONS OF CORRELATED ITEMS HAVE NOT BEEN NOMINALLY 2.0%) IN CROSS SLOPE. WHERE PATH OF TRAVEL WILL BE GREATER THAN 1:30 (5.0%), ADA RAMP MUST RECEIVED. BE ADHERED TO. A MAXIMUM SLOPE OF 1:12 (8.3%), FOR A MAXIMUM RISE OF 2.5 FEET, MUST BE PROVIDED. THE RAMP MUST HAVE ADA HAND RAILS AND "LEVEL" LANDINGS ON EACH END THAT ARE CROSS SLOPED NO MORE 20. NEITHER THE PROFESSIONAL ACTIVITIES OF BOHLER ENGINEERING, NOR THE PRESENCE OF BOHLER ENGINEERING THAN 1:50 IN ANY DIRECTION (1/4" PER FOOT OR NOMINALLY 2.0%) FOR POSITIVE DRAINAGE. AND/OR ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND p DOORWAYS - MUST HAVE A "LEVEL" LANDING AREA ON THE EXTERIOR SIDE OF THE DOOR THAT IS SLOPED AWAY ITS SUBCONTRACTORS AND SUBCONSULTANTS AT A CONSTRUCTION/PROJECT SITE, SHALL RELIEVE THE GENERAL FROM THE DOOR NO MORE THAN 1:50 (1/4" PER FOOT OR NOMINALLY 2.0%) FOR POSITIVE DRAINAGE. THIS CONTRACTOR OF ITS OBLIGATIONS, DUTIES AND RESPONSIBILITIES INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION LANDING AREA MUST BE NO LESS THAN 60 INCHES (5 FEET) LONG, EXCEPT WHERE OTHERWISE PERMITTED BY MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING, OVERSEEING, ADA STANDARDS FOR ALTERNATIVE DOORWAY OPENING CONDITIONS. (SEE ICC/ANSI A117.1-2009 AND OTHER SUPERINTENDING AND COORDINATING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND COMPLIANCE REFERENCED INCORPORATED BY COD.) ANY HEALTH OR SAFETY PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES WITH JURISDICTION OVER THE PROJECT AND/OR PROPERTY. BOHLER ENGINEERING AND ITS PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY . WHEN THE PROP. CONSTRUCTION INVOLVES RECONSTRUCTION, MODIFICATION, REVISION OR EXTENSION OF OR CONTROL OVER ANY CONSTRUCTION CONTRACTOR OR ITS EMPLOYEES IN CONNECTION WITH THEIR WORK OR ANY HEALTH TO ADA COMPONENTS FROM EX. DOORWAYS OR SURFACES, CONTRACTOR MUST VERIFY EX. ELEVATIONS SHOWN OR SAFETY PROGRAMS OR PROCEDURES. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETY. ON THE PLAN. NOTE THAT TABLE 405.2 OF THE DEPARTMENT OF JUSTICE'S ADA STANDARDS FOR ACCESSIBLE BOHLER ENGINEERING SHALL BE INDEMNIFIED BY THE GENERAL CONTRACTOR AND MUST BE NAMED AN ADDITIONAL DESIGN ALLOWS FOR STEEPER RAMP SLOPES, IN RARE CIRCUMSTANCES. THE CONTRACTOR MUST IMMEDIATELY INSURED UNDER THE GENERAL CONTRACTOR'S POLICIES OF GENERAL LIABILITY INSURANCE AS DESCRIBED ABOVE IN NOTIFY THE DESIGN ENGINEER OF ANY DISCREPANCIES ANDIOR FIELD CONDITIONS THAT DIFFER IN ANY WAY OR NOTE 19 FOR JOB SITE SAFETY. ANY RESPECT FROM WHAT IS SHOWN ON THE PLANS, IN WRITING, BEFORE COMMENCEMENT OF WORK. GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT PORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE T, THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND 11 FUI L CONFORMANCE WITH LOCAL RFGI a ATIONS AND CODES. CONSTRUCTED IMPROVEMENTS MUST FALL WITHIN THE MAXIMUM AND MINII/IUM LIMITATIONS IMPOSED BY THE BARRIER FREE REGULATIONS AND THE ADA REQUIREMENTS. • THE CONTRACTOR MUST VERIFY THE SLOPES OF CONTRACTOR'S FORMS PRIOR TO POURING CONCRETE. IF ANY NON-CONFORMANCE IS OBSERVED OR EXISTS, CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER PRIOR TO POURING CONCRETE. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS TO REMOVE, REPAIR AND REPLACE NON -CONFORMING CONCRETE. IT IS STRONGLY RECOMMENDED THAT THE CONTRACTOR REVIEW THE INTENDED CONSTRUCTION WITH THE LOCAL BUILDING CODE PRIOR TO COMMENCEMENT OF CONSTRUCTION. GENERAL GRADING & UTILITY NOTES 26. STORM DRAINAGE PIPE: UNLESS INDICATED OTHERWISE, ALL STORM SEWER PIPE MUST BE REINFORCED CONCRETE PIPE (RCP) CLASS III WITH 1. ALL PROJECTS WITHIN THE JURISDICTION OF THE ONSLOW WATER AND SEWER AUTHORITY (ONWASA) SHALL BE WATER TIGHT JOINTS. WHEN HIGH -DENSITY POLYETHYLENE PIPE (HDPE) IS CALLED FOR ON THE PLANS, IT MUST DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH "ONWASA'S MANUAL OF SPECIFICATIONS AND STANDARDS, CONFORM TO AASHTO M294 AND TYPE S (SMOOTH INTERIOR WITH ANGULAR CORRUGATIONS) WITH GASKET FOR LATEST REVISION". WATER TIGHT JOINT. PVC PIPE FOR ROOF DRAIN CONNECTION MUST BE SDR 26 OR SCHEDULE 40 UNLESS INDICATED OTHERWISE. 2. PUBLIC WATER DISTRIBUTION SYSTEMS SHALL CONFORM TO THE DESIGN AND CONSTRUCTION REQUIREMENTS OF THE NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, NCAC TITLE 15A, SUBCHAPTER 18C, RULES 27. STORM AND SANITARY SEWER PIPE LENGTHS INDICATED ARE NOMINAL AND MEASURED CENTER OF INLET AND/OR GOVERNING PUBLIC WATER SYSTEMS, LATEST REVISION. MANHOLES STRUCTURE TO CENTER OF STRUCTURE. 3. ALL STRUCTURES AND UTILITIES SHALL COMPLY WITH THE APPLICABLE AREAS OF ENVIRONMENTAL CONCERN (AEC) 28. STORMWATER ROOF DRAIN LOCATIONS ARE BASED ON PRELIMINARY ARCHITECTURAL PLANS. CONTRACTOR IS STANDARDS, AS AMENDED, IN ACCORDANCE WITH THE STATE GUIDELINES FOR AEC'S (15 NCAC 7H) PURSUANT TO THE RESPONSIBLE TO AND FOR VERIFYING LOCATIONS OF SAME BASED ON FINAL ARCHITECTURAL PLANS. COASTAL AREA MANAGEMENT ACT OF 1974. 29. SEWERS CROSSING STREAMS AND/OR LOCATION WITHIN 10 FEET OF THE STREAM EMBANKMENT, OR WHERE SITE 4. LOCATIONS OF ALL EX. AND PROP. SERVICES ARE APPROXIMATE AND MUST BE INDEPENDENTLY CONFIRMED WITH CONDITIONS SO INDICATE, MUST BE CONSTRUCTED OF STEEL, REINFORCED CONCRETE, DUCTILE IRON OR OTHER LOCAL UTILITY COMPANIES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OR EXCAVATION. SANITARY SEWER SUITABLE MATERIAL. AND ALL OTHER UTILITY SERVICE CONNECTION POINTS MUST BE INDEPENDENTLY CONFIRMED BY THE CONTRACTOR IN THE FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ALL DISCREPANCIES MUST IMMEDIATELY BE SEWERS CONVEYING SANITARY FLOW COMBINED SANITARY AND STORMWATER FLOW OR INDUSTRIAL FLOW MUST BE REPORTED, IN WRITING, TO THE ENGINEER. CONSTRUCTION MUST COMMENCE BEGINNING AT THE LOWEST INVERT SEPARATED FROM WATER MAINS BY A DISTANCE OF AT LEAST 10 FEET HORIZONTALLY. IF SUCH LATERAL SEPARATION (POINT OF CONNECTION) AND PROGRESS UP GRADIENT. PROP. INTERFACE POINTS (CROSSINGS) WITH EX. IS NOT POSSIBLE, THE PIPES MUST BE IN SEPARATE TRENCHES WITH THE SEWER AT LEAST 18 INCHES BELOW THE UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED BY TEST PIT PRIOR TO COMMENCEMENT OF CONSTRUCTION. BOTTOM OF THE WATER MAIN, OR SUCH OTHER SEPARATION AS APPROVED BY THE GOVERNMENT AGENCY WITH JURISDICTION OVER SAME. 5. CONTRACTOR MUST VERTICALLY AND HORIZONTALLY LOCATE ALL UTILITIES AND SERVICES INCLUDING, BUT NOT LIMITED TO, GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. . WHERE APPROPRIATE SEPARATION FROM A WATER MAIN IS NOT POSSIBLE, THE SEWER MUST BE ENCASED IN WITHIN THE LIMITS OF DISTURBANCE OR WORK SPACE, WHICHEVER IS GREATER. THE CONTRACTOR MUST USE, REFER CONCRETE, OR CONSTRUCTED OF DUCTILE IRON PIPE USING MECHANICAL OR SLIP-ON JOINTS FOR A DISTANCE OF TO, AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE AT LEAST 10 FEET ON EITHER SIDE OF THE CROSSING. IN ADDITION, ONE FULL LENGTH OF SEWER PIPE SHOULD BE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE TO ANY EX. UTILITIES LOCATED SO BOTH JOINTS WILL BE AS FAR FROM THE WATER LINE AS POSSIBLE. WHERE A WATER MAIN CROSSES DURING CONSTRUCTION, AT NO COST TO THE OWNER. CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED WITH UNDER A SEWER, ADEQUATE STRUCTURAL SUPPORT FOR THE SEWER MUST BE PROVIDED. DAMAGE TO ANY EX. UTILITIES DURING CONSTRUCTION. 28. WATER MAIN PIPING MUST BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS AND SPECIFICATIONS OF THE 6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL CONSTRUCTION CONTRACT DOCUMENTS INCLUDING, BUT LOCAL WATER SURVEYOR. WATER LINE MATERIALS SHALL BE AS FOLLOWS: NOT LIMITED TO, ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR 4" AND LARGER - PVC C-900 OR ASTM D 2241 CLASS 200. SMALLER THAN 4" EITHER COPPER TUBE TYPE "K" (C151 TO THE INITIATION AND COMMENCEMENT OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT AND/OR PER ASTM B88) OR PVC SDR-21 PER ASTM D1784 AND D2241. (ALL PIPE AND APPURTENANCES MUST COMPLY WITH DISCREPANCY BETWEEN THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE OR APPLICABLE THE APPLICABLE AWWA STANDARDS IN EFFECT AT THE TIME OF APPLICATION.) CODES, REGULATIONS, LAWS, RULES, STATUTES AND/OR ORDINANCES, IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD, IN WRITING, OF SAID CONFLICT AND/OR 29. CONTRACTOR MUST ENSURE THAT ALL UTILITY TRENCHES LOCATED IN EX. PAVED ROADWAYS INCLUDING SEWER, DISCREPANCY PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR'S FAILURE TO NOTIFY THE PROJECT WATER AND STORM SYSTEMS, MUST BE REPAIRED IN ACCORDANCE WITH REFERENCED MUNICIPAL, COUNTY AND/OR ENGINEER SHALL CONSTITUTE CONTRACTOR'S FULL AND COMPLETE ACCEPTANCE OF ALL RESPONSIBILITY TO NCDOT DETAILS AS APPLICABLE. CONTRACTOR MUST COORDINATE INSPECTION AND APPROVAL OF COMPLETED COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE WITH ALL FEDERAL, STATE WORK WITH THE AGENCY WITH JURISDICTION OVER SAME. AND LOCAL REGULATIONS, LAWS, STATUTES, ORDINANCES AND CODES AND, FURTHER, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH SAME. 30. WHERE BASEMENTS ARE TO BE PROVIDED FOR PROP. DWELLING UNITS, THE DEVELOPER SHALL, BY BORING OR BY TEST PIT, DETERMINE THE DEPTH TO GROUNDWATER AT THE LOCATION OF THE PROP. DWELLINGS. WHERE 7. THE CONTRACTOR MUST LOCATE AND CLEARLY AND UNAMBIGUOUSLY DEFINE VERTICALLY AND HORIZONTALLY ALL GROUNDWATER IS ENCOUNTERED IN THE BASEMENT AREA, BASEMENTS WILL NOT BE INSTALLED UNLESS SPECIAL ACTIVE AND INACTIVE UTILITY AND/OR SERVICE SYSTEMS THAT ARE TO BE REMOVED. THE CONTRACTOR IS CONSTRUCTION METHODS ARE UTILIZED, TO BE REVIEWED AND APPROVED BY THE MUNICIPAL CONSTRUCTION CODE RESPONSIBLE TO PROTECT AND MAINTAIN ALL ACTIVE AND INACTIVE SYSTEMS THAT ARE NOT BEING OFFICIAL. IF AND WHERE SUMP PUMPS ARE INSTALLED, ALL DISCHARGES MUST BE CONNECTED TO THE STORM REMOVED/RELOCATED DURING SITE ACTIVITY. SEWER. A CLEANOUT MUST BE PROVIDED PRIOR TO THE CONNECTION TO THE STORM DRAIN IN ORDER THAT BLOCKAGES CAN BE ADDRESSED. 8. THE CONTRACTOR MUST FAMILIARIZE ITSELF WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AS IDENTIFIED OR REQUIRED FOR THE 31. LOCATION OF PROP. UTILITY POLE RELOCATION IS AT THE SOLE DISCRETION OF UTILITY COMPANY. PROJECT. THE CONTRACTOR MUST PROVIDE THE OWNER WITH WRITTEN NOTIFICATION THAT THE EX. UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH THE JURISDICTION AND UTILITY COMPANY 32. CONSULTANT IS NEITHER LIABLE NOR RESPONSIBLE FOR ANY SUBSURFACE CONDITIONS AND FURTHER, SHALL HAVE REQUIREMENTS AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. NO LIABILITY FOR ANY HAZARDOUS MATERIALS, HAZARDOUS SUBSTANCES, OR POLLUTANTS ON, ABOUT OR UNDER THE PROPERTY. 9. THE CONTRACTOR MUST INSTALL ALL STORM SEWER AND SANITARY SEWER COMPONENTS WHICH FUNCTION BY GRAVITY PRIOR TO THE INSTALLATION OF ALL OTHER UTILITIES, 10. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF SITE PLAN DOCUMENTS AND ARCHITECTURAL DESIGN FOR LIGHTING NOTES: EXACT BUILDING UTILITY CONNECTION LOCATIONS, GREASE TRAP REQUIREMENTS/DETAILS, DOOR ACCESS, AND Jl� EXTERIOR GRADING. THE ARCHITECT WILL DETERMINE THE UTILITY SERVICE SIZES. THE CONTRACTOR MUST COORDINATE INSTALLATION OF UTILITIES/SERVICES WITH THE INDIVIDUAL COMPANIES, TO AVOID CONFLICTS AND TO 1. THIS LIGHTING PLAN DEPICTS PROP. SUSTAINED ILLUMINATION LEVELS CALCULATED USING DATA PROVIDED BY ENSURE THAT PROPER DEPTHS ARE ACHIEVED. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THE NOTED MANUFACTURER(S). .ACTUAL SUSTAINED SITE ILLUMINATION LEVELS AND PERFORMANCE OF INSTALLATION OF ALL IMPROVEMENTS COMPLIES WITH ALL UTILITY REQUIREMENTS WITH JURISDICTION AND/OR LUMINAIRES MAY VARY DUE TO VARIATIONS IN WEATHER, ELECTRICAL VOLTAGE, TOLERANCE IN LAMPS, THE CONTROL OF THE SITE, AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND SERVICE LIFE OF EQUIPMENT AND LUMINAIRESAND OTHER RELATED VARIABLE FIELD CONDITIONS. CODES AND, FURTHER, IS RESPONSIBLE FOR COORDINATING THE UTILITY TIE-INS/CONNECTIONS PRIOR TO CONNECTING TO THE EX. UTILITY/SERVICE. WHERE A CONFLICT(S) EXISTS BETWEEN THESE SITE PLANS AND THE 2• THE LIGHT LOSS FACTORS USED IN THESE LIGHTING CALCULATIONS ARE 0.90 FOR ALL LED LUMINAIRES, 0.80 FOR ARCHITECTURAL PLANS, OR WHERE ARCHITECTURAL PLAN UTILITY CONNECTION POINTS DIFFER, THE CONTRACTOR ALL HIGH PRESSURE SODIUM LUMINAIRES OR 0.72 FOR ALL METAL HALIDE LUMINAIRES UNLESS OTHERWISE MUST IMMEDIATELY NOTIFY THE ENGINEER, N WRITING, AND PRIOR TO CONSTRUCTION, RESOLVE SAME. SPECIFIED. THESE FACTORS ARE INDICATIVE OF TYPICAL LIGHTING INDUSTRY MODELING STANDARDS. 11. WATER SERVICE MATERIALS, BURIAL DEPTH, AND COVER REQUIREMENTS MUST BE SPECIFIED BY THE LOCAL UTILITY 3. THE LIGHTING VALUES AND CALCULATION POINTS DEPICTED ON THIS PLAN ARE ALL ANALYZED ON A HORIZONTAL COMPANY. CONTRACTOR'S PRICE FOR WATER SERVICE MUST INCLUDE ALL FEES, COSTS AND APPURTENANCES GEOMETRIC PLANE AT ELEVATION ZERO (GROUND LEVEL) UNLESS OTHERWISE NOTED. THE VALUES DEPICTED REQUIRED BY THE UTILITY TO PROVIDE FULL AND COMPLETE WORKING SERVICE. CONTRACTOR MUST CONTACT THE ON THIS PLAN ARE IN FOOTCANDLES. APPLICABLE MUNICIPALITY TO CONFIRM THE PROPER WATER METER AND VAULT, PRIOR TO COMMENCING CONSTRUCTION. 4. THE. LUMINAIRES, LAMPS AND LENSES MUST BE REGULARLY INSPECTED/MAINTAINED TO ENSURE THAT THEY FUNCTION PROPERLY. THIS WORK SHOULD INCLUDE, BUT NOT BE LIMITED TO, FREQUENT VISUAL INSPECTIONS, 12. ALL NEW UTILITIES/SERVICES, INCLUDING ELECTRIC, TELEPHONE, CABLE TV, ETC. ARE TO BE INSTALLED CLEANING OF LENSES, AND RELAMPING (IF NECESSARY) AT LEAST ONCE EVERY SIX (6) MONTHS. FAILURE TO UNDERGROUND, ALL NEW UTILITIES/SERVICES MUST BE INSTALLED IN ACCORDANCE WITH THE UTILITY/SERVICE FOLLOW THE ABOVE STEPS COU►_Q CAUSE THE LUMINARIES, LAMPS AND LENSES TO FAIL PROPERLY TO PROVIDER INSTALLATION SPECIFICATIONS AND STANDARDS. FUNCTION. 13. SITE GRADING MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE 5. WHERE APPLICABLE, THE EX. CONDITION LIGHT LEVELS ILLUSTRATED ARE REPRESENTATIVE OF AN RECOMMENDATIONS SET FORTH IN THE PAD AND SITE PREPARATION NOTES REFERENCED IN THIS PLAN SET. THE APPROXIMATION UTILIZING LABORATORY DATA FOR SIMILAR FIXTURES, UNLESS ACTUAL FIELD MEASUREMENTS CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REPLACING UNSUITABLE MATERIALS WITH SUITABLE MATERIALS ARE TAKEN WITH A LIGHT METER AND ARE, CONSEQUENTLY, APPROXIMATIONS ONLY. DUE TO FACTORS SUCH AS SPECIFIED IN THE PAD AND SITE PREPARATION NOTES AND SITE WORK SPECIFICATIONS. ALL EXCAVATED OR AS FIXTURE MAINTENANCE, EQUIPMENT TOLERANCES, WEATHER CONDITIONS, ETC, ACTUAL LIGHT LEVELS MAY FILLED AREAS MUST BE COMPACTED AS OUTLINED IN THE SITE WORK SPECIFICATIONS. MOISTURE CONTENT AT TIME DIFFER. EX. LIGHT LEVELS DEPICTED ON THIS PLAN SHOULD BE CONSIDERED APPROXIMATE. OF PLACEMENT MUST BE SUBMITTED IN A COMPACTION REPORT PREPARED BY A QUALIFIED GEOTECHNICAL ENGINEER,_ REGISTERED WITH THE STATE WHERE THE WORK IS PERFORMED, VERIFYING THAT ALL FILLED AREAS AND 6. THIS LIGHTING PLAN IS INTENDED TO SHOW THE LOCATIONS AND TYPE OF LUMINAIRES, ONLY. POWER SYSTEM, SUBGRAIDE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED HAVE BEEN COMPACTED IN CONDUITS, WIRING, VOLTAGES AND OTHER ELECTRICAL COMPONENTS ARE THE RESPONSIBILITY OF THE ACCORDANCE WITH THESE PLANS, SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE SITE WORK ARCHITECT, MEP AND/OR LIGHTING CONTRACTOR, AS INDICATED IN THE CONSTRUCTION CONTRACT SPECIFICATIONS AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. SUBBASE DOCUMENTS. THESE ITEMS MUST BE INSTALLED AS REQUIRED BY STATE AND LOCAL REGULATIONS. MATERIAL FOR SIDEWALKS, CURB, OR ASPHALT MUST BE FREE OF ORGANICS AND OTHER UNSUITABLE MATERIALS. CONTRACTOR IS RESPONSIBLE FOR INSTALLING LIGHTING FIXTURES AND APPURTENANCES IN ACCORDANCE SHOULD SUBBASE BE DEEMED UNSUITABLE BY OWNER/DEVELOPER, OR OWNER/DEVELOPER'S REPRESENTATIVE, WITH ALL APPLICABLE BUILDING AND ELECTRICAL CODES AND ALL OTHER APPLICABLE RULES, REGULATIONS, SUBBASE IS TO BE REMOVED AND FILLED WITH APPROVED FILL MATERIAL COMPACTED AS DIRECTED BY THE SITE LAWS AND STATUTES. WORK SPECIFICATIONS. EARTHWORK ACTIVITIES INCLUDING, BUT NOT LIMITED TO, EXCAVATION, BACKFILL, AND COMPACTING MUST COMPLY WITH THE RECOMMENDATIONS IN THE SITE WORK SPECIFICATIONS AND ALL APPLICABLE 7. CONTRACTOR MUST BRING TO DESIGNER'S ATTENTION, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. EARTHWORK ACTIVITIES MUST COMPLY WITH ANY LIGHT LOCATIONS THAT CONFLICT WITH DRAINAGE, UTILITIES, OR OTHER STRUCTURES. THE STANDARD STATE DOT SPECIFICATIONS FOR ROADWAY CONSTRUCTION (LATEST EDITION) AND ANY AMENDMENTS OR REVISIONS THERETO. 8. IT IS LIGHTING CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE PROJECT ARCHITECT OR OWNER REGARDING THE POWER SOURCE(S)FROM WITHIN THE BUILDING, AND TIMING DEVICES NECESSARY TO MEET 14. ALL FILL, COMPACTION, AND BACKFILL MATERIALS REQUIRED FOR UTILITY INSTALLATION MUST BE AS PER THE THE DESIGN INTENT. RECOMMENDATIONS PROVIDED IN THE SITE WORK SPECIFICATIONS AND MUST BE COORDINATED WITH THE APPLICABLE UTILITY COMPANY SPECIFICATIONS. FILL AND COMPACTION MUST, AT A MINIMUM, COMPLY WITH THE 9. THE LIGHTING CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CONTRACTOR REQUIREMENTS INDICATED IN STATE DOT REQUIREMENTS AND SPECIFICATIONS AND CONSULTANT SHALL HAVE NO LIABILITY OR RESPONSIBILITY THE SITE PLAN, INCLUDING BUT NOT LIMITED TO, GENERAL NOTES, GRADING AND UTILITY NOTES, SITE SAFETY, FOR OR AS RELATED TO FILL, COMPACTION AND BACKFILL. FURTHER, CONTRACTOR IS FULLY RESPONSIBLE FOR AND ALL GOVERNMENTAL RULES, LAWS, ORDINANCES, REGULATIONS AND THE LIKE. EARTHWORK BALANCE. 10_ THE CONTRACTOR MUST VERIFY , THAT INSTALLATION OF LIGHTING FIXTURES COMPLIES WITH THE 15. THE CONTRACTOR MUST COMPLY, TO THE FULLEST EXTENT, WITH THE LATEST OSHA STANDARDS AND REGULATIONS REQUIREMENTS FOR SEPARATION FROM OVERHEAD ELECTRICAL WIRES AS INDICATED BY LOCAL JURISDICTION. AND/OR ANY OTHER AGENCY WITH JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE "MEANS AND METHODS" REQUIRED TO MEET THE INTENT AND PERFORMANCE 11. WHEN A BANK ATM IS INCLUDED IN THE PLAN, THE LIGHTING DESIGN REPRESENTS BOHLER'S UNDERSTANDING CRITERIA OF OSHA, AS WELL AS ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION AND/OR TRENCHING AND INTERPRETATION OF THE REGULATORY LIGHTING LEVELS INTENDED BY PUBLISHED STANDARDS. PROCEDURES AND CONSULTANT SHALL HAVE NO RESPONSIBILITY FOR OR AS RELATED FOR OR AS RELATED TO EXCAVATION AND TRENCHING PROCEDURES. 12. UPON OWNER'S ACCEPTANCE OF THE COMPLETED PROJECT, THE OWNER SHALL BE RESPONSIBLE FOR ALL MAINTENANCE, SERVICING, REPAIR AND INSPECTION OF THE LIGHTING SYSTEM AND ALL OF ITS COMPONENTS 16. PAVEMENT MUST BE SAW CUT IN STRAIGHT LINES, AND EXCEPT FOR EDGE OF BUTT JOINTS, MUST EXTEND TO THE AND RELATED SYSTEMS, TO ENSURE ADEQUATE LIGHTING LEVELS ARE PRESENT AND FUNCTIONING AT ALL FULL DEPTH OF THE EX. PAVEMENT. ALL DEBRIS FROM REMOVAL OPERATIONS MUST BE REMOVED FROM THE SITE AT TIMES. THE TIME OF EXCAVATION. STOCKPILING OF DEBRIS WILL NOT BE PERMITTED. 17. THE TOPS OF EX. MANHOLES, INLET STRUCTURES, AND SANITARY CLEANOUT TOPS MUST BE ADJUSTED, AS NECESSARY, TO MATCH PROP. GRADES IN ACCORDANCE WITH ALL APPLICABLE STANDARDS, REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. 18. DURING THE INSTALLATION OF SANITARY SEWER, STORM SEWER, AND ALL UTILITIES, THE CONTRACTOR MUST MAINTAIN A CONTEMPORANEOUS AND THOROUGH RECORD OF CONSTRUCTION TO IDENTIFY THE AS -INSTALLED LOCATIONS OF ALL UNDERGROUND INFRASTRUCTURE. THE CONTRACTOR MUST CAREFULLY NOTE ANY INSTALLATIONS THAT DEVIATE FROM THE INFORMATION CONTAINED IN THE UTILITY PLAN. THIS RECORD MUST BE KEPT ON A CLEAN COPY OF THE SITE PLAN, WHICH CONTRACTOR MUST PROMPTLY PROVIDE TO THE OWNER AT THE COMPLETION OF WORK. 19. WHEN THE SITE IMPROVEMENT PLANS INVOLVE MULTIPLE BUILDINGS, SOME OF WHICH MAY BE BUILT AT A LATER DATE, - - THE CONTRACTOR MUST EXTEND ALL LINES, INCLUDING BUT NOT LIMITED TO STORM SEWER, SANITARY SEWER, UTILITIES, AND IRRIGATION LINE, TO A POINT AT LEAST FIVE (5) FEET BEYOND THE PAVED AREAS FOR WHICH THE CONTRACTOR IS RESPONSIBLE. CONTRACTOR MUST CAP ENDS AS APPROPRIATE, MARK LOCATIONS WITH A 2X4, AND MUST NOTE THE LOCATION OF ALL OF THE ABOVE ON A CLEAN COPY OF THE SITE PLAN, WHICH CONTRACTOR MUST PROMPTLY PROVIDE TO THE OWNER UPON COMPLETION OF THE WORK. 20. THE CONTRACTOR IS FULLY RESPONSIBLE FOR VERIFICATION OF EX. TOPOGRAPHIC INFORMATION AND UTILITY INVERT ELEVATIONS PRIOR i O COMMENCING ANY CONSTRUCTION. CONTRACTOR MUST CONFIRM AND ENSURE 0.75% MINIMUM SLOPE AGAINST ALL ISLANDS, GUTTERS, AND CURBS; 1.0% ON ALL CONCRETE SURFACES; AND 1.5% MINIMUM ON ASPHALT (EXCEPT WHERE ADA REQUIREMENTS LIMIT GRADES), TO PREVENT PONDING. CONTRACTOR MUST IMMEDIATELY IDENTIFY, IN WRITING TO THE ENGINEER, ANY DISCREPANCIES THAT MAY OR COULD AFFECT THE PUBLIC SAFETY. HEALTH OR GENERAL WELFARE, OR PROJECT COST. IF CONTRACTOR PROCEEDS WITH CONSTRUCTION , f WITHOUT PROVIDING PROPER NOTIFICATION, MUST BE AT THE CONTRACTOR'S OWN RISK AND, FURTHER, 'eklo ,%Nf CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS THE DESIGN ENGINEER FOR ANY DAMAGES, COSTS,-�',A}� INJURIES, ATTORNEY'S FEES AND THE LIKE WHICH RESULT FROM SAME. `i tom: 21. PROP. TOP OF CURB ELEVATIONS ARE GENERALLY 6" ABOVE EX. LOCAL ASPHALT GRADE UNLESS OTHERWISE NOTED. �___-- FIELD ADJUST TO CREATE A MINIMUM OF 0.75% GUTTER GRADE ALONG CURB FACE. IT IS CONTRACTOR'S OBLIGATION "%I.'.w TO ENSURE THAT DESIGN ENGINEER APPROVES FINAL CURBING CUT SHEETS PRIOR TO INSTALLATION OF SAME. 22. REFER TO SITE PLAN FOR ADDITIONAL NOTES, 23. IN THE EVENT OF DISCREPANCIES AND/OR CONFLICTS BETWEEN PLANS OR RELATIVE TO OTHER PLANS, THE SITE PLAN I . WILL TAKE PRECEDENCE AND CONTROL. CONTRACTOR MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER, IN WRITING, OF ANY DISCREPANCIES AND/OR CONFLICTS. 24. CONTRACTOR MUST REQUIRED TO SECURE ALL NECESSARY AND/OR REQUIRED PERMITS AND APPROVALS FOR ALL OFF SITE MATERIAL SOURCES AND DISPOSAL FACILITIES. CONTRACTOR MUST SUPPLY A COPY OF APPROVALS TO _ ENGINEER AND OWNER PRIOR TO INITIATING WORK ANY WORK. 25. WHERE RETAINING WALLS (WHETHER OR NOT THEY MEET THE JURISDICTIONAL DEFINITION) ARE IDENTIFIED ON PLANS, ELEVATIONS IDENTIFIED ARE FOR THE EXPOSED PORTION OF THE WALL. WALL FOOTINGS/FOUNDATION ELEVATIONS ARE NOT IDENTIFIED HEREIN AND ARE TO BE SET/DETERMINED BY THE CONTRACTOR BASED ON FINAL STRUCTURAL DESIGN SHOP DRAWINGS PREPARED BY THE APPROPRIATE PROFESSIONAL LICENSED IN THE STATE WHERE THE CONSTRUCTION OCCURS_ - REVISIONS BY NCDENR REVISIONS 7 BAB 5/18/16 NCDENR REVS/OTB REV 8 BAB 5/31 /16 NCDOT/NCDENR REVS 9 BAB 6/6/16 QA/QC, OTB REVISIONS 10 ATZ 6/20/16 NCDEQ REVISIONS 11 8/3/16 BAB BID ADDENDUM 1 12 9/21 /16 BAB NCDEQ REVISIONS 13 BAB 10/3/16 NCDEQ REVISIONS 14 BAB 10/19/16 DRAWN BAB CHECKED MAT DATE 7/11/14 SCALE NTS JOB No. NCC 138078 SHEET k.-.oe "054 24 . �6_ _j C:\USERS\BBUCKLAND\APPDATA\LOCAL\TEMP\ACPUBLISH_4152\NCC138078SDX.DWG PRINTED BY: BBUCKLAND 10.19.16 @ 9:00 AM LAST SAVED BY: BBUCKLAND K GENERAL NOTES � HAZARDOUS MATERIAL MANAGEMENT & SPILL REPORTING NCDENR S TANDARD NOTES A. PROJECT OFFICE WALL SWPPP POSTINGS: THE FOLLOWING ITEMS MUST BE POSTED TOGETHER IN A SINGLE, ORGANIZED LOCATION ON A WALL INSIDE THE PROJECT OFFICE: 1) 1. ON -SITE BURIAL PITS ARE NOT ALLOWED AT ANY LOCATION WITHIN THE TOWN OF SWANSBORO. ANY HAZARDOUS OR POTENTIALLY HAZARDOUS MATERIAL THAT IS BROUGHT ONTO THE CONSTRUCTION SITE SHALL BE HANDLED PROPERLY SWPPP SITE MAPS (ALL PHASES); 2) SWPPP DETAIL SHEETS; 3) MAP SHOWING LOCATION OF OFFSITE IMPORT OR EXPORT FACILITY; 4) TO REDUCE THE POTENTIAL FOR STORMWATER POLLUTION. ALL MATERIALS USED ON THIS CONSTRUCTION SITE SHALL BE PROPERLY REVISIONS TO DETAILS, SITE MAPS, OR SWPPP-RELATED RFIS; 5) SITE SWPPP BINDER; 6) SWCT PLACARD; 7) CURRENT OWNER 2. ANY GRADING BEYOND THE LIMITS OF CONSTRUCTION SHOWN ON THIS PLAN IS SUBJECT TO A FINE. STORED, HANDLED, DISPENSED AND DISPOSED OF FOLLOWING ALL APPLICABLE LABEL DIRECTIONS. FLAMMABLE AND COMBUSTIBLE LIQUIDS STORMWATER COMPLIANCE TRAINING CERTIFICATES FOR SUPERINTENDENT(S) AND COMPLIANCE OFFICER(S); AND 8) CERTIFICATIONS . SHALL BE STORED AND HANDLED ACCORDING TO APPLICABLE REGULATIONS, AND, AT A MINIMUM, ACCORDING TO 29 CFR 1926.152. ONLY AND/OR TRAINING CERTIFICATES REQUIRED TO PERFORM INSPECTIONS BY THE APPLICABLE CONSTRUCTION GENERAL PERMIT OR 3. GRADING 1 ACRE OR MORE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION AND SUBJECT TO A FINE. APPROVED CONTAINERS AND PORTABLE TANKS SHALL BE USED FOR STORAGE AND HANDLING OF FLAMMABLE AND COMBUSTIBLE LIQUIDS. AUTHORITY HAVING JURISDICTION. . 4. GROUND STABILIZATION MUST OCCUR WITHIN 7 DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1, AND GROUND MATERIAL SAFETY DATA SHEETS (MSDS) INFORMATION SHALL BE KEPT ON SITE FOR ANY AND ALL APPLICABLE MATERIALS. HOWEVER, MSDS STABILIZATION MUST OCCUR WITHIN 7 DAYS ON OTHER AREAS. MAY ALSO BE ACCESSED VIA TELEPHONE OR OTHER ELECTRONIC MEANS OR APPARATUS. B. PERMITTED PROJECT AREA: I 11 FOR PURPOSES OF THIS SWPPP AND ASSOCIATED STORMWATER PERMIT, 'PERMITTED PROJECT AREA'IS DEFINED AS ANY AND ALL AREAS I 1 5. BASIN OUTLET STRUCTURES WITH DRAINAGE AREAS EQUAL OR GREATER THAN ONE ACRES MUST WITHDRAW WATER FROM THE IN THE EVENT OF AN ACCIDENTAL SPILL, IMMEDIATE ACTION SHALL BE TAKEN BY THE GC TO CONTAIN AND REMOVE THE SPILLED MATERIAL. WITHIN THE PROJECT LIMITS OF DISTURBANCE, AS SHOWN ON THE SWPPP SITE MAPS AND IDENTIFIED IN THE NOTICE OF INTENT TO THE SURFACE. THE SPILL SHALL BE REPORTED TO THE APPROPRIATE AGENCIES IN THE REQUIRED TIME FRAMES. AS REQUIRED UNDER THE PROVISIONS OF AGENCY. ALL GROUND -DISTURBING AND CONSTRUCTION -RELATED ACTIVITIES (MATERIAL STORAGE, DUMPSTERS, PARKING AREAS, THE CLEAN WATER ACT, ANY SPILL OR DISCHARGE ENTERING WATERS OF THE UNITED STATES SHALL BE PROPERLY REPORTED. PROJECT OFFICE TRAILER, ETC.) MUST BE INCLUDED WITHIN THE PERMITTED PROJECT AREA LIMITS OF DISTURBANCE. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY THE NCDENR EROSION CONTROL INSPECTOR. . - � OFFSITE AREA(S) TO BE DISTURBED AS PART OF THIS PROJECT (NOT ON OWNER PROPERTY): . ALL HAZARDOUS MATERIALS, INCLUDING CONTAMINATED SOIL AN D LIQUID CONCRETE WASTE, SHALL BE DISPOSED OF BY THE CONTRACTOR ROADWAY IMPROVEMENTS TO WEST CORBETT AVENUE AND HAMMOCK BEACH ROAD. 7. ALL ELEVATIONS ARE IN REFERENCE TO THE SURVEYORS BENCHMARK WHICH MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR IN THE MANNER SPECIFIED BY FEDERAL, STATE AND LOCAL REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS. TO GROUND BREAKING. ALL AREAS OUTSIDE THE PERMITTED PROJECT AREA (I.E., LIMITS OF DISTURBANCE) ACQUIRED FOR USE BY THE GC OR A . - RE A WRITTEN RECORD OF ANY SPILL AND ASSOCIATED CLEAN-UP ACTIVITIES OF PETROLEUM PRODUCTS OR SUBCONTRACTOR OF THE GC (BORROW SOURCES, DISPOSAL AREAS, ETC.) MUST BE MANAGED IN ACCORDANCE WITH APPENDIX E - TAB 8. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL HAZARDOUS MATERIALS IN EXCESS OF 1 GALLON OR REPORTABLE QUANTITIES, WHICHEVER IS LESS, ON THE DAY OF THE SPILL. THE GC 21 OF THE 02370 SPECIFICATION. THE CONTRACTOR IS REQUIRED TO LOCATE OFFICE TRAILERS AND MATERIAL STORAGE AREAS FOR THE PLANNING AND DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, AND ANY APPLICABLE LOCAL LAWS AND CODES. SHALL PROVIDE NOTICE TO OWNER, VIA THE ONLINE CRITICAL INCIDENT REPORT, IMMEDIATELY UPON IDENTIFICATION OF ANY SPILL. SPILL PROJECT WITHIN THE LIMITS OF DISTURBANCE. THE CONTRACTOR MAY REQUEST USE OF OFF -SITE LOCATIONS FOR OFFICE TRAILERS OR 9. PERMANENT CUT AND FILL SLOPES PLACED ON A SUITABLE FOUNDATION SHOULD BE CONSTRUCTED AT 2:1 (HORIZONTAL TO VERTICAL) REPORT FORMS ARE AVAILABLE IN THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER. COPIES OF SPILL CRITICAL INCIDENT REPORTS SHALL BE PRINTED AND MAINTAINED IN THE JOBSITE BINDER. NON -ERODIBLE MATERIAL STORAGE; HOWEVER, APPROVAL MUST BE OBTAINED FROM THE CONSTRUCTION MANAGER, THE CEC AND THE I OR FLATTER. PERMANENT SLOPES OF 3:1 SHOULD BE CONSTRUCTED WHERE MOWING IS DESIRABLE AND AS INDICATED, IF FILL WAL-MART SWCT PRIOR TO THEIR USE. REQUESTS WILL BE REVIEWED ON A CASE BY CASE BASIS AND IF APPROVED, LIMITATIONS ON USE MATERIAL IS BROUGHT ONTO THE PROPERTY OR IF WASTE MATERIAL IS HAULED FROM THE PROPERTY THEN THE CONTRACTOR SHALL ANY SPILLS OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN EXCESS OF REPORTABLE QUANTITIES AS DEFINED BY EPA OR THE WILL BE PROVIDED BY THE CEC. � DISCLOSE THE LOCATION OF ANY ON -SITE AND/OR OFF -SITE BORROW LOCATION AND/CIR WASTE BURIAL LOCATION TO THE EROSION STATE OR LOCAL AGENCY REGULATIONS, SHALL BE IMMEDIATELY REPORTED TO THE EPA NATIONAL RESPONSE CENTER (1-800-424-8802) AND CONTROL INSPECTOR. I NCDENR (910) 796-7215 C. SPECIAL PROJECT AREAS: THERE ARE NO SPECIAL PROJECTS, LOCATED BEYOND THE OWNER PERMITTED PROJECT AREA, REQUIRING INSPECTION AND 10. ANY REPORT SUBMITTED TO NCDENR MUST ALSO BE SENT TO THE TOWN OF SWANSBORO ENGINEERING DEPARTMENT ATTENTION THE STATE REPORTABLE QUANTITY FOR PETROLEUM PRODUCTS IS: MAINTENANCE ASSOCIATED WITH THIS CONSTRUCTION PROJECT. DIRECTOR INCLUDING ANY SELF INSPECTION REPORTS. IF THE PETROLEUM DISCHARGED, RELEASED OR SPILLED: . D. 1 NON-STORMWATER DISCHARGES: 11. LIMITS OF CLEARING SHOWN ARE BASED ON CUT AND FILL SLOPES OR OTHER GRADING REQUIREMENTS. THE GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES PROHIBITS MOST I . IS 25 GALLONS OR MORE, OR CAUSES A SHEEN ON NEARBY SURFACE WATERS, OR IS 1000 FEET OR LESS FROM SURFACE WATER BODIES; NON-STORMWATER DISCHARGES DURING THE CONSTRUCTION PHASE. THE DISCHARGES ALLOWED BY THIS GENERAL PERMIT SHALL NOT 12. CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURES AS INDICATED PRIOR TO GRADING OPERATIONS. NODEVICEMAYBE THEN fHE PERSON OWNING OR HAVING CONTROL OVER THE OIL MUST IMMEDIATELY TAKE MEASURES TO COLLECT AND REMOVE THE CAUSE OR CONTRIBUTE TO VIOLATIONS OF NORTH CAROLINA WATER QUALITY STANDARDS FOR SURFACE WATERS AND WETLANDS fl 5A., ­­1 ­11 REMOVED WITHOUT APPROVAL OF EROSION CONTROL COORDINATOR. DISCHARGE, AND REPORT THE DISCHARGE TO NCDENR WITHIN 24 HOURS OF DISCHARGE, AND BEGIN TO RESTORE AREA AFFECTED BY 1..­� NCAC 213.0200). DISCHARGES ALLOWED BY THIS PERMIT MUST MEET ALL APPLICABLE WATER QUALITY CERTIFICATION OR PERMIT I � I � I � I DISCHARGE. REQUIREMENTS AS OUTLINED IN 15A NCAC 2H.0500 AND 2H.1300. - 11 . I I . 13., CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY WITH EXISTING CONTOURS. I I ALLOWABLE NON-STORMWATER DISCHARGES THAT OCCUR DURING CONSTRUCTION ON THIS PROJECT ARE INCLUDED IN THE FOLLOWING - I IS 25 GALLONS OR LESS, DOES NOT CAUSE A SHEEN ON NEARBY SURFACE WATERS, OR IS 1000 FEET OR MORE FROM SURFACE WATER .1%. . . 14. ALL DISTANCES ARE HORIZONTAL GROUND. . BODIES; THEN THE PERSON OWNING OR HAVING CONTROL OVER THE OIL MUST IMMEDIATELY TAKE MEASURES TO COLLECT AND REMOVE THE I LIST FROM THE US EPA CONSTRUCTION GENERAL PERMIT: . I � 11 I I . . I DISCHARGE. IF IT CAN NOT BE CLEANED UP WITHIN 24 HOURS OF THE DISCHARGE, THE OWNER MUST REPORT THE DISCHARGE TO NCDENR, I I I - � 11 �1.1 I .11, � I I 1 15. TOTAL DEN-UDED-AREA = 21 �50 AC AND BEGIN TO RESTORE AREA AFFECTED BY DISCHARGE. 9 DISCHARGES FROM EMERGENCY FIRE -FIGHTING ACTIVITIES I � I 1. " , 0 I � FIRE HYDRANT FLUSHINGS I _ � 16. ANCHOR SILT FENCE WITH COMPACTED BACKFILL ON TREE PROTECTION ZONES. DO NOT BURY. THE REPORTABLE QUANTITY FOR HAZARDOUS MATERIALS CAN BE FOUND IN 40 CFR 302 AND * 0 I LANDSCAPE IRRIGATION I 1�1­ WATER USED TO WASH VEHICLES AND EQUIPMENT, PROVIDED THAT THERE IS NO DISCHARGE OF SOAPS, SOLVENTS, OR DETERGENTS .1 1 I I I . �'. - I.: 17. ALL EROSION CONTROL DEVICES SHOULD BE CHECKED PERIODICALLY AND AFTER EVERY MAJOR STORM EVENT. IF ANY FAILURES ARE WWW. NCGA. STATE. NC. US/STATUTRES IN HTML/CHP430. HTML. THE ACTS STARTS AT ARTICLE 21A, 143-21.75 - - USE FOR SUCH PURPOSES . FOUND, THEY SHOULD BE REPAIRED AS SOON AS POSSIBLE. TO MINIMIZE THE POTENTIAL FOR A SPILL OF PETROLEUM PRODUCT OR HAZARDOUS MATERIALS TO COME IN CONTACT WITH STORMWATER, * WATER USED TO CONTROL DUST THE FOLLOWING STEPS SHALL BE IMPLEMENTED: * POTABLE WATER INCLUDING CONTAMINATED WATER LINE FLUSHINGS 18. ANY ASSOCIATED DEMOLITION PERMITS AND METHODS OF DEMOLITION ARE TO BE OBTAINED AND ARRANGED BY THE CONTRACTOR 0 ROUTINE EXTERNAL BUILDING WASHIDOWN THAT DOES NOT USE DETERGENTS PRIOR TO CONSTRUCTION. 1) ALL MATERIALS WITH HAZARDOUS PROPERTIES, SUCH AS PESTICIDES, PETROLEUM PRODUCTS, FERTILIZERS, SOAPS, DETERGENTS, * PAVEMENT WASH WATERS PROVIDED SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE NOT OCCURRED (UNLESS ALL SPILL . . MICALS, ACIDS, BASES, PAINTS, PAINT SOLVENTS, ADDITIVES FOR SOIL STABILIZATION, CONCRETE, CURING MATERIAL HAS BEEN REMOVED) AND WHERE DETERGENTS ARE NOT USED. YOU ARE PROHIBITED FROM DIRECTING PAVEMENT WASH I 1.� � 11 I . :,.-.. - I I 1, I—— . . 19. SEDIMENT TRAPS AND BASINS NEED TO BE STABILIZED IMMEDIATELY AFTER INSTALLATION. COMPOUNDS AND ADDITIVES, ETC., SHALL BE STORED IN A SECURE LOCATION, UNDER COVER AND IN APPROPRIATE, TIGHTLY SEALED WATERS DIRECTLY INTO ANY SURFACE WATER, STORM DRAIN INLET, OR STORMWATER CONVEYANCE, UNLESS THE CONVEYANCE IS . CONTAINERS WHEN NOT IN USE. CONNECTED TO A SEDIMENT BASIN, SEDIMENT TRAP, OR SIMILARLY EFFECTIVE CONTROL � 20. STONE OUTLETS SHOULD BE INSTALLED AT LOW POINTS OF THE SILT FENCING, BASED ON FIELD CONDITIONS. - 9 UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE 2) THE MINIMUM PRACTICAL QUANTITY OF ALL SUCH MATERIALS SHALL BE KEPT ON THE JOB SITE AND SCHEDULED FOR DELIVERY AS CLOSE 0 UNCONTAMINATED, NON -TURBID DISCHARGES OF GROUND WATER OR SPRING WATER 21. EFFECTIVE OCTOBER 1, 2010, PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT A PROJECT AFTER EACH PHASE TO TIME OF USE AS PRACTICAL. 0 FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS SUCH AS SOLVENTS OR OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. I CONTAMINATED GROUNDWATER SELF -INSPECTION REPORTS ARE REQUIRED. A SAMPLE SELF -INSPECTION REPORT, AS WELL AS DETAILS OF THE SELF -INSPECTION 3) A SPILL CONTROL AND CONTAINMENT KIT (CONTAINING FOR EXAMPLE, ABSORBENT MATERIAL SUCH AS KITTY LITTER OR SAWDUST, ACID, * CONSTRUCTION DEWATERING WATER THAT HAS BEEN TREATED BY AN APPROPRIATE PROGRAM, CAN BE FOUND ON THE LAND QUALITY WEBSITE. IF YOU HAVE QUESTIONS OF THE SELF -INSPECTION PROGRAM, PLEASE BASE, NEUTRALIZING AGENT, BROOMS, DUST PANS, MOPS, RAGS, GLOVES, GOGGLES, PLASTIC AND METAL TRASH CONTAINERS, ETC.) BEST MANAGEMENT PRACTICES (BMPS) MUST BE IMPLEMENTED FOR THE GENERAL PERMIT ALLOWABLE DISCHARGES FOR THE DURATION CONTACT (910) 796-7215. SHALL BE PROVIDED AT THE CONSTRUCTION SITE AND ITS LOCATION(S) SHALL BE IDENTIFIED WITH LEGIBLE SIGNAGE AND SHOWN ON OF THE PERMIT. THE TECHNIQUES DESCRIBED IN THIS SWPPP FOCUS ON PROVIDING CONTROL OF POLLUTANT DISCHARGES WITH SITE MAPS. a. THE SPILL CONTROL AND CONTAINMENT KIT SUPPLIES SHALL BE OF SUFFICIENT QUANTITIES AND APPROPRIATE CONTENT TO PRACTICAL APPROACHES THAT UTILIZE READILY AVAILABLE EXPERTISE, MATERIAL, AND EQUIPMENT, I � CONTAIN A SPILL FROM THE LARGEST ANTICIPATED PIECE OF EQUIPMENT AND FROM THE LARGEST ANTICIPATED QUANTITIES OF I NON-STORMWATER COMPONENTS OF SITE DISCHARGES MUST BE UNCONTAMINATED, NON -TURBID WATER. ALL NON-STORMWATER I PRODUCTS STORED ON THE SITE AT ANY GIVEN TIME. b. CONTENTS SHALL BE INSPECTED DAILY DURING THE DAILY STORMWATER INSPECTION. DISCHARGES MUST BE ROUTED TO A STORMWATER CONTROL PRIOR TO DISCHARGE. WATER USED FOR CONSTRUCTION WHICH DISCHARGES FROM THE SITE MUST ORIGINATE FROM A PUBLIC WATER SUPPLY OR PRIVATE WELL APPROVED BY THE STATE HEALTH I 4) ALL PRODUCTS SHALL BE STORED IN AND USED FROM THE ORIGINAL CONTAINER WITH THE ORIGINAL PRODUCT LABEL. CONTAINERS DEPARTMENT. WATER USED FOR CONSTRUCTION THAT DOES NOT ORIGINATE FROM AN APPROVED PUBLIC SUPPLY MUST NOT MUST BE STORED IN A MANNER TO PROTECT THEM FROM THE ELEMENTS AND INCIDENTAL DAMAGE. DISCHARGE FROM THE SITE; IT CAN BE RETAINED IN RETENTION PONDS UNTIL IT INFILTRATES OR EVAPORATES. WHEN NON-STORMWATER I IS DISCHARGED FROM THE SITE, IT MUST BE DONE IN A MANNER SUCH THAT IT DOES NOT CAUSE EROSION OF THE SOIL DURING 5) ALL PRODUCTS SHALL BE USED IN STRICT COMPLIANCE WITH INSTRUCTIONS ON THE PRODUCT, LABEL. DISCHARGE. I 6) THE DISPOSAL OF EXCESS OR USED PRODUCTS SHALL BE IN STRICT COMPLIANCE WITH INSTRUCTIONS ON THE PRODUCT LABEL AND D.2 POWER WASHING: REGULATIONS. � I NCRETE CUTTING EFFLUENT, AMONG' OTHERS, MUST BE COLLECTED FOR PROCESS WATER SUCH AS POWER WASHING WATER AND CO L_ . I I TREATMENT AND DISPOSAL. IT MUST NOT BE FLUSHED INTO THE SITE STORM DRAIN SYSTEM OR DISCHARGED OFF -SITE. L . . E. DISCHARGE POINTS: I I .- � 11 ALL DISCHARGE POINTS MUST BE INSPECTED TO DETERMINE WHETHER EROSION AND SEDIMENTATION CONTROL MEASURES ARE � EFFECTIVE IN PREVENTING DISCHARGE OF SEDIMENT FROM THE SITE AND/OR IMPACTS TO RECEIVING WATERS. SEDIMENT L ACCUMULATION DOWNGRADIENT OF DISCHARGE LOCATIONS SHALL BE REPORTED AS A SEDIMENT OISCHARGE (SEE APPENDIX E - TAB 14, SEDIMENT RELEASES, OF THE 02370 SPECIFICATION) AND THE POTENTIAL UPSTREAM CAUSE SHALL BE INVESTIGATED TO PREVENT . L, 11 E. CONTACT THE CM, CEC AND SWCT TO DETERMINE APPROPRIATE ACTION FOR CLEANUP LOF DISCHARGED RA AN/ Dr- nII-rCInr- r7 TWP I IRAIT-(Z P DISTURBANCE SEE SA FILING AND NIT RING' F EFFLUENT PLAN (IF APPI-11CABLE). or-ullvir-1141 Int-%I . I I . . F. SITE STORMWATER OUTFLOW DESCRIPTION: � THE SITE HAS THREE DISCHARGE POINTS. THE SOUTHERN PORTION OF THE SITE IS ROUTED TO A WLT POND AND DISCHARGED TO THE � L . . STREAM THAT EXITS THE SITE TO THE SOUTHEAST. THE NORTHERN SECTION OF THE SITE IS SPLIT INTO TWO DRAINAGE AREAS BY A L RIDGE IN THE PARKING LOT THAT DIRECTS FLOW TO ONE OF TWO WET PONDS WHICH DISCHARGE INTO THE EXISTING STORM SEWER NORTH OF THE SITE. L L I 1. . � I I I EROSION AND SEDIMENT Ckl-J"'NTROL NOTES, I I I I - . 11 - � I A. CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THIS STORM WATER POLLUTION PREVENTION PLAN. I ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST OF OWNER - THROUGHOUT ALL PHASES OF CONSTRUCTION. I I B. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL 11 �11 I I 11 OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR L I .1. OWNER. � I I 11, . C. SITE MAP MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR v, L - I I '' REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL TIMES. - - � .1 . L D. CONTRACTOR TO LIMIT DISTURBANCE OF SITE IN STRICT ACCORDANCE WITH SWPPP IMPLEMENTATION SEQUENCE, OR AS REQUIRED BY . �1. THE APPLICABLE GENERAL PERMIT. NO UNNECESSARY OR IMPROPERLY SEQUENCED CLEARING AND/OR GRADING SHALL BE PERMITTED. - - -.1, � L I . I E. ALL DENUDED/BARE AREAS THAT WILL BE INACTIVE FOR 7 DAYS OR MORE, MUST BE STABILIZED IMMEDIATELY UPON COMPLETION OF I - . L I MOST RECENT GRADING ACTIVITY, WITH THE USE OF FAST -GERMINATING ANNUAL GRASS/GRAIN VARIETIES, STRAWMAY MULCH, WOOD - I CELLULOSE FIBERS, TACKIFIERS, NETTING AND/OR BLANKETS. COMPLETION MUST BE ACHIEVED WITHIN 7 DAYS. F. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY STABILIZED AS SHOWN ON THE PLANS. THESE AREAS SHALL BE SEEDED, SODDED, AND/OR VEGETATED IMMEDIATELY, AND COMPLETED I . NO LATER THAN 7 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS. REFER TO THE GRADING PLAN AND/OR . LANDSCAPE PLAN. L G. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. TEMPORARY AND/OR PERMANENT STABILIZATION SHALL BE APPLIED PER REQUIREMENTS IN THESE E&S CONTROL NOTES. H. DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION AND SEDIMENT CONTROL MEASURES (SILT FENCES, ETC.) TO PREVENT EROSION AND POLLUTANT DISCHARGE OFF -SITE. . 1. ALL MEASURES STATED ON THIS SITE MAP, AND IN THE STORM WATER POLLUTION PREVENTION PLAN, SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED BY A QUALIFIED PERSON IN ACCORDANCE WITH THE I I CONTRACT DOCUMENTS OR THE APPLICABLE PERMIT, WHICHEVER IS MORE STRINGENT, AND REPAIRED IN ACCORDANCE WITH THE SITE L PLANS. J. STORM WATER POLLUTANT CONTROL MEASURES INSTALLED DURING CONSTRUCTION, THAT WILL ALSO PROVIDE STORM WATER MANAGEMENT AFTER CONSTRUCTION, ARE INCLUDED IN THE CONTRACT DOCUMENTS. THE SITE -SPECIFIC POST CONSTRUCTION STORM WATER OPERATION AND MAINTENANCE (O&M) MANUAL IS INCLUDED IN THE CONTRACT DOCUMENTS. K. ALL PERMANENT CONTROLS AND SYSTEMS MUST BE INSTALLED AND FUNCTIONING AS DESIGNED AND FREE OF ACCUMULATED � SEDIMENT AND DEBRIS DURING FINAL PROJECT INSPECTION AND APPROVAL. L L. ALL MECHANIZED EQUIPMENT WILL BE REGULARLY INSPECTED AND MAINTAINED TO PREVENT CONTAMINATION OF WATERS AND WETLANDS FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS, OR OTHER TOXIC MATERIALS. IN THE EVENT OF A SPILL OF PETROLEUM PRODUCTS OR ANY OTHER HAZARDOUS WASTE, THE PERMITTEE SHALL IMMEDIATELY REPORT IT TO THE NC DIVISION OF WATER RESOURCES AT (919) 733-3300 OR (800) 858-0368 AND PROVISIONS OF THE NORTH CAROLINA OIL POLLUTION AND HAZARDOUS SUBSTANCES CONTROL ACT WILL BE FOLLOWED. F_ GENERAL NOTE: 1 IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN FULL CONFOR QNS AND CODES. _j IIIii I I ­t4�­­I . I I ,I. - , , - - !:� :: ��"'�,,-,, " ��_ ,�; I 1. .1,111, 1, 1-11.. I I I 1. 0 1 �, /�� .11 I � . -1 , " 110 �­I`l , �__'.."' , , � � �.. :- -1 . I - �Z" �­`1311' . . " , . .. .... !l 111111111111501RR51 I . ­_ ­,��"`_ I ��l . - � I �11�_ ",I I � ­��ll _*��l � , _5 , � - I I " m " 'M�1'11 _ _� " ? "I ,� 1. I , � Q. ;_,;ll ,- ." "I'll; .1 . 1; - I ,. . 1. �_ � vl. �� ­_`llt � ., ,.-,-" , � � , -, .-I�zl I I . � ­,�a' I II � I 11 . , � : -,­ , ­­ , ��lllll " " �' 4"77- �W,�NMMII "I", I I :.,,,,,,/ _- v "' "' , � �. z ,:� ,,,,, w ,; :'� ,4, ;��,� , � I I �1� � I I I , � - I """, "I'll 1. '� -1 I . , ` �'N, 1, k7� - � . I � ... �,,, " , - -� , ...... , , � ,� I . , ` .,� , �1_ , , ,� "' , _,!r . . — - 111. I , -�ez,,,,;�. I I , , ��. � I : " �'_'l "I �',' � � I � . ., , " "I'll, _ , ­ 2", Al, ,"," w I 01 I , : -1 I ;, � , � � ... ... � ; 1­­,:­�­., ­­ I �� I .", ,: , - , t-- I I ­_____� ",- .., I" I I ... ­_,, ­'. 11 � . ,4 , � e, , ,:, � � � :�:� - I I , - , - I I .. � "I - I � - I - J'�U:�� I �.. 1.11.1-el 1� .l. ­­ Al , . - '�� 0 . 1-..--,,i�� I � ,� I,- I I I I � ��,: , "ll �'!�,��.��," i?�,,,�' ',��, ,%, 6 " : ,��:,!, , � 1. . ms - %, � ,�i , I I - - 1, I - I I.. :, . � , , � ­­ - � - . I . �,�&,% I . �,�. �,. _11 , I .1 ,�. ,.!� . .. , I" , 11 I , � . � ­,�, i/ ":� , it . , ': - . ,, !� .; . ,. - " z _�-� i �<, 11 . , :-, - � ,�� ", � � .. � 4 : �: � I I , , . , ;; � , '. I 1, , % , " , ,� � - . '--- � - I I � , 41, 6,4 I., � ,� I, � . � , �r, �, , 11 � I ..... _­ .. I - � � � I , , I , - - . ­ " . ...., � 1 t__4 ,f , ,� 11: , . �� _­ ­11�'! ,Q�l .11 ­__ I , I ­_ I ,,,,, , e �.11 , � 1114 - ,. _. , . I . ", , I " �:�I_"_'%,"I__ltl� �� ­---s��=n1l,rZ,": 1_.,,,�,��`� _� , ", " I , - . -, �1, , � 1�rl'l "I', v � , , ­ �� , . I .. �� /".1- 111 I � ". I � -` -A , 11 1. _� I "r '. . . . . . . . . . . I., �'wl 11 I , ­ `/ ""�"i�, -, I , I I , , , " , " - , I'll- , , , , , " - , �,; ,�'� ­ , , , , , , , , - I , � I , , � , I � 4��-� �� , , ,��. *_ - , , , , I , ,� '. 1­1 ­, 'I- �, u., , ­,i, . . . . 1 v �, �_ -1" -1 - , �,�; "I'll""" . "' - , , , - 1,/ I 11­111�'111_11 ,-, - ­�� I I � , , �� 1; v �.l , � _� I �� ��e'p,­, i�, - '­;, Ik. ,,'� IV, F /I � f: - : � 1% llll�� , " I lk. - I'll . " - .: , � I o � , 1�' :, �,�z,p��, rl , , 0/0 I' 6 � I I 11 '1�1, �,�,­_� - - , 11 , �7_' fjf, 't F, .17, t�, ,,,�,_ � - , �,­�­� , -� , , - " , ", " 1, - f-I'l � I �l �, �,'�,' _�ll ��, , "I `­ 'I, � - _�� �. , * ,� ',,"a,��,,,,�,�l'I",;-"�,,,,�,,�--�.�,�,Z".,�,--"�,,',',,,',",I���-��,,� , - , ,,, ,4 r I � _*/ � - ,� 'N' -,- ",00 - - " I 1�1. - - , 1��,l , � , . , �; - ly w­r_11�l_,,',.:l,�.­­ ,,, I I , . 1 , �l . �'� , "!,�� �,:�i�V� 'i'll I I _ : : I/ . p ", ,t:� 1 ,�z � -1 '� �g, !V_,�,� , , ��z ��:' re i '' �� I " Q�,_'�'��A-F��,:� �, � "; � ­i.'_l,_­�� , 1�,i&, � %,�, . �' x -,I ". , , N , , � 0 �, , - -� , ,e,'�� _,,�, -I 11,1 1 -,5 - ,� -��,:­ I .: 11 11 � � " " I - I , �1.1,�,�';',,��-,---;,�,-,�,��,.,�,,�,,--",-"""t�,,,�,-I 1prl�f� :_ < .'A" ` ". y I , ,�,' "I.: � 1, SO I � �� i " 01 , - . ­_1 , 21 ", ��b 11 1! � . v k� ,,,;,, �, ,`;'� � i ,l 1,111 f . , ^:,�e . �, , fll-- �� _6 'r ... � '' 1, -, , , - - - �- -& , , ­ ., , �� � / , , k , � " i ,I - 1_� � I " - '. �l .,� - e�­'­ , Il , " \1 m I � , ,� ,�� ,;, " 1. .1 I; ­e NWI­. , A L,,! !� i � � � ,:� � - ­- ,, Iio,wav>, ,:,-, "I - -�� , , s il,,P . 0 _,u , �", rr,?M -:] , , , - I � - , -j, - - � . �l I / f114 fl"'­?�`,�,,,*� '�S�­-a, t !r: ri ", , , � . . J, ­_- �,,,. 101._ """'f . , , . ". 7""��",�!�, ,,,i��� . llyl., , " �:tlo &:, ., v I , , , , I - �.��­ `I�11��'�l . � , , ­ , . ,V! ,;�, ,�, , k . I ,I � IJ ,� 1, _�' _` - P" , �, , _1 I" " I 11 " � , I �",: �, 1. � I . , . , I , , e;,_,e,,,ll-­- ­ � I � . ll'� 1-1 `�;;1'11.. �.�; I "I I I - -0 - ­�w,­ I � ,�,, I . , V �� � - , 10 r- _/ I � I 1 � .:._�.._ , �,!�`,,�N�, ) " ,IIelllf7_ 1, - "', k"ll , I , - , . a ��:��,��I�_ ", � � ,,kP' ,� , III, � �611,ft�2 M ­­,­ ...... . -, X � - I .­­.,...� � t I - I 1111�1�4'f. f �_ , ,, �11 '­� "'. "I"'.. ­­/ I � :t��"��$55i,i Wr A - , " 1 ..", It le: � . 1. :�, ­5 , e­ I _� . I , , . :_ 11 - - - - , . �, , I..",4, ". .11 " -- ` , , � . , , , ., , , I . I I - - , � � , 11 i f " , "" . %". I % e I : fe . .. 5 ��, ;,�, j J� - 4 " ,- " .. . 4 . " x � .� I 1[: .. I - � . , - � - , i_ zx, _­ - - - i -- , - -, ". 7, , , I : , e'l � � , ,�, -1, / "," � , " x , , , -- , " , , I "' , - I :\ " , - , � , V, 6 .I.- �. V I I" ') �ill/ "'. � __�,�. . I I "�, , , � I ,�, I ,�� J ,� z " - " o-7 ;4&_",_�___l%, _'� 4­.. � �1, %%. , ,,, .1 I I , _,. . � "I'i"I" " � -,;. � . , , �, ­m.: . , , t ,�,,�', �� , _ , - I ., . . ,� j ! - , J - ,�� � .. . , �,� I � , Xll�& . 1. % Is- - , . . � _� �, f - - - 7' i - " ,,17,`­,M��:!j � ": I, I - - I m, 14 / , 1 1� o,;�"' �: ;�, . , - I - J"- -I " �� , ��I - - " �n " � . - - _�? 1,, , �� , , ,'_ . � % .. , , %, �'l .1, � 'l., ff v 11 .�_ - 11 ll,��,�,'_� j , , I , t�, , 'I", � - - � , . / , " � - - - , - I I ."., ­- - , - �.. - � lle; - - "�� ,Lz", - � - / � - i i _A , .i:1,1_�-,� ,,,, 4 4 ,- � �., - ,711,1­ I / , /,/ -,, ,-,- ��- " - � 1­1 11J�l­ �_//­l :::::,O:: :: , .�. ��, - , "� " - __ ,� ­, . / 5, , 'e" - '� A -, - � �� - � ��', - -,- i2l ',',,%�,`,i��,,,�i "?,__ � , ­ , " '. " , ", � i , , ./ _; , " ;t 4��, '4;, , �_�-,,� - ,-, , - 11 . / . -, ` E", , � . - , � �� , I'd, � I : - " -, -- - , i� -, ,e , , ,� - - "I .� '? _11 , - , � ., � u , ,/ , 0, , . i r ­­- "u-, I% � - X,�f � , � " . ,,_� � �� ,0 , � , : , I , lel. ., . 11, ,,/�,, , , , �� , , , . . .. , - z , "I I 'A 1. � , - . � I I - ,�/ ,, � � , , - ­�, " - ... ,� A'�7 'y _ 01 I ," "_� - , - , ,� 11 i - � - yo �y , , -_ .. I , ' ----' --,, - ,�!'lc:, , " -, �� , - 11: ` e/ �,� , �� � , Qg " ��g, , I " , , � _17�� , I, ,� " � ,,,, , e �, "' -�j , . � :�,i,��,anl -,�,:��,N�,,,iii�!"`!,. _ , k� _�-, %,��: ��'�,�t� I f i: N,'gg -,��41 "ll - , ­"­ . , , ,� , - - ­ � _;�!�,' ,,� " -4�' -'e, 1, � � I - - - �� /'-V , A , �,',,?,N.,,_l`,­/,�.. � ,.,; f �il,'Z lh, A ,",­�I,'�,, , . " , I - , " � ,,, 7 , ��: :", � ]g'_ � ,��'�j , �� , , , ;. � I I�.���� I� , , , , " : ,�, , , 0! ! ........ . - , � ,/� " , ­U4 'a ­", `,�, : , w .. , � . �,, . � , - ,v : , , ,�, /, _/ - , , - - v ,�� . ', ?� ,/", , � � - I - , � . .1 ­_ . .., I - . I . � . , W�1'21 � �, , , , , 'r ��,;�e 11:1::, -- /, _,� ", I �- � -- i , f 'IF I ­ - I . , , � " , . '. 11­ `�, � �� /,` ""', "` , - " , - i ,� � - -,,, -�,, , , � 1, , 0 , ../I...:. :::. " , 'Ir , , � � � , I— 11 .. ff, M,� . — � " I ,�l , , , , . �:::::::: :� ft,� ,,:�r,�l _ - - , �s',_ _�' - " -,�t " ,,, �l ­�4A,,b - I I I - _�, ,� _: _� 1p: , I ­ � , , I . I _,�_ . ;; ", , � ." - * , , � , - I I �, . ,,, , - "! _� , - I` __­ - - - `;,�-;- I'll � �, .e ,,`I;I�, �, � " I ., 'i I ­: i: �� -,j �: � j .1 ��,-, , " _; I I ,� - , - '_. _�� , � , 7"<, ��"�­­'; --­_ �,, -- 1, , .,( ,; , .�aj ,,i�,?�,ef,7,V, ­k, .�-;"i""",.,!,�',���-I'l"�,-,�ll'�_-"-,-",il--�.��"'f� . .- . : ., , - �_ "'If � u , 1 � _,t - - �, ,li,,_,li I . �, , I 1_1�� li'l, i 11 U ,� z " , f i / I . k :.: � , R''."'""".1", A , - " 4. ", � -.1. I `,'e'ffg��` "s I I -1 � " ,:, "" , '' ... 1 ,/_', '1� . :�� qi x1l. ,� � , ", - / -- , _�e­ � --�� ,�� , � ;,;,j , ­1 , , , It 1/' I �l ... g � "' , � , , I ,� ! � , � F * :: di,,,"`,��,liiIll' ,,�;:: __ . , i ,�'�,,.0, �� --:,, " , " " - " 1 , , 'I' , " , - � 7 - � ` I � �� iii,/,2 I'�:�� '4/1"l ,� -, _;!�!,;�� 1 x ` � __ __ . I _,_ , , " � , e _ I _� - 1. " " - _ , , - _�6 ,�e�, , -, - '10 __ , , - -1 "" � ,:: __ � - , - " , �­ " , � ,� - � f i�e - �'? I ,�l , , "�', � W_� - � ��', I 1� - ­ , I 1��;"�: " ,4 I I - , ,:: ­1 , 11 , , N 34p42'26.68" OR N 34707411 '. _ - _, � , - � _/_;�ll ','�,7 ___1 " " - 'I 11"l-, -- " �­ i - , , ''Ill,""', _�� - _­ �, '10n� -. ­ - - , " . �� '_� � !�l , A/ f -, 11 W , �K ""71, ��r 11 ,I, I- �­rr�-Z �- -%4N,, - , - � - - , 1-11 "I'll", ,1� " � H': �;tP � , " � , - '! X> , � � � �­ /,�, � ... M,11,i', -"i,ii- !,-,!!&,i�,,,�= ��, ". I " �� ,,,,, ,,, iilE " e� Rl' ,;�� --�5e­��l I i �, - ­ �� I � :.,/����//��������9me��JJ�"I'��� Ri i , , "I'l- I'l- � � , I I I � - ,_ , '', .01"", ill'i,". " I I "." , k, ­1 � , ­1 . " �, � , - ; . -1 ,,, , " , �M - 1-111, -, - , ` " '"ll" I., � �' I - :1, ", N - , " .1 I - I " , i , C7 oft� ... A.". 1. � I, I il .1 " , "" ""' - �­­ ­!,�` _,`5 I j , - 'j, �� , ��,,,,��,,,�,,,��,,�,",-',',",,��-�,,!�,,,�� "I""', 111, -,,,','i,`i,,,,, W 77'8,57.49"W OR W 77-149 , / , A, �, � � - - � i", Ij,,/��-, , 41 _l::!ll&u,lJl_ "I 303 ! 0,�V: 5 � , I'll lm;o - - - lt_'�z ", ,.­ I llr�<,v ­1 I _ , �_._ , , � I - I 11 � - I , " �� - -� �,,_I, R, - - " " w,�,__ " , "2� , . ", 01, I ­ ,-j,, f I "" - -�_ �- 11 77�"I --`�'­ �L?il ��,,;Lli._��x_ -- Am _� ­,_,�,��,�_ '01", � _�z, . , " - , " /' "� ' 7 --' �'-7_-�__,I,7"'f � � � �`! � �::: ,,�,, 7 `�-,,JHJ,�,ie/i " , _ �, , :::': �­ -.1.....- ­.... - - .- ­11_��__­­,_ - "�� ,�,� -� = .t.­_­ - f� � �­­-- " ,�� -� _��,� .. .. .... �,�";_,:� ,g *�, �,�,�,��,s,,N', ,....., �:� , , �t­ -1 - , ; ,� ,',­�"' , ., � , l ­1 I I ��-_-­�­­�­ �, �� A,,,�'� I z %�., _�:i�., � - , - ­­ , 11- � _ � ­1 , - 11 � 11 � ,� , , � I �?;,� -�,;­��,'�.­ ­­., " I", ­ I 1. I _� I :el,".",_ 5 r I % , 'r� , ,.".l.. � __ '1� �� -1; I . , , ", ... ` /":.: I , -, / ./r : jA �, 1-1, , , " � I , , I '' ,� ,�m�, - . _� , � .. ., - , , ­� V, e �.� �i�"',`.��' i I . ,,,, - � �, ,/ ..., , , , �' ��'��.,��,,? 5� ? 1. , , ,,,�jeflt��,�, AR � I �l ,'�, V� � 1, A 1, : ,�� �,,,,�,2 �,,%,Al a - � - - - - I . � /,-,'. � � . ; �', � ". � ,", I __ . ,� - � I I 1: . � . � ,. ;;, A, I , - .. . 2� , � -1, - \ ... � �a ... .. , � , , A", I.. ," � :_:�:�. �,.'.��, STO ,,, �,/' I �7 � , I - , �,,/",,.­:%" '. i::::, ��': �­­, � 11 , �: ­�__- � � _,,,x,,i,-,,/ "i': � I 11, ", I ,�Fl e I ­_1 � I, ; ". � 11 I I I I " . . - � . . . . . . �,'-��'�,-, �_ , ,.,� �::::: 1. m 1, , "" �,�l ;, '�� -,il�ll'-""-�.��""�l",�,�"?",� � I ,,�,�,,��"' XiI� " .� ­ 11 111. , � , I .:� , lI'l". I!, 11 e 11 ,. w;, I - . �wf, � " . - I ll� . ,.. I A "��""�!z�""�""",""�,��--�',.��-,�!1::��, " .11.2", - ,i�:,�"�V_ I , � �,�, , ��11­11"�',­ ��01'_�_ _� 1, - ENTE �,��": . - "I'll, - - � . ll� ", % , t I I'll, 11 .11 I � ��:, / 1, ,, �'ll . ,;111111.1��:�. �_ �­ I , t :_i x_____, , - n"".. . I . I ,.­,,­.,.''�_ ­­ " '__ � . _&�, � ��-�t� I , I I il ll'�Nl_ " " 1 , ;1�,Jf ; I , , I.....1 1 I �­;:�__ �1, ,,,, , :�i , �.;4,1 I I �� I- ,� :­ � � .11 " :j � - /11111�F_/!! �"; �­ - . I , I " , , `&li 01, NORTH, ULTIMATELY ENTERING f­� .1 ,�";�,,�--"���("",�o,��i,��""�",�� I �', _,lFl.l`,_l% - ,,,, -, I - ,/, I ,��'j .1.1, - , �,� I "' '�� '' f,`-­&,v-'­c, ,,, " ,�&'a�, ",":', - I ... .... .� � I � ,,, ��­­. - - � � .1 , "ll, ,�f,ll:�iii � , I . 11 , , g '­��­. � . .1 a , - , "'! - � .. " 1� "Ill, .1. ,:, �­ll ,:: I'll I : - �w, �.,::::t " _P'l . I - I .�� ,�l _ , I �1, Ill , t __ . , � , , �,�n, 1/� � 1 � I � , Ilz �e" ­ , " - l_,',,P,,�ll;l, . IV, 1, , . g - , - , �, I , /I I �o. - , ; ,,,, " I � � " �, �,,,�,,�UFI% _.,�`Y - . , ll't,_'lm'l& �1�1�,"11��' � � __ " ,,, f- - . wl,�11� I � - , � . ;� : ,� ,��,4 ,,�`,P­_. � � I l( 111 I � "" "J"'.".""". 4w �,� 1 I � ; , . I . :1 - 5��"',�jp,/��, ,_ - , ­!'l - ��,��l " I� ".,- � ; E:�: � _ "',�,/,""', g ;,e , , �,/ , ­� ... I.. �/�`L','4,,E', �� , . r-'���-,�/,.�'�,�:."",��,,,�',, " - ,,, , , �, Q, 1� CARTWHEEL BRANCH APPROXIMATELY . ":�. ,�'i..;i� ,,,�',"�"�, N,"11,!,^-�,: J , 3:; `� , � ; ,,`vi,',il,E,,' .��.,�� . .. .... �312R._-,, � , ��i�,6,,,l ,� I ,I`,, /,,. " : g .I 111 . j, f�N.!�, 1,�,, -, ES,6w,,`L.',',4,E,' __ :, ,%!��, ,/ I I - �,,�' �"'%, 1p',� `�f��,.,�� 1�� . STORMWATER OUTFALL #2 . ,�_ ", I ­,,�­ W� , I ��, T��:, 4-1.. ","2 " I 2,050 FEET TO THE NORTH. STORMWATER " , , 1� �;­ I �,,� ­_ ,­­, I'll 01 . ,�ll I I , � �N� ... %,�: - "113,701 I �� ''I, !i� ,��f 1 . , " ,��,�': �', �l . _4 �,�-%",11­; _1114�, - . � ?", �11'1_ 11 . ­ � STORMWATER FROM THE PROPOSED S!TE q001 � � �� -, � - , " 00 �l �`,, -, , � . ""', I., . 1, I . A , - , " �,,.,,�',�_��, �� � , , , " - ­_'1`1�1 � I ­�' �_m ,,�',�,'�',�',�',�,'�,'�,'�,'�"I .......... �_ii�,� � �� . EXITS THE SITE AT THE APPROXIMATE ,6-W"`N --,;, �'; 0" : z �,,­: 1-11 ,; , , 'r-�� -� iti f: � ,""","�,,�,"""'" 41�",' 1� "', ,� 3-­ �-,i,,�_ MpiS, :,, �,F, "I'll",mi � - /�� :'lly'- " . ll"�_`,� , ,V, _ - Mi" , ­1. I" ";,11MI, - - ­1 � %', ,-,"��: _':� . ..... ... - �' ENTERS A CLOSED STORM SYSTEM TO -, -� - I'll x"", i. ��: l/ "I , 11j, _­ "', '�- . _:�a, -1 , �,-,;; � , -1, _",`,;��'l 1.1- ­��,,$/,, THE I - � " . lz I I COORDINATES OF:;, . - ­­,1/11, "i _'�� �. I I A , _�'l"",�,;�`,,!�"'/, , , ,'lllvif ­ , I I � -, -.11,11 , I I., , ` I , , - ___ � I.. I _.� I 11 � , I ,"', ., - . I , , il`,::�",:j��P 1P - .� I "I'' ;r, ,�I­�­ .. � , . � .. . ��le.. 1, ?", g, .1 p::j , W, `71 I NORTH, ULTIMATELY ENTERING %I -A �� _':�,,.�%v �� ­­ , - ,;: ,,,, ,� ... I,/// � , , F� " , 1,15,111,11N � I � 111, , - ". . 1. , 5 LAT: N ,�, -1,"'.. � ... , I , 11-1 ... 1,11-1. , , . � , ­�',",�� 5, , �:.., I �1� ; �`,�_,, ' .� >,;., 0 I ... 11 ,,, �� �: I" .. I - - '- - �- i,�I,i � .1 7, dit'll i6 11 I "I _,�� . � I , " ,�� .., % "I'll, � �51_ I'll lv,"���- �,t� : .1 LONG: W 77'08'58.31 "OR W 77.149531 " "", - A.I., ,"g, fl� , 111, I N, ,!�31��2�'," ,'-',,'m,,.,, : CARTWHEEL BRANCH APPROXIMATELY , � � '.. � , " 79!�e :1, � -, : , , ".. 6: : � ��, � , I ':��'�� - .. '1�111�1'1?;,I_ ,N­­�, _ � .1 1.11.1 I /.,� "', ,� _m_ 11 � 'n �,] Z � , _;�_ �� . . ......... ­..... 11 1-1.1-1-1.11. ...... ­..111111......,�� - - , 0�,m, ­�,,, x1l ��i __ _� 1*�ie�­,_," ,� llpl� "I'll �,,,Alle * , � - 'RU"," I , f_o� - ��,_.­­`11` __ ­ M '14 �r , ��,,_ " � .� . , N .. Z I ,�n, .11 4.75�� 1,,�,,i A//��,, �, �%,�;`1�1'; �',',A , .1 .. , ... ll,� .. ���`4��,� " 2,300 FEET TO THE NORTH. STORMWATER . v lo_, , _2�1�1;:_ 1""w;ell";l Zll,:,,�,,, I , >"� , , A— "I'vol ��,� � �� . - 1- , - ­2'i",_� , i�,-,�� "', - '' I � �11�1 �g -', ��­ -�,,:,,�m,;,-,e "_" v'm ­­­­�I11-1;ll , '/F �Il __ 5 � I . ;,g -%-"/, , �' I" � �'II M / " �, o�,,� - ... - I I I - I ... I ". " "g, I I I - ­- �! _��Rl"' , '. 10" R`,�'�l � ­ "­` . ,/ m �t_, "", i EXITS THE SITE AT THE APPROXIMATE � - 0. I , I'll, "I , , ! i, ,, , I :� '- ` V: � :, o �:�� , �, � N 34o42'2.47" OR .700687 ,,�%11. qV ::­1 I" , � _ � : �IR�, ,,,,>,p�,� � 11, /l: 'g,", , I - , I .1 - _ , , Z. ... " � ... : , � .1 - . , , "' 11 � �, I - ... I - I.. 1_v 21 I �, ", �. , �, . ..., , _ . . - 1�11X­,;­_/ COORDINATES OF I I .1 . . .�::e,',�,l I . ,:�, .1 1 �,::, lll.�, Av ,.�_ ,,,,,,',,`­,,_,,, W778'57.33"W OR W 77.149258 I'll, I � , : . . . . . �, _��-, e,,­ � ,.. ,,, Al:_ , . - . . - I - 11 .... . � 1: �:: � ,, ,�4 __ . 00 , � - .. ,_,� . ­7 - I��:­­ ... ... I 1. ­,'';,­ 1. LAT: N 34o42'4.99" OR N 34.701386 ­_,,_`�� -, 1. � ::: 11­ . I - e�lll. ­ I'll, ­­­ ':'�"'_... I , I 61 1, K1.1,114'. Z ,I. I'll � ­ I - - Ill: ... 100� , " /,X', 1 "", - I—, I I I " '"' I.- , , I . . I, _�.�": -, � �, �z�,/.;�'. --l' "I , I ­­`�I`i�Blll'�iil - � " 0� - � . � . ,� "_ 14 : ". , /I. _-, . " . : ... - � - . � ':.�, flii"­­ �� J01"X.111,1211i ,", � ,,?��,:, - ,'I � . � -1 �P. I ll� " :,?,�� . . 0 � I _.�,­,�, e_ ''I �:�_. �, : X _�__ ... �___ � ,_�,�, , . -.1 I I :� I-. , ., - "" - 'i_ ... , - I � ... LONG: W 77o8'54.75" OR W 77.148542 :_4 , 1. , � . - �, I �". ,­- ­�­ - �, . , - -.", - " , , 1. ,f", ;�:: 11 I , , - , , I'l ''. ,. �`Isf'.�,,� If , �, .1. , . 7 D .1 r", -_;,_;-__­.,;; ��:� �, .. .�", J` �. �. " � �,,�,,�����";;i.,��/-�,/���,".",;"",,�i-i���"-�ll""����-�.�,,,,�,,,;,,,,,,,� I ,,�, I _1 . , , - , , , ':"- `21�`-`-� ", � , — ­­ ­­�' ­�'- 2 , , "', I'll., , ,� - - , 'lli2�,�i'L��jl I /,xs, 71"'S I I I 1 1117711%_/146/ii .. 1 'qijii�',,gj'� �-�����,-,,,�����,�,:�i��":��,�.,,,�,,-"�,., ,� I, . 1. " �� ''.7 - -I '111­11--l' 7 � I I N�.'Nr::"�,�,�_�'Af : - ""',%,"l -,�-,�.""","�,,�"""��:��,,,,,�,,��,,'�,,�� . e� ,� 0� , " ., I, ,, L,_��,., ; _,,,�>'p',,"',,j,s,',,"' ��_,.,',, p", "', Q, I , , &1� ���.',` " 111. - I � '' NJ , _, �!,,, I - '_ , , , '11. �; IlIx I A - �� , � , , k'e` , `- -,',,­,'W I .1 1�1_ I ': ': . �,�, � I I - _­�, I __ - � I ,e ��­,,, . 1�1_ " , . " 'i , , , - ,/ - 1� - ­��11%1 I � � , " �,�,�:� � , , , 11 , I g"", "" " . ��_� C:� � ,'��%,'i�,Ef`�".",�,z . ,.,e _� , "'IM I, , , ��",;�a ltl�,�,,�i'i",,�,� , " - u q,z'�','��, _��,'A , ,,�i�"""` ,,, " �,,V , - , , I - , � " . "ll .. I _­ . � " ,4"" , "-is g ''I'll. ` `�;,?I::::��T�t , -,� -,,,, "'I ,,ii,�', "i , � 0%, I � - '' . - %­�,i� �K , X___ " __��': 1��"", I ­ ,, , - ,� ;"_ , , ; � ;./ , LL - _� :j ,,,,,, � - �l I.. " I ., - I -- - ,,, , � ­@,"", E � I , -dtl`� - 7�, 'Aff_:;.:._ -.,.�`�"... __' g"ll- I- I �1- " ;,,-Uiv, ,,, -," - " � 1:1 I N�,:� , ��: : �l ­��iii,4 �,!�,��,�,�f�,',,,,,,',,�',-,'-��,,�,,,,I � � �.;_�,,.�., _,, 11-11, ,� , �. I I 111- al", , 'I" I :�,� �,�`,,,,',' .. R�z, " - " ­� �-?, ., , , �. I i_ , - ,,� 1-1 I !s"I",/ .:�il , - �l Jle'? , ? ". I I .. � , 1. - 1. /�, �? ,._­­­�1�11, � �,�,"i,�'-",,i'�,�',�li�',�,,,', 15,15, ,,,, -,"'ID", �-,,, � g'.-�I,, ,_ ­;"I'l 61. - 11- .� 11, , ,�­, ­', , � , - , , I , �� - - ,,---,-, I �,/ -" - , , , 1 1, I ­�­,,�,�, ��2,,, ­:'-1, I— - %',� / , , �­ � N- ". :��,,"�__,... - ._"m �1* ,,,,,,, 'w _ "': --- :,-`=�,,V,',,,,,,',�'Y " , R,�, �-�,�,,�,,",,--,',,,--,�--,,,,,�,,-�,��� ,,-� . I ,,, . - - ,!,,,, - % - � . ''�, � - � . , / " , I. A 11 .1.1. I" �:� ,.: ,,, , f.s,:�� " I � __ I 111 , � ... "": 11, "­� � _ /, � .,.,. 7�',',,, p ��!, � ��,�',��','�,`,:, z�� ,,, - "',­.. ",;;I, , � fl, , , - ­ �' /,,,� I I ., �e 11-g , I- ., , / , , % I ,:. %1, � , / , - . , , , ,� � , I " , 11 ,�� I : - � . '' , , � e , , . "I',- , � ,. - �� .:, , ,�j�� I /, � ,�,�, ,�,`,,, �� ... ... I , _�, _ 1­1 , / I , ,,, :11 - "" " � , I 114 ,11; W �,, , I ', I , ` � �� "I', �`ll -1,11-k _� em . �n , - I � , , � ­� , �. -, 01 � 411�111i!_P 110111"Ell'i;,""I'l , ,. �, �_ - I—%. "' ", ". . �; �'_ "".. & - I ". �� ,",7 , - 41, � 1, �'. / , , � . 1 , .�: """�',�,,���,',,,",�,",,','�:!', ", "S Sy �- �' , - '. , j __ � , �,,,,;,",gnp,�� "J'_ ... ;�� , , � ­,�,,, , - �. z - -_ " -, , � ,,, .1.11 I'll ,�� . . I :, ::: I �!/ ,� "'F, I I , I , I ­r­i � ,�L " , , I - 11 , W� � , � 6., ,S, �i��` ....... - _�._ ". � 11 ,7 " I I ,�,�`- . ""� ,�� ., I��. 4� � I , -� � 1� � ­�,, - , � , , ", c F_� I � :��` ­,�:, ,,, �,'& ,,�I,�,_ St'-,,- -/ , ", _ . "', �,,',­'­, ,, ., , I ., I �,;� ��;�' , _'�,,�: , I 1A, ­_ � R , �: �y , I ,II�;'­II,,I,_ :�, , I _,� �1111111_1 7 : I '.'I �,?,_ I A 11 e 50's 1 ��'l - -1/11 �'. " � �� , 4v .1 ­f 1" - ! �­ , "", " I ,�� ",'�' ,�,�,�1/1'�."�����%m,�m,m�`-/�����`���";�'I , . I ­,: . , . , , � 1�11111 , , , ­ I .1� ,, 11 , ,*.. , I I 1.1111­1 7 -1 - �11'1,1.�P. 11". . - . � � . . . . . ��,;, "' , - , - I I` F 1, I � , /�_iIlll , r _11;: ,� - - , , �� " 1". ­ I , I 1. - " I , ��,;, ` :::�:T -` �� , "' ��' 11 __ __, � - , , ` , �� , , Yll�'ll � , .- I 5'.� �' ", , . ,. , �� �., i ,,�/",I� - - ,�� ,'­,� I i? , '-,­�� , .,vi , , , , - - : lo � � - I - , � , "�,,` �� , �` ` .1 - ,.,?/',� i / // %� I , : I t , � I � I � _,", , 101, "" I g 1, I �� "I , �V � 1771 I", I . I - I � ,�� ."7 IS"', " 1.11 A` ' ��,,,y'�i�,;, � W�,, f r %� , 1: " - I 1:11 I ., e - ", .. �l , �V',,��,,�: , / , , � � . I , , , - 4� ., 1, �,­ � � - I " - ,, I N"", . .... .... . , ., ,:�� � -�, � ­ P/0'a �_ �� - "I � , � �_ _111". e�'Nil - " el& ,,,,, -, �, - , � " �, IN, , �' "i � .11 � I �,',I`i�]I',2 _,,�� � - m ,I 5� ".R. " , I , �� .... 0"., .., �". � - � ,/.F. '&,� I � 3 I , ,,,�",!` -�� 1 . - . ­ , �, V�!,',, �,et��, , �� " ., � , I 1-11,10 ,',4, 5, ., � � �. ,J I ?�: . . ­,Rlk�l,al, I ,�­Ii'.� , I 11 . , , - 11 ­­­_;­,?,,�l ,_ , � - , I , - -�Uz­­,: ,­ 11 , . , .11 %l ." I � I , I '. , . . . ­'. �f,,',�',,-, . ". ___,"d I -X 4 I �,� ; �-,," �; , ", , , - 6 "'lli��,,I��I � _��"""", ,'!�:!���_� " - I - . . . . . . ­.. : - I., /, , , , 1p, I .1 1�,w 5 - - ... I --­N,I, X�­ I , ", I - ,�l ,11 " " - - ` I � , 1 �__4 �, - � , ,%_ , 'N'I'',.... , � I -, , �`! " I � "R , , , ,11 - :�? I 11,11,1.� ... �.,, ­-, � � ......... �, 10� 11 �:,� f : " ,'k��*,,,%o,�, �Zfl,i, i _,�, 1�� ,. I , - � ... , , - , ,�01­'A: ,/ � " --/-­"` , - 11- _ /.;, , � , 'ji 11.1 � , �, , , �Re& , " , : . ., ­,��!i�, �� . 9 sc, . ., , 1�" 's , , �� ­­."'. '.�_ , I - A I " �N ",,,Iq : � -9 �'_. .: , ,,,,� ­_,,;L�l ,: 1, �. 11111 !��_�,;i,>��­.­­�e; pk� I ,�_ I ,­./'I(,,"�­ N?� :'. - - k .. - X, - , A/ r-/. ��l "t ,,,,,,,,, , , ""', ... .. . . :? lq_lk:;_,�'. , 11 � , . , .,�,,;,�//"-"f,�,,�,,���,.,v%,,��, ... i ,,, ,,�U�;�N,]`���," _�, ,%i� ,'�� I - .1 �le - - 1111 ,,�,��, I � �, .__,: , - t , �'� �'-,�� I � I .� . ,,i , _ ? ...... ,� I.. I , �... - _ I � ", �l 1.1, , ... �7; . I I ll.'�� 2 1. " -, .11 � tl'.1.11' � , , I - , ­­ 1517'r .. , - , I ­"?,� 11"'Ir/ ,���,��,;"�,,,,i,',"�,.�""",�,�i,;,�,: . .1 I I " , ­­ , M"ll 11,1�1::��?_ , , ''.". �, _., 4 I �l - ''. �., , 1. � ­ 'I'll , -, " � , , - � � . ''. . �,� ,, �"_ f � � I I . I . , - . � " � I I ,� . I'll.., I—, - I ­11. 1. �. ", ,_ I _ . :107�', , , 11 , / " - : ... , , , , , _�� " I � ­1 ., : I �_ _� __.. ''. !-/, ,,,j����!!��;�-�,�.���"-,���""", : �,,, � I as ", - 11 s - '' " '�,,i _2 ,_,�."�, � � /�_ � : A"o- - , , , R., -�� Yk , , "" " �� � - 1�f w /, �- -0 ... :1 , 'Y I ­,� :�. 4 0 , lt.�:� , , I I " , //;�///;/,� ,� 1, q., ,',:', , " � " lll�_,` Al""�`F'_!, ,��'I",""""",�"".""��. P%lc , , ", ,��§11,111;:�,',`, I �11>1111 , . ,,-,. A ,e, �'�.,,,�,. � %` � - I � �,:�,, , ., . ,, 1: s, 11-- 1.11 .1p , , - 4-� � 4 "il , ., 4 " 1w 3_11 �,_ , - , 1'. �_____­. � 0, , , 1`1, - iv, _�_ I 10 "I'll" , , "" � -11 _� ­ , , � . .�� � . .- 1-­ �,, ,71��I!s,, -%,- i,-,;-���,���,l�>,,,,,�,�-,���7,�,., ""R , _�,�,, I ��,,��,� ,"'ll , N�4- g - ,/r ,/,.: - , , 0� , I �?n , ", ­ , . 11 - , "", � - 1-111". �0!1,� ,? , ,� , I- "__ i!��,�,�: . I , g, , "" C "I ,;,,�,_,�,�,,���,��"$��,�,,��,����� �" � 0, ! � v ­% �, I , , I '�,,�,�M/,M.11:-�; 1 I , _g/', Oyr­ �1!1?�,,� '_�', ': I m ,' ,, �,�,'��.,,`­ . , "' , ,- 4.TAU, � ,�­,�:�,,,,,:-,f"`,�,�,, '�v­ I � _,,� ,&­f. ,,, -­ % ­ �` ,%/ - .1 1_ , �� " %%/, Hi�i �;�� ­_t�.­, ­­� , "%-1111f, � ," �,>, . ,�'r � 0 s_ �._ . � � .1.1.1 - ""', �, �v_,_,lviwll_o ­._ I �z 1�/<1_11_.: �. -, "_&�.. �: " , !.7p ""', - , I !, . � �� Q� � I I ''. ,. / � �­, 1�� '1�w i" ',,,� �m,, � . , I , 0 . , I ,,, � , , , I . __1�1' _"��i�,.',,,`,�,'� "." , �.l - �4�, �,_. , :;.", t�li?, �� �; ; 11 ,1�1:�',_`,;!e'�' I',�,'_,�'�� �, �­ ,,� 0 ,,,,, , , " � ,:: _ I - -, � I Mz ,.:,,,, �� f , ", '11��'_ I . "" :" `,;";',%',!i, ,�,,:, -, %, "' ',',�__,��,,. ".1-k- � ,­11-l-, " � - I . / STORMWATER OUTFALL #1 � ll­i�� �, , 'v, I �,/ : �'ll ll"111,,� � , , I& " - - - - I , ,;:, ,�" , ,� I , �-.,._. ­�.­ "..", �, I I'�,�,,",;����,,�,�����,5�;�����.t �zgv - �,�X"`�,ii�i,,,, ,, � "'M � I/ �I , ,/ - ­1 I �� I � ,,, ,A,4%;, "�, "'�, ,---,- , '12:". , I ­ -,111 - STORMWATER FROM THE PROPOSED SITE:� " - -, � .;3, I/ / ...... . ... V, , - , � � ,,, , . , %�, , " r - , '11, . � " " / ,,, 44 I ...... I , ,��V yll, /",I, 1, 1, , /, P e� I I _�/� 7�,,�,,,@` j, ... ��., �� I Xf � '01��% I I ,-­lll:;'l_ -1. ; . , . . , 9, , . 1, _. , � - " "' ­;��ll 0 IP, 14:11y'. .: P'S%L,::: , � ".___ 1 "m e, " . � 9' Xmelg&lorl 111111"'Im -1, ,, "'. �_ z5 � , w�" �_ 'i . , ", , , 1,2_� . I 10 -�?`J-,,,,,,,"- - , ", C, � 4 'L�,,,� , 'S/1`12 il � " ". 1. ',� _,�Y-�,O,�,��,% . , 0 . " ", , , , ­ 11 i, I , , I I I _,". , �> .1 - i _ / - NsAyg; ,,`I?',�i 11 __ � -1 �. � z , :1 �/,,...�... ;­..�'.�;M. ..: I'l,". ,:�:,, , t'..- - . , , .. 1, , I � ENTERS AN OPEN CHANNEL TO THE SOUTH 'I".. 4L.... ,, '­�;�11. -:11. �k ` � , I � .., �_ lv�, � I � ��:&� ... . .. ;�?i�, �Sl. ,,Xl��'I ., ��.] 5� 1� - , c g _ ".., Fmligy ,�� , 1', , " �;M. , 5, ­1, ... , ,��J,', _11'10R,�l I& I 411/1'r... . � _ , I - - - :, � , I _ , ��­ , _,�OI , , 4 - "I 'I � ", I A" � iii I _e� , �, , .1 - � ��� I - I.: , e, e " � 1"',�,"'l-i"'.�"P , ll� 'Os", A . "I'll , I" I I � � 1-ij, ,',�.�4 �,ljl;�w�,-?&,-, -1�,�� 1-1. � � , ; m � ;/0 " , , � ,,,�i��.,��,'_' _� " I ll`�' ."",,��,,��""",-��,�,,,,��--"""�,,,,�,,�,,,,,,,r�,,,"��i EAST, ULTIMATELY ENTERING HALLS ,q�,,�.,, � �,/_I_ ,��.!�q� �. ,,"&!�l 1_11, I il I" � -.1- - ,p ,�. �%. I_. � ­­ - - 11 ,j , , �___, 11 I,,�, , : - , , � I 1 I 1. -, , - ­­ , , � / , , � t � � I I -0 ... � " " , , - �, : .:�,,I�, ll�.! : - - - , , .� 1: , � R, ffi, '-,.z_­; " , ,]",�,� 1� - , , 1: 1. � ...... . , , 1_!',",,� �: , ­�,k ��-, �..5 `­:"� z 1 .­c�_;�� � I " ­­�`­ : , �'.l 'i�7 - , , "I Rl,�_�,. ,:::l""",'_Iffl 0 '­ - - - -1 I VW:�fo I I I ", , < p_._ � ... e'_' _311 � X k CREEK APPROXIMATELY 4,500 FEET TO � ,�'l .�, ,l-r- 1-IINk �: __�:_ ,v,,,,,t,`��, T :r., - � 1, , , - , "p, I I - ,.�-,�x 'i"2 - -- i -v/_ " :�3&�px.kl. I . 1. � m- . . �__%� , - n , I . , 6m m_�,,,,,_,-�- , Q ��,,,2:0,, I , . . ?.. ", � I T %::11111 � A'. �, �,-Z,-�� �, -� ,�.. . , .�""'­', '_ ,z t , .;�,5 u , ,�;��­ -1 �_ - ... -, �___ , - � - - "'t , , �_llle'� " T _ - . ,�� ,­_ "" . I I I I � l/.111.1 - , "; :.�, , 1 ____,'­, ,.A�xtf__. I - . 1 I '�lellll Z"N , - � ;�-��'� - � I � ,, 1'111�Z �l I �'l , , '17 - _k _AW", � ���i�i�li�21 j�- �', N,'��",­ - THE SOUTH. STORMWATER EXITS THE SITE l,`­l;­" , ­1111,1­111 I ,� ,�,,� Q �741'1` I% ,�--- - .� _. , � ... k,,�,�, ::� "' "" I 1- "I Im-,�.�q, * - I. ., I _'�,�.?_""_ I ,�,x,-�, , "z,L.L_ ,!'l-l", ----- ------- �, ` , � 1- 1. .. I .,,/,. Iv­`&;43 , ., �` I , :1:_ , /­fp::: : �'11: : ;,,�f .. / �, �,.�,�;;� ll-, , , � _i� ­7 --l�-TI�'7::'. . I� , ��j � - ", - I , "t- ,!� , - 1,:�% �, AT THE APPROXIMATE COORDINATES OF lil'i", :­�l�, ­ 11 � , I /,,.-,, g � _, , Irl � 0,m; � ,, ��,�,Bv � I'� , 0 ;� 11; Al'' ,,.,. ,. _Ex .- , .11 w , � . ..r :­ I Ii - , , , , '11" , �' , -, , , "m ,�, . - �, : � 11 . . ,."­ " , , f, , "IF �_�,Ii,,!,,P� �? ,�, , ''; ; Irlu �o / ,0 I fl�,__� , "I"'IN s 1, __I ff 1_1�1 ,�� �,:.��:,:ilV , I "I'Li, l/n/P11"�11."D _2�11� �,e �,_ J, " ­1 ­11 .1 /11 . . , I ", Dnl',% .... ... . �A� A. �Uw',Z��."/,.�,m ,x -, " I t! � , " , , � .. , - " 1111 I . . - ­­'� � 1 "I , - �,­ " - - ', ". : 1� . "", , , , ,W",� � 1�1,�,",,`k,'�'l ,,; .1 j _11- - - 1, - .., .. . .. , �,I ...... ;, , ��',N�'­'-,Z,! , I �;,f,,,,'�,,'�,��.,�"I'�ll,�ll",; ... , /� " ", LAT:N 34*41'54.64" OR N 34.698511 '�,,,;,,���',',,-,'��-,-,,,�.,','r�z"/,�,',,,,/,,�-/�,,, 'p ,�/ ",.fS,7"��I?' , I '. K, %� - , _ , -%;,_­ , I I � , ,� �, ./� ���.1,1�.1,����-'��,�,,�,,,�",��f-,."; 2.111- I , ;��!�'�,���,����,,�,,�,,,,,,,,��,�M�,r",e;;�"/�,�,�t��,;,: , � I I � a� ,,,� - w , � iwt 'It 1. " a, ; j, . , t . I . _ , -, �I -�f `,­'n �f��,_' - . � ,.- 1� / - I , ­ __, ___,___ /I """ � ,;g' ,/­ j , W: : I tv, , , � ,,, . � " � 1, "'t, I , t 1 v �/,l "I, � ­� � I.. � ,.. �, I 1 � , ", &`N.e_ LONG:W 7791.29" OR W 77150358 e,'�-,Wl-,��,�--',,i�,�Ifl,�-�,;,��,�l�f,,�, ""; 11 I _�F Ai _,�_i��_� '�,l " , �1111,� w­­ <-,_;;,"��A�,ir " 1% , ,��,, - - �,, , ­. - N,m.z, '11�711_ %t, I"', -, ` _ , 11", I',; Ilk, - "W� � '"', �t� �, ��W'�, , 11 ... �­ , � - Xil:�, I N - , , "' I :�� �., ',�;��O I", - ;;,"O", .,- , - .. :�� :�� . � 1 , - &�. ,,, ,,, . f ­� I c, - , lill.� I I � , " -r-11-- . � ";/�/��!, ��&,, � , I I ( if' f - �,�-,� ��:,_�/_ �,, 1,_, ,1119?,.� I I �. /, "A6,W10" 1. � - �, - � I. I �._ 'r , , 1.11 " N � "'..., I ... 11 ... ­ � " ��ll lt � . "I'll', I .... m " , I �� I -, ��:N 11, x , " 11 - I _', , ,� � , 01.o' �vl_ 1, 11 � �, ��. .., � �� 11 ���z�,;�p - 3 , I �_ I.,� . �'��- , /Z .. I ,� , ",fl _,,�;�, - "Orl, , of" 11 - - "��- I.- � , ey , I ". 1�111 � ­ ll 11 , � 'III', . Z� -, .... . . ... , ; 'I'll, �_f il I PIW , llll_l'l'll,'l,;�l"_� __ "",?.�"' , - . �llf - , ­,­J, ,/,��- -- - V - . 11 , "I", I '. � - " "I I 1�' ',,- '�,�,�r ,_ 'l �,�w ,%,,�l'/"'-/ -, , - i. 'I, % � , ,,�­_ � �,�. " , �`�� - bb- - 1, � 1� "tl�`,Z�i 10 - I ­1 i"",lt�,1�111� ­ 1; , . �,z�,;�P,,�: ,�� , _'ll-�i@ll'll'l'llvI_ 11 � fr, , �,11�i . f el,�' - - � ��z�,;,�.�, I 44,444"_ _ I -,�,,,�,�,,�-�,,��!�,,,,',-�,,�,!�;, , ,�.�, - � - �..l 3A � 5� 1 ,�.�, ',',��,�P,_ ""I � � ,�.�, IINI� ,r';,7/­,%:'lk i' �­ /" -,,�, / X t ,$ 1 �l I I - �'. 11 %�­, - "" ,,�-P""�i ��,�'� X � � � � 11 ��l p � - � I , . , / , , , / I l , , ,� _S_'llid ,", �1�1_11� ,,,',,�, � II "'I'lil, ,,� 'l '51 �: 5 , lll/� k�,lr, - ',,/ I _,iif",",��y A - �I I "" , �61 , / ,�i, , _r�l �., vuog ___ , -` �,,,, " ., _­,e lF.- '7�, 11 ,_X�,,!,�%_ - ,.,, ­,, - . , -, I ''I' '__ N � � �grl � , ��, . F, �_ , , , �� I __l , _-m—r, - I , �� "li"':, i---, A, �Wy' `;_,� -- 4, `,i��i���ii,��, ­­_lii!! ., , �i_ I 1�� "fl,li,i�'� . ,� � � I I I �� -11 - .1 %, ... , , iK .. , , , ,I, , " , - _. �, � ,� � k 1�14__ n_ , 1, - .... .. '__ . . - "m �, -1, � � e 4,�, 1, �, �01;,­ ,111_� - , '. �, I . e� � I � - - � ­ I, I , �, "' 77� __ , u i - �,,,,� I ,; ,,�� 1;1��l � ,�. , �,�,,,�',,�,� . / , - ,�.>,,�,,,�-:'��',�',�',�',�,�.'�'.�'.�'.�',�,,�,,�,,�,��,�,,�,?"",�,,,�', " - v - �� �/, , ,­:, , .. .,f ,.,�.., -11, - , ;:� �f 1, � �� ��., , ", �� � MW �� - I i/ I I , - I - :: *1 __ llil!im"�ltl � - I-. OP, - p., N J/ - , __ � "I � - I 1. , - I , -- - ,/ . � ", I I ­. � , �� � I , ,z� ij ?,� � p "c' �� , � . p "I ­ '�: , "r i _"�4 e _,­11.1 - I , "I � , 1­, %, � I � I "I " , - . ,� /ti,�,���'�..,!�""�`/"��`����"�,', - 1, , r/,�W� ­ � �' �I�,� f 10' I I , �,/N%, j I, 1, X, I "I I ­­ ­­­___"'_ '�l , �l �, I i `-` /­­,�,-, . I"', . e, Y , , ... 1, "" , - _ I ,,,,,, I _ ­ ."? ".. X �', � " � I'L �. � �_ 4.` . xl",N, 1% ­� ;�� .k It ��//-""�,,,,"",��"/";,�,*,-,�;:""��,,�', ­,", , , "' lK, ,��-""����,�,�,�,�,�,�,,�,,�,,�,,�,,�,,�-�,�,�,�,�,�,111,11",�,.,11>1.-��,. `1`1, ": ���.i��,",g - , _��, �, K a, , , I � ,-",* " �, I , , , , , . - , 11 `�! � 4.�', , ,Ii< _: ��, �, , "' " / �, , - , I - -1 � 3 " � 11, ,,-,,,,­, �,�,'� ��, ,�,E! 'W'.11, ,,­­­�­ 11 - - -- -���,,,.�-,,.�,/".-�,,,,�,�-�,, . , x `11 -,� �-�, - , _111� ��,5�",�;,"� , :..­� 1��,�,�� ,". 1. , � 11-111111 � ..''I'l , " - ��,`�'_',,�,A�,>� , ,��r" , , .V_ � v �e '21>'. ,, "', _ -1 ��,­: �. , '/ , - - ��`��- -­ "/,: - , ", , ,�,� .,��, � -� '� �", A",�,I,i-,�`lv�i /:��/w­wy 7 4 ,,, ',�,�,',,',",_ �, " , ��' / `4 ��,`, - ,,, , - ­ , .. �. - , ", �� "my; ''I'll- I -"l"Z , , , , � �,e , / �-l-l'��i�,,���"l'-",��;!"",�,"�, -� 1� I- ��. :,_,5,>,r ,� - /; - , �', >�. 11, ­­­ �>', , , � , ...... e� �,�� � ,,, , - _i�� _U , / "..'_ ,,­5,, 7 �� f,� "., - - ` i I e,,�, ""IN ,� " """A..."'k., ".,." AC f ,�I, E�:�,�� , , " , : -, " - �, , � ,,,, " , , , �,-�� � ,/ , �g '_ I , , �,�.,...�.. ��'�,­jl� �,­­­_ §, , _ I ". , - ­­��, , ,,,� , g , �_ a. �, 11. il ,,, , �� ,; . a �,ig/,,hv, "" ,_ �l ,� i -,�� i"N' ��' _llk�1_14%/ 71, I:, - � J,�,,,� � , I I ��15­1`111'1'1%1 �� , fui� ,� qz-,,,�,,',,,,�, "W�� ­.­' W'%llle, 1- � , , `�, � �'1111�� � a ,�,,'?: -e, -,"i_ �,_il!%,�'k _"�.?,%7 �- - .,; �wl � "'. , , f1l" ;, �. - �__ , , X., 'i , �.�,e,�'�'ll 11,1�, " , ,,,, e X, 1. . "I .. .... 11 �4 " ` ` , - , , / " -� ,,, 'Y . , - U,, "I'll".... 1.1111, 11 �_- - � 5'ia 0, �,,, - ; � ,/, "A" , , / , , ""Ilk ll_� �e�e�, _, ` I i' " I , '. ll'f,':�,_� . , , "I'll 111- .. ", ,-, ­��X p , -� I' ­_-.- ", ; `%,j,?,�n's0 q ,I , , I � - - - - " , - , I I � 1­1 1�1�1 11"'. _,�_ , — �', 1 - �� .- , ,�, __,�__--_4,,;�C,iSI`,,I 3-�I'r �`_l � , " ", - , , - � P. - - ,,� . I " `� . � , %, I �. ��,, � " � '-' -�; 1-- , - , , - -, , . ���'�i;�������,.,,-,,,,�,,,,,��,,���.,���� . "" ",-" , , "' - " i ... _;,­'m �e",-' � e,_, �ii%'W�z 1 _� I " ., � " - .... :� , , __ I - I , :251X? " - �:� ." , ", ,� i � th - :, �;�� � , ,K,��f,� �t,,,,� � �a�, "All �, I "", �,','� - � �N, �� ,, ��',�� ..... , ""I �,_ " . �,A�,, � , �:�i�::��:�:. � ��,,,���:��-,��"""."�x,,��,,��:,��, I � :;,�a� � �, . `­"7, " 1; * I l�,,',,��-,.",��!,,,,',�""�����, :� �,. , / ;���,,,o, _� 1;2i 1, I __ �, , � , , " I " " 1 . I—. �, " ­ I 1-1-1 ... 11 " � ,,,, ­_ ,F ", � , ��7 , � - I , , , `_�l N'. "I e- t �'l � �1` vn, - � -, , �l �l I I -` �- - -� �� ���",',��,-,,,����,�"?�',�',�,,% .... I , "I,-- ... ­ -1 -,,- :�� . . . . . ", 1. " � &O",- ,-, :��%',:���;�x , e ""I'l,/ � ,�,� ­­ __, e,". , � - �.- ; - N ''I I--^,,- 1_`_`_ �, ,, . ".., ,!�,',_ .l­l,/.l?, ... I ­ ........... -, � � - , , , , - -1 - , '� -;,/- I I - - - � .� ,:.­.'�: 1 -, ", � . . . . . . . . . . . . . . ,�ew - 4 , � ;���,�,,,��,���,,,��,,�����,,;���,,-���,,�."-",-.�,���,,,��� �,.-.. - _ 1� , �l -, �:.�:�� " , �_ � , �1�11'111 I i 'f "�� I/ 11 I � I - I i -,�!_ -�.� /,� ;�vt,A, : ,1� , . :�, 1 : �, .1 ­.. . I � ­11 11 �., - - I " ,1A, I'll I . �P­ � � g., �, -, --� - . , ''. � . . , . . . � I "IN � ,�?� I � I 1� I ;,"011 ___.. 1__ll­­l_�__ll//`l A? /��', , _���,,'_ I ��lil� I - - -11 ,� " � ", , �11��1,1,1 " , , - �'5, 0, , . , I /�., '. � -",!�� I . .. � . . e .. -11 ", � ,� ,z,�,.,,�,,'�. �,_ - _ � . -1 I . _,_ '. -11 � , I � , " � 1.111, , I - �� �,� I �T F I . 11 �,�,:�.�� , , ­z I I ,. I/ , �,;��­,­,�­'­­­ �' ,-I- I _A` " ��_... z � - .1 , , � s `11�i�� w - 'i I I �/,,'C "'���������.1;��--,'�:����!',,,, -n 11 2 �� �l � � .�� ��::-�, , , , , .,�.� I-" ,,� ., , ; "' � -` ""'F. __: .1:1�1 � ­� , e.. 1_5�:� � 1_15.�u�_, "I'll" -11 rl 1p, ", . 1�t � ,I ;� , __ I'll �, , , ?�� 7 .. -, - ll� 11 MIN"IF , __ � �'* " ,/ , �:__""",,�",',', ,�, ,,',,,`;: �; , �� e :�: 11 , ­1 '_ - I , �' , . � I IN , - ., _ , I ": � `1 ­� , I �- "_�,�,� - I ____lk��1�11', I �_J H , -,,tl , .", 11 "I , e 11 � ­:­,,,,,,x.,�­'��'l � 11.1.11 , �, , . �/c I , , , - 0 I ;��­F� ,,, I - �_ �, - , ; . 4-1111.1, 1 � 11 ,� ,7 11 ,io, - � � 4, ­-, ­ i, ,� - - / - .1 ! '," �. yl: q "I -, ,I - �/ 5? t � 11 - - �l xo­ .4 ... .. 'r , 1, " I .�� .// �� - - - , �� . , dv�",­.�'�"l s,�,.,­ ��,o _ ,',',e,��,,"�; ': �, 111 I ::­:�-, I I 11ER 31 1-1 -1 - -�,�,���iiili!M& �: ��, � , ,,,, I 11 ,I/ I. �l , I . ��l I . 1� X" . 1� i �� - . 4 I - - I , , , " " " , s, l­­.,'­,­, ", 'i` "' � - ., --,,, i't"'-f�;. , �,_ - ,,�, �'� � ".. , , , , 1;­-, , ' � , . I I . , � I ' . �� �� . , ': � -.1.1 , -- .. � ?.:,4 .... I ,� , i::�� � Ao/ ,��,���i.,�i,���..i�������:��]�;��� I iq,, I -�' ,. - � � ___�; �� I ), -1 ,,, �,, ".. -1, 1� ,'-,,,,',`-, 34o " �, / " � s �11 - __�,��111,j�;!j]Q :� ­.. , , 311 - I - Ofxoltpf " A�' ::�,�,:�.;.:?, ­ � ,�_ 1. " - , 11.1 11 1.1 1" OR N ', , , , - , , 11, , � 4 - %, __ N 4 34.686419, .p_; 5 , , ll�. .. ,,, - .111.1.1. 11-.1. � , ,�': ,�­ ��_,l � , A , 1'12�',",Z,'.,'�,,�, � , - i A 'e' �l , '. . - :_� n�',e, ll.e� I " i �. 1'� " , _� � I '* 11 � �n�',e, � � � � � � � � � � � � 1:.�%l , Q , . ,,� , � i-15,0 1�i[�,�,�, ;'I�li. � I e, -, �..'l .:,,.��� �:�,:::��.�_':"I,�;l � �­, ­ ,�­ ", I , ._ , �­, ­­ "j �t - I � '­­ , f, I �. 11 �__ ,��J­ "41111.11 11 - Al, - - �,,� , ­1 "'I : I x ,:;:l: 1, W 77'8'48.45"W OR W 77.146792 al/ 1,,� � , - ��, , ­ , , b/a -1- y­: ,,,�­,��-,­,�,"', , , , , - , A � . I.- �. �. ., ,,, , A -, - I" I ,�,. 1 _14 � ., �� ,;;;,: I, � . ,­Xll,..l­l.11.j>-, - - __,­�. �; �l � I ., 'Ix - "�'�,",­,�',`��,;z? , ll��"`7 I 1, 1'� ..., . � �;�,, - >" - . - " "' ­,�,��,� ': ,.,'� � . � I" '�,��",,-""""""""""',; ��� :....'� . - A 11 t�'� , , ,� � e,:,, ,. , I, _ mll­ :,�,,��._ "I ......... �:: ; I- , ,,��.,--'�.,�;�.�F��e/"/"""�,,�,�,:,��I A - -, V�,n � ll,-,�_-,: 'I ��,��,_ 11Z,l " / 7r;`� _ I , ;� � i � I'll, "t ffy_��4 11 . - ,,,,--,.,, .1 I I.. I I., ��K,�,,�­: � -, - USGS f"WADIRANGLE MAP4. NIZI NOT TO SCALE SITE LOC ATIONMA P 1-11 1--X.A— NOT TO SCALE � . Sw _..., .0000 AO"% dewom I %wov rol v , I �j rg�,-IF_�, _- ?- T , t , u ,,, t�,mv " 11 1 f �,I ) A D, sw_— A I DEVELOPER/6ft- : WAL—MART REAL ESTATE BUSINESS TRUST MAIL STOP 5570 2001 SE 1 OTH STREET 72716-5570 479-204-3314 SITE OPERATOR/GENERAL CONTRACTOR: PLIDPI NOTES __­­'­_"" IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. r REVISIONS BY-) - NCDENR REVISIONS 7 5/18/16 BAB 8 NCDENR REVS/OTB REV BAB 5/31/16 9 NCDOT/NCDENR REVS BAB 16/6/16 10 QA/QC, OTB REVISIONS ATZ 6/20/16 � 11 NCDEQ REVISIONS - BAB 8/3/16 12 BID ADDENDUM 1 BAB 19/21/16 13 NCDEQ REVISIONS - BAB 10/3/16 1 14 NCDEQ REVISIONS BAB i `IIIIIiI� 10/19/16 I DRAWN BAB MAT DATE 7/11/14 SCALE AS SHOWN JOB No. NCC138078 SHEET f-"n Z! "" - .. BLISH-4152\NCC1380780PX.DWG PRINTED BY: BBUCKLAND 10.19.16 @ 9:01 AM LAST SAVED BY: BBUCKLAND s GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGIIEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN L FULL CONFORMANCE WITH LnrAI nrni 1 ATlnnlc Ah cnn/ PHASE 11 LIMITS OF WORK 1"=250' r m SWPPP IMPLEMENTATION SEQUENCE NOTE: UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING, LAY DOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, MASON'S AREA, FUEL AND MATERIAL STORAGE AREAS/CONTAINERS, SOLID WASTE CONTAINERS, ETC., IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES IN LOCATION AS THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS. IN ADDITION, NOTE ALL AREAS WHERE FILL IS IMPORTED FROM OR SOIL IS EXPORTED Tr) ON THE SITE MAPS. NOTE: DOWN SLOPE PROTECTIVE MEASURES MUST ALWAYS BE IN PLACE BEFORE SOIL IS DISTURBED. ACTIVITIES ARE PRESENT IN THE ORDER OR SEQUENCE IN WHICH THEY ARE REQUIRED TO BE COMPLETED. CONTRACTOR SHALL REFER TO THE PROJECT SPECIFICATIONS FOR DEWATERING RECOMMENDATIONS DURING CONSTRUCT ION. PHASE I 1. CONTRACTOR TO HOLD PRE -CONSTRUCTION MEETING WITH NCDENR, NCDWQ, AND US ARMY CORPS OF ENGINEERS PRIOR TO COMMENCING ANY ACTIVITIES ON SITE. ATTENDEES MUST BE NOTIFIED A MINIMUM OF 30 DAYS PRIOR TO MEETING. 2. INSTALL THE SWPPP INFORMATION SIGN AND POST REQUIRED DOCUMENTS NEAR THE PLANNED CONSTRUCTION EXIT ON HAMMOCK BEACH ROAD, AND WITHIN EASY ACCESS TO THE GENERAL PUBLIC WITHOUT ENTERING THE SITE. CONTRACTOR SHALL ENSURE THAT SIGHT VISIBILITY FOR ONCOMING TRAFFIC IS NOT IMPACTED. 3. STAKE/FLAG THE LOD (WHERE STAKING IS NOT POSSIBLE/PRACTICAL, THE LOD MUST BE CONSPICUOUSLY, AND PROMINENTLY, MARKED TO DENOTE THE BOUNDARY). LOD MUST REMAIN CONSPICUOUSLY MARKED THROUGHOUT THE ENTIRE CONSTRUCTION PROJECT. LOD SHALL BE STAKED AS CLOSE TO PROPERTY LINE AS POSSIBLE WHEN IN CLOSE PROXIMITY TO ALLOW FOR FULL AREA TO GRADE NEAR PROPERTY LINE. CONTRACTOR SHALL CONTACT CEC FOR FURTHER CLARIFICATION WHEN APPLICABLE. 4. INSTALL PERIMETER SEDIMENT CONTROL BMPS IN THE VICINITY OF, AND DOWN GRADIENT FROM, THE LOCATION OF THE PLANNED CONSTRUCTION EXIT, CONSTRUCTION OFFICE TRAILER, AND TEMPORARY PARKING AND STORAGE AREAS, AND ALL PUBLIC RIGHT-OF-WAY FRONTAGE. CLEAR ONLY THE MINIMUM AREA ABSOLUTELY NECESSARY TO INSTALL THESE PERIMETER CONTROL BMPS. PERIMETER BMPS SHALL BE INSTALLED AS CLOSE TO LOD AS POSSIBLE TO ALLOW FOR CONSTRUCTION. 5. INSTALL STABILIZED CONSTRUCTION EXIT, AND SET THE PROJECT OFFICE TRAILER. TIRE WASH MAY BE REQUIRED IF CONSTRUCTION EXIT IS NOT SUFFICIENT TO RETAIN SOIL. 6. INSTALL PERIMETER SEDIMENT CONTROL BMP'S NECESSARY FOR THE INSTALLATION OF THE CLEAN WATER SWALE, AS SHOWN ON THE SITE MAPS. CLEAR ONLY THE MINIMUM AREAS NECESSARY TO INSTALL PERIMETER CONTROL BMPS. 7. INSTALL CLEAN WATER SWALE STARTING AT EXISTING CANAL. AS SWALE IS GRADED, IT SHALL BE IMMEDIATELY STABILIZED WITH SOD. 8. PREPARE TEMPORARY PARKING STORAGE AREA.. 9. INSTALL INLET PROTECTION ON EXISTING INLETS WITHIN THE LIMITS OF WORK AS IDENTIFIED ON PLANS. 10. HALT ALL ACTIVITIES CONTACT THE CEC TO PERFORM INSPECTION AND CERTIFICATION OF BMPS. BMP CERTIFICATION MUST OCCUR BEFORE STORMWATER PRE -CONSTRUCTION MEETING. (THIS SHOULD BE SCHEDULED IN ADVANCE, IN ANTICIPATION OF THE EXPECTED DATE WHEN THE ABOVE SEQUENCE ITEMS WILL BE COMPLETED.) ALL EXCEPTIONS NOTED ON THE BMP CERTIFICATION FORM MUST BE ADDED AS DEFICIENCIES WITHIN THE BMP CERTIFICATION FORM AND RESOLVED WITHIN 24-HOURS. BMPS MUST NOT BE CERTIFIED IF ONE OR MORE OF THE EXCEPTIONS WILL NOT BE RESOLVED WITHIN 24-HOURS OF THE BMP CERTIFICATION BY THE CEC. IF THE CEC IS UNABLE TO CERTIFY THAT SITE CONDITIONS ARE PER PLANS AND SPECIFICATIONS, THE CERTIFICATION OF BMPS MUST BE RESCHEDULED. THE STORMWATER PRE -CONSTRUCTION MEETING MAY ONLY OCCUR AFTER BMPS CAN BE CERTIFIED. GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT THE STORMWATER PRE -CONSTRUCTION MEETING WITH THE CEC, OWNER'S CONSTRUCTION MANAGER, AGENCY(IES) AND SUBCONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. DAILY STORMWATER INSPECTION REPORTS IN THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER MUST START ON THE NEXT BUSINESS DAY AFTER THE SITE BMPS & PRE -CONSTRUCTION MEETING CERTIFICATION IS SIGNED/CERTIFIED BY THE CEC. 11. INSTALL REMAINING PERIMETER SEDIMENT CONTROL BMPS, INCLUDING THE SKIMMER SEDIMENT BASINS, AS SHOWN ON THE SITE MAPS. CLEAR ONLY THE MINIMUM AREA NECESSARY TO INSTALL PERIMETER CONTROL BMPS AND STOCKPILE SUITABLE MATERIALS IN STOCKPILE AREAS SHOWN FOR CUT SOILS GENERATED DURING THE CONSTRUCTION OF THESE MEASURES (TO PROVIDE DRYING AND TREATMENT AS NECESSARY TO MAKE MATERIALS SUITABLE). GRADE SKIMMER BASIN 1 SUCH THAT SEDIMENT LADEN WATER IS NOT DIRECTED INTO THE CLEAN WATER DITCH. 12. INSTALL PERMANENT RISER STRUCTURES AND DISCHARGE PIPES WITH SKIMMERS TO DEWATER BASINS (REFER TO DETAIL SHEET SW-7 & D-1). SKIMMER SHALL BE ONLY OUTFLOW ORIFICE FROM BASIN, PLUG LOWER ORIFICES OF ALL STRUCTURES. 13. HALT ALL ACTIVITIES CONTACT THE CEC TO PERFORM INSPECTION AND CERTIFICATION OF BMPS. ALL EXCEPTIONS NOTED ON THE BMP CERTIFICATION FORM MUST BE ADDED AS DEFICIENCIES WITHIN THE BMP CERTIFICATION FORM AND RESOLVED WITHIN 24-HOURS. BMPS MUST NOT BE CERTIFIED IF ONE OR MORE OF THE EXCEPTIONS WILL NOT BE RESOLVED WITHIN 24-HOURS OF THE BMP CERTIFICATION BY THE CEC. IF THE CEC IS UNABLE TO CERTIFY THAT SITE CONDITIONS ARE PER PLANS AND SPECIFICATIONS, THE CERTIFICATION OF BMPS MUST BE RESCHEDULED. 14. FILL IN PORTION OF EXISTING CANAL TO PREVENT WATER FROM FLOWING BACK INTO SITE. 15. DEWATER POND/DITCH WITH PUMP. PUMP WATER SHALL BE DIRECTED TO SKIMMER SEDIMENT BASIN FOREBAY AS SHOWN IN SITE MAP. 16. WHILE MATERIALS FROM POND ARE DRYING, BEGIN IMPORT OF MATERIALS TO SITE FOR BUILDING PAD AREA. FILL IN POND AND DITCH WITH SUITABLE IMPORT MATERIALS PER PROJECT SPECIFICATIONS AND MUCK OUT MATERIALS THAT WILL NOT PASS PROOF ROLL. COMPACT IMPORT AS NOTED IN THE SITE WORK SPECIFICATIONS. 17. MAY START FILLING OPERATIONS IN PARKING LOT AREA IF MATERIALS DRY BEFORE IMPORT IS COMPLETE. 18. INSTALL PROPOSED DIVERSION CHANNELS AND PIPES AS NOTED ON THE PLAN TO DIRECT RUNOFF TO SKIMMER SEDIMENT BASINS. PHASE 11 1. BEGIN CLEARING, GRUBBING, AND STRIPPING THE SITE AND ROADWAY AREAS. (PHASE CLEARING AND GRUBBING TO THE EXTENT PRACTICAL TO MINIMIZE THE AMOUNT OF AREA DISTURBED AT ANY POINT IN TIME) 2. ONCE IMPORT IS COMPLETE, USE DRIED MATERIALS FROM BASIN EXCAVATION TO COMPLETE PAD PREPARATION. 3. ONCE PAD FILL AND COMPACTION IS COMPLETE, BEGIN SETTLEMENT MONITORING. 4. WHILE SETTLEMENT MONITORING IS ONGOING, BEGIN GRADING THE SITE WHILE ENSURING DRAINAGE IS CONTINUOUSLY ROUTED TO THE INSTALLED BASINS. BEGIN FILL OPERATIONS ON NORTHERN SIDE OF OUTPARCEL AND GRADE SUCH THAT RUNOFF IS DIRECTED TOWARDS SKIMMER SEDIMENT BASIN 3. 5. BEGIN GRADING IN AREAS OF ROADWAY IMPROVEMENTS. 6. START CONSTRUCTION OF BUILDING PAD, STRUCTURES, AND ROADWAY. 7. TEMPORARILY STABILIZE, THROUGHOUT CONSTRUCTION IMMEDIATELY FOLLOWING THE COMPLETION OF THE MOST RECENT'' --LAND DISTURBING/GRADING ACTIVITY, ANY DISTURBED AREAS, INCLUDING MATERIAL STOCKPILES THAT ARE SCHEDULED OR LIKELY TO REMAIN INACTIVE' FOR 7 DAYS OR MORE. 8. DURING CONSTRUCTION, DO NOT DIRECT ANYSEDIMENT-LADEN WATER TO AREAS OF INFILTRATION TRENCHES. NO HEAVY EQUIPMENT OR TRUCKS SHOULD BE USED IN AREAS OF INFILTRATION TRENCHES. 9. IMMEDIATELY PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO FINAL GRADE. 10. INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, UTILITIES, CURBS AND GUTTERS. 11. INSTALL INLET PROTECTION AT ALL STORM SEWER STRUCTURES AS EACH INLET STRUCTURE IS INSTALLED. 12. STABILIZE AREAS TO BE PAVED WITH STONE BASE. 13. COMPLETE GRADING AND INSTALLATION OF PERMANENT STABILIZATION OVER ALL AREAS. 14. REMOVE DIVERSION CHANNELS, BRING TO FINAL GRADE AND IMMEDIATELY STABILIZE THE DISTURBED AREAS AFTER REMOVAL. 15. ONCE ALL. LAND DISTURBING HAS BEEN COMPLETED AND FINAL STABILIZATION HAS BEEN ACHIEVED THE SEDIMENT BASINS SHALL BE DREDGED TO ORIGINAL ELEVATIONS AND VOLUMES, REPAIRED AS NECESSARY FOR THE POND TO FUNCTION AS PERMANENTLY DESIGNED. REMOVE SNORKEL, UNSEAL THE BMP ORIFICES AT THE BASE OF THE STRUCTURE, AND INSTALL THE APPROPRIATE TRASH RACKS. THE RISER STRUCTURE AND ALL PIPES SHALL BE INSPECTED AND CLEANED IF NECESSARY TO ENSURE RESIDUAL SEDIMENT DOES NOT REMAIN FROM USE AS A SEDIMENT BASIN. SEDIMENT SHALL NOT BE WASHED INTO RECEIVING CHANNEL AT END OF OUTLET PIPE. CONTRACTOR SHALL ENSURE THE POND MEETS PERMANENT STABILIZATION REQUIREMENTS. ONCE SITE IS STABILIZED, INSTALLATION MAY BEGIN ON INFILTRATION TRENCHES (SEE INFILTRATION TRENCH DETAIL REGARDING CONSTRUCTION AND MAINTENANCE REQUIREMENTS). 16. PAVE SITE. 17. ADJUST INLET PROTECTION DEVICES FOR PAVED AREAS AS WORK PROGRESSES, PER BMP DETAILS. 18. OBTAIN CONCURRENCE FROM THE OWNER CONSTRUCTION MANAGER (CM) THAT THE SITE HAS BEEN FULLY STABILIZED AND ALL CONSTRUCTION HAS BEEN COMPLETED, THEN: A. REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS), B. STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF TEMPORARY BMPS, AND C. ASK THE CM TO CONTACT THE CEC TO COMPLETE THE CEC PRE -NOT SITE INSPECTION AND REPORT (ONLY CM MAY DO THIS). 19. CONTINUE DAILY INSPECTIONS AND REPORTS UNTIL THE CM FINAL DAILY INSPECTION REPORT, MARKED'READY TO TERMINATE PERMIT', IS SIGNED BY THE CONSTRUCTION MANAGER AND SUBMITTED VIA THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER. NOTE: THE GENERAL CONTRACTOR MAY COMPLETE CONSTRUCTION -RELATED ACTIVITIES CONCURRENTLY, ONLY IF ALL PRECEDING BMPS AND STABILIZATION ACTIVITIES HAVE BEEN COMPLETELY INSTALLED. BMP-RELATED STEPS IN THE ABOVE SEQUENCE ARE BOLDED FOR CLARITY. THE CEC MUST APPROVE, IN WRITING, ANY CHANGES IN THE ABOVE SWPPP IMPLEMENTATION SEQUENCE, BEFORE THEIR IMPLEMENTATION BEGINS. THE ESTIMATED DATES OF IMPLEMENTATION OF POLLUTION CONTROL MEASURES SHALL BE DOCUMENTED BY THE CONTRACTOR ON THE SOIL EROSION/SEDIMENATION CONTROL OPERATION TIME SCHEDULE ON SHEET SW-5. -ANC7--A AND LIMITS `%F W01R)l _"MENTA"TION SEQU-T V), SWPIDID IMPLY 1- 1], rd LIMITS OF DISTURBANCE LEGEND SYMBOL/LINE DESCRIPTION _ PERMITTED LIMITS OF DISTURBANCE LIMITS OF WORK WORK TO BE COMPLETED PRIOR TO ,1ST HALT MINIMIZATION OF DISTURBED AREAS: 1. CONTRACTOR SHALL MANAGE CONSTRUCTION ACTIVITIES TO REDUCE EROSION AND RETAIN SEDIMENT AND OTHER POLLUTANTS IN THE SOIL AT THE CONSTRUCTION SITE. 2. CONTRACTOR SHALL MINIMIZE THE TIME BARE SOIL IS EXPOSED. 3. CONTRACTOR SHALL MINIMIZE SITE DISTURBANCE BY MINIMIZING THE EXTENT OF GRADING AND CLEARING TO EFFECTIVELY REDUCE SEDIMENT YIELD. NOTE TO GC: OWNER HAS AUTHORITY AT ANY TIME TO LIMIT SURFACE AREA OF ERODIBLE EARTH MATERIAL EXPOSED BY CLEARING AND GRUBBING, EXCAVATION, BORROW AND EMBANKMENT OPERATIONS AND TO DIRECT THE GC TO PROVIDE IMMEDIATE PERMANENT OR TEMPORARY POLLUTION CONTROL MEASURES. DEVELOPER/OWNER: WAL-MART REAL ESTATE BUSINESS TRUST MAIL STOP 5570 2001 SE 10TH STREET BENTONVILLE, AR 72716-5570 479-204-3314 SITE OPERATOR/GENERAL CONTRACTOR: SUPERINTENDENT: IMT PORTANT. GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. r�REVISIONS BY NCDENR REVISIONS 7 5/18/16 BAB 8 NCDENR REVS/OTB REV BAB 5/31 /16 9 NCDOT/NCDENR REVS BAB 6/6/16 10 QA/QC, OTB REVISIONS ATZ 6/20/16 11 NCDEQ REVISIONS BAB 8/3/16 BID ADDENDUM 1 12 9/21/16 BAB 13 NCDEQ REVISIONS BAB 10/3/16 14 NCDEQ REVISIONS BAB 10/19/16 APPROVED CONSTRUCTION THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 r � 1927 S. TRYON1 CHARLOTTE,: 1 • - •:i 411 •:1 41 B• • a • ►. J DRAWN BAB CHECKED MAT DATE 7/11/14 SCALE AS NOTED JOB No. NCC138078 SHEET C:\USERS\BBUCKLANDIAPPDATA\LOCAL\TEMPACPUBLISH_4152\NCC138078OPX.DWG PRINTED BY: BBUCKLAND 10.19.16 @ 9:02 AM LAST SAVED BY: BBUCKLAND Supported" Un6upported" Type of Test Method Units Silt Fence Siit Fence Value Grab Strength ASTM D 4632 N (Ibs) Machine Direction 400 550 MARV 0) 0) X-Machine Direction 400 450 MARV (90) (90) Permittivitye ASTM D 4491 sec-1 0.05 0.05 MARV Apparent Opening Sizee ASTM D 4751 mm (US Sieve #) 0.60 (30) 0.60 (30) Max. ARV° % 70% after 70% after Typical Ultraviolet Stabilit y T ASTM D 4355 Retained 500 h of 500 h of Strength exposure exposure III .- • . 1 1 1- '• • -• • •' 1 1 -• :+ ' ' ' • • • • uoil III1gIr.r . r, u�:- lIllip" I�riIi'rrlr.,, ,II Ir rrrr 1, •n.�rrr rrl l:Q,rr% Mee l . 1 • 1 \I�,: rii!iiiii�'�ii l�riipj"� 'ii-,i�;l�i1�-r,a uaiii'riii�l!i rr�i ,�li��iriii,11 I - dui i��i',���' �iNO 1',iGii ,Ill ' • . • • ••' r4 ■irr�rrO,rr4rMi r., ■ . urlu;�� r irrrre G •• cq. Ireii.-Nolgr ir■i:;;' =_!!� rrre uii;ii_ _--- • - 1 - • 1 I. �,'riii'i;. ...■ ilrl ■rr ...W rr,r .,i- --!�Inilii r rrOii�iia ���Irc7',,.i,,..,j-.ej---.ri •-_ ...r. j.r : •- 1'N-Mill :Till 'I.rrrrr-__ _ - ,, rrr pn -_ • • - • 1 • • 'iiia MI!!rrirpti!rr�iI ,Ill • • •' . 1 g6Ciuii:�I�ii rlriririi,; :'�u�I��.i�q','h..=='I;"-z-. prr 1(it�s..•,�lrr1 rrr .urh. IIIr urlev rr0 rr■,� --%r. IF r., i, 'r.. '�•G°-=. R ,l!!;�riiii�=gip:; ii=' •' •- - an �rir -Or ..�I r r■..:-.- �� Ill f •- • • • • -18rr �.iiil _�ilnr ,qt rr�....,..-_iir : r■r i�Mii• h'1;rr:r%I 11 'ip--;•�,.1;!1rr prprl1 �-141,111 ::���rlrrI rrrr ri,,r. r41 u°1"I'l `' 1::�!i ile,II4IlCiiii`-�e■ _9rr �.�;-�-. _�..r ,€.r, il1ra - >�r n■�r� ,r.p.ill - . .�C��•;liNiriii' •Ilir, ■� _.rr No, 1: !jh t� , ur f i ® a,Ij piiiii'"lia p�llriiiiiiri�ii':::;'110 unr,nri....�JIrruOrrvi;.■�,rCp.:;;.r�" "1'r''�.€' :;riii�r �iiiir i�l' ® Xllr' • •- 1 1 �'' • 1 Nee ",u, rf1r :.1 rrnrli•••.:r;r., ;1, / r prt fir..; .ur / / rrrr■ r., , �', r �•rr,�•...:rnuliI I.: ,. `. • rrr rr; r , � r... ., !rrr irr►r c t:.r p, rpm rrrr r:,jr,. ®r irp rr.r •� . • Irr r ar . �■ ru . 11 1 - • �rrnnlr11 Ill prn rI ' • ii I ' I rrr urn '' �I fr' A j �h 'i 11 i '// I �� �� ��� u rrl .:r r t rr r r► r r r r r .r . r � �r rr �. r rrl 1►1rr ■rrr. rr. r.r / p r � rr rr u , rr r rrrr l all O• 1 ■ I I �11111 ' 11111111111111110� �% 1I111 NIl �f ICI I�III �Illlu.�l�.- • •. 1 • 1. • •' 1 1 • 1 "� rtl� -I • - • • ill •' • •' 1 1 • • IF 1 1 ••1 1 I, ;, I0 % I0 0. 1 "Ill �1 0, i 1 0, • 0. • 1 10. 0. • ; 1 • •- 1 1 1�.� .• 0. 1 • •- 9 III �I 1 1 11`• `` ' • 1 �� f , NOTES: 1. ALL SITE ACCESS MUST BE CONFINED TO THE CONSTRUCTION EXIT(S). BARRICADE TO PREVENT 1, IMPORTANT: GC SHALL NOT APPLY FLOCCULANTS WITHOUT PREVIOUS REVIEW AND WRITTEN CONFIRMAAON BY CEC. USE OF ANY LOCATIONS OTHER THAN THE CONSTRUCTION EXIT(S) WHERE VEHIC" =S OR FLOCCULANTS MUST BE USED ONLY IN LOCATIONS SHOWN ON THE SWPPP MAPS, AT RATES AND METHODS SPECIFIED EQUIPMENT MAY ACCESS THE SITE. AND AS APPROVED BY CEC. CEC SHALL CONFIRM WHETHER TO FOLLOW MANUFACTURER DIRECTION, OR MODIFY 2. CONTRACTOR TO LOCATE TEMPORARY CONSTRUCTION FENCING, JERSEY BARRIERS, OR BOTH MANUFACTURER'S DIRECTION. ALONG THE SIDES OF THE CONSTRUCTION EXIT TO PREVENT CONSTRUCTION TRAFFIC FROM SHORT CIRCUITING/BYPASSING THE EXIT. 2. FLOCCULANTS SHALL BE USED AS FAR UPSTREAM OF BASINS, TRAPS, TANKS, OR OTHER WATER CONTAINMENT AREAS 3. PROVIDE SEDIMENT TRAP ON DOWN GRADIENT SIDE (OR BOTH SIDES) AS REQUIRED. SEDIMENT AS POSSIBLE. THE EFFECTIVENESS OF FLOCCULANTS DEPENDS ON THE TRAVEL TIME AND AGITATION OF THE WATER, TRAP SHALL BE LOCATED OUTSIDE OF THE RIGHT-OF-WAY AND AT A MINIMUM SETBACK FOR PROPER MIXING. DISTANCE AS REQUIRED PER LOCAL JURISDICTION. 4. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL CONSTRUCTION EXIT(S) IS NOT 3. ALL SEDIMENTATION/SETTLING MUST OCCUR WITHIN THE LOD. THAT IS, VELOCITY OF FLOW IN WATER CONTAINMENT SUFFICIENT TO PREVENT TRACKING OF DIRT, DUST OR MUD, THEN TIRES MUST BE WASHED SHOULD BE NEAR ZERO, AND THE TIME OF RESIDENCE AS LONG AS POSSIBLE. BEFORE THE VEHICLES ENTER A PUBLIC ROAD. ALL WASH WATER MUST BE ROUTED TO A SKIMMEF SEDIMENT TRAP OR OTHER TREATMENT AREA AND SHALL NOT BE DIRECTLY DISCHARGED -1 ,Z OFF -SITE. 4. FLOC BLOCKS, FLOCCULANT-IMPREGNATED WATTLES, AND ANY OTHER CONTROL MEASURES WHICH SUPPLY 5. LOCATIONS WHERE VEHICLES ENTER AND EXIT THE SITE MUST BE INSPECTED FOR EVIDENCE OF FLOCCULANTS MUST BE REGULARLY INSPECTED AND MAINTAINED, AS ARE ALL OTHER CONTROL MEASURES. , Z SEDIMENT TRACKING BEYOND THE PERMITTED PROJECT AREA. ALL MATERIALS SPILLED DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS 5. STANDARD EROSION AND SEDIMENT CONTROLS ARE REQUIRED BOTH PRIOR TO AND AFTER CHEMICAL TREATMENT IN ARM . MUST BE REMOVED IMMEDIATELY. ACCORDANCE WITH THE SWPPP PLANS. - -. 6. ANY SEDIMENT DEPOSITED ON THE ROADWAY SHALL BE SWEPT AS NECESSARY (AND WITHIN THE SAME DAY AS DISCOVERY) AND DISPOSED OF IN AN APPROPRIATE MANNER. SEDIMENT SHALL CHEMICALLY -ENHANCED SETTLING e I eRETE OR KI BE WASHED INTO STORM SEWER SYSTEMS. PASSIVE TREATMENT SYSTEMS Vc��pe9ASPHALT PAVEMENT 7. EXIT(S) SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF I MUD BEYOND THE EXIT(S). THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE CONSTRUCTION .I, I , North Carolina DWQ Approved PAMS/ Flocculants List I � � � € I € € , EXIT(S) AS CONDITIONS DEMAND. �op,4u� f 8. CONTRACTOR SHALL BE PERMITTED TO TURN THE STONE WHEN THE SURFACE BECOMES SMOOTH Updated AND SURFACE VOIDS ARE FILLED TO MAINTAIN EFFECTIVENESS OF CONSTRUCTION EXIT UNTIL 2/22/2013 1' SUCH 11ME THAT VOIDS BELOW THE SURFACE BECOME FILLED AND THE CONSTRUCTION EXIT IS € NO LONGER EFFECTIVE. AT SUCH A TIME THE CONTRACTOR SHALL REMOVE THE INEFFECTIVE (Listed in alphabetical order) STONE AND REPLACE PER DETAIL. PADOT 2A 9. IF EXIT BMP IS S11LL INEFFECTIVE, GC MUST CONTACT THE ENGINEER AND SUBMIT AN RFl AS COMPACTED SUBGRADE NECESSARY. f • 14j• •-• I • I •,• I • I�, FOR SEPAR ON r-GEOTEXTILE • a . • Iil ::• • • •-i • • •-i PLAN VIEW ti 25' MINIMUM VA- RIES► 100' MIN. 20' 20'� VARIES 2 N. MIN. �' _ EDGE OF EXISTING PAVEMENT CONCRETE -1 ASPHALT PAVEMENT MIRAFI 14ON GEOTEXTILE FABRIC FOR DRAINAGE AND FILTRATION MIRAF1 14ON ADOT 2A GEOTEXTILE FABRIC COMPACTED SUBGRADE FOR SEPARATION 10' MIN. DEPTH\-V CRUSHED Y-Y CLEAN STONE STONE BASE SECTION A -A r. / /K/ Z I EMBEDDED SILT FENCE FABRIC MIN. z I � 1 6" INTO GROUND W/ 6" LAID ALONG I EMBEDDED SILT FENCE FABRIC MIN. I BOTTOM OF TRENCH. SOIL SLICING IN `t0V o I 6" INTO GROUND W/ 6" LAID ALONG I ACCORDANCE WITH ASTM D 6462 n I BOTTOM OF TRENCH. SOIL SLICING IN 8.2.2 IS ALSO ACCEPTABLE. I ACCORDANCE WITH ASTM D 6462 I 1 8.2.2 IS ALSO ACCEPTABLE. r � NOTE TO GC: THE GOAL OF A CONSTRUCTION EXIT AND ASSOCIATED A -A -SECTION A -A -SECTION WHEEL WASH AREAS IS TO ELIMINATE TRACK OUT. SIMPLY MANAGING - . TRACK OUT THROUGH DESIGNATED OR CONTINUAL STREET SWEEPING IS (FOR SLOPES LESS THAN 3: 1) (FOR SLOPES 3:1 AND GREATER) NOT AN ACCEPTABLE PRACTICE. WHILE STREET SWEEPING IS AN ACCEPTABLE PRACTICE FOR REMOVING DUST AND MINIMAL AMOUNTS OF TIE BACK CONSTRUCTION EXIT FINE SEDIMENT, OBSERVABLE TRACK OUT FROM THE PROJECT SHOULD SPECIFICATIONS FOR SILT FENCE INSTALLATION �E N.T.S. TRIGGER THE USE OF ADDITIONAL MEASURES (WHEEL WASH), CONSIDERATION OF ALTERNATE EXITS, OR DISCON11NUING VEHICLE STEEL POST SILT FENCE 1. MATERIALS AND INSTALLATION SHALL COMPLY WITH ASTM D 6462 LAST REVISED: WAL-MART TRAFFIC UNTIL CONDITIONS ON -SITE HAVE IMPROVED. TRACK OUT IS A SILT FENCE TYPE WIRE SECTION DRAINAGE AVERAGE LATEST EDITION. STANDARD SEDIMENT RELEASE. ALL SEDIMENT RELEASES MUST BE REPORTED TO WIRE FENCE ( THE SWCT VIA THE ONLINE CRITICAL INCIDENT REPORT. SECTION BACK OR LENGTH AREA SLOPE OF 2. INSTALL SILT FENCE AT A FAIRLY LEVEL GRADE ALONG THE JUNE 2012 DETAIL SLICED) (FT) (ACRES) AREA CONTOUR WITH THE ENDS CURVED UPHILL TO PROVIDE SUFFICIENT UPSTREAM STORAGE VOLUME FOR THE ANTICIPATED RUNOFF. WOODEN SLAT SF1 WIRE BACK 1020 0.27 1.5% 3. ATTACH THE GEOTEXTILE OR FABRIC TO THE WOVEN OR WELDED SILT FENCE FABRIC SF2 WIRE BACK 350 0.20 1.5% WIRE FENCE WITH THREE WIRE TIES OR OTHER FASTENERS .•.....�•.• -,• - USE SINGLE ROLL 6.5' WIDE MAT IN TYPICAL DIT .. SF3 WIRE BACK 210 0.25 1.5% (HORIZONTALLY SPACED EVERY 30"), ALL SPACED WITHIN THE TOP 30, INSIDE CORNER - PLAN VIEW 8 OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES .-.•. •.'•/ // Q \ SF4 WIRE BACK 790 0.25 33% THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1" 2. / ,/� VERTICALLY APART. AT EACH POST ATTACH THE GEOTEXTILE OR O'•'• •//,`�� r� 1 / \ SF5 WIRE BACK 270 0.25 2.0% FABRIC � THE WOVEN OR WELDED WIRE FENCE TO THE POST ,N� �ir' ��� SF6 WIRE BACK 580 0.55 2.0% AS PREVIOUSLY STATED. IN ADDITION, EACH TIE PLACED ON A - - POST SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN '•'•'•......' ' .• I� ' - - ............... SF7 WIRE BACK 650 0.25 .• • 1.0% t8- D TO PREVENTSAGGING. TIGHTENEJ A 240 7 SF8 WIRE BACK 0.12 ADJOIN EACH OTHER, SILT FENCE FABRIC DJO E C 0 33% 4. WHEN TWO SECT10 NS OF S L , „ � B THEYSHALL BE OVERLAPPED A MINIMUM OF 60 ACROSS TWO ::::•::::::::::::::::....:::::::.:.:::::::::::::::.: ..... .:•: ;� .... - :.:::::::::::::.:::. ::.:::.::::::::::::::..:.:::: ........:::.:::;•:::•::•::::•:>:;;:::•:: .... . POSTS AS SHOWN. .......... ........................... ....................... ... Q W ......................... ...........:..,.,.,..::••:::• .. .. AL POINTS ................... .................... CRITICAL 5. ALL SILT FENCE SHALL INCLUDE WIRE SUPPORT UNLESS THE LAPS A SEAMS A. OVER AND STATIC SLICING EQUIPMENT IS UTILIZED TO INSTALL THE FENCE ;; ......;.;:..;;.:::.-::::::' A B. PROJECTED WATER LINE » " •'' B C. CHANNEL BOTTOM SIDE PER DETAIL SILT FENCE INSTALLATION SLICING METHOD)-. ) c Material Property Requirements f:`.::••''''%:: SLOPE VERTICES TABLE 1 Temporary Silt Fence Mat p y q P Y » �. 6. WRAP APPROXIMATELY 6 OF FABRIC AROUND THE END POSTS "`"''' ................. ` :::.:. ..... ::::::::...................... AND SECURE WITH 3 TIES. ................................. ........ ...... ...�::..;:,. 7. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED ROLLER EXERTING AT LEAST 60 POUNDS PER SQ. INCH. COMPACT DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. CE FOR A WIDE TRENCH WITH APPROXIMATEL 12" 30 OF Company Product Maximum Recommended Concentration* Applied Polymer System APS 712 59.3 ppm APS 730 5.6 ppm APS 740 5.2 ppm APS 703d .. APS 703d#3 ` APS 706b •• L.M.G. Dust Magnet 163 powder 0.5 mg/L DBP-2100 28.125 m /L APS 705 27.7 ppm Aquamark, Inc AQ100 Land surface application only at 39.7 ppm Aquamark, Inc AQ109 Land surface application only at 0.180g/I Ashland Hercules Water Tech Ashland Charge Pac 55 10 mg/L Ashland Hercules Water Tech Ashland Zalta MC 9500 10 mg/L Cape Fear ConsultingPAX-CFC39A 5 ppm Cape Fear Consulting CFC-4330 4.5 ppm Carolina Hydrologics HYDROLOC PAM Land surface application only at 3.0 mg/I Green Techniques Soil Defender Land surface application only at 0.008% HaloSource, Inc. GelFloc 2.56 mg/L HaloSource, Inc. LBP-2101 500 mg/L Hanes Geo Components TerraGuard Granular PAM 3.25mg/L Innovative Turf Solutions EnviroPam 200 m /L Innovative Turf Solutions Erosion Guard Powder, Erosion Guard Logs/Erosion Guard Flats 200 mg/L Innovative Turf Solutions FLOC 650 mg/L Leaner Meaner Greener, Inc L.M.G. Dust Magnet 281 Solution 0.05% Nalco Nalco 8187 100 ppm NTU GeoScrub 10, 13, 20, 23. 34 10 mg/L NTU GeoScrub Bubbles 1 m /L Paschal Associates Sales PFR P251 25 ppm Southeastern Laboratories SEL FLOC 6026 7.5 ppm Storm Klear 3% Liqui -Floc 9.4 m /L Terra Novo EarthGuard .000625 mL/L LAST REVISED: WAL-MART REVISED JUNE 2012 DETAIL VC VENT PIPE (FOR DEWATERING) CONTACT. J.WfAIRCLOTH & SON TIME TO DEWATER: .- TO _ DAYS (919) 732-1244 (PI )I FAX) /� INLET END. ORIFICE INSIDE SCREEN PATENT # 5,820,751 / AND ACCESSIBLE THROUGH DOOR x WATER ENTRY UNIT NOTE SIMMER MAY VARY SLIGHTLY FROM ILLUSTRATION PVC Brow (TTP.) PVC END CAPS / A FLOAT - 'C' ENCLOSURE OUTLET END; ATTACHES TO A SCHEDULE 40 PVC PIPE, WHICH SHALL BE CONNECTED TO TEMPORARY ORIFICE PLATE IN OUTLET STRUCTURE BARRB. PPE LONGER THAN SIM NOT INCLUDED YM swim SUPPLIED BY USER. FLEXIBLE HOSE PERSPECTIVE VIEW VC VENT PIPE (FOR DEWATERING) SCHEDULE 40 PVC PIPE MATETt SURFACE ELEVATION THE UPSTREAM SIDE FIRST. COMPACT EACH SIDE TWI 2. BEGIN Al THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6 1,15cm) DEEP X 6 l,15cm1 Y ( cm) PLATE TOTAL OF FOUR TRIPS. BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12' (30cm) 8. ADD POST CAPS AS NEEDED BASED ON SITE CONDITIONS AND APART IN THE BOTTOM OF THE TRENCH. BACKFiLL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" FUDW trog FLYWU PVC TEE APPLICABLE AGENCY REQUIREMENTS. (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED 2'x 1 9. INSTALL ROCK CHECK DAMS EVERY 100 FT UNLESS OTHERWISE APPROXIMATELY 12 (30cm) APART ACROSS THE WIDTH OF THE BLANKET. v GLADE Rro (2 TIP.) . NOTED TO PREVENT SCOURING. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL MAINTENANCE NOTES SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE BOTMM SURFACE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 1. SILT FENCES SHALL BE INSPECTED ALONG ITS ENTIRETY AND MUST 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6" (10cm-15cm) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" FRONT VIEW BE GLEANED WHEN SEDIMENT HAS ACCUMULATED TO ONE-THIRD THE (10cm) APART AND 4" (10cm) ON CENTER TO SECURE BLANKETS. HEIGHT OF THE SILT FENCE. -MAINTENANCE CLEANOUT MUST BE SKIMMERORIFICE D REGULARLY TO PREVENT ACCUMULATED SEDIMENTS FROM 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A BASIN SIZE DIAMETER CONDUCTE 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NO. (IN) IN REACHING 'ON -THIRD THE HEIGHT OF THE SILT FENCE. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5cm-12.5cm) AND STAPLED. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE ( I 1 6.0 5.1 HALL BE 2. ALL MATERIAL EXCAVATED FROM BEHIND SILT FENCE S OF THE OVERLAPPING BLANKET EVEN WITH THE COLORED SEAM STITCH ON THE BLANKET BEING OVERLAPPED. 2 2.5 21 SKIMMER SEDIMENT BASIN #1-3 (SEE SHEET SW-3) EMBANKMENT SHOULD BE MACHINE COMPACTED AND STABILIZATION MATTING PLACED ON SLOPES. FLEXIBLE HOSE SEE OUTLET ,:,�;;,'.', .l • STRUCTURE "� DETAIL FOR WET •ti ::.."•• yr• •'t ": ,:�,' POND • , . r,:�:t'r -k*?7x, =;y::e.:, DISCHARGE PIPE +, -_-_ SKIMMER RISER CONNECTION ELEVATION - INSTALL SKIMMER INTO PERMANENT RISER STRUCTURE SKIMMER RISER BASIN CONNECTION NO. ELEVATION 1 9 2 27.75 3 NOTES: 1. SEE AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIVER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. 3. INSTALL SKIMMER AND COUPLING DIRECTLY INTO PERMENANT STORMWATER POND RISER THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND COUPLING. 4. SKIMMER SEDIMENT BASINS SHALL BE CONSTRUCTED PER GRADING PLANS C-7,8. 5. PRIOR TO CONVERTING SKIMMER SEDIMENT BASINS TO WET PONDS BASINS SHALL BE CLEANED OUT AND SEDIMENT REMOVED. MAINTENANCE NOTES: 1. SEDIMENT TRAPS MUST BE INSPECTED AND MUST BE CLEANED WHEN THE ORIGINAL CAPACITY HAS BEEN REDUCED BY 50 PERCENT OR LESS, AS REQUIRED BY THE GOVERNING AGENCY. 2. ALL MATERIAL EXCAVATED FROM BEHIND SEDIMENT BARRIERS OR FROM TRAPS SHALL BE INCORPORATED INTO ON -SITE SOILS OR SPREAD OUT ON AN UPLAND PORTION OF THE SITE AND STABILIZED. 3. VERIFY THAT NO EROSION IS OCCURRING AT DISCHARGE POINTS TO AND FROM IMPOUNDMENTS AND VERIFY THAT TRAP SIDE SLOPES ARE STABILIZED AND SHOW NO SIGNS OF EROSION. SOURCE BOX BOHLER LAST REVISED: DETAIL A of 14 gage steel wire with a mesh spacing of 150 mm 6 in. or refabrie<ated polymer mesh of equivalent S11t fence support shall consist g g P 9 ( ) P P �"' q STOCKPILED ON AN UPLAND PORTION OF THE SITE IF SUIT ABLE FOR K T IS RECOMMENDED AT 30 TO 40 FOOT 9m-12m INTERVALS. USE A 00 UBLE ROW OF 7 HIGH FLOW CHANNEL APPLICATIONS A STAPLE CHECK SLOT IN C ( ) a.o 3 3.0 strength. REUSE. » STAPLES STAGGERED 4 (10cm) APART AND 4" (10cm) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. NOTES: BThese default values are based on empirical evidence with a variety of sediments. For environmentally sen hive areas, a review of previous , `3. SPECIAL ATTENTION SHOtJLD BE PAID TO ENSURE THAT NO 8• THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A 6" (15cm) DEEP X experience and/or site or P / accordance with Test Method D 5141 should d b the agency to - regionally specific eotextile tests m c be performed r p Y 9 Y 9 Y P 9 BYPASS UNDERMINING OF HAS OCCURRED AND THAT NO SS UNDE SILT FENCE 0 » 6 (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE THE NCH AFTER STAPLING t. A SHOULD BE 45 OR LESS WH WA - EN THE TER ) SURFACE IS AT THE MAXIMUM POOL ELEVATION THE IZA confirm suitability of these requirements. CAs measured in accordance with Test Method D 4632. IS OCCURRING AT JOINING SECTIONS. ELEVATION OF THE 2 CFS/ACRE DISCHARGE. TABLE 1 TAKEN FROM ASTM D 6461-99 (2007) 4. IF EXCESS SEDIMENT IS ACCUMULATING IN ANY SECTION OF SILT 2.) WIDE ROPE AND STAKES SHALL BE INSTALLED FROM SKIMMER HEAD TO TOP OF BASIN BERM. GUIDE FENCE, THE CONTRACTOR SHOULD IMPLEMENT ADDITIONAL UPSTREAM ROPE SHALL BE OF SUFFICIENT LENGTH TO ALLOW SKIMMER HEAD FREE MOVEMENT FROM CLEAN OUT STABILIZATION MEASURES OR ADDITIONAL BMPS (PENDING CEC ELEVATION, TO TOP OF THE 2 CFS/AC DISCHARGE ELEVATION. APPROVAL) TO PREVENT EXCESSIVE BUILDUP ON SILT FENCE. SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF 5 L ECF SOURCE BOX SIGN CONTROL FABRIC IN DITCHES O ERO IS FAIRCLOTH CL SKIMMER DETAIL IMENTATION/SILT FENCE WITH WIRE BACKING DAMAGED. BOHLER LAST REVISED N.T.S. DETAIL SK N.T.S. &�ip MAY 2014 SOURCE BOX N.T.S. BOHLER LAST REVISED SOURCE BOX DETAIL MAY 2014 LAST REVISED: WAL-MART STANDARD WET DETENTION BASIN KERB , HERBACEOUS PLANT SCHEDULE JUNE 2012 DETAIL . VEGETATED SHELF PLANTINGS: f 21,520 SQUARE FEET OVERALL . ' ` TY BOTANICAL NAME COMMON NAME ROOT SPACING PLANTING RATIO I - Wl - -� "I ' 1 076 CARER TENERA , PLAN VIEW <0% SLOPE> a GEOTEXTILE SECTION Y-Y D -.t.- <0% SLOPE> L GEOTEXTILE SECTION Z-Z OUTLET NO. PIPE DIA Pd (IN) RIP RAP APRON NCDOT CLASS THICK. d (IN) LENGTH L (FT) INITIAL WIDTH Wi (FT) TERMINAL WIDTH W (FT) OUT A 30 I 15" 20' 7.5' 31. OUT B 30 1 15" 20' 7.5' 31' OUT C 18 B 12" 9' 4.6 15.0' OUT D 24 1 15" 16' 6.0' 24.5' OUT E 24• 1 15" 16' 6.0' 24.5' OUT F 15 B 12" 7.5' 4.0' 13.0' OUT G 18 B 12" 9' 4.5' 15.0, RR RIPRAP APRONS AT PIPE OUTLETS WITH END WALL N.T.S. SOURCE BOX LAST REVISED: BOHLER DETAIL MARCH 2O13 _ GENERAL NOTE: S THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJI ;K SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATII SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECOR CITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITI EPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AI FULL CONFORMANCE WITH LOCAL RFGI II ATIONS AND CODES. r,,,,.,,,.,.,.,,,,•,.,.,.,""" , T WI: S Wes.. IRMOObt ::� rzTET Est�t ti q l,g winter and t , YYnnao '�Y 0 1�E�.: €' ;, _ .:._ Y !1. N 'f,€z'€::r'�,i r-uw t�',�% .✓.a,hoxi..d%Y �.af ..xsE`^ �. s1LT'.# � .:� I Sao# *S q y £ ' os^s a3I F'ISit = 1 a; : r t F. € i ,�.=r�w r€com.1`119.114 -a`-- V. i �€ � 25f�� _ #: a6" rice# Cal ;€rYi ,e' a 0 t<3,,�- T " ,,5404 1.1 Bch: i A �Zyi T °s H? e ',}r x ty #��r f :5',`-a ph,ait i�t i nr A zMe ,,ra+: ��ept4sx�x�:,-,Iilszi "i &-€ %-r•x�2t l �0.43, . 4.a s>i,. r, .-v -a . , R � F"g��7,t �f�, f � v ���d seed, �gwMue odmu f rrr' 1T f���� Ith� ?fit s*pi di= -Via: ti,�, „, ,, m,,,,,,,,, ,,,,,,,,,, ,,, ; i T :€1 T�f+o :' 1..Bt'€Tt T-.MIkt , _ __ f j ;€�'� � 9V. f rltlt 0 : �'�II--- ar,� u=.l gr ss in aY I s,1€1Ss Itlr;­11-11 0, � ,Wet j. 1 So amendwnts " I T FTI -if y 2, jti ° I).OLIId u ctr I #1x1;W01hr��t3 Arc: - s ,,z. f king .Tt afar,rlettir , I B tT'uct, aP ' ,ul�°%.3" ,��. ',,.� Alis'(� fi.u�.4ac se ' .'€`�v sma�7 T:rin tT e as a fr, � �t�H�9 Asa:: I` I:I �tfft :I � :�v z°'y , ; z a€ rr rcn i I tt � iy f l Gune, da, e. n W T �. $Odk4 11 ... aY, . • -� , z. 41�', r Ors :: �e�'I.e�fk`�:,'8sk I:u;:3`3^, � „qt'7,;� fir, I ag€.'3: s a:}ads:` r z s TsTti€'.<s ,.sz3, 1 I s f f T ,..�z, „. s r n. ,....Fred.. ., , r, , , .,aw:: W, 1 1€ €..-"- ;a# •, '),I $ € �& T tt� ass i30kx„ have- 'zt s; : dim s : {:: �< sF3 , a o" t e a� 1�r, 04=,;�f ::'s'G r 3 fTK. 4L � g, :ate �`: 'i3.4z t' € fi§ € s T -�", 11 SE:E 0 ` �;; LJi i x' fik s. ,.'"„ 1; 2v,�" �sr„� l,�st'Z %s 4',K °"fs,'�1 zr¢ 'a e' •'r<>" r ��"' , `' ra.b .;: f.4s sack M� 1. }�:.=-ding r, yi f't�% 6$T a V� : 1. r s Eof ,' lzps ,z€tt � F VI WIV- � �Yzj1T§# R1, '��;iZ & I,^ . 41ki" �-fi-" , ci='4:,1z� �,rrl",%'2ic : UnAl a:k�h:i'. 'lfye£'r;CE <sse..,c.,),_ air ': r',�:"-z t ifli Sj €3b >%� r€ ¢ f x � $ €s4 Tr 3£ € s343 r `t €):x�ax s � s it* I .M�i4 I !+ it t y arr% {boa . n : 3 1.00tut 3r $ �z 14z,'� t ",€ ? � t&d i. �' s r_ s taa, , it s V, 9,��'t : t- 11 . a. � �asN l os 1.s l r 1 a 4 t .. y$F, 4.Q`.vY, '& :�I�i •czar '�; "ri d $EWn�S>'?+ :o �irr°'a�'.�'�'A ifi`, gib, aufx<-TIE. % en.", {Sd: ..... . . QUILL SEDGE 2 PLUG 2 O.C. 20A 646 EUPATORIADELPHUS FISTULOSUS JOE PYE WEED 2" PLUG 2' O.C. 12% . 538 LOBELIA CARDINALIS CARDINAL FLOWER 2" PLUG 2' O.C. 10% SOURCE BOX 646 LOBELIA ELONGATA LONGLEAF LOBELIA 2" PLUG 2' O.C. 12% LAST REVISED: NCDENR TEMPORARY SEEDING SPECIFICATIONS 861 SACCHARUM BALDINII NARROW PLUMEGRASS 2" PLUG 2' O.C. 16% STANDARD TS N.T.S. 538 IRIS VIRGINICA BLUE FLAG IRIS 2" PLUG 2' O.C. 10% - 1076 JUNCOS EFFUSUS VAR Sol UTUS MAY 2013 DETAIL _ SOFT RUSH 2 PLUG 2 O.C. 20% . 5,380 NOTES: 1) PLANTING RATIO IS BASED ON THE AREA, NOT THE TOTAL QUANTITY OF THE PLANTS. THE QUANTITY OF EACH PLANT IS DETERMINED BY THE AREA RATIO AND THE SPACING IN WHICH THEY ARE TO BE PLANTED. KITING E' ASIN T T B CONDUCTED UNTIL T E A TUAL WATER ERNST SEED CO. BASIN FLOOR SEED MIX 2) PLIA 0 B IS NO 0 E C H C LEVEL OF THE BASIN AND ALL SURROUNDING AREAS SPECIFICATIONS ER;I�TM -127 ST B IZATION DETAIL 5 HAVE STABILIZED. PRIOR TO PLANTING, CONTRACTOR TO VERIFY THE WATER DEPTH TO THE NEAREST INCH. PLANTING AREA MAY NEED TO BE REVISED AND PLANT QUANTITIES ADJUSTED BASED ON FIELD CONDITIONS. NOTES: NOTES: NOTES ELYMUS VIRGINICUS VIRGINIA WILD RYE 1. CONSIDERATION MUST BE GIVEN TO ANTICIPATED CLIMATE AND SEASONAL CONDITIONS WHEN 1. THE GC IS REQUIRED TO, AT A MINIMUM, INITIATE SOIL STABILIZATION MEASURES IMMEDIATELY 1. PERMANENT STABILIZATION SHALL BE ACCOMPLISHED IN ALL DISTURBED AREAS BY COVERING THE SOIL PERMANENT GRASS CHART CARER WLPINOIDEA FOX SEDGE PLANTING SEED. WHENEVER ANY CLEARING, GRADING, EXCAVATING OR OTHER EARTH DISTURBING ACTIVITIES HAVE WITH PAVEMENT, BUILDING STRUCTURES, VEGETATION, OR OTHER FORMS OF SOIL STABILIZATION. POA PALUSTRIS FOWL BLUEGRASS PERMANENTLY CEASED ON ANY PORTION OF THE SITE, OR TEMPORARILY CEASED ON ANY PORTION 2. SEED SHALL BE FREE OF WEEDY SPECIES AND APPROPRIATE FOR SITE SOILS AND REGIONAL CLIMATE. OF THE SITE AND WILL NOT LIKELY RESUME FOR A PERIOD EXCEEDING 14 CALENDAR DAYS. 2. THE GC IS REQUIRED TO INITIATE PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY UPON SEED AND MULCH PER THE CONSTRUCTION DRAWINGS AND THE 02900 PLANTING SPECIFICATION REACHING FINAL GRADE. FOR THOSE AREAS NOT AT FINAL GRADE THAT WILL NOT BE DISTURBED FOR IMMEDIATELY AFTER TOPSOIL IS APPLIED AND FINAL GRADE IS REACHED. 2. THE GC HAS 7 DAYS FROM INITIATION OF STABILIZATION TO COMPLETE SOIL PREPARATION, SEEDING, GREATER THAN 14 DAYS, THE CONTRACTOR SHOULD INITIATE TEMPORARY STABILIZATION PER THE MULCHING, AND ANY OTHER REQUIRED ACTIVITIES RELATED TO THE PLANTING AND ESTABLISHMENT OF TEMPORARY SEEDING OR STABILIZATION DETAIL. 3. THE SITE HAS ACHIEVED FINAL STABILIZATION ONCE ALL AREAS ARE COVERED WITH BUILDING VEGETATION. THE GC ALSO HAS 7 DAYS FROM INITIATION OF STABILIZATION TO COMPLETELY INSTALL FOUNDATION OR PAVEMENT, OTHER LANDSCAPING COVER (STONE, MULCH, ETC.), OR HAVE A STAND NON -VEGETATED MEASURES, IF UTILIZED. 3. THE GC HAS 7 DAYS FROM INITIATION OF STABILIZATION TO COMPLETE SOIL PREPARATION, SEEDING, OF GRASS WITH A MINIMUM OF 70 PERCENT DENSITY OVER THE ENTIRE VEGETATED AREA, OR I MULCHING, AND ANY OTHER REQUIRED ACTIVITIES RELATED TO THE PLANTING AND ESTABLISHMENT OF GREATER IN ACCORDANCE WITH THE GENERAL PERMIT REQUIREMENTS. 3. ALL DISTURBED AREAS MUST BE STABILIZED TEMPORARILY WITH THE USE OF FAST -GERMINATING VEGETATION. THE GC ALSO HAS 7 DAYS FROM INITIATION OF STABILIZATION TO COMPLETELY INSTALL ANNUAL GRASS/GRAIN VARIETIES APPROPRIATE FOR SITE SOIL AND CLIMATE CONDITIONS. MULCH IS NON -VEGETATED MEASURES, IF UTILIZED. 4. VEGETATED AREAS MUST BE WATERED, FERTILIZED, AND RESEEDED AS NEEDED TO ACHIEVE THIS REQUIRED FOR ALL SEEDING APPLICATIONS, AND ALL MULCH APPLICATIONS MUST INCLUDE A SUITABLE FORM OF MULCH ANCHORING TO MINIMIZE MOVEMENT OF MULCH BY WIND OR WATER 4. SOILS MUST BE PREPARED BEFORE INSTALLATION OF SOD OR SEED. SEE 02900 SPECIFICATION FOR SYMBOL SQ. FT. VARIETY SEEDING RATE SEED :.;'• ±88,000 SF TURF -TYPE SEEDED BERMURiGRASS WiA' SNOR SIMILAR 90 - 135 LBS / ACRE 2-3 LBS. / 1000 SQ. FT. SOD t7,000 SF BERMUDA TIFWAY 419 N/A MEADOW SEED + + + + + ±25,200 SF I ERNST BASIN MIX ERN11i I (SEE SPECIFICATION) AGROSTIS SCABRA TICKLEGRASS (ROUGH BENTGRASS) SPARGMIUM EURYCARPUM GIANT BUR -REED VERBENA HASTATA BLUE VERVAIN JUNCOS EFFUSUS SOFT RUSH SCIRPUS ATROVIRENS GREEN BULRUSH SCIRPUS CYPERINUS WOOL GRASS SCIRPUS POLYPHYLWS MANY -LEAVED BULRUSH MIMULUS RINGENS SQUARE STEM MONKEYFLOWER REQUIREMENT. INSTRUCTION ON PROPER SOIL PREPARATION. CARET( SCOPARIA BLUNT BROOMSEDGE 5. THE VEGETATIVE DENSITY MUST BE MAINTAINED THROUGH PROJECT COMPLETION TO BE CONSIDERED STABILIZED. AREAS PROTECTED BY EROSION CONTROL BLANKETS ARE NOT PERMANENTLY STABILIZED 4. ALTERNATIVE STABILIZATION MEASURES TO SEEDING, SUCH AS ANCHORED MULCH APPLICATION (WITHOUT SEEDING), MAY BE UTILIZED DURING PERIODS WHEN VEGETATIVE GROWTH IS UNLIKELY (E.G. 5 AT THE COMPLETION OF GROUND -DISTURBING ACTIVITIES, THE ENTIRE SITE MUST HAVE PERMANENT HELENIUM AUTUMNAI-E COMMON SNEEZEWEED ACTIVITIES,THE E ENTIRE IRIS VERSICOLOR UNTIL THE APPLICABLE GENERAL PERMIT REQUIREMENT FOR FINAL VEGETATIVE DENSITY IS ACHIEVED. WINTER MONTHS). VEGETATIVE COVER MEETING VEGETATIVE DENSITY R THE GENERAL PERMIT, OR MULCH BLUE FLAG PER LANDSCAPE PLAN, IN ALL AREAS NOT COVERED BY HARDSCAPE (STONE, PAVEMENT, BUILDINGS, JUNCOS TENUIS PATH RUSH 6. RIP -RAP, MULCH, GRAVEL, DECOMPOSED GRANITE OR OTHER EQUIVALENT PERMANENT STABILIZATION EMPLOYED IN LIEU OF VEGETATION BASED ON SITE -SPECIFIC CONDITIONS, DESIGN 5. IT IS NOT ACCEPTABLE TO ALLOW BARE SOIL TO REMAIN EXPOSED AT ANY TIME DURING THE YEAR, ETC.). MEASURES MAY BE AdQ GOVERNING AUTHORITY APPROVAL REGARDLESS OF WEATHER/TEMPERATURE/SITE CONDITIONS. 6. SEEDED AREAS SHALL BE PROTECTED WITH STRAW MULCH, HYDRAULIC MULCH OR A ROLLED EROSION SEEDING RATE: 15 LBS PER ACRE OF THE ERNST MIX WITH AN ADDITIONAL -30 LBS PER ACRE OF GRAIN RYE (AS A NURSE CROP). THE 6. ALTERNATIVE STABILIZATION MEASURES INCLUDE, BUT ARE NOT LIMITED TO: ANCHORED STRAW/HAY CONTROL PRODUCT. STRAW MULCH MUST BE TACKIFIED OR CRIMPED BY DISC OR OTHER MACHINERY, TEMPORARY SEEDING SPECIFICATION AS NOTED ON THE SOIL EROSION AND SEDIMENT CONTROL PLAN SHALL APPLY TO THIS AREA. 7. ALL SEEDED AREAS SHALL BE INSPECTED REGULARLY TO CONFIRM THAT A HEALTHY STAND OF MULCH, WOOD CELLULOSE FIBER MULCH, SPRAY -ON SOIL GLUES/BINDERS, AND ROLLED EROSION AND ROLLED EROSION CONTROL PRODUCTS MUST BE INSTALLED PER MANUFACTURER RECOMMENDATIONS. ONLY ROLLED EROSION CONTROL PRODUCTS ARE PERMITTED TO BE USED IN FLOW GRASS IS MAINTAINED. CONTROL PRODUCTS. CONVEYANCES. 1.) THE FORMULATION NOTED ABOVE IS REPRESENTATIVE OF THE ERNST SEED SPECIFICATION. THE MOST CURRENT FORMULATION AS SPECIFIED BY 7. ALL ROLLED EROSION CONTROL PRODUCTS SHALL HAVE CURRENT QDOR(TM) STATUS ISSUED BY THE 7. ALL AREAS TO BE SEEDED MUST MEET TOPSOIL DEPTH, PH AND ORGANIC CONTENT REQUIREMENTS AS THE ERNST COMPANY AT THE TIME OF PLANTING SHALL BE USED. EROSION CONTROL TECHNOLOGY COUNCIL (ECTC) PLUS- ANY STATE OR AGENCY -SPECIFIC SPECIFIED IN THE 02900 SPECIFICATION - PLANTING OR XERISCAPE SPECIFICATION. REQUIREMENTS. EVIDENCE OF QDOR!TM) APPROVAL SHALL ACCOMPANY THE PRODUCT SHIPPED TO THE JOBSITE FOR READY IDENTIFICATION BY THE CONTRACTOR OR AGENCY INSPECTOR, 8. FINAL SITE STABIUZATION IS ACHIEVED WHEN PERENNIAL VEGETATIVE COVER PROVIDES PERMANENT 2.) SEED SHOULD BE APPLIED USING DRILL SEEDING OR BROADCAST SEEDING METHODS ONLY. THIS SEED MIX WILL NOT GERMINATE WELL WITH STABILIZATION WITH A UNIFORM DENSITY GREATER THAN 70 PERCENT OVER THE ENTIRE AREA TO BE HYDROSEEDING METHODS. 8. ROLLED EROSION CONTROL PRODUCTS (NETS, BLANKETS, TURF REINFORCED MATES) AND VEGETATED STABILIZED BY VEGETATIVE COVER. THIS AREA IS EXCLUSIVE OF AREAS THAT ARE COVERED WITH AREAS NOT MEETING REQUIRED VEGETATIVE DENSITIES FOR FINAL STABILIZATION MUST BE INSPECTED ROCK (CRUSHED GRANITE, GRAVEL, ETC.) OR LANDSCAPE MULCH, PAVED OR HAVE A BUILDING OR DAILY. RILING, RUTTING AND OTHER SIGNS OF EROSION INDICATE THE SPECIFIED EROSION CONTROL OTHER PERMANENT STRUCTURE ON THEM. 3.) THE ENTIRE FACILITY SHALL BE STABILIZED WITH A NORTH AMERICAN GREEN SC150 STRAW &COCONUT BLANKET (OR APPROVED EQUAL). THE DEVICE IS NOT FUNCTIONING OR INSTALLED PROPERLY AND/OR ADDITIONAL EROSION CONTROL DEVICES ARE WARRANTED. BLANKET SHOULD BE INSTALLED ON TOP OF THE SEED IN ACCORDANCE WITH THE MANUFACTURER SPECIFICATIONS. SEEDING/VEGETATION REQUIREMENTS SVR 8 STEM�POR�ARYN.T.S. SEEDING OR STABILIZATION PERMANENT SEEDING, SOD OR N.T.S. q) THE SEED MIX WILL NEED DAILY SUPPLIMENTAL WATERING UNTIL IT HAS GERMINATED AND REACHED AN es N.T.S.ULCHING N.T.S. AVERAGE HEIGHT OF AT 12-18". SOURCE BOX SOURCE BOX SOURCE BOX 5.) THE SEEDING AREA SHALL BE MOWED ONCE AFTER THE FIRST GROWING SEASON, EARLY IN THE SPRING, AND THEN SHALL BE MOWED NO MORE LAST REVISED: WAL-MART LAST REVISED: WAL-MART LAST REVISED: WAL-MART THAN ONCE EVERY THREE YEARS THEREAFTER EARLY IN SPRING ONLY. STANDARD STANDARD STANDARD ­ 1 JUNE 2012 DETAIL JUNE 2012 DETAIL JUNE 2012 DETAIL 25% 25% 25% 6% 3% 3% 2% 2% 2% ,elvv: 2% 1% 1% , � � juli �t . 1%1 1% 1% Xa DEVELOPER/OWNER: WAL-MART REAL ESTATE BUSINESS TRUST MAIL STOP 5570 2001 SE 1OTH STREET BENTONVILLE, AR 72716-5570 4-79- 204- 3314 SITE OPERATOR/GENERAL CONTRACTOR: SUPERINTENDENT: - - - - -- -- A � - IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. (woepep`�REVISIONS 7) EY 7 NCDENR REVISIONS BAB 5/18/16 8 NCDENR REVS/OTB REV BAB 5/31/16 9 NCDOT/NCDENR REVS BAB 6/6/16 10 QA/QC, OTB REVISIONS ATZ 6/20/16 11 NCDEQ REVISIONS BAB 8/3/16 BID ADDENDUM 1 12 9/21/16 BAB 13 NCDEQ REVISIONS BAB 10/3/16 14 NCDEQ REVISIONS BAB ,am10/19/16 DRAWN Ile) BAB CHECKED MAT DATE 7/11/14 SCALE NOTEDAS JOB No. NCC138078 SHEET V V �� C:\USERS\BBUCKLAND\APPDATA\LOCAL\TEMP\ACPUBLISH_4152\NCC1380780PX.DWG PRINTED BY: BBUCKLAND 10.19.16 @ 9:02 AM LAST SAVED BY: BBUCKLAND mm N/ E �y N/F KEYSTONE CONTRACTORS, INC D.B.3163 P.522 M.B. 45 P. 94 E VACANT PARCEL ZONED B-1 , r ' , �kkttkt , %ik k e« t t N/F; t ` t t THE COUNTY OF ONSLOW iti` ; �, t D. B.1912 P.100 M.B.23 P.19 EDUCATIONAL USE : k ZONED RA t �t y/ / S1 11 � w_ K it t t 1000 N/F THE COUNTY OF ONSLOW •r ; � tit _ ,� }� s , ,. A. � , L D.B.1912 P.100 ' \\\ M.B.23 P.19 y EDUCATIONAL USE ZONED RA i% i t1 F I z 1 Mii `~`l i„i`� ` // t i i tt• i i 1i t i E\ E A Q aEn r \ a \ N/F THE COUNTY OF ONSLOWx \\ u D.B.1912 P.100� R M.B.23 P.19 \\ EDUCATIONAL USE \ ZONED RA f T GENERAL NOTE: 'HE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PR( SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELA PECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF REC( NG PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONST TANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWING FULL CONFORMANCE WITH_! ncAi RFG a ATInNs AND cnnFS. �W. KEITH WALSH, L.L.C. EP¢. D. B.3851 P.585 G� E� VACANT PARCEL ZONED R=8SF N/F W. KEITH WALSH, L.L.C. D.B.3851 P.589 M.B.32 P.240 VACANT PARCEL ZONED R-8SF \"'tea.•..«... PROP. 60' ACCESS EASEMEYT 0.41 AC. ; N/F SWANSBORO INVESTORS, LLC E- D.B.4096 P.345 RESULTANT TRACT II M.B.67 P.179 RESIDENTIAL USE ZONE h h z 1 ZONED B-1 F CONSTRUCTION NARRATIVE E AND SCHEDULE 1. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL TOWN/COUNTY REGULATIONS AND CODES AND O.'S.H.A. STANDARDS. 2. CONTRACTOR SHALL REFER`TO THE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONSOF VESTIBULES, SLOPE PAVING, SIDEWALKS, EXIT -PORCHES, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 3. ALL DISTURBED AREAS ARE TO RECEIVE FOUR INCHES OF TOPSOIL, SEED, MULCH AND WATER UNTIL A HEALTHY STAND OF GRASS IS ESTABLISHED. 4. ALL DIMENSIONS AND RADII ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. 5. CURB AND GUTTER IS PROPOSED FOR ALL LOCATIONS OTHER THAN TO ALLOW SHEET FLOW INTO WET PONDS ON SITE. 6. EX. STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE ABANDONED, REMOVED OR RELOCATED AS NECESSARY. ALL COST SHALL BE INCLUDED IN BASE BID. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, (UNLESS OTHERWISE NOTED ON PLANS) INCLUDING BUT NOT LIMITED -TO; ALL UTILITIES; STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS & POLES, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES REQUIREMENTS AND PROJECT SITE WORK SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST SHALL BE INCLUDED IN BASE BID. 8. SITE BOUNDARY, TOPOGRAPHY, UTILITY AND ROAD INFORMATION TAKEN FROM A SURVEY BY A LAND SURVEYOR. 9. TOTAL SITE AREA IS ±19.0 ACRES. (ACREAGE DOES NOT INCLUDE OUT PARCEL ACREAGES.) 10. THE SITE WORK FOR THIS PROJECT SHALL MEET OR EXCEED "THE SITE SPECIFIC SPECIFICATIONS". 11. SIGNS SHALL BE CONSTRUCTED BY OTHERS. PER TOWN OF SWANSBORO ORDINANCE(SEC. 16-13, MONUMENT SIGN ALONG HAMMOCK BEACH ROAD CAN BE NO LARGER THAN 64 SF AND 12' TALL. PYLON SIGN ALONG W. CORBETT AVENUE CAN BE NO LARGER THAN 64 SF AND 20' TALL. (SEE ARCH. PLANS) 12. REFER TO ARCHITECTURAL PLANS FOR SITE LIGHTING ELECTRICAL PLAN. 13. ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. 14. DRIVEWAYSAFFECTED BY ROAD WIDENING ALONG HAMMOCKS BEACH ROAD TO BE REPAIRED UP TO THE RIGHT OF WAY. 15. EIGHT (8) 10'X25' LOADING AREAS HAVE BEEN PROVIDED FOR THIS PROPOSED DEVELOPMENT IN THE TRUCK BAYS. 16. VARIOUS TRAFFIC CONTROL DEVICES HAVE BEEN PROVIDED IN THIS PLAN. REFER TO DETAILS FOR ADDITIONAL INFORMATION. 17. SEE DETAIL SHEETS FOR CONCRETE AND ISOLATION JOINTING DETAILS. 18. FOUR (4) 1,000 LIQUID PROPANE TANKS TO BE INSTALLED BY AMERIGAS. CHAIN LINK FENCING TO BE 3' AWAY FROM TANKS, WITH (2) FENCE GATES. BOLLARDS TO SURROUND FENCING AT 4' SPACING FROM CENTER, AND PLACED 3' UNDERGROUND. 19. CONTRACTOR TO CREATE A BREAK IN GUARD RAIL AND ADD GATE IN FENCE SURROUNDING PROP. WET PONDS. REFER TO SITE PLANS FOR EXACT LOCATIONS. SHEET INDEX MAP \ C \ i rr SEE SHEETS: -.. C-5 NORTH SITE PLAN / C-8 NORTH GRADING AND / DRAINAGE PLAN I - C-11 NORTH UTILITY PLAN I G-14 NORTH LANDSCAPE PLAN' _ \ O m \ SEE SHEETS: I M \ C-4 SOUTH SITE PLAN C-7 SOUTH GRADING AND > DRAINAGE PLAN C-10 SOUTH UTILITY PLAN C-13 SOUTH LANDSCAPE PLAN HATCH 3I LEGEND '; " STANDARD f`fl/. j DUTY ASPHALTIC T `<; CONCRETE PAVEMENT �`�j .,. , .+,.., `%„yam✓ THIS DEVELOPMENT PROPOSES TO BUILD A WALMART SUPERCENTER AND FUEL STATION. THE CONSTRUCTION OF THIS PROJECT WILL INCLUDE INSTALLING AND MAINTAINING VARIOUS EROSION AND SEDIMENTATION CONTROL MEASURES, DEMOLITION OF EXISTING FEATURES, AND CONSTRUCTION OF PROPOSED FEATURES. THE PROPOSED FEATURES AS PART OF THIS PROJECT INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: • VARIOUS ROAD IMPROVEMENTS • NEW PAVEMENT, CURB, AND GUTTER • NEW ASPHALT PAVEMENT AND CONCRETE • PAVEMENT MARKINGS • ABOVE AND UNDERGROUND UTILITIES • STORMWATER MANAGEMENT FEATURES INCLUDING PIPING AND WET PONDS • FUEL TANKS AND PUMPS • ABOVE GROUND STRUCTURES • LIGHTING • LANDSCAPING ALL CONSTRUCTION IS TO TAKE PLACE ACCORDING TO ALL APPLICABLE LOCAL, STATE, AND NATIONAL REGULATIONS. THE TENTATIVE CONSTRUCTION SCHEDULE IS AS FOLLOWS. - CONSTRUCTION START: THIRD QUARTER 2016 GRAND OPENING: THIRD QUARTER 2017 HEAVY DUTY ASPHALT (PRIVATE) ADA STRIPING r I: c .a PROP BUILDING 4 � {, d 4 STANDARD CONCRETE a 4. E AA: `. NCDOT « PAVEMENT REQUIRED PARKING TABLE WALMART. STORE 1 SPACES PER 300 SF WALMART FUEL STATION 1.5 SPACES PER NOZZLE AND 1 SPACE PER 50 SF SPACES REQUIRED FOR STORE 530 SPACES REQUIRED FOR FUEL STATION 33 TOTAL 563 REQUIREMENTS BASED ON THE TOWN OF SWANSBORO'S UNIFIED DEVELOPMENT ORDINANCE. SITE ANALYSIS TABLE WALMART STORE 158,583 S.F. WALMART FUEL STATION 754 S.F. SURFACE PARKING LOT (INCL. 25 ADA SPACES) 622 SPACES TOTAL 622 RATIO 3.90/1, 000 S.F. CART CORRALS 13 CORRALS/26 SPACES * PARKING SPACES OBSTRUCTED BY CART CORRALS ARE NOT INCLUDED IN OVERALL PARKING RATIO. ,y GRAVEL AND VEGETATIVE STRIP NCDOT PAVEMENT r MILL AND OVERLAY' Ya N w s 100 50 25 0 100 ALERT TO CONTRACTOR: �-� ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE 1"-100' MILESTONE DATE IN PROJECT DOCUMENTS. REVISIONS BY -) 7 NCDENR REVISIONS BAB 5/18/16 NCDENR REVS/OTB REV 8 5/31 /16 BAB 9 NCDOT/NCDENR REVS BAB 6/6/16 QA/QC, OTB REVISIONS 10 ATZ 6/20/16 11 NCDEQ REVISIONS BAB 8/3/16 BID ADDENDUM 1 12 9/21 /16 BAB 13 NCDEQ REVISIONS BAB 10/3/16 NCDEQ REVISIONS 14 10/19/16 BAB 0�:� DRAWN BAB CHECKED MAT DATE 7/11/14 SCALE 1 "=100' JOB No. NCC138078 SHEET C:IUSERS\BBUCKLAND\APPDATA\LOCAL\TEMP\ACPUBLISH_415PWCC138078SS5.DWG PRINTED BY: BBUCKLAND 10.19.16 @ 9:04 AM LAST SAVED BY: BBUCKLAND Al 1. CONTRACTOR IS RESPONSIBLE FOR DEMOLITION OF EXISTING STRUCTURES INCLUDING REMOVAL OF ANY EXISTING UTILITIES. UTILITIES ARE TO BE REMOVED TO THE RIGHT-OF-WAY. 2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE B APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 3. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED. C 4. PRECAST STRUCTURES MAY BE USED AT CONTRACTORS OPTION. 5. STORM PIPE SHALL BE AS FOLLOWS UNLESS OTHERWISE NOTED: CLASS III RCP (ASTM C76) WITH RUBBER O-RING GASKETS TO FORM WATER -TIGHT CONNECTIONS. 6. EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS. 7. EXISTING GRADE CONTOUR INTERVALS SHOWN AT 1'. D 8. PROPOSED GRADE CONTOUR INTERVALS SHOWN AT V INTERVALS. 9. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 10. ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT E STRUCTURE IS WATERTIGHT. 11. ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". 12. THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORM WATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND THE SPECIAL CONDITIONS, SECTION 8, ENVIRONMENTAL COMPLIANCE AND STORM WATER POLLUTION PREVENTION. 13. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. G 14. CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS. 15. TOPOGRAPHIC INFORMATION IS TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS. IF THE CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR TO THE OWNER FOR REVIEW. H 16. ALL UNSURFACED AREAS DISTURBED BY GRADING OPERATION SHALL RECEIVE 4 INCHES OF TOPSOIL. CONTRACTOR SHALL APPLY STABILIZATION FABRIC TO ALL SLOPES 3H:1V OR STEEPER. CONTRACTOR SHALL STABILIZE DISTURBED AREAS IN ACCORDANCE WITH GOVERNING SPECIFICATIONS UNTIL A HEALTHY STAND OF VEGETATION IS OBTAINED. 17. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODE AND BE CONSTRUCTED TO SAME. ' 18. ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR INVERT FROM INVERT IN TO INVERT OUT. 19. CONTRACTOR TO ADJUST ANY EXISTING STRUCTURES TO PROPOSED GRADE IN ANY AREA OF PROPOSED GRADING. 7 8 9 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 GAS STATION FOUNDATION SUBSURFACE PREPARATION FOR WALMART WM STORE NO. 7179, SWANSBORO, NORTH SHEET INDEX MAP CAROLINA JUNE 20, 2016 / —� \ /A, co UNLESS SPECIFICALLY INDICATED OTHERWISE IN THE DRAWINGS AND/OR SPECIFICATIONS, THE LIMITS OF THIS \ ' SUBSURFACE PREPARATION ARE CONSIDERED TO BE THAT PORTION OF THE SITE DIRECTLY BENEATH AND 5 FEET - BEYOND THE GAS STATION. ?' ESTABLISH THE FINAL SUBGRADE ELEVATION TO ALLOW FOR THE CONCRETE SLAB AND BASE. REFERENCE ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR REQUIRED SLAB THICKNESS. THE MINIMUM 6-INCH THICK BASE MATERIAL SHALL CONFORM TO NORTH CAROLINA DOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES SEE SHEETS. \ SECTION 1010, "AGGREGATE BASE COURSE" (ABC). THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING / \ _ ACCURATE MEASUREMENTS FOR ALL CUT AND FILL DEPTHS REQUIRED. ANY PROPOSED EQUIVALENT ALTERNATIVE C-5 NORTH SITE PLAN BASE MATERIAL MUST BE SUBMITTED FOR APPROVAL WITHIN 30 DAYS AFTER AWARD OF CONTRACT. ANY EQUIVALENT / C-8 NORTH GRADING AND I ALTERNATIVE SHALL ONLY BE USED IF APPROVED IN WRITING BY THE CEC AND AOR. EXISTING VEGETATION, TOPSOIL, AND OTHERWISE UNSUITABLE MATERIAL SHALL BE REMOVED. AFTER STRIPPING / DRAINAGE PLAN TOPSOIL, THE EXPOSED SUBGRADE SHALL BE PROOFROLLED WITH A LOADED DUMP TRUCK OR SIMILAR PNEUMATIC TIRED VEHICLE (MINIMUM LOADED WEIGHT OF 20 TONS) UNDER THE OBSERVATION OF THE CTL. THE PROOFROLLING C-11 NORTH UTILITY PLAN f PROCESS SHALL CONSIST OF TWO COMPLETE PASSES OF THE EXPOSED AREAS WITH ONE OF THE PASSES PERFORMED /\ C-14 NORTH LANDSCAPE PLAN I PERPENDICULARLY TO THE PRECEDING ONE. MATERIALS WHICH ARE UNSTABLE UNDER PROOFROLL SHALL BE REPAIRED BY UNDERCUT AND REPLACEMENT WITH COMPACTED STRUCTURAL FILL, USE OF A GEOTEXTILE WOVEN / \ I FABRIC, DISCING/DRYING/RECOMPACTING, OR SOME COMBINATION OF THE ABOVE. MATERIALS ANTICIPATED TO BE \ UNSTABLE UNDER PROOFROLL, PRIOR TO REPAIR, WERE ENCOUNTERED IN THE UPPER FIVE FEET AT BORING LOCATIONS G-1 AND G-4. AFTER THE PROOFROLLING OPERATION HAS BEEN COMPLETED AND THE SUBGRADE IS / DETERMINED TO BE STABLE, SITE GRADING SHALL PROCEED IMMEDIATELY. THE PROOFROLLING OPERATION SHALL BE \ I O REPEATED WITH AT LEAST ONE PASS IN EACH DIRECTION IMMEDIATELY PRIOR TO PLACING AGGREGATE BASE COURSE: ON -SITE SOILS EXCAVATED FROM BELOW THE GROUNDWATER TABLE (E.G. EXCAVATED FROM PROPOSED / \ STORMWATER PONDS) WILL REQUIRE DRYING. CONTRACTOR SHALL PHASE CONSTRUCTION IN A MANNER THAT \ PROVIDES OPEN SPACE FOR MECHANICAL DRYING AS INDICATED ON THE PLANS. ON -SITE SOILS THAT CANNOT BE \ D MECHANICALLY DRIED WITHIN A REASONABLE TIME PERIOD, PROVIDED REASONABLE EFFORT TO MECHANICALLY DRY / HAS BEEN PERFORMED, SHALL BE CHEMICALLY DRIED USING LIME OR CEMENT. THE RATE OF LIME OR CEMENT SHALL BE DETERMINED BY CONTRACTOR AT TIME OF CONSTRUCTION BASED ON MATERIAL TYPE AND MOISTURE CONTENT. / SEE SHEETS: \ I ~� s s Sc OR SOME C-4 SOUTH SITE PLAN •. STRUCTURAL FILL SHALL CONSIST OF: 1) SOILS WITH A USCS CLASSIFICATION OF SW P M \ \ �I " COMBINATION OF THESE; 2) CONTAIN LESS THAN 3 PERCENT ORGANIC MATERIAL; 3) BE FREE OF OTHER DELETERIOUS MATERIALS; 4) HAVE A STANDARD PROCTOR DRY DENSITY OF AT LEAST 100 PCF; AND 5) HAVE A MAXIMUM PARTICLE C-7 SOUTH GRADING AND SIZE OF 3 INCHES IN ANY DIMENSION. DRAINAGE PLAN PLACE AND COMPACT STRUCTURAL FILL IN MAXIMUM 8-INCH LOOSE LIFTS. ALL STRUCTURAL FILL SHALL_ BE COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D 698) EXCEPT FOR THE FINAL 12 \ C-10 SOUTH UTILITY PLAN INCHES WHICH SHALL BE INCREASED TO 98 PERCENT. FILL MOISTURE SHALL BE MAINTAINED WITHIN 3 PERCENT OF OPTIMUM MOISTURE DURING COMPACTION. C-13 SOUTH LANDSCAPE PLAN Fz �y �e ,,�� '®•�.'"',�z~ ;� ' ems`' \ N 35176 excavations will extend through MATERIALS THAT BAN TYPICALLY BE EXCAVATED BY ROUTINE EARTH -MOVING EQUIPMENT. a p / H"`""""""/F EXCAVATIONS WILL EXTEND BELOW THE WATER TABLE. TEMPORARY DEWATERING MEASURES SUCH AS INSTALLATION N3 OF WELL -POINTS OR USE OF INTERNAL SUMPS AND PUMPING WILL LIKELY BE REQUIRED. THE CONTRACTOR SHALL EXERCISE CARE IN LOWERING OF GROUNDWATER LEVELS ADJACENT TO BEARING SURFACES. \ s ✓dc Z THE FOUNDATION SYSTEM SHALL BE ISOLATED SPREAD FOOTINGS AT COLUMNS AND CONTINUOUS SPREAD FOOTINGS O \s4~. spmN AT WALLS. SOILS REQUIRING REPAIR WERE ENCOUNTERED NEAR THE ANTICIPATED FOUNDATION BEARING ELEVATIONS IN BORINGS G-1 AND G-4 PERFORMED WITHIN THE GAS STATION FOOTPRINT. THESE SUBGRADE SOILS SHALL BE •`"~� """-«��-,,._^ A UNDERCUT AND REPLACED WITH WASHED STONE (NCDOT #57) WHERE ENCOUNTERED AT THE FOUNDATION BEARING A ` ELEVATION. FOUNDATION SUBSURFACE PREPARATION FOR WALMART WM STORE NO. 7179, SWANSBORO, NORTH CAROLINA , 'w / JUI4E 20, 2016 THIS GAS STATION FOUNDATION SUBSURFACE PREPARATION DOES NOT CONSTITUTE A COMPLETE SITE WORK �B 32 �' `° �'" ~'.., "~�.. SPECIFICATION. IN CASE OF CONFLICT, INFORMATION COVERED IN THIS PREPARATION SHALL TAKE PRECEDENCE OVER UNLESS SPECIFICALLY INDICATED OTHERWISE IN THE DRAWINGS AND/OR SPECIFICATIONS, THE LIMITS OF THIS THE WALMART SPECIFICATIONS. REFER TO THE SPECIFICATIONS FOR SPECIFIC INFORMATION NOT COVERED IN THIS SUBSURFACE PREPARATION ARE CONSIDERED TO BE THAT PORTION OF THE SITE DIRECTLY BENEATH AND 5 PREPARATION. THIS INFORMATION WAS TAKEN FROM A REVISED FINAL GEOTECHNICAL EXPLORATION REPORT FEET BEYOND THE BUILDING AND APPURTENANCES. APPURTENANCES ARE THOSE ITEMS ATTACHED TO THE PREPARED BY S&ME, INC., DATED MARCH 24, 2016 (GEOTECHNICAL EXPLORATION REPORT IS FOR INFORMATION ONLY BUILDING PROPER (REFER TO DRAWING SHEET SP1), TYPICALLY INCLUDING, BUT NOT LIMITED TO THE BUILDING AND IS NOT A CONSTRUCTION SPECIFICATION). SIDEWALKS, PORCHES, RAMPS, STOOPS, TRUCK WELLS/DOCKS, COMPACTOR PAD, ) ETC. THE SUBBASE, WHERE REQUIRED, DO NOT EXTEND BEYOND THE LIMITS OF THE ACTUAL BUILDING AND THE APPURTENANCES. ESTABLISH THE FINAL SUBGRADE ELEVATION TO ALLOW FOR THE CONCRETE SLAB AND BASE. REFERENCE f d -`v`d �� ""•-..,� ''•~..,�_ ...��"'"'�.: � °'•.�,�,..v � .ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR REQUIRED SLAB THICKNESS. THE MINIMUM 6-INCH THICK BASE MATERIAL SHALL CONFORM TO NORTH CAROLINA DOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES SECTION 1010, AGGREGATE BASE COURSE (ABC). THE BASE SHALL BE OVERLAIN BY A 10 MILS VAPOR BARRIER CONFORMING TO ASTM E 1745 CLASS A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ACCURATE MEASUREMENTS FOR ALL CUT AND FILL DEPTHS REQUIRED. ANY PROPOSED EQUIVALENT ALTERNATIVE BASE MATERIAL MUST BE SUBMITTED FOR APPROVAL WITHIN30 DAYS AFTER AWARD OF CONTRACT. ANY EQUIVALENT ALTERNATIVE SHALL ONLY BE USED IF APPROVED IN WRITING BY THE CEC AND AOR. »,.��`-.. �� da „„ � -.,"` 4 3 �Fti �d A .,� � f Pti`f sx� �, ``"- 'a`..£ »•... , �"��a'yypy� ! „`"'I6 / "'�•"„ , ." <" "I've ,. EXISTING VEGETATION, TOPSOIL AND OTHERWISE UNSUITABLE MATERIAL SHALL BE REMOVED. AFTER : 3 b /•'.J"°�' Wit; `'2, ",~"', f 1��°,3? +,...�, j'�/ a":,",`••.,.."-°-` SITE SUBSURFACE PREPARATION FOR WALMART WM STORE NO. 7179, SWANSBORO, NORTH CAROLINA dim`" `b �,-,. STRIPPING TOPSOIL THE EXPOSED SUBGRADE SHALL BE PROOFROLLED WITH A LOADED DUMP TRUCK OR JUNE 20 2016 di�'d "� . `v ?s?s 32 `� �I ``� " a ' -~, 1` £" SIMILAR PNEUMATIC TIRED VEHICLE MiNIMUM LOADED WEIGHT OF 20 TONS UNDER THE OBSERVATION OF THE K � � 6/Pride ®� ti ti �� ?� 2y 3 � "`�,.. � o� . ' � "33 � "" ;� �� , � �'� ��"��� �.. ( ) CTL. THE PROOFROLLING PROCESS SHALL CONSIST OF TWO COMPLETE PASSES OF THE EXPOSED AREAS WITH THE SUBSURFACE EXPLORATION INDICATES THE NEAR -SURFACE SOILS AT THIS SITE CONSIST OF SANDS fd 5d® `�' ONE OF THE PASSES PERFORMED PERPENDICULARLY TO THE PRECEDING ONE. MATERIALS WHICH ARE 3d �n I 1• a d y �.„ d f a ep� dad x~ ,u r � � �;e �'••,..:_ „„ _ AND CLAYS, BECAUSE THESE NEAR -SURFACE SOILS ARE MOISTURE SENSITIVE, SITE PREPARATION AND `�' ddd ' q, o 3 %• B rf M�� "=y =� UNSTABLE UNDER PROOFROLL SHALL BE REPAIRED BY UNDERCUT AND REPLACEMENT WITH COMPACTED '+ § f sd z 6'°"_.,4, y' \` V-'•.,:N.,. GRADING WILL BE SIGNIFICANTLY INFLUENCED BY WEATHER CONDITIONS AT TIME OF CONSTRUCTION. s Bd�d rid d ,~ STRUCTURAL FILL, USE OF A GEOTEXTILE WOVEN FABRIC DISC ING/DRYING/RECOMPACTING OR SOME `�`° B `` f``._� " COMBINATION OF THE ABOVE. MATERIALS ANTICIPATED TO BE UNSTABLE UNDER PROOFROLL, PRIOR TO SITE GRADING SHALL BE PERFORMED DURING THE TYPICALLY DRIER SUMMER MONTHS, IF PRACTICAL.] dB��Fdd ,d >g 98 �� ��' td Bd B 16 .w REPAIR, WERE ENCOUNTERED IN 10 OF THE 12 BORINGS PERFORMED IN THE BUILDING FOOTPRINT. AFTER THE � Bd rid d tS g ff� f �y � ."wa�,3" ••, ..„„ ,a o, u gg EXISTING VEGETATION, TOPSOIL, AND OTHERWISE UNSUITABLE MATERIAL SHALL BE REMOVED AFTER r d ` j1 fff f " ^'w, �." PROOFROLLING OPERATION HAS BEEN COMPLETED AND THE SUBGRADE IS DETERMINED TO BE STABLE, SITE ddd d B � STRIPPING TOPSOIL. THE EXPOSED SUBGRADE SHALL BE PROOFROLLED WITH A LOADED DUMP TRUCK r� d8 ~ _ / '£f �` f ,ff, ddd � `` GRADING SHALLPROCEEDIMMEDIATELY. THE PROOFROLLING OPERATION SHALL BE REPEATED WITH AT LEAST dBd d .� Y, = t � �," `Bdd�d �t ?g '' f;` ;._z�., � '`` ` ONE PASS IN EACH DIRECTION IMMEDIATELY PRIOR TO PLACING AGGREGATE BASE COURSE. OR SIMILAR PNEUMATIC TIRED VEHICLE (MINIMUM LOADED WEIGHT OF 20 TONS) UNDER THE �'x, .... dt dB rid � " OBSERVATION OF THE CTL. THE PROOFROLLING PROCESS SHALL CONSIST OF FOUR COMPLETE PASSES Bd dB 3? 30 ��_ dl rid d �'� � �"' y £ -", { � f � xx;^vx ,�, ,\ OF THE EXPOSED AREAS WITH TWO OF THE PASSES PERFORMED PERPENDICULARLY TO THE PRECEDING ,u d�d�Bd ddd Yw" ¢ £fib _ ��fF. d,"~x- e EXISTING UTILITIES SHALL BE REMOVED WHERE PRESENT BENEATH THE BUILDING FOOTPRINT. ABANDONED PROOFROLL SHALL BE REPAIRED BY UNDERCUT AND UTILITY TRENCHES SHALL BE BACKFILLED WITH C ONES. MATERIALS WHICH ARE UNSTABLE UNDER 00 d .4~� � #� � f f � COMPACTED STRUCTURAL FILL, ABC STONE, OR WASHED REPLACEMENT WITH COMPACTED STRUCTURAL FILL, USE OF A GEOTEXTILE WOVEN FABRIC, N dgdd�d d` d 4 ` I "� ' ��, k 0 � ' �� STONE (NCDOT#57). dffl5rid td f d i z c� rn ! m(zr,mG/DRYING/RECOMPACTING, OR SOME COMBINATION OF THE ABOVE. MATERIALS ANTICIPATED TO rid t d nn BE UNSTABLE UNDER PROOFROLL, PRIOR TO REPAIR, WERE ENCOUNTERED IN 17 OF THE 64 BORINGS t6��ed ` ddd 33 PERFORMED IN PAVEMENT AND BMP AREAS. AFTER THE PROOFROLLING OPERATION HAS BEEN d E STABLE SITE GRADING SHALL PROCEED tsd`q �v ;vvp�°� �� sac"> `za r f `� COMPLETED AND THE SUBGRADE IS DETERMINED TO B34 IMMEDIATELY. THE PROOFROLLING OPERATION SHALL BE REPEATED WITH AT LEAST ONE PASS IN EACH- DIRECTION"✓M1 IMMEDIATELY PRIOR TO PLACING AGGREGATE BASE COURSE IN PAVEMENT AREAS. �``ddd t �~ , °<w,F,✓ `� •`'° �''s � � ,~- � ( � t -PLACE PROVIDED THEY DO NOT CONFLICT W;TH EXISTING UTILITIES IN PAVEMENT AREAS MAY REMAIN IN PROOFROLL. ABANDONED UTILITY PROPOSED UTILITIES AND THE TRENCH BACKFILL IS STABLE UNDER P ILLED WITH COMPACTED STRUCTURAL FILL, ABC STONE, OR WASHED STONE N TRENCHES SHALL BE BACKF , i (NCDOT #57 Bp Bfdwd i I i '`- M PROPOSED� BBddff�� Bd qy� �� `�� r +, `:�� ti i .� � _: }`• ON -SITE SOILS EXCAVATED FROM BELOW THE GPOUNDWATER TABLE (E.G. EXCAVATED FROM o dddd d��o d STORMWATER PONDS) WILL REQUIRE DRYING. CONTRACTOR SHALL PHASE CONSTRUCTION IN A MANNER 1,000 ddd;. d �9 EN SPACE FOR MECHANICAL DRYING AS INDICATED ON THE PLANS. ON -SITE SOILS THAT PROVIDES OP E MECHANICALLY DRIED WITHIN A REASONABLE TIME PERIOD, PROVIDED REASONABLE f� f-"f , THAT CANNOT B C�€BE. .�- EFFORT TO MECHANICALLY DRY HAS BEEN PERFORMED, SHALL BE CHEMICALLY DRIED USING LIME OR U _ J O F LIME OR CEMENT SHALL BE DETERMINED BY CONTRACTOR AT TIME OF CEMENT. THE RATE O CONSTRUCTION BASED ON MATERIAL TYPE AND MOISTURE CONTENT. Vied d ; 'Ell °aft d f,.,_ -°�• ,k; , `^�,.. �„my � ".,. 4 STRUCTURAL FILL SHALL CONSIST OF: 1 SOILS WITH A USCS CLASSIFICATION OF SW, SP, SM, SC, OR 'd' ,, �� fa?, 1`., '�5, 4`*S .�,° y4^*s, °t ,.•., h+ - ` 2f: L1 �\„ sue.",.~,» ,` ,''yi;.,, \,'• cu :C t COMBINATION OF THESE 2 CONTAIN LESS THAN 3 PERCENT ORGANIC MATERIAL; 3) BE FREE OF ,�e�� ¢� SOMECOmg OT HER DELETERIOUS MATERIALS` 4 HAVE A STANDARD PROCTOR DRY DENSITY OF AT LEAST 100 PCF; k 4 .. ?'.® , d .« "`°q°.»r+''"'< ^.x. . "° :'fir "�e ..3 . � -:: '' z �. ,"...:. "^a i^,,,..,.,,., ,.,•-,.< �}h'r E SIZE OF 3 INCHES H ES I N ANY DIMENSION. AND 5) HAVE A MAXIMUM PARTICLE ACV a i RAL FILLS L PLACE AND COMPACT STRUCTURAL FILL IN MAXIMUM 8 INCH LOOSE LIFTS. ALL STRUCTU HALL \. °', ri .�. ®Bd. ''rg; '. *t: ti.. �� ' � � S _ -fr ���',.„R,>> >�,.- F, J3 §`'� .r= n t•- � �y BE COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D ILL MOI ,' d ....., r ENT. F ST RE _.^.. ...".. _ H SHALL BE INC �' `�... � ,, -^ . �, ..........._...._.,_._..�_ � ...,. 4 0. r 698 EXCEPT FOR THE FINAL 12 INCHES WH C «: , ` `' R i f dy i f k- �i ., £ COMPACTION. E MAINTAINED WITHIN 3 PERCENT OF OPTIMUM MOISTURE DURING COM SHALL B ,`,',�,s.. _-� -� `r' s:. h'� K"'!-°,?r„r '�"35 '„,q; ,, •s "`?'::.� , ."••<' /�d, fie,. F >,'e^� '.—� e ab"....:..,CIAI C I . -ArAnl TYDI`I IV RX(\/TD_L1 RfiA RY R011TINF .., ..,_.. .....,.., _.___......_ ._....... �l f a € ,.,.. .� Bt. V d ' GRADING LEGEND EXISTING NOTE TYPICAL NOTE TEXT PROPOSED NOTE 0 CONTOUR 2 ___.___.,..-_w �t5__-_._-.___ LINE SPOT C516.00 TC 516.00 70 516 � O 1 ELEVATIONS BC 515.55 m� STORM STM LABEL # - -- - - - - - - STM = STORM SEWER (`8 STORM 1' MANHOLE > , STORM O M£ CLEANOUT CURB MR INLET YARD INLET ❑® ON -SITE SOILS EXCAVATED FROM BELOW THE GROUNDWATER TABLE (E.G. EXCAVATED FROM PROPOSED STORMWATER PONDS) WILL REQUIRE DRYING. CONTRACTOR SHALL PHASE CONSTRUCTION IN A MANNER THAT PROVIDES OPEN SPACE FOR MECHANICAL DRYING AS INDICATED ON THE PLANS. ON -SITE SOILS THAT CANNOT BE MECHANICALLY DRIED WITHIN A REASONABLE TIME PERIOD, PROVIDED REASONABLE EFFORT TO MECHANICALLY DRY HAS BEEN PERFORMED, SHALL BE CHEMICALLY DRIED USING LIME OR CEMENT. THE RATE OF LIME OR CEMENT SHALL BE DETERMINED BY CONTRACTOR AT TIME OF CONSTRUCTION BASED ON MATERIAL TYPE AND MOISTURE CONTENT. STRUCTURAL FILL SHALL CONSIST OF: 1) SOILS WITH A USCS CLASSIFICATION OF SW, SP, SM, SC, OR SOME COMBINATION OF THESE; 2) CONTAIN LESS THAN 3 PERCENT ORGANIC MATERIAL; 3) BE FREE OF OTHER DELETERIOUS MATERIALS; 4) HAVE A STANDARD PROCTOR DRY DENSITY OF AT LEAST 100 PCF; AND 5) HAVE A MAXIMUM PARTICLE SIZE OF 3 INCHES IN ANY DIMENSION. OFF -SITE IMPORT STRUCTURAL FILL SHALL BE USED IN THE FIRST STAGES OF BRINGING THE BUILDING PAD TO GRADE, WHILE THE ON -SITE MATERIALS ARE DRIED AS INDICATED ON THE PLANS. PLACE AND COMPACT STRUCTURAL FILL IN MAXIMUM 8-INCH LOOSE LIFTS. ALL STRUCTURAL FILL SHALL BE COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D 698) EXCEPT FOR THE FINAL 12 INCHES WHICH SHALL BE INCREASED TO 98 PERCENT. FILL MOISTURE SHALL BE NIAINTAINED.INITHIN 3 PERCENT OF OPTIMUM MOISTURE DURING COMPACTION. EXCAVATIONS WILL EXTEND THROUGH MATERALS THAT CAN TYPICALLY BE EXCAVATED' BY ROUTINE EARTH -MOVING EQUIPMENT. EXCAVATIONS MAY EXTEND BELOW THE WATER TABLE. TEMPORARY DEWATERING MEASURES SUCH AS INSTALLATION OF WELL -POINTS OR USE OF INTERNAL SUMPS AND PUMPING WILL LIKELY BE REQUIRED. THE CONTRACTOR SHALL EXERCISE CARE IN LOWERING OF GROUNDWATER LEVELS ADJACENT TO BEARING SURFACES. SETTLEMENT PLATES SHALL BE INSTALLED DURING FILL PLACEMENT. REFER TO EXHIBIT Al IN THE OTB DOCUMENTS FOR THE LOCATION AND DETAIL OF THE SETTLEMENT PLATES. ELEVATIONS AT THE PL PL ATES A ES SHALL BE MEASURED BY A LICENSED SURVEYOR IN THE STATE OF NORTH CAROLINA AT THE TIME OF INSTALLATION, WEEKLY DURING FILLING AND FVFRY TWt) WFFK.q T11FI?FAFTFI? TWP nATF ns= RAI=Acl ID17R.MKIT Anln M M/ATInKI REVISIONS BY NCDENR REVISIONS 7 5/18/16 BAB NCDENR REVS/OTB REV 8 BAB 5/31 /16 NCDOT/NCDENR REVS 9 BAB 6/6/16 QA/QC, OTB REVISIONS 10 ATZ 6/20/16 NCDEQ REVISIONS 11 8/3/16 BAB BID ADDENDUM 1 12 9/21 /16 BAB 13 NCDEQ REVISIONS BAB 10/3/16 14 NCDEQ REVISIONS BAB 10/19/16 DRAWN BAB CHECKED MAT DATE 7/11/14 SCALE 1 "=100' JOB No. NCC138078 SHEET GENERAL NOTE: S THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJI X SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATI£ -_ SPECIFICATIONS IONS OR APPLICABLE CODES IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECOR C S CITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITI EPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS A FULL CONFORMANCE WITH LOCAL REG L ATIONS AND CODES. C:\USERS\BBUCKLAND\APPDATA\LOCAL\TEMPIACPUBLISH_41521NCC138078SS5.DWG PRINTED BY: BBUCKLAND 10.19.16 @ 9:04 AM LAST SAVED BY: BBUCKLAND 3 WHEN PERFORMING GRADING OPERATIONS DURING PERIODS 332 33 {4 OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE F.ND GROUND WATER MANAGEMENT TO CONTROL " MOISTURE OF SOILS. ;u € .... .... ... .. .... .,..., .... .. , .. ,.....,.. ,.,. .. .. ...,,. .,�._: .....,. , , nv, �i; �,..._-n„i..:»,.-� ,/Y/.slm"YIOu/ /, F/! H/"P/wN/,:y."s / ...z=e,d✓%/.!//W.l✓r/,!✓.eN.(%>%//,ss,-FF,T"..-....+.:c- !rN//N/.(.//dF .z+: REFER TO MASTER SITE SPECIFICATIONS" F � 15 16 1 17 m 0 IV A IN GRADING LEGEND EXISTING NO TE TYPICAL NOTE TEXT PROPOSED NOTE _20- CONTOUR 0 ---------- 2 5 --------- LINE 5 SPOT Xi�m FTC�_�51600 70 516 4 0W 5 16, 4 ELEVATIONS rsdIP STORM 1!t LABEL - - - - - - - - STM = STORM SEWER m m mi[---MF7Mr7M E) STORM MANHOLE STORM CLEANOUT CURB INLET YARD INLET GRADING KEYNOTES (NOT ALL USED THIS SHEET) SEE ROADWAY PLANS FOR FULL ROADWAY GRADING AND NOTES. CONTRACTOR SHALL ENSURE 2% MAX CROSS SLOPE AND 5% RUNNING SLOPE FOR ADA CROSSWALK/SIDEWALK AREAS, AND 2% MAX SLOPE IN ANY DIRECTION IN ALL ADA PARKING AREAS. CURB TAPER. (SEE DETAIL SHEET.) CONTRACTOR SHALL RELOCATE PIPE TO CENTERLINE OF NEWLY CONSTRUCTED DITCH. PROPOSED PERMANENT BAFFLE FOR WETPOND. SEE DETAIL SHEET. PROPOSED AREA TO MINE FOR FILL SOILS AND REPLACE AND STOCKPILE WITH UNUSABLE SOILS AND TOPSOIL. STORMWATER MANAGEMENT AND ACCESS EASEMENT (VARIABLE SIZE). LEVEL SPREADER (40'WIDE) WITH ENGINEERED VEGETATEDFILTER STRIP (50, LONG). PROP. GUIDE RAIL AND SAFETY FENCE. CONTRACTOR TO INSTALL PERMANENT 15" RCP PIPE FOR CONTINUATION OF DITCH LINE. INFILTRATION TRENCH (WITH PERFORATED PIPES) DUE TO NEARBY SHELLFISH WATERS. @ RAISED PLANTER WITH SUBSURFACE INTERCEPTOR DRAIN SYSTEM. PROP. TRENCH DRAIN WITH UNDERLYING 18" RCP PIPES TO TIE-IN TO DOWNSTREAM STRUCTURE (REFER TO ACO PLANS). n 14 PROP. GABI N BASKET WALL TO FORM FOREBAY. (15' 0/v POWSR.11V9, A� ­AAL USE ZONED RA Ar " x i Z *N f "If '/ifg. f TIC 34.77 "A eI TC 3 .07 TC 3� TC 34.92 TC 34.96 34.86 1/0 j/0, TC M. z , yt, STM TC 3m4.89 TC 34. N 351,000 TC B-5 BC 34.39 vy V lj� Rr 34.44 G 34.70 G 34.24 /rf "Jh STM B_ w G V, G 34.24 U N 44 N/F It ;,117 ir ...... .... THE COUNTY OF ONSLOW/T �3'4'.92 D.B,, 1912 P.100 .00 C111 STM M3�23 P19 B-4 -2.20% E D U C A,11� 10 N A L U Sk, ggp B-14 ZONLU IN-111 Im TIC 34.14 13 TC 33.58 G 34.24 V R iENV G J Ir 2 .......... ON OF EX. P REMOVE PORTI I �PE B3 AND DISCHARGE TO PROP. DITCH 6" 141 -1A A A 0,14_! InIT('HHP2!.. IC AKIV DnTCKITIAI nDAHMnIA1ATCD 40-11 Iw" I t-N- CO 1 CONTRACTOR IS RESPONSIBLE FOR DEMOLITION OF EXISTING STRUCTURES INCLUDING REMOVAL OF ANY EXISTING UTILITIES. UTILITIES ARE TO BE REMOVED TO THE RIGHT-OF-WAY. 2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF �Aqj EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE SEE SHEETS: APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST -OR C-5 NORTH SITE PLAN EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACT TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS C-8 NORTH GRADING AND SHOWN ON THE PLANS. DRAINAGE PLAN 3. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED. C-1 1 NORTH UTIL11-Y PLAN 4. PRECAST STRUCTURES MAY BE USED AT CONTRACTORS OPTION. . C-14 NORTH LANDSCAPE PLAN M 5. STORM PIPE SHALL BE AS FOLLOWS UNLESS OTHERWISE NOTED: CLASS III RCP (AST M C76) WITH > RUBBER O-RING GASKETS TO FORM WATER -TIGHT CONNECTIONS. Z 6. EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS. K 0 7. EXISTING GRADE CONTOUR INTERVALS SHOWN AT 1'. 8. PROPOSED GRADE CONTOUR INTERVALS SHOWN AT 1'INTERVALS. 9. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE m THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 0 r 10. ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT SEE SHEETS: STRUCTURE IS WATERTIGHT. C-4 SOUTH SITE PLAN 0 11. ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL C-7 SOUTH GRADING AND > HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". 0 DRAINAGE PLAN 12. THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE EPA OR C-10 SOUTH UTILITY PLAN APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORM WATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND THE SPECIAL CONDITIONS, SECTION 8, ENVIRONMENTAL C-13 SOUTH LANDSCAPE PLAN COMPLIANCE AND STORM WATER POLLUTION PREVENTION. 13. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. 14. CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS. 15. TOPOGRAPHIC INFORMATION IS TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS. IF THE CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A Tr)Pr)('_PAPI­4Ir'. -qHP\/PV PV A PPrlqTPPPn i AmnqHPVP:V P TC) T14F OIAINIF=P F P PPVIPIA/ V P_ 0A A3 G 34.75 TC 34.81 A-15 u JO.1 I HP - TC 34.4b G 34.86 TC 34.70 TC 33 90 N� (3 3357 TC 32.8: TC 34.24 ... ... .. .......... TC 34.81 1 34 5 G 34.36 TC 33. G 34. - TC 34. 34.49 Z. u �a TC 33.,, TIC 32.93 r ��7 a Idw, Or 3 DEWATE]RING NOTE 16. ALL UNSURFACED AREAS DISTURBED BY GRADING OPERATION SHALL RECEIVE 4 INCHES OF TOPSOIL. CONTRACTOR SHALL APPLY STABILIZATION FABRIC TO ALL SLOPES 3H:1V OR STEEPER. WHEN PERFORMING GRADING OPERATIONS DURING PERIODS CONTRACTOR SHALL STABILIZE DISTURBED AREAS IN ACCORDANCE WITH GOVERNING OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, SPECIFICATIONS UNTIL A HEALTHY STAND OF VEGETATION IS OBTAINED. DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. 17. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODE AND BE CONSTRUCTED REFER TO MASTER SITE SPECIFICATIONS. TO SAME. 1 -1 8. ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR INVERT FROM ALERT TO CONTRACTORa 1 INVERT IN TO INVERT OUT. ALL GENERAL CONTRACTOR WORK TO BE COMPLE, L-L.8 (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE 19. CONTRACTOR TO ADJUST ANY EXISTING STRUCTURES TO PROPOSED GRADE IN ANY AREA OF MILESTONE DATE IN PROJECT DOCUMENTS. PROPOSED GRADING. NTAMINATION IS ENCOUNTERED IN C�; . ...... .... ... -j -N OHM, V"" 'S RESPONSIBILITY TO TC 33.99 & T S AREA, IT IS GC W 7 TC 34.66 BTAIN ANY NECESSARY PEW 1 a milu 9 7 MA E CONTAMINATION ACCORDIN(3LY.,qx,,, TIC 34.9-4 34.06,-� N, G 34.31 '-HARLES C 34 75 Zf G 34. 7 m /W MARY & RIM L_ B-11 /0" G 34.48 r_' I A A 1) ­j 'P, D3.2639 P�913 "ARCEL B Z, r A-7 VB.49 P.136 G 35.. STIM RESIDENTIAL USE -2 G 3 B r ZONED B s 1"A" .91 A �,g N 350,675 G 34.00 PIN __j_11 . . . . . . . . . . . . . . . . . . . . STM f B-1 STIM "'M e G 30. M A-6 p GT 1811 A _0_ I IT Q ..... ... 25 135.. I Z, 34. 1) N Tr,14.60 ;"U�n� G 301 ug, v B-9 XIA NIOM0,11"'s ...... .... .. ......... q; N N/F G 35.0 EN DOUG',-fi,.S- STA-ALLEY 3� D3.1572 P�624 HP,14.14 �J? "PA", R C E L "AN _4 k M,B,,49 P�136 0 TIC 34 50 USE RESIDENT' G 34.5 ZONED B-1 HP - TC 34 34. TM 'PAS PROP. TRAPEZOIDAL ff'PASS DITCH 4�_ Rol MO., (21 SIDE SLOPES WITH 5'WIDE BOTTOM) N................... N ------- WIDE MOUNTABLE CU J. (10 ........................ THE COUN"Iff OF ONSLOW I PROP PERM. 2'TALL D3.1912 P.100 RIP -RAP CHECK DAM ................... ................................ HE'S I ............ VB�23 P19 f ..................... % G 19.00 EDUCA-TIONAL USE ZONED RA I tit) DITCH LP 27.01 21 W RAATrW PY 4.L ......... I. r', % 00 G HP 2.14 3132 k TOP OF POND = 32.25' BOTTOM OF POND = 13.0' GENERAL NOTE: PERMANENT POOL = 29.0' IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION, SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO AREA TREATED = 451,365 SF (INCLUDING THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN ADDITIONAL IMP. AREA FROM ROAD WORK) WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN DESIGN CRITERIA: 90% TSS REMOVAL, nFs. %I -YR STORM C:\USERS\BBUCKLANDXAPPDATAkLOCAL�TEMP\ACPUBLISH A152\NCC138078SS5.DWG PRINTED BY! SBUCKLAND 10.19.16 @ 9:04 AM LAST SAVED BY: BBUCKLAND N w E 60 30 15 0 60 imams PIPE FROM FROM INV TO TO INV DIAMETER SLOPE PIPE LENGTH MATERIAL 11-12 1-1 28.62 1-2 28.24 18" 0.50% 753T RCP 12-13 1-2 1 28.14 1-3 28.00 18" 0.51% 27.54' RCP 21-24 2-1 29.10 2-4 29.10 12" 0.00% 55.00' RCP 21-22 2-1 29.00 2-2 27.92 158 0.96% 112.18' RCP 22-23 2-2 27.82 2-3 26.64 15" 1.18% 100.16, RCP 31-32 3-1 2&88 3-2 28.88 12' 0.00% 76.00' RCP 31-CBC.3 3-1 28.88 CB-C3 26.80 15' 0.92% 225.T RCP AI-OUTA A-1 24.40 OUT A 23.87 36" 0.50% 106.27- RCP A2-Al A-2 24.72 A-1 24.50 36" 0.50% 4364' RCP A3-A2 A-3 25.31 A-2 24.82 30" 0.50% 97.85' RCP A4-A3 A4 25.84 A-3 25.41 3011 0,51% 85.00' RCP A5-A4 A-5 26.81 A-4 25.94 30" 0.50% 173.00' RCP 124.74' RCP ATA6 A-7 27.95 A-6 27.63 30" 0.50% 64.46' RCP A8-A7 A-8 28.36 A-7 28.05 30" 0.51% 61.33' RCP A9-A8 A-9 31.20 A-8 30.10 121 100% 109.79' HDPE A10-Al A-10 29.90 A-1 29.00 18" 1.07% 83.81' RCP All-A10 A-11 30.35 A-10 30.00 1T 1.10% 31.78' HDPE 1181 3.99% 85.67' A13-A8 A-13 29.23 A-8 28.46 24- 0.50% 154.51' RCP A14-A13 A-14 29.84 A-13 29.23 18, 0.50% 122.00' RCP A15-A14 A-15 29.89 A-14 29.84 18, 0.51% 9.00, RCP B1-OUTB B-1 25.93 OUT B 25.50 30" 1 0.82% 52.43' RCP B2-BI B-2 26.23 B-1 26.03 30" 0.56% 35.99 RCP B3-B2 B-3 27. B-2 26.33 3011 0.50% 147.09 RCP B4-B3 B-4 27.74 B-3 27.17 24" 0.50% 113.52' RCP B5-B4 B-5 28.24 B4 Z bb-bb m zu'll B-5 28.34 240 0.50% 154.32' RCP 01-00 D-1 t.U.01- D_u 4U.f 1 10 v.1)u to 122.00' RCP B8-B1 B-8 29.25 B-1 28.35 18, 1.00% 90.21' RCP B9-B8 B-9 29.80 B-8 29.35 15" 1.01% 44.73' RCP B10-B8 B-10 30.35 B-8 30.00 10, 1.01% 34.68' HDPE -11, 29.46 B-2 28.60 15" 1.01% 85.57' RCP B1 2-133 B-12 27.60 B-3 27.17 18, t01% 42.62' RCP 18, 1.01% 52.37' RCP B14-B13 B-14 28A3 B-13 28.33 15', 1,05% 9,50'- RCP B15-B5 B-15 31.03 B-5 30.75 12' 0.82% 33.86' HDPE B`16-B15 B-16 31- _5 12' 0.82% 57.66' HDPE C1_OUTc C-1 25.30 OUT C 25.00 18' 1.15% 26.00' RCP C2-C1 C-2 25.90 C-1 25.40 IT 0.54% 92;34' RCP C3-C2 C-3 27.00 C-2 26.00 18" 1.01% 98.99, RCP D1-OUTD D-1 26.80 OUT D 2 6.65 24! 0.67% 22 .4 8' RCP D2-DI D-2 27.32 D-1 26,80 16" 0.50% 104. 87' RCP D3-D2 D-3 28.52 D-2 27.32 15' 0.50% 242.32' RCP D4-D3 DA 29.00 D-3 28.62 12w 1.00% 38.01' HDPE EI-OUTE E-1 26.80 OUT E 26.68 24" 0.50% 24.07' RCP E2-E1 E-2 28.27 E-1 28.18 18, 0.53% 16.97' RCP E3-E2 E-3 29.09 E-2 1 28.27 18" 0.50% 162.75' RCP E4-E3 E4 29.35 E-3 29.09 IT 0.51% 51.31' RCP FI-OUTF F-1 27.25 OUT F 27.00 15" 1.19% 21.00' RCP GI-OUTG G-1 26.80 OUT G 26.68 18, 0.50% 24.07' RCP RSI-11 RS-1 29.00 1-1 28.72 118' 0.51% 54.98- RCP RS2-21 RS-2 29.25 2-1 29.10 15" 0.59% 25.38' RCP RS3-31 RS-3 29.00 3-1 28.88 15, 1 0.53% 1 22,69' RCP STORM STRU4f,__11TURE SCHEDULE NAME TYPE RIM ELEV. INVERTS 1-1 NCDOT STD MANHOLE 31.27' INV IN = 28.72' INV OUT = 28.62' 1-2 NCDOT STD MANHOLE 30.93' INV IN = 28.M INV OUT = 28.14' 1-3 ENDWALL 29.71' INV IN = 28.00' INV IN = 29.10' 2-1 NCDOT STD 6MANHOLE W/ 18"TALL WEIR FLOW SPUTTER 32.02' INV OUT = 29.00' INV OUT = 29.10' 2-2 NCDOT STD MANHOLE 32.50' INV IN = 27.92' INV OUT = 27.82' 2-3 CONVERT EXISTING STORM STRUCTURE TO MANHOLE 32.20' INV IN = 26.64' INV IN = 26,64' 2-4 CLEANOUT 32,77' INVIN=29,10' INV IN = 28.89 3-1 NCDOT STD 5'MANHOLE W1 18" TALL WEIR FLOW SPUTTER 31.80' INV OUT = 28W INV OUT = 28.88' 3-2 CLEANOUT 32.OT INV IN = 28.88' INV IN = 24.50' A-1 NCDOT STD CURB INLET 33.36' INV IN = 29.00' INV OUT = 24.40' INV IN = 24.82' A-2 NCDOT STD MANHOLE 34.10' INV IN = 26.56 INV OUT = 24.72' A-3 NCDOT STD CURB INLET 33,60' INV IN = 25.41' INV OUT = 25.31' A-4 NCDOT STD CURB INLET 33.OU INV IN = 25.94' INV OUT = 25.84' A-5 NCDOT STD CURB INLET 33.26 INV IN = 26.91' INV OUT = 26.81' A-6 NCDOT STD CURB INLET 33.11' INV IN = 27.63' INV OUT = 27.53' A-7 NCDOT STD MANHOLE 34.62' INV IN = 28,05' INV OUT = 27.95 INVIN=30,10' A-8 SIPHONIC MANHOLE 34.71' INV IN = 28.46 INV OUT = 28.36' A-9 VESTIBULE ROOF LEADER 34.7T INV IN = 31.20 A-10 NCDOT STD CURB INLET 33.60' INV IN = 30.00' INV OUT = 29.90' A-11 TRUCK WELL DRAIN INV OUT = 30.36 A-12 SIPHONIC MANHOLE 34.91' INV OUT = 30.00' A-13 DBL NCDOT STD GRATE INLET 32.11' INV IN = 29.23' INV OUT 29.23' A-14 NCDOT STD CURB INLET 32.25' INV IN = 29.84' INV OUT 29.84' NCDOT a I DCURD IINLr- I U.au IN v uu I Lulozy INV IN = 26.03' B-1 NCDOT STD CURB INLET 33,00' INV IN = 28.36 INV OUT = 25.93' INV IN = 26.33! B-2 NCDOT STD MANHOLE 33.54' INV IN = 28.60' INV OUT = 26.23' INV IN = 27.17' B-3 SIPHONIC MANHOLE 34.26' INV IN = 27.17' INV OUT = 27.07' B-4 SIPHONIC MANHOLE 34.2e INV IN = 27.84' INV OUT = 27.74� INV IN = 30.75' B-5 NCDOT STD MANHOLE 34.35' INV IN = 28.34' INV OUT = 28.24' B-6 DBL NCDOT STD GRATE INLET 33.25' INV IN = B11' INV OUT = 29.1 V B-7 DBL NCDOT STD GRATE INLET 33.26 INV OUT = 29.82' INV IN = 30.00' B-8 NCDOT STD MANHOLE 34,49 INV IN = 29.35' INV OUT = 29.25' B-9 DBL NCDOT STD GRATE INLET 33.30' INV OUT = 29.80' B-10 TRUCK WELL DRAIN INV OUT = 30.35' B-11 NCDOT STD CURB INLET 32.74' INV OUT = 29.46' B-12 NCDOT STD MANHOLE 33.23' INV IN = 27.70' INV OUT = 27.60' B-13 NCDOT STD CURB INLET 31.75' INV IN = 28.33' INV OUT = 28,23' B-14 NCDOT STD CURB INLET 31.75' INV OUT = 28.43' INV IN = 31.03' B-15 CLEANOUT 34.84' INV IN = 31.03' INV OUT = 31.03' B-16 VESTIBULE ROOF LEADER INV IN = 31.50' .7 INV OUT = 31.50' C-1 NCDOT STD CURB INLET 31.25' INV IN = 25.40' INV OUT = 25.30' C-2 NCDOT STD MANHOLE 32.97' INV IN = 26.09 INV OUT = 25.90' C-3 DBL NCDOT STD CURB INLET 31.47' INV OUT = 27.00' CB-C3 DOGHOUSE NCDOT 840.02 19 D-1 NCDOT STD CURB INLET 31.26 INV IN = 26.80' INV OUT 26.80' D-2 NCDOT STID CURB INLET 32.26 INV OUT 27.32' D-3 NCDOT STD CURB INLET 31.80' INV IN = 28.62' INV OUT = 28.52' D-4 FUEL CANOPY DRAIN 32.8T INV OUT = 29.00' E-1 NODOT STD CURB INLET (5X5 BOX) 31,26' INV IN = 28.18' INV OUT = 26.80' E-2 NCDOT STD MANHOLE 31AT INV IN = 28.27' INV OUT = 28.2T E-3 NCDOT STD GRATE INLET 32.96 INV IN = 29.09' INV OUT = 29.09 E-4 NCDOT STD GRATE INLET 33.02 INV OUT = 29.36 F-1 NCDOT STD CURB INLET 31.25' INV OUT = 27.25' G-1 NCDOT STD CURB INLET 31.26 INV OUT = 26.80' OUT A ENDWALL OUT B ENDWALL 2U Py 4� 250 _T1 I ft, OUT C ENDWALL 2 1 IN 25.0(d OUT D ENDWALL 291'! INV IN 26.66 CUTE ENDWALL 30.81' INV IN 26.ff OUT F ENDWALL 24.16 INV IN 27.00' OUT G ENDWALL 28.71' INV IN 26.68' RS-1 RISER STRUCTURE 31.66 INV OUT = 29.00' RS-2 RISER STRUCTURE 30.69' INV OUT = 29.25' RS-3 RISER STRUCTURE 30.44' INV OUT = 29.00' R r-% EVISIONS BY NCDENR REVISIONS 7 BAB 5/18/16 8 NCDENR REVS/OTB REV BAB 5/31/16 NCDOT/NCDENR REVS 9 BAB 6/6/16 QA/QC, OTB REVISIONS 10 ATZ 6/20/16 NCDEQ REVISIONS 11 18/3/16 BAB BID ADDENDUM I 12 BAB 9/21/16 NCDEQ REVISIONS 13 BAB 10/3/16 NCDEQ REVISIONS 14 BAB) mm 10/19/16 DRAWN BAB CHECKED MAT DATE 7/11/14 SCALE 1 11=60' JOB No. NCC138078 SHEET F�" IV C 10 19 G 1 J K j ml 1 8 9 I 10 13 15 I 16 I 17 I 18 DEWATERING NOTE, WHEN PERFORMING GRADING OPERATIONS DURING PERIODS r<1ERR,U7D OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, p DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL C'.���1��UNI�ATION MOISTURE OF SOILS. REFER TO MASTER SITE SPECIFICATIONS. \ CO R��ALERT TO CONTRACTOR.- STM ALL GENERAL CONTRACTOR WORK TO BE COMPLETED EXM wa�,.y FINAL UTILITIES, ) 1 = (EARTHWORK, AND FINAL GRADING BY THE � MILESTONE DATE IN PROJECT DOCUMENTS. 12 N 351, 760 'V ft 05 SEE SHEETS: � �,��.-:::-���� $�� ;�4 � "-°�� e� Zv a- s°v. C-5 NORTH SITE PLAN � , mo 811wo1 %�y / .,mq '' STM'"+„-.,. `•.,,""'y»¢.'.:eO""4a,.'"a„a.., '` `"a ii..,-` C-8 NORTH GRADING AND W NAIuB STM df d , 2.a EX6 9, LIP` P0LPv7 Of HW-2 7 ply w..� � DRAINAGE PLAN PE`INNf$1Brf�IO #, HPdTC 34A0 CSTLLvB-CrC-11 NORTH UTILITY PLAN p� a..,a�• naM'.,y „y .�,.". HP-TC33,75 " " FOR FULL ROADWAY WIDENING C-14 NORTH LANDSCAPE PLAN T pfp g����jjy1 r 30 qa "" a 'sTM y LIA IIIJVLo' 34 ` � $Jr"`7o ilia , d%rb d' 1 'a+, a // a. �,": ;;M `'"'•,.ate "oJ/ "a,,. _ r��',.�,�~,'r r �° y:» EX8 a" a u' AND IMPROVEMENT DESIGN SEE \ D s ,�Lx 5� �f / / .� , " .� ""w �90 aUN $ 4"' s 8''g, s "€`° .s "�'$ qs'",`s?„�` INC i'a e , P / ` a,.,�, a,,,^,°e,�. �a� py , P _ - g t, `,� / ° �,11a ° ,a," COM WIC' TfON d e `� -�... ��"„;^ -�,�„ "tea„ \ _ h" .a•...IN ROADWAY IMPROVEMENT PLANS MA 45 s Ir,"��` y dfrd v~ 0 13 SIGNS E i %e°rr STM. a.. r \ ! OkSTM. VACANT PARCEL / \ �..p g�@�,.,, y,�4 ate, y I8,§ E'%�'"'D B I 10 DRAINAGE & UTILITY TC33,20 a y$I'al ��f ;,rrg / \ R) EASEMENT r / �� � ;� s � =° RO :� ``_��_.." ; qf; .,. r STM a wawa PER M.B. 45 P°94) r � 13,,�� 0 i 3 , , j f r �� " ..~" D REr� QED \ �� / � TC 32.62 , � , � � �' / % �' ' t �„ „.'�'�.., ��� . �,.., ��ILA � IPIA 9 /11 /° , M3, 6 P r Its=~� t � « � : ~ 4 ��,�; s rr j��� q 4 , $ S i Oe~ 9 A a "$' db �,'� � �' ! l �z; g • o�y. ."'+. '�'"'*,„ a � x"y '¢°�'.`b ��°S'w""o:~-°""�C, 'ew^a"y, ,� •'�,. // f3� gQ s� „G . s ;, .,,,,,, BBB "h 11 +<t n � i". 0 0 ''t, ��~ St l£ (,,,, R ,°t .#.°.., a�B � STM � ,,, �.,,,,. � 'q- Q✓ "o I � .� 'q, ¢ a,2 { a E�€o s Y� e,'"'•zL,yg� � :"�P�a��;� as'� q s i°."° q,, y � STM / SEE SHEETS: � F r y r TC 32.86 EX. OU a a z=. N E � €� �, �a � � �� 2-5 �; � w 1 ' °: / a /•c ! D,,13, a �' s, 02',6'>.°f d L, q'd, ' .<E,, ,f C-4 SOUTH SITE PLAN \,� " '° / �° / 0 ? �y�c`k r Yg HP -TC 35.28 y� O r3 l is .»,,,,,, jd't ...E.,. swC a �." l y� i"�~�l r 4,,''6,'. s b x °q✓` � E,1 � � r.'z � \ ` • • ..�,• ' ''"",. � „".,, °.,"^e. ° ���5°z° a `�� \ a q rr s/ / f 4 / ,,' 9° HP - TC 35.28 TC 33.33 z», ,r r / -, ;;�..,. ch ; A �'f : I , $ I•.°$';„w, ' o • ,. C-7 SOUTH GRADING AND a r°l STM ; f r ,a HP TC 33.08 OUT $ E .,,/ �" 6a �°,�„ �4 � :,,,,,," � TC 33.02 G 33.85 _ ,'"`.� ' fg� ��,> • .�, DRAINAGE PLAN ff E� ° ,,` , �/6f, ,, ♦ /i �, :: ��&~N`°f ' _� •�..�1 `- � TC33.85 s 'G33.85 � � �'.•°"""�� €�°,,.:� dot -.. .,. y~; - TC 31.75 33 PLAN \ C 10 SOUTH UTILITY �.�.® ,. •,°Ap ,> G32.80 '° �� TC33.85-.{ °'`��<� ?, °'a-.....��� .�, ��•�? ,� !®«°8f STM �.,..� ` `M. e -a __ �A t4 �, .�� " TC 33,80 , °a, r ° t �°°.: RS-3 � e.�, x ' � �.��«a,�., `_� ; `. TC 33.85 ra� C-13 SOUTH LANDSCAPE PLAN ®°°� / 3-2 STM �` G 32.70 G 33.60 STM 8sr -.. 7 \ a ° HP-TG32.58 TC 32.45 E-3 < ?S 6 STM G 33.80 TC 33.80 2-2 R/y/ mow / TC 32,77 "G 33.75 � �TC 33.51 $ � � EX 3 4 J r �• fY STM c .45 H1 " 6s/(®� p/ o ♦ px„., -16010 :z :: TC33.32 3 (�.- STORM SEWER PIPE SCHEDULE PIPE FROM FROM INV TO TO INV DIAMETER SLOPE PIPE LENGTH MATERIAL 11-12 1-1 28.62 1-2 28.24 18" 0.50% 75.37' RCP 12-13 1-2 28.14 1-3 28.00 18" 0.51% 27.54' RCP 21-24 2-1 29.10 2-4 29.10 1 12" 0.00% 55.00' RCP 21-22 2-1 29.00 2-2 27.92 1 15" 0.96% 112.18' RCP 22-23 2-2 27.82 2-3 26.64 15" 1.18% 100.16' RCP 31-32 3-1 28.88 3-2 28.88 12" 0.00% 76.00' RCP 31-CBC3 3-1 28.88 CB-C3 26.80 15" 0.92% 225,50' RCP AI-0UTA A-1 24.40 OUT 23.87 36" 0.50% 106.2T RCP A2-A1 102 24.72 A-1 24.50 36" 0.50% 43.64' RCP A3-A2 A-3 25.31 A-2 24.82 30" 0,50% 97.85 RCP A4-A3 A-4 25.84 A-3 25.41 30" 0.51% 85.00' RCP A5-A4 A-5 26.81 A4 25.94 30" 0.50% 173.00' RCP A6-A5 A-6 27.53 11-5 26.91 30" 0.50% 124.74' RCP ATA6 A-7 27.95 A-6 27.63 30" 0.50% 64.46' RCP A8-A7 A-8 28.36 A-7 28.05 30" 0.51% 61.33' RCP A9-A8 A-9 31.20 A-8 30.10 12" 1.00% 109.79 HDPE A10-Al A-10 29.90 A-1 29.00 18" 1.07% 83,81' RCP All-A10 A-11 30.35 A-10 30.00 10" 1.10% 31.78' HDPE Al2-A2 A-12 30.00 A-2 26.58 18" 3.99% 85.67' RCP A13-A8 A-13 29.23 A-8 28.46 24% 02% 154.51' RCP A14-A13 A-14 29.84 A-13 29.23 18" 0.50% 122.00' RCP A15-A14 A-15 29.89 A-14 29.84 18" 0.51% 9.00, RCP B1-OUTB B-1 25.93 OUT B 25.50 1 30" 0.82% 52.43' RCP B2-131 B-2 26.23 B-1 26.03 30" 0.56% 35.99 RCP B3-B2 B-3 27.07 B-2 26.33 30" 0.50% 147.09' RCP B4-B3 B-4 27.74 B-3 27.17 24" 0,50% 113.52' RCP B5-B4 B-5 28.24 B-4 27.84 24" 0.51% 78.73' RCP B6-B5 B-6 29.11 B-5 28.34 24" 0.50% 154.32' RCP B7-B6 B-7 29.82 B-6 29.21 18" 0.50% 122.00' RCP B8-B1 B-8 29.25 B-1 28.35 18" 1.00% 90.21' RCP B9-B8 B-9 29.80 B-8 29.35 15" 1,01% 44.73' RCP B10-B8 B-10 30.35 B-8 30.00 10" 1.01% 34.68' HDPE B11-132 B-11 29.46 B-2 28.60 15" 1.01% 85.57' RCP B12-B3 B-12 27.60 B-3 27.17 18" 1.01% 42.62' RCP B13-B12 B-13 28.23 B-12 27.70 18" 1.01% 52.37' RCP B14-B13 B-14 28.43 B-13 28.33 15" 1.05% 9.50' RCP B15-B5 B-15 31.03 B-5 30.75 12" 0.82% 33.86' HDPE 616-615 B-16 31.50 B-15 31.03 12" 0.82% 57.66' HDPE Cl-OUTC C-1 25.30 OUT C 25.00 18" 1.15% 26.00' RCP C2-Cl C-2 25.90 C-1 25.40 18" 0,54% 92.34' RCP C3-C2 C-3 27.00 C-2 26>00 18" 1.01% 98.99' RCP D1-OUTD D-1 26.80 OUT D 26.65 24" 0,67% 22.48' RCP D2-D1 D-2 27.32 D-1 26.80 15" 0.50% 104,8T RCP D3-D2 D-3 28.52 D-2 27.32 15" 0.50% 242.32' RCP D4-D3 DA 29,00 D-3 28.62 12" 1.00% 38.01' HDPE El-OUTE E-1 26.80 OUT E 26,68 24" 0.50% 24,07' RCP E2-El E-2 28.27 E-1 28.18 18" 0.53% 16.97' RCP E3-E2 E-3 29.09 E-2 28.27 18" 0.50% 162.76 RCP E4-E3 E-4 29.35 E-3 29.09 18" 0.51% 51.31' RCP F1-OUTF F-1 27.25 OUT F 27.00 15" 1.19% 21.00' RCP G1-OUTG G-1 26.80 OUT G 26.68 18" 0.50% 24.07' RCP RS1-11 RS-1 1 29.00 1.1 28,72 IT 0,51% 54.96 RCP RS2-21 RS-2 29.25 2-1 29.10 15" 0.59% 25.38' RCP RS3 31 RS-3 29.00 3-1 28.88 15" 0.53% 1 22.69' LRCP GENERAL NOTE: S THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJI X SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION, SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATII SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECOR UTING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITI EPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS A FULL CONFORMANCE WITH ! nra1 RFr,ULATIONS AND CODES. TC 32.38 33 #r d s d ar STM ,aq res fsfsf r ` ' STM ""a � a„.. � a� " ..s:�';. � G3245��' fs rfr TC32.$0 G-1 0 .." k�Y,0 d # r drr <��s ss OUT � � °`^ti•' %� h� G 33.35 a''/ Hew` ' -T, � : ,.:� : TC 32.95F � v . r f fs r fsr s § TC 31.75 G 12.00 TC 31.75 \ M TC 33.85 ° "°° TC 32.88 G 32.80 ss rrP d rf ® 9 f� �•, / sgf r are f 18 f r s r ass °ter tr TC 32.52 >j TC 32.98 df rd rarr r r I TC 33.60 / � d � # �`# �` s i # y f,r �F,s` ,f s TC 32,90 TC 31.96 >s TC 33.38 -4 G 32.66 € ## rg f q, STM / `° € UNIATION Jv fd ss f rf , ER:Pafs'OUND srdz r rr �q� o OUT F srffrff/�r2p0 �0 1 TC 33.74 / TC 32.55 � t t sr rr `rrr , ss � � $TM =13 � � � s �,. � v 28 € STM N « �, m t` as R �.Ia I � � rs�f ddfs d ° TC32.50 � .- �.-.... a OUT STM "" HP - G 33.31 �/ .,,s ; �� I� �>€-., �O If fr trdd , i r f T,;6 .' LP - TC 31.75 2 E-2 se rr raft ,"-STM 9 a f,a�,s°,� - F.�P.914 N 351,23 frd rsr`a d@° d E-1 1 TC 33.67 TC 84 STMi TC 32.60 � � �€ 1 F; a` ¢'_° L€ E s r a f s `ss d4° d TC 31.75 �, D{{{ -?` IN ZONED B µ 1 TC32.37 EIS # / ?� tr ss/p`sr rd �e TC 34.75 4 TC 32.18 TC 32.81t�r4 � TC 32.59 , TC 32.50 30 UTILITY SEMEN,d f gf f$„ r TC 34.29 € TC 33.22 € 32 TC 31.96 TC 32.80 /15' ON B , H 510 TC 34.34 POWERLINE rs f srfs s tit TC 32.50 TC 32.40 > r -F Fr". 8l�Eg� # %as a,t�dar rf ss TC34,25 4 �'9° / TC33.88 ' a s t q g 1 TC 34.95 :, rn r TC 31.83° ,o =s g TC 35.141 TC 34.57 TC 34.17 TC 34.30 , •zss � TC 34.22 / TC 34.46 TC 34.32 / ' TC 33,40 I €I ��,.. TC 34.53 ' � TC 33.36 v_ •1 TC34.27 34 '•./ '. HP-G33.65 N/ 6% ,..� ., `� TC33,12 ' r88O � ` �`�"- ° TC 32.95 p``� � 'I tB, E � � <7.�`'�V"1 S ♦ / M R ,ti, l"ak ....,. 'wb f °c ,! : s $ a.,,xm.e , STM - T_C � # i RIM 33.25 � r 9sg WET POND # NSF TC /, TC32.61 i ARY `,F° R�ANN �` oT �, #` D £"7 � 8 UNDERGROUND TC 34.25 Cc F%r. TC34.16 ' � � ;��.� 3 _ TC 32,36 �q > / STM A # D. . t € o £ COtl MUNI> 'ATfQI ' #t -11 10 TC 34.87 �.� �s�+� i °� rs r ,� TC 32.58 r� # � � €� >� "� .� � {,. ,,-�„q n, / TC34.07 \ r D2 tt ��i°B, �' 32 LINc`., TOP OF POND = 31 .75 , TC34.43 M . 13 , .3 P A BOTTOM OF POND = 12.0' ° �. `� TC34.26 TC34.10 PERMANENT POOL = 29.0' � �y� �Op L l�e4 dM1aFa �.� �� ti f#RESIDENTIAL U E ` HP G 34.01 o TC 3429 �'t f OR{ ? D m £ AREA TREATED = 160,000 SF � %lei _ QTnA TC 34,20 r; l 1/� r' ZONED R,b s. _ 1W =� WET POND "2 DESIGN CRITERIA: 90%TSS REMOVAL, 1-YR STORM GRADING NOTES �d 1V `''k,,, , TC 34,36 / RIM 33.26 TC 34.41 TC HP-G33.95 r 1. CONTRACTOR IS RESPONSIBLE FOR DEMOLITION OF EXISTING STRUCTURES INCLUDING REMOVAL OF ANY EXISTING UTILITIES. UTILITIES ARE TO BE REMOVED TO THE RIGHT-OF-WAY. 2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 3. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED. 4. PRECAST STRUCTURES MAY BE USED AT CONTRACTORS OPTION. 5. STORM PIPE SHALL BE AS FOLLOWS UNLESS OTHERWISE NOTED: CLASS III RCP (ASTM C76) WITH RUBBER O-RING GASKETS TO FORM WATER -TIGHT CONNECTIONS. 6. EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILT AND:DEBRIS. 7. EXISTING GRADE CONTOUR INTERVALS SHOWN AT 1'. 8. PROPOSED GRADE CONTOUR INTERVALS SHOWN AT T INTERVALS. 9. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 10, ALL STORM PIPE ENTERING STRUCTURES SHALL BE'GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT. 11. ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER 12, THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORM WATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND THE SPECIAL CONDITIONS, SECTION 8, ENVIRONMENTAL COMPLIANCE AND STORM WATER POLLUTION PREVENTION. 13, CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. 14. CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS. 15. TOPOGRAPHIC INFORMATION IS FAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS. IF THE CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR TO THE OWNER FOR REVIEW. 16. ALL UNSURFACED AREAS DISTURBED BY GRADING OPERATION SHALL RECEIVE 4 INCHES OF TOPSOIL. CONTRACTOR SHALL APPLY STABILIZATION FABRIC TO ALL SLOPES 3H:1V OR STEEPER. CONTRACTOR SHALL STABILIZE DISTURBED AREAS IN ACCORDANCE WITH GOVERNING SPECIFICATIONS UNTIL A HEALTHY STAND OF VEGETATION IS OBTAINED. 17, CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODE AND BE CONSTRUCTED TO SAME. 18, ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR INVERT FROM INVERT IN TO INVERT OUT. 19, CONTRACTOR TO ADJUST ANY EXISTING STRUCTURES TO PROPOSED GRADE IN ANY AREA OF PROPOSED GRADING. ofl. 'N�4;Z` < ti v7, GC TO ENSURE EX, DRAINAGE " 4 a6 TC 34,0019.00 PATTERNS ARE MAINTAINED AND DRAINAGE TC 34.05 ` S STM IS PROVIDED TO PROPOSED OR 14 °' i I TC 34.11 ;`� EXISTING DRAINAGE FACILITIES €€, F ° ( { f TC33,79 a '� `a A 2� �,f N�/ ,-3I. 4--� "_ . o /o TC 33.40 TC 32.81 8 TM s 1 /�y'°� pe,�' I ;� 1 UTILITY POLL € al,Q Ef °,i °.�s "E S A. � AINL & E =g t I ' . 1`TC33.52 0 r S __S ; Q' .1 y k• ., STM 3, TC33.15 . LP TC31.75 STM € }-"'. � r, °> �: � � D3K t F'90 Pa 9 1 A-14 STM I L; 3.25 • s 90 t / 1 F M #, r € ° y i' I A-15 TC32.71, rr �7';ASIE N i IAA "� TC 32.80 `� TC 32.62 TC 33.18 33 A='= dt 3 t I HP - G 32.81 .- � ,- TC 3395 R0�7 PERM. DITCH TO PROVIDE POSITIVE 1 � FROM ADJACENT PROPERTIES AND INIMIZE P4NIf}ING. P " 32.82 STM STM • ;'1' �' m. TC 33.03 _ V TC 33,40 R HP-TC33.90 s # s 1 TC 32.55 '` s "Y , ") Slat IT _ Elp F N " _ E V s 'kNS � RO INWES ORS, I �,"C y 8 10 11 GRADING LEGEND EXISTING (VOTE TYPICAL NOTE TEXT PROPOSED NOTE 20 CONTOUR ----------- 25--------- LINE 5` SPOT TC 516.00 N 55164 0� R �'s �,4 ,s, ELEVATIONS -KC516.001 BC 515.55 STORMI$ STM LABEL # --' -- --- '--- -- ---M ""-"- --- STM = STORM SEWER STORM MANHOLE -1 STORM O CLEANOUT CURB INLET 0 YARD INLET FR H,, 7 P.17 1 q� s R SIDE IAL. USE � t I s I4\ GRADING KEYNOTES (NOT ALL USED THIS SHEET_ OSEE ROADWAY PLANS FOR FULL ROADWAY GRADING AND NOTES. OCONTRACTOR SHALL ENSURE 2% MAX CROSS SLOPE AND 5% RUNNING SLOPE FOR ADA CROSSWALK/SIDEWALK AREAS, AND 2% MAX SLOPE IN ANY DIRECTION IN ALL ADA PARKING AREAS. OCURB TAPER. (SEE DETAIL SHEET.) OCONTRACTOR SHALL RELOCATE PIPE TO CENTERLINE OF NEWLY CONSTRUCTED DITCH. PROPOSED PERMANENT BAFFLE FOR WETPOND. SEE DETAIL SHEET. OPROPOSED AREA TO MINE FOR FILL SOILS AND REPLACE AND STOCKPILE WITH UNUSABLE SOILS AND TOPSOIL. OSTORMWATER MANAGEMENT AND ACCESS EASEMENT (VARIABLE SIZE). @/ LEVEL SPREADER (40' WIDE) WITH ENGINEERED VEGETATED FILTER STRIP (50' LONG). OPROP. GUIDE RAIL AND SAFETY FENCE. 10 CONTRACTOR TO INSTALL PERMANENT 15" RCP PIPE FOR CONTINUATION OF DITCH LINE. 11 INFILTRATION TRENCH (WITH PERFORATED PIPES) DUE TO NEARBY SHELLFISH WATERS. 12 RAISED PLANTER WITH SUBSURFACE INTERCEPTOR DRAIN SYSTEM. 13 PROP. TRENCH DRAIN WITH UNDERLYING 18" RCP PIPES TO TIE-IN TO DOWNSTREAM STRUCTURE (REFER TO ACO PLANS). 14 PROP. GABION BASKET WALL TO FORM FORE BAY. TOP OF POND = 31 .75' BOTTOM OF POND = 1 9.0' r PERMANENT POOL = 29.25' pill AREA TREATED = 156,200 SF DESIGN CRITERIA: 90% TSS REMOVAL, 1-YR STORM I FOR FULL ROADWAY WIDENING i AND IMPROVEMENT DESIGN, SEE i1 1 c, € ROADWAY IMPROVEMENT PLANS s PROP. I it ACCE EASEM 11 0.41 it �c € 1r STORM STRUCTURE SCHEDULE NAME TYPE RIM ELEV. INVERTS 1-1 NCDOT STD MANHOLE 31.27' INV IN = 28.72' INV OUT = 28,62' 1-2 NCDOT STD MANHOLE 30.98' INV IN = 28.24' INV OUT = 28.14' 1-3 ENDWALL 29.71' INV IN = 28.00' INV IN = 29.10' 2-1 NCDOT STD 5' MANHOLE W/ 18" TALL WEIR FLOW SPUTTER 32.02' INV OUT = 29.00' INV OUT = 29.10' 2-2 NCDOT STD MANHOLE 32.50' INV IN = 27.92' INV OUT = 27.82' 2-3 CONVERT EXISTING STORM STRUCTURE TO MANHOLE 32.20' INV IN = 26.64' INV IN = 26.64' 2-4 CLEANOUT 32.77' INV IN = 29.10' INV IN = 28.88' 3-1 NCDOT STD F MANHOLE W/ 18" TALL WEIR FLOW SPLITTER 31.80' INV OUT = 28.88' INV OUT = 28.88' 3.2 CLEANOUT 32.07' INV IN = 28.88' INV IN = 24.50' A-1 NCDOT STD CURB INLET 33.36' INV IN = 29.00' INV OUT = 24.40' INV IN = 24.82' A-2 NCDOT STD MANHOLE 34.10' INV IN = 26.58' INV OUT = 24.72' A-3 NCDOT STD CURB INLET 33.60' INV IN = 25.41'INV OUT = 25,31' A4 NCDOT STD CURB INLET 33.00' INV IN = 25.94' INV OUT = 25.84' A-5 NCDOT STD CURB INLET 33.25' INV IN = 26.91' INV OUT = 26.81' A-6 NCDOT STD CURB INLET 33.11' INV IN = 27,63' INV OUT = 27.53' A-7 NCDOT STD MANHOLE 34 62' INV IN = 28.05' INV OUT = 27.95' INV IN = 30.10' A-8 SIPHONIC MANHOLE 34.71' INV IN = 28.46' INV OUT = 28.36' A-9 VESTIBULE ROOF LEADER 34 77' INV IN = 31.20' INV OUT = 31.20' A-10 NCDOT STD CURB INLET 33 60' INV IN = 30.00' INV OUT = 29.90' A-11 TRUCK WELL DRAIN INV OUT = 30.35' A-12 _ SIPHONIC MANHOLE 34,91' INV OUT = 30.00' A-13 DBL NCDOT STD GRATE INLET 32.11' INV IN = 29.23' INV OUT = 29,23' A-14 NCDOT STD CURB INLET 32,25' INV IN = 29.84' INV OUT = 29.84' A-15 NCDOT STD CURB INLET 32.30' INV OUT = 29.89' INV IN = 26.03' B-1 NCDOT STD CURB INLET 33.00' INV IN = 28.35' INV OUT = 25.93' INV IN = 26.33' B-2 NCDOT STD MANHOLE 33.54' INV IN = 28.60' INV OUT = 26.23' INV IN = 27.17' B-3 SIPHONIC MANHOLE 34.26' INV IN = 27.17' INV OUT = 27,07' B-4 SIPHONIC MANHOLE 34 28' INV IN = 27.84' INV OUT = 27,74' INV IN = 30.75' B-5 NCDOT STD MANHOLE 34.35' INV IN = 28,34' INV OUT = 28.24' B-6 DBL NCDOT STD GRATE INLET 33.25' INV IN = 29.21' INV OUT = 29.1 V B-7 DBL NCDOT STD GRATE INLET 33.26' INV OUT = 29.82' INV IN = 30.00' B-8 NCDOT STD MANHOLE 34.49' INV IN = 29.35' INV OUT = 29.25' B-9 DBL NCDOT STD GRATE INLET 33.30' INV OUT = 29.80' B-10 TRUCK WELL DRAIN INV OUT = 30.35' B-11 NCDOT STD CURB INLET 32.74' INV OUT = 29.46' B-12 NCDOT STD MANHOLE 33 23' INV IN = 27.70' INV OUT = 27.60' B-13 NCDOT STD CURB INLET 31.75' INV IN = 28.33' INV OUT = 28.23' B-14 NCDOT STD CURB INLET 31.75' INV OUT = 28.43' INV IN=31.03' B-15 CLEANOUT 34.84' INV IN = 31.03' INV OUT = 31,03' B-16 VESTIBULE ROOF LEADER 34 77' INV IN = 31.5V INV OUT = 31.50' C-1 NCDOT STD CURB INLET 31.25' INV IN = 25.40' INV OUT = 25.30' C-2 NCDOT STD MANHOLE 32.97' IN`/ IN = 26.00' INV OUT = 25.90 G3 DBL NCDOT STD CURB INLET 31.47' INV OUT = 27.00' CB-C3 DOGHOUSE NCDOT 840.02 30.66' INV IN = 26.80' D-1 NCDOT STD CURB INLET 31.26' INV IN = 26.80' INV OUT = 26.80' D-2 NCDOT STD CURB INLET 32.25' INV IN = 27.32' INV OUT = 27.32' D-3 NCDOT STD CURB INLET 31.80' INV IN = 28.62' INV OUT = 28.52' D-4 FUEL CANOPY DRAIN 32.83' INV OUT = 29.00' E-1 NCDOT STD CURB INLET (5X5 BOX) 3126' INV IN = 28,18' INV OUT = 26.80' E-2 NCDOT STD MANHOLE 31.47' INV IN = 28.27' INV OUT = 28.27' E-3 NCDOT STD GRATE INLET 32.95' INV IN = 29.09' INV OUT = 29.09' E-4 NCDOT STD GRATE INLET 33.02' INV OUT = 29.35' F-1 NCDOT STD CURB INLET 31.25' INV OUT = 27.25' G-1 NCDOT STD CURB INLET 31.26' V OUT A ENDWALL V% = 23,8T OUT B ENDWALL 9'N OUT C ENDWALL INV IN = 25.00, OUT D ENDWALL OUT E ENDWALL 30.81' INV IN = 26.68' OUT F ENDWALL 24.15' INV IN = 27.00' OUT G ENDWALL 28.71' INV IN = 26.68' RS-1 RISER STRUCTURE 31.66' INV OUT = 29.00' RS-2 RISER STRUCTURE 30.69' INV OUT = 29.25' RS-3 RISER STRUCTURE 30.44' INV OUT = 29.00' REVISIONS BY NCDENR REVISIONS 7 5/18/16 BAB 8 NCDENR REVS/OTB REV BAB 5/31 /16 9 NCDOT/NCDENR REVS BAB 6/6/16 QA/QC, OTB REVISIONS 10 6/20/16 ATZ 11 NCDEQ REVISIONS BAB 8/3/16 12 BID ADDENDUM 1 BAB 9/21 /16 13 NCDEQ REVISIONS BAB 10/3/16 NCDEQ REVISIONS 14 10/19/16 BAB APPROVED . CONSTRUCTIO THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 BOHLER ENGINEERING 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www.BohlerEngineenng.com C:\USERS\BBUCKLANDINPPDATA\LOCAL\TEMPIACPUBLISH_41521NCC138078SS5.DWG PRINTED BY: BBUCKLAND 10.19.16 @ 9:05 AM LAST SAVED BY: BBUCKLAND A J51,760 2 3 1 5 g", . "IF 777%�Z; ­ZZ51, CONTRAaFIORS, INC 3163 P�522 45 P� 94 NT PARCEL S "ONA,", N S R!, 0 1 INVEST,�;)RZ.;rl LI/J,; 1 1 QQ_ NED B-1 3 4 '7 1/0 35 P12 51. M B; EZ 1 it 1 13 " r ­�, ; il lic! 1 B 0 F 0 R, V N 74 1 D JI-B. 4, 0 P S n I, �9! m x Ow t 'a IM&; ip _j 1 VP 70, E x TP I E It -4 ............... to D v1t1L4 1 STM % EX6 % Y- E-3 'y I lj ............ .... .... .. ... . ..... . ....... ........ qTM 2 3 JM STM DRAINAGE AREA 3 - BMP #3 .................................... .. ............... ...................... J� V 11, It ------- ... ..... . ............. I U I AL AKtA 160,000 or & r J 1PERVIOUS AREA 123,910 S N PERVIOUS AREA 36,090 -------- --- ", 2" ........... .... ........ .. - ...... ..... .. C VALUE: 0.77 .... .. ... ........ I Xx ........... ....... .. . ........... G-1 ell jr : I It 59 OF& JA g!aw ,, MATCHLINE ISHEY""T DA,=2 ------ --------- wen .......... . .............. z .. ............. ... .. r% 0 A J BRENDA, S11­,A.NLFE,",,' x ... .... ..... PRUtj R AD WORK ALON G"' C' 0' RBETT AVE AN D e, * D :�11 ........ ... f ... . . . ........... D-13�3313 P,,914 COMMERCIAL USE HAMM K BEACH RD RESULTS IN NET INCREASE OF 11v 351,236 4- .......... ........... - .......... . ............ ZONED B-1 f OF IMPERV +31,400 SF IOUs AREA, WATER QUALITY i If rz, N/F .. ................. . ........ ............ % TREATMENT FOR THE EXCESS RUNOFF FROM THIS THE COUNT`f OF ONSLOW .......... . ... . ....... . ........... .......... . ... . . . ................ ... ..... ... D.B. 1912 P,100 7 ..... ....... ....... ....... IMPERVIOUS AREA TO BE PROWIDED IN WET POND 1. .......... M,,13�23 P. 19 b'A' // I , , 1 1 . : f -1-10NAL USE E D UIC A, I ?,p 'X` �,S Z % �x, > x S, �/n ZONED WN. Z/ ..... ..... 'A' E I " W1111 V W. I,� E,�j Q'I 1,21 711V m K1,E',YS—,F(.),NE CONTRA(.,�'IORS, INC D3.3163 P�522 1-N ................... j x ............................ ............... z ;< N/F V .. .. ... ............. ..... . ............. .... ........... ...................... . . . . . . . .. I i N 14- S C H A R L E S A. RININ L,'- .............................. .............. MARY S,, RAM&S < h DI'42 D-2 x Y N ;11 ................ v "V, D3,1817 P. 884 ............... - .......... ..... . . ... ... . ... ..... M.8,43 P.32 'S BMP #2 ......... ....... �/ . ..... .... X DRAINAGE AREA 2 AL M,,B�37 P19 ; I I 1 ..1.1.1. - /1.1.111, .......... TOTAL AREA 128,200 SF x V /x" . ...... ............... . . IMPERVIOUS AREA =98,200 S ZONED B-1 RESIDENTIAL USE /K 11' F > PERVIOUS AREA 30,000 SF < A< C VALUE: 0.76 M. _-A A­ j, f X >/ x... ... k, .......... 7-1 K! X 70 X N/Fj 'I, " / I" , , , , 1 4� ............ ...... .................. x f J-1 IAR y6e. m:" '�u ...... / Tg X",/ " , 1, If /I x ex I 'LS ox/ STM ef MARY S� R 1001 x x* > ........ .. . , /x, x /X X, STM D-B� 790 P,291 x M3,43 P�32 x N/F q K RESIDENTIAL USE K, "y" X > V, iN ZONED B-1 THE COUNTf OF ONSLOW D31912 P-100 'X X X x _x k-, LOD x", M313 P19 �A )< //x- "I" 1V j EDUCA1 IONAL USE X N "A' "", / t A Z ON ED RA IX 28U�L g m X ............ . ........... A /x K NN > /,Z > . ..... " ... . ..... . ... . 2 x A., "p, A I � I / '. x 9`1 J'115�`Z'IiPIR�, v v (f 'A. 4 N X A a g x ff > ................. . . . . . . .............. /x K X, 33 Ir 10' GRA L DRIVf ...... ..... 74 & ............. jo I N/F THE COUN11),(� OF ONSLOW D-131912 P100 MB,23 P19 EDUCATIONAL USE ZONED RA IT IS THE RESPONSIBILITY OF THE CONTRACTOR T 0 REVIEW ALL OF HE DRAWINGS AND SPECIFICAT IONS ASSOCIAT ED WITH T HIS PROJECT TIVETO E WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELA I T HE SPECIRCAT IONS OR APPL;CABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY -1 HE PROJECT ENGINEER OF RECORD IN I E WRITING PRIOR TO T HE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUT DIN ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY T HE DRAWINGS AN C:kUSER,5�BBUCKLAND�APPDA,TAkLOCALkTEMP�ACPUBLISH-415ZNCC'.38078HP3.DWG PRINTED BY: BBUCKLAND 10,19.16@9:06MA LAST SAVED BY: BBUCKLAND DRAINAGE AREA 1 - BMP #1 TOTAL AREA = 479,365 SF ON -SITE AREA = 446,000 SF OFF -SITE AREA = 33,365 SF MPERVIOUS AREA 384,765,E PERVIOUS AREA 94,600 SF C VALUE: 0.79 .......... g N/F SBORO INVES DRS, 111-ff, 1-10 �7 .... ......... D.BAK0196 P-345 N/F RESULI'ANT It X . ..... ..... !--; I I I 'HARLES A. RAWLS & C I MAIRY S RAWLS M3,67 PJ79 RESIDENTIAL USE g� W,,gvg�gi At ZONED 8-1 D3.2639 P�913 x P r A 6 k,13�49 PA7 j� Q T fl E RESIDENTIAL U' ZONED B-4 x MTN _ ...... X w- A _04 F E 'N' T -583 "",""'.3 'I Q� ... . ...... , - Az z"_ SIPHONIC MANHOLE STRUCTURES X /`111_/ 1. __' ." , Z x UN X DO NOT PICK U` SURFACE RUNOFF x�, sk z'_ , ,, , A, K a m , "I, N/F STEVEN DOUGUNS �_-;[AiNLED( & / /K -72 P.624 ,/q, 'vA_1 X 1: Y. x /, x PARCEL "A" x M,8�49 P,136 w" K NTIAL USE X 2 x RE&D- I ZC`NED B-1 A_ ----------- I It ------------- IN S,__, FS 7 ....... ..... 41 ...... ....... .......... ................... ........... q I g; ..................... ......... ........... ..................... ............. ................. ............. A ...... ................ ....... N .......... ......................... ......................... .� ................ ........... 7 .............. ........ ...... 404 24 f ......... .......... 0 01 or ..................... v.0 ............... ..... "y r ..... ............. ... ......... % .. ... ... .... . ......... ............ -------- W, 1H W IL. H, LJ -7 ........ E_13�3851 P�581 .................... V M.B.23 P�3111� ....... ... ........... ' I SIDENTIAL USE It ZONED 8 N F .4 �N _K, PROP. 60' A Xf 'SS EASf MENT 0.41 K v Z- t 1p 17 1 18 1 POST-DEVELOPMENT DRAINAGE AREAS I DRAINAGE AREA/ TYPE AREA (AC) RATIONAL C STRUCTURE A-1 ----------------------------------------------- I -- ------ ---------------------------------------------- CURB INLET - ---------------------- ------------------------ -------------------------- 0.14 0.95 A-3 - - ----------- ---------- ----------------------------------------- CURB INLET ------ 0.12 - -- ------ .. ........ ---------------- 0.95 A-4 CURB INLET 0.13 0.95 A-5 CURB INLET 0.22 0.95 A-6 CURB INLET 0.20 0�95 A-8 SIPHONIC MANHOLE ROOF DRAIN 0.92 0.90 X9 VESTIBULE ROOF DRAIN 0. 03 0.90 A-1 0 CURB INLET 0,05 0.95 ---- - --------------------------------------------------- - - ------- ------------ ------ - -- ------ ­­­_­­­ I ------ A-1 I TRUCK WELL DRAIN 0.07 0.95 A-12 SIPHONIC MANHOLE ROOF DRAIN 0.92 0,90 A-1 3 DBL DROP INLET 0.50 0.90 A-1 4 CURB INLET 0.35 0,93 A-1 5 CURB INLET 1 0�35 0�93 B-3 SIPHONIC MANHOLE ROOF DRAIN 0,92 0.90 B-4 ------------------------------------------------------------------------------- ---------- SIPHONIC MANHOLE ROOF DRAIN ----------------- ----------------------------- 0.92 0.90 B-6 _------------_ DBL DROP INLET ---- ---------- ____ ------------ O�79 ------------- ------------- --------------------------------------- --------- 0,93 B-7 DBL DROP INLET O�69 0,92 B-9 CBL DROP INLET 0.23 0.95 B-1 0 TRUCK WELL DRAIN 0.07 0.95 B-1 I CURB INLET 0.22 0.95 B-1 3 CURB INLET 0.22 0,95 B-14 CURB INLET -- - -------------------- 0,92 B-16 --------------------------------------------------- --------- VESTIBULE ROOF DRAIN -------- ---- 0.03 ----- - -------------------­------ ------ 0.90 CURB INLET 0,08 0.93 C-3 DBL CURB INLET 0,49 0.85 D-1 (INLET) CURB INLET 0.05 0.9r D-1 (TRENCH DRAIN) TRENCH DRAIN 0.95 0.91 D-3 CURB INLET 0,30 0.80 D-4 i FUEL CANOPY ROOF DRAIN Ulu" 0.90 - - --------- - - - ---- ---------------------- * --------------------- ------------------­- ................ .. ............ ........ .. E-1 (INLET) CURB INLET 0.45 0,95 E-1 (TRENCH DRAIN) TRENCH DRAIN 0.70 0.95 E-3 TO SERVE FUT, DEV. 0.65 0.83 E-4 TO SERVE FUT, DEV. 0.60 0,83 0,90 F-1 CURB INLET 0.32 G-1 (INLET) CURB INLET 0.20 0,90 G-1 (TRENCH DRAIN) ---------- TRENCH DRAIN 1 ------------------------ - --------------------_ - -------------------------------------- 1 ---------- ----- 0.70 --- ------- ---------------_---_- ---- -- 0,50 ---------------- - ---- HATCH LEGEND I --------------------------------- I --------------------- 1­ ADDITIONAL ,N-SITE/OFF-SITE� IMPERVIOUS REA TREATMENT� VOLUME TO BE �CCOUNTED FOR IN WET POND 1 6.0 30 15 0 itv= 60' WET POND 3 1 DRAINAGE AREA ECEIVI w E S rREVISIONS BY 7 NCDENR REVISIONS BAB 15/18/16 I NCDENR REVS/OTB REV 8 1 15/31/16 BAB I 9 NCDOT/NCDENR REVS BAB 6/6/16 101 Q,4JQC OTB REVISIONS 6/20/16' ATZ 1 NCDEQ REVISIONS 813/16 BAB 12 1 BID ADDENDUM 1 9/21/16 BAB 131 NCDEQ REVISIONS 110/3/16 BAB 14 NCDEQ REVISIONS 10/19/16 BAB DRAWN BAB . ......... m 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 ( 10 I 11 I 12 I 13 I 14 I 15 I 16 I 17 I 13 0 C F G I L2— L LEVEL SPREADER/VEGETATED FILTER STRIP (FROM WET POND 1) 20 10 5 0 20 1 "= 20' , 8 ' G 33.80 :�' ,. I � ,. ` .� "°"' •'< � `"°�°`~., f STM G 33.75,./ STM ! ,.. 75 ,o / � G 32.65 D-4 G 32.90 a 0� G 33.45 ,.. £j° 50 G 32.90 G 33.55y, G 32.90 Af <, < , PG 33.55 ` f e ' 8 Cn °E f� I? � du • . ,8 is � .,d �' ,ia��t �' : Y .° ` � • < ' % � � <..��� °,,� �. • � � � `. �0. , �' � TC 32.95 a / s � � v �> G 32.80 G 32.90 / f� STORMWATER MAINTENANCE/ ! 33 ACCESS EASEMENT OF G 32.45 , CLEANOUTIOBSERVAT104UELL TC 33.60 ' / \ STORMWATER MAINTENANCE] `- G 32.66 ACCESS EASEMENT INFI TION THE CH AREA G 32.22 STM \ / .< if 2-4 � 66' c . ° ` PERFORATED PIPE \ \ TC 32.55 _„ / TC 33.00 ' FLOW SPLITTER MANHOLE STM I / TC 31.84 2-1 TC 32.60 STM b STORMWATER MAINTENANCE] ; ACCESS EASEMENT RS-2 TC 32.50 i VA �di dP P y1, 9 t dy dfPd ,,, 1 TC 32.62 ' I / J d d P d d 1 ! ! J P d ! f TC 32.34 / J��, / IF d d p ' ,•yP t 7 TC 32.86 / STORMWATER MAINTENANC !� INFILTRATION TRENCH (FROM WET POND 2) / AC'CSS EASEMENT ! s d TC 32.06 / # If d o o''GAA "ri/ HP-TC33.08 I �/ FLOW SPUTTER MAItl OLE STM \ \ `°�~« . PE OKAYED PIPE STORMWATER ACCESS EASEMENT 31 ; ! y � / . `� �6, INF TRATION TRENCH AREA € �„ -0 P d ; d ♦ \ / i STM ♦ \`,! __ TC 32.45 ,' HP- TC 32,58 ?s 3-2 O CLEANOUTIOBSERVATION WELL ~ `' ' ♦ STORMWATER MAINTENANCE] ACCESS EASEMENT j V 20 10 5 0 20 INFILTRATION TRENCH 1 "= 20' (FROM WET POND 3) N ,dd4 REVISIONS BY NCDENR REVISIONS 7 5/18/16 BAB NCDENR REVS/OTB REV 8 BAB 5/31 /16 NCDOT/NCDENR REVS 9 BAB 6/6/16 QA/QC, OTB REVISIONS 10 ATZ 6/20/16 11 NCDEQ REVISIONS BAB 8/3/16 BID ADDENDUM 1 12 9/21 /16 BAB NCDEQ REVISIONS 13 10/3/16 BAB NCDEQ REVISIONS 14 BAB 10/19/16 DRAWN BAB CHECKED MAT DATE 7/11/14 SCALE AS NOTED JOB No. NCC138078 SHEET GENERAL NOTE: 'HE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PRi SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELA PECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECI ING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSI TANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWING,' FULL CONFORMANCE WITH LOCAL REGI Iit ATIONS AND CODES. C:\USERSIBBUCKLAND%PPDATA\LOCAL\TEMMCPUBLISH_41521NCC138078SS5.DWG PRINTED BY: BBUCKLAND 10.19.16 @ 9:08 AM LAST SAVED BY: BBUCKLAND 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21 22 29 1 30 1 31 V D E I X i K L IN J LANDSCAPE SCHEDULE KEY QTY. BOTANICAL NAME COMMON NAME SIZE REMARKS SHADE TREE(S) AROG 52 ACER RUBRUM'OCTOBER GLORY' OCTOBER GLORY RED MAPLE 21/2-3" CAL B+B QPH 32 QUERCUS PHELLOS WILLOW OAK 21/2-3" CAL. B+B UPD 76 ULMUS PARVIFOLIA'DYNASTY DYNASTY ELM 3-3112" CAL. B+B SUBTOTAL: 160 ORNAMENTAL TREE(S) CCFP 43 CERCIS CANADENSIS'FOREST PANSY' FOREST PANSY REDBUD 2-2112" CAL, B+B CF 35 CORNUS FLORIDA WHITE FLOWERING DOGWOOD 8-10, B+B LI 1 LAGERSTROEMIA INDICA WATCHEZ NATCHEZ CRAPEMYRTLE 8-10, B+B MV 49 MAGNOLIA VIRGINIANA SWEETBAY MAGNOLIA 8-10, B+B SUBTOTAL: 128 EVERGREEN TREE(S) TD 37 TAXODIUM DISTICHUM BALD CYPRESS 810' B+B SUBTOTAL: 37 EVERGREEN SHRUB(S) ICH 634 ILEX CRENATA'HELLERI' HELLERI JAPANESE HOLLY 15-18" #3 CAN ICS 508 ILEX CRENATA'STEEDS' STEEDS JAPANESE HOLLY 30-36" #3 CAN IGS 800 ILEX GLABRA'SHAMROCK' SHAMROCK INKBERRY HOLLY 24-301 #5 CAN WM 32 MYRICA CERIFERA WAX MYRTLE 24" CONTAINER JD 30 JUNIPERUS DAVURICA'PARSONI' PARSONS JUNIPER 15-18" #3 CAN SUBTOTAL: 2017 ORNAMENTAL GRASS(ES) MSG 238 MISCANTHUS SINENSIS'GRACILLIMUS' MAIDEN GRASS 2 GAL. CONTAINER SW 135 PANICUM VIRGATUM'SHENANDOAH' RED SWITCHGRASS 2 GAL. CONTAINER SUBTOTAL: 373 ALL PLANTS MUST CONFORM TO THE CALIPER AND SIZE REQUIREMENTS PRESENTED IN THE LOCAL ORDINANCE WET DETENTION BASIN HERBACEOUS PLANT SCHEDULE VEGETATED SHELF PLANTINGS: f 21,520 SQUARE FEET OVERALL ' QTY BOTANICAL NAME COMMON NAME ROOT SPACING PLANTING RATIO 4 { 1,076 CAREX TENERA QUILL SEDGE 2" PLUG 2' O.C. 20% 646 EUPATORIADELPHUS FISTULOSUS JOE PYE WEED 2" PLUG 2' O.C. 12% 538 LOBELIA CARDINALIS CARDINAL FLOWER 2" PLUG 2' O.C. 10% 646 LOBELIA ELONGATA LONGLEAF LOBELIA 2" PLUG 2' O.C. 12% 861 SACCHARUM BALDINII NARROW PLUMEGRASS 2" PLUG 2' O.C. 16% 538 IRIS VIRGINICA BLUE FLAG IRIS 2" PLUG 2' O.C. 10% 1,076 JUNCOS EFFUSUS VAR. SOLUTUS SOFT RUSH 2" PLUG 2' O.C. 20% 5,380 NOTES: 1) PLANTING RATIO IS BASED ON THE AREA, NOT THE TOTAL QUANTITY OF THE PLANTS. THE QUANTITY OF EACH PLANT IS DETERMINED BY THE AREA RATIO AND THE SPACING IN WHICH THEY ARE TO BE PLANTED. 2) PLANTING OF BASIN IS NOT TO BE CONDUCTED UNTIL THE ACTUAL WATER LEVEL OF THE BASIN AND ALL SURROUNDING AREAS HAVE STABILIZED. PRIOR TO PLANTING, CONTRACTOR TO VERIFY THE WATER DEPTH TO THE NEAREST INCH. PLANTING AREA MAY NEED TO BE REVISED AND PLANT QUANTITIES ADJUSTED BASED ON FIELD CONDITIONS. SYMBOL SQ. FT. VARIETY SEEDING RATE SEED •;":�'• f88,000 SF - UDAGRASS TURF TYPE SEEDED BERM ' OR SIMILAR - 135 ACRE 90 LBS / -3 LBS. 1000 . FT. 2 SQ SOD t7,000 SF BERMUDA TIFWAY 419 N/A MEADOW SEED + + t25,200 SF I ERNST BASIN MIX ERNMX-127 ism SPECIFICATION ERNST SEED CO. BASIN FLOG R SEED MIX SPECIFICATIONS (ERNMX-127): ELYMUS VIRGINICUS VIRGINIA WILD RYE 25% Q CAREX VULPINOIDEA FOX SEDGE 25% POA PALUSTRIS FOWL BLUEGRASS 25% AGROSTIS SCABRA TICKLEGRASS (ROUGH BENTGRASS) 6% SPARGANIUM EURYCARPUM GIANT BUR -REED 3% VERBENA HASTATA BLUE VERVAIN 3% JUNCUS EFFUSUS SOFT RUSH 2% SC IRPUS ATR OVIRENS GREEN BULRUSH 2% R SCIRPUS CYPERINUS WOOL GRASS 2% SCIRPUS POLYPHYLLUS MANY -LEAVED BULRUSH 2% MIMULUS RINGENS SQUARE STEM MONKEYFLOWER 1% CAREX SCOPARIA BLUNT BROOMSEDGE 1% HELENIUM AUTUMNALE COMMON SNEEZEWEED 1% IRIS VERSICOLOR BLUE FLAG 1% JUNCUS TENUIS PATH RUSH 1% S SEEDING RATE: 15 LBS PER ACRE OF THE ERNST MIX WITH AN ADDITIONAL 30 LBS PER ACRE OF GRAIN RYE (AS A NURSE CROP). THE TEMPORARY SEEDING SPECIFICATION AS NOTED ON THE SOIL EROSION AND SEDIMENT CONTROL PLAN SHALL APPLY TO THIS AREA. 1.) THE FORMULATION NOTED ABOVE IS REPRESENTATIVE OF THE ERNST SEED SPECIFICATION. THE MOST CURRENT FORMULATION AS SPECIFIED BY T THE ERNST COMPANY AT THE TIME OF PLANTING SHALL BE USED. 2.) SEED SHOULD BE APPLIED USING DRILL SEEDING OR BROADCAST SEEDING METHODS ONLY. THIS SEED MIX WILL NOT GERMINATE WELL WITH HYDROSEEDING METHODS. 3.) THE ENTIRE FACILITY SHALL BE STABILIZED WITH A NORTH AMERICAN U GREEN SC150 STRAW & COCONUT BLANKET (OR APPROVED EQUAL). THE BLANKET SHOULD BE INSTALLED ON TOP OF THE SEED IN ACCORDANCE WITH THE MANUFACTURER SPECIFICATIONS. 4.) THE SEED MIX WILL NEED DAILY SUPPLIMENTAL WATERING UNTIL IT HAS GERMINATED AND REACHED AN AVERAGE HEIGHT OF AT 12-18". V 5.) THE SEEDING AREA SHALL BE MOWED ONCE AFTER THE FIRST GROWING SEASON, EARLY IN THE SPRING, AND THEN SHALL BE MOWED NO MORE THAN ONCE EVERY THREE YEARS THEREAFTER EARLY IN SPRING ONLY. GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENT' RELATIVE TO THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN C:\USERS\BBUCKLAND\APPDATA\LOCAL\TEMP\ACPUBLISH_4152\NCC138078LP3.DWG PRINTED BY: BBUCKLAND i0.19.16 @ 9:09 AM LAST SAVED BY: BBUCKLAND '�„ 3t 3 i LANDSCAPE '" I f �;, � �g €,,,,Je/ .,� .,,,,� t'•.rG °�i ? `Y � T '. , 4 SUMMARY ---------- gym' �-'^ "� 3 1 e f � 3 ; `'s, 1133 £ .. ; �, t .. €.«" t,,,", �,,.", p"w� i :..,,,,, ,.,� . I,,,,.i ,.Z , j s �' £ 4 WEST PERIMETER BUFFER = f 1,184 LF EAST PERIMETER BUFFERS = f 1,614 LF i 2 CANOPY TREES REQUIRED / 35 LF = 68 TREES REQUIRED 2 CANOPY TREES REQUIRED / 35 LF = 98 TREES REQUIRED 7 TREES PROVIDED 98 TREES PROVIDED UNDERSTORY TREE SUBSTITUTES DUE TO 122 TREES PROVIDED NOTE = TOTAL PROVIDED INCLUDES USING 6 EXISTING TREES FOR CREDIT { CONFLICT WITH OVERHE10 POWER TO MEET THE CANOPY TREE TOTAL 12 SHRUBS REQUIRED / 35 LF = 408 SHRUBS REQUIRED 12 SHRUBS REQUIRED / 35 LF = 444 SHRUBS REQUIRED 408 SHRUBS PROVIDED 444 SHRUBS PROVIDED SOUTH PERIMETER BUFFERS = t 1,251 LF TOTAL NORTH PERIMETER BUFFERS = t 724 LF TOTAL 2 CANOPY TREES REQUIRED / 35 LF = 74 TREES REQUIRED 2 CANOPY TREES REQUIRED / 35 LF = 27 TREES REQUIRED 74 TREES PROVIDED 27 TREES PROVIDED NOTE TOTAL PROVIDED INCLUDES USING 24 EXISTING TREES FOR CREDIT - TO MEET THE CANOPY TREE TOTAL 12 SHRUBS REQUIRED / 35 LF = 162 SHRUBS REQUIRED 12 SHRUBS REQUIRED / 35 LF = 408 SHRUBS REQUIRED 162 SHRUBS PROVIDED 408 SHRUBS PROVIDED NOTE PROPOSED BUFFER ALONG THE ADJACENT COMMERCIAL PARCELS IS - DIVIDED ALONG THE PROPERTY LINE, WITH EACH USE TO PROVIDE ONE-HALF OF THE REQUIRED BUFFER PLANTINGS. 23 24 25 26 27 28 7 N 351,760 N 351,760 N/F KEYS NE CONTRACTORS, INC F D.B.3163 P°522 M.B. 45 P. 94 VACANT PARCEL n ZONED B--1 PLANTING NOTES: ~! F 1. ALL LANDSCAPE AREAS ARE TO RECEIVE A MINIMUM OF 4" OF TOPSOIL, SEE 2900 SPECIFICATION. / 2. ALL PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE OF PESTS AND DISEASE. 3. ALL PLANT MATERIAL SHALL BE CONTAINER CROWN OR BALLED AND BURLAPPED AS INDICATED IN THE PLANT LIST. 4. ALL TREES SHALL HAVE A STRAIGHT TRUNK AND FULL HEAD AND MEET ALL REQUIREMENTS SPECIFIED. { 5. ALL MATERIALS ARE SUBJECT TO THE APPROVAL- OF THE LANDSCAPE ARCHITECT BEFORE, DURING, AND AFTER INSTALLATION. :� • ~ ''�+ 6. ALL TREES MUST BE GUYED OR STAKED AS SHOWN IN THE DETAILS..„y ~,W. tr 7. ALL PLANTING AREAS SHALL BE COMPLETELY MULCHED AS SPECIFIED. 8. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL AVOID DAMAGE TO ALL UTILITIES DURING THE COURSE OF THE WORK. N/F LOCATIONS OF EXISTING BURIED UTILITY LINES SHOWN ON THE PLANS ARE BASED UPON BEST AVAILABLE INFORMATION AND ARE TO BE CONSIDERED APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR 1) TO VERIFY THE LOCATIONS OF UTILITY LINES AND ADJACENT TO THE WORK AREA 2) TO PROTECT OF ALL UTILITY LINES DURING THE CONSTRUCTION PERIOD 3) TO REPAIR ANY AND THE COUNT' OF ONSLOW r4; F THE CONSTRUCTION. D. B.191 2 P° 100 ALL DAMAGE TO UTILITIES, STRUCTURES, SITE APPURTENANCES, ETC. WHICH OCCURS AS A RESULT0 , 236 ; M.B.23 PA 9 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL QUANTITIES SHOWN ON THESE PLANS BEFORE PRICING THE WORK. ` EDUCATIONAL USE 10. CONTRACTOR SHALL BE RESPONSIBLE FOR DELIVERY SCHEDULE AND PROTECTION BETWEEN DELIVERY AND PLANTING PER SPECIFICATIONS TO MAINTAIN HEALTHY CONDITIONS. ZONED RA fi 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FULLY MAINTAINING (INCLUDING BUT NOT LIMITED TO: WATERING, SPRAYING, MULCHING, FERTILIZING, ETC.) ALL OF THE PLANT MATERIALS AND LAWN FOR THE PERIOD OF TIME SHOWN IN THE 02900 SPEC.` 12. ANY PLANT MATERIAL WHICH IS DISEASED, DISTRESSED, DEAD, OR REJECTED (PRIOR TO SUBSTANTIAL COMPLETION) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL PLANT LIST SPECIFICATIONS. qlmkk 13. THE CONTRACTOR SHALL COMPLETELY GUARANTEE ALL PLANT MATERIAL FOR A PERIOD DEFINED IN THE 02900 SPEC. THE CONTRACTOR SHALL PROMPTLY MAKE ALL REPLACEMENTS DURING THE NORMAL PLANTING SEASON. 14. AFTER BEING DUG AT THE NURSERY SOURCE, ALL TREES IN LEAF SHALL BE ACCLIMATED FOR TWO (2) WEEKS UNDER A MIST SYSTEM PRIOR TO INSTALLATION. Nw� 15. STANDARDS SET FORTH IN "AMERICAN STANDARD FOR NURSERY STOCK" REPRESENT GUIDELINE SPECIFICATIONS ONLY AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIAL %� � 4p,2 16. WHERE SHOWN ON THE PLANS AND DETAILS, PLANTING BEDS ARE TO BE COMPLETELY COVERED WITH A HARDWOOD MULCH FROM A LOCAL SOURCE HARVESTED IN A SUSTAINABLE MANNER TO A MINIMUM DEPTH OF FOUR INCHES. N J5 1,000 //l 17. REFER TO WALMART SPECIFICATIONS FOR INFORMATION NEEDED FOR IMPLEMENTATION OF PLANTING PLANS.a� THE COUNTY OF ONSLOW 18. WEED MAT IS REQUIRED IN LANDSCAPED ISLANDS AS SPECIFIED. D. B.191 2 P.100 %9 . ' 6 QUANTITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF ALL PLANTING BEDS AT SPACING SHOWN. °B �` P.19"� ' �,,,�..,A dg 19. All PLANT MATERIAL Q� , a � EDUCATIONAL USE j``u 20. THIS PLAN IS TO BE IMPLEMENTED COOPERATIVELY WITH SWPPP PLAN, AS NEEDED, TO MAXIMIZE THE EFFECTIVENESS OF THE SWPPP PLAN FOR THIS SITE. ZONED RA ,. f f �! 4/� �• \ w~,'k,,,,,h ,r..."^' "� p w„e, 'vy�b� S FOR SOIL TA ILL ATION AS AREAS ARE COMPLETED AFTER GRADING. \\\ 21. THE CONTRACTOR IS ENCOURAGED TO COMPLETE TEMPORARY OR PERMANENT SEEDING OR SODDING IN STAGE L S B Z LEIS GRAD G � � ,, s , ""h`�'�" `"•`�� ,, � r :N� 22. THIS PLAN DOES NOT PRESENT ANY TEMPORARY STABILIZATION REQUIRED AS PART OF SWPPP PLAN. 23. ALL SEEDING AREAS TO MEASURED AND VERIFIED BY CONTRACTOR PRIOR TO BID AND AGAIN PRIOR TO SEEDING. 'alb --a'a/..•,.',,,,„,b---£'! ,9 INS. FENCING MUST BE A MINIMUM FOUR HIGH OF -4r 4. ALL EXISTING VEGETATION THAT IS TO BE PRESERVED SHALL BE FENCED WITH A DURABLE STURDY FENCE BEFORE GRADING BEG THE FEET 4) ,.:.:;.;;=; :::• " MU BE INSTALLED ON THE TREE PROTECTION :FENCE AND BE VISIBLE ;- F 7, � q y DURABLE CONSTRUCTION, AND PLACED OUTSIDE THE ORIPLINE OF THE TREES TO BE PROTECTED. TREE PROTECTION ZONE SIGNS ST y//��py3yp'y{ gy (y y,Jy [y ( ) .- i%'j •,: ..... ...'• � :. ,.... .,::. .,s„. -. ,.. ., .,., ., .,... , ,. ,;; ^. .:; ,a .;.., :.. ..: a / :::' .��4 � a,P �4A'+F gl ��TwLC ��Y _ ARE NOT ABLE TO BE PROTECTED LANDSCAPE ARCHITECT AND CEC TO ON ALL SIDES OF THE FENCED IN AREA (MINIMUM ONE SIGN ON EACH SIDE AND/OR EVERY 300 LINEAR FEET}, IF TREES SHOWN , .... ;�'�.. � _.,.,���_,. .M,,�/�.:......,..' ��4\�9� 1 i •. f:FiF�f F�� A. RAVVI � P�: N 35176 .~ham 6 w`•.. nh�, „°.�, ~"•ham �"`°�'��,, .; •'^`;, � `4`4w�w�i.• A _+r ``s'``' '~w„ •.,w ,he"(w, up„bW h`e .mow.. ~ 3' tir •w. h {f N�z i a� r� A, BRENDA A' AREA TO BE SODDED LAWNGRASS SEE PERMANENT RAS ( / >. R IA ESIDE _NT L USE ZONED B -1 S r r l l e' r•~ , b 3j n Y' Y•. G G D WITH ERNST BAST N SEED MIX TO E SEEDED l� F N � • .X r AREA B 4 4'0 ;d 6 t= + +/ £ ( ERNMX-127 SEE SPECIFICATION AREA SHALL NOT BE T COUNTY OF ONSLOW H . � �� • / + MOWED REGULARLY . M,8°23 P° 19 4 l�t VEGETATED SHELF PLANTINGS (REFER TO WET DETENTION E EDUCATIONAL USE � :: • :. • • e ....... , • ..., .'. y6 r '6 BASIN HERBACEOUS SCHEDULE NO MOWING AREA ) ZONED RA (3 / co SEE SHEETS: � \ G5 NORTH SITE' PLAN I G8 NORTH GRADING AND � DRAINAGE PLAN G11 NORTH UTILITY PLAN C-14 NORTH LANDSCAPE PLAN = � � I o \ � I m n / SEE SHEETS: \ � � _ C-4 SOUTH SITE PLAN I � O \ - C-7 SOUTH GRADING AND o DRAINAGE PLAN G10 SOUTH UTILITY PLAN C-13 SOUTH LANDSCAPE PLAN- r..........: t� N/F ' Vt L.L.C. LIMITS OF BMP/MOWING AREA (SEE NOTES ABOVE ' REGARDING AREAS NOT TO BE MOWED) � ^- D 3851 P 87 I ,234 N 350,234 M. B.23 P.3 3 u N/F RESIDENTIAL USE ALL SEEDING/SODDING AREAS SHALL BE MEASURED AND VERFIED BY CONTRACTOR PRIOR TO BID W. KEITH WALSH, L.L.C. ZONED B--1 ALERT TO CONTRACTOR: I. THE SITEWORK FOR THE WAL-MART PORTION OF THIS PROJECT SHALL MEET OR EXCEED THE "WAL-MART STANDARD SITEWORK SPECIFICATIONS." 2. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL W F CONNECTION OF SERVICES. 3. WHEN PROPOSED SPECIES ARE UNAVAILABLE, PLANT SUBSTITUTIONS MAY BE CONSIDERED WITH APPROVAL BY THE OWNER AND/OR LANDSCAPE ARCHITECT AS LONG AS PROPOSED MATERIAL IS TRUE TO PLANTING INTENT AND MEETS CODE REQUIREMENTS. NOTE TO CONTRACTOR: 18" WIDE SOD STRIP IS REQUIRED BEHIND ALL CONCRETE CURBS/BUFFERS. E D.B.385 1 P. 585 t 3 y F s a b VACANT PARCEL RCEL r '^,%•/�,.,�'L•%',H /,W,.E' i•.ti//'h%% ..H//rY, f/N /..../:%:✓,C,'9/v<-}. �/a9/^'%'9.'..W/2;';/:Y9:4/Nf�: L//�"B/HiY///%///N.fF.E<;;•<; ...,9-_,.-.; ,2'H/U/////%NCM, /¢i✓.....c-__�✓'/i0%4.:. lb'/rtl'b// /.,✓...s�,:;.UH//Li LNY/9/,.M,'�M/////00//f:6Y.•/,l %////%U6H.4H/H/,.K%/� ZO"N F� ��= 8SF` t t � r N/F "EITH WALSH, L.L.C. ).B.3851 P.589 M3.32 P.240 VACANT PARCEL ZONED R-8SF AUTOMATIC IRRIGATION IS NOT REQUIRED ON THIS PROJECT DUE TO ENVIRONMENTAL CONDITIONS THAT �`�° �\H 20. •�v p•N D S C q'A�•• .�% DO NOT WARRANT THE INSTALLATION OF A WATERING SYSTEM FOR PLANT ES TA LISHMENT AND A' SURVIVAL. 637 Q� . I N/F SWANSBO INVESTORS, D.B°4096 P RESULTANT T M,B•6f"jP. RESIDENTIAL ZONED B / ,t 3 sQ. i� �a . L ` 1 , E •ice O 4 LANDSCAPE AR ITECT SIG ATURE/ SEAL 100 50 25 0 p"` 100 A 1"-100' �a CREVISIONS BY NCDENR REVISIONS 7 BAB 5/18/16 NCDENR REVS/OTB REV 8 BAB 5/31/16 NCDOT/NCDENR REVS 9 6/6/16 BAB QA/QC, OTB REVISIONS 10 ATZ 6/20/ 16 NCDEQ REVISIONS 11 8/3/16 BAB BID ADDENDUM 1 12 9/21/16 BAB NCDEQ REVISIONS 13 BAB 10/3/16 NCDEQ REVISIONS 14 BAB 10/19/16 DRAWN BAB CHECKED MAT DATE 7/11/14 SCALE 1 "=100' JOB No. NCC138078 SHEET 0 ; ---------- _,__________________ 1__­ 1 1 2 -----I--- I----- ____________,____ 3 1 4 __ ___ - ____ ------------- - - __ - 1 5 1 6 1 7 rk 0 A C A _9 I G I 1" IV K 11 All PERMANENT GRASS CHART SYMBOL SQ. FT. VARIETY SEEDING RATE SEED ±88,000 SF TURF -TYPE SEEDED BERMUDAGRASS 'SAW OR SIMILAR 2-3 LBS. / 1 000 SO. FT. . SOD F111'111111111A ±7,000 SF BERMUDA TIFWAY 419 N/A MEAM SEED . - + + + + + + + + ±25,200 SF ERNST BASIN MIX (ERNM -127) 1 (SEE SPECIFICA1M) ERNST SEED CO. BASIN FLOOR SEED MIX SPECIFICATIONS (ER,NMX-127 ELYMUS VIRGINICUS VIRGINIA WILD RYE 25% CAREX VULPINOIDEA 25% POA PALUSTRIS FOWL BLUEGRASS 25% AGROSTIS SCABRA TICKLEGRASS (ROUGH BENTGRASS) 6% SPARGANIUM EURYCARPUM GIANT BUR -REED 3% VERBENA HASTATA BLUE VERVAIN 3% SOFT RUSH 2% SCIRPUS ATROVIRENS 2% SCIRPUS CYPERINUS WOOL GRASS 2% SCIRPUS POLYPHYLLUS 2% MIMULUS RINGENS 1% CAREX SCOPARIA BLUNT BROOMSEDGE 1% HELENIUM AUTUMNALE COMMON SNEEZEWEED 1% IRIS VERSICOLOR BLUE FLAG 1% JUNCUS TENUIS PATH RUSH 1% SEEDING RATE: 15 LBS PER ACRE OF THE ERNST MIX WITH AN ADDITIONAL AIN RYE (AS A NURSE CROP). THE TEMPORARY SEEDING SPECIFICATION AS NOTED ON THE SOIL EROSION AND SEDIMENT CONTROL PLAN SHALL APPLY TO THIS AREA. .1-1-1-1.1-1-1-1-1-1-1 11-11 I ­­­­­., ... I ........... 11.1 ..... 11.1-1-1--l-1-1­1 "Ir — OVERALL PROJECT WEST PERIMETER BUFFER = ± 1,184 LF I I . EAST PERIMETER BUFFERS = ± 1,614 LF � REQUIRED UIRED / 35 LF = 98 TREES REQUIRED 7 TREES PROVIDED I I � 98 TREES PROVIDED UNDERSTORY TREE SUBSTITUTES DUE TO 122 TREES PROVIDED I NOTE = TOTAL PROVIDED INCLUDES USING 6 EXISTING TREES FOR CREDIT CONFLICT WITH OVERHEAD POWER I . , TO MEET THE CANOPY TREE TOTAL . I 12 SHRUBS REQUIRED / 35 LF = 408 SHRUBS REQUIRED . I � I I - 12 SHRUBS REQUIRED / 35 LF = . 1 444 SHRUBS REQUIRED -1 408 SHRUBS PROVIDED . 444 SHRUBS PROVIDED SOUTH PERIMETER BUFFERS = ± 1,251 LF TOTAL . FFERS = ± 724 LF TOTAL 1 2 CANOPY TREES REQUIRED / 35 LF = 74 TREES REQUIRED 1 2 CANOPY TREES REQUIRED / 35 LF = � 27 TREES REQUIRED 1 74 TREES PROVIDED 27 TREES PROVIDED NOTE = TOTAL PROVIDED INCLUDES USING 24 EXISTING TREES FOR CREDIT I - I I I TO MEET THE CANOPY TREE TOTAL 12 SHRUBS REQUIRED / 35 LF = 162 SHRUBS REQUIRED 12 SHRUBS REQUIRED / 35 LF = 408 SHRUBS REQUIRED 1 162 SHRUBS PROVIDED 408 SHRUBS PROVIDED FER ALONG THE ADJACENT COMMERCIAL PARCELS IS I DIVIDED ALONG THE PROPERTY LINE, WITH EACH USE TO PROVIDE ONE-HALF I OF THE REQUIRED BUFFER PLANTINGS. I oi, . I 1.) THE FORMULATION NOTED ABOVE IS REPRESENTATIVE OF THE ERNST D.B.1912 PAOO ,05' u, � SEED SPECIFICATION. THE MOST CURRENT FORMULATION AS SPECIFIED BY Powc-pumt,-�% ,__, ,­�% A ,,,, ,/,,' ,,�, THE ERNST COMPANY AT THE 11ME OF PLANTING SHALL BE USED. M.B.23 PA9 ,,, 'Iqul, "", IF, , I ", , ._� 10 rm/jv. . 1,911 M71 / . I // I ,,,�' �, EDUCATIONAL USE / li'llIff . , I If Z, t I , , , - .1 ,/ 117 � APPLIED USING DRILL SEEDING OR BROADCAST /If /� / t;" I . 1/1 /I // i SEEDING METHODS ONLY. THIS SEED MIX WILL NOT GERMINATE WELL WITH 111/1' .,/,., f1l, 1� � / . , // i YI/ or ,_ ,e_ A I- - I HYDROSEEDING METHODS. 11 /�/ , �/ - N, / J/ . , P / " I ­� �1/11­111% " 'If Ill / I *1 , I ,/1%1111, Ar / I 4., / \ , ", ,e4, ,(/ ,�, Mf . *,/%�,%,___,.� TIRE FACILITY SHALL BE STABILIZED WITH A NORTH AMERICAN A // I , % "' 3.) THE EN 1 ,,, i / . I -,. "I,_ � ROVED EQUAL). THE Iff, // I/ . 11� I �1..., I , J/ , % , 11, "I .1111, � I ", Vf I.. �.�,l �,, .. .. I , , I'll --- , .... � /, �", BLANKET SHOULD BE INSTALLED ON TOP OF THE SEED IN ACCORDANCE WITH i'/ �f/ , I % I',, *,_�,�. �N � 1 '�1%111�1 I/ /.j / , ,�qll " % I "I IFICATIONS. A/1 , / i , 1. , I , ./",/, ,� &7, " I �, "I,--,. , � A, - I `____-�. 1,,� " 111. I ", ", 'N . " / 41 " I % �,, . I . . . . . . . . 11 . .. ... . I I P,�, --"" I I / �,,,, e 4.) THE SEED MIX WILL NEED DAILY SUPPLIMENTAL WATERING UNTIL IT HAS A111, I 11 k ­', ­�,,�., ..", If I ,�., '11� � . .. .... ,�., ,�., ,�., I - Ira' , / ,,-,, 4 ICH k I 11 ,�., .1', . b/'X','itP , ��,�, - , - , OF AT 12-18". .9; 1", , "/,?F,7.� .1 / -, � --,, ,�,�, I " . . . . . . . . . . I "`­` GERMINATED AND REACHED AN AVERAGE HEIGHT I ,,, I . �, ­­ -,,I " -:�,,,, ­1%_?1_`___1 ... I, . ; "Ill, , -- 11,�� ,�'_ "I ­`- Z, , " I 11 I _%4m /11 '. I I �, I I 1'.� I `I,- - - I " 2 Iq ""�� , W"'r-', '. Al "' /116�0 / / "',/ 5.) THE SEEDING AREA SHALL BE MOWED ONCE AFTER THE FIRST GROWING , � ��, 9 - _,��/� , `1­_111 ,X ""' `­ . . .. fAr 9 // 7 /, i�, - "______k, , 'I-,' t I Z, / ­­�,,,­ 1 2 UPD , �,�,�"."� "".1, " � I ,,,, -,,,,, � , RLY IN SPRING ONLY. r,1 "I `­_ , *,--,---,, � I ',"',� -"*----" SEASON, EARLY IN THE SPRING, AND THEN SHALL BE MOWED NO MORE " " i ., ", , I / I "o / V / -%,", - . THAN ", " "'. 111 #� Ill '111 165, I " Ka I/ 16 ICS '__1 ­,�', ///1 - , 1��.,� ,�", I ;i / i it­1. , z>'_'__,__-,_ .. .... - ,"// ", C-71 � I , ,� -11-11. I 1,11 I ", , ., /A 5 1 % --, I � ­ ,,, "'. _1___1 I A, , I 11 '�_­,., 'I". ^1 i� A/0" /11 / I %, "I . I " - I JI/ , f t J� 11. . I 1'��_, 11, I "i--� , I � :�� 1 16) 1�1, f . I 1"." N \ - i I ­--,,�� 1 , 11 4 1 � I i ", " N J5 1, TOO - - 17�1 ,Z -, F 6 IQI I � t .1 1V4 � . '1,,� #;o � ,� - . '. ; "I '%, "�'_ �/--,,­:; " 1 Ll- — . I'll 11111_111� "C,11'_�.,, , ��11 � 1�1 I � - , , . ,.�, ,k"_�� 6 CCF , , � I , � ,r-, � I .,��wft � Je "' �/"�� , I � 11 /I- ,I, ,,, , 11 ;;;; . '. '�,','�!;�, " /I .101, 1� ,­�, , 11 / � � < 11. _. .1, ___ - ____ - ­ ------,--- ____,_____ ____ - - __ — __ - — ____ -------, - -_ - - ____ -_ - --- ______ —_ 8 �.l 9 1 10 I 1 1 1 12 1 , 13 PLANTING NOTES: 1. ALL LANDSCAPE AREAS ARE TO RECEIVE A MINIMUM OF 4" OF TOPSOIL� SEE 2900 SPECIFICATION. 1 2. ALL PLANT MATERIAL SHALL, BE HEALTHY, VIGOROUS, AND FREE OF PESTS AND DISEASE. 3. AL PLANT MATERIAL SHALL. BE CONTAINER CROWN OR BALED AND BURLAPPED AS INDICATED IN THE PLANT LIST. 4. ALL TREES SHALL HAVE A STRAIGHT TRUNK AND FULL HEAD AND MEET ALL REQUIREMENTS SPECIFIED. . 5. ALL MATERIALS ARE SUBJECT TO THE APPROVAL OF THE LANDSCAPE ARCHITECT BEFORE, DURING, AND AFTER INSTALLATION. 6. ALL TREES MUST BE GUYED OR STAKED AS SHOWN IN THE DETAILS. ' 1 7. ALL PLANTING AREAS SHALL BE COMPLETELY MULCHED AS SPECIFIED. 8. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL. AVOID DAMAGE TO ALL UTILITIES DURING THE COURSE OFTHE WORK. LOCATIONS OF EXISTING BURIED UTILITY LINES SHOWN ON THE PLANS ARE BASED UPON BEST AVAILABLE INFORMATION AND ARE TO BE CONSIDERED APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR 1) TO VERIFY THE LOCATIONS OF UTILITY LINES AND ADJACENT TO THE WORK AREA 2) TO PROTECT OF AL UTILITY LINES DURING THE CONSTRUCTION PERIOD 3) TO REPAIR ANY AND ALL DAMAGE TO UTILITIES, STRUCTURES, SITE APPURTENANCES, ETC. WHICH OCCURS AS A RESULT OF THE CONSTRUCTION. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL QUANTITIES SHOWN ON THESE PLANS BEFORE PRICING THE WORK. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR DELIVERY SCHEDULE AND PROTEC11ON BETWEEN DELIVERY AND PLANTING PER SPECIFICATIONS TO MAINTAIN HEALTHY CONDITIONS. 11. THE CONTRACTOR SHALL. BE RESPONSIBLE FOR FULLY MAINTAINING (INCLUDING BUT NOT LIMITED TO: WATERING, SPRAYING, MULCHING, FERTIUZING, ETC.) ALL OFTHE PLANT MATERIALSAND LAWN FOR THE PERIOD OF TIME SHOWN IN THE 02900 SPEC. 1 12. ANY PLANT MATERIAL WHICH IS DISEASED, DISTRESSED, DEAD, OR REJECTED (PRIOR TO SUBSTANTIAL COMPLETION) SHALL. BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF I THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL PLANT LIST SPECIFICATIONS. 13. THE CONTRACTOR SHALL COMPLETELY GUARANTEE ALL PLANT MATERIAL FOR A PERIOD DEFINED IN THE 02900 SPEC. THE CONTRACTOR SHALL PROMPTLY MAKE AL REPLACEMENTS DURING THE NORMAL PLANTING SEASON. 14. AFTER BEING DUG AT THE NURSERY SOURCE, ALL TREES IN LEAF SHALL BE ACCLIMATED FOR TWO (2) WEEKS UNDER A MIST SYSTEM PRIOR TO INSTALLATION. 15. STANDARDS SET FORTH IN "AMERICAN STANDARD FOR NURSERY STOCK" REPRESENT GUIDELINE SPECIFICATIONS ONLY AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS,FOR PLANT MATERIC 16. WHERE SHOWN ON THE PLANS AND DETAILS, PLANTING BEDS ARE TO BE COMPLETELY COVERED WITH A HARDWOOD MULCH FROM A LOCAL SOURCE HARVESTED IN A SUSTAINABLE MANNER TO A MINIMUM DEPTH OF FOUR INCHES. 17. REFER TO WALMART SPECIFICATIONS FOR INFORMATION NEEDED FOR IMPLEMENTATION OF PLANTING PLANS. 18. WEED MAT IS REQUIRED IN LANDSCAPED ISLANDS AS SPECIFIED. 19. ALL. PLANT MATERIAL QUANTITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF ALL PLANTING BEDS AT SPACING SHOWN. 20. THIS PLAN IS TO BE IMPLEMENTED COOPERATIVELY WITH SWPPP PLAN, AS NEEDED, TO MAXIMIZE THE EFFECTIVENESS OF THE SWPPP PLAN FOR THIS SITE. 21. THE CONTRACTOR IS ENCOURAGED TO COMPLETE TEMPORARY OR PERMANENT SEEDING OR SODDING IN STAGES FOR SOIL STABIUZATION AS AREAS ARE COMPLETED AFTER GRADING. . 22. THIS PLAN DOES NOT PRESENT ANY TEMPORARY STABILIZATION REQUIRED AS PART OF SWPPP PLAN. 23. ALL SEEDING AREAS TO MEASURED AND VERIFIED BY CONTRACTOR PRIOR TO BID AND AGAIN PRIOR TO SEEDING. 24. AL EXISTING VEGETATION THAT IS TO BE PRESERVED SHALL BE FENCED WITH. A DURABLE, STURDY FENCE BEFORE GRADING BEGINS. THE FENCING MUST BE A MINIMUM FOUR FEET (4') HIGH, OF DURABLE CONSTRUCTION, AND PLACED OUTSIDE THE DRIPLINE OF THE TREE(S) TO BE PROTECTED. TREE PROTECTION ZONE SIGNS MUST BE INSTALLED ON THE TREE PROTECTION FENCE AND BE VISIBLE ON Ali SIDES OF THE FENCED -IN AREA (MINIMUM ONE SIGN ON EACH SIDE AND/OR EVERY 300 LINEAR FEET). IF TREES SHOWN ARE NOT ABLE TO BE PROTECTED, LANDSCAPE ARCHITECT AND CEC TO BE NOTIFIED. 25. THIS PLAN PROPOSES TO USE A COMBINATION OF A FENCE AND DENSE LANDSCAPE PLANT MATERIAL TO FORM A SCREEN OF NOT LESS THAN SIX FEET (6') HIGH SUFFICIENT TO BLOCK THE VIEW OF RESIDENCES OR RESIDENTIALLY ZONED LOT(S). 26. THE PRACTICE OF TOPPING CRAPE MYRTLE IS DISCOURAGED. MINIMUM PRUNING TO DEVELOP CRAPE MYRTLE'S NATURAL TREE FORM IS ENCOURAGED. : ... .. . . '­�', ,�. 27. WATERING BY HAND FOR PLANT ESTABLISHMENT IS REQUIRED FOR UP TO 1 YEAR AS PART OF THE WARRANTY PROGRAM DEPENDING ON TYPE OF PLANTING LOCATION. CONTRACTOR TO INCWDE 4�� _ PRICE IN BASE BID. ---"--- ____ ____ --,----,---- , - _____ ___ . _____ I I—— - ­- - - - - - -­- —I,------ ­ ____ __ ___ - _ � � I - ' � ­ � � . 14 15 . 16 11. 17 18 1 I'll I I I I ' _F LANDSCAPE SCHEDULE KEY I QTY. BOTANICAL NAME - T COMMON NAME I SIZE - I REMARKS _ SHADE TREE(S) I AROG 52 . ACER RUBRUWOCTOBER GLORY' - . OCTOBER GLORY RED MAPLE 2 1/2-T CAL. B+B QPH 32 QUERCUS PHELLOS WILLOW OAK 2 1/2-3" CAL. B+B UPD 76 _F ULMUS PARVIFOLIA'DYNASTY' . DYNASTY ELM 3-3 1/2" CAL. . I B+B SUBTOTAL: i 160 ORNAMENTAL TREE(S) - CCFP 43 CERCIS CANADENSISTOREST PANSY' I FOREST PANSY REDBUD 2-2 1/2" CAL. I B+B I CF 35 � CORNUS FLORIDA WHITE FLOWERING DOGWOOD 8-10, B+B LI 1 LAGERSTROEMIA INDICA'NATCHEZ NATCHEZ CRAPEMYRTLE 8-10, B+B MV 49 MAGNOLIA VIRGINIANA SWEETBAY MAGNOLIA . 8-10, . B+B SUBTOTAL: 128 EVERGREEN TREE(S) TD 37 TAXODIUM DISTICHUM I BALD CYPRESS T 8-10' 1 B+B SUBTOTAL: 37 1 EVERGREEN SHRUB(S) . - ICH 634 ILEX CRENATA'HELLERI' HELLER JAPANESE HOLLY 15,181, #3 CAN ICS 508 ILEX CRENATA'STEEDS' STEEDS JAPANESE HOLLY 30-36" . #3 CAN IGS 800 � � ILEX GLABRA'SHAMROCK SHAMROCK INKBERRY HOLLY 24-30" #5 CAN WM 32 I MYRICA CERIFERA WAX MYRTLE 2411 CONTAINER JD 30 1 JUNIPERUS DAVURICA'PARSONI' _T PARSONS JUNIPER T 15-18" 1 #3 CAN SUBTOTAL: 2017 ORNAMENTAL GRASS(ES) I � MSG 238 . MISCANTHUS SINENSIS'GRACILLIMUS' - MAIDEN GRASS I 2 GAL. CONTAINER SW 135 PANICUM VIRGATUM'SHENANDOAH' RED SWITCHGR�SS 2 GAL. CONTAINER SUBTOTAL: I I 373 � I - I ­ I . 1-1 I . I LANDSCAPE LEGEND ALL PLANTS MUST CONFORM TO THE CALIPER AND SIZE REQUIREMENTS PRESENTED IN THE LOCAL ORDINANCE WET DETENTION BASIN HERBACEOUS PL—ANT SCIIEDULE INGS: ± 21,520 SQUARE FEET OVERALL . QTY I I I . . BOTANICAL NAME ROOT SPACING PLANTING RATIO 1,076 CAREX TENERA QUILL SEDGE 2" PLUG 2' O.C. 20% 1 1 � 646 EUPATORIADELPHUS FISTULOSUS 2" PLUG 2' O.C. 12% 538 - � LOBELIA CARDINALIS ' ' CARDINAL FLOWER 2" PLUG 2' O.C. 10% .1 1 646 . I I I . ' " . � ' LOBELIA ELONGATA LONGLEAF LOBELIA 2" PLUG 2' O.C. 12% I-1 861 I SACCHARUM BALDINII 2" PLUG 2' O.C. 16% r) IR IPIq VIPr.INIrA D1 HE" 171 Ar% IDIC oll 01 I I AW " f I pl� ,,, / ,- OF �, / `ll;,". 1_� _­___ I—_ - A". �, 1 \ ,,,, ­1 1­ USJ , `__�11 / I f-m',"�_ I 11-1%­ ........ I . . ;,Z11 i, , I /1y -, __1 '- 1'1'�,.,� I �� N, � ..... _ I 1r; f gj�t "I �� � ­­," - VT -- -�1,1,1�"',1-,, ., y r, "', k "N" "�, "%l." I'%' :',.%%.:.%.. I... 1 SUS VAR. SOLUTUS SOFT RUSH 2" PLUG 2' O.C. 20% . , ­ J� I R - 1-1 - . ..... _ _.". 11-1 I 11.11 111­1 /' 11-1, -- . /_ , , ­ z � 11 _11� I - 1 -14 -,,. / ,�,, ��", � �/ ,,�% �, �� , - ­ --,,� ) ,� /X1 '' , � I ... � ........... _ AREA TO BE SEEDED LAWN (SEE PERMANENT GRASS CHART) I .1 W, 11 it � :_Z� .� .1k,111111:1f '-,-- , "11-1-1111-1/111, ­ _1`1 '�,." , %1".."'I"', .... � '' �.l.".".1'. I , , , // �R/. - ­ ��., a,%i �§ ,g,;,,, // ,z �__ "r, /0 I , /I'll �1&e - . , I ,�,, ag �, ....... � - . � . �, , �.,� .11-111­1111.11 ..... 5,380 � "�`, - I fit t , �, �,�"""�, "",�".�', I ­ `11­1__.�, -"", I . . "­­," ­ - - , � �, . - Z `_ .�,� ;­7 " 11 . , ,,� �4 _, � `,:� . . '4�� 1 1 1 n I fit __1 �",� ,� , �,,�_� �, , ,%/, - ­1 k �"" J I 1, '-.,, i��'li�,,,�,,-��,,,�,,�,,,��',�,-",-","",-�",�',�,-,,,,�,,��,,,����.-���,,,,i�?�;,I � .�'--- N"", ,- ,,� %, 11_1__�,-" � NOTES: . i, , �,__ ul"'M , / ,�,� , N/F I? 5MV 'It, . I -��-.- - '­­,-­ % -,­�,f I �,,, ­-..,,,-�, 4 "_`�`_'_, "I'll, , I , I , �,,) 1. I '_1 ��', 2-"""��,'�"I'l�'l";"�li,-"","��i�"Il', -, I ". I 1, - I I.- I \�" ­11111-7-11 V,�11,� , / '_1 � 111 ', .� " ;P ", z�`, -­�/ I0, ­, I I , �,­,­­��,',­,�,,, � - .1, ". . �, , CIS __1 , 1.", / " i I I , ,,, 1S., � I - I I , 1, -.5 IZI, . . I / f J// , � , -� ,�. - ­ I- le I'll ,�_;�,,��5 , 1, 11 ... 1�;-,, --,��, ­��ra 1) PLANTING RATIO IS BASED ON THE AREA, NOT THE TOTAL QUANTITY OF THE PLANTS. THE QUANTITY OF EACH PLANT IS , -" - ,Z"� I `�; I __ - --, 111_�,� Vft_1_1_�11_ ­_ 1, � " , - . I , ; I . N, -, ;, ,11111�"f- I , �,, - - "1111 ; %*' , , -, - " _ I I... � I -,_� --ft-, I "/Z/;;, I __ - � � ,� ,,-,,, �",�­��_ ,,:� "I ...... - '­� t, - , — � ',',�' ­_-, ,,-,,� `_`, " -Wk `�,, 1� 1_� DETERMINED BY THE AREA RATIO AND THE SPACING IN WHICH THEY ARE TO BE PLANTED. f ,� - - ��-&i,i��,,�� . " ,,, ", --qt�, "..� ��111" V111" I __ ,:,:-��, , '-- 11 �<, _�\, D.B.1912 P-100 / ­ . �'_­< r " -zz - -,,-", " AREA TO BE SODDED LAWN (SEE PERMANENT GRASS CHART) P ,4# ,� , ; /' I "��, " 1 , -1" "' , , �.�. ., lil%!��,_,� �, 1�_, � *, I '. * - �; I "t :�-, `­­.. / ­, , ­ cb, I I - , , "' ""' '' -, ­ - ` � -, -` -, e �, , 11,11" M.13,23 P-19 ,,,,I,t�,,,,,� ��,,,- ,-��1`,�- ,,�,,,-',,�",'�,,,,,,��,,,'��,����,,, """'I"I""", �,�l,�""��,,-�""",�,'�;!-�.,,"�',,'�L"�,,�� �/ ff- FA 1­1, / ,�",�:�,, ,',�!��!-',�-`�,1,111- I.- �, ,,,,,,,�,,,,,,�,�,,,,�,,���,!,,,�����,�.�,'�-,,�! ,.-,.,��,-- .. --,.,�., .. - � ICS/ - I ­,�­-,,,� - 111111111 _,,� � � 0 - "" 2) PLANTING OF BASIN IS NOT TO BE CONDUCTED UNTIL THE ACTUAL WATER LEVEL OF THE BASIN AND ALL SURROUNDING AREAS I � �, ,,, " ,,,, =,�­ �,,� '---- - �­_­,� """ .... .. f �,� ',� _,��:� .... � �s W � 11.11 ,� , , " � �11 1`111,­1 . __6, - 1,� � I'll 11-ll�-"" i* � 'fX"'1;"1"1 1-1, ,!, , / �', ...... I / _,� �. ., / �, .Z,!�-�, , �, , ­ - EDUCATIONAL UYFF/20 " 6 ICS I / ,� / �',',��, 10%nq1' - ,-, / - _�_111_1:>, HAVE STABILIZED. PRIOR TO PLANTING, CONTRACTOR TO VERIFY THE WATER DEPTH TO THE NEAREST INCH. PLANTING AREA MAY NEED �,,�­ 111 11�,.­--, ­'-­ "' 1�,-,�,� I ��. - . . . . . . 11 i1F'4 '*---- ... �,��":,,,,�_­,'_­, ,�,­�­­ _­,-� ,� I I -� , , ;,_,e­­ �, ,,,, - �� - 'N , �, 1;, _,,�� - ... _�,�, _ � � j ,�',,,,",---�,,��,-��"i'l�'ll""I'l",",�",�ll!�����,!-,'�,,,,�, "",:",,,�-""",,�,,�,""�,,�,,� �,, -.,., 11", 11111,11111- 1 U. �, . NST BASIN SEED MIX ­1 111_­­­','­ . . . ... . ... �� " . 1.1 il . ,e ,,-", , ,/,�'/, Ill � _,�,,�,,. '. ­1-4. ,� 14� .� I I I 11� '4_%, 't. .. . . ,�_­­­, �,­ I _ - - . � ��,�­11'1­ , � , I �_',�', - ----,:--. , , �, / , ­ -, ­,,,�� FZ��. �, , -- / - 1, TO BE REVISED AND PLANT QUANTITIES ADJUSTED BASED ON FIELD CONDITIONS. , ,,,, , 14 F., I ; �,�� I I - � a 'N \ % .�, , I � - . �,� _., I - . V + � I , , �,_^ (ERNMX-127, SEE SPECIFICATION) - AREA SHALL NOT BE � ,,,, �� 11� - , , -, i . \% .% , r , , ­ I �M ,'f, ". �­_­­ �11� ,-4,',�, Z� , , "t, 1_� �, 11, A I I I RA, �,��­�'�Z., 11 ).1 _� I ,111 � I _1_11 ,�� 11 1.111, I ­ -,. m� " -1 I - � � , �",'�t��\ � .-,,'�> ,rl � \ , i\ , ,g,� `11111111111 � � ,�;- � , �e� 'I / "', " JP.D _11�1- 0- ­��, , \ / " 3 �'11',_ ­11 ;,,,,,,,, �1_ �""`,,-,'�,�'_2,,� ,� `��_-";-,-�-� -,� - . - MOWED REGULARLY. � , - ot, � \ ��_%1_41 I'll, ,�,�,,�,� �111�1 : . ,,,,,,- , W, X � el. '­� �=_ 1­1 .1, \ I 1% .",/ -, " � 1­1`� ,�,� �1� .�� I . ­:!�k�%',, 19, - tV "I , ­ ­ �,, �11 , '. jt �� I'll , _�41_vv�­ - V,,,,�-�/J '__ , 11 � ,o, �11=1. Z ­­ -, . ; �8 1�, \ ' I 1�­ ;e_ ,�V? � � � I _��' , . � , ��_7-, a zz., � I 20"'10,11D�N�E lJ"`4t_' � " ­1 I . � , IN _,, ,/ "! �. - - -", " -S ., 4!� .. - , 11 , . .. �� - _Izz� A� ep� ,%,Lv " , , , , - I 4 � ­_� "�1,1�,��,�,�����,,,,,�,,,,,,,,,,��",M""-7',�,,,, .1 . " �1' I - - ._i _ - - 5 MV 1� A, �W_ i, � "I UTILItY EAS84 "', ,,,,,� � , 11��'�, I I 1 151� e "I - VEGETATED SHELF PLANTINGS (REFER TO WET DETENTION ,, bkf \' I � ,��, I'll, '�,' e"",",',� �" �`�,,' - I -"�F ---,.,, 11,11N .......... � I - 11.111-111-11-111-1-1. I 11 �­, X '. 1��, — "I--i,,ll-�,,�l",��' �,�,,,,,��.�X,�­ �,,,� " Y) �!'�',,w . ... .... .// t9ls - N , - _ / - __ ­.. I "I'll, ,',r z-;"�,­-,;,�,,m"� a, � �. // - J'� ------ 'm I � Z I . �, I I I 11-0 11 e',', I BASIN HERBACEOUS SCHEDULE) NO MOWING AREA \ , 0 � ------ I A, " , - ,�� X "­­"­­-,' 11 11 1, I I'll, li�, ,� - �1; �e 400,0':-i-__� \ "I N i �, *� ,6 401 I I 4�,� , ", ------- - I'll, ��, / ., � " � - ­ "' I'll, , - LIV _ 15"", - "/ Ill: I _�-.,-- , I , � - ­�, � " � .---... I % "I'll 111,�,"""I", 11 ,X " A., ­­,,�, \ ;�_'�� f I ��,�"I'll'I"""�-�'-,-,��"""""""""--"""I"","� 1�1"� - ­1 - ­,�­Q', �_,,� � - w ,� ��� � � I 11 Aff, *1 , " I _�__� ___ --I,- _?v 51 e.__­�, " � , IV, I " e, __ � "I � � I ',,,�Wll� , �, ­ -_ � I - �',,,`,o 11 1�1 I " 1��_ _f I � - ,- �.. �7� <1 , ",I �,� - " I i" "11"i"A", ZW=,", M 1, _"I',,""'_ 21m," _1, - a �,_. % ­1 " _� I/ �', - - --- - - � ''I'll, 11 ­­_ , " " " " " I I 11,121-1111-1 ","­­ �1�1'2',E,1'1'1` W", ;; _1; I �,', ,., I I __ .. ..... . 11 . "�11�1, "I" P�t I � ,�, - ­;�.� On_ - , I -­ � � �­ %­�.. -11,11, N", _ � "' N 11 I LIMITS OF B If ,** �;111 -, - ­ ­ I_ V1. � "" "I iil��, ; MP/MOWING AREA (SEE NOTES ABOVE - , =-11 '12- ,&�;_ , - , � I i N,,,� ... . .. . �,%,Ml " "I'li, , � 1 �. ; �_ 11 I , ­ 112 "i, � _"Olz, , , I / Z,z _,, �,, � ,,,�,�,,�ll,�,,,�.;�,,,�,,,,,,,,,,,,,,�l,,,�l, 1", _ I'll I 11 I it" - K" I �, I ��111 I , ", � , � "K, .�.. - ­ , i REGARDING AREAS NOT TO BE MOWED) , � I'll 1'1��`,�� , I ��, �,,,1114 -1-­11", 1 5 , ,-. , I � _A4, , it ( "', ,� � . -11 . -1 .. I i 11 _ M, � . - , I I 11�1 I I" I ,;, ­ . I I - ­ "�_Z`�'Z ­­­ I - N - -7- ---_ 25 MSG "I I , �4 ��, 0 : - 11 ... � - APPROX. 266 L.F. OF BUFFER PLANTINGS TO BE " It - - I '�', �11`­1'1�11'0: � , - __ , . .................. � , - � e,� ", ".. I'll " - " �- -1- ­1 �___, , , � �, , M" � , I ", � i*1 , 1 " ­z � ­' , " I 11 1­1 I , - - " � 11 , , 1­,e�­ , 0 ,� ,,�- �, `i,�'1_11�' � - - � ­", "I'll ,,�,r�, " � - , ­ . , - , - ' I , I; " V I ; � .."I.I..". ­­.. ,,� I—'; ,�� �11 , "� ... _ _ ,__ -, ,., \ ��,�,MQ � , - 1. ',�­' 1� , �� ,,',;,-,'�,,, "; \ ",I � I "" � "", ,� ,�,, 1-1- - ­ � 11 `­� . . 1A ­ ­ ,�-,�,�,,,� �' "L-'---'�,�",-�,���,,��,�;,��� " ­­ �p ,�� _ 'N"I"I"I"I"', , . �, 11 -`��'�"��' �'.,"�l",�,��,�f'.���,�",,,�,'-,',', E,,�-0,,E`, �,,�,,�,,����Ill"!!,��"I","""I _._t , -�-'­'� . ... .. 1`111111 , , i-,.", , _7 " ,v�. .! � , . �, , -_ L �-- � , .1�_", I �Ilz ­11M,1511,111,11- "', ­1211111 'I'l-111,111 �r,­ , or. I I 2E'111'11��411% oil,"% ,­ , 3 ICS . .. , ','�,, � 11 17 NO e� 2,111"i'll _111,11, -, 'XI ,�', �­ 11 MET BY USING EXISTING TREES FOR CREDIT A01 I I "I- M1,111 I 111111,!1 "",'I .1, � I I .. ., ,--- 11,,',�"'�'g t - AN "., �. - 11 ­� ,� �,,g'�,,',,',,�s'_ 1'111`11�11',, , ,� , _ " - , 1 16 CANOPY TREES TO BE RETAINED FOR CKtUl I . I i"M� "I"I'll - . I , I - __ ­ -1 11 111115 __ I X � 1; . 11 - �i �� '. ;I1 " ,,, , I "" y I 11 11 �1.111111 ",N111, 1111", )�� _ , �­,�­­,','.­,, � "�'�1'11'11�`2�'�'�11'11 � ­­� I � , e �ll'I"""""""""'ll",��'�'�'�'����1,11,111,111"1"11"1��"- _'�'�,`,11111111'�11 I ,�,,', ""I" " --, ,,, - , - � '11'1,�, �', ,11" �_ , � , - 1-1 ii ,­ �,, ;,­�_­,­,�e .1 �� -1 ­ . ­ , \ ��'\,_,,_ ALL SEEDING/SODDING AREAS SHALL BE MEASURED AND VERRIED BY CONTRACTOR PRIOR TO BID �_���`,',',',',' . ....... . �,�,,,��,','����?,","":�,,"'�',�,����"","""""������, �,�� ',�',,�,`, $�, , 5011 ��el.­Z,1_111 ­ , ,;�,��,,,�,,, " ""41, ,� " _ " �� 1, ell. �� �,,; ­1 I _ 1­1 "I _V. '. � -,, 1, ,,, I -- ,;�i�, 11", , -",-,;. _111`11'11i­,`� - �;,--,�,i��""",,i��i�����������,,,,',,i""""; � , __ I - - I I - I �!��i 11­',�,, ", � , �e�� � o �: % I --- 11 ..", . � " . _� , , �,��,',',',','�������?""":�,,', ,"�, ,'�,_ _ , , , � 11 A 1Z_ ___ I - �'1�11'1"1�11 _11'11�11` , � �� _,_,,!o-",.-',",�2� - __,,,,� I , I I'll �1� � 1`1 ,,, �, - ,.� � . MSG __ � � � _. _ I �, t I 111� I . I " �,­ ",�'�'��,��',�',"�.,'��,�,,"",,"�,,',"i� , : � , " � �,'�'.�� � ,�,� 11�1111. -. , , ': �'. , ,,--� -,' . . . - �% Q__ � , , ''I "I I i" 110 , , � , 1� _"":�, � �, � � �, 1��_ �� ,,,, _­ , , .,!,,. . , , -�, I - \ ,,__ U - ,. , __ '_ , , , E", " , , I � .", � --� 11 — W I ,.�::: ... �,'11 , - I I 1111- rr�,, �` �1. - ,�,� ,­', I I I 1111- I—' 1-1. , ", - ��­, "' - - , u � , "' . �U , \ I I It I ., \ �,,, I 11111�1_ -0., , 1.� \----- ��",­ 11-1111 ,�11,e'­,'­ "I - I 11-111 --I'll"", "I'll ��' ; , " , , , I ­.Vt "I - 41 ��.,', el, z" 'c . �2- - -- -4, --a, .. .. .. �', " ",:�� -, I I � - - � -, , , , , , - 11­� ­1, � ­ 1�. ��. " ," � * i D.B.4096 P.345 I . , ,- I— ­ - ��,,,­ � "" �, , � "'. " "', ­%­ �, ,��, ­ � � � ___ �, , i .,o _ �74­ N/r ; I I �,�qg I % k - "I 1, 1� 11, Al . . . . . . �� `�, '.,�,, , , 11 �1� , .% ­­1 �� "k, -,"'I", 1, �;� i / , � __� - 1111,12,1`11_11", �' �­' � ���i""",-"��,,,�-',,i�;!��,,,�"""i"",�',,�.-'�,",',,",i�-,,-, � I � I *11 I ­ I'll I'll %,"­­', v , A ell��,§ ,,, j?, % - ". / ­ I 11 ?I. ` * ­ ;�' "' � , ­ - I I , �. --- , RESULTANT TRACT 11 , I , . I 11 � I I ,�"e"` `�T �",�'.1�""I""���-","",���iI I _� , , ;� e, , ,,'�:, -` , �1111 ; 11 I , � " 1� 5 MSG I M, I It � , I , , I I '� _&A � 1`111 1", _'11111 ��,� .>� I CHARLES A. RAWL�5%11r, 11 11 . I I I , . I -, I - ­,; �'�, I . - I I � ; '1� r - ��: I i ' V - �, , " , t -\- I I � 11 11 5, ­ , M.B.67 P,179 � . . I I ­1� � , - _; " - I , I I I 11 , � �1111`n,1_11� "I , ";, " , - � I I .. ­ I , , I � I I - �­, -­­ ��'11 � ., �, � f MARY S. RAWLS I , 11 , --- �"'�gs'�­,� �­ " 1� ,,,,,,,,, I RESIDENTIAL USE , 11, el . , I I I ��, " � lft�112`_21 I I . �` 1 ­ �IMMI ­ 1� "', I'll ��­'­., . '�� I ".. / I <1/. It - �� I �, �� ,�,',�.',',,�,,M� 1i �'ll",�""I'll",��,,��l-",�-111I �,,�;,�,,�O� ,,, �� � I : I , ,�,� , - 1� ","", ... X_� ....... . I X':' ',,-;,;­,,­ .1,111-11.��"1.1"-.,�,"�,��,�;-��ll'',�,,�,�-��', - I , - 11 �1�1m�� � , __ � ", " , , "� --- I 11 IV '�,",�, "I 1"11.,`,�; y 1 -­ . -, , , - ,., I _'11. � . I I � � I I vl 1111_1�11�1 � �, " " , ­-­� "",_`11 " I "I ____ 111,1151 �:_",,�"-l'-",-","",���Ill"",,,� 11 D.13,2639 P.913 1. � I �`�­, I I ,; _1­, � ...... �, 1-111, �, � � � �, �� I N-CAP , _;� ": I , " . , I . , , 11-1, "I - ,�,�­,,,,� ­ .1 1;1,� , , I � , "," I � �� '. \ - t I . I . 1� __ ( , 1, _,�,�­,,,, 1:11,111, ��,��'_' � 1� ;',­ _ - � ­� . , . � I f I i " , ­M'�`,`__�', �­; 2,1211�1_1!1"�,,'E` : I � "I ". ;I - I � ­ I _1 '2, � I �,:, :�, t 1 j�,4 � ­�11111��111111 I ��, 111 I ". f 1� ­ - I "i-�ll'?,,�I'l�"I'�'il-�,.,"� �­­-,,, ��""":�,��,�;,�;",�;"",-,�,,�ll,� ��,. :�_ � I I . 1. _­�,;_­�','�1,11,��111, �,Mnl�, I ,I 1� ox, -1 I _­­ � � ", '' PARCEL "B" , ��"�����,;"",�,,��""',,I���-,"'.I��,�",�,-���'��i",'��,,��,'-,5� 1,�. , "; �, - �, �',,', �, 1, �,,, " 1. �� I I 'i�` ,,, ,,,;�,,�l"��I'lli�ll"!�l""�",���������,�,,�,,��i . " I , " e � �­`, � � . I i ., 111H � ­11", � Ii , 1� 1111� ,, �1'11 ­y ......... ��­­­ I I,— ,11�"1_11111'�`, I I I i I � 1 ADJUST STOCKPILE AREA AS NECESSARY AND/OR REPLACE TREES TO BE CLAIMED FOR CREDIT WHICH ARE REMOVED OR DAMAGED DURING CONSTRUCTION % % lor % IF' � 0 J/ , h /0" 114M11" ___ ,,,, %1, -X,N, /0 '*N" , '11�, 'I%' NA, N1, BUFFER PLANTINGS IN THIS AREA TO BE. MET BY USING EXISTING TREES FOR CREDIT � CANOPY TREES TO BE RETAINED FOR CREDIT (REMAINING 30 REQUIRED FOR BUFFER ARE PROPOSED AS NEW PLANTINGS) .. - ,;� ", , '. I I , i ? % . ''. \ � ��,,,,',";'­­­,�`,�, !11'�', I I I ,,�4 , � I , �i�"i___111,1113' _1_1,�,�� 1.1'!`11,� --,,,, � I �­­ e, � .... ... .... �', ­11-11-1 1'1_1'_'1W14 �'111 1'1� I 5 I 11 I � f , '', ,� I fr. ,�,�� I ­,,M;,,,,,0_5�-`�� __ �. I I � '!���i""�-",""�""I"!�,��,��""I"�-",!, / , , ��,�,�Z�11%111­ , ­'��, "I '�­­ , - - - - _� �, ,�b , �: � , , � , �Z`,, , �, 1,411� 1_'11'11'�,�,'��_� 1_1,.:� I I 1 - I I ,­ ,,, � . . . . . . .... ......... i ," � �1­111 , ­ '' - __ ____ ��, ... ell­,�`Z'11'1 11 1'� I ,"'. .1��? ;"!�', - , , -1-1­111111 1'11'111'1,�`�Z'11'1�� �11� I I 11­1­111­'�� ',A­� --Al 111^��_ I I ­­ , `,� �`.� �­ � i 1.1%, , , , ,� ,�',;,Z, ­� ''I I I I � - 1 35 , ��'. "i ,,, " �, " �`�L�� ��- '' ­ �I.",�"I'�'I'l"�,,�,�""'��",�'llI 1%, I I I � ��!'�;'��'�,,,�,,,-�,,",,�,ii!!������- - _ f , f �,,,'� ,,,,�"'i� -�,, '­­, , �� .'.��,h , - " � '. '' I - 11 �t � I ­ - "'A", , I_ . 1. �� 1 "&, ,� ., ,,�, , ,�/ , , � I " ''' �,,,,,M;%NR5, ,e 1V ­_,� 11-IN", - � I E� M3.49 P.136 ,,,, I y"',�,"", `;"%-,, _.,,,,,,, I ���!,�c�,"�",.,��i-I'�,�il"�15-li�, , � I I -1111'. �,�: I If_ - . �, �, � -, " " .:��; IGS , ��'. 1 Pji i � , I - I - 's -11 �, �� '_ " I I I I I ,_1 , " , " � �� *, 1 % " 1�1� ­­­­ ­11 1-1-11.11 11-11.1-1.1 ��___­­ I I I -1 �^P'111.; - ", - -, 'j-P ,�"f - ­ 11 11-1-1. 11,_.___ ---- " -_ - � I ; I ' ­Ie�.11 "_,'��'­1111__,, ­­,, ­­ 1111- "I'll, ,�­­,," �­­­­­�:­­, I I I -�!-�'I'lli""I"",-�l"!"�ll""I'�'I'l",""""- � , , ��, TI . , . , _� �, ,��'z,��,, �;�""",���,,,---,�,,�-,','��-,��� " " �, 11-1111-11-11 ­­ ,;,, '' 111 ,� 11 11 I I'� �-,:��""","",-�,,,'�'!"��,,,,�,�""",".",.��-,,�,-,,�,,-,,,�,�-� ,,-, -,�, �: 1� IDE WATER R , 1�­: _111,�,,, ,,�IaO I .. �,� �, 1, � "I ��""-"""-,"""""'-l"""�""�"I'll�-�1-1 . . . . . . , , ,,�e, ft, ESIDENTIAL USE . �t�� , , �, � - , - , " , , , � , , , "A' " � . " ", , I I'll I I 11 I I 11 I - -11, I'll., � �� I � I " ­ T. I/ ­ "I 'IV I - , , _��, ,11 , � � , I � " �,� , - I I ,0 FWD , W, , -I'l"---���'ll"�'I'll�"I'll""��"""----"",","-,""IlI : 11 �� 11 I . I , � . . , , , � - , I I ­111. I'll, 111 "I'll I I " - ­ - I le� � I I I Pi `W�', ^% 'A1110 - ­',_____ , - I ­, 11 � . , " � , , 'IV , " .'.'�, , " , , 11 �-""",�;�,,,-,,-,,�-,,�,,���5 . . . . . . �,�--,""'S,'-0 � �, ��X"1­1',", I , ,,, I'll—, � ,�� � ", �" "',­,", � �,� ­ - I I 11 ­11z, 6=i;=1 '. " 91 � I I I 11; � ­,,� �:,� - ­11­�111 "Ill''- ­ , I I - I - I . �', 11.111, � ,� T7�w� ", "I , I � ­ -, , ,­,-, : ; I I 1.1, 1­ /_ 11 I I ,*'/ I , ., I" . , W, - ''.. I'll, _71Z�_, " ,,,�!o ­_­, "', ,g, ", V, - 11111 ­­ , I , , LINE EASEMENT "9 I& I . , '' , - % I x 11111"'N'R, R"'I'll, ''I I 11 I I I I 1, I I ,��;" --�,,'��--," �, -, , I Al � Zlll�, _," I "I - I - ­ " "", - __ ,,� 111­1;1`111,_�'11101 "MIR, I"i',-�����,,�,,�,��,�,',,��,,, ��,_,',���,,,,��,"��` " , " , I , , . , ___, , " , � ........ . �­: I I 11 I I , ", - I , , �_ ­- I I ­ ,�_,� , """', , --- �'Zr , " "'; - - w,'�,,-­- - I ___ __"W�l _:� , � , �,���_, , � -�J ­W%,�,-,2'� - I -, `& I '. /I * , �,�%., 1,41,111 11,11,11,1111111 e ­­­ _1­11-­ _��,,,_' I �_ �;�' "",�""",��""",!"",��,,, ',"'; ""', , , 1 il %tv � D i i� 1, -Y­ I �, �'. , " "",ll',�, , , - '- - _� �,�,��',�,�",­`_,":," - f , , '' -/, - - - , - -f.v, .., - - , '' � -� '' -... �� �_ ,�. e, ','� - I - I I , I - '� . 0�', !"'."'! -, , N 111 R' 11""", �11 - , -;; _7 , , , ", , " "" I I I , 11 , -7 '�, , '__1 , - '­', �, I I 1: - : � I— ", -, I I � I , ,�* . -, - ­ -­'­%,� 1, I" ­, .1 : I I I : � ��, , I � "" , ., ­-,­".'' 11� 11 *­, _,_ ,, MINI-1-11, - - -9 SF ,I � ' �,,,]�_ ,�,�,' � ,-�,�,�,�"""�"-""��',,,',-",--""",-",,,���"""-"",","�"""i�',��,,�,,,�:�,, � I . I 1, ., . . .... N "I ��BLE�i,,"",,,,,,S-,F�,,���-",,,, , 1, . I �, OR K, ." , , �"_,e � I'M � � � Z.��, . , , , " 1 __115 1,,5 1 "I , � " I I /V ,J?OU,D - — 4 11 1, I . - - �`, ,�5;,�"""���,�,,������-""������������!'������,,,,� �111�1: '1,5' ­ 1-11 ,_,� I I I I I I — ___________� ,� ­� .­", ,f ­ ­­ ­ _�_ , �_ , �, 11 I e­ ,:e I __:�, I �' , . 11; � ­1 I I . ' , - ­ - , � -, - I" I ­11 ­ ­11 I'll I- �., -11, "I — — 1, . - , ­­­11", , I , ­:": -� ���,."i����',,�,,,�,����,,�""",�,�, -I' , , /�', "_"., ift, �-, I I . � r , -.11_1­,11.", � 'I, "". ­­;­_'O�'­ 'It�l _� "' � ' ��,-,��_-- I I — — ____________� , � ", ", , *.,�:, _.�, �, "_ il 15elibl.- - - '', '", ­ -3 .,. I ­1 � I I 11 � 1. I I , '�* "'..'', , `�;� ..,. 11 "I 11 I 1. I — — "E 'r ,�-_,­"­." -,.", ,,,, Q - I I I � * * I , - , , , .�,� , I 1, -1 — _11.1 0,02 _1� MG��,S`,,,F,,,� ,`,,,,-,4,',,, 8"',",B!""',� I I , , I - :�,.' '�;'�!"­­­-­ I I - 110� I � - , -, 11,­' ''I 11 ­ . , A " � 11 .111, I I I I a ., , , � I " , , -,�",��,,,,, -. , , " -,\,� 1.�,_.­ , ��'�,"���,,�"�,'�'��"-"-"",����ll,����ll'i�,"i�"-1,"il"-'I'll""�,,,,�,��-,-"�'I'��'ll"�,-', ��-,;-�,��,�',]���,,',�"""�,,i,-�,,��;;�����i�,,�!���",�,�,_',,-,"-""�,,��,,,�, 11 elll_­,­ � I ".. — — It �, III - , . � � . , I I I I . . � 4% P, I'll, , I , , 10 I , I , I 1�,­­ ­ , �­ , I'll � . , . . . I �� � , """ ,�_, � III/,, , ­,''i"I'll , - I III, I 1`­"1"_11;1 - __�",;i ... �_ �Fw/F/ - � , . " � -e- '' 11 I � t _111'­­_ .,, ,��P.'.­,­_K ,,, �,__�., - elllil 1", 11�` -, ,� . � 11 . , 'k . Al 1-111111-1-1 ..... . - - , - ­ " .., ­�­,�­,;"�,­­,­ �Ie I " ,­­, I - I . -9 1 1. ­1 - �`­ " ,'� - �*��, , I \,� N"."'�,, ", , i, _ — - �'1�1'11'M,15'Mll , I 11:,­-­­_ I I I 1, � J1 11 I %7 � I.", _�� " " 'I�',��,-",�"I'��'�,,�-""""""",�",���'I'lI " " I - I I ­ 1, - .1 ", \ ''. �'� - ,'� " ­ 1_._,_, - , I 4�`.-1�1'11�;. �, ,,,:,,,_, � � ,,, ,,;�, I � I "'. - j . ..� " , , � / � � , /7., , 1,,�� I N" , " :�� I I ­ � . I ve 11,11,11" � � � I '11­ . I I I - 11 ` - - ­& I , ��'_", 11 I `_ _,"R .''. /I - ." " 4111, , - 17 MSG �� il a' I 1 , � " " ,­�,._ � I � 1_��1`1%1.1_1'��;.,_, � � - �� ,;,%, - I I 1� �,.,i�,;il,§21"N - , _­� I . I ; I � , � ,E!i�: � �! �, R, � , , , / � __1k - - -!��];"'� ,, � ,1 -11 ­� .. I I ff. ME_S� r �­ " I "e � r I ni ", � �,, � - , �, I I ­­ . I �,,,�,��,�,�,',�,,_,,� _�,�_;, , , - I . , , �1 "I" I �, - f 11, I . , . I � I 1: 11 __ - 0 I I I . , ''. I , I ''I 1­�,� �,, -,,,.�-,'�, ` � �::"",�,,,,,����������-,��,j�� 1'e', I �­'.,,!1�1 %,, t t ", I _­.­'­_ 10, . __ )�v 1'r � �. 1*1 \ - I 1"..., - . , ? I . � . . ,�'11 -_­Z_�,; ' " "I, - �, ,"I ��", �� � . I I ­ X , I ­ , I 1��, �,,��!�;, � �� 11, ­_ I I - 1, ,- I �, .- , . , : I" " , I �,:,� I I � - . , ;, , . ­­ , - . F .1 .."'. "I � - " �,'�� - e , , , "N"I", , 11 - 1 � V1, �t,' , " � , . " , , - , , , 's , . , ? ./_ ,��. , �. � -�, , � -­ I I . , , - ­1�11 __ _��_ fi_,� , �­ �' -I"'- , , �­­, . :7.�z,, , " - . !���"1"1"i��,�"I"�ll"��"I'� 1111'�, ;_ � - . � , �_'111 �,N� � "I I . � � , '' _­'�', I " I , - -*" - , � IIRI %A1 11 1�1 )Q?i , "/*/, _ ,Z ;- �­ I e I I : , - , M ,_ '. _ I " . ,&.'", , P ""I'll, _114t�_ `*-"I'- . 11�� , � �1'x­ I "� I I '. 11 'I %, , I i , , - %, , �', .1'% ,;'IN , " �, I . I I !�, , N / , " , , , 1�,,�',,, ��:_� - '_ t - � , "N' " , _ _ %,�, I" , I I %_ . '%, %'N",�%,, _�, , �", i: % "',�7, �, "4. % , �� , � , , " ,�4,1� , , � 1, " I I—'' ,,g,'��Q `-, i ­­ - - - -",. " t �� , -- �-' - �, , ", "b, F, � " ,g ­- -, , , -- ­­ I - , %�.x " ... , " - g",t -1 .1 - ­ - , m ­ 11 V - - , " . ; " !,`x / ­ - _ . R- - -1 �11 ,�,i,,,',',,,',% , ", I I �, � ?""�" . __ , "I I , " - "'I'll' , �.� - ­� , - I '41 1-1-11 �' , '01 ;,,_; , , - - " - ­11 �­e�z�� ��`, ".I I f �-. - -,;�"%,' I - '11, 1: 1,11,11111 ,�___, I �1 _ ­ - .- . . I U) I ',I-i � '' ­ . I 9 71, - , � "_e', 1,1,11, - ­', '' 111 I 11;­� , . � �, Iffil", 1" 0 � - 11 , ­­ `­� . � � � - , , / 11 11 , � � . � , - � . . , , , �, ", , I 0" 11 ­1111 �111 10 '-,"�,-,,,��',,",�;;���,��,-�.,,,,���,,, , , -, ". � " � - "" - - 39 �H , � I 11 �,� - ",;Z� �,� t - -:� , , J , ''... �. I - I ,-it i I , �' " 01"111- ,�� ,� , �;-"�,,��,,,�,�,,,�,,,�,��,,�,,,,��;'� ,� 1,,',,�L,,",,��,,,& ,,, - I ., .1 n i ,I "I'vNX NIS1110"'S"I.N.43 I ��_ - 1`11, �=,,�,�;'� i . I- Il't I I �. , .. �,A . , � � e"'111, �11111111 %� _,,,,��,�,,,,-�,';,�����,,,��,��r', , 1Z - I � . I . �,,_ ,_­,,�,,�,,`-,k I I . .. , $ , , " NN , �- -- '. —.1,1­, %�� 'i � '' ,,�­� 11 " � ,.!-,,,,', - � " � - I I f � . , . ­ I Mg,101�1'1, � 1­1117 I I .. ,� � m . . I , I I I , , t � - I I 1.11--l-I ... - .. .. .. ........ ... .... ­­­­ 11" I, - , � ­-� � � ", , � . � , � �, I '' ­ �Wll­li`, .: W a Ft . k, �, �, � ,:I -_ ./ 11 -, , , , I �, 11_11_"Ile^_,Ti� ,e-". :�_"-!­�;:,� "''. I _. I It � I � - ,,�N ­ _ � 11 - �1_1� ,� , , -A' , 11 I , I �'111� ,­ �e I , I a's tt , �111M �,,,� ,51 �. ­1 - , I ? , , - � �� 111­1,� . - , 'f_*�, I ,/�, I �11� ", " , , iil�111"',, " . ", �, ­�� , , ,� f Z�z I'Z " `R_ _"�',' , . I 6 I I � 2 �� !�,� - " I . I -i . 11, � - lil I , , � %*� Z - . � t , i� I . - , 1.11 � ", �k. 111111'0� . , ­ 11 �. , 1-1 �-,--.� 11`�-,,��,,�,�!s-,,",, -,�,.�;i"­',!, "M ,2's , , q t '11 . I I , � - ,""111 jl, .-11��`,'� ,�'N2,�,i, _Z ,P . ­�,;, "" , , ", - ,.,. - � - � ,,, I'll I "Il, ,'1J111!'1�"1'10_ , -- - , N, �4'1' , , , , %�' I 1. .11 �_:;;�:,�, �,,,� - � - - -� .� .:.� , , " , I ,-, 'e'llAo. �,:�,-","-��-",�����ll"�,,���,,�"Ii,�-,�"-l�,��,�'I'll�",�'ll�-,�'i-I""I '_:"­"'� - . . - ji !. % ��,.� "I ... ", . � , , ­ � ^� 1111 .1 "", ,,, , ,i%- , ., , ': "', ­., , ., - 11 1� 1111 11 I ., , - - , I , I , IM I I 1-1 _ �, I _ , _ . 1, , , - I "f -������,�,�,,,,�,,,,��,�,,���v,I ��' -I'l"!�ll'-,�"I'll",",-,.�-1,�"I'�-,�"Ilf,!'��"I'�,-�"Il,"�,�-",ll"Ill",""",,�� .,: 'j-", '' ,_ ". , -_ K a . - . I �1'11 �: I . . I , .�': 10,1110111 1� � , , I -�% ,% -� , � " I 11. - 't 1. '� ­ , _ ''I ­. t I I - P 1; ,� , I "I'll el ­ � . , - , , . � I " vt .. 'm ,- , , � , , . "I �' � I , , - I I I - - - . - __ ,,, � 11�11 .. . I 11, "#O ", - I k� ,,,�, I I'll ­,­­-­­­­ - �e _J, ."";��'..';­-', , , '.. , , " ,­. "I , � 9 1% ,��, " "I I � 1, _, W_"'�,�- ":, , �, � I ;_ " " - . i I `a -4 , I - ­ ­ , � ��, �N, ,- I � � ­-, 111" - - -�_��A ,��,�,,���,�'ll""I�,"-,,,,�,,�� ", -! 1� - , ��- �-`�-- �;;� - ��::"":-�,� � .-, � ''. � � _. �:. "'�:�--�]'ii_ 11"I"I'll 1 "" - ,�,,,�,,�,,� � -� �, ", "I �; -.1 � 'D '' � '" . ........ �,� , , __ � - 1��- �i�,�i:,,,',,�;���"",�""","",",��� . ­,� " ..'_ � 1 Ul -I � � _,; " �,M ... M "I", r -1, ­11­,­� , , " �, , , , � . , , � _00_ , ," " I � 7". � 2 I id? � � ,� , 111 ��, V t t A 1-1 1113@ .- ,_�_Mw' ,­ - .­_1__.11'1_-� i ��_' 1_��:�!��, _110 -,,;, _ , '' .." ­ � --I- - �..' �v / _1 I �;_ � " � ­� , C) td lx� 1_4 Ml� , N_' - , ­ ..... .. i:_'_,�,� ":�,,��:! i�, I '.., , �_ '�,��,,,,,,,��,�,',','.,,",�,�,�,�,��,�,,�,,"� 1�­ ­ I I �� -, , '' '', � "I I ­1­111111- ; � "", �; %,., , I 111. 11_�, �11111111111 ,�,'i " - �, 29 IGS , 1, , - - , ­�,"�,,,,'_!,, _ , . � '3 111'1�­_�', �,,- " 2j� - �, 'g," ," � , ,��: " . I ""­,,­*,-,-",.. - - 1, ,�, -­­,,,�`F,,��,�­ '" '' ­�:,- 5 tao,i 4 � I'll -1 - V / / X'S " , - I',-- / I.. � , " 1: �,'�,,�,'�"",�--,--�--:",�'-",�I'll"",�l',�I ,]:�,�� , .. � " �` �_R 237 IGS ""? I ::;, �",�"2 "11,0- - � ,� � �1111'1­n ��;,� 1; ,� 1'lr --- ��­ ��, - - I , , _111 ­ .- - 11 " , , , " " ", , , , - , I , 11 � - �11 ',:�,e,' :", ,,',� 'I'll'' , - , " ", � �` `,"�, ­',- `,'�"';"�,,,.�`, ­','­',.,,.,�­ � , �' . - 11 I.1-- , I 1_� ,"', � ,�','�,�,,� - �--"�,�`, ,,�""�','�', _� I . , , , , , " , . I ''I It I., / 1%, � :1 �', _� 11 � �,�­ �, , - - � . I � . � ,�, , " - -^­�, _ , I >� �_-� P-4 , ­ , 111111,­ / i � 11 ­­ "", , ,� � , ,��,,�,,,'-,',�"""�",.�,,,�,,�"",�,,,� 'f� % I .. � , 0 , '� , �,� �, , S,� � - _ � ".., - .. � , , I - I I - . I . ­ �­, �,,',,,,,�;'��,�,�,,--�,�,,',',�i,,',,,z;�,,,,,��,,��� � 4 ­­­ 11� ­. � _ ,� , , I ,I, � __ "A � , ", ,;��', - � % % - '15', i �� ,� ,, , '-,55-�'� � �, , 111,111 �� �",�,',�,,-�:���",�,,����,���",-,�,.,'.',,�,'�,-',�,� , " e, . - ", , "', �,,'.'_., _�",_,, -, I % .11, " �_ 11,11111z,_.' ,; , , '' _- % " I I 1� , "' , ��"`� ­­, '­'­ ­1 ____ ­._1'.,�,,__,.._�"_. Ut -, I I 8 � � � I ��,�--�",j,%&�.',��-',�,,',,,,���,�""I��"'�, , , `-1-1 _ . , . , .�� "I'���,�?�,.,��',""'�-,,,�,,�',���,�,�", -- ­':�-, , - 121, � " �' _,i' "I"', ` " I 0.1-'N' - I �� � I-R-0 - _,:'11 _'11� ,�,�,,`,� , -i',�,�� N/F � I � i I ��O�Zl_ � , I "',', _.,:1xE__1 _`t � , " , .. . , /1, 1� , " % , 4,11 � . �,�: - ��, 1"11,�`_11� ­­", - *,­',,�­_.,_'.._,,_ t e� e g ""­' _11.­_ I � % - � ., - , ,� �, � �`,",_� �� ____ � , � V 11, _­� " I " ., -3 *I �,�:;-,�,S2­� , , -1,15,11, ,��', � , � � 20 ICH , � I I " k - "I-- I` ,�7 N �d -k�t., lv", 11� " % - - 111_111A"`�`, I— 11 ''I., �'. �', 12. I-- ,�� � . , , f " %%,j ''.""'. �) 11 I '11­'.1 I �_i � � , L,-, I 11� _11:11­..­_-,. - , , , t, I 1. `�.',­ 1 -, '' .1 . ".'. -, � - - 11 �, "I ". '_,,11 "'' - � -J-, . -, ", V, �. , , , , - , I \ , � , I ", � D.B.1572 P.624 11 �� A , ,_� - i , . -., .� - 1. .., - , / , -:t's " " ", , " ,�,.,-,,F ",* 1_i�. .­­'­, '' ", _�'._, I .r. , 1.�, , _ _ -1 -_ - ­­ %-)! "I , -;%"'."". -, -..,�. I It _1% - � ­" 41 ­� ", ­�, ` , .I. � " 4, t 1111AXIVI ,%f""�'_ - - -. �,- - ,�_;, ", Q �-: — , , � . . - If -1 _�, — '' ", . '' , � � � , _ "i. I I "i" �%� .­,�. ­-,,_'�-­­ - ­ ! % " �, ;,,� " ',`�,'� _11_��,, .- �; I , �1, , .,�1'­ ­ - """, , . ". , f PARCEL "A" , - , S . � �' I , 1, J, , ! 11<­ " t 11 It �1',hl ,',If , �� 41 '' :� % % -, I NZ ­., , � ,.I-,--,?,. ,,,� " 1, 1�­_ . . - I � I ,; ­ 'S . � ­ ", . ." I f -, � A � , .. f" 11 , " " ". �.�-,�'_' 1� I I � V I t'__�, "1­"1_1­_111 ..."''!7 �� .1 ­_ V - , , I � 1. 1* Ir % .1 _�' Z *11 '11%,­ � / t" :_ I I �c M.13.49 P.136 111111, , .�-,.".":!�.,Z...�..�--,;../"�l��"I ­.­_,_�,,r�, .. I- " , "''', "'''', � , _� , '­ ­­111 , 1; ­. , � � .6'. _ I ( - �., . el I ... 11-1 I , �,', '. ��,�� . - , _', 3 Tu � , I P - �, .'�- '� -, ­ . � � , , , , , . " ... , , ..' - , 22AROG . I ( , , " ,:%., , -,,,�,.� 'I', - " ,,, " "I ", '� , "I Nlk" I , 1111 I 1, 11 '*1N 1,10, - . �t ,� . , " - - , , , � , I I I 11IN 1� - I _ . - , , -1 - . - r9 � , - I I I )�It& I X.1%, � �, 11%&,%ikl INS ,__ " , ',�,, �,� I � - , I ,I , 1 , . .­�,­,�,. , �1 I 1, � - " I - .1 � 1, , - . 11 . I <^I % � I "*Al/. :1�11, , I - - '. '' " � ­ , N , 11 ­�; . . . , , - I I 0116N11"N'SO \ , , ',_�:, '4 ,�; �, il '_1 . , " ''... " "­—, RESIDENTIAL USE Z � '� �S_N,**�1112, 91�;/�;o I �,­ '' � '.. �'., � _ I \ I- ­ � - . " ­ ''.. 1­ 1.1, I � - - " I ,',�,­',.�_', . ­.� , ,­.,-­, E R, 1�3',­ r'� I � � I , "I h �­ , ,,-- , , , "" " " - I , , '. " . I , 1- 111�ilv , I . -� - s", , , . -, 11 ,,'�:" , I , - ;.;..",. I I � I � '' ­ '' I , - &V �, I X . ,4, -. - I ,,, ,_ io I I , % � ,:,- � i ( .11, -I' 1.11.­,�­_, -1�1,1," , ''. - - , " I I , , � % ;,,,,f,c,, i'��"I'�'�Fi&\%Zl�,;�,Z�,���!"il�,,�"",��lI ,�� I I ­_' , - ­ I , I .. , � "I , I 11� ",:, I . `%, I ", ....... �111�� -",4 �,t,` -,i, " , * . . _ I ixl, \ ­11;,SS1$§ — I t.-I ,_ "M , 0. -,, 0 Vk I Ir i " S',_ 7:� oi -. -, , , ,,�<,, .. , , "'., " .1 .. � - i" I I .. . 1. � I . I � . , , " N " , , "I "�� 11 � I ,- - , , �,K-,,� I . k N I I 1. ._ ­ �.,­,,­ "If" 0 X111" I 1% "I "A"', , , � " '� I , .. I 1, I � . . � ,� , '11__�,/ - I - .11 I ,*,' , � .-, --, I -� — 1. I. " INNIN. ININN%. S , , I I ­1 b V11 I , M* I ­ - , " 1, , , 6 !7 /,.. I _%�7��%-,I,*,,- �% ; __ 1�_-, , ­ � , . " 3Q E,11-1%:Rslo N 11 7 , � ,,--Ir4,, �_1,1� 11 �, � ,.,� � �'. �'. . - " , —23 IGS I . �t ,tt I I � ., � f � � * , . I -, - I " . , - "; , , - - , , % � "I . I .- 11 � '_ , ' '' I m--il I , , �%!, ZRI, 1 � I I , , ", � -, , , '. '' , " ., IV I � I "'T f- - � .11 - �,� , , , �_ � .­ . , 1, -_� 1­­ I I ..­­ - I - '' a 0, 0 _Z_ xl%';Zt_� N" � Z. � , , "I 1� I 11-1 40 '" ',��-,-,�,_ lill; V1 � ". ­,'­­.,­.,- �1, .. 1111­1111111--­% 1�.1111 ,­,.­_'_ I � o x , I � �1111 .1 , � . , " RR , I "0'? I � I , � 4�', -1 , - 1 I � " It", I � .. , . ­ , . � 1-4 1 , , - -'� I, I 11 MSG . ++ ,S , � 'R " " 23 MSG k",%ION1111111 ,.,.,-., . , I ,, " ", I - - " " , " - '' , , % ­11'.. I , '110 "I, I I "'� I , o -,. .11, � , � . I I � , , 1� '�­', 4, '. , _;, �' � ­. 1. _ � _ - .. ­ , , , , - ,,, , I ,/ , -,,,,,. ."""', , �� N IM1601,11 0, -le � � . ., , _ '' . �, I . I ,,, I . � �1' ) , . 1, I.. ., , " � , , . / I st'r - � I ..'' ­ ­ 11 , " 1 11. Al, I . _', 'i "''I'_ I " ., ,_ ..-.-,,--./ ,_1 , I _ , , �­ , � I *,��,, I , , I �, , I � - . � ,�_,��, _­ . � " - 11 \ �, ­ - , ", - *;`_�, �,,' - , , . 1. �fp - -, . . � I . , , . , . _� - - " - - � " - - , " - - " "'. F % I �/ 11__�, : rl _. "I I , I � I vi - 11, ­ I , , If - ,/,�r� '' '' '� -,­..­" I __11\1"'.., 'I', �',� " , . � , , ,,�\ It. 56, JP " , "'No, . f , ­* � , It , I . v. 11 , � 7%, 11 , . ­ APPROX. 84 L.F. OF BUFFER PLANTINGS TO BE - ,� , t.si F , , 1, ,;010!�­ , , '' _\'_''. ­ 11 '. I � I "'�, _. - ,� ,�, , . . ...... . . , '- , . - . I - I - - I '' ­ , I 'I'll. ­ -, �, - "" .'. � . — �%, '.I - ;�e , , ' If il . , , " , , , , , , , , , "I.I. , , "-,' I � 1", '.­ -.''- '.' - -,., - -, ., '.-�- , .. — -1 11 , " 6 %_ I � ", , ". ­1 " _ � . �, .., -�­ � , �' ,� MET BY USING EXISTING TREES FOR CREDIT " __ , . .% , :_', ''. - � ­�%; " " -, I � , -1 ­ I - , - , , 71 � ...'....................'. . I ... I .... ' ' - -- ", .�, "N., ..� ,�, � a , Ir"11 � , I - , . , ", �� , , �. , - - " . , - "'. . " - , �'_"_-..' . I _ ....... 7 - - '_ - I V V1. � % , . /I '' . _ '' .. " , ­­ "; .. ..'' ..... . - -,,�, % ,%�\ _ � ­ . . , ....... � I 11 11%, % -,to - ,,f , ... � .... I ... I . . I 6 CANOPY TREES TO BE RETAINED FOR CREDIT �, 1,1 , � I , 'I I , , , , , -, - .. , " � , , N F . . Ili , , � ­��---.-,-t,..-""",._. �1 __', vv,��__�_,�___;, ­­-.1-1 ....... 111.11.11, '�%, / "I " . - . - 11 I—- ­� . - �_ "' I � ,: �. 11 11.1. .. � .... I .... - I ....... �, . �%, 1 �,,,,,,, - '1411 . . . I . �­ " ",;" ',,:':' .... ................ -_ �-;,, _T I" I '' - I - .11, � ...UPD'1".,.,.,. , 21-&%� OnIlki"TV n17 nKIQI n\A1 30 A I . � . i"I 11.1 - I I � � ,'-, " � . -,'. " - .. ., ,� � , 11 - ,­­­ I ...... � ­� ". N I � I I I . . . � I � I . I ............... � . .. -�',­, I,., - '. , , , - � , " ��j �j��:�;-�� " � ,� , . � . . � � ......... - � -- �11'1 - " " 11. It -A 1­1111111 1,111111111 ........ .. � � I I -, 1 \ , "I I'll"', "I J ­ I � � *,j'-�'_ -, - - -, ., - -, *. I.., �,� � ��; � . I � . I � . I . . . . - . . . � � . . . . I . I . . . I . . ". f, I I .�, .. % '11\ I FIL I I "N' '. .1", I% %. " " NX-111N, % % 11;111111; ",%'. R I. 11 , � I .. , 1 --"�,4,, , . , ,- "'.- -', , , - - V_�,_�`�­ �_­ ,,,, -, , . . , , __� - i \ ", \ WI. , " 11t , , , , I ............... � , , � .. . � - � , ", . I , . I /. I ............................. I .... . . � I - - \ ,� , I "Ill." INN, 'III'* 1*11, , , . , , " * , I � , , I - , , "��"�,� " , I � -,�:�1,!,�,,-�l � � . I., .... � I � ...... I I I I .... . , , _, , ,,- `1, I , D.B.1912 P-100 'A I I ,­v,; � 11, 0,01 ,.% 4.11 "I , . ''.,. . �". , �.,,�.-, . lblk� "I'll", " � , ­%4 $ ­ , 11 "' I, , I . . -,, ., I , *11 "X0`1'; , � H %, , "", I k " " I , _'11 , I , , , , I - , I M." ....... - - 11 I *_1 It . � ''. -­ '' ­-�­,­�, ,.' - ­1 .. ­ ­ I I I I . . , I . . , I . I ., , ,� , I ..' . � ­ " ­., ... - '' / ''I", ........... I , � ­.- , � - � . 1. , . " , - " I "AN"A I . . 1, , . , '- ", , �::�:��::�� -- -- , , M.B.23 P.19 " " I 111;11 - !C.,�,,�� %. � .''.., - ., - , , , ,_�,-'._­ � ., I . � - - - ... .... 1, - __-X_ " ,� \ \ ", " I ".1 " I . - '' , ­� I ­i `i:�,`:','I',,`�h�� � -�-�--;�-- 7 -- -:.........'..... , , � I ��� " , 66'. '�' - ,.\1.1_,-'1. �1, �'­', , N .. �'... ­ " '' -, .. � : - .:. �, -_ EDUCATIONAL USE 11__� N, . '­�,',�,', ,__'_ ...� /".'' I 11 .... ­­1­1111- ... 1, 11 , ,� 3 %. 1, , , , , .. � , � ... I -_ , I - 11 ­' ­ I , ,�' .... .... .... ' ;1X -�_n,,,,-,,, 1� - .. � ,-. -, . ­ ., _ _..,-%�, '­ I '11�� 1. , .... ......... I.....,."." , _��_.___� a 11 - .7 1_ ­ ....%..%........ .. �::�:�::::::::::). -, '. ", 1, . , I , I . . . .. ­1 - " I R, . 6AR , _. _ �.­ I" , " ­ " - , . .. , , , , . , 1� I -1 , I I , , I -, t I _''. -, * ,'-'. � .-�!`, � � � " , ... A ....... - - , \ , - � I I -1 , , \' , "., I , "' 'I'-'- .. I - * , --- , , I ". -, ''"' , , , .. 0* - _­' - - 0 \ 1\1 11 " "'� � . '. " . " . I . 1A ........ "'� '-%Y,�,,�I��,,i,��,s�,,,,�,:�,,%��,.%, "'� . ­ - ''. - ­-­ -.. * , , , -, ­ " ......... J...%-,%*".,.-.,.'_ - -_ .- , 1% �� ­ ­.­� ­�'­', , - '­ *j , ...... - I I " I ......... -_ � , N11 , , , � � �_,' , - I -, -'--' - ­­- 'r - I ­ I I - _:._._._._,_._.1.. '_�' , ,,, " �, � . ­1 . - , .... ..... U � . " " , ., . , . - � . :-:1�11:1:-:1:1�-:.: - , I 26 , I � "", *' 81 '. . . I I - /-, , . .:.:.�: --- --- I "I ;`&I �, , "" "' ��_'_'_'. , I '.",-, "11"11­.,.,.1 - 111 * ­ - ­,.�- I 1. .. . , ­'!, ­ *.'.'.'.'C.'.' - � , � ... � - . - - .*. . - --- -_ . '111 ,.,, " 1. ;11 " " .. ... � � . . � � . I ,_;� ".,. . - I 1� 11 .. ,,,,,t%X,X'%%--,N %x,-- ) . . .11­'­1_1_-'. - I. ''""' . - ------ I", I ,% ". _ . . � ..... I I --- � � I .--- - - - '- -,­�­. 1, __ 1_ ------ - � . : , .,�� �. I I . - ___ __ \ ,N�'11 \ \ t 11 \.: .:1,17.%* ... - '. 11 - , . -, . . .1. *%'.'.'.'�.'.'. . . � , , � . IN . . . , . , - , '' ''I '' - '111 1�, ft I 1� ., , - :A , � ­ ...... � .. , , . I :k *?0.44'. .11.11 ......... . . - 1/%, I . '14, " - . . . - , , , , "' I �N,��. �_ , , � - . I ' 41YO.'54 , - \ .���- - '_ I , I . . . . . I , ... I I � . . I . . . .`��, . . �, . . � ..... � . I `,,,a47 ........... I -:-:%'�.;', "I �!�_ \ . I , , 1�1 , . . I I . . , , . . ..... I .... I., ... I . .� %� \ , , � .-\ , ­ 1. ..... , I , I... I ........ � 'I'll I fl, I,- - � ,��, \_15 ICH \-*.* . � , , , " . I III I ­ " , I NO/" " -,"el-1, I / el . I , " .. A . , ''. ... - 11 .� .11 .... . . -� " . . . . , , ,.,. � � - . , * * , , , , ...... " . I 1 \ , . I I , \ I ; 3 QPH \ . . . . , . . . . . . .... , . I . '. N. I , '. ", "'. I... . - . . . . . . I I I I . I I . . . I . . . . . . . . I ... I . . I . I ..... I I \ "� . , -,%,W* .. , . � . . ... . . .... 11 ..... . I " -,%�D.�t, . . " N/F \ � , I ... - ............ , I *1"'. I I ...... I I ----------- � 1 11, -2j, 5 QP I'll, 4T 3 IGS 1. . . I ....., . I � , , Ai - I - - I I � - I I ... � I I - - I ..... . I ;2I \ I it , , --- ---- . . I . ......... � , - , �� I/ -%'-'_1�_1-'-'-%% ................ . , W. KEITH WALSH, L.L.C. , �,� T, I , '' * ... * * ........... * .... * ...... * '' ; 11 % \ .. 1. ... I ..... �_ .- - I ....... I .... ... � I ... I., . I "t %/\ . . .. ...................._­1 .... I .............. . ". Ill i " I '� 1%'* . . . 1. 1. � I ��. ... 1. I I ... D.B.3851 P.587 I i\ . .. ...... I .......... - . ........ .......... . _3 � . .... ......... ... � �. , \ , ___ -'-'-*-'.* .......... . V .... 7. � M.B.23 P.31) r1r, \_.-I I , , - ....� . . .... ---.---: , : , . � I - , - , I 1 20 ICH - � . - ._­_-�%�.., I I I - \ RESIDENTIAL USE I-1 f .K3 S ­1 111 ,AV,. % 4.1% " . J,7 . (VI V% % . � I � , N1, . . "' .�"__ 011 I - \ 111 , _IG % %-� ,- �� � %, � - � _� I f 18 IGS --- 111 I I % " I i 5 V00- I, , ­ I 1 9 MSG / F 1111 � At 350,�iJ_4 \ I W. KEITH WALSH, L.L.C. —APPROX. 346 L.F. OF BUFFER PLANTINGS TO B � N 350,2341 35 ICH 1 26 IGS D.B.3851 P.585 MET BY USING EXISTING TREES FOR CREDIT a % 1 20 CANOPY TREES TO BE RETAINED FOR CREDI� � %, I - 'k 1, , 4 TD \ � 111 4 F I I'll, / \ 1 115 \ GENERAL NOTE: IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJEi ,RK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE ­IE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITU' 3EPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AN FULL - QF WITH LOCAL Z�Q"! NSANDCODES.- __ C:XUSERS\BBUCKLAND\APPDATA\LOCAL\TEMP\ACPUBLISH 4152\NCC1 38078LP3.DWG PRINTED BY: BBUCKLAND 10. 1 9.16 @ 9:09 AM LAST SAVED BY: BBUCKLAND 4I I%ln %, 11* AROG . 1111 I I III W1 1 1%, r r % I - �W/l WT�:_1_1� _"__"�_ .- - -,�_- 11 ­ - miew WX -_ I.- ­ I'm I �_, _­��_ WI/ 4�_141=111 -� -, m/ IS110A I'll "I'll, ..... . , � �f � �_; ME; Wi � I = _ v4"',_ ,� - MWINIM011 �Y t�: ,_�, WIR ,�,_� � - wn� "M �� a� ';'g,�, m, I � ��_� __,_� e X 11-111ell, awwo"fflffl 1�_,_�1110110X MWONW - - _�, . . . . . . . . . . . . . . . . ... - I OWNER MAINTENANCE RESPONSIBILITIES Upon Owner's (or Owner contractor's) completion of landscaping work, the Owner is fully responsible for all future maintenance, care, upkeep, ate(ing, and trimming of all installed vegetation, plants, tree, bushes, shrubs, grasses, gross, ornamental plants and flowers, flowers, ground cover, nd landscaping, including all landscape islands and areas adjacent or part of the landscaped areas. This responsibility includes, but is not limited to, the following. I Trees adjacent to walkwoys and areas of pedestrian traffic must be maintained to assure that any branches must be limbed up to a clearance height of 7 ft. (from all pedestrian surfaces) or pruned back to avoid any interference with the typical path of travel. a Trees within vehicular sight lines, as illustrated on the landscape plan, are to be trimmed to a clearance height of 7 ft. (from all paved, traveled surfaces), or as otherwise indicated on the plans. 3 Vegetative ground cover, shrubs and ornamental plants and grasses must be trimmed so that no portion of the plant exceeds 30 inches above grade (of all paved, travel surfaces) along and within the sight lines of parking lots and ingress -egress ways. I Fallen plant flowers, fruit, seeds and debris droppings are to be removed immediately from vehicular and pedestrian traffic areas to prevent tripping, slipping or any other hazards. a The practice of topping Crope Myrtle is discouraged by the Town. Minimum pruning to develop Crope Myrtle's natural tree form is encouraged. � ese requirements do not affect the plant life guarantees the landscape contractor is required to provide. F1A_ I . I Uf 1. THE SITEWORK FOR THE WAL—MART PORTION OF THIS PROJECT SHALL MEET OR EXCEED THE "WAL—MART STANDARD SITEWORK I SPECIFICAT-I;ONS.11 . 2. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED I I - - PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL CONNECTION OF SERV-ICES. � 3. WHEN PROPOSED SPECIES ARE UNAVAILABLE, PLANT SUBSTITUTIONS MAY BE CONSIDERED WITH APPROVAL BY THE OWNER AND/OR , LANDSCAPE ARCHITECT AS LONG AS PROPOSED MATERIAL IS TRUE TO PLANTING INTENT AND MEETS CODE REQUIREMENTS. I I I � P, ______ 91 a I 18" WIDE SOD STRIP IS REQUIRED BEHIND ALL CONCRETE CURBS/BUFFERS. AUTOMATIC IRRIGATION IS NOT REQUIRED ON THIS XX­X0%%%JII1 I I I III/////////, -\ \A C A R 0 ­'//1,1z RONMENTAL CONDITIONS THAT ,\\\" !�,_ X,- same*, �, / -/1, ,z 's �,u 00-�Mtj,�;c -0 '1/ " , 'I - -7 ,�_, DO NOT WARRANT THE INSTALLATION OF A .:f N #- � 10%,# 0 , * ,# " * !� �) -y WATERING SYSTEM FOR PLANT ES LISHMENT AND . i:: ZzF ., 1�t SURVIVAL. % . = ., � = mi- Me = 637 0; = = 1, Y) : = = J0 0- ZZ !�� 0op 0411 Z, 4 - S� *#,, \",** .:�� ,�� - �# 11</ 11 I 007 --//, 'k� & LANDSCAPE ARMITECT SIGIIATURE/ SEAL . . ,///, A G 04\ "01111111111111111mow. am - - I I ALERT TO CONTRACTOR � 610 310 15 0 610 � ALL GENERAL CONTRACTOR WORK TO BE COMPLETED � ­7 (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE ifl- 601 k MILESTONE DATE IN PROJECT DOCUMENTS. � � - � J I � I I � � I - � . - - - r-% REVISIONS BY NCDENR REVISIONS . 7 5/18/16 BAB NCDENR REVS/OTB REV 8 BAB 5/31/16 NCDOT/NCDENR REVS 9 BAB 16/6/16 QA/QC, OTB REVISIONS 10 ATZ 6/20/16 NCDEQ REVISIONS 1 1 18/3/16 BAB BID ADDENDUM 1 12 9/21/16 BAB NCDEQ REVISIONS 13 BAB 10/3/16 NCDEQ REVISIONS 14 BAB IIIII�� 110/19/16 mi�� 1 2 3 N 351,760 N 351,760 FF__._.t7. PERMANENT GRASS CHART ti vI .� V A `z, IV C !J 10 OL SQ. FT. VARIETY SEEDING RATE S t88,000 SF TURF -TYPE SEEDED BERMUDAGRASS 'SAIiARA' OR SIMILAR 90 - 135 LBS /ACRE 2-3 LBS. / 1000 SQ. FT. SOD t7,000 SF BERMUDA TIFWAY 419 N/A MEADOW SEED + + + + + t25,200 SF ERNST DAS1N MIX ERNMX-127 (SEE SPECIFICATION) d " 9 :» �� ®'1_ \ "7-te° d� -1 _�Z41 _51�_, �h 41 ,% �i / /„ A �y^.^„?n ( \ ,,, '°"tin° f , ; _ ,Y,. -�,�. E p p ^\«✓ a ' , w ,yr IGS _ �, d ,;« :.. a .,, .a11� . .gib:°,. 7 . , �,,,,^;,N", : ;".., \ ,-,e. '«, ''„^, » v"�4q d��.»„ Sew, % , �hG,b V fl �, b, �,,z ', . „i `�""` % ?,� 1 y, 'Y/i°w•»,w..,w,,. I _sie{ d `"'y.°iy, , „, ; z'` '-„�� ```:•' g{-n:°" a '/mow„,.,; °/�, 'b / d.. :` 4 w L i .,., Via° r{ pp^^ ww`=nro„ '^'""oy,"` b f L"ygm „qw wY» +y '�qy, "`w, j£ e�'^en,,,,,„n °`` ".'a _ k, ( ,rE, .l1 .b d "�a, `"„ »a a✓s.-, sr,. ;: / /zti.. exs s uj, {? 1 Y ' . y d' I i"N. »„, '- A` 0 n ei f a 1 C ' x rkl 6 • '»z°x G �. tea^ r . w, $q ,a �`% ,° a�» » w' �. ,,,, :•� "tea d v /° »`»»'; g e �+C 9 .m °•w k �Bpar t ", • ;�, g .t • ti`�. . ;q�', M" fin" w' �\ '� 0,.. 4Y', • y. w` y , krQ, b »'•ww .,�, q .G„ ay �°y z 3 r^> i\ , � ' ,��VO',,,.ww.. 11 '1 ' "w.n za I „_ " ; w�, 2 a G" y.aap'•". e f d ^w. b d °bo b, G »w» 'a G, / » G `II�V '�,�` R'' :L' '. E TO L w.. G �. /b , jjj P ,p ' „ate, ,, °•.. w' 1 y�" '.. w 0 � ham» .bu,. iiV a- .,T'. .'TF2E':F"�'AR° •�`• E�PLA t1:"' .�`w 0. B "°S•• '�'.e FJ'9' W, •,` v• LF`f .' 'w! "/ /,�H s' '' b » ", •,,, 4w'^ ^bC u,,�'m"ejm,. $ " �, �Y riu 'O "ac° b � A°'>"uci �l, b � GELS.y� h FIJ�TII��� •E '�LCR ° 'NT' `F•:' � .���. 0 �' D b� _» e v(. ! a� w 9 PH / ,�c • r °`� Q UPA� RLINE �i a� k�` S , L �„ max. s AtS OR. V 'TO C- e`•-. . .. `:. �,/ �� / . , G r / y' 2 t- IBI ��. �("� -» y} � r ,� b OLJ . •A EL•. :b s' �''} :A `°� �115° , 9 ,♦ / '�'DN e ','�s �41 g'`L` •'� . B 7 w,f k i+sb , 1 ,e"n ' " 1 , . '`"...„ "fir -`�' 8' 9 ,f •' -,' ,'�' .� g, y. b G "� g• dw� G G S" 9 °U ;» b, •eE b r ,y :g' 7 _ /y� I. 111. I" i "n 4T 'S'a{. : / n G.. b %' .mz G 6, g. : ®• f H• b` •w,. r,� °'°pyre `v . e" d E `/ a s a b 'a nG . X: TIAaI : y. I., \ » E Cx - . %\ ►: E ,m w d d w €_ d �y \c b Y bw\ g ✓ k � ! :t'-, D�`a m;,, k d b o } ` 141- S / ;;,,, ✓� br:7 b � 9 E r d t . z:'.,.xs1b : d A ^�''� I asS I �I � � • •� 1f ' �/'/ C«fjjm b I a.g° '. �l . ail s 6 i. v b N { . 4� j G 4 4i £ , ,y z,.wQ, qq m »; � t / "4 y f i 6 "",b 4 % w o G , s 4� b/b a b ti 3' -A F bk' `1 � d' ba 'S. I , i 1 ` f" y •� a, O 9 s Y'• H r 2 • ay', i y p 6 "b. ., j '� _ "y �'i t k' 6, ,q 5 ° Rn a 0 5 „ d b� °4 5 C k. 9 `/ a' avb a, � y a 2,. '1 4 .4' 9 b ` O G "o gf r � d ;' . g. • d J �" � R 6Y lt�f�}N b„•u w"k b!be f.' n,3 3>. �-:"% b1-11 �a g•��� A •b / x°!' h a YS ,' ,k " ny v�'c xppy yOo°' �xn L / a 'a �� ba,'i •i;`' r.e l•' i y f^ s ' e; "a°�, ., r N.' i �.✓ f ,a ,yp �; x y 4 <� ,zu � AROG r= q �y, d d 'f J / . 2 ' ` gn / r% b / 4 ""may y`ew i /, i a y :d 7 y, 'aI - %""„ °"ri azi' ' j �: 4 „A'' ` x B"^ "li +/'� / }j , W "2,G'' 4^ ,Y9 fin/ / L •'n^.nn "b; / a �, a'o °q6a ' k w l b ""'ab' °b, � s a P �� � ' dtn . � Y w y''k : / // o`er•` rw aye°„ d" a» a, 2 yam , , ,;°may° , y°, 'y"Oo/H"'o b .'.l ofi d � 1; 1� 'bb�„z k' r / ,ak by d f �, s ' 's .d a x •zD: �' ''4 �,'• d n ' "2'N d ,9 ) d t ,w Y ✓r�4 ¢k / f 11 A. G Y Y y 'a ' Y t / f' n. // y d bad. ° 6 y. 1 1t m /r f i° � l % ,/dam // � °��; �: si j A�' , � ,^,. G y G, ' �/ f t t /b g f I bb t r� /2UPD s UPD s p; ''k�„ / 1.. 1 d d t f ! °�'' I c_� ,--//zd��a''� �fy // �` :Z y -, b// � `"'. ^•""b f f I d k f F „ a. tw �t''.' f a ,ywa » , a t 6'0 / f' f sd d a a yy'. ' .,,°. ., a'a Y r 'v G f a» ac„c'',°�2 p ,cy, / s f �gy 14 UPD t w t a " � f r' S "'aa. b° f �b d' a Paz w .y,F;, � y,%/ / `:d /obaviw $ f 41 n a/ o, t 1 f bi'/�xn"yi„ "'a ° a: "0 'n � " • Yi o' '� /%11-1 bb/b/4 0 i f a ' bb y / „o f ba� N F 1 PD F r� U t f 4,yf. 9 Z a'�° �// t , 3 wi / / // ,y� . J/%�/ °,G ► ; s , f ,yaave'y„'yr - m. I P Y ,e,. �f s, {} d syi. 111 °i%o ' i % Z% a Y /i 1 # 6 Z E d{ f g �4; r p BRENDA STANCE f f, a / ICS , 101CH ' i // / a 1 ref 1 ' f€fr 1 �`" a��, $ G ICH / 4 ' of 2 ` of'/�,'' y g ,€ / f- D.B.3313 P,9 f f f f d 1, 201CS n>, ,j / � � •\ � / �� "tee P �� � �- w s, �, `_W # f I r ��� �` COMMERCIAL USE �, ff s // d t f8 �y rf �y 1uPD- �/ \ ef,\ �� s ZONED B-1 s I 1 off € // / 201CH I fE f fI 111 / i, f s'` c z/ E s „_ 1 £ bf € t f ICH rf i `; y s d' ^_" ' E d d 1 4 f d t'. 9 UPD 7 � R . t p k f/ y f t d # , / 6 $ ff, l i f �.,�%e UT1 IP # ��"' 5 rdt d f �p pd� � �11 + d k� P / \ y / yl d, \ �i E € t k ; f t , N THE COUNTY OF ONSLOW p'b .s t f„ t fps d t .. 20ICS a� 1 rru , Yj ` / f°� , fmft_ D9.1`� Ad A t ft y� 1 I:: ;, ��1y;I 1 LI ily-` ,w,J ?/ G H 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 „ N 351, 760 �" craeg ti cGZG�b�a //M-11i�� 1011-tic n' sw,f � .,,. c, r � gi Hir bbG��G�� ,y ^i r.✓"""" xj5 i--"m'r" 'r `"" `fyg `"w„"'w" 4� G'b/`ka, '11- ' € ,.,« 6�" f, \ 1/,�" •,,.,,„"' off, w«`'p '»»"'w'"..,. '/''flG6y:F 4 1 » b�:" ww '^». --. ^«, w { 'dw,,,'°w "°° G'Os, 0 O 1 d� »„ " w. t -,, " %% w,"ww w b�uiu, � , „� �G" , CO ,, \ - �� .. „wy br f e sY?4 � 0 -) t,_ 11 w �" 11 / " • e,°w.rw `i�`"«"4'¢,ya'Oi� gi „" '",..,.°, ,. b'>F/b�db"l,G,i �/. \ w„ !�yk,^% 4/'//// tl"»„ »,„w»» alb /N „'°lir%. / �� ERNST SEED CO. BASIN FLOOR SEED MIX `v „� .,.�11":.: " ® 9b 7* SPECIFICATIONS (ERNMX-127): NCGs MON "DAMS" \ �^_ dd� w „w"^•„^ /�, � N®.351, 895.4 w \�'°° fb'bGN>/ �/p °' ye9„w,: jJ lv� E=2,55J,J�S��� 3CCFy9,w 1,• ✓,� ��l ELYMUS VIRGINICUS VIRGINIA WILD RYE 25% NOD 83f2001 � ter" CAREX VULPINOIDEA FOX SEDGE 25% 1. f"LZ� 32 34 �!/ POA PALUSTRIS FOWL BLUEGRASS 25% NAVD88 AGROSTIS SCABRA TICKLEGRASS (ROUGH BENTGRASS) 6% EIP (POINT Of- SPARGANIUM EURYCARPUM GIANT BUR -REED 3% 8EGINNNING) VERBENA HASTATA BLUE VERVAIN 3% � ' # ELEL� 2i� 92 JUNCUS EFFUSUS SOFT RUSH 2% 1 GRID f °35163.2 ,52 3 SCIRPUS ATROVIRENS GREEN BULRUSH 2% GRID f_.-25560�9.718 SCIRPUS CYPERINUS WOOL GRASS 2% LATITUDE• 34.42806935" SCIRPUS POLYPHYLLUS MANY -LEAVED BULRUSH 2% g NAF LONGITUDE--77`08'59 42 STEM MON KEYFLOWER 1% MlMulus RINGENS SQUARES KEYSTONE � ONTRACTORS, INC CAREX SCOPARIA BLUNT BR OOMSEDGE 1% D. 3 P, L� 31G 522 HELENIUM AUTUMNALE COMMON SNEEZEWEED 1% M � 94 IRIS VERSICOLOR BLUE FLAG 1% M. 45 P. 31 ICH JUNCUS TENUIS / PATH RUSH 1% 1 VA A CANT P RCEL f F^ Y 11 1 %�i ZONED B-1 RE OF THE ERNS T MIX WITH AN ADD ITIONAL � 3 SEEDING RATE : 15 LBS PER AC t/ i � JJ fs" j �j 1p � fp! �/ {� / s4 f.d�I�af.�'� LJ C/ ,mP. CRE OF IN RYE AS A NURSE CROP). THE � a� 30 LBS PER A ( I ,� r- r , ze`° ' EROSION =y �.�,.��" AS NO TED ON THE SOIL TEMPORARY SEEDING SPECIFICATION EM,, / d 14 C FP t d TO THIS AREA. PLAN SHALL APPLY� 1 S IMENT CONTROL� {< -�� �.� AND SEDIMENT L f > d f r / d 1.1 THE FORMULATION NOTED ABOVE IS REPRESENTATIVE OF THE ERNST 1 p� ) � 76 sw �d ' SPECIFIED BY FORMULATION AS SPEC THE MOS T CURRENT FO SEED SPECIFICATION.d T E TIME OF PLAN TING SHALL BE USED. o d� THE E RNST COM PANY AT H f , �f p 7sMV d d f d e / 2. SEED SHOU LD BE APPLIED USI NG DRILL SEEDI NG OR BROADCAST d f ) SEEDING METHODS ONLY. THIS SEED MIX WILL NOT GERMINATE WELL WITH `'�. ff' f/ f d i d HYDROSEEDING METHODS. Pd d 3 UP fd f d rf 6 Yd dam' NORTH AMERICAN 4�F f/ WITH A TY SHALL BE STABILIZED T E ENTIRE FACILITY 3 H ., d ) t dw tiwn 4 a^ THE w. .� OR APPROVED EQUAL). f BEEN SC15 O STRAW & COCO NUT BLANKET Q G {` A i� d ACCORDANCE WITH � , SEED IN ACCORD TOP OF THE BE INSTALLED ON � b BLANKET SHOULD b � ® f / f THE MANUFACTURER SPECIFICATIONS. � w»" e` 1 d�/� ` L db� d � " d dt • d d w ' rd ^-n d d ' , •dv d 6 s ,1 O i d (MENTAL WATER ING UNTIL IT HAS THE SEED MIX WILL NEE D DAILY SUPPL d/ 4,) E d ' • rf f,®/ -, s GERMINATED AND REACHED AN AVERAGE HEIGHT OF AT 12-18". " , w•,. ` / d v / d ,d d 0 dd ! d' G • x r 4 t d d 1 / FIRST GROWING ONCE AFTER THE IR SHALL BE MOWED 0 � DING AREA SHA 5. THE SEE l d tt d 16 t t d t r" G AND THEN SHALL BE MOWED N 0 MORE t EARLY IN THE SPRING, � � � ^ , SEASON f d f � f 1tf THAN ONCE EVERY THREE YEARS THEREAFTER EARLY IN SPRING ONLY. # etd d tf d% __.-_ �� f!; a t fifpaa'� f t 121CH d / d /5 d t t d d /d tl to g d d f� i d d, ° d t � f l b'l vG" � / d d s ? f d f b v A d f, C t 1%.a rffd d�f td ' 44'k a; °� f1 dt f1 fffd d f zz ze •"` 3 d • 'ham �b ° •t a i�,' f :Y� ' d f f f t t 8}6 dt flft p d 1% , �a V dtfp f ! pf �' 1 U r ft��t1 tddd f e, f tt fd8tf f f zb ",, dd td dd fptt did df �d�l �df k�P,o'>'"' °`°''`",,- »'0 N 351,23 yzd t t °, ? ft tf ldttp 1t a wyy ► It td t�. I4` , ' 1% y'a„ 1f a d p- Q td d f dt fv p� ,° f' tt pdpdd d o F If' tt tlttg fp f �, N"I m de t t d 32IGS ­111a`b,, i r d 1 f fd lty t "y ,, i 1 • / 1 s' 14 IC id /� d4d"� $ • _ a€ r } f f p F frl/ �t �l t �df t y H y„ , 101C '� ,z ///,y/s� /y 13 MSG - I ; f t 1 s,^ / d6 b,y°b (�,f� P1, f df ,. ,,,,r�,z x4 / f 1,,, ; /'/�/�%/$/y�id$i r'ti [°: q, r' '"o". fY-,$�Cf@6'lly d 9 (CIS `% / "/ 4E I ' ij * e 5/.//j,'/' �/,'/ �"' '16y� +�s Y ` t $ td� t t ,�, 1 UPD $ { 4 v9; 1911 , I �; ;:f 'I'r, /, 2 ,�d6 t d .a., i i rr { - yyha 2d/..� d/ a� y 5 pdi d / 20 ICS „ . /s y ° . , �,,k ,, - 11 t 1{ I ,e $y. dd 1 " a��e�yw'', ;• �` £ g�,IE 6 TALL WOODEN FENCE I ,;I '; ,i 11 1' .W11 v (MIN. 80% OPACITY) I� '_ 1 - ICH / 7 s ,` I* I, - `�/°, b / 1 UPD 4 �d $ y 4QP //%k • Y If'::1` »* b 1 y z%/abH,,,r, y ` 20 ICS 4 ♦ �p ,� <�� 7S € s °y4 3 TD d 4 I / . Nu,�r ♦ � k TICS 4 ", , CHARLES A, RAWLS & � .t.1�t 0 I , ,� s 201CS \� �» � p g.1111 4 _� I �, y it ( t aI ►£ s„ 1 UPD !, EbG 7 ♦ .. g 11, 15 MSG MARY S. RAC LS ; i . f;1I sfi 11 4, a3y2 11,zy y.,,. >d d^ GyL ' 111 //y/////� 16�` 15 IC f 1 iD i 1;' -'q //G���. ,,n / (,�(()�" ► . f.,� x" 9 ,I //� ,¢L�, ! D,�.1817 I . 88 ► �: �GGiiiGerpipa ,` ♦/%' �1,''{{„��xy �/,�d 1 1 4 ///�� - / % � �' 6f f M . 13i `1' 3 I .3 2 ' ' � £ I ' Hb /1G. y, ksr�"P1 df a: I d , �/��d d�, 'TALL WOODEN FENCE i ': yG y. 1 G� y l /� d �'. 1 0 *� G ,yam' y d / ` /%/� /� d /dd f M,B.37 P,1 D ; � . I 1 0» ;1: a G�ti;'..,, yam; n 1 201CS 4 . / / `6 ; f (MIN. 80 �o OPACITY) _ {'. s I � _ � F ~ . ,w. k �� 4� f 1kf /�/� /s /dyd RESIDENTIAL USE S ; I I F cb I "-1 �'n„ 2 1 p �" %,� f � " s / .i y/1 13 Ids { \ lle ,I } t f: .....,GGi c y _ " % y j" �/� sly ft�lg// 9AROG �ONE� L} 1 it "vj. m °aGG� 1 `� 201CS .bra / 11 1 y �%//// s�s�fss d t3 i %. G�•2// y,,,;,� t 1 UPD '.� ,.``�, 4 1 -� yi%4s$ gr� '-'" -•.�. ` 1 t /rz,m°°Ga9 . a g"".' y ;� �/ , fdt$y,/ I a „Itl i 1 a `- �f d O1. /? ,f",,,t day 7 MSG 1 E W 1 , e° s� ♦ / //f fg/$�/ 5 IGS d" s ''° f l r";s^' v" 'Z'" •" i. 1 11 6,a -.}: � ^. //°.� b '/ir // / y/i LY'$° ,Yd,r' x ..� ,i/ %° s 2 s i _J - ., .'A . F /d rydddytfd >fs Ni=:iY. p,d:fi`i -;�'i3 , 1 ui *`kt ; ,, '' $ ya° 1 - ft 3¢d fyi�yr t' --- ° �..`, ' 111•; '"y `ti p � f/ - � " � €. s c s a s ♦ �'d /� /� G� � ry w; - 7MSG t -"'� - ♦ f° £ 1 ")lt',I s 7 I b u 1 xsY' 1 1` r bi F 1 sl° Ik3;zoy`�,,,d, �,,& v yp�c� g 4 y •1• ✓,� m 11 a; „�° '✓x r 4` ' k`,. 9da , 91GS # axx 3 1 , i 1 q , i11 WATER I EXHIBIT A , ,d ., �, ,y � : „ Nf F iw","._.: 1 _� �1 I PROPOSED L NE /`' , » 91 s �- m, d CHARLES A. RAWLS 8c 1 : 'Il '" 11 1°=10'1.-:: g ►► f MARY S. RALs bE� a" dLnn11 I LANDS CAPE LEGEND f G, `'� °h, I'll♦��'� 1s►cH D.B.17D0 P,291 `x♦.. �;:, 111 PLANTING NOTES: 1 p % �/�,, TD . ,♦, a=•: rd�,t t yp g q}_ ^� P�+ ►111 ` €`, ,_ i 4 �cAr,,,, n G ' 'b ' '`,« 3 ® k 4 ` ..y�` t i' <B. t ✓ 1 .3� ♦ •,PiA.5 1 » - ..:.,.,.,.. 1..,,.^ i G/2GG� � °`•,, Gt r°"° .,, f I ``'•, 1 °.� I is 1 1,I1 a 1. ALL LANDSCAPE AREAS ARE TO RECEIVE A MINIMUM OF 4 OF TOPSOIL, SEE 2900 SPECIFICATION.1. 1,101 »`' "%/" y ,,� f RESIDENTIAL USE 20 VYME WATER 1._£ ;I _ : V y 2D ICs.' TALL WOODEN FENCE _ z `' ` AREA TO BE SEEDED LAWN (SEE PERMANENT GRASS CHART) y<a- / H o ON 1 / SEWER11 ':IF 2. ALL PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE OF PESTS AND DISEASE. GG "` b, � y .. • • 'I "' / (MIN. 80 /o OPAGITY) 3 ME w. 11 ..... ... ',`°-f r/i/b GGGao T 1 UPD y; ry°w�D Il SIN C EA _ _ , / ' £; a g' .•" 14 MSG SE .. _ - �riF,°,. -: ``� Y`E"<; 5 I'-- QICH r ; f - ,;'s' ` <'S`�', B CONTAINER CROWN OR BALLED AND BURLAPPED AS INDICATED IN THE PLANT LIST MATERIAL SHALL E ;:,. 3. ALL PLANT �, .._- sir m�r,,,>n'r��//GAG ., � t MSG ,n ;-^31 ,„f t 11MSG �' £, Vic' ::i'� 1. 11 . •/bra E GGd,. 2 AR0 }✓ i AND MEET ALL REQUIREMENTS SPECIFIED. ,a '► s IsG _/� - ` 1 1111 4. ALL TREES SHALL HAVE A STRAIGHT TRUNK AND FULL HEAD Q �, 4`1 } ° �' � b '°:`��""""o/Gm Y; 37 ( S z 11 IGS s ¢ 5 � �11; q t „� � 5 ,..9 � g ,. AREA TO BE SODDED LAWN (SEE PERMANENT GRASS CHART) '` G°"� s IGSI IF 4`�'� I $ " v «�4"y /`1. 1 5. ALL MATERIALS ARE SUBJECT TO THE APPROVAL OF THE LANDSCAPE ARCHITECT BEFORE, DURING, AND AFTER INSTALLATION. ` '11 y%/a' '"` 15 h ,, •/ w,,a `2r '° ` k " i S4 t i ; / 11 6. ALL TREES MUST BE GUYED OR STAKED AS SHOWN IN THE DETAILS. _ + + + + +` AREA TO BE SEEDED WITH ERNST BASIN SEED MIX y, 7. ALL PLANTING AREAS SHALL BE COMPLETELY MULCHED AS SPECIFIED. + + + + + - �Oy + + + + + (ERNMX-127, SEE SPECIFICATION) - AREA SHALL NOT BE' ° ' ~r -� tN _ f i1= PRO'�a' 60 + + + + tN € 1.g,. AG�ES.5 - _ MOWED REGULARLY. m , '" 2.,�, ' t ,b -� � , :'` 8. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL AVOID DAMAGE TO ALL UTILITIES DURING THE COURSE OF THE WORK. ``' ff ` r y"'r 4 NG BURIED UTILITY LINES SHOWN ON THE PLANS ARE BASED UPON BEST AVAILABLE INFORMATION AND ARE TO BE CONSIDERED APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OFF/b - S - 1> EASE ENT LOCATIONS OF EXIST( r 1a I " THE CONTRACTOR 1 TO VERIFY THE LOCATIONS OF UTILITY LINES AND ADJACENT TO THE WORK AREA 2) TO PROTECT OF ALL U11LTTY LINES DURING THE CONSTRUCTION PERIOD 3) TO REPAIR ANY AND f E -- I ►_ 0 AG VEGETATED SHELF PLANTINGS (REFER TO WET DETEN11ON 11,. J A RESULT OF THE CONSTRUCTION. d APPURTENANCES, ETC. WHICH OCCURS AS O��-'fr' YEI �FfU� �-�- �' ~`� � `;'� �� ° ALL DAMAGE TO UTILITIES, STRUCTURES, SITE APPU '� '� -�, -1 _" -�� E .- r BASIN HERBACEOUS SCHEDULE) NO MOWING AREA 10 ICH 1 ;: i ` 1I ' 1 �'`' ` 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL QUANTITIES SHOWN ON THESE PLANS BEFORE PRIC,NG THE WORK. t 1 € � £ E/F x d .f[' , ., i ' b A'A w, 10 MSG , " I 1 1 10. CONTRACTOR SHALL BE RESPONSIBLE FOR DELIVERY SCHEDULE AND PROTECTION BETWEEN DELIVERY AND PLANTING PER SPECIFICATIONS TO MAINTAIN HEALTHY CONDITIONS. c ` ` y �« 10 ICH '" t €.,. °- 1 s ,,,,,, ,,,,,,,,,, ,, ,,, ". ,, H 4 t 4 411 1 I I LIMITS OF BMP/MOWING AREA (SEE NOTES ABOVE Elp 10 IGS11 N/F ,I �� 3 I 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FULLY MAINTAINING (INCLUDING BUT NOT LIMITED TO: WATERING, SPRAYING, MULCHING, FERTILIZING, ETC.) ALL OF THE PLANT MATERIALS AND LAWN FOR I 1 REGARDING AREAS NOT TO BE MOWED) - �:N€r ,1 1 i THE PERIOD OF TIME SHOWN IN THE 02900 SPEC. I 11PD SWANSBORO INVESTORS, LLC 4"H, ; 1 -,_ - ._.,....._..,.,._,.,... ,,,,,, „b D.B.4096 P.345 € XN 1 6 11 . ,r 12. ANY PLANT MATERIAL WHICH IS DISEASED, DISTRESSED, DEAD, OR REJECTED (PRIOR TO SUBSTANTIAL COMPLETION) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF �` RESULTANT TRACT II° ► t ° s 11. :.s 1 41 I•. " 1. µ ... M.6.67 P.179 • _. i1 1 . ► ►;. ,f �;,,,. FbC THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL PLANT LIST SPECIFICATIONS. ALL SEEDING SODDING AREAS SHALL BE MEASURED AND VERFIED BY CONTRACTOR PRIOR TO BID I ►' ' bb _' .. • / RESIDENTIAL USE .�F ► { l `` 1 13. THE CONTRACTOR SHALL COMPLETELY GUARANTEE ALL PLANT MATERIAL FOR A PERIOD DEFINED IN THE 02900 SPEC. THE CONTRACTOR SHALL PROMPTLY MAKE ALL REPLACEMENTS DURING THE B►11 ►►► K NORMAL PLANTING SEASON. 14. AFTER BEING DUG AT THE NURSERY SOURCE, ALL TREES IN LEAF SHALL BE ACCLIMATED FOR TWO (2) WEEKS UNDER A MIST SYSTEM PRIOR TO INSTALLATION. 15. STANDARDS SET FORTH IN "AMERIGM STANDARD FOR NURSERY STOCK" REPRESENT GUIDELINE SPECIFICATIONS ONLY AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIAL. 16. WHERE SHOWN ON THE PLANS AND DETAILS, PLANTING BEDS ARE TO BE COMPLETELY COVERED WITH A HARDWOOD MULCH FROM A LOCAL SOURCE HARVESTED IN A SUSTAINABLE MANNER TO A MINIMUM DEPTH OF FOUR INCHES 17. REFER TO WALMART SPECIFICATIONS FOR INFORMATION NEEDED FOR IMPLEMENTATION OF PLANTING PLANS. I I L C 'i P E S I'w.✓ � `'¢ � '',, OVERALL ' 18. WEED MAT IS REQUIRED IN LANDSCAPED ISLANDS AS SPECIFIED. I f 's1 € `Q D °•.w% k i Yd ': EY'�f !� i f £ y :.,� Yw,i L",.,,< 'w,..% t I 19. ALL PLANT MATERIAL QUANTITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF ALL PLANTING BEDS AT SPACING SHOWN. I I WEST PERIMETER BUFFER = f 1,184 LF EAST PERIMETER BUFFERS = f 1,614 LF I L 20. THIS PLAN IS TO BE IMPLEMENTED COOPERATIVELY WITH SWPPP PLAN, AS NEEDED, TO MAXIMIZE THE EFFECTIVENESS OF THE SWPPP PLAN FOR THIS SITE. I I I 2 CANOPY TREES REQUIRED / 35 ' LF = 68 TREES REQUIRED 2 CANOPY TREES REQUIRED / 35 LF = 98 TREES REQUIRED 1 21. THE CONTRACTOR IS ENCOURAGED TO COMPLETE TEMPORARY OR PERMANENT SEEDING OR SODDING IN STAGES FOR SOIL STABILIZATION AS AREAS ARE COMPLETED AFTER GRADING. 7 TREES PROVIDED 98 TREES PROVIDED I 22. THIS PLAN DOES NOT PRESENT ANY TEMPORARY STABILIZATION REQUIRED AS PART OF SWPPP PLAN. UNDERSTORY TREE SUBSTITUTES DUE TO 122 TREES PROVIDED NOTE = TOTAL PROVIDED INCLUDES USING 6 EXISTING TREES FOR CREDIT I CONFLICT WITH OVERHEAD POWER TO MEET THE CANOPY TREE TOTAL 23. ALL SEEDING AREAS TO MEASURED AND VERIFIED BY CONTRACTOR PRIOR TO BID AND AGAIN PRIOR TO SEEDING. I 2 4. ALL EXISTING VEGETATION THAT IS TO BE PRESERVED SHALL BE FENCED WITH A DURABLE, STURDY FENCE BEFORE GRADING BEGINS. THE FENCING MUST BE A MINIMUM FOUR FEET (4') HIGH, OF 12 SHRUBS REQUIRED / 35 LF = 408 SHRUBS REQUIRED 12 SHRUBS REQUIRED / 35 LF = 444 SHRUBS REQUIRED DURABLE CONSTRUCTION, AND PLACED OUTSIDE THE DRIPLINE OF THE TREE(S) TO BE PROTECTED. TREE PROTECTION ZONE SIGNS MUST BE INSTALLED ON THE TREE PROTECTION FENCE AND BE VISIBLE ; 408 SHRUBS PROVIDED 444 SHRUBS PROVIDED 1 ON ALL SIDES OF THE FENCED -IN AREA (MINIMUM ONE SIGN ON EACH SIDE AND/OR EVERY 300 LINEAR FEET). IF TREES SHOWN ARE NOT ABLE TO BE PROTECTED, LANDSCAPE ARCHITECT AND CEC TO BE NOTIFIED. I 1 SOUTH PERIMETER BUFFERS = f 1,251 LF TOTAL NORTH PERIMETER BUFFERS = f 724 LF TOTAL M 25. THIS PLAN PROPOSES TO USE A COMBINATION OF A FENCE AND DENSE LANDSCAPE PLANT MATERIAL TO FORM A SCREEN OF NOT LESS THAN SIX FEET (6') HIGH SUFFICIENT TO BLOCK THE VIEW OF 2 CANOPY TREES REQUIRED / 35 LF = 74 TREES REQUIRED 2 CANOPY TREES REQUIRED / 35 LF - 27 TREES REQUIRED RESIDENCES OR RESIDENTIALLY ZONED LOT{S). 1.1 74 TREES PROVIDED 27 TREES PROVIDED 26. THE (PRACTICE OF TOPPING CRAPE MYRTLE IS DISCOURAGED. MINIMUM PRUNING TO DEVELOP CRAPE MYRTLE'S NATURAL TREE FORM IS ENCOURAGED, NOTE = TOTAL PROVIDED INCLUDES USING 24 EXISTING TREES FOR CREDIT TO MEET THE CANOPY TREE TOTAL 1 27. WATERING BY HAND FOR PLANT ESTABLISHMENT IS REQUIRED FOR UP TO 1 YEAR AS PART OF THE WARRANTY PROGRAM DEPENDING ON TYPE OF PLANTING LOCATION. CONTRACTOR TO INCLUDE - 12 SHRUBS REQUIRED / 35 LF 162 SHRUBS REQUIRED PRICE IN BASE BID. - 12 SHRUBS REQUIRED / 35 LF = 408 SHRUBS REQUIRED 162 SHRUBS PROVIDED 408 SHRUBS PROVIDED NOTE =PROPOSED BUFFER ALONG THE ADJACENT COMMERCIAL PARCELS IS I I - DIVIDED ALONG THE PROPERTY LINE WITH EACH USE TO PROVIDE ONE-HALF 1 GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN L FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. J OF THE REQUIRED BUFFER PLANTINGS.11 I';R, ZONED -1 ► -b,�, ►w { 1. ai ��� �; - " f �. :11'•. :1 I /1 d ter/ ::tl:: - `% •, . i ,. t b ...,C,a/%m s r� 111 1 s5: ��' '4'l ti n / I y� I '4 : I ' `.`: �� I 1 • k: 11 1 � t € 1 J-.1 F j$1' it St ' ►:It . 14 II 1Y II " � `•'I I I. 1I I (=1 11I (=4 � , ,I ` III 1 4 �S`; ' , 1 i 1 (� - I 4 l � _ =._ %zd 1t. 1 t . p { 1 .'. 1. 1 ,1 L - ': ,:_ I.. T'.1.,: , •"11 , 11' ►;1 P-I,- • :� 1: 11 11 k44, "wg4t."i" LANDSCAPE SCHEDULE KEY QTY. BOTANICAL NAME COMMON NAME SIZE REMARKS SHADE TREE(S) AROG 52 ACER RUBRUM'OCTOBER GLORY OCTOBER GLORY RED MAPLE 21/2-3" CAL. B+B QPH 32 QUERCUS PHELLOS WILLOW OAK 21/2-3" CAL, B+B UPD 76 ULMUS PARVIFOLIA'DYNASTY' DYNASTY ELM 3-3 1/2" CAL. B+B SUBTOTAL: 160 ORNAMENTAL TREE(S) CCFP 43 CERCIS CANADENSIS'FOREST PANSY I FOREST PANSY REDBUD 2-2 1/2" CAL. B+B CF 35 CORNUS FLORIDA WHITE FLOWERING DOGWOOD 8-10, B+B LI 1 LAGERSTROEMIA INDICA'NATCHEZ NATCHEZ CRAPEMYRTLE 8-10, B+B MV 49 MAGNOLIA VIRGINIANA SWEETBAY MAGNOLIA 8-10, B+B SUBTOTAL: 128 EVERGREEN TREE(S) TD 37 TAXODIUM DISTICHUM BALD CYPRESS 8-10, B+B SUBTOTAL: 37 EVERGREEN SHRUB(S) I H 634 ILEX RENATAI HELLERII HELLERI APANESE HOLLY LY 15-18I #3 CAN ICS 508 ILEX CRENATAI STEEDSI STEEDS JAPANESE HOLLY 3 a36n #3 C AN IGS 800 ILEX GIABRA SHAMROCK SHAMROCK INKBERRY H 0 HOLLY u 4- 2 30 #5 CAN WM 32 MYRICA CERIFERA WAX MYRTLE N 2 4 CONTAINER JD 30 I 1 J NIPERUS DAVURICA PARS NI U 0 PARSON JUNIPER S U n 15-18 #3 CAN SUBTOTAL: 2017 ORNAMENTAL GRASS(ES) MSG 238 MISCANTHUS SINENSIS'GRACILLIMUS' MAIDEN GRASS 2 GAL, CONTAINER SW 135 PANICUM VIRGATUM1 SHENANDOAH RED SWITCHGRASS 2 GAL. CONTAINER SUBTOTAL: 373 ALL PLANTS MUST CONFORM TO THE CALIPER AND SIZE REQUIREMENTS PRESENTED IN THE LOCI L ORDINANCE WET DETENTION BASIN HERBACEOUS PLANT SCHEDULE VEGETATED SHELF PLANTINGS. ± 21,520 SQUARE FEET OVERALL 9-TY BOTANICAL NAME COMMON NAME ROOT SPACING PLANTING RATIO 1,076 CAREX TENERA QUILL SEDGE 2" PLUG 2' O.C. 20% 646 EUPATORIADELPHUS FISTULOSUS JOE PYE WEED 2"PLUG 2'O.C. 12% 538 LOBELIA CARDINALIS CARDINAL FLOWER 2" PLUG 2' O.C. 10% I 646 LOBELIA ELONGA(A LONGLEAF LOBELIA 2"PLUG 2' O.C. 12% 861 SACCHARUM BALDINII NARROW PLUMEGRASS 2" PLUG 2' O.C. 16% 538 IRIS VIRGINICA BLUE FLAG IRIS 2" PLUG 2' O.C. 10% 1,076 JUNCUS EFFUSUS VAR. SOLUTUS SOFT RUSH 2" PLUG 2' O.C. 20% 5,380 . NOTES: 1) PLANTING RATIO IS BASED ON THE AREA, NOT THE TOTAL QUANTITY OF THE PLANTS. THE QUANTITY OF EACH PLANT IS DETERMINED BY THE AREA RATIO AND THE SPACING IN WHICH THEY ARE TO BE PLANTED. 2) PLANTING OF BASIN IS NOT TO BE CONDUCTED UNTIL THE ACTUAL WATER LEVEL OF THE BASIN AND ALL SURROUNDING AREAS HAVE STABILIZED. PRIOR TO PLANTING, CONTRACTOR TO VERIFY THE WATER DEPTH TO THE NEAREST INCH. PLANTING AREA MAY NEED TO BE REVISED AND PLANT QUANTITIES ADJUSTED BASED ON FIELD CONDITIONS. OWNER MAINTENANCE RESPONSIBILITIES Upon Owner's (or Owner contractor's) completion of landscaping work, the Owner is fully responsible for all future maintenance, care, upkeep, watering, and trimming of all installed vegetation, plants, tree, bushes, shrubs, grasses, grass, ornamental plants and flowers, flowers, ground cover, and landscaping, including all landscape islands and areas adjacent or part of the landsccped areas. This responsibility includes, but is not limited to, the following: Trees adjacent to walkways and areas of pedestrian traffic must be maintained to assure that any branches must be limbed up to a clearance -height of 7 fit. (from all pedestrian surfaces) or pruned back to avoid any interference with the typical path of travel. Trees within vehicular sight lines, as illustrated on the landscape plan, are to be trimmed to a clearance height of 7 ft. (from all paved, traveled surfaces), or as otherwise indicated on the plans. • Vegetative ground cover, shrubs and ornamental plants and grasses must be trimmed so that no portion of the plant exceeds 30 inches above grade ;of all paved, travel surfaces) along and within the sight lines of parking lots and ingress -egress ways. • Fallen plant flowers, fruit, seeds and debris droppings are to be removed immediately from vehicular and pedestrian traffic areas to prevent tripping, slipping or any ' other hazards. The practice of topping Crape Myrtle is discouraged by the Town. Minimum pruning to develop Crape Myrtle's natural tree form is .1 encouraged. 1. 1. These requirements do not affect the plant life guarantees the landscape contractor is required to provide. ALERT TO CONTRACTOR! I. THE SITEWORK FOR THE WAL-MART PORTION OF THIS PROJECT SHALL MEET OR EXCEED THE "WAL-MART STANDARD SITEWORK SPECIFICATIONS.11 2. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVILE COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL CONNECTION OF SERVICES. 3. WHEN PROPOSED SPECIES ARE UNAVAILABLE, PLANT SUBSTITUTIONS MAY BE CONSIDERED WITH APPROVAL BY THE OWNER AND/OR LANDSCAPE ARCHITECT AS I-ONG AS PROPOSED MATERIAL IS TRUE TO PLANTING INTENT AND MEETS CODE REQUIREMENTS. NOTE TO CONTRACTOR: 18" WIDE SOD STRIP IS REQUIRED BEHIND ALL CONCRETE CURBS/BUFFERS, 11 AUTOMATIC IRRIGATION IS NOT REQUIRED ON THIS ,.\�``\Ix�N►11fc1aR'o'fff'''��. PROJECT DUE TO ENVIRONMENTAL CONDITIONS THAT `�.``��1 ���oscgA,/2''%''�,, DO NOT WARRANT THE INSTALLATION OF A ZLIF• -Y WATERING SYSTEM FOR PLANT ES TA LISHMENT AND ' * �� -F0 SURVIVAL. _ :� 637 =: = = •N e = `Y• �P �i F V LANDSCAPE AR ITECT SIG ATURE SEAL .191 '''''''''f 0/ A . GPO +f►uuI1111 Sa r�R�EEVISIONS BY NCDENR REVISIONS 7 BAB 5/18/16 NCDENR REVS/OTB REV 8 5/31/16 BAB NCDOT/NCDENR REVS 9 BAB 6/6/16 QA/QC, OTB REVISIONS 10 ATZ 6/20/16 NCDEQ REVISIONS 11 BAB 8/3/16 BID ADDENDUM 1 12 9/21/16 BAB NCDEQ REVISIONS 13 BAB 10/3/16 . NCDEQ REVISIONS 14 BAB 10/19/16 I'll I � i . 11 1 I. ,. ALERT TO CONTRACTOR 60 30 15 0 60 ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE - DATE :N 1"= 60' MILESTONE PROJECT DOCUMENTS. (11m� DRAWN M") BAB CHECKED MAT DATE 7/11/14 SCALE 1 "=60' JOB No. NCC138078 SHEET C:\USERS\BBUCKLAND\APPDATA\LOCAL\TEMPIACPUBLISH_4152\NCC138078LP3.DWO PRINTED BY: BBUCKLAND 10.19.16 @ 9:09 AM LAST SAVED BY: BBUCKLAND ONCRETE PAVEMENT SECTION PAVEMENT SURFACE (SEE PAVEMENT DETAIL) CONCRETE -TO -ASPHALT DETAIL NOT TO SCALE 2' MIN. CLEAR ZONE (TYP., LT. & RT.) VARIES 2% MAX. CROSS SLOPE _ K. "..a;��: �•A, k ':pr o•, •'if �. :'.�. •a..• k :. .9 .`•�e.e �-4" CLASS A CONCRETE COMPACTED SUBGRADE (PER (3000 P.S.I. @ 28 DAYS) SITEWORK SPECIFICATIONS) 4" THICK, COMPACTED STONE BASE (TYPE 2a) COTE: 1. EXPANSION JOINTS 1/2" WIDE PREMOLDED BIT. MATERIAL SHALL BE INSTALLED AT 30' INTERVALS, CRACK CONTROL JOINTS TO BE SPACED AT INTERVALS EQUAL TO SIDEWALK WIDTH. CONCRETE SIDEWALK DETAIL NOT TO SCALE FULL HEIGHT CURB I 6' CURB TAPER _ I 1" RADIUS 2" PAVEMENT SURFAC CURB TAPER DETAIL NOT TO SCALE 1 Fn ACDWAI T CI IDCA(`G (ni II?Qr- /C_Q rQ\ 1 r," ACDL.IAI T 011DCAf`C f`nl IDCC /C a FIB\ 5" 4,000 PSI CONCRETE 6" COMPACTED STONE BASE .a4...:• .. Aar . ... ..fr •a o. fie'. :.�• b'. +bv .+b ��a' ..wG :Oq: x'�5 S, i.g•Q k, A s �, ., :ti A''¢n:.�: yy'; '✓ey op '5. ae-":y.." ''.s ?aa :ate .�s'•:� r'p::. y, ..e�: :•y'• '•,s; ;. D°. ,` ,ik,' i° •e` �. d,« Rai' .: •'ey"a fi I1: ;II!I_-I_I.; 11lµ I" � �79 1:I 1 1-11 t �...i 1 S--•^-^t i i,..,....,.t i ' { I'�..I I S..^.,....,� � '..�'�.I I �".,"" � i COMPACTED SUBGRADE (PER SITEWORK SPECIFICATIONS) (PER SITEWORK SPECIFICATIONS) (PER SITEWORK SPECIFICATIONS) '�\�qI Jam', p},{�'Q, � V O Ji E O NOTE: 1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF 11 PER GEOTECHNICAL 1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF 11 PER GEOTECHNICAL REPORT NOTE: REPORT PREPARED BY S&ME, INC, ENTITLED INITIAL GEOTECHNICAL PREPARED BY S&ME, INC, ENTITLED INITIAL GEOTECHNICAL EXPLORATION REPORT; 1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF 11 PER GEOTECHNICAL EXPLORATION REPORT; WALMART SUPERCENTER #86290 SWANSBORO, NC, WALMART SUPERCENTER #86290 SWANSBORO, NC, DATED 4/18/13 (PROJECT REPORT PREPARED BY S&ME, INC, ENTITLED INITIAL GEOTECHNICAL DATED 4/18/13 (PROJECT #1051-13-378G). REFER TO SPECIFICATIONS MANUAL #1051-13-378G). REFER TO SPECIFICATIONS MANUAL FOR COMPACTION EXPLORATION REPORT; WALMART SUPERCENTER #86290 SWANSBORO, NC, FOR COMPACTION REQUIREMENTS, REQUIREMENTS. DATED 4/18/13 (PROJECT #1051-13-378G). REFER TO SPECIFICATIONS MANUAL FOR COMPACTION REQUIREMENTS. HEAVY DUTY ASPHALT HIAAAJI. T PAVEMENT SECTION STANDARD DUTY ASPHALT PAVEMENT SECTION STANDARD DUTY CONCRETE SECTION NOT TO SCALE NOT TO SCALE NOT TO SCALE EXISTING CURB AND GUTTER TO BENCH MILL INTO BE REMOVED AS EXISTING LANE A NEEDED 6" 4,000 PSI CONCRETE 6" COMPACTED STONE BASE MINIMUM OF 1.5" DEEP AT A WIDTH OF 2' LIMITS OF SAW CUT 9 a•::+• 4 ,. rod ° z•.&«:: .' r :; : .6 �; �,•....'. °. <. •' ,a.. �'�'•.'`.'", as".. °: x•a `, zei "a. w` A • a; • • « .. a' o...- -' a w. „ - ..< 2'.: .: -z z.. .� e.,. ._H.s••.. t..'.. ..z. .::':��. .. d 4....'._�•'q °4 .bz <8l ._ei ...✓. « .. _ ,. .., ,.. e, .. .,,.. \-COMPACTED SUBGRADE NOTE: (PER SITEWORK SPECIFICATION 1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF 11 PER GEOTECHNICAL REPORT PREPARED BY S&ME, INC, ENTITLED INITIAL GEOTECHNICAL EXPLORATION REPORT; WALMART SUPERCENTER #86290 SWANSBORO, NC, DATED 4/18/13 (PROJECT #1051-13-378G). REFER TO SPECIFICATIONS MANUAL FOR COMPACTION REQUIREMENTS. HEAVY DUTY CONCRETE SECTION NOTE: 1. CONTRACTOR TO BLOWOUT DUST FROM DRILLED HOLES PRIOR TO APPLYING GROUT. CONCRETE DOWELING DETAIL NOT TO SCALE INFILTRATION TRENCH DESIGN REQUIREMENTS ID VOLUME (CF) K (INItiR) T (DAYS) REQ. AREA (SF) LENGTH (FT) WIDTH (FT) HEIGHT (FT) SHWT ELEV. BOTTOM ELEV. FROM WET POND 2 24,075 2.0 4.51 1,318 55 24 2.0 29.0 29.0 FROM WET POND 3 30,416 2.0 4.f 9 1,814 76 24 1 1.75 28.75 28.75 2" ASPHALT CONCRETE SURFACE COURSE 2" ASPHALT CONCRETE BASED ON: A=V/(2'K`T) INITIAL COURSE 'NOTE THAT NO SEPARATION BETWEEN SHWT AND BOTTOM OF INFILTRATION BASIN IS REQUIRED DUE TO USE AS SECONDARY BMP FOR 8" AGGREGATE 'EFFECTIVE INFILTRATION.' BASE COURSE REFER TO NCDENR BMP MANUAL FOR COMPLETE REQUIREMENTS. COMPACTED SUBGRADE (PER SITEWORK SPECIFICATIONS) 7•a MAINTENANCE NOTES: 1. FOR THE FIRST YEAR OF OPERATION, INSTALLATIONS SHOULD BE INSPECTED MONTHLY AND AFTER EACH MAJOR STORM. AFTER THE FIRST YEAR, QUARTERLY INSPECTIONS, PREFERABLY CONDUCTED AFTER A STORM, ARE RECOMMENDED. 2. TRASH AND DEBRIS SHOULD BE REMOVED IF PRESENT. 3. THE FLOW DIVERSION STRUCTURE SHOULD BE REPAIRED/REPLACED AND UNCLOGGED AS NECESSARY FOR PROPER FUNCTIONING. ASPHALT PAVEMENT SECTION PER PLAN AND DETAILS JJJJJJJ JJJJJJJJJ JJJSi JJJJ,JJ 18" SQUARE CONCRETE JJJ_ JJJJ JJJJJJJJ ENCASEMENT J J J J JJ (3000 P.S,I CONCRETE) 3,000 P.S.I CONCRETE ASPHALT OR CONCRETE AS TRAFFIC RATED CLEANOUT COVER FINISHED GRADE DETERMINED BY F2" ASPHALT OR CONCRETE TRAFFIC SURFACE 71. i''•\ •., 'gym .`4' :.•-:: ,.. . fax \ ^� <� � i �. ..4 � ='•i ,�� , _ '• ! d- , 'tom•. :'t .''.t: .y': �++ •r 4" SEWER CLEANOUT CAP '. ;; '`''''�''.�• :, I I I; I SAND CUSHION � I I ":��• �;• € : . •�: `.� I ----I € I( 3000 P.S.I. CONCRETE 6" PVC ENCASEMENT PIPE--// TRAFFIC RATED CLEANOUT DETAIL CONSTRUCTION NOTES: 1. CARE SHOULD BE USED DURING INSTALLATION TO MINIMIZE COMPACTION OF SOIL ON THE BOTTOM AND WALLS OF INFILTRATION DEVICES. TO AVOID COMPACTING THE DRAINAGE MEDIA, LIGHT EQUIPMENT AND CONSTRUCTION TECHNIQUES THAT MINIMIZE COMPACTION SHOULD BE USED. 2. RUNOFF SHALL NOT BE DIRECTED INTO AN INFILTRATION DEVICE UNTIL THE DRAINAGE AREA IS STABILIZED. 3. A MINIMUM OF ONE (1) OBSERVATION WELL SHALL BE CONSTRUCTED WITH THE INFILTRATION SYSTEM TO PERIODICALLY VERIFY THAT THE DRAINAGE MEDIA IS FULLY DRAINING. THE MONITORING WELL SHALL CONSIST OF A 4" TO 6" DIAMETER, PERFORATED PVC PIPE WITH A LOCKING CAP. THE NOT TO SCALE 4"x4" WOOD POST 8'-0" O.C. r� �I 1 "x6" WOOD SLATS 2"x4" STRINGER (VERTICAL) (2 TYP.) �. � COMPACTED SOIL PER SITE PREP WELL SHOULD BE PLACED NEAR IHEGENIEROF FINISHED GRADE-,--. H HHhHHHHHH I H H NOTE AND SPECIFICATIONS THE FACILITY OR IN THE GENERAL LOCATION OF THE '*'�--WASHED #57 STONE LOWEST POINT WITHIN THE FACILITY, WITH THE T _ ; _ �' I FILTER FABRIC INVERT AT THE EXCAVATED BOTTOM OF THE I LI=I I I I`�I FACILITY. I -'III s' � '� ' i I I----' `�• ' " - TYPICAL EXISTING' _ f 4. IF NECESSARY REMOVE 6" OF BOTTOM MATERIAL LANE 24" PROPOSED CURB WIDTHW CONCRETE BASE '„_,-; -•-- � ',' ' -"-" ;: A; � I (BELOW DESIGN BOTTOM OF TRENCH) BEFORE :L eLl ba 3 AND GUTTER AS INSTALLATION OF INFILTRATION DEVICE IN ORDER PROPOSED TURN LANE NEEDED. SEE NCDOT I €- AT 2.0% MAXIMUM CROSS V1 PERFORATED PVC PIPE (2 ROWS TO RESTORE PRE -CONSTRUCTION INFILTRATION SLOPE DETAIL 846.01 OF 718 HOLES ON THE BOTTOM OF RATES. I•••`, I�111 =` I I THE PIPE SPACED AT 120- EVERY 6") IN' I LTIRA T ON TRINENCCH DETAIL L TYPICAL SECTION OF ROADWAY WIDENING NTS NOT TO SCALE FINISHED GRADE FRAME TO BE THOROUGHLY `¢ SEE ACO DESIGN EMBEDDED IN MORTAR CAST -IN -PLACE REINFORCED ` CONCRETE @ 4,000 P.S.L CD cn u.l w a 0 W b OUTLET PIPE ---- CONCRETE FOOTING ,. • A' @ 4,000 P.S.I. CD ma• NOTES. 1. THIS DETAIL IS SCHEMATIC ONLY. FINAL DESIGN TO BE ACO K200 TRENCH DRAIN. REFERENCE ACID PLANS AND DETAILS. 2. SEE PLAN VIEW AND PROFILES FOR GRATE AND TRENCH INVERT ELEVATIONS. 3. UNDERLYING 18" RCP PIPES TO BE PROVIDED AND CONNECTED TO DRAIN IN LOCATIONS SHOWN IN ACO PLANS AND CONNECTED TO MOST DOWNSTREAM STRUCTURE. TRENCH DRAIN DETAIL I L NOT TO SCALE PLATEIDIVIDER ANCHORED TO STRUCTURE OUTFLOW TO - INFILTRATION TRENCH ACCESS MANHOLE- 5.00' OUTFLOW TO INFILTRATION TRENCH INFLOW FROM POND �o INFLOW FROM POND BYPASS OUTFLOW BYPASS 5.00, OUTFLOW TO-\ INFILTRATION TRENCH PLATEIDIVIDER ANCHORED TO STRUCTURE � 1 i BYPASS OUTFLOW 5.00, 5.00, OUTFLOW TO PLATUDIVIDER ANCHORED INFILTRATION TRENCH TO STRUCTURE PLATEIDIVIDER ANCHORED OUTFLOW TO INFLOW FROM POND -,,,,,.,TO STRUCTURE t � INFILTRATION TRENCH INFLOW FROM POND BYPASS OUTFLOW BYPASS OUTFLOW FROM WET POND 3 FLOW SiPLITTERLI�L DETAIL L NTS NOTES: 12"0 MIN+ 1. ALL LUMBER TO BE PRESSURE TREATED. 2. USE 6"x6" POSTS AT ALL CORNERS (ANGLE POINTS). 3. FINISHED SIDE OF FENCE TO FACE ADJACENT PROPERTY OWNERS. BOARD ON BOARD FENCE DETAIL NOT TO SCALE PLATE/DIVIDER ANCHORED TO STRUCTURE ACCESS MANHOLE -INFLOW FROM POND 'PASS OUTFLOW .,-ACCESS MANHOLE `-OUTFLOW TO INFILTRATION TRENCH FROM POND s REVISIONS BY NCDENR REVISIONS 7 BAB 5/18/16 NCDENR REVS/OTB REV 8 BAB 5/31 /16 NCDOT/NCDENR REVS 9 BAB 6/6/16 QA/QC, OTB REVISIONS 10 ATZ 6/20/16 NCDEQ REVISIONS 11 BAB 8/3/16 BID ADDENDUM 1 12 BAB 9/21 /16 NCDEQ REVISIONS 13 BAB 10/3/16 NCDEQ REVISIONS 14 BAB 10/19/16 APPROVED FOR CONSTRUCTION THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - 811 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 www., ohlerEngineering.com DRAWN *19 BAB CHECKED MAT DATE 7/11/14 SCALE AS NOTED JOB No. NCC 138078 SHEET GENERAL NOTE: 'HE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS FRI SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELA ,PECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RED ING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSI TANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWING,' FULL CONFORMANCE WIrH L QCAI RONS AND CODES. C:\USERS\BBUCKLANDIAPPDATAILOCALITEMP'ACPUBLISH_41521NCC138078SDX.DWG PRINTED BY: BBUCKLAND 10.19.16 @ 9:10 AM LAST SAVED BY: BBUCKLAND 18" OUTLET CULVERT ELEV. 29.0' FABRICATED ALUMINUM BAR GRATE - - _ TOP of POND ELEV. 32.25' TRASH RACK WITH 5"X5" OPENINGS , 6' X 6' BOX STRUCTURE (INTERNAL DIMS) (7' X TEXT. DIMS) — — _ TOP OF RISER ELEV. 31.0' CONVERT HOLE FROM SKIMMER TO----_ PERMANENT 5" ORIFICE WHEN SKIMMER / PERMANENT POOL ELEV. 29.0' - BASIN CONVERTED TO WET POND ---- - - - - - - - - - - - - - - ELEV. 29.0' ` : ,?•':,.:...,.;.�,:' .;> qn st'4s -T •:!A•i••:} 1!••Y:.�: !�'� ..n �.� y 1•� f l 'C:t Y•< f.A;:S ., :',::� �y _' 's` :. s'•.•'rT ', �,v:.(.•J.•y=..•. :.r•:..:.�:: !��+.: •. i 1:f•. .; .) :•!::, -�i•:� ;_>:• `�i'. •w. '<: ter':`:' :<• :i�. .t•: �i;.a• � w:.: i••}:• a•,:.; a .. f .. w. •:e...• /': JyS .. •': :•y::'•?!,. NOTES: CONCRETE BALLAST PAD 9' SEE NCDOT STANDARDS FOR OUTLET STRUCTURE BOX, GRATE, REINFORCING, ETC. ALL CONCRETE TO BE 3,600 PSI COMPRESSIVE STRENGTH. WHET PL OND 1 0"UTL ET CONTIR 0L STIRINUCT�TIR E NTS 15" OUTLET CULVERT ELEV. 29,25' FABRICATED ALUMINUM BAR GRATE TRASH RACK WITH 5"X5" OPENINGS 6' X 6' BOX STRUCTURE (INTERNAL DIMS) TOP OF POND ELEV. 31.75' -------------- (TXTEXT. DIMS) TOP OF RISER ELEV. 31.05' CONVERT HOLE FROM SKIMMER TO---,- PERMANENT 1.75" ORIFICE WHEN SKIMMER / — — — _ PERMANENT POOL ELEV. 29.25' BASIN CONVERTED TO WET POND - - - - - - - - - - - - - - ELEV. 29:25 •:�', • .•,6. ,�<,_ ''''� •'•'•• :; - .�:= -_ �:�.;':;:•,� •�., t•�,_,..r:. ,,:;=:�';�:.. . a: •.1':' �.f .; •1•;:y.!}d drt•;..:is`•is :;. ..; ,. fi•..i'.i' i.,•i. ;:c, w%.••••'.ai �'Fy' .1 t' .:4i ' a•:t: : i:. f: i1!i w�• .:4-•••w."i'::: �" .:i:+ -: .<....... •! .:. •:..'•: -,. NOTES: : • ..<..... CONCRETE BALLAST PAD 91 SEE NCDOT STANDARDS FOR OUTLET STRUCTURE BOX, GRATE, REINFORCING, ETC. ALL CONCRETE TO BE 3,600 PSI COMPRESSIVE STRENGTH. WET �01�D 2 OTC TL ET CCONTIRxOL ST�l�JCCT�J�� NTS 18" OUTLET CULVERT ELEV. 29.0'-\ FABRICATED ALUMINUM BAR GRATE TRASH RACK WITH 575" OPENINGS 6' X 6' BOX STRUCTURE (INTERNAL DIMS) _ _ - - - - - - - _ TOP of POND ELEV. 31.75' (7'X7'EXT. DIMS) ---_ TOP OF RISER ELEV. 31.0------------ CONVERT HOLE FROM SKIMMER TO---, PERMANENT 2" ORIFICE WHEN SKIMMER / — — — PERMANENT POOL ELEV. 29.0' BASIN CONVERTED TO WET POND — - - - - - - - - - - - - - - ..3 • > , •� � .v ..i i-: e":`..::s': ti•= .a�•.�.yw:y!g,; _ .+.v �s..vv:f •, •" r!S +'., .i•.::{fp,.a: NOTES: " w;'e: `C ::•i�;. a•::: i :;..:c:•; CONCRETE BALLAST PAD 9' SEE NCDOT STANDARDS FOR OUTLET STRUCTURE BOX, GRATE, REINFORCING, ETC. ALL CONCRETE TO BE 3,600 PSI COMPRESSIVE STRENGTH. WET BOND 3 O�J��Io�E� �01���OJIo ����JCC��JJ�E NTS HOLE FROM SKIMMER TO NT 5" ORIFICE WHEN SKIMMER NVERTED TO WET POND 'ED ALUMINUM BAR GRATE LK WITH 575" OPENINGS :T CULVERT ELEV. 29.0' CONVERT HOLE FROM SKIMMER TO PERMANENT 1.75" ORIFICE WHEN SKIMMER BASIN CONVERTED TO WET POND ELEV. 29.25' FABRICATED ALUMINUM BAR GRATE TRASH RACK WITH 5"X5" OPENINGS ,ULVERT ELEV. 29.25' CONVERT HOLE FROM SKIMMER TO PERMANENT 2" ORIFICE WHEN SKIMMER BASIN CONVERTED TO WET POND ELEV. 29.0' FABRICATED ALUMINUM BAR GRATE TRASH RACK WITH 5"X5" OPENINGS 8" OUTLET CULVERT ELEV. 29.0' INFLOW 2:1 SLOPES UNDER PERMANENT POOL SLOPES ABOVE PERMANENT POOL -10' WIDE,10;1 VEGETATED SHELF WET POND I CROSS SECTION NTS (10:1 VERTICAL EXAGGERATION) 3:1 SLOPES ABOVE PERMANENT POOL TOP OF RISER STRUCTURE WEIR ELEV. 31.05' TEMPORARY POOL @ ELEVATION 31.05' T WIDE,10:1 VEGETATED SHI TOP OF POND ELE`!, 31.75' PERMANENT POOL @ ELEVATION 29.25' A Iy� ` f OUTFLOW TO FLOW SPUTTER %$ AND INFILTRATION TRENCH wqg GABION BASKET WALL TOP ELEV. 29.25' `' LOCATION AS SHOWN ON PLANS TO SEPARATE FOREBAY AND MAIN POOL . (ASSUMED 35% POROSITY FOR VOLUME yU CALCULATIONS) ARMOR BOTTOM OF WALL WITH CLASS I RIP -RAP EMBED BOTTOM OF GABION BASKET WALL ±2' PUMP TO DRAIN IF NECESSARY FOR POND MAINTENANCE 20n T CLEANOUT ELEV. 20.0' ND ELEV.19.0' WHET _POND 2 CROSS SECTION NTS (10:1 VERTICAL EXAGGERATION) TOP OF RISER STRUCTURE WEIR ELEV. 31.0' BAFFLE WALL 3:1 SLOPES ABOVE PERMANENT POOL TOP ELEV. 31.75' _TEMPORARY POOL @ ELEVATION 31.0' 19 WIDE, 10:1 VEGETATED SHELF PERMANENT POOL @ ELEVATION 29.0' y ys GABION BASKET WALL TOP ELEV. 29.0' LOCATION AS SHOWN ON PLANS TO SEPARATE FOREBAY AND MAIN POOL s (ASSUMED 350% POROSITY FOR VOLUME 3' { CALCULATIONS) INFLOW 2:1 SLOPES UNDER PERMANENT POOL ARMOR BOTTOM OF WALL WITH CLASS I RIP -RAP TOP OF POND ELEV. 31.75' -3:1 SLOPES ABOVE PERMANENT POOL '--OUTFLOW TO FLOW SPUTTER AND INFILTRATION TRENCH T WIDE,10:1 VEGETATED SHELF PUMP TO DRAIN IF NECESSARY FOR POND MAINTENANCE ,;. EMBED BOTTOM OF 4, SEDIMENT CLEANOUT ELEV,13.0' GABION BASKET WALL ±2' OTTOM OF POND ELEV.12.0' WHET POND 3 CROSS SECTION REVISIONS BY NCDENR REVISIONS 7 BAB 5/18/16 NCDENR REVS/OTB REV 8 BAB 5/31/16 NCDOT/NCDENR REVS 9 BAB 6/6/16 QA/QC, OTB REVISIONS 10 ATZ 6/20/16 NCDEQ REVISIONS 11 BAB 8/3/16 BID ADDENDUM 1 12 BAB 9/21 /16 NCDEQ REVISIONS 13 BAB 10/3/16 NCDEQ REVISIONS 14 BAB 10/19/16 DRAWN BAB CHECKED MAT DATE 7/11 /14 SCALE AS NOTED JOB No. NCC138078 SHEET GENERAL NOTE: 'HE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PRl SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMEN (S RELA iPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RED ING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSI TANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWING,' FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. C:IUSERSIBBUCKLANDWPPDATAILOCALITEMPIACPUBLISH_41521NCC138078SDX.DWG PRINTED BY: BBUCKLAND 10.19.16 @ 9:10 AM LAST SAVEL BY: BBUCKLAND NTS (10:1 VERTICAL EXAGGERATION) 12/08/11 RESERVED PARKING VAN SIGNAGE OTHER THAN ACCESSIBLE (PED XING, STOP, ETC.) GALVANIZED NOTE: SQUARE TUBE THE MIN. HEIGHT OF THE BOTTOM OF THE ,. LOWEST SIGN SHALL BE 7'-0" USE 6" SCH. 40 0 STEEL PIPE FILLED W/ I CONCRETE WITH TOP ROUNDED AND PAINTED TRAFFIC YELLOW - " 0 SLOPE TOPJ. OF CONCRETE PAVED SURFACE 3500 P.S.I. P.C. r CONCRETE BASE•' 4 4. Q IYLL- .'�Ial• d 4'-0" 18"0 SINGLE POST N.T.S. NOTES: 1. ALL SIGNS SHALL COMPLY WITH U,S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION'S "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES", LOCAL CODES AND AS SPECIFIED. MOUNT SIGNS TO POST IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. 2. GALVANIZED SQUARE TUBE POST TUBES - 2"x2"x3/16" 14ga POST TUBE SHALL MEET ASTM A1011 GRADE 50. POST TUBE GALVANIZED AS PER ASTM A653 GRADE 90. LAYOUT PER STRIPING EQ. EQ. DETAIL/SITE PLAN �1.4 tj� mj) JV POST WITH SIGNS) NEVER LESS THAN 9' (UNLESS STOP SIGN IS USED) PAINTED ENDCAP - 90' SIGN LOCATIONS — 90° PARKING NOTE: ALL SIGNS EQUAL TO OR GREATER THAN 36" HAVE ITWO TRUCK P STSHALL ENTRANC SIGNAGE OTHER THAN TRUCK ENTRANCE (TRUCK EXIT, NO THRU TRAFFIC, ETC.) 24" 0. C. GALVANIZED—, NOTE: SQUARE TUBE THE MIN. HEIGHT OF THE BOTTOM OF THE .. LOWEST SIGN SHALL BE 7'-0" USE 6" SCH. 40 STEEL PIPE FILLED W/ {' �I CONCRETE WITH TOP } rI ROUNDED AND PAINTED I I} TRAFFIC YELLOW - 0 SLOPE TOP OF CONCRETE PAVED SURFACE 3500 P.S.I. P.C. �•,�' r CONCRETE BASE Q •• ;. LL.• L�. o ., w 4'-0" 18"0 DOUBLE POST N.T.S. LAYOUT PER STRIPING DETAIL/SITE PLAN POST WITH SIGNS)—y NEVER LESS THAN 9'-/ (UNLESS STOP SIGN IS USED) PAINTED ENDCAP - 60' SIGN LOCATIONS — 600 PARKING SIGN MOUNTING AND BASE WITH BOLLARD (USE WHERE SIGN IS NOT WITHIN CURBED ISLAND) N.T.S. DTSIGNW13 RESERVED PARKING VAN SIGNAGE OTHER THAN ACCESSIBLE (PED XING, STOP, ETC.) GALVANIZED --,,NOTE: SQUARE TUBE THE MIN. HEIGHT OF THE BOTTOM OF THE LOWEST SIGN SHALL BE 7'-0" 0 I i_ SEE BREAK AWAY — TUBE POST SLOPE TOP — OF CONCRETE GROUND SURFACE 3 3500 P.S.I. P.C.—,"'4` CONCRETE BASEII' LLJ > t •� a: N b- I D, 1•i --. 1 o ow _ 4'-0" 12"0 SINGLE POST DWI NOTES: 1. ALL SIGNS SHALL COMPLY WITH U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION'S "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES", LOCAL CODES AND AS SPECIFIED. MOUNT SIGNS TO POST IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. 2. GALVANIZED SQUARE' TUBE POST TUBES - 2%2%3/16" 14ga POST TUBE SHALL MEET ASTM A1011 GRADE 50. POST TUBE GALVANIZED AS PER ASTM A653 GRADE 90. ANCHOR TUBE - 2-1 /4"x2-1 /4"x3/16" 14ga HEAVY DUTY ANCHOR TUBE SHALL MEET ASTM A500 GRADE B. STRUCTURAL TUBE AND STEEL SHALL BE HOT DIP GALVANIZED PER ASTM A123. THE UPPER SIGN POST SHALL TELESCOPE INSIDE THE ANCHOR TUBE A MINIMUM OF 12". THE ANCHOR TUBE SHALL BE A MINIMUM 27" DEEP WITH 3" MIN. 4" MAX. EXPOSED ABOVE FINISH GRADE. LAYOUT PER STRIPING ,—DETAIL/SITE PLAN SIGN MOUNTING AND BASE N.T.S. POST WITH SIGNS)—/ POST WITH SIGN(S)-1 CURBED ISLAND - 90' CURBED ISLAND - 60' SIGN LOCATIONS — 900 PARKING SIGN LOCATIONS — 60° PARKING SIGN MOUNTING AND BASE WITHOUT' BOLLARD (USE WHERE SIGN IS WITHIN CURBED ISLAND) N.T.S. 24" SUBSURFACE INTERCEPTOR DRAIN AS MANUFACTURED BY ELJEN CORPORATION (EL00502) MULCH OR APPROVED EQUAL. DRAIN TO BE INSTALLED AROUND ENTIRE PERIMETER OF PLANTER. WEED FABRIC u _ SEE FORARCHITECTS WALLDETAILS a I -III -I I I.I i TRUCK i IENTRANCq 24" O.C. NOTE: ALL SIGNS EQUAL TO OR GREATER THAN 36" IN WIDTH SHALL HAVE TWO POSTS SIGNAGE OTHER THAN TRUCK ENTRANCE (TRUCK EXIT, NO THRU TRAFFIC, ETC.) GALVANIZED --,,,,,NOTE: SQUARE TUBE THE MIN. HEIGHT OF THE BOTTOM OF THE LOWEST SIGN SHALL Z BE 7'-0" 0 F, SEE BREAK AWAY TUBE POST SLOPE TOP OF CONCRETE GROUND SURFACE 3500 P.S.I. P.C.-� 71 CONCRETE BASE '4, • 1. •. �; I f. �� CV 4'-0" 12"0 DOUBLE POST N.T.S. 5/16" GR. 5 0 FLANGED BOLT X 5/16" GR. 5 0 SERRATED a FLANGED NUT O b GROUND SURFACE PLAN VIEW PARTIAL ELEVATION SQUARE TUBE BREAK AWAY POST N.T.S. LAYOUT PER STRIPING DETAIL/SITE PLAN SOLID ARROW MARKINGS USED AT EXITS FROM THE PARKING LOT TO PUBLIC STREETS PAVEMENT MARKINGS N.T.S. DTRLTURN 03/03/11 1 CONCRETE FLUME N.T.S. 2'-0" 6 6„ TOOLED EDGE (TYP) — 1'-0» INISH GRADE FINISH GRADE •-3" RADIUS (TYP) 4000 PSI - .`,�4�� CONCRETE 1'-0" 4 6„ D ( II I I1 1 11 II I II ({III{ ( i l r '—'I I I! { II I SOURCE BOX 6" MIN. COMPACTED ABC LAST REVISED: BOHLER COMPACTED SUBGRADE DETAIL MARCH 2O13 NOTES: 1. WORDS AND ARROWS SHALL BE APPLIED IN ACCORDANCE WITH SECTION 3B.20 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. 2. THESE WORDS AND ARROWS ARE TO BE PAINTED RETROREFLECTIVE WHITE. 3. OPEN ARROWS SHALL CONSIST OF A 4" PERIMETER STRIPE. 6-0" .14 F� �14 t� 4 t + "ONLY" PAVEMENT MARKING AS INDICATED ON PLANS 4" + ao 4" 4" 1'-0" 1'-0" 1'-0" OPEN ARROW MARKINGS USED IN THE PARKING LOT AISLES mn. 6'-0- III —III —I Z - - =1 I=1 1I- 1�1=1�1; �W -III=1ul -III- MW W 4 4 4. cn I I I_I i I_I I I_I SLR OPE I 6" PERFORATED PVC PIPE (2 I, ROWS OF 1 /2" HOLES ON BOTTOM OF PIPE SPACED AT 120' EVERY 5") AROUND ENTIRE PERIMETER OF PLANTER. a . ,4' SLOPE Q 1 % MIN. . a• .a SEE GRADING PLAN �. c a' FOR CONNECTION RAISED PLANTER - SUBSURFACE INTERCEPTOR DRAIN SYSTEM N.T-S. REV{SIONS BY NCDENR REVISIONS 7 5/18/16 BAB NCDENR REVS/OTB REV 8 5/31 /16 BAB NCDOT/NCDENR REVS 9 6/6/16 BAB QA/QC, OTB REVISIONS 10 ATZ 6/20/16 NCDEQ REVISIONS 11 8/3/16 BAB BID ADDENDUM 1 12 9/21 /16 BAB NCDEQ REVISIONS 13 BAB 10/3/16 NCDEQ REVISIONS 14 BAB 10/19/16 APPROVED FOR CONSTRUCTION ij THE STATE OF NORTH CAROLINA REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. CALL - B11 I 1 BOHLER CHARLOTTE, NC 28203 • - 9:0401 :0 40 www.BohlerEngineering.com DRAWN BAB CHECKED MAT DATE 7/11/14 SCALE AS NOTED JOB No. NCC138078 SHEET GENERAL NOTE: fHE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PR, SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELA >PECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RED 'ING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSI 'TANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWING: FULL CONFORMANCE WITH I Kcal RFG111 IONS AND CODES. C:\USERS\BBUCKLAND\APPDATA\LOCAL\TEMPIACPUBLISH_4152\NCC138078OD3.DWG PRINTED BY: BBUCKLAND 10.19,16 @ 9:10AM LAST SAVED BY: BBUCKLAND