LETTER OF APPROVAL
RE: Project Name: US 401 Industrial Site
Acres Approved: 11.5
Project ID: HARNE-2022-002
County: Harnett, City: Neill's Creek, Address: US Hwy 401
River Basin: Cape Fear
Stream Classification: Other
Submitted By: 4D Site Solutions, Inc.
Date Received by LQS: July 8, 2021
Plan Type: New
Dear Mr. Raynor:
The subject erosion and sedimentation control plan has been approved by default. The
Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a
minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority
must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt
of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or
disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will
be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This
plan approval shall expire three (3) years following the date of approval, if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC
issued prior to the commencement of any land disturbing activity on the above -named project.
The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI
form to Annette Lucas at Annette.lucasgncdenr.gov or Paul Clark at Paul. clark(2ncdenr.gov.
After you submit a complete and correct NOI Form, a COC will be emailed to you within three
business days. A $100 fee will be charged annually until a Notice of Termination is issued. This
fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional Office 1225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
NORTH CAROLINA -
oewnmwtoiEnviro�memalaual� /`� 910.433.3300
Letter of Approval with Modifications
ABJ Investments LLC
August 12, 2021
Page 2 of 2
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
Title 15A NCAC 413 .0118(a) requires that a copy of the approved erosion control plan be on file
at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form. This permit allows for a land -disturbance, as called for
on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of
this permit and would require a revised plan and additional application fee. In addition, it would be
helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan
to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
rz 'Qa�
Jodi Pace, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval