Loading...
HomeMy WebLinkAbout20210805 Ver 1_108-21 DCM Permit_20210820Permit Class Permit Number NEW 108-21 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to McMullan Partners LLC., 4425 Brantley Circle SW, Shallotte, NC 28470 Authorizing development in Brunswick County at adj. to Shallotte Inlet and the AIWW, at 4425 Brantley Circle SW, in Shallotte, as requested in the permittee’s application dtd 3/10/21, incl att workplan drawings (4), Drawing 1,2 of 2 and Spoil Site dtd 3/10/21 and Overview of Dredge Footprint dtd 4/23/21. This permit, issued on August 19, 2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Excavation 1) In order to protect juvenile shrimp and finfish populations, no excavation or filling shall be permitted between April 1 and July 31 of any year without the prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies. 2) No excavation shall take place outside of the area indicated on the workplan drawings. 3) Excavation shall not exceed -3.5 feet below the normal low water level. In no case shall the depth of excavation exceed the depth of connecting waters. (See attached sheets for Additional Conditions) McMullan Partners LLC. Permit No. 108-21 Page 2 of 3 ADDITIONAL CONDITIONS 4) The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. 5) No excavated or fill material shall be placed at any time in any vegetated wetlands/marsh or surrounding waters outside of the alignment of the fill area indicated on the workplan drawings. 6) All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the National Response Center at (800) 424-8802 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. Dredge Material Disposal 7) No dredge material shall be placed within 30 feet of the normal high-water line. 8) All excavated materials shall be confined above normal high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. The barriers shall be maintained and functional until the site is graded and stabilized. 9) The dredge material disposal area shall be inspected and approved by a representative of the Division of Coastal Management prior to the commencement of any dredging activities. Maintenance Clause 10) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any maintenance excavation work authorized by this permit, and such notification shall include: A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the original permit plans with cross-hatching indicating the area to be maintained, the area to be used for dredge material disposal, and the estimated amount of material to be removed. The location, design and holding capacity of the dredge material disposal site shall be approved by a representative of the Division prior to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee’s signature shown anew on the original plan. USACE Conditions 11) A “Consent to Cross” authorization from the Corps of Engineers must be obtained for the easement of the Corps navigation channel prior to material disposal. Provide a written request and a map showing disposal site and the crossing location to Justin Arnette at Justin.R.Arnette@usace.army.mil. 12) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish & Wildlife Service’s Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https://www.fws.gov/raleigh/pdfs/ManateeGuidelines2017.pdf. McMullan Partners LLC. Permit No. 108-21 Page 3 of 3 ADDITIONAL CONDITIONS General 13) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 14) All debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and removed to an appropriate upland location. 15) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2021-00967). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2021-0805. NOTE: Future development of the permittee’s property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources.