Loading...
HomeMy WebLinkAboutSW8160501_Historical File_20200303LEGEND: bS - EXISTING IRON STAKE SIS - SET, IRON STAKE EIP = EXISTING [RON PIPE EC-M = EXtSITNG CONCRETE MONUMENT CC = CONTROL CORNER EPK = EXISTING PIK RAIL SPK = SET PK NAIL ENI> = EXISTING NAIL (em) = BENCHMARK R/W = RIGHT OF WAY EOP = EDGE OF PAVEMENT MBL - MINIMUM BUILDING LINE BOC = BACK OF CURB CO = SANITARY SEWER CLEAN -OUT WM = WATER METER P I P I = POWER. POLE LP = LIGHT POLE PPT = POWER POIF WITH, TRANSFORMER SL* = SECURITY LIGHT GW = GUY "RE CS = CATCH aASIN DI = DROP INLET JB: = JUNCTION BOX RCP = REINFORCED CONCRETE PIPE CMP = CORRUGATED METAL PIPE INV = IN-VERT ,FES = FLARED FN& SECTION (PIPE) AC� = ACR'E(S,) SF = SQUARE FEET EB - ELECTRIC BOX' 04w= WATER VALNA� 04,w = IRRIGATION VALVE FOC = FIBER OPTIC CABLE BOX TLB, TRAFFIC, LIGHT BOX T13 TELEPHONE BOX NTS NOT, TO SCALE MW K40NITORING WELL N/F NOW OR FORMERLY 5SMH-1 SANITARY SEW'R, MANHOLE D&UE DRAINAGE & UTILITY EASEMENT DU&AE DRAINAGE, UTILITY, & ACCESS EASEMENT LIE UTILITY EASEMENT FF FINISH FLOOR DEEO >SOOK,, PAGE D.B., PG­ M.S., PG�= MAP. BOOK, PAGE --UT-- = UNDERGROUND. TELEPHONE LINE --UE-- = UNDERGROUND ELECTRICAL LINE --E-- = OVERHEAO OOWERUNE _UG_ = UNDERGROUND GAS - Ts- = OVERHEAD TRAFFIC SIGNAL -FO- UNDERGROUND- FIBER, OPTIC CABLE -0-0- 4' CHAIN -LINK FENCE -0-Cl- 6' WOOD FENCE -SF- SILT FENCE �; FIRE HYDRANT Okpp POWER POLE LIP LIGHT, POLE SANITARY SEWER MANHOLE HC HANDICAP HCPS HANDICAP PARKING SIGN HANDICAP PARKING. SPACE HANDICAP RAMP PAINTED STOP BAR STOP 8 = STOP SIGN nll=untlnllm = GRADING LIMITS LINE SILT FENCE LINE CPS = COMPACT PARKING SPACE PROPOSED TRAFFtCfL,0W EXISTING TRAFFIC FLOW *SBCF - STEEL SOLLARD WITH� CONCRETE FILL INT. DOO = INTERIOR LANDSCAPING EXT. 000 = EXTERIOR LANDSCAPING +17.47 = EXISTING SPOT ELEVATION = PROPOSED GRADE = MATCH EXIS11NG GRADE = PROPOSED r.RADE AT TOP OF CURB = PROPOSED GRADE ATTOP OF WALK 06L = DRAINAGE BREAK LINE = DOUBLE CONCRETE BLOCK FILTER = FLARED END SECTION VIC[NITY SKETCH NOT TO SCALE + CONC. LEVEL SPREADER # TOP=33t47 + 32,40 IN-V=XX.XX + 32.55 EDGE OF WA TER 2 + 32,34 + \1 32t5l PSI. + STORM MH 30 4- 3263 32.32 TOP=31-20 EDGE 0 F ATER N N�- 2% 5 4 4� 4\, + '16,�4 9i A + 300 + _'\-29,94 + + 32.36 14331 190 "N' 32,27 + + 1,9136 29-91 + 32�30 j 18,90 + 32;to + 3?_38 1 7 0,4 16 3p 58 14 1--" + +29,96--- 32,3!____- 29,70 3atea 3262 + 2", 917A + 33,51 32-20 2.9 1 49 ­'Mia-t 2 - 30 28 25 429.76 + + 12.07 DAAld I A ),W 38.88 + 3251 294 +25. 1 - - - - - - - - - - + 28.64) <9 + 25 32�4 z + 12,33 *32ZG 29-43 v .4sy a 20 29.87 42 28-14 32�49 \ \ \ \ - j I STORM MH 9,56 TOP-z��t.'12 1 1, 1 t 13-p It, + M93 11 1 k � 30. I I � 32,50 + 11-6,; 1 t I \ I \1 . 7 3 19 98 1 1-) I 1 1 j I I I I 1�1 .1 11 A I 1 1 4- �Si�4 + 18.70 fe "I 9198 J, /4�?.52 .0. ea, 9.95 7t It +4 3 32 + 32.43 + 32-44 4 - 3-R.rr + 2,� 29.6i /4+ 12.37 + a J 1 +32-39 + M83 + 32,�6 32 4- 32,31 \t 28.4 -U.97 23. + 20 X TOP= 30.9 7 L + +1 7 ipl. $ / I + < + OUTLET STRUCTURE 29-81 i4llt - 4� 0, R INV OUT (18-RCP)=29.03 + 32.51. 19.9 32.tg + 9.791 4,38 4f7 11 % + 312 39 4., 2,41 nge \3 46tN 1644 1262 9 5 5 + 3216 32.25---� 14,7 k 31.06 .�4 32.29 31 RIP -RAP 4+ 3V57 2 G7- 32,09 43:3 TYPICAL ?G 0 + 2 293 840 at. 3 1 3t.74 4%:- 127, CS 30�99 1 1'5 4 32,09 30 32 ts 16 101 + 9.99 9�90 2%89 % 32.14 3226 31. 89 27731 3t, 1. 29,87 + + 32.16 0.95 + It'93 30 �2814_ 29.� 32,19 7+ 32.46 7,79 32 32,09 /* ag, 2P.496� 4- 5 19 :31 L 32,21 Trosh Rack +31,96 moo + 32,50 0=30-97 NOT TO SCALE 7179-00 - Swansboro Walmart Supercenter Stormwater As -Built Technical Memorandum Date: February 27, 2020 Re: 7179-00 Swansboro Walmart Supercenter — Driveway Extension W. Corbett Ave Swansboro, NC 28584 Onslow County Project #: NCC138078 Stormwater As -Built Analysis: Temporary (WQV) Storage Analysis (from WQ orifice to next available outlet): Required per approved calculations/plans: Pond 1 = 109,216 cf (including 9,134 cf from off -site) Pond 2 = 24,075 cf Pond 3 = 30,416 cf Provided per as -built survey: Pond 1 = 109,755 cf (at 31.01') Pond 2 = 29,445 cf (at 31.19') Pond 3 = 32,486 cf (at 31.12') As -Built drawdown should match design, since orifice sizes match design. Total Pond Volume Above Permanent Pool Provided (and per approved calculations/plans), see peak attenuation below Pond 1 = 190,790 cf (190,536 cf design) Pond 2 = 39,103 cf Pond 3 = 48,719 cf Peak Attenuation: Drainage Area 2-Year Storm 10-Year Storm South (Pre -Development) 5.39 cfs 7.56 cfs North (Pre -Development) 3.41 cfs 4.78 cfs South As -Built) 2.63 cfs 3.38 cfs North As -Built 1.05 cfs 1.30 cfs Permanent Pool As Built Conditions: BMP Name Average Depth SA/DA% (Per 90%TSS with Avg. Depth) SA Required SA Provided Pond 1 7.67ft 7.5ft 2.8 13,422 sf 49,685 sf Pond 2 3.Oft 9.10 11,666 sf 14,123 sf Pond 3 9.14ft 7.5ft 2.68 4,288 sf 14 EaVEDMARO�� Secondary BMP/SCM Analysis: The level spreader and vegetated filter strip, as well. as the infiltration trenches downstream of Ponds 2 and 3, are constructed of approximately the same dimensions and intent as the designed facilities. The infiltration areas shown on the survey were approximated based on the original stakeout locations of the trenches from the design plans. Due to field conditions and proximity; to wetlands, the vegetated filter strip's shape was altered to provide approximately the same filtering area. Based on our review of the signed and sealed survey provided to Bohler by John L Pierce and Associates Land Surveying, the constructed stormwater control measures meet the NCDEQ requirements from the time of permitting and approval. All supporting calculations have been provided in the appendix section of this memorandum. Sincerely, Bohler Engineering Michael Theberge, P.E. General Project Description/Stormwater Management GENERAL PROJECT DESCRIPTION Wal-Mart Real Estate Business Trust proposes to redevelop the existing land located along the south side of West Corbett Avenue (NC Highway 24) and the west side of Hammock Beach Road in Swansboro, North Carolina. This site currently consists of vacant land, an existing Walmart building with associated parking, (3) existing ponds, and an existing stream. The proposed project area is approximately 1.84 acres and will include a redeveloped driveway extension to serve the existing Walmart Supercenter building, fuel station, one outparcel, and f 623 parking spaces. The development will also include the construction of landscaping, lighting, stormwater management facilities, the installation of all utilities to support the development, and an access driveway to NC Highway 24. Pertinent data characterizing the existing and proposed site conditions are shown on the accompanying Site Plan Documents. STORMWATER MANAGEMENT The pre -development condition of the site consists of two primary drainage areas. The southern portion of the site drains to an existing pond and drainage feature at the south of the site. The northern portion of the site drains to the existing stormwater network in Corbett Avenue and to the drainage feature to the west of the property that ultimately drains to the existing stormwater network in Corbett Avenue. Hydrographs have been generated for the 2, 10, and 100-year storm events for the pre- and post - development conditions. The post -development conditions maintain the same relative Drainage Treatment Areas, however to provide water quality measures and rate control, three wet ponds were previously designed to intercept flow from the impervious surfaces created by the development. Wet pond 1 discharges to the existing drainage feature at the south of the property, and wet ponds 2 and 3 discharge to the existing network in W. Corbett Ave. Due to the proximity of potential Shellfish Area (SA) waters, after discharging from the pond, the water flows through underground infiltration trenches in order to infiltrate the required storm volume for Wet Ponds 2 and 3. Wet Pond 1 discharges into a level spreader and vegetated filter strip in order to provide "effective infiltration." The wet ponds have been designed in accordance with the NCDENR Stormwater BMP Manual to provide 90% TSS removal for the water quality volume (WQV). The water quality volume for this project is required to be the greater of 1.5" or the difference in the runoff from the pre- and post -development conditions for the 1-yr, 24-hr storm depth. The wet ponds will also serve as a means of stormwater rate control, and have been designed to reduce the post -development release rates for the 2 and 10-year storm events to be at or below the corresponding pre -development rates. Infiltration of the WQV after discharge from the wet ponds is provided through underground infiltration trenches. The Dekalb Rational Method was utilized for calculating the peak runoff rates and generating hydrographs for the pre- and post -development conditions as defined in the computer watershed software "Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2016". The hydrographs were generated based on the precipitation amounts dictated by the NOAA Atlas 14 for the project site in Swansboro, NC for each storm event. The storm drainage system has been designed to intercept runoff at topographic low points and areas of significant runoff quantities and convey stormwater to the stormwater management basins. The Hyrdaflow StormSewers Extension was utilized for designing the storm conveyance system. Conveyance design precipitation amounts are based on the 10-year storm event. Spread calculations are provided for the inlets based on the 4"/hr rainfall intensity. Some spreads in the parking lot are excessively high, because the proposed trench drain is not modeled in these calculations. Per "Revised Final Geoiechnical Exploration Report" by S&ME, Inc., the subject site lies in an area consisting mostly of Onslow series soils. The survey indicated that the Onslow series consists of moderately well -drained soils that transition from a loamy fine sand to sandy and clayey loam with depth. The subsoil is formed from loamy and sandy marine deposits. Stormwater Management Analysis The tables below show the calculations of the Water Quality Volume (WQV) for the three ponds that must be discharged within 2-5 days and then effectively infiltrated as secondary treatment. Wet Pond 1 WQV: The proposed road work on Corbett Ave and previously constructed road work on Hammock Beach Rd result in an increase in impervious area of approximately 43,020 sf, which also includes the impervious area of the pump house and water tank, which do not flow to the wet ponds. Additional water quality treatment storage volume is provided in Wet Pond 1 to account for this additional increase in impervious area. For calculation purposes, the drainage area and impervious area draining to Wet Pond 1 have been increased by the 43,020 sf value to account for the additional treatment being provided by the pond. Total Treatment by Wet Pond 1 (includes offsite area): Design Runoff (Pre) 0.183; in Design Runoff (Post) 2.863t in Drainage Area = 11.23 Acres :Design Runoff (Pre) 7,437 13 Design Runoff (Post) _ 116,653 ft3 Volume required = 109,216 ft3 A level spreader with vegetated filter strip is used for "effective infiltration" after Wet Pond 1. Due to the storage volume of Wet Pond 1, the resulting outflow for the 10-year storm is very small and results in the required length of the level spreader being relatively small. In our engineering judgment, the length of the level spreader has been increased to provide a more conservative, constructible, and maintainable system. Wet Pond 2 WQV: Wet Pond 2 Infiltration Area Needed: V +, 240751cf K i 2.00.;in/hr T ` 4.57 days Design Runoff (Pre) = 4,751 ft3 A 1318 sf Design Runoff (Post) = 28,832 ,ft3 W 24ft Volume required = 24,076 'ft3 L 4.9 ft Wet Pond 3 WQV: Design Runoff, (Pre) = Design Runoff (Post) i .. ........ ... ..i.. .. _ Drainage Area = 0.445; in 2.779' in 3.63 Acres Design Runoff (Pre) = 5,706 ;ft3 Design Runoff (Post) 35,608 1ft3 Volume required = 29,902 tt3 Wet Pond 3 Infiltration Area Needed: K 2.001inlhr T 4.191days A 1814'sf w 24?ft L 76fft BMP Sizing: For all 3 wet ponds, equation Option 2 from Figure 10-2b is used. The values used for each variable can be found in the Wet Pond Supplement for each pond. For Wet Pond 1, the two forebays have been designed to provide approximately 20% of the permanent pool storage volume. The forebays are also sized proportionally to the drainage area flowing to each. Forebay #1 receives flow from approximately 43% of the drainage area, while it is approximately 8.4% of the permanent pool volume (or approximately 42% of the total forebay volume). Forebay #2 receives flow from approximately 57% of the drainage area, while it is approximately 11.6% of the permanent pool volume (or approximately 58% of the total forebay volume). For all 3 wet ponds, a water quality orifice is used at the base of the riser structure to draw down the water quality volume within 2-5 days. The next available outlet on the riser structure is placed above the required water quality volume. The elevation of this next available outlet is considered the temporary pool volume, and this elevation (and resulting pressure head value used for the orifice equation) was used when determining the drawdown times through the water quality orifices. The infiltration trenches proposed after Wet Ponds 2 and 3 were sized based on the drawdown times of the water quality volume through the water quality orifice in the riser structures, as discussed above. The infiltration trenches were sized based on the water quality volume, infiltration rate (based on soil borings and infiltration estimates from a geotechnical engineer), and drawdown time of the upstream wet pond. List of Important Modifications since Previous Approval: Post -development drainage areas have changed due to proposed driveway extension construction. New E&SC plans are to be implemented, based on the new construction. Calculations and narrative have been revised since the previous submission. o Drainage areas in erosion and sediment control plans have been updated to match stormwater drainage areas due to the additional impervious areas and diversion ditches during erosion control that will direct water towards the storm inlet basins. o New additional limits of disturbance are proposed with the modifications. Due to the amount of BUA added to the previously approved SWM plans, we are proposing a Major Modification to the existing approved permit. BMP Design/Calculations E--- �. ' --' 7 WET POND #1 WALMART SUPERCENTER BMP DESIGN CALCULATIONS 1I ; WATER QUALITY TO MEET 90% TSS REMOVAL DRAINAGE AREA TO FACILITY = 11 23 Ar.. (Includes 43,020 sf of impervious area not draining to pond) LAND USE = Walmart Supercenter ESTIMATED PERCENT IMPERVIOUS = 82% AVERAGE POOL DEPTH = 768 PERCENT IMPERVIOUS = 82% SA/DA = 2.80 % 0.0280 SA REQUIRED = 11.2264 Ac. X = 0.3143 Ac. = 13,693 SF )-E NA Pre % Impervious = 0% Post % Impervious = 82% Rv(pre)= 0.05 infin Rv(post)= 0.784 in/in Design Rainfall = 3.65 in (1 yr, 24 hr) Design Runoff (Pre) = 0.183 in Design Runoff (Post) = 2.863 in Drainage Area = 1123 Acres Design Runoff (Pre) = 7,437 ft3 Design Runoff (Post) = 116,653 ft3 Volume required = 109,216 ft3 Total (including off -site)= Pond Height above Orifice = Orifice Invert Elevation = FEET 0.0280 109,216 ft3 (Assumed to be 7.5' for SA/DA) 31.01 feet (109,755CF @ 31.01') 29.08 feet Orifice Diameter (D) = 5.00 inches = 0.42 Orifice Area (a) = 0.1364 square feet Gravitational Constant (g) = 32.2 ft/secz Head (H) = 1.72 feet Driving Head (Ho) = 0.574 feet Discharge Coefficient (Co) = 0.6 Drawdown rate (Q) = 0.497 cfs Time (t) = 219,588 seconds = 264 Note: The above calculation is based on the orifice equation where: feet days 7/24/20191:01 PM Page 1 of 1 PERM. POOL ELEV. TEMP. POOL ELEV. VEG. SHELF (BOT.) 'ERM. POOL ELEV. VEG. SHELF (TOP) VF%G. SHFI F (RnT ) PERM. POOL ELEV VEG. SHELF (TOP) Wet Pond 1 Design Wet Pond 1 Treatment Volume - Main Pool Elev Area (so Inc Storage (co Total Storage (co 29.08 49,6 7 49,685 0 0 30.00 57, ' 7 57,680 49, 18 49,388 49, 8 31.01 61, 59 61,859 60 352 60.367 109 70 32.00 65 71 65,992 6 ,161 63-286 17 ,831 32.25 7 ,008 76,000 1 ,705 17,749 19 ,536 Wet Pond 1 Permanent Pool Volume - Main Pool Elev Area (so Inc Storage (co Total Storage (co 12.00 3,303 0 0 13.00 8,360 0 0 14.00 11,288 0 0 15.00 12,757 0 0 16.00 13,982 0 0 17.00 15,202 0 0 18.00 16,425 0 0 19.00 17,737 17,081 17,081 20.00 19,075 18,406 35,487 21.00 20,476 19,776 55,263 22.00 21,949 21,213 76,475 23.00 23,477 22,713 99,188 24.00 25,010 24,244 123,432 25.00 26,647 25,829 149,260 26.00 28,313 27,480 176,740 27.00 30,001 29,157 205,897 28.00 31,939 30,970 236,867 28.58 33,334 18,929 255,796 29.08 36,620 17,489 273,285 29.58 39,688 19,077 292,362 Wet Pond 1 - Forebay#1 Elev Area (so Inc Storage (co Total Storage (co 19.00 243 0 0 20.00 566 0 0 21.00 904 735 735 22.00 1,281 1,093 1,828 23.00 1,709 1,495 3,323 24.00 2,185 1,947 5,270 25.00 2,730 2,458 7,727 26.00 3,353 3,042 10,769 27.00 4,010 3,682 14,450 28.00 4,725 4,368 18,818 28.58 J,L I L 2,882 21,699 29.08 5,565 2,694 24,393 29.58 6,052 2,904 27,298 MAIN POOL & FOREBAY #1 UNALTERED WITH THIS PERMIT MODIFICATION 49,388 109,755 173,041 190.790 SURVEYED TOP Of SED. STORAGE (B( POND) = 13.00' OBSERVED TOP SE STORAGE(BOT. POND) = 18.00' OBSERVED/SURVE 1 TOP SED. STORAGE(BOT. POP = 20.00' VEG. SHELF (BOT.) PERM. POOL ELEV. VEG. SHELF (TOP) Wet Pond 1 - Forebay#2 Elev Area (sf) Inc Storage (cf) Total Storage (cf) 19.00 471 229 0 0 20.00 1,11 677 0 0 21.00 1,7 1163 1,4 8 920 1,4 8 920 22.00 2,3 2 1872 2, 3 1518 3, 81 2438 23.00 2,8 7 2591 2, 10 2232 6, 90 4669 24.00 3,5 1 3326 3, 99 2959 9, 89 7628 25.00 4,1 1 4087 3, 1 3707 1 130 11334 26.00 5, 40 4871 4 61 4479 1 ,791 15813 27.00 5, 16 5698 5 328 5285 2 ,119 21098 28.00 6, 19 6533 ,917 6116 2 ,036 27213 28.58 6 74 6962 ,797 3914 ,833 31127 29.08 7 452 7500 ,556 3616 6,389 34742 29.58 ,683 7787 ,784 3822 0,173 38564 DEPTH : 28.58 - 18.00 = 10.58 A(bot. shelf) = 45,508 A(bot. pond) = 16,425 A(perm. pool) = 49,685 Davg = 7.68 OBSERVED/SURVE` TOP SED. STORAGE(BOT. POI = 20.00' Permit No. (to be provided by D WQ) J&'Q- �pF W ATFRQ NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. Project name 7179-000 Walmart Supercenter Swansboro, NC Contact person Michael A Theberge Phone number 980-272-3400 Date 27-Feb-20 Drainage area number Wet Pond 1 Site Characteristics Drainage area 489,020 fe Impervious area, post -development 398,718 fe % impervious 81.53 % Design rainfall depth 3.7 in Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1.5" runoff volume 47,912 ft3 Pre -development 1-yr, 24-hr runoff 7,437 ft3 Post -development 1-yr, 24-hr runoff 116,653 ft3 Minimum volume required 109,216 ft3 Volume provided 109,755 ft3 Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.7 in Rational C, pre -development 0.15 (unitless) Rational C, post -development 0.80 (unitless) Rainfall intensity: 1 -yr, 24-hr storm 0.15 Whir OK Pre -development 1-yr, 24-hr peak flow 1.45 ft3/sec Post -development 1-yr, 24-hr peak flow 25.00 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 23.55 ft3/sec Elevations Temporary pool elevation 31.01 fmsl Permanent pool elevation 29.08 fmsl SHWT elevation (approx. at the perm. pool elevation) 29.60 fmsl Top of 10ft vegetated shelf elevation 29.58 fmsl Bottom of 1 Oft vegetated shelf elevation 28.58 fmsl Sediment cleanout, top elevation (bottom of pond) 18.00 fmsl Sediment cleanout, bottom elevation 17.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state -required temp. pool? Y (Y or N) Elevation of the top of the additional volume 31.0 fmsl OK Form SW401-Wet Detention Basin-Rev.9-4/1all 2 Parts I. d II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Surface Areas Area, temporary pool 61,859 ft' Area REQUIRED, permanent pool 13,693 ft SAIDA ratio 2.80 (unitless) Area PROVIDED, permanent pool, APerrn r1001 49,685 fe OK Area, bottom of 1Oft vegetated shelf, AhO, Sh,,If 45,508 ft? Area, sediment cieanout, top elevation (bottom of pond), Abatpwd 16,425 f? Volumes Volume, temporary pool 109,755 fe OK Volume, permanent pool, Vpenpod 332,420 fe Volume, forebay (sum of forebays if more than one forebay) 59,135 f? Forebay % of permanent pool volume 17.8% % Insufficient forebay volume. SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 2.80 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vperm-pod 332,420 ft3 Area provided, permanent pool, Ap.11n_pool 49,685 ft' Average depth calculated N/A ft OK Average depth used in SAIDA, da,,, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, A,.,n_,O , 49,685 ft2 Area, bottom of 10ft vegetated shelf, AWLAW 45,508 ft' Area, sediment cleanout, top elevation (bottom of pond), AboL-pwd 16,425 fe "Depth" (distance b/w bottom of 10ft shelf and top of sediment) 10.58 ft Average depth calculated 7.67 ft OK Average depth used in SAIDA, deV, (Round to down to nearest 0.5ft) 7.5 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 5.00 in Area of orifice (if -non -circular) in' Coefficient of discharge (Co) 0.60 (unitless) Driving head (H.) 0.57 ft Drawdown through weir? N (Y or N) Weir type N/A (unitless) Coefficient of discharge (C,,,) N/A (unitless) Length of weir (L) N/A ft Driving head (H) N/A ft Pre -development 1-yr, 24-hr peak flow 1.45 fe/sec Post -development 1-yr, 24-hr peak flow 25.00 8 /sec Storage volume discharge rate (through discharge orifice or weir) 0.49 Osec Storage volume drawdown time 2.54 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3.2 :1 OK Length to width ratio 3.2 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: PUMP Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. E 11. Design Summary, Page 2 of 2 of w�re9 V-2-> �f NCDENR s STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, initialed and submitted. Project name 7179-000 Walmart Supercenter Swansboro, NC Contact name Michael A Theberge Phone number 980-272-3400 Date May 18, 2016 Drainage area number From Wet Pond 1 The purpose of the LS-VFS Other. Explained below Stormwater enters LS-VFS from A BMP Type of VFS Engineered filter strip (graded & sodded, slope < 8%) Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 10-yr storm Design storm Maximum amount of flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak discharge from the BMP during the 10-year storm Maximum capacity of a 100-foot long LS-VFS Peak flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any "Other" responses above Purpose: "Effective infiltration" after 90% TSS wet pond due to proximity to SA Waters ft, Do not complete this section of the form. fe Do not complete this section of the form. °% Do not complete this section of the form. Do not complete this section of the form. cfs Do not complete this section of the form min Do not complete this section of the form inlhr Do not complete this section of the form cfs Do not complete this sectiun of the form Other. Explained below cfs Do not complete this section of the ;urm. (Y or N) Do not complete this section of the form. 3.65" (1-yr, 24-hr storm) due to proximity to SA Waters Wet detention pond 0.51 cfs 0.7 cfs 10 cfs 0.7 cfs N (YorN) Form SW401 LS-VFS - 29Jure2012 Rev.10 page 1 of 3 LS-VFS Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per cis Computed minimum length of the level lip needed Length of level lip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10-year storm) freeboard (during the 10-year storm) Peak velocity in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above A BMP sq ft No fa6bay is it:iuirc.^ in in 10 ftfcfs 7 ft Ten feet is the minimum level spreader length. 20 ft 50 ft 29.00 fmsl 28.00 fmsl 2.00 % N (Y or N) OK N (Y or N) N (Y or N) N (Y or N) Pick one: W a s � (Y or N) (Y or N) Form SW401 - LS-VFS - 29June2012 - Rev.10 page 2 of 3 EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Section view of the level spreader (1" = 20' or larger) showing: Underdrain system (if applicable), Level lip, - Upslope channel, and - Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. If a non -engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. Initials Page or plan sheet number and any notes: MT i MT MT MT MT Forth SW401 - LS-VFS - 29June2012 - Rev.10 page 3 of 3 WET POND #2 WALMART SUPERCENTER BMP DESIGN CALCULATIONS WATER QUALITY TO MEET 90% TSS REMOVAL DRAINAGE AREA TO FACILITY = 2 94 Ac. LAND USE = Walmart Supercenter ESTIMATED PERCENT IMPERVIOUS = 77% UPfit:, I1 c AVERAGE POOL DEPTH = 3 FEET PERCENT IMPERVIOUS = 77% SA/DA = 910 % = 0.0910 SA REQUIRED = 2.94 Ac. X 0.0910 0.27 Ac. 11 666 SF Pre % Impervious = 8% Post % Impervious 77% Rv = 0.05 + 0.9(I) Rv(pre)= 0.122 in/in Rv(pre)= 0.739 in/in Design Rainfall = 365 in (1 yr, 24 hr) Design Runoff (Pre) = 0.445 in Design Runoff (Post) = 2.699 in Drainage Area = 2.94 Acres Design Runoff (Pre) = 4,757 fta Design Runoff (Post) = 28,832 fta Volume required = 24,075 fta Other Impervious Area to be Treated = 0 sf Other Runoff Depth to be Treated = 3.47 in Other WQV to be Treated = 0 fta Total (Including off -site)= 24,075 ft' Pond Height above Orifice = 31.19 feet (29,445CF @ 31.19') Orifice Invert Elevation = 29.36 feet Orifice Diameter (D) = 1.75 inches = 0.15 feet Orifice Area (A) = 0.0167 square feet Gravitational Constant (g) = 32.2 ft/sec' Head (H) = 1.76 feet Driving Head (Ho) = 0.586 feet Discharge Coefficient (Co) = 0.6 Drawdown rate (Q) = 0.062 cfs Time (t) = 391,135 seconds = 4 53 days Note: The above calculation is based on the orifice equation where: Q=CoA 29 7/30/2018 10:37 AM Page 1 of 1 PERM. POOL ELEV, TEMP. POOL ELEV_ SURVEYED TOP SED. STORAGE (BOT. POND)= 20.00' OBSERVED TOP SED. STORAGE (BOT. POND)= 25.00' VEG SHELF (BOT.) PERM. POOL ELE VEG SHELF (TOP) OBSERVEDiSURVEYED TOP OF SED STORAGE = 20.00' Wet Pond 2 Design Wet Pond 2 Treatment Volume - Total Elev Area (sf) Inc Storage (cf) Total Storage (cf) 29.36 14,123 0 0 30.00 16,714 9,868 9,868 31.00 19,105 17,910 27,777 31.19 19,621 3,679 29,445 31.75 20,826 11,325 39,103 Elev 19.00 Wet Pond 2 Permanent Area (sf) 12 Pool Volume - Total Inc Storage (cf) 0 Total Storage (cf) 0 20.00 335 0 0 21.00 793 0 0 22.00 1,338 0 0 23.00 2,154 0 0 24.00 3,160 0 0 25.00 4,261 0 0 26.00 5,445 4,853 4,853 27.00 6,876 6,161 11,014 28.00 8,226 7,551 18,565 28.86 10,388 8,004 26,569 V 29.36 11,831 5,555 32,123 29.86 13,008 6,210 38,333 VEG SHELF (BOT.) PERM. POOL ELEV. VEG SHELF (TOP) Wet Pond 2 - Forebay Elev Area (sf) Inc Storage (cf) Total Storage (cf) 19.00 5 0 0 20.00 47 0 0 21.00 117 82 82 22.00 218 168 250 23.00 357 288 537 24.00 515 436 973 25.00 707 611 1,584 26.00 919 813 2,397 27.00 1,289 1,104 3,501 28.00 1,553 1,421 4,922 28.86 2,020 1,536 6,458 29.36 2,292 2,615 7,537 29.86 2,564 2,292 8,750 Depth: 28.86-25.00 = 3.86' A(bot. shelf): 12,408sf A(bot. pond): 4,261 sf A(perm. pool): 14,123sf D(avg.): 3.06' D(used): 3.00' Forebay Volume (perm. pool): 7,537cf Total Volume (perm. pool): 32,123cf + 7.537cf = 39,660cf % Forebay to Total Volume: 7,537cf i 39,660cf = 19.00°b Permit (to be provided by DWQ) NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Project name 7179-000 Walmart Supercenter Swansboro, NC Contact person Michael -A Theberge Phone number 980-272-3400 Date Drainage area number r L Site Characteristics 30-Jul-18 Wet Pond 2 Drainage area 128,200 fe Impervious area, post -development 98,200 fe % impervious 76.60 % Design rainfall depth 3.7 in Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1.5" runoff volume 11,849 ft3 Pre -development 1-yr, 24-hr runoff 4,757 ft3 Post -development 1-yr, 24-hr runoff 28,832 ft3 Minimum volume required 24,076 ft3 Volume provided 29,445 ft3 Peak Flow Calculations Is the pretpost control of the 1 yr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.7 in Rational C, pre -development 0.21 (unitless) Rational C, post -development 0.76 (unitiess) Rainfall intensity: 1 -yr, 24-hr storm 0,15 in/hr OK Pre -development 1-yr, 24-hr peak flow 0.40 ft3/sec Post -development 1-yr, 24-hr peak flow 9.69 ft3lsec Pre/Post 1-yr, 24-hr peak flow control 9.29 fOlsec Elevations Temporary pool elevation 31.19 fmal Permanent pool elevation 29.36 fmsl SHWT elevation (approx. at the perm. pool elevation) 29.00 fmsl Top of 1 Oft vegetated shelf elevation 29.86 fmsl Bottom of 1 Oft vegetated shelf elevation 28.86 fmsl Sediment cleanout, top elevation (bottom of pond) 25.00 fmsl Sediment cleanout, bottom elevation 24.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state -required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl �pF W A �VVF pY S['--ya �Y -- Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 2 Permit (fo be provided by DWQ) Surface Areas Area, temporary pool 19,621 fe Area REQUIRED, permanent pool 11,666 ft' SAIDA ratio 9.10 (unitless) Area PROVIDED, permanent pool, Aperm-ool 14,123 ft' OK Area, bottom of 1 Oft vegetated shelf, AWLshdf 12,408 ft' Area, sediment cleanout, top elevation (bottom of pond), Abolmd ° 4,261 ftZ Volumes Volume, temporary pool 29,445 ft3 OK Volume, permanent pool, VPerm-pool 39,660 ft3 Volume, forebay (sum of forebays if more than one forebay) 7,537 ft3 Forebay % of permanent pool volume 19.0% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 9.10 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, VPermyool 39,660 ft3 Area provided, permanent pool, • perm_Pnd 14,123 fe Average depth calculated NIA ft OK Average depth used in SAIDA, deV, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, Apemrt.Pool 14,123 fe Area, bottom of 10ft vegetated shelf, Abol shelf 12,408 W Area, sediment cleanout, top elevation (bottom of pond), Ahot_and 4,261 fe "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 3.86 ft Average depth calculated 3.06 ft OK Average depth used in SAIDA, d,v, (Round to down to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 1.75 in Area of orifice (if -non -circular) in' Coefficient of discharge (Co) 0.60 (unitless) Driving head (Ho) 0.59 ft Drawdown through weir? N (Y or N) Weirtype N/A (unitless) Coefficient of discharge (C.) N/A (unitless) Length of weir (L) N/A ft Driving head (H) N/A ft Pre -development 1-yr, 24-hr peak Flow 0.40 ft3/sec Post -development 1-yr, 24-hr peak flow 9.69 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.06 ft3/sec Storage volume drawdown time 4.53 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10.1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 6 :1 OK Length to width ratio 6 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: PUMP Form SW401-Wat Detention Basin-Rev.9-4/18H2 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the appiicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. MT C-6-C-8_ 1. Plans (1" 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, Pretreatment system, High flow bypass system, - Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. MT D-1 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. _MT D-1 3. Section view of the wet detention basin (1" 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. _SW-2 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. MT Appendix_ 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. MT SW-2 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. MT Appendix 7. The supporting calculations. _MT Appendix 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. _MT Appendix_ 9. A copy of the deed restrictions (if required). _MT Appendix_ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 18 of 18 Permit No. (to be provided by DWQ) A , STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR of waw e�aR- 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part /I/) must be printed, filled out and submitted along with all of the required information. Project name 7179-000 Walmart Supercenter Swansbom, NC Contact person Michael A Theberge Phone number 980-272-3400 Date 7/24/2019 Drainage area number From Wet Pond 2 Site Characteristics Drainage area 128,200.00 ftz Impervious area 98,200.00 fe Percent impervious 76.6% % Design rainfall depth 3.65 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.65 in 1-yr, 24-hr intensity 0.15 in/hr Pre -development 1-yr, 24-hr discharge 0.40 ft3lsec Pust-development 1-yr, 24-1hr discharge 0.06 ft31sec Pre/Post 1-yr, 24-hr peak flow control -0.34 ft3lsec Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1.5" runoff volume 11849.00 ft3 Pre -development 1-yr, 24-hr runoff volume 4,757.00 ft3 Post -development 1-yr, 24-hr runoff volume 28,832.00 ft3 Minimum volume required 24075.00 ft3 Volume provided 29,445.00 ft3 OK Soils Report Summary Soil type A Infiltration rate 2.00 in/hr SHWT elevation 29.00 fmsl Trench Design Parameters Drawdown time 4.53 days OK Perforated pipe diameter 1200. in Perforated pipe length 55.00 ft Number of laterals 0 Stone type (if used) #57 Stone void ratio 40% Stone is free of fines? Y (Y or N) OK Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by OWQ) Trench Elevations Bottom elevation 29.00 fmsl Raise basin bottom, Must be at least 2-ft above SHWT Storage/overflow elevation 30.50 fmsl Top elevation 31.00 fmsl Trench Dimensions Length (long dimension) 55.00 ft Width (short dimension) 24.00 ft Height (depth) 2.00 ft OK Additional Information Maximum volume to each inlet into the trench? ac-in Length of vegetative filter for overflow N/A ft OK Number of observation wells 1 Distance to structure 15.00 ft OK Distance from surface waters 1,000.00 ft OK Distance from water supply well(s) N/A ft OK Separation from impervious soil layer N/A ft OK Depth of naturally occuring soil above SHWT 0.00 ft Minimum of atleast 1-ft of naturally occuling soil above shwt Bottom covered with 4-in of clean sand? N/A (Y or N) 11K Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y or N) OK Bypass provided for larger storms? Y (Y or N) Trench wrapped with geotextile fabric? Y (Y or N) Pretreatment device provided Y Wet Pond Form SW401-Infiltration Tronch-Rov.4 Parts I. & II. Design Summary, Page 2 of 2 WET POND 93 WALMART SUPERCENTER BMP DESIGN CALCULATIONS I:. ,' WATER QUALITY TO MEET 90% TSS REMOVAL DRAINAGE AREA TO FACILITY = 3.65 Ac. LAND USE = Walmart Supercenier ESTIMATED PERCENT IMPERVIOUS 78% AVERAGE POOL DEPTH = 914 FEET (Assumed to be 7.5' for SAIDA) PERCENT IMPERVIOUS = 78% SA1DA = 280 % = 0.0280 SA REQUIRED = 3.65 Ac. X 0.0280 = 0.10 Ac. 4.447 SF 1W9#0 }NAB OUAL ` W'a Pre % Impervious = 8°% Post °% Impervious = 78°% Rv = 0.05 + 0.9(I) Rv(pre)= 0.122 in/in Rv(pre)= 0.750 in/in Design Rainfall = 365 in (1 yr, 24 hr) Design Runoff (Pre) = 0.445 in Design Runoff (Post) = 2.737 in Drainage Area = 3.65 Acres Design Runoff (Pre) = 5,893 ft3 Design Runoff (Post) = 36,216 ft3 Volume required = 30,325 ft3 Other Impervious Area to be Treated = 0 sf Other Runoff Depth to be Treated = 3.47 in Other WQV to be Treated = 0 It, Total (including off -site)= 30,325 ft3 Pond Height above Orifice = 31.12 feet (32,486CF @ 31.12') Orifice Invert Elevation = 29.16 feet Orifice Diameter (D) = 2.00 inches = 0.17 feet Orifice Area (a) = 0.0218 square feet Gravitational Constant (g) = 32.2 fUsec2 Head (H) = 1.88 feet Driving Head (Ho) = 0.626 feet Discharge Coefficient (Ca) = 0.6 Drewdown rate (Q) = 0.083 cfs Time (t) = 364,991 seconds 422 days Note: The above calculation Is based on the orifice equation where: =C,A ZgH. 7/24/2019 1:33 PM Page 1 of 1 PERM. POOL ELEV TEMP. POOL ELEV. Wet Pond 3 Design Wet Pond 3 Treatment Volume Elev Area (sf) Inc Storage (cf) Total Storage (cf) 29.16 14,318 0 0 30.00 16,780 13,061 13,061 31.00 17,790 17,285 30,346 31.12 17,882 2,140 32,486 31.50 18,175 6,851 39,337 32.00 19,352 9,382 48,719 Wet Pond 3 Permanent Pool Volume SURVEYED TOP Elev Area (sf) Inc Storage (cf) Total Storage (cf) SED. STORAGE 12.00 1713 0 0 13.00 2,556 0 0 (BOT. POND)= 13.00' 14.00 3,003 0 0 15.00 3,418 0 0 16.00 3,756 3,587 3,587 OBSERVED TOP 17.00 4,121 3,939 7,526 SED. STORAGE 18.00 4,527 4,324 11,850 19.00 4,932 4,730 16,579 (BOT. POND)= 1 1- 20.00 4,342 4,637 21,216 21.00 5,759 5,051 26,267 22.00 6,174 5,967 32,233 23.00 6,496 6,335 38,568 24.00 6,819 6,658 45,226 25.00 7,143 6,981 52,207 26.00 7,468 7,306 59,512 27.00 7,804 7,636 67,148 28.00 8,131 7,968 75,116 VEG SHELF (BOT.) 28.66 9,069 5,676 80,792 PERM. POOL ELEV. 29.16 9,974 4,761 85,552 VEG SHELF (TOP) 1 29.66 10,698 5,168 90,720 Wet Pond 3 - Forebay OBSERVEDiSURVEYED Elev Area (sf) Inc Storage (cf) Total Storage (cf) TOP OF SED STORAGE 17.00 5 0 0 = 18.00' 18.00 234 0 0 19.00 521 378 378 20.00 818 670 1,047 21.00 1,128 973 2,020 22.00 1,355 1,242 3,262 23.00 1,581 1,468 4,730 24.00 1,788 1,685 6,414 25.00 2,003 1,896 8,310 26.00 2,224 2,114 10,423 27.00 2,471 2,348 12,771 28.00 2,701 2,586 15,357 VEG SHELF (BOT.) 28.66 3,621 2,086 17,443 PERM. POOL ELEV. 2�.16 4,344 1,994 19,434 VEG SHELF (TOP) 29.66 4,705 2,262 21,696 Depth: 28.66-15.00 = 13.66' A(bot. shelf): 12,690sf A(bot. pond): 3,418sf A(perm. pool): 14,318sf D(avg.): 9.14' D(used): 7.5' Forebay Volume (perm. pool): 19,434cf Total Volume (perm. pool): 85,552cf + 19,434cf = 104,986cf Permit No. (to be provided by DWG) �A SOP WAT�cgO WDENR y r STORMWATER MANAGEMENT PERMIT APPLICATION FORM �'a► 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. 77, Project name 7179-000 Walmart Supercenter Swansboro, NC Contact person Michael A Theberge Phone number 980-272-3400 Date 24-Jul-19 Drainage area number Wet Pond 3 Site Characteristics Drainage area 158,811 fe Impervious area, post -development 123,480 fe % impervious 77.75 % Design rainfall depth 3.7 in Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1.5" runoff volume 14,884 ft3 Pre -development 1-yr, 24-hr runoff 5,893 ft3 Post -development 1-yr, 24-hr runoff 36,218 ft3 Minimum volume required 30,325 ft3 Volume provided 32,486 ft3 Peak Flow Calculations Is the prelpost control of the 1yr 24hr storm peak Flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.7 in Rational C, pre -development 0.21 (unitless) Rational C, post -development 0.77 (unitless) Rainfall intensity: 1 -yr, 24-hr storm 0.15 in/hr OK Pre -development 1-yr, 24-hr peak flow 0.27 ft3/sec Post -development 1-yr, 24-hr peak flow 9.56 ft3lsec Pre/Post 1-yr, 24-hr peak flow control 9.29 ft3lsec Elevations Temporary pool elevation 31.12 fmsl Permanent pool elevation 29-16 fmsl SHWT elevation (approx. at the perm. pool elevation) 28.75 fmsl Top of 1 Oft vegetated shelf elevation 29.66 fmsl Bottom of 1 Oft vegetated shelf elevation 28.66 fmsl Sediment cleanout, top elevation (bottom of pond) 15.00 fmsl Sediment cleanout, bottom elevation 14.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state -required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl Form SW401-Wet Detention Basin-Rev.9-4/18/12 Paris I. & il. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Surface Areas Area, temporary pool 17,882 ft2 Area REQUIRED, permanent pool 4,256 ft2 SAIDA ratio 2.68 (unitless) Area PROVIDED, permanent pool, Aperm-peoi 14,318 fl? OK Area, bottom of 1 Oft vegetated shelf, Abol Shea 12,690 fC Area, sediment cleanout, top elevation (bottom of pond), Abx.p"nd 3,418 ft2 Volumes Volume, temporary pool 32,486 fts OK Volume, permanent pool, Vpe._Pool 104,986 ft3 Volume, forebay (sum of forebaysIf more than one forebay) 19,434 ft3 Forebay % of permanent pool volume 18.5% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 2.68 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vperm_pool 104,986 ft3 Area provided, permanent pool, Apeni_poo1 14,318 ft2 Average depth calculated NIA ft OK Average depth used in SAIDA, deY, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, Aperm_pool 14,318 ft2 Area, bottom of 10ft vegetated shelf, Ab,1 Sear 12,690 ft2 Area, sediment cleanout, tap elevation (bottom of pond), Abolywd 3,418 ft2 "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 13.66 ft Average depth calculated 9.14 ft OK Average depth used in SAIDA, deY, (Round to down to nearest 0.5ft) 7.5 ft Insufficient. Check calculation. Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.00 in Area of orifice (if -non -circular) in Coefficient of discharge (Co) 0.60 (unitless) Driving head (Ho) 0.63 ft Drawdown through weir? N (Y or N) Weir type NIA (unitless) Coefficient of discharge (C.) NIA (unitless) Length of weir (L) NIA ft Driving head (H) N/A ft Pre -development 1-yr, 24-hr peak flow 0 27 ft3/sec Post -development 1-yr, 24-hr peak flow 9.56 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.08 ft3/sec Storage volume drawdown time 4.22 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: PUMP Form SW401-Wet Detention Basin-Rev.9-4119/12 Parts I. & II. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM bl)W_ Rw Nme 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name 7179-000 Walmart Supercenter Swansboro, NC Contact person Michael A Theberge Phone number 980-272-3400 Date 7/24/2019 Drainage area number From Wet Pond 3 Site Characteristics Drainage area 158,811.00 ftZ Impervious area 123,480.00 ft Percent impervious 77.8% % Design rainfall depth 3.65 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.65 —in 1-yr, 24-hr intensity 0.15� in/hr Pre -development 1-yr, 24-hr discharge 0.27 ft3/sec Post -development 1-yr, 24-hr discharge 0.08 ft3/sec Pre/Post 1-yr, 24-hr peak flow control -0.19 ft3/sec Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1.5" runoff volume 14884.00 ft3 Pre -development 1-yr, 24-hr runoff volume 5,893 ft3 Post -development 1-yr, 24-hr runoff volume 36,218 ft3 Minimum volume required 30325.00 ft3 Volume provided 32,486.00 ft3 OK Soils Report Summary Soil type A Infiltration rate 2.00 inlhr SHWT elevation 28.75 fmsl Trench Design Parameters Drawdown time 4.22 days OK Perforated pipe diameter 12.00 in Perforated pipe length 76.00 ft Number of laterals 0 Stone type (if used) #57 Stone void ratio 40% Stone is free of fines? Y (Y or N) OK Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Trench Elevations Bottom elevation Storage/overflow elevation Top elevation Trench Dimensions Length (long dimension) Width (short dimension) Height (depth) Additional Information Maximum volume to each iniet into the trench? Length of vegetative filter for overflow Number of observation wells Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Depth of naturally occuring soil above SHWT Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Trench wrapped with geotextile fabric? Pretreatment device provided 28.75 fmsl Raise basin bottom, Must be at least 2-ft above SHWT 30.25 fmsl 30.50 fmsl 76.00 ft 24.00 ft 1.75 ft OK ac-in N/A ft OK 1 OK 25.00 ft OK 1,000.00 ft OK N/A ft OK N/A ft OK 000 ft Minimum of atleast 1-ft of naturally occuring soil above shwt N/A (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y Wet Pond Form SW401-Infiltration Trench-Rev.4 Parts I. & il. Design Surnmary, Page 2 of 2 Permit No. (to be provided by OWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. _MT_ _C-6-C-8_ 1. Plans (l" 50' or larger) of the entire site showing: Design at ultimate build -out, - Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Trench dimensions, Pretreatment system, High flow bypass system, Maintenance access, - Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. __MT__ _ __D-1_ 2. Partial plan (1" = 30' or larger) and details for the infiltration trench showing: Bypass structure, Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. —MT—. 3. Section view of the infiltration trench (1" 20' or larger) showing: Pretreatment and treatment areas, and Inlet and outlet structures. _MT_ 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. _MT__ _Appendix_ 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. MT_ _SW-2, D-1_ 6. A construction sequence that shows how the infitiration basin will be protected from sediment until the entire drainage area is stabilized. _MT _Appendix_ 7. The supporting calculations. _MT_ _Appendix_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. _MT_ _Appendix_ 9. A copy of the deed restrictions (if required). Form SW401--Infiltration Trench-Rev.4 Part III. Required Items Checklist, Page 3 of 3 Permit No. (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. if the applicant has designated an agent, the agent may initial below.lf a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. MT C-6-C-8_ 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), - Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 3. Section view of the wet detention basin (1" 20' or larger) showing: - Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. _MT-SW-2 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. MT Appendix_ 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. _MT SW-2_ 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. _MT Appendix_ 7. The supporting calculations. MT Appendix_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. _MT Appendix_ 9. A copy of the deed restrictions (if required). _MT Appendix_ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 18 of 18 Hydraflow Table of Contents 190705 - Stormwater Ponds.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Friday, 07 / 5 / 2019 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 2 - Year SummaryReport ......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, Dekalb, Pre South...................................................................................... 4 Hydrograph No. 2, Dekalb, Pre North...................................................................................... 5 Hydrograph No. 3, Dekalb, Post to Pond 1.............................................................................. 6 Hydrograph No. 4, Dekalb, Post to Pond 2.............................................................................. 7 Hydrograph No. 5, Dekalb, Post to Pond 3.............................................................................. 8 Hydrograph No. 6, Dekalb, Pond Bypass South...................................................................... 9 Hydrograph No. 7, Dekalb, Pond Bypass North..................................................................... 10 Hydrograph No. 8, Reservoir, Out Pond 1............................................................................. 11 PondReport - Pond 1........................................................................................................ 12 Hydrograph No. 9, Reservoir, Out Pond 2............................................................................. 13 PondReport - Pond 2........................................................................................................ 14 Hydrograph No. 10, Reservoir, Out Pond 3........................................................................... 15 PondReport - Pond 3........................................................................................................ 16 Hydrograph No. 11, Combine, Post Combined South............................................................ 17 Hydrograph No. 12, Combine, Post Combined North............................................................ 18 10 Year SummaryReport ....................................................................................................................... HydrographReports................................................................................................................. 19 20 Hydrograph No. 1, Dekalb, Pre South.................................................................................... 20 Hydrograph No. 2, Dekalb, Pre North.................................................................................... 21 Hydrograph No. 3, Dekalb, Post to Pond 1............................................................................ 22 Hydrograph No. 4, Dekalb, Post to Pond 2............................................................................ 23 Hydrograph No. 5, Dekalb, Post to Pond 3............................................................................ 24 Hydrograph No. 6, Dekalb, Pond Bypass South.................................................................... 25 Hydrograph No. 7, Dekalb, Pond Bypass North..................................................................... 26 Hydrograph No. 8, Reservoir, Out Pond 1............................................................................. 27 Hydrograph No. 9, Reservoir, Out Pond 2............................................................................. 28 Hydrograph No. 10, Reservoir, Out Pond 3........................................................................... 29 Hydrograph No. 11, Combine, Post Combined South............................................................ 30 Hydrograph No. 12, Combine, Post Combined North............................................................ 31 100 - Year Surnmary Report..::............................................................ 32 HydrographReports................................................................................................................. 33 Hydrograph No. 1, Dekalb, Pre South.................................................................................... 33 Hydrograph No. 2, Dekalb, Pre North.................................................................................... 34 Hydrograph No. 3, Dekalb, Post to Pond 1............................................................................ 35 Hydrograph No. 4, Dekalb, Post to Pond 2............................................................................ 36 Hydrograph No. 5, Dekalb, Post to Pond 3............................................................................ 37 Hydrograph No. 6, Dekalb, Pond Bypass South.................................................................... 38 Contents continued... 190705 - Stormwater Ponds.gpw Hydrograph No. 7, Dekalb, Pond Bypass North..................................................................... 39 Hydrograph No. 8, Reservoir, Out Pond 1............................................................................. 40 Hydrograph No. 9, Reservoir, Out Pond 2............................................................................. 41 Hydrograph No. 10, Reservoir, Out Pond 3........................................................................... 42 Hydrograph No. 11, Combine, Post Combined South............................................................ 43 Hydrograph No. 12, Combine, Post Combined North............................................................ 44 IDFReport .................................................................................................................. 45 I Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Ob 0 Legend IV HXIL Origin Description 1 Dekalb Pre South 2 Dekalb Pre North 3 Dekalb Post to Pond 1 4 Dekalb Post to Pond 2 11 5 Dekalb Pust to Purrd 3 R npk.aib Pond Bypass South 1 7 Dekalb Pond Bypass North 8 Reservoir Out Pond 1 9 Reservoir Out Pond 2 10 Reservoir Out Pond 3 11 Combine Post Combined South 12 Combine Post Combined North Project: 190705 - Stormwater Ponds.gpw Friday, 07 / 5 / 2019 Hydrograph Return Period RPFPRydrographsExtension for AutoCAD® Civil 3D®2018byAutodesk,Inc. v2018.3 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Dekalb ------ ----- 5.389 ---- ---- 7.555 ---- ------ 11.13 Pre South 2 Dekalb ----- ----- 3.411 ---- --- 4.781 -- ------ 7.045 Pre North i 3 Dekalb - - 55.74 ----- - 72.38 --- ------- 98.56 Post to Pond 1 4 Dekalb ------ ----- 15.41 -- --- 20.01 ----- ------- 27.25 Post to Pond 2 5 Dekalb ------ ----- 19.39 --- --- 25.17 ---- --- --- 34.28 Post to Pond 3 6 Dekalb ----- ----- 2.081 ---- ---- 2.742 ----- ----- 3,751 Pond Bypass South 7 Dekalb ----- ---- -- 0.517 ---- -- 0.672 ----- ----- 0.915 Pond Rvnass North 8 Reservoir 3 ---- -- 0.529 ----- ---- 0.613 ----- — --- 0.729 Out Pond 1 9 Reservoir 4 ------- 0.349 ---- ----- 0.398 --- --- - 0.465 Out Pond 2 10 Reservoir 5 ------- 0.413 ----- ------ 0.472 ----- 0.551 Out Pond 3 11 Combine 6, 8, ------- 2.609 ---- ------ 3.355 ------ ---- - 4.480 Post Combined South 12 Combine ' " '" ----- 1.058 ----- ----- 1.306 ----- 1.660 Post Combined North Proj. file: 190705 - Stormwater Ponds.gpw Wednesday, 07 / 24 / 2019 2-YEAR 24-HOUR STORM EVENT Hydrograph Summary Repo rlydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Dekalb 1 225 30,411 1 — Pre South 5.389 2 Dekalb 3.411 1 225 19,246 Pre North 55.74 3 Dekalb 1 25 50,002 - — - Post to Pond 1 4 Dekalb 15.41 1 25 13,824 ------ Post to Pond 2 5 Dekalb 19.39 1 25 17,389 ---- Post to Pond 3 6 Dekalb 2.081 1 50 3,733 ---- Pond Bypass South 7 Dekalb 0.517 1 25 464 --- Pond Bypass North 8 Reservoir 0.529 1 50 42,490 30.00 49,157 Out Pond 1 9 Reservoir 0.349 1 49 13,737 30.19 13,223 Out Pond 2 10 Reservoir 0.413 1 49 17,262 5 30.21 16,680 Out Pond 3 11 Combine 1 50 46,223 6, 8, ----- Post Combined South 2.609 12 Combine 1.058 1 25 31,463 7, 9, 10, -- Post Combined North 190705 - Stormwater Ponds.gpw Return Period: 2 Year Wednesday, 07 / 24 / 2019 Hydrograph Repold Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2018 by Autodesk, Inc. v2018.3 Hyd. No. 1 Pre South 3 Wednesday, 07 / 24 / 2019 Hydrograph type = Dekalb Peak discharge = 5.369 cfs Storm frequency = 2 yrs Time to peak = 225 min Time interval = 1 min Hyd. volume = 30,411 cuft Drainage area = 13.750 ac Runoff coeff. = 0.16* Intensity = 2.450 in/hr Tc by User = 45.00 min OF Curve = Swansboro1.IDF Asc/Rec limb fact = n/a * Composite (Area/C) = [(13.550 x 0.15) + (0.200 x 0.95)] / 13.750 Q (cfs) 6.00 M 4.00 Ow rM 1.00 0.00 --J. 0 Pre South Hyd. No. 1 -- 2 Year 60 120 180 240 300 Hyd No. 1 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 ' 0.00 360 420 480 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 2 Pre North 4 Wednesday, 07 / 24 / 2019 Hydrograph type = Dekalb Peak discharge = 3.411 cfs Storm frequency = 2 yrs Time to peak = 225 min Time interval = 1 min Hyd. volume = 19,246 cult Drainage area = 6.630 ac Runoff coeff. = 0.21* Intensity = 2.450 in/hr Tc by User = 45.00 min OF Curve = Swansborol.IDF Asc/Rec limb fact = n/a * Composite (Area/C) = [(6.130 x 0.15) + (0.500 x 0.95)] / 6.630 Q (cfs) 4.00 r M 1.00 0.00 ' 0 60 — Hyd No. 2 Pre North Hyd. No. 2 -- 2 Year 120 180 240 300 360 420 Q (cfs) 4.00 3.00 2.00 1.00 —� 0.00 480 Time (min) Hydrograph Report 5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 3 Post to Pond 1 Hvdrograph type = Dekalb Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 10.230 ac Runoff coeff. Intensity = 6.897 in/hr Tc by User OF Curve = Swansborol.IDF Asc/Rec limb fact * Composite (Area/C) = [(2.070 x 0.15) + (8.160 x 0.95)] / 10.230 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 Post to Pond 1 Hyd. No. 3 -- 2 Year Wednesday, 07 / 24 / 2019 = 55.74 r_.fs = 25 min = 50,002 cuft = 0.79* = 5.00 min = n/a Q (cfs) 60.00 50.00 30.00 20.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 — Hyd No. 3 Time (min) Hydrograph Report 6 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 4 Post to Pond 2 Hydrograph type = Dekalb Peak discharge = 15.41 cfs Storm frequency = 2 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 13,824 cuft Drainage area = 2.940 ac Runoff coeff. = 0.76* Intensity = 6.897 in/hr Tc by User = 5.00 min OF Curve = Swansboro1.IDF Asc/Rec limb fact = n/a * Composite (Area/C) = [(2.250 x 0.95) + (0.690 x 0.15)] / 2.940 Q (cfs) 18.00 15.00 12.00 •M . 11111111 Post to Pond 2 Hyd. No. 4 -- 2 Year Q (cfs) 18.00 15.00 12.00 . 11, 3.00 0.00 Ir 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hyd No. 4 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 5 Post to Pond 3 Hydrograph type = Dekalb Peak discharge = 19.39 cfs Storm frequency = 2 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 17,389 cult Drainage area = 3.650 ac Runoff coeff. = 0.77* Intensity = 6.897 in/hr Tc by User = 5.00 min OF Curve = Swansborol.IDF Asc/Rec limb fact = n/a * Composite (Area/C) = [(2.830 x 0.95) + (0.820 x 0.15)] / 3.650 Q (cfs) 21.00 18.00 15.00 12.00 .M 3.00 Post to Pond 3 Hyd. No. 5 -- 2 Year Q (cfs) 21.00 18.00 15.00 12.00 M M 3.00 0.00 W I I I I I I I I I I I I I I I I 1 I I I I I 1 I N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 -- - Hyd No. 5 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil MOD 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 6 Pond Bypass South Hydrograph type = IDekalb Peak discharge = 2.081 cfs Storm frequency = 2 yrs Time to peak = 50 min Time interval = 1 min Hyd. volume = 3,733 cult Drainage area = 2.500 ac Runoff coeff. = 0.15 Intensity = 5.549 in/hr Tc by User = 10.00 min OF Curve = Swansboro1.IDF Asc/Rec limb fact = n/a Q (cfs) 3.00 2.00 1.00 0.00 16, 1' 0 10 20 Hyd No. 6 Pond Bypass South Hyd. No. 6 -- 2 Year 30 40 50 60 70 80 Q (cfs) 3.00 2.00 1.00 :211 0.00 90 100 Time (min) Hydrograph Report 9 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 7 Pond Bypass North Hydrograph type = Dekalb Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.500 ac Runoff coeff. Intensity = 6.897 in/hr Tc by User OF Curve = Swansboro1.IDF Asc/Rec limb fact Wednesday, 07 / 24 / 2019 = Q_517 r_.fs, = 25 min = 464 tuft = 0.15 = 5.00 min = n/a Pond Bypass North Q MS) Hyd. No. 7 -- 2 Year Q (Cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 — Hyd No. 7 Time (min) Hydrograph Report 10 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 8 Out Pond 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 3 - Post to Pond 1 Max. Elevation Reservoir name = Pond 1 Max. Storage Storage Indication method used. 50.00 40.00 30.00 20.00 10.00 0.00 0 300 — Hyd No. 8 M. Out Pond 1 Hyd. No. 8 -- 2 Year Wednesday, 07 / 24 / 2019 = 0.529 cfs = 50 min = 42,490 tuft = 30.00 ft = 49,157 tuft Q (cf.. 60.0C 50A 40.0C 30.0C 20.0C 10.0C 0.00 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 3 1.Total storage used = 49,157 cuff Time (min) Pond Report 11 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Pond No.1 - Pond 1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation 29.08 ft Stage / Storage Table :Stage (t) Elevation (ft) Contour area (sqft) Incr. Stoi age (cuft) Tutat storage (cuft) 0.00 29.08 49,637 0 0 0.92 30.00 57,687 49,318 49,318 1.93 31.01 61,859 60,352 109,670 2.92 32.00 65,771 63,161 172,831 3.17 32.25 76,008 17,705 190,536 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) = 18.00 5.00 Inactive 0.00 Crest Len (ft) = 24.00 20.65 Inactive 0.00 Span (in) 18.00 5.00 18.00 0.00 Crest El. (ft) = 30.97 31.54 30.75 0.00 No. Barrels 1 1 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 29.03 29.08 30.00 0.00 Weir Type = 1 Ciplti Rect --- Length (ft) = 157.00 0.00 0.00 0.00 Multi -Stage = Yes No Yes No Slope (%) = 0.68 0.00 0.00 n/a N-Value - .013 .013 .013 n/a Orifice Coeff. 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D ExHi User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 29.08 0.00 0.00 0.00 -- 0.00 0.00 0.00 -- 0.000 0.92 49,318 30.00 0.55 is 0.53 is 0.00 -- 0.00 0.00 0.00 --- 0.530 1.93 109,670 31.01 1.43 is 0.79 is 0.00 --- 0.64 0.00 0.00 --- --- -- 1.429 2.92 172,831 32.00 10.84 oc 0.04 is 0.00 10.69 s 21.45 0.00 - --- 32.18 3.17 190,536 32.25 11.36 oc 0.03 is 0.00 11.20 s 41.14 0.00 --- --- 52.37 Hydrograph Report 12 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 ! 2019 Hyd. No. 9 Out Pond 2 -!ydrograph. type =Reservoir Peak discharge = 0.349 cfs Storm frequency = 2 yrs Time to peak = 49 min Time interval = 1 min Hyd, volume = 13,737 cult Inflow hyd. No. = 4 - Post to Pond 2 Max. Elevation = 30.19 ft Reservoir name = Pond 2 Max. Storage = 13,223 cuft Storage Indication method used. Out Pond 2 Q (Cfs) Hyd. No. 9 -- 2 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 6 3.00 3.00 i 0.00 aim 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) — Hyd No. 9 Hyd No. 4 _ Total storage used = 13,223 cuft Pond Report 13 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Pond No. 2 - Pond 2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 29.36 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 29.36 0.64 30.00 1.64 31.00 2.39 31.75 Contour area (sqft) 14,123 16,714 19,105 20,826 Incr. Storage (curt) 0 9,855 17,894 14,968 Total storage (cufY) 0 9,855 27,750 42,718 Wednesday, 07 / 24 / 2019 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 1.75 0.00 0.00 Crest Len ft = 24.00 Inactive 0.00 0.00 Span (in) = 15.00 1.75 0.00 0.00 Crest El. (ft) = 31.19 31.25 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 29.28 29.36 0.00 0.00 Weir Type = 1 Ciplti --- --- Length(ft) = 237.71 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.60 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions 0c) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cis cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 29.36 0.00 0.00 --- 0.00 0.00 -- - --- 0.000 0.64 9,855 30.00 0.06 is 0.06 is 0.00 0.00 -- --- 0.303 1.64 27,750 31.00 0.10 is 0.10 is 0.00 0.00 0.503 2.39 42,718 31.75 6.06 oc 0.01 is 6.06 s 0.00 -- 29.35 Hydrograph Report 14 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 10 Out Pond 3 Hydrogranh type = Reservoir Peak discharge = 0.413 cfs Storm frequency = 2 yrs Time to peak = 49 min Time interval = 1 min Hyd. volume = 17,262 cuft Inflow hyd. No. = 5 - Post to Pond 3 Max. Elevation = 30.21 ft Reservoir name = Pond 3 Max. Storage = 16,680 cuft Storage Indication method used. 18.00 15.00 12.00 • II WE 3.00 0.00 0 240 480 - Hyd No. 10 720 Out Pond 3 Hyd. No. 10 -- 2 Year Q (cfs) 21.00 18.00 15.00 12.00 If 1 M E4 0.00 960 1200 1440 1680 1920 2160 2400 2640 2880 Time (min) Hyd No. 5 Total storage used = 16,680 cuft Pond Report 15 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Pond No. 3 - Pond 3 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation 29.16 ft Stage / Storage Table Stage (ft) Elevation (a) 0.00 29.16 0.84 30.00 1.84 31.00 2.34 31.50 2.84 32.00 Contour area (sgft) 14,318 16,780 17,790 18,175 19,352 Incv. Storage (tuft) 0 13,046 17,281 8,990 9,379 Culvert / Orifice Structures Weir Structures Total storage (cult) 0 13,046 30,327 39,317 48,696 [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 2.00 0.00 0.00 Crest Len (ft) = 24.00 Inactive Inactive 0.00 Span (in) = 15.00 2.00 0.00 0.00 Crest El. (ft) = 31.12 30.70 31.50 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 29.05 29.16 0.00 0.00 Weir Type = 1 Rect Rect --- Length (ft) = 248.19 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 0.90 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfii User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs efs efs cfs cfs 0.00 0 29.16 0.00 0.00 --- 0.00 0.00 0.00 --- -- 0.000 0.84 13,046 30.00 0.09 is 0.09 is -- 0.00 0.00 0.00 --- --- --- 0.365 1.84 30,327 31.00 0.14 is 0.14 is 0.00 0.00 0.00 -- -- --- 0.557 2.34 39,317 31.50 6.78 oc 0.01 is -- 6.76 s 0.00 0.00 -- -- --- 27.10 2.84 48,696 32.00 7.27 oc 0.00 is - 7.26 s 0.00 0.00 -- -- - 28.34 Hydrograph Report 16 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 11 Post Combined South Hydrograph type = Combine Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyds. = 6, 8 Contrib. drain. area 2.00 1.00 M Post Combined South Hyd. No. 11 -- 2 Year 300 600 900 1200 1500 1800 Hyd No. 11 Hyd No. 6 — Hyd No. 8 Wednesday, 07 / 24 / 2019 = 2.609 cfs = 50 min = 46,223 tuft = 2.500 ac 2100 2400 2700 Q (cf., 3.00 2.00 1.00 0.00 3000 Time (min) Hydrograph Report 17 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 12 Post Combined North Hydrograph type = Combine Peak discharge = 1.056 cfs Storm frequency = 2 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 31,463 cuft Inflow hyds. = 7, 9, 10 Contrib. drain. area = 0.500 ac 1.00 240 480 720 Hyd No. 12 Post Combined North Hyd. No. 12 -- 2 Year 960 1200 1440 1680 Hyd No. 7 - Hyd No. 9 1920 2160 2400 - Hyd No. 10 Q (cfs) 2.00 1.00 0.00 2640 Time (min) 10-YEAR 24-HOU R STORM EVENT 18 Hydrograph Summary Repo rlydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Dekalb 1 225 42,634 ----- --- Pre South 7.555 2 Dekalb 4.781 1 225 26,982 ---- ---- Pre North 72.38 3 Dekalb 1 25 64,929 ----- ---- Post to Pond 1 4 Dekalb 20.01 1 25 17,951 ---- ----- Post to Pond 2 5 Dekalb 25.17 1 25 22,580 ---- ---- Post to Pond 3 6 Dekalb 2.742 1 50 4,919 -- — Pond Bypass South 7 Dekalb 0.672 1 25 603 --- --- Pond Bypass North 8 Reservoir 0.613 1 50 55,701 3 30.24 63,915 Out Pond 1 9 Reservoir 0.398 1 49 17,837 4 30.41 17,248 Out Pond 2 10 Reservoir 0.472 1 49 22,411 5 30.50 21,75( Out Pond 3 11 Combine 1 50 60,621 6, 8, ---- Post Combined South 3.355 12 Combine 1.306 1 25 40,850 7, 9, 10, ----- Post Combined North 190705 - Stormwater Ponds.gpw Return Period: 10 Year Wednesday, 07 / 24 / 2019 19 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 1 Pre South Hydrograph type = Dekalb Peak discharge = 7.555 cfs Storm frequency = 10 yrs Time to peak = 225 min Time interval = 1 min Hyd. volume = 42,634 cuft Drainage area = 13.750 ac Runoff coeff. = 0.16* Intensity = 3.434 in/hr Tc by User = 45.00 min OF Curve = Swansborol.IDF Asc/Rec limb fact = n/a * Composite (Area/C) = [(13.550 x 0.15) + (0.200 x 0.95)] / 13.750 Q (cfs) 8.00 N. 101111 4.00 2.00 !WIT Pre South Hyd. No. 1 -- 10 Year Q (cfs) 8.00 6.00 4.00 2.00 0 60 120 180 240 300 360 420 480 — Hyd No. 1 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 2 Pre North Hydrograph type = Dekalb Peak discharge = 4.781 cfs Storm frequency = 10 yrs Time to peak = 225 min Time interval = 1 min Hyd. volume = 26,982 cult Drainage area = 6.630 ac Runoff coeff. = 0.21 * Intensity = 3.434 in/hr Tc by User = 45.00 min OF Curve = Swansborol .IDF Asc/Rec limb fact = n/a * Composite (Area/C) = [(6.130 x 0.15) + (0.500 x 0.95)] / 6.630 Q (cfs) 5.00 4.00 3.00 2.00 1.00 M, Pre North Hyd. No. 2 -- 10 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 IIIIIIIA911 0 60 120 180 240 300 360 420 480 Hyd No. 2 Time (min) Hydrograph Report 21 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 3 Post to Pond 1 Hydrograph type = Dekalb Peak discharg Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 10.230 ac Runoff coeff. Intensity = 8.957 in/hr Tc by User OF Curve = Swansborol .IDF Asc/Rec limb fact * Composite (Area/C) = [(2.070 x 0.15) + (8.160 x 0.95)] / 10.230 Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 Post to Pond 1 Hyd. No. 3 -- 10 Year Wednesday, 07 / 24 / 2019 = 72.38 Ofc = 25 min = 64,929 cuft = 0.79* = 5.00 min = n/a Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 w I I I I I I I I I I I I I I I I I I 1 I I I I I � 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 -- Hyd No. 3 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 4 Post to Pond 2 Hydrograph type = Dekalb Peak discharge = 20.01 cfs Storm frequency = 10 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 17,951 cuft Drainage area = 2.940 ac Runoff coeff. = 0.76* Intensity = 8.957 in/hr Tc by User = 5.00 min OF Curve = Swansborol.IDF Asc/Rec limb fact = n/a " Composite (Area/C) = [(2.250 x 0.95) + (0.690 x 0.15)1 / 2.940 Q (cfs) 21.00 18.00 15.00 12.00 3.00 Post to Pond 2 Hyd. No. 4 -- 10 Year Q (cfs) 21.00 18.00 15.00 12.00 • E1 3.00 0.00 --r I I I I 1 1 I 1 I 1 I I 1 I 1 I I I I I 1 1 I I �w 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 Hyd No. 4 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 5 Post to Pond 3 Hydrograph type = Dekalb Peak discharge = 25.17 cfs Storm frequency = 10 yrs Time to peak = 25 min Time interval = 1 min Hyd. volume = 22,580 tuft Drainage area = 3.650 ac Runoff coeff. = 0.77* Intensity = 8.957 in/hr Tc by User = 5.00 min OF Curve = Swansborol.IDF Asc/Rec limb fact = n/a Composite (Area/C) = [(2.830 x 0.95) + (0.820 x 0.15)] / 3.650 Q (cfs) 28.00 24.00 20.00 12.00 4.00 Post to Pond 3 Hyd. No. 5 -- 10 Year 100 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 - Hyd No. 5 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil MOD 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 6 Pond Bypass South Hydrograph type = Dekalb Peak discharge = 2.742 cfs Storm frequency = 10 yrs Time to peak = 50 min Time interval = 1 min Hyd. volume = 4,919 cuft Drainage area = 2.500 ac Runoff coeff. = 0.15 Intensity = 7.312 in/hr Tc by User = 10.00 min OF Curve = Swansboro1.IDF Asc/Rec limb fact = n/a Q (cfs) 3.00 1.00 M Pond Bypass South Hyd. No. 6 -- 10 Year i 10 20 30 40 50 60 70 80 Hyd No. 6 Q (cfs) 3.00 2.00 1.00 '� 0.00 90 100 Time (min) Hydrograph Report 25 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 7 Pond Bypass North H%Irirograph type = Dekalb Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.500 ac Runoff coeff. Intensity = 8.957 in/hr Tc by User OF Curve = Swansborol.IDF Asc/Rec limb fact Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 Pond Bypass North Hyd. No. 7 -- 10 Year Wednesday, 07 / 24 / 2019 = 0.672 cfr = 25 min = 603 cult = 0.15 = 5.00 min = n/a Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 8 Out Pond 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 3 - Post to Pond 1 Max. Elevation Reservoir name = Pond 1 Max. Storage Storage Indication method used Q (cfs) 80.00 70.00 - 1I 50.00 40.00 30.00 20.00 10.00 26 Wednesday, 07 / 24 / 2019 = 0.613 cfs = 50 min = 55,701 cuft = 30.24 ft = 63,915 tuft Q (cfi 80.0C 70.0( 60A 50.0( 40.0( 30.0( 20.0C 10.0C 0.00 - -- 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 8 — Hyd No. 3 Total storage used = 63,915 cuft Hydrograph Report 27 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 9 Out Pond 2 Hydrograph type = ReseR/oir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 4 - Post to Pond 2 Max. Elevation Reservoir name = Pond 2 Max. Storage Storage Indication method used. ti : 1 1 15.00 12.00 • OX . OU 3.00 240 480 Hyd No. 9 Out Pond 2 Hyd. No. 9 -- 10 Year Wednesday, 07 / 24 / 2019 = 0.398 cfs = 49 min = 17,837 cuft = 30.41 ft = 17,248 cult Q (cfs) 21.00 18.00 15.00 12.00 '• X M 3.00 0.00 720 960 1200 1440 1680 1920 2160 2400 2640 2880 Time (min) Hyd No. 4 Total storage used = 17,248 cuft Hydrograph Report 28 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 10 Out Pond 3 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 5 - Post to Pond 3 Max. Elevation Reservoir name = Pond 3 Max. Storage Storage Indication method used Q (cfs) 28.00 24.00 rM 16.00 12.00 M 4.00 M 300 600 Hyd No. 10 Out Pond 3 Hyd. No. 10 -- 10 Year Wednesday, 07 124 / 2019 = 0.472 cfs = 49 min = 22,411 cuft = 30.50 ft = 21,750 cult Q (cf.. 28.00 24.0C 20.0C 16.0( 12.0( 4.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 - Hyd No. 5 Total storage used = 21,750 cuft Time (min) Hydrograph Report 29 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 11 Post Combined South Hydrograph type = Combine Peak discharge = 3.355 cfs Storm frequency = 10 yrs Time to peak = 50 min Time interval = 1 min Hyd. volume = 60,621 tuft Inflow hyds. = 6, 8 Contrib. drain. area = 2.500 ac Post Combined South Q (cfs) Hyd. No. 11 -- 10 Year 4.00 RM r M 1.00 1MTa Q (cf.- 4.00 3.00 2.00 1.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 11 - Hyd No. 6 Hyd No. 8 Hydrograph Report 30 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 12 Post Combined North Hydrograph type = Combine Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyds. = 7, 9, 10 Contrib. drain. area 1.00 Wednesday, 07 / 24 12019 = 1.305 cfs = 25 min = 40,850 cult = 0.500 ac Post Combined North Hyd. No. 12 -- 10 Year 240 480 720 960 1200 1440 1680 1920 2160 2400 Hyd No. 12 Hyd No. 7 - Hyd No. 9 Hyd No. 10 Q (cfs) 2.00 1.00 0.00 2640 Time (min) 31 Hydrograph Summary Repo rlydraflowHydrographsExtension for AutoCAD® Civil 3D®2018byAutodesk,Inc. v2018.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Dekalb 11.13 1 225 62,820 --- ------ Pre South 2 Dekalb 7.045 1 225 39,756 ---- -- -- Pre North 3 Dekalb 98.56 1 25 88,408 ----- -- ------ Post to Pond 1 4 Dekalb 27.25 1 25 24,443 ---- --- --- Post to Pond 2 5 Dekalb 34.28 1 25 30,745 ---- --- --- Post to Pond 3 6 Dekalb 3.751 1 50 6,730 ---- ---- — - - Pond Bypass South 7 Dekalb 0.915 1 25 820 ---- ---- --- Pond Bypass North 8 Reservoir 0.729 1 50 75,587 3 30.63 87,164 Out Pond 1 9 Reservoir 0.465 1 49 24,277 4 30.77 23,603 Out Pond 2 10 Reservoir 0.551 1 49 30,494 5 30.97 29,751 Out Pond 3 ----- 11 Combine 4.480 1 50 82,317 6, 8, — Post Combined South 12 Combine 1.660 i 1 25 55,592 7, 9, 10, ----- ---- Post Combined North 190705 - Stormwater Ponds.gpw Return Period: 100 Year Wednesday, 07 / 24 / 2019 Hydrograph Report 39 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 8 Out Pond 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 3 - Post to Pond 1 Max. Elevation Reservoir name = Pond 1 Max. Storage Storage Indication method used. Q (cfs) 100.00 :1 11 •1 11 40.00 20.00 1 Out Pond 1 Hyd. No. 8 -- 100 Year 300 600 900 1200 Hyd No. 8 Hyd No. 3 Wednesday, 07 / 24 12019 = 0.729 ffs = 50 min = 75,587 cult = 30.63 ft = 87,164 cuft TOP OF POND = 32.25' FREEBOARD AT 100-YR = 1.62' Q (cfi 1500 1800 2100 2400 2700 Total storage used = 87,164 cuft a N11A111111111111111111 80.00 60.01C 40.0C 20.00 a-�a- 3000 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Hyd. No. 9 Out Pond 2 Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 4 - Post to Pond 2 Max. Elevation Reservoir name = Pond 2 Max. Storage Storage Indication method used. 40 Wednesday, 07 / 24 / 2019 = 0.465 cfs = 49 min = 24,277 cult = 30.77 ft = 23,603 cult Hydrograph Report 41 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Wednesday, 07 / 24 / 2019 Hyd. No. 10 Out Pond 3 Hydrograph type = Reservoir Peak discharge = 0.551 cfs Storm frequency = 100 yrs Time to peak = 49 min Time interval = 1 min Hyd. volume = 30,494 cuft Inflow hyd. No. = 5 - Post to Pond 3 Max. Elevation = 30.97 ft Reservoir name = Pond 3 Max. Storage = 29,751 cuft Storage Indication method used. Out Pond 3 TOP OF POND = 32.00' FREEBOARD AT 100-YR = 1.03' Hydraflow Rainfall Report 45 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v2018.3 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 ----- 2 86.6430 12.8000 0.8789 --- 3 0.0000 0.0000 0.0000 ------ 5 0.0000 0.0000 0.0000 ---- 10 88.8151 12.4000 0.8031 -- --- 25 78.2208 11.0000 0.7384 50 71.0036 9.7000 0.6904 ---- 100 69.6549 9.2000 0.6567 ---- File name: Swansborol.IDF Intensity = B / (Tc + D)"E Return Intensity Values (in/hr) A.-�J Friday, 07 / 5 / 2019 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 6.90 5.55 4.66 4.03 3.56 3.19 2.89 2.65 2.45 2.28 2.13 2.00 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 8.96 7.31 6.22 5.44 4.84 4.38 4.00 3.69 3.43 3.21 3.02 2.85 25 10.10 8.26 7.05 6.20 5.55 5.04 4.63 4.29 4.00 3.76 3.55 3.36 50 11.10 9.07 7.76 6.83 6.13 5.59 5.15 4.79 4.48 4.22 3.99 3.79 100 12.20 10.00 8.59 7.60 6.85 6.26 5.79 5.39 5.06 4.78 4.53 4.31 Tc = time in minutes. Values may exceed 60. Precio. file name: H:12013\NCC138078\Technical\Storrnwater\Swanshnro_ncn Storm Rainfall Precipitation Table (in) Distribution I-yF 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.65 4.44 0.00 0.00 6.86 8.53 9.98 11.60 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BOHLER ENGINEERING NC, PLLC 1927 South Tryon Street Suite 310, Charlotte, NC 28203 Professional Engineering Services Telephone: (980)272-3400 Fax: (980)272-3401 LETTER OF TRANSMITTAL VIA: FedEx TO: NCDEQ RE: Submittal 127 Cardinal Drive Ext. Wilmington, NC 28405 _• ATTN: Christine Hall DATE: March 2, 2020 JOB NO: NCC 13 8078 IMAR 3 102o WE ARE SENDING YOU Sho drawin s ❑ p g Copy of letter ®Attached ❑Prints Change order COPIES DESCRIPTION Stormwater Technical Memo Signed As Built Survey These Are Transmitted: ❑ For approval [-]For your use ®As requested ® For review and comment ❑Approved as submitted ❑Approved as noted ❑ Returned for corrections REMARKS: If you have any questions or require additional information, please do not hesitate to contact this office at (980) 272-3400. COPY TO: SIGNED: 40"Mmft1b Michael Theberge, P.E. Project Manager