HomeMy WebLinkAboutNCG140078_DMR_20210128PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
4 QTR
0 Orig — State
0 Copy — State
0 Copy — Plant
0 Copy - File
CERTIFICATE OF COVERAGE NO. NCG 14 0 0 7 8 SAMPLE COLLECTION YEAR: 2020
FACILITY NAME: Chandler Concrete Piedmont - Madison Pit #106 SAMPLE QUARTER: ❑Jan -March ❑April -June ❑Jul -Sept ❑Oct -Dec
PERSON COLLECTING SAMPLES: COUNTY: ROCKINGHAM
CERTIFIED LABORATORY:Pace Analytical Lab #633 PHONE NO. (336) 226-1181
��^ADD TOLISTSERVE? ❑YES ®NO EMAIL:
LIMIT VIOLATIONS? YES ❑ NO ® l -Fp`J'P D DISCHARGING TO CLASS: ❑SA ❑HOW ❑PNA ❑Trout ®Other: C
Part A: Wastewater Monitoring Requirements
FED J 8 2021 OPTIONAL INFO:
Outfall No.
Date Sample
Collected
(mm/dd/yr)
C
I
Type of Wastewater
(VE, RM, MD)z
ENTRAL FILES
WRSEPTION
p
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
Non -Polar
Oil &Grease
using method
1664SGT-HEM5
(mg/L)
Discharge
Duration
(minutes)
Total Flow
(gallons/day)7
-
-
-
6-93,a
303,5
53
(15)b
-
-
1
NO FLOW
VE RM MD
N/A
N/A
N/A
No Discharge this Period -
'If wastewater systems have notdischarged in this quarter —report "No Flow" or "No Discharge" here. Please make sureto markthe sample quarter above.
2 Reportthe abbreviation forthetype of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more
than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to
continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
' TSS limits are 20 mg/L for wastewater discharges to HOW waters,10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to
benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50%of the Summer 7Q10 Flow as per 15A NCAC 02B.0224. Permittees
who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the
discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis.
Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17
Page 1 of 2
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties f%submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date:8/1/2017-06/30/2022
/ z Vz4
(D e)
Last Revised 07/27/17
Page 2 of 2