Loading...
HomeMy WebLinkAbout20060331 Ver 1_Other Documents_20101202BEVERLY EAVES PERDUE GOVERNOR November 28.201O Contract No.: TIP: VVB8E I emon, t: F.A. No.: County: DoeoripUom STATE Of NORTH CAROUNTA DEPARTW-NT OF TRANSPORTATION EUGENE A.CONT`JR. SECUTARY ��� � � � � �`} ��� . ' C201A18 R-2606B 34480.3.GV1 NHF-0311(23) Randolph US-31I Bypass (Future |-74) From North of8R-1820 (Spencer Rd]to DS-220 Results of Sediment Investigation of Wyatt FadowLake Mr, Wyatt �.Fadow 3083Thpmpson Heath Road Sophia, NC 27350 Dear Mr. Farlow� After heavy storms on May 15, 2010 you contacted NCIDOT and NCDENIR about turbid water and silt reaching your lake, We were aware nf the silt loss from the project and had notified the proper agencies and our Roadside Environmental Unit \oinvestigate, The investigation revealed that recoverable silt did migrate downstream from the project approximotg|y90Ofeet. The silt was removed by hand from the stream to that point and the stream was monitored for possible accumulation of sift that could be removed from the system. Minor amounts of silt were beyond this point, but the deposits were not enough to be recovered. A logging operation that was upstream may have also contributed to the film of silt. Very turbid water discolored your lake for several days on some occasions. Dn October 25.20i8. the Beotevhnica Engineering Unit completed a pond sediment investigation atyour property. Attached are the findings and observations uf the investigation. The sediment samples show that all locations have less than half an inch of recent sediment thickness. /\ film ofsediment that iynot retrievable did reach your lake. |n conclusion, NCDOT has investigated the sediment hn your lake and conclude that a thin film did reach your lake. It is improbable that the recent sediments observed in the samples collected from your lake result from construction activities related to the WS-311 Bypass Project. Nn matter the source ufthe sediment |n your lake, itim not feasible turemove the thin film oJ recent sediment. VVn will continue to rnonitor the stream for retrievable deposits from the US-311 Bypass Project until it is stabilized. m,%IuwoADonsnn RESm�NTEN7mcR'S OFFIZ:F P o� BOX `1o* Ay°coopm.wrzrz0w wEEo"s hr��/Ncnoranx/DoH`/ LommIow: 272m3� DRIVE Asoeen"o1wc2z204 Page November 29.2O1O If you have any questions concerning this matter or if this office can be of further assistance please advise. Si �J e ifffi n P Resident Engineer Attachment on: Mr. Tim Johnson, PE ec: Ms, Vickie Davis, PE Mr, Ron Hmncock,PE Mr. Dwayne Lambert MT Mason Herndon, K4r, LewioCuUlnaU File