Loading...
HomeMy WebLinkAbout20211243 Ver 1_Pre-Filing Acknowledgement Email_20210819Strickland, Bev From: laserfiche@ncdenr.gov Sent: Thursday, August 19, 2021 1:20 PM To: ryan.kimberley@dot.gov Cc: Wanucha, Dave Subject: Pre -Filing Meeting Request Acknowledgement - FHWA Project BLRI 2D17, Blue Ridge Pkwy, Replace Laurel Fork Bridge - 20211243 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for FHWA Project BLRI 2D17, Blue Ridge Pkwy, Replace Laurel Fork Bridge that you submitted on (date). The ID number for that project is 20211243, Version 1. Reviewer Contact Information: Reviewer: David Wanucha Reviewer Email: dave.wanucha@ncdenr.gov Reviewing Office: Winston-Salem Regional Office - (336) 776-9800 When you submit your application please upload a copy of the attached document in this email. For internal use only: Transportation Project This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20211243 Version * 1 Winston-Salem Regional Office - (336) 776-9800 Dave Wanucha Pre -Filing Meeting Request submitted 8/17/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Ryan Kimberley ryan.kimberley@dot.gov FHWA Project BLRI 2D17, Blue Ridge Pkwy, Replace Laurel Fork Bridge Federal Land, US Government Ashe Owner Address: Street Address 22001 Loudoun County Parkway Address Line 2 Building E2, Suite 200 City State / Rovince / Region Ashburn VA Fbstal / Zip Code Country 20147 USA Is this a transportation project?* ( Yes r No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* NC SEPAINEPA No 19-0242 Do you know the name of the staff member you would like to request a meeting with? Dave Wanucha Please give a brief project description below and include location information. * The Federal Highway Administration and the National Park Service plan to replace the Laurel Fork Bridge at Milepost 248.9 on the Blue Ridge Parkway in Ashe County. The existing bridge was built in 1939. The bridge spans a creek known locally as Laurel Fork and listed as Cranberry Creek (B,TR,+) by NCDEQ. (36° 23.291'N, 81° 15.603'W) The bridge replacement is being conducted in accordance with the National Environmental Policy Act (NEPA) and other environmental regulations. An Environmental Assessment (EA) was prepared for the undertaking. The EA also included four other bridges that are not included in this Water Quality Certification request. Information about the project was submitted to NCDEQ and the State Clearinghouse. Comments were provided by Dave Wanucha from the NC Division of Water Resources. The comments were included in the NEPA document and incorporated in the project plans. The replacement bridge will be built on the same horizontal and vertical alignment as the existing. There will be no permanent impacts to streams or wetlands, since the abutments and piers are not located within them. Project impacts are no more than minimal, and are related to improvements of the existing agricultural easement that will be used for construction access. An application package has already been sent to the NCDEQ Land Quality Section related to the Trout Buffer Waiver, ESC review, and NPDES. Based on the previous level of coordination with NCDEQ, and a follow up call with David Wanucha on 8/17/2021, FHWA is not requesting an additional meeting. FHWA is also requesting a reduced or waived 30- day waiting period. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 8/17/2021 KA,