Loading...
HomeMy WebLinkAbout20200142 Ver 4_No Written Concurrence_20210819 Carpenter,Kristi From:Ward, Garcy Sent:Thursday, August 19, 2021 2:00 PM To:Johnson, Jay B; Tom Steffens Cc:Lane, Stephen; Bullard, Aaron; Harrell, Stanley L; Lane, Heather C; Blankenship, Andrew; Brittingham, Cathy Subject:RE: B-4484, CAMA Permit 45-20, Minor Modification, temporary construction access Jay, Given that there are no jurisdictional impacts associated with this proposal, a written modification of the 401 is not required. The information you provided is sufficient for our files. However, it is understood that DOT is responsible for any loss of fill material and it’s subsequent removal from jurisdictional areas. Garcy From: Johnson, Jay B <jbjohnson@ncdot.gov> Sent: Thursday, August 19, 2021 1:37 PM To: Tom Steffens <thomas.a.steffens@usace.army.mil>; Ward, Garcy <garcy.ward@ncdenr.gov> Cc: Lane, Stephen <stephen.lane@ncdenr.gov>; Bullard, Aaron <jaaronbullard@ncdot.gov>; Harrell, Stanley L <slharrell1@ncdot.gov>; Lane, Heather C <hclane@ncdot.gov>; Blankenship, Andrew <ablankenship@ncdot.gov> Subject: RE: B-4484, CAMA Permit 45-20, Minor Modification, temporary construction access Tom, Garcy, Could the contractor get started now? Or do we need to hold off until we get your mods issued? Thanks for your consideration. Jay From: Brittingham, Cathy <cathy.brittingham@ncdenr.gov> Sent: Thursday, August 19, 2021 12:53 PM To: Johnson, Jay B <jbjohnson@ncdot.gov> Cc: Lane, Stephen <stephen.lane@ncdenr.gov>; Tom Steffens <thomas.a.steffens@usace.army.mil>; Ward, Garcy <garcy.ward@ncdenr.gov> Subject: B-4484, CAMA Permit 45-20, Minor Modification, temporary construction access Hello, Attached please find a Minor Modification of CAMA Major Permit 45-20 authorizing the following changes to the design for the temporary construction access at the eastern end of the Replacement for Bridge 138: eliminate the previously authorized temporary work platform in areas that are previously authorized as permanently impacted fill areas for the new bridge approach; and replace approximately 80 linear feet of the previously authorized temporary work platform with a temporary fill causeway that is 80 linear feet with a variable width of 30-60 feet in an area that is located outside of waters of the State and outside of the Neuse riparian buffer zone. A paper copy will be sent to NCDOT in Greenville. Please let me or Stephen Lane know if you have any questions or concerns. Sincerely, 1 Cathy Brittingham Cathy Brittingham, Transportation Project Coordinator N.C. Division of Coastal Management (919) 707-9149 phone cathy.brittingham@ncdenr.gov Mailing Address: : c/o DWR Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Physical Address: 512 North Salisbury Street Archdale Building th 12 Floor, Room 1204C Raleigh, NC 27604 Please visit https://deq.nc.gov/about/divisions/coastal-management/ for more information about the N.C. Division of Coastal Management. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2