Loading...
HomeMy WebLinkAbout20211251 Ver 1_ePCN Application_20210819 DWR Division of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1,2021 Ver4.1 Initial Review Has this project met the requirements for acceptance in to the review process?* 6' Yes ✓ No Is this project a public transportation project?* R Yes r No Change only if needed. BIMS#Assigned* Version#* 20211251 1 Is a payment required for this project?* (7 No payment required Reviewing Office* ✓ Fee received Winston-Salem Regional Office-(336)776- ✓ Fee needed-send electronic notification 9800 Select Project Reviewer* Dave Wanucha:eads\djwanucha Information for Initial Review la.Name of project: Collinstown Road Pipe Replacement 1a.Who is the Primary Contact?* Stephanie Braquet lb.Primary Contact Email:* 1c.Primary Contact Phone:* scbraquet@ncdot.gov (336)747-7800 Date Submitted 8/19/2021 Nearest Body of Water Dan River Basin Roanoke Water Classification C Site Coordinates Latitude: Longitude: 36.5378 -80.3501 A. Processing Information County(or Counties)where the project is located: Stokes Is this a NCDMS Project ✓ Yes 6' No Is this project a public transportation project?* ( Yes r No Is this a NCDOT Project?* ( Yes r No (NCDOT only)T.I.P.or state project number: WBS#(?) DF17109.2085013 Pre-Filing Meeting Information Is this a courtesy copy notification?* 6 Yes C- No la.Type(s)of approval sought from the Corps: 7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* C- Yes 6 No lb.What type(s)of permit(s)do you wish to seek authorization? 7 Nationwide Permit(NWP) r Regional General Permit(RGP) r Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? C Yes G No Nationwide Permit(NWP)Number: 03-Maintenance NWP Numbers(for multiple NWPS): 1d.Type(s)of approval sought from the DWR: I7 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: F Yes r No For the record only for Corps Permit: C- Yes s No If.Is this an after-the-fact permit application?* C Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C- Yes R No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C' Yes C No lh.Is the project located in any of NC's twenty coastal counties? CYes RNo 1j.Is the project located in a designated trout watershed? C' Yes 6 No B. Applicant Information Id.Who is applying for the permit? 17 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* ✓ Yes t No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 375 Silas Creek Pkwy Address Line 2 City State/Rovince/Region Winston-Salem North Carolina Fbstal/Zip Code Country 27127 United States 2e.Telephone Number: 2f.Fax Number: (336)747-7800 2g.Email Address:* scbraquet@ncdot.gov C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (d apprcpriate) 1c.Nearest municipality I town: Collinstown 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 alY Slate/Ftovince/Region Postal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Dan River 3b.Water Resources Classification of nearest receiving water:* C 3c. What river basin(s)is your project located in?* Roanoke 3d.Please provide the 12-digit HUC in which the project is located. 030101030104 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project area is a mix of residential and rural. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* C Yes 6 No r Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 4g.List the total estimated linear feet of all existing streams on the property: 4h.Explain the purpose of the proposed project:* During Tropical Storm Zeta on October 29,2020 water overtopped the roadway.The inlet section of the pipe collapsed and deterioted causing erosion of the inlet shoulder.The water that overtopped the roadway caused erosion of the outlet shoulder and what was left of the pipe deterioted and disappeared.The purpose of the project is to repair the damage and replace the pipe. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The stream will be dewatered using the pump around method.The existing 73"x 55"Corrugated Metal Pipe Arch(CMPA)will then be excavated and replaced with 12'11"x 7'6" Aluminum Structural Plate Pipe Arch(ASPPA)with 33'3"x 10'10"prefabricated headwalls.The work will be accomplished using frontend loaders,trackhoes,backhoes,skid steers, trench rollers,sheepfoot rollers.On occasion boom trucks,forklifts,and truck-mounted cranes will be used.Once the pipe is in place,pavers,tack trucks,and rollers are used to complte the shoulder and roadway work. 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* C Yes r No r Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* ✓ Preliminary r Approved r Not Verified r Unknown F N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Agency/Consultant Company: Other: 6. Future Project Plans 6a.Is this a phased project?* ✓ Yes r No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): n Wetlands 17 Streams-tributaries r Buffers n Open Waters r Pond Construction 3.Stream Impacts 3a.Reason for impact(?) 3b.Impact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 Placement of fill Temporary Dewatering UT to Dan River Perennial Corps 22 30 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: O 30 3i.Total stream and ditch impacts: 30 3j.Comments: E. Impact Justification and Mitigation L) 1.Avoidance and Minimization la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The Erosion Control plans for the project have been designed in accordance with Design Standards in Sensitive Watersheds.The proposed pipe will have prefabricated headwalls. 1b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The linear feet of the proposed pipe is less than the linear feet of the existing pipe. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? C Yes ( No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: The proposed pipe is shorter in length than the existing pipe and the impacts are temporary,not permanent.Also,the impacts are below the threshold that would require mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes ( No If no,explain why: The project is not located in the Neuse-Tar Pamlico River Basin. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ( Yes r No Comments: The project is not adding any impervious surfaces and it is not changing the existing stormwater drainage on the roadway. G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ( Yes rNo 1b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* ✓ Yes ( No Comments:* A FEMA compliance spreadsheet was used for this project because the damage was due to a natural disaster and it is being federally funded by FEMA.The spreadsheet contains information regarding structures,location,cultural resources,permit requirements,endangered species,stream classification,wetlands,open waters,etc. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes ( No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes ( No 3b.If you answered"no,"provide a short narrative description. The pipe replacement is only taking place because it was damaged during a natural disaster and it is an emergency repair.There were no plans in place to replace this pipe prior to Tropical Storm Zeta. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes ( Nor N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ( Yes rNo 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ✓ Yes ( No 5d.Is another Federal agency involved?* ( Yes r No r Unknown What Federal Agency is involved? FEMA 5e.Is this a DOT project located within Division's 1-8? ✓ Yes ( No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? ✓ Yes ( No 5g.Does this project involve bridge maintenance or removal? C Yes a No 5h.Does this project involve the construction/installation of a wind turbine(s)?* Cyes allo 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? C Yes a No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Data Explorer 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* C Yes a No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* US Fish and Wildlife Database IPaC 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* C Yes a No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NC Natural Heritage Data Explorer 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-yearfloodplain?* C Yes f No 8c.What source(s)did you use to make the floodplain determination?* FEMA Flood Map Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document 20210720 Collinstown Road-Culvert Replacement plans.pdf 955.98KB vicinity map Collinstown Road.pdf 362.44KB topo map Collinstown Road.pdf 657.34KB Sign_NCDOT-DF170092085013_Pipe_Replacement PCN cover letter.pdf 275.94KB Signed_Cultural_Resources_form_Collinstown Road.pdf 256.15KB survey report Collinstown Road.pdf 4.32MB He must be FCF a f luE Comments Signature * ®By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Stephanie Braquet Signature ftgicutit Ploszlictt Date 8/19/2021