Loading...
HomeMy WebLinkAbout20211248 Ver 1_560222_Surface Water Impacts_2021.07.29_20210816 Highway North Carolina Department of Transportation ¢,,Ho.. z k„, � Stormwater e Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 48207.3.1 TIP No.: B-6012 County(ies): Madison Page 1 of 1 General Project Information WBS Element: 48207.3.1 TIP Number: B-6012 Project Type: Bridge Replacement Date: 8/2/2021 NCDOT Contact: _Mike Calloway Contractor/ Designer: TGS Engineers (Rusty Lassiter) Address: 20 Old 74 Address: 706 Hillsborough Street Asheville, NC 28803 Suite 200 Raleigh, NC 27603 Phone: 828-298-2741 Phone: 919-773-8887 ext. 121 Email: mkcalloway@ncdot.gov Email: rassiter@tgsengineers.com City/Town: Marshall, NC County(ies): Madison River Basin(s): French Broad CAMA County? No Wetlands within Project Limits? No Project Description Project Length (lin. miles or feet): 0.090 miles Surrounding Land Use: Mountainous; Rural Proposed Project Existing Site Project Built-Upon Area (ac.) 0.6 ac. 0.3 ac. Typical Cross Section Description: Two 10.0' paved travel lanes with 2.0' paved shoulders. Two 9.0' paved travel lanes with 2.0' grass shoulders. Annual Avg Daily Traffic (veh/hrlday): Design/Future: Year: Existing: 510 Year: 2019 General Project Narrative: Replacement of Bridge No. 560222 on SR 1151 over Back Branch in Madison County, NC. The proposed 35' long by 24'-10" wide single span bridge would replace the existing (Description of Minimization of Water 22' long by 17'wide single span bridge. The proposed bridge will be relocated +/-32 ft. downstream of the existing bridge. Existing bridge will be removed upon completion of the Quality Impacts) new alignment. Bridge No. 560222 is within the French Broad drainage basin and is not subject to riparian buffers. Since the proposed bridge will be relocated downstream and come in close proximity to the stream, there will be a stream relocation (126 feet in length)from the upstream face of existing bridge to Big Pine Creek. Waterbody Information Surface Water Body(1): Back Branch NCDWR Stream Index No.: 6-108-4 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: N/A Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? IN/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no,justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) WBS Element: 48207.3.1 TIP No.: B-6012 County(ies): Madison Page 2 of 2 Additional Waterbody Information Surface Water Body(2): Big Pine Creek NCDWR Stream Index No.: 6-108 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: N/A Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no,justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) r /f 1 See Sheet 1-A For Index of Sheets STATE T 1 E OF' �O 1�& �Tf'ET C..`R O L I N A STATE STATE PROJECT REFERENCE NO "RR ET 1, L�` 1L L V 1 L 1 LO 1L ND. NRRTs F75 PERMIT DRAWING N.C. B-6012 1 PROJECT 5�`/ DIVISION 0 7 HIGHWAY O J STATE PROl.N0. Pw.PROl.NO. DR9CRIPTION N `/ LOCATION #o os kilo SHEET 1 OF 6 48207.3.1 BRZ-1341(004) PE 1ftoil i'•' as 48207.3.1 BRZ-1341(004) RAN & UTIL. O ® 1 .: t 48207.3.1 BRZ-1341(004) CONST. I 117.,,i ill MADISON CO U1�TY r:1:1 '/ 116$ .2\Niptif Ba kB,a«•..::r 51 LOCATION: BRIDGE NO. 560222 OVER. BACK BRANCH L ,) •"'�: �,; RIGHT OF WAY PLANS V , N ON SR 1151 (BIG PINE ROAD) SUBMITTAL E—XXX L11114 » DATE: XXXXX � Dee TYPE OF WORK: GRADING,DRAINAGE,PAVING,AND STRUCTURE O ,e'''''6 Oe: '"41 — �, VICINITY MAP WETLAND AND SURFACE WATER IMPACTS PERMIT \ J Or" BEGIN BRIDGE o �J,s, o -L- STA. 14�+ 41.2 0 �P,� 4 �, T�� SITE 1 iCb�,p� , ` �\ egcK 7 Zi/'s /ti Js / -° Cy \tea B�iV E��� // 7/ > BEGIN CONSTRUCTION "�° ''� - -- v. ��ly � ��"..i_ce. —Yl— STA. 10 + 90.00 - pf '� , vNc N —L— STA. 11 + 50.00 \lif �,Sj BEGIN PROJECT ..=a4 J —L— STA. 16 + 25.00 B-6012 �,� �°\... END PROJECT 0050 J$ ,Sj .( B-6012 w 0l %./\�� END BRIDGE ,,S/ END CONSTRUCTION ou —L— STA. 14 + 7&8.0 —DR— STA. 11 + 70.00 V W W / OC> N C THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. INCOMPLETE PLANS _+ DO NOT USE FOR R/W ACQUISITION T CLEARING ON THIS PROJECT SHALL BE PERFORMED DOCUMENT NOT CONSIDERED FINAL • TO THE LIMITS ESTABLISHED BY MODIFIED METHOD II. UNLESS ALL SIGNATURES COMPLETED co)S Ell. LNCDOT CONTACT: V I R G I NI A M A B R Y HYDRAULICS GRAPHIC SCALES DESIGN DATA PROJECT LENGTH ENGINEER t0 PRO!F,y PLANS PREPARED BY: PLANS PREPARED FOR: ',� 44 ADT 2017 = 510 1GS TGS ENGINEERS I NCDOT oe r' r 20 10 0 20 40 % * PLANS 804-C N.LAFAYETTE ST PRIORITY PROJECTS UNIT 'i" T = 6 LENGTH ROADWAY PROJECT B-6012 #560222 =0.083 SHELBY,NC 28150 1000 Birch Ridge Dr. P V = 35 MPH LENGTH STRUCTURE PROJECT B-6012 #560222 =0.007 Ii PH (704)476-0003 CORP LICENSE NO.:C-0275 Raleigh,NC 27610 A�®p P.E. ®R @�®�� C `� 20 10 0 20 40 * TTST =3% +DUAL =3% TOTAL LENGTH PROJECT B-6012 #560222 =0.090 iI. SIGNATURE: 7"A� L I ' I U _ �I�' JIMMY7EL.TERRY, PE ROADWAY DESIGN RIGHT OF WAY DATE • - PROFILE (HORIZONTAL) FUNC CLASS = _ ENGINEER JULY 19,2019 _i'uo LOCAL - RURAL R.E.BURNS & SONS CO 00o O 4 2 0 4 8 P.O.BOX 7168 AUSTIN R.TURNER, PE Np STATESVILLE.NC 28687 PROJECT DESIGN ENGINEER LETTING DATE: `', ` i i i SUB REGIONAL TIER PH f704)924-8646 l Nz V P.E. JULY 19,2019 �X�� \ , PROFILE (VERTICAL) zols STANDARD SPECIFICATIONS SIGNATURE: J\ it MADISON COUNTY PROJECT REFERENCE NO. SHEET NO. GR SC PROP.SBG AT-1 S FOR -L-,-Y1- AND -DR- PROFILE'S,SEE SHEET NO.5 DETAIL 1 DETAIL 2 BRIDGE #560222 B-6012 4 c R=20' VARIES TYPE-III S / SPECIAL LATERAL'V'DITCH SPECIAL LATERAL'V'DITCH RW SHEET NO. \ TYPE—III 1 R=15' (Not to Scale) (Not to Scale) ROADWAY DESIGN HYDRAULICS T i T TTTi _ , ENGINEER ENGINEER Y ( of Fill yQ OOH Natural 1°k Fill Natural p� g< Slope J a3 rn Ground V 1,,..N 'n° Sloe Ground •/ FAO ;; \\ v�Q .�O 9 p_- wV� f O A,� GeotextlleMin.D=1.5 Ft.i� Min.D=1.5 Ft. 1' 3" VARIES TYPE-IIIGREU TL-2Type of Liner= CL I Rip-Rap Max.d=1.5 Ft.TYPE-IIISCFROM STA.12+25 TO STA.13+50-L- LT. iSj/C' R=20' PROP. FROM STA.14+00 TO STA.14+25-L- LT. \ •AT-1 FDPS 7Z DOCUMENT NOT CONSIDERED FINAL BRIDGE/ROADWAY RELATIONSHIP SKETCH SITE 1 RICKY FLoD CALD4ELL UNLESS ALL SIGNATURES COMPLETED ()OREN LE I$CAL ELL PERMIT DRAWING TGS ENGINEERS FOR STRUCTURE PLANS, SEE SHEET S-1 THRU S-XX KYLE ALL CALD LL J 804—cLBY LIC 2815 ST '" SHEET _2_ OF _6_ �■ CORPPH. LICEN E NO.: C-0275 `c�o�yr TO FOR PARCEL R 7z ��o F TO BE TRANSFERRED GRASS // $ %tip BACK TO PREVIOUS / e� v.* OWNER7 ,e) s• GRASS 2SFD /Vc: ,p \ JS \ EXCAVATE "�. `s s� Js\ ,„TO ELEV-2328.0' ':)` 10 e''i„ WOODS `e,'�B na OIL TANK TANK CC \4' // EXISTING R/W �c's.p Tg Jg �' EXCAVATE STEPS, g �\ l01G / o1111* � ,e�, TO ELEV-2327. � / SF DODGL 4$A.ROLLAR Te �s EST.40cuyds .0 / /�s/� /�s� RETAIN DURING C, M CONSTRUCTION OWABLJE FILL WHEN _� �' e CLASS 'B IP RAP BANK STABILIZATION O O / TB FLOW(PLUG AND FILL W/ - �� GEOTEXEST.1 ONS T E � IITONS RIP �P �� • 00 / i FPROJECT IS COMPLETED) r ail E CLASS CONC t / _�c�j6 O /gif sj s/ \1 EST.110 '�/ GRADE TO DRAIN ` 15 .." - '-7 �i� ��� ��R / C _�i i�Q4041 �► _l`�` u.gleerik i► l����,A ,it**,A il_D �� F .� i - Arre,"'''''W.P.'Y'AVIifee �,30,.. i SPECIAL LAT'' L V DITCH /" i�// /� - tea`s�� �ic�.��.\\ // /ls / �7 SEE DJ: G i� / PECIAL LA RAL V DIT \``�►��►�!I`�► .4 _A / / / —� �� SEE DETAIL �i' 1 4' ''s� �\ secoNDARv / TN ELDER o et, // / /� ��� �►� �'� �, cpowi�/F �� �s 14 /1/ / i Z , 01111;11111111111 WOODS / -•-"---------.'- 0,) 13 4i1P ,,,, ._ reariffigillak Z'''-191W4bli.W'-.-.-1. .,.. .. ..i_.,:-...mirg„,,_ . k 0 / �� I �'�� �\�y Wy ROCK CROSS VANE x / / 6 / // © ' CLASS�IAIP RAP ..., �YI-t1-.--- ' e . N1 F /.- O �I / Ord EST.12 •�$--___ ,;, cam, Q BOULIER & RK ei .4 //� y F —_F F Ley I woODS ` O G�PIT iiil �`�' N1411 GR SECONDARY oh /// — �� -E \xA pi qiiii I infq i 1 m gist* GROWTH F ��/ ? O //_� E CULTIIDED \� Fes` 1111 iqh of ;Ol OS / // F/ \�F---� �y�'�� F BouLDER� ` �`\ 0 E ?`` O // F\ E 1. -"LPN CALD�ELL / 'I .*P�// OO �/ \ PROPOSED DT STREAM RELOCATION I s . / z ( ) c Qt j/ / / JEFFREY �.�IASSEY j ' al / E F /� O Ss �// 8Z r EiP RETAIN w 142"x91" CMAP / i / 73, EIP /.:: / CS) /a` N DENOTES IMPACTS IN / j5/ 0' 50' 100' m P'"'0 ///// SURFACE WATER '' W00D5 } ° 7^1.' 1' HORIZONTAL SCALE wDENOTES TEMPORARY } /� . � '/� IMPACTS IN SURFACE WATER e�PN�/ GRASS I ce / o FOR L -Y1-AND -DR- PROFILE'S,SEE SHEET NO.5/ / — '' / / - - MADISON_C OUNTY, PROJECT REFERENCE NCE NO. SHEET O. 0C Sc PROP.SBG AT-1 / DETAIL 1 — /' DEfAIL 2� — _-- $R�D�E #�6922-� B-60/2 4 R=20' VARIES --- / / _ - ----_-TYPE-Ills / —SPECIAL 0'DITCH / 3 ��ALLAo RjL�DJTG - _ ! SHEETNO. TYPE-III 1-3rR=15 / to Scale) ----- / / / I ' - —_-- — ��, ROADWAY DESIGN HYDRAULICS UT TIM1I - _ — —� / / / / / �— -- -- ——- --�'/ ENGINEER ENGINEER — --7'J /-/ / / /- ` ' ::\ \�' — — / / / A 't / !� Q oiO , \\ \\ \7 % / Natural / I' ��A1a Fill � N turn2) / /Ground qR/ ' fie--" Sloee__ Ground o — PROP. FDPS FDPS FV viaO NOO R=20' •ATTY-1PE-IISC1_3. x 11 VARIES TYPE-III GREU IL-2 PROP. FDPS .' �� — —. —____ — — / _ / � — 7 / / fl i /Mm'b-1. F1 / , �_ / / 5—— M_in.D ]�/Ft � / ' / Max d T.5F) //�/ / �— FROM SYA.12+2 .TO STA.13+SQL LT. /�;y�ype�f finer EL I Rid Rap — / � 60 TO' STA.14+25-L-"LT.; // FROM STA.14+ / / y / / / v // '/ / / A.)0� // DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED D BRIDGE/ROADWAY RELATIONSHIP SKETCH - \ j I —\ \ __ — SITE / / RICKY FLOYD CA`D LL\ \ � -- — / DEN LEAS CAL PERMIT DRAWING TGS ENGINEERS FOR STRUCTURE PLANS, SEE SHEET S-1 THRU S-XX \ \ ___ -42 _ _Aar KYLE ALL - - -// * / SHEET 3 OF 6 IJ804CN. LAYETTEST \ ` \ \ \ \ _ — H (70.4�476-0003 \ \ —� ---- _ _ _ ■ CORP. LICENSE NO.: C-02 7 5 • A \ A A — / � � -—V I\ A\\\\\\\VA\\VAA\\\VA\V A A \ V A A A V AVAVAV A Fi — — —� / / / �" — --/ / %///\ A\\\V`6.\ AAAVAVA\\\V\\VAV \\ \ AAVA , V �— , '/ / / RAM FOR PARCEL 7z / / �� A VAVAVA\ AA \ V �A — _ / / / � TO BE TRANSFERRED cRAss/\\\\ AAA \\\\ VA \ \ \ \ \\V vAVA� y ---__4-- — � / / �/ % \VAVA\\\\\VAAAA\\\\\\\VA V V A \ \ V A \ \ AV pr , 4 / / / / / / '� BACK TO PREVIOUS / / %%/ \VAVVAVVA\\\\A VAVAA\\\\\\\VA A A\AV AA A \V\ V A \V A V A--�l ��'�— �'q A — I I I AS / / ' / " �v\VV \ V \ V A \ // / —OWNER i\VV, \\\\ � �\ VAAA V _ A / / /\\ ` A\\\\VAVAA\\\\\\VAVA \ VA \ V \ AvV � VA /4� � / / / / / VA\\VVVA \ A\\\ V ' A\\ VA \ A \ v V �\\\\c VV �� � AA � / / � / % • I iVAV \\\VAVA\ vA \ V '0A\\II A\\ A \\\\\VA\ VA \ \ \ VAA A \ V A V V vvvvA / /i / I I \A VA\\\\\\VAv •A vv\\v / CRASS\\ I III\\\ \ \ \\\\ v \\\ I\\III I! V A\� \� AV\\\\\\\\\VA \ \ \ V \ \ \1V A AV AvI-v�\ \ \\\ \ A \ \ v \ \\VV � // //�III I� A y0 v A\ v I III \ A\\\\\\ 111VA \ A \ Xr I � �' �A ems a�O EXCAVATE ;/�� � / / liii/ II III II I ) \\\\\\l ll 1 � rero ELEv-zszs.Q �i % I � \8 / /o /\ �� yd5 \ A/c Ip � / / /I 1 � / I 1\\\\\11II I I �� OH, �C ' � i i w� / � / a / °o �IIII / \�11III I vv � / ///I 1 \ V ES6TI RAY ��I I I I y, � ' - I � 0 / //i/II1HIV( / I \ I1IIIIII I 1 A �vvvv\ V—iv° �. ys 'ij!/ / XCAVATE c IIIIII IlII I \V A\III AI / / / A \ � � / TO ELFV-2327./ / I / � am 'o� � / /I / . / //ii / �— II I I I I I/\I 1 Ag I M g N R I RETAIN DURVG V s / �/ E.ST,...40cuyds ��-�� — / O// ::::---/,-;1, -1---;::; i / /j I I / / /I I I I CONSTRUCT°i _ __ TB / CLA55 'B RAP -BANK T. �TABILIZATIQD � .. / / / .--;. � O / // "I I I \ I / / l PLUG AN wr LOEAB FILL"WHEN �— l� _ � G �� IYRI P- � / I IIIIIIII AI IIIII IIII I PROJECT 0PLEED/ I lI C / I / � s �A - - r �� GEOTEXILE � , � 6 e 1 �� / L / ,- . ;� .I� Waal/ rb. � � / /////////llll I I I I I / �/� �nW ` . .Ps�T „--_-,--_,.....":,-;-/--- ,, / / j All 65 _ _ ,/./�\�; ►• L;.;AI .....�� O .7 '� / °` IIIIIIII I I / / iiii� Ol/ ////(/////////IIII1 / /l/ lI lI / / / / / "--- --/-//<II IIIIIIIlI I \ IlIIIIlIII l l II l l / / � i � � ! y�Ia� i/. / -- iiiii 103344 1 . �s / i /Il l A ` � I � - % / %/ %_ ;" P � —Illllljll\ �l IIL°///// / / / 4 � / . c ,\ I \ � ` I/IIII 111l I 1 / l 1 I �/ / / i � � � � �j / - / �� --,- _ _ — _ -IIIIIII11 \ I . / % ��- i� /I IIII\\\\ \ \ I /IllllllII1 / I(IIIII %ti" ce'/ 1 �� N � �'/ !I" IIII\II \ \ i / '' 7 � i% i// / / CALAT . / TC i ii / ' YI /�// fl3 -v, ,' a `� ' i/ i 4`• �R \ / � � � / i -- .l, . u — p _ �/ / � % � /�'•EC1AL LA RAL V DITtiliralla Nr�� //�► ��. III III \ � //////////l l ! � II / /i , Iij � /— iSE� E41L ' ✓' ' ).� _ — i / � / J/ � ,g- ©� ,. ) .4044 C�—,- � / //I I \ , // / // IIII I I/ / ' / / //// / l / � / I/ %ii %ii/ / � �� �� ► a � r -_ / - ✓ / /l/ / i) I I I 1 //////////// / / 1 I IJi/ // -i � / _ �otiO -- — > � / I / / / (/ i// / /' �u a�tS // � � j/ i // // '� D l 11/ II( -/ l f I /�j% /z�� i i // - � .� .� �R - _/ �� w6 / /// � � ,% / / // /jlllllj/ 1 /i 11 I I I /// I 1 I/j////// /7/j / / - � � .5.;��m 0W _ ��� F � 1 ® �� a /Thi l ////l/ l/ l i - M�� �/ � / �� / / 7) //// /// / '� III/ I I / /// / //// / / / / ,� � i / / / / �,V' �� �A ::: ( /0 / / � //// / /v/ � liw / /� ►t � 4 � �" / —_ // / i //// IIII I I l J // i --/ / / /3 , 1 III / / / 11a11o. / // / // /� / / • ' 1 . � � / ,/ / / 7 / ,�---� � / e ,ER & RRKOCK CR¢ 5 VNE / // / /// � % / S APILITI e / I /i� C�r' \ • l /--� / / / / / / � %% j / i /i / % / % j� / / E iE / /CCA IIRI � \ /� / /f/ / / / /,I / / /� � '/ EST,12 •.�— / /ii�/ i � /// / /� % / / // i V N ii /i ///iii �//// /% / / o A/ / // ® N ,/4 j/ ///ii////i // / A 4 / //// / F �'� woos �a vA / / e ////i //iii/ //iiA//�/4' //f/ ///// //i/ / — _ V,i; � . — J / /i//i//i/IIII /// / , / , . IN Nia / / / /Fr A//// / //i//// i / O • / ///// / r / HELD/ i A / / �i�%�% / ° % 4 � jj /l / //j/////( / /N:,,,,,,._. — l l///�o / jiiice' —/ ce / 7 r► �y� Feou�oea��Sv `�,N / N �� / — '/ I I / � /m ///// // ij ///C / ////////// , / r • 0 ///// //// — —�I-- j/ � g � / / / / / I / / / //N lii Il� / / / _/ l l l / / // / S / j/ / v / F F _' , . � / � / ///// /// / / ONo /// // / \ / ._-- E r - LPN CALD EL- / // V � � —� z / / // /o / / /9 / / / / j��� _ / /�/% //j// / S // 4 A // / ///l \ VA l s� PROPOSED S M�REL9CA'ION/ — —/ / // /// // / //— E / /% % ✓ //////// 7 / / SEE SHEET D-// / / � ..� / 1 JEFFREY1.M�sfV ..-"../v ///� ////�� /2 , / --� — - -- / I// / / / // , / / H / �y 1 / /�� ' -- l /� �_ �llll/ //jj // / // // / I1R4E2TA"xI9N1 CMAP // / � _ / /////// // � / // 1 // « v/�cc r/ / /// / E V A /�/ / /j/ 1 . /w / ,/ / / // /� / // /// \ 1 A / aI � ll / / / � / / / / CULTIVATED ) / / / / / / / � ' .7 % —� �/ / /1 ZVA / //// �> /L / / n /// FIELD \ �Ni ` / / / / / � j/ / // / \ y // i // // j / / 1 / / // ii--- /Eio / // //// / V / _ �i ! / / / 1 / / / / / / � / / // �� � // / // / �` i� /a / i/ \ � / / / /� ///�aj / /U�i / /' / `" / /CZ, :. --- 1 ///7 7,- t, ivim _ / �i / / ' � / / / // ■ ■ ■ ■ ■/ / ii / / DENOTES IMPACTS IN // / � �/� / //v /// / // / HORIZONTAL SCALE \ � SURFACE WATER \ /— 0� /V (5' /� //// ///// // / //'/ 0 /////;z sa I DENOTES TEMPORARY > //// \// /i //�/////// /���! • /// / / / /,� / / / / /// l ��i/i� �/ / / / / �i/-i / \.� / /// i�//////-�/ /'� / / �� / / / / / , IMPACTS IN SURFACE WATER /— / / �/ /v��/ /// /��� c,!v / / c — / v / / / ///// /j //// % � �%/ -- � / / / / 'o /// / // -x- / / / / / IV / l / / / ////'/i ///ice//// �� �i // --F� � / ii / / / Ot / / , i // / , / 0` PROJECT REFERENCE NO. SHEET NO. co - PERMIT DRAWING co PROPOSED STREAM RELOCATION SHEET 4 OF 6 ROADNABY �SHEETNO GINEER ENGINEER INCOMPLETE PLANS DO NOT USE FOR x6W ACQUISITION 440 H t. `` 5 83 AAC�WO Fop°s op oN 'Yq 2Q7 ���o�T FLU aRF,Np� Cp EST.2020cD.yds EXCAVATION RELOCATION �p�s�/ / / 90� F+sJ p�V1.E :1,$'' AI�O 2 0 P� s'&`-�w ./ / ,;.•''''''/ DOCUMENT NOT CONSIDERED FINAL �`<s>� w o y1 �951 �.v j��/ UNLESS ALL SIGNATURES COMPLETED ` !' \'B p'S ,.S 1 REV` N.,r 804C SN LAFAYETTE ST F OOHS`` '• "H tip, -�>e G� OILA A/C ��Nc/� \ / / GR SHELBY,NC 28150 1pP +� \ �� 2 �'`isrwc aiw CON ��x` /''g p\��1S .. PH (704)476-0003 p N�' `'��,�S. se Jl x.BM"1 STEPS �R\\ �1S g\G CORP. LICENSE NO.: C-0275 PROPOSED STREAM CENTERLINE LOCATION ppJp�pS 9�9A sr 48.CO *' �/ �/ -\ - -' /ass/ .. / // \��;` �, // 15 ,�s COGS STATION LATITUDE LONGITUDE St�i�• // /// � �` . =�/ LATHY . 1�j 1 6Ve W GG/ / /::: ::::::: 72 •� /0ei` /4 / 1+17.58 • 0+98.17 • ��� �P� VANE STATION Ge �s'` �� \a�w GR J � SACKFUL m. RED \\ / / G `� •• . MST STONE EXCAVATED POOL 11, iA'�aN ? `' l� `` • VANE TMATEO REACT SPOULO HAVE FF 0+75.52 35.796714 -82.806940 3�� o''' `s\ `\ � EXCAVATED TRENCH s ro cexrEn of Fool GGG SS 0+75.52 0 f �v FLOW RSV STONE CONSTRFOR UCTION DEarexTxLE S ¢' 6'I e '1 •}, Tioxss y\ 'p,/ / ��' 0+67 0+04.79 �F•1� �'`I. REDTEXTILE SECTION A-A FP6�AV 0+58.lg �.�C�' 1 � ,;t411','.yE�. 0+67 35.796712 -82.806912 / / PS'Q REF �15 "-'--5=1�� x °oL I �,I jis EU VANE ARM ATI \¢ _ 0+38.34 1-l�` ROCK wnxKFuu HEADER ELEVATION /� sP�`E GV\'F\�0 © 1S FOOT DIRECTION OF ENGINEER ROCKS ER \ P N /4P? A ROCK K A q,SLOPE J�PDDL EXCAVATED PER 1 Z 0+58.8 35.796713 -82.806884 �/ �*el 1S GS VANEXTO.A"TX SACKFI YP.u T O / / E ,'At/ WGO ELEVATION OR TO SLIGHTLY MSr STONE TO FOOTE BED y G ) semexnLE n G�' \� BnOI ROCKS A ROCKS m VANE Ann SHOULD 0+38.34 35.796728 -82.806772 11 G ,P G) %� �' �GP GRp55 DLD IRExsI WIDTH PLAN VIEW MEDIUM SIGNIFICANT SPACES Y 5 STATION HEIGHT LENGTH o 2 6*X D" SECTION B_g NOT RE GAFFED OR HAVE O�GG� \5 ___ _ _ • __ iirrexEEApNPr""LEs00i POOL TO LINE WITH WHERE 0+04.79 35.796779 -82.806723 p� 7 5 ai Dco REDucE v0=Ds ERE' sroxE c"x RE ussD ro BET EEN FOO ai E ROCK CROSS VANE DETAIL COMPACT HEADERS AND EXTEERG. x,COMPACT R KaLL TO EXTENT PDGG=RLE DR AT rNE V O XDTE.APPLIES TO ALL CROSS VANES NOT TO I LE s1 POOL DEPTH SHOULD RE U TO O TIMES UANKFULL DEPTH. y MI O 711 I l 0' I I I I I I I I I El NI zl co o1 -off 1 NI NI I CD 1111 it 01 IIII OI ,I V Cl al CIC PI WI PROPOSED STREAM RELOCA1lON PROFILE NOTE:CENTER HEADER ROCK S I JLO HAVE Ei EEATL PE.THAT DIRECTS FLOW I• rENTEP OF cc D_ 0 04.79 +OL HEADER ROCK 0-+3-E.34 0+58.88 0+67 0+7-5,52 ,-98,17 1 17.58 0 i N 2325' 2325' N N IS L n co 2315' 2315' r CLASS 'B RIP RAP FO:TER ROCK o" 0-00 0-10 0-20 0-30 0-40 0-50 0-60 0-70 0-80 0-90 1-00 1--0 1-20 NZ 0) X I�X= cr 11111111 m BEGIN GRADE I PROJECT REFERENCE NO. SHEET NO. -L- STA 14+78.80 PERMIT DRAWING -L- e-sole 5 2,348 ELEV.2,342.85 ROADWAY DESIGN HYDRAULICS ......��......-��� -- ENGINEER ENGINEER •--.._...---..__... -- ET 5 € 6 ■11 .-_.._...---..__... - I III - Pi= 11+80.00 ��1��1���111��1�1 .� - - - - III EL = 2 34180' KC= l90 ■- ■�� �- --�LEFT DITCH ■ 2,344 --►►►►► D5 = 60 MPH I■1111111I11111111I , : .:13.5 ■ ■■-■■■-_-■■-_■■■ __=1111' ■■ ■ M �1111 lir - (-13,T6 ■-■■■-�-■■_T■■ommommmoommom ommommmoommo ■■■■■ ■■�-■- ■■-�-■■ 25' ■-■■■-�-■■-■ �■■■■■ ■■�-■- ■■-�-■■ o ■■■- -■■_�■■ �■■■■■ III■�■11 2,340 L‘�_ ■ ■■ ■■■ =�=i■■■ �■■-�-■■ DOCUMENT NOT CONSIDERED FINAL III■-■II UNLESS ALL SIGNATURES COMPLETED TGS ENGINEERS ..S- END BRIDGE i/ J 8O5HELESY, NFA ETTE ST \` _ -II,-III M■ PH (704)476-0003 2,336 I o _I �■■- -■■■■ CORP. LICENSE NO.: C-0275 .k� :__ I if =■■-�-■■■■ ■■■ .. \ L I I I I I I I IIIII(I I II I II I ''_I_• :::_::::: .1i , mmmmmmmm II I _ ' �__ __i ■■ 2,332 ....-.... _■■■■_■■■-4 moommom. 0 i 11�11 moommomBRIDGE HYDRAULIC DATA -��� -���� 'N _ -■■■■-__ O N-� ►► ■■ 2,328 -....-.... __---�„_ __ x, ■■ =DESIGN DISCHARGE = 340 CFS - -■■■ -■■■■mommENNE '�_'mr.imio ' 1 1 1 1 1 y -� ��■■ DESIGN FREQUENCY = 25 YRS mommENNE -■-■-■■- r N :c. \ i y,. . -� = ■■ =DESIGN I* ELEVATION = 2329.4 FT -■■■■-■■■■ -• \ e �i• smommENNE �� ��11 mommENNE 2 324 BASE DISCHARGE = 490 CFS -■■■■---mommENNE • _^• \ : / ��- BASE FREQUENCY = 100 YRS --■■_-- �r� ��r_ L• 2' 319/2- • -�- r.•...- �- BASE Hi* ELEVATION = 2330J FT -om� -ENNE ,_nr o._ a-~ -�- -'.■..._-•.�■■ -■■■■_■■■■ �ii�r ■�■■ -�-��� coo■■ ■1111■1111 • •• LOWEST LO -.II■■ OVERTOPPING DISCHARGE= 850 CFS -■■■■_-- :ate_ 5.0'CAI 1111111 •. ■ =■=11111111111111ING 2,370 =OVERTOPPING FREQUENCY= 500+ YRS 11111 ■ er' •• -= a ■�■��■� 2 320 -OVERTOPPING ELEVATION = 23315 FT ■1111- 11■M ■■ =■=11111111111 11 F. CAP c•-� -- �■uo■o■�� ■ ► a. c-aa:� 11111111 ■■n= __ =■=11111111111-11 2,316 DATE OF SURVEY = 9/25/2019 � ' r cyy■■■ L^ ■:. -. =`''i�' 11111.311d. ,r :: S•H1 1� G•° 1011 2,316 .S.ELEVATION AT DATE OF SURVEY = 2323.3 FT „"II"I"I r FOR -L- PLAN, SEE SHEET NO. 4 2,312 - mI,,,,,,,,,I III 2,312 11 12 13 14 15 16 0 -a = --DR- Y- 1 l- cL 2,346 2,346 I 2,346 . !�• I 1 E • `1- BEGIN GRADE ■■■■■■■■■■ a ♦ Yl 51 A /O+90.UO 2 342 R�/N 2 342 ELEV.2,33592 2,342 D1 STA ll7 �5= 1 -END GRADS - N -L- STAII+03J4 ■ • l- SI '.1I+�66- N ♦ PI= 10+98.00 N ELE✓.2,333./0 I 1 • EL = 2.335.05' L STA/3+7729 __ IC Pl- 10+50 •` VC = l5' ELEV.2.334J2 c 2,338 EL ROE •2,338 _ • DS =I l5 MPH 2,338 K = 8 ' 1 - °�r� o DS - 20 MFH Fl Fi/PP iip ! ■ ,2 2,334 J 2,334 _ 6O�• � 4 .03 2,334 c 1 d.+,9j� PI= 11+45.00 m \ • EL = 2,326.69' III \ VC = 50' \ w 2,330 1 •„,....... as /5 MPH 2,330 I_ - \\ - 2,330_ cc 2,326 ►- / ! 2,326 2,326_ N 2,322 2,322 2,322 N N 0 U IL) 1 2,318 1 2,318 2,318 I I U m c mAmmmaimm, 1 1 1 2,314 2,314 FOR -Y1- PLAN, SEE SHEET NO. 4 _9a FOR -DR- PLAN, SEE SHEET NO. 4 2 310 I 11 2,310 l i i 1 - 2,310 C,U NZ`N 10 11 10 11 ,-X= WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 14+60 Stream Relocation 0.02 < 0.01 126 14 1 -L- 14+60 Bank Stabilization 0.01 120 TOTALS*: 0.03 < 0.01 246 14 0 *Rounded totals are sum of actual impacts NOTES: No wetland impacts at site. NC DEPARTMENT OF TRANSPORTATION Total of 126ft of Proposed Relocated Channel DIVISION OF HIGHWAYS 8/2/2021 MADISON COUNTY B-6012 48207.3. 1 Revised 2018 Feb SHEET 6 OF 6