Loading...
HomeMy WebLinkAbout20211248 Ver 1_Accept_SR 1151_Bridge 560222_Div 13_20210816 August 16, 2021 Mr. Yates Allen NCDOT Division 13 Environmental Specialist North Carolina Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 Dear Mr. Allen: Subject: Mitigation Acceptance Letter: Division 13 Project, Replace Bridge 560222 on SR 1151 (Big Pine Road) over Back Branch, Madison County; WBS Element 48207.3.1 The purpose of this letter is to notify you that the North Carolina Department of Environmental Quality – Division of Mitigation Services (NCDEQ-DMS) will provide the compensatory stream mitigation for the subject project. Based on the information received from you on August 10, 2021, the impacts are located in CU 06010105 of the French Broad River basin in the Southern Mountains (SM) Eco-Region, and are as follows: French Broad 06010105 SM Stream Wetlands Buffer (Sq. Ft.) Cold Cool Warm Riparian Non- Riparian Coastal Marsh Zone 1 Zone 2 Impacts (feet/acres) 0 126.000 0 0 0 0 0 0 This impact and associated mitigation need were under projected by the NCDOT in the 2021 impact data. NCDEQ-DMS will commit to implement sufficient compensatory stream mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In-Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from NCDEQ-DMS. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707-8420. Sincerely, James B. Stanfill DMS Asset Management Supervisor cc: Ms. Lori Beckwith, USACE – Asheville Regional Office Ms. Linda Fitzpatrick, NCDOT – EAU File: SR 1151 – Bridge 560222 – Division 13