Loading...
HomeMy WebLinkAbout20211241 Ver 1_Meeting Request Review_20210813 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWmnnacnlrtl Qua fay ID#* 20211241 Version* 1 Regional Office* Asheville Regional Office-(828)296-4500 Reviewer List* Kevin Mitchell Pre-Filing Meeting Request submitted 8/13/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Dave McHenry Contact Email Address* dgmchenry@ncdot.gov Project Name* B-3186/B-5898 US 74/23/19 Bridges Project Owner* NCDOT Project County* Haywood Owner Address: Street Address 253 Webster Road Address Line 2 City State/Rovince/Region Sylva NC Fbstal/Zip Code Country 28779 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* B-3186/B-5898 Do you know the name of the staff member you would like to request a meeting with? Kevin Mitchell Please give a brief project description below and include location information.* The project involves replacing and widening five bridges and interchange reconfiguration at the intersection of US 74/23/19 in Haywood County. Note that there already has been coordination with Kevin Mitchell on this project including two site visits(January 13, 2021 and March 15(?),2021) as well as follow-up email coordination regarding impacts, permitting and likely mitigation. However, I wanted to submit this just in case it was also needed for the PCN submittal I need to get in soon. Thanks Dave Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 8/13/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* r Yes r No If rrore information is needed,please add comrents for the errail notification below.