Loading...
HomeMy WebLinkAbout20211245 Ver 1_Riparian Buffer Authorization Request_20210812 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 8/12/2021 3:47:58 PM(Start) Approve by Carpenter, Kristi Lynn 8/19/2021 11:16:52 AM(DOT- Initial Review) • The task was assigned to Carpenter, Kristi Lynn 8/12/2021 3:57 PM Buffer Authorization Application Form Water Resourcese" ENVIRONMENTAL QUALITY 15ANCPC 02B.0233(8)(b),.0243(8)(b),.0250(11)(b),.0259(8)(b),.0267(11)(c),.0607(e)(2)Buffer Authorization Online Form- Update 10/23/2018 Original Submittal 8/12/2021 A. Owner/Applicant Information ................................................................................................................................... .. .. .. ............. .. ............... .. ............. .. ............... ............... .. ............. .. ............... .. ............. .. ............... .. ............. .. ............... ............. General Information .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Primary Contact Email:* christine.farrell@ncparks.gov Reese list the contact person's erreil for questions or payrrent on this project if needed. Who is submitting the application?* ® Owner ❑ Applicant other than Owner El Agent Is there an agent working on this application C Yes but not submitting it? O No 1. Property Owner Information: ............................................................................................................................. 1a.Name on Recorded Deed:* STATE OF NORTH CAROLINA lb.Responsible Party: (for Corporations) 1c.Mailing Address:* Street Address ATTN NCSSM PO BOX 2418 Address Line 2 Oty State/Bovine/Region Durham NC Fbstal/Zip Code Country 27715 US Id.Telephone:* 9193685237 le. Email Address:* christine.farrell@ncparks.gov B. Project Information and Prior Project History .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 1. Project Information ^. ._J .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 1a. Name of Project:* Eno River State Park-Cole Mill Rd repairs (Subdivision,facility,or establishrrent narre) lb.Is this a publicly-funded transportation project?* C' Yes r No 1c.TIP# Id.Subdivision Name: le.Nearest Durham Municipality: If.Property Size: acres 1g.County(or Counties)where the project is located:* Durham 1h.Property ID# Date of Purchase 0804-02-60-0267 10/10/1975 Tax RN or Parcel kl 1 i.Deed Information Type of Book Book# Page# Deed 000430 000379 Map 000066 000072 1j.Attach a copy of the recorded map that indicates when the lot was last platted. aick the upload button or drag and drop files here to attach docurrent Eno River Cole Mill Rd_peacreek plat 66-72.pdf 193.89KB FCF only 1k.How would you like to provide the Latitude and Longitude information?* f Address Lookup 6. Manually Latitude* 36.059354 Longitude* -78.978169 11.Is the project located in any of North Carolina's twenty coastal counties?* f Yes r No 2. Surface Waters 2a.Name of the nearest body of water to proposed project:* Eno River 2b.Water Quality Classification of nearest receiving water:* WS-IV,B;NSW 2c. List the total estimated linear feet of all existing streams(intermittent and perennial)on the property:* 0 (linear feet only) 3. Project Description: 3a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: A 48"RCP culvert approximately 400 ft NE of the Cole Mill Rd bridge(#310049)in the DOT ROW of Cole Mill Rd became blocked by debris and overtopped at some unknown point in time.The overtopped culvert caused large erosional gullies to form that begin at the bridge abutment and continue downslope to the left bank of the Eno River. The Cole Mill Rd(SR-1401)bridge became a popular,unauthorized access point to Eno River State Park's Pea Creek Trail when the Park closed due to Covid-19. Wooden steps of unknown origin exist down the bridge slope next to the large gullies that visitors use to access the closed Pea Creek Trail,and park on the side of Cole Mill Rd when doing so. DOT has agreed to assist State Parks in repairing the slope and removing the steps to discourage this dangerous roadside parking and unauthorized access to an unsafe trail that has unfortunately exacerbated due to the pandemic. 3b.Attach an 8'/z x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. aick the upload button or drag and drop files here to attach docurrent ENRI_ColeMillRd_USGS.pdf 1.73MB FCF only 3c.Attach an 8'/z x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach docurrent ENRI_NRCS-soilmap.pdf 2.19MB FCF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* DOT will stabilize an approximate 35 ft wide section of the bridge slope between the large erosional gullies and wooden steps with rip rap and check dams to improve erosion&sedimentation control measures.The wooden steps and 3 tulip poplars will be removed when check dams are installed.DOT is providing materials and labor while State Parks will obtain the buffer permit.The left top of bank has not yet eroded and therefore the closest rip rap placement will be—15 ft landward and will not impact the OHWM. Attach a site plan as applicable to the project: aick the upload button or drag and drop files here to attach docurrent Cole Mill_ditch_Hyd.pdf 33.85MB DWR_Eno River Cole Mill Rd Buffer Auth.pdf 1.84MB FCF only 5.Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project(including all prior phases)in the past?* ✓ Yes r No 6. Project History ..................................................................................... 6a.Have permits or certifications been requested or obtained for this project(including all prior phases)in the past?* ✓ Yes ✓ No 7. Future Project Plans ................................................................................................................. 7a.Is this project a phased project?* r Yes C: No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* C Neuse River Basin(15A NCAC 02B.0233) f Catawba River Basin(15A NCAC 02B.0243) f Randleman Lake Watershed(15A NCAC 02B.0250) ✓ Tar-Pamlico River Basin(15A NCAC 02B.0259) C' Jordan Lake Watershed(15A NCAC 02B.0267) ✓ Goose Creek Watershed(15A NCAC 02B.0606&15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation,then you MUST fill out Section D of this form. Site#-Reason Stream Name Buffer Impact* Impact Type* Zone 1 Zone 2 1-rip rap& Eno River Permanent Exempt 1,050. 700.00 geotextile (P) 00 Square Ntip label(e.g.Road Ft rmor Terrp Square Feet Crossing 1) Feet Total Zone 1 Impacts: 1,050.00 Total Zone 2 Impacts: 700.00 Total Buffer Impacts: 1,750.00 Comments: Zone 1 will not need fill or rip rap placed within the 1st—15 feet.Square footage is based off maximum possible impacts with a width of 35 ft(parallel to the Eno)that DOT will impact of zone 1 and 2. Materials estimates from DOT: Zone 1: 15 cubic yards of fill,25 tons Class 1 rip rap Zone 2:7 cubic yards of fill, 15 tons of Class 1 rip rap D. Impact Justification and Mitigation ........................................................................................................................................................................ 1.Avoidance and Minimization ................................................................................................................................................................................................................................................................................................................................................................................................................... 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* NCDOT BMPs will be utilized to avoid adverse impacts to the Eno River. Manual labor will be performed to the maximum extent practical to avoid excesssive equipment tracking down the slope. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* The wooden steps will not be removed until just before stabilization work begins. This will avoid concentrated flow paths from forming between the gullies and bare earth slope.The culvert upstream that caused the accelerated runoff issues has already been cleared out by DOT and will better handle stormwater for the drainage area. E. Diffuse Flow Plan 1a.What type of SCM are you providing?* ✓ Level Spreader r' Vegetated Conveyance(lower SHVVT) r' Wetland Swale(higher SHWT) I•J Proposed project will not create concentrated stormwater flow through the buffer ✓ Other SCM that removed minimum of 30%nitrogen 1 c. Diffuse Flow Documentation* Click the upload button or drag and drop files here to attach docurrent Cole Mill_ditch_Hyd.pdf 33.85MB F CF only F. Supplementary Information Environmental Documentation 1a. Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land? F Yes ✓ No 1b.If you answered "yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act(NEPA/SEPA)? ✓ Yes r No Violations 2a. Is the site in violation of DWR Wetland Rules(15A NCAC 02H.0500), Isolated Wetland Rules(15A NCAC 02H.1300),DWR Surface Water or Wetland Standards,or Riparian Buffer Rules(15A NCAC 02B.0200)? ✓ Yes r No 2b.Is this an after-the-fact buffer authorization application? r Yes G.Additional Information ._J Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach docurrent F CF only Additional Comments: Spoke with Robert Ridings to clarify the proposed project as transportation/DOT. H. Sign and Submit .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................:............ By digitally signing below,I certify that: o I have given true,accurate,and complete information on this form; o I agree that submission of this form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the application form." Print Name:* Christine Farrell Signature Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* in Yes O No Is this project a public transportation CJ Yes project?* r No ID#* 20211245 Version:* 1 Select Reviewer:* Rob Ridings:eads\rgridings Select Reviewing Office* Central Office-(919)707-9000 Has payment been received?* r No Payment Needed r Fee Received r Need Fee-send electronic notification