Loading...
HomeMy WebLinkAboutGW1-2021-00920_Well Construction - GW1_20210402 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: Jon Keifer 14.WATER ZONES Well Contractor Name FROM TO DESCRIPTION ! NCWC 4097-A ft. ft. ft. ft. NC Well Contractor Certification Number 15.OUTER CASING for multi-cased wells OR L1NER if a ticable Landprobe, Dept. of Bunnell Lammons Eng., Inc. FROM ro DIAMErER THICIQVFSS MATERIAL ft. ft. in. Company Name WI0300435 16.INNER CASING ORTUBING(geothermal closed-loop) 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS I MATERIAL List all applicable well construction permits(i.e.UIC,County,State, Variance,etc) 0 It. 60 ft- 611 Schd 80 JPVC 3.Well Use(check well use): ft. ft. in. 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public 60 ft. 70 ft' 6" in. .010 Schd 80 SS 304 ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) ft 60 ft in ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑Irri ation ❑Wells>100000 GPD FROM I TO MATERIAL EMPLACEMENT MErHOD&AMOUNT Non-Water Supply Well: 0 ft. 54 ft- Neat Grout 150 Gallons Tremie ❑Monitoring ❑Recovery ft. ft. Injection Well: ft. ft. ❑Aquifer Recharge 17Groundwater Remediation 19.SAND/GRAVEL PACK if a Iicable ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO I MATERIAL I EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage 54 It. 58 ft- #1 Choker Sand JTremie ❑Experimental Technology ❑Subsidence Control 58 ft. 74 ft- #2 Filter Sand JTremie ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION color,hardness soiVrock type,grain size,etc. 0 It. 10 ft. Not logged-Vacuum Utility Clearance 4.Date Well(s)Completed: 03/31/21 Well DO S I W-8 10 ft. 50 ft. Sand 5a.Well Location: 50 ft' 60 It' No Recovery Allen Steam/Duke Energy N/A 60 It. 73.5 It• Weathered Rock Facility/Owner Name Facility ID#(if applicable) 73.5 f' 77 It. Bedrock 2 253 Plant Allen Road, Belmont, NC 28012 Physical Address,City,and Zip Gaston 3592779998 21.REMARKS W County Parcel Identification No.(PIN) 'nn t 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: R (if well field,one lat/long is sufficient) 22.Certification: 529350.9 N 1399576 Easting W Jon Keifer Jon Keifer 2021-03-3115:58:37 3/31/2021 6.Is(are)the well(s): InPermanent or ❑Temporary Signature of Certified Well Contractor Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or IlNo 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the ofthis record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well'details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 77 (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if different(example-3@200'and 2@100� 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: (ft) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use"+" II.Borehole diameter: 10 (in.) 24b. For Injection Wells: Copy to DWR,Underground Injection Control(NC) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: Rotary 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA 13a.Yield(gpm) Method of test: Permit Program,1611 MSC,Raleigh;NC 27699-1611 13b.Disinfection type: Amount: i Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018