HomeMy WebLinkAbout820122_30 Day POA_20210722PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number 82-0122 County: Sampson
Facility Name: Ernest Odum I & II
Certified Operator Name;
Ashley Odum Operator Number: 20044
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 1 II Large II Small
Spillway(Y or N): N N N
Le ve l(in ch a s): 17 17 17
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated,
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 7/22/21
I hereby certify that I have reviewed the Information listed above and Included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Ashley Odum Phone: 9102144986
Facility Owner/Manager (print)
Ashley Odum
Facility Owner/Manager (signature)
Date: 7/22/21
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
Odum I
Odum II Large
Odum II Small
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
line m = 678.3 Ib PAN
II
line m = 150.8 Ib PAN
line m = 34.3 Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
863.5 Ib PAN
111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o tract #
p field #
q. crop
r. acres
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
s remaininglRR 2
PAN balance
(I&acre)
101
Bermuda
2.96
143.00
423.3
March
-Sept
104
Bermuda
3.64
236.00
859.0
March
-Sept
105
Bermuda
1.94
233.00
452.0
March
-Sept
106
Bermuda
3.40
231.00
785.4
March
-Sept
107
Bermuda
4.53
226.00
1023.8
March
-Sept
1State curren crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) =
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) =
x. Crop's remaining PAN balance (line v from section 11I) =
y. Overall PAN balance (w - x) =
3543.5 Ib. PAN
863.5 Ib. PAN
3543.5 Ib. PAN
-2680 Ib. PAN
Line y must show as a deficit. If line y does not showasa deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
Information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
PoA (30 Day) 2/21 /00
able and recalculate the overall NAN balance. It animal waste is to be hauled to another permitted tacillty, provide
nformation regarding the herd population and lagoon freeboard levels at the receiving facility.
NARRATIVE:
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Odum I
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x tine d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd # 0 certified herd #
17.0
19.0
inches
inches
2.0 inches
96000
ft2
119680 gallons
180
89219.9
36001
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
J. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + ky1000) x line 1=
6/1/21
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0
78400
days
ft3
ft3
ft3
ft3
97739 gallons
3.12
Ibs/1000 gal.
678.3 Ibs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
IOdum II Large
2. Current liquid volume in 25 yr./24 hr. storm sto age & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e, line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
1200
certified herd #
17.0
19.01
inches
inches
2.0 inches
15000
ft2
18700 gallons
180
62701.8
2530
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
6/1/21
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
29740 ft3
8,560
ft3
ft3
47747 gallons
2.27
Ibs/1000 gal.
150.8 Ibs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Odum II Small
2. Current liquid volume in 25 yr./24 hr. storm sto age & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
0
certified herd #
17.0
19.0
Inches
Inches
2.0 Inches
7650
ft2
9537 gallons
180
9890.4
300
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
6/1/21
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0
4462.5]
days
ft3
ft3
ft3
ft3
5563 gallons
2.27
Ibs/1000 gal.
34.3 Ibs. PAN
PoA (30 Day) 2/21/00