Loading...
HomeMy WebLinkAbout820122_30 Day POA_20210722PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 82-0122 County: Sampson Facility Name: Ernest Odum I & II Certified Operator Name; Ashley Odum Operator Number: 20044 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 II Large II Small Spillway(Y or N): N N N Le ve l(in ch a s): 17 17 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated, *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 7/22/21 I hereby certify that I have reviewed the Information listed above and Included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ashley Odum Phone: 9102144986 Facility Owner/Manager (print) Ashley Odum Facility Owner/Manager (signature) Date: 7/22/21 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Odum I Odum II Large Odum II Small n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = 678.3 Ib PAN II line m = 150.8 Ib PAN line m = 34.3 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 863.5 Ib PAN 111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o tract # p field # q. crop r. acres t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' s remaininglRR 2 PAN balance (I&acre) 101 Bermuda 2.96 143.00 423.3 March -Sept 104 Bermuda 3.64 236.00 859.0 March -Sept 105 Bermuda 1.94 233.00 452.0 March -Sept 106 Bermuda 3.40 231.00 785.4 March -Sept 107 Bermuda 4.53 226.00 1023.8 March -Sept 1State curren crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = x. Crop's remaining PAN balance (line v from section 11I) = y. Overall PAN balance (w - x) = 3543.5 Ib. PAN 863.5 Ib. PAN 3543.5 Ib. PAN -2680 Ib. PAN Line y must show as a deficit. If line y does not showasa deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new Information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance PoA (30 Day) 2/21 /00 able and recalculate the overall NAN balance. It animal waste is to be hauled to another permitted tacillty, provide nformation regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Odum I 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x tine d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 0 certified herd # 17.0 19.0 inches inches 2.0 inches 96000 ft2 119680 gallons 180 89219.9 36001 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design J. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + ky1000) x line 1= 6/1/21 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 78400 days ft3 ft3 ft3 ft3 97739 gallons 3.12 Ibs/1000 gal. 678.3 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): IOdum II Large 2. Current liquid volume in 25 yr./24 hr. storm sto age & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e, line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 1200 certified herd # 17.0 19.01 inches inches 2.0 inches 15000 ft2 18700 gallons 180 62701.8 2530 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 6/1/21 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 29740 ft3 8,560 ft3 ft3 47747 gallons 2.27 Ibs/1000 gal. 150.8 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Odum II Small 2. Current liquid volume in 25 yr./24 hr. storm sto age & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 0 certified herd # 17.0 19.0 Inches Inches 2.0 Inches 7650 ft2 9537 gallons 180 9890.4 300 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 6/1/21 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 4462.5] days ft3 ft3 ft3 ft3 5563 gallons 2.27 Ibs/1000 gal. 34.3 Ibs. PAN PoA (30 Day) 2/21/00