Loading...
HomeMy WebLinkAboutWQ0014079_Regional Office Historical File Pre 2018 (2)tate of North Carolina Department of Environment and Natural Resources Division of Water Quality James S. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director July 22, 1998 Mr. Jay H. Bost, Jr., P.E. Project Manager - Capital Projects Charlotte Mecklenburg Utility Department 5100 Brookshire Boulevard Charlotte, North Carolina 28216 Bost: NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AIM } NATURAL RESOURCES ?WV 1410, if ?4,A'I L' JUL Subject: Permit Charlotte Mecklenbug Utility Department Torrence Chapel Road Pump Station CMUD Job Number 205-95-649 Public Wastewater Collection System Mecklenburg County 9 In accordance with your modification request received June 11, 1998, we are forwarding herewith Permit No. WQ0014079 dated. July 22, 1998, to the Charlotte Mecklenburg Utility Department for the construction and operation of the subject wastewater collection extension. The modification consisted of a change in the diameter of the force main and a change in the size of the pumps. This permit shall be effective from the date of issuance until rescinded, shall void Permit No. WQ0014079 issued August 1, 1997, and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.Q. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. One set of approved plans is being forwarded to you. If you need additional information concerning this matter, please contact Ms. Joni Cardin at (919) 733-5083 extension 509. 11 A. Preston Howard, Jr., P.E. cc: Mecklenburg County Health Depa M ►+a11e Regional +Qffiee, Water Quality Section , Woolpert LLP NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO THE Charlotte Mecklenburg Utility Department Mecklenburg County FOR THE construction and operation of approximately 5,684 linear feet of 8-inch gravity sewer, a 323-GPM pump station with duplex pumps, on -site audible and visual high water alarms, on -site generator with automatic transfer switch, and approximately 12,392 Linear feet of 6-inch force main to serve 66 single-family dwellings for Torrence Chapel Road, and the discharge of 12,540 GPD of collected domestic wastewater into the Charlotte Mecklenburg Utility Department's existing sewerage system, pursuant to the modification request received June 11, 1998, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The facilities must be properly maintained and operated at all times. 4. The sewage and wastewater collected by this system shall be treated in the Charlotte Mecklenburg Utility Department's McDowell Creek Wastewater Treatment Facility (NC0036277) prior to being discharged into the receiving stream. 5. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality (Division) accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 1 r7. Construction of the sewers, pump station(s) and force main shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility '1' ity h been een installed in accordance 10. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 1 1. The Permittee shall provide for the pump station and force main the following items: a. Pump on/off elevations located so that 2-8 pumping cycles may be achieved per hour in the pump station, b. An air relief valve located at all high points along the force main, c. A screened vent for the wet well, d. Fillets located in the wet well at the intersection of the flooring and sidewalls, e. Three feet of cover (minimum) over the force main or the use of ferrous material where three feet cannot be maintained, f. Sufficient devices which will protect the pump station from vandals, and g. Flood protection if the pump station is located below the 100-year flood elevation. 12. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater collection facilities. 13. NONCOMPLIANCE NOTIFICATION: The Permittee shall report by telephone to the Mooresville Regional Office, telephone number (704) 663- 1699, as soon as possible, but in no case more than 24 hours or on the next working day following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. 2 Persons reporting such occurrences by telephone shall also file a written report in letter form within five (5) days following first knowledge of the occurrence. This report must outline the actions taken orproposed to be taken to ensure that the problem does not recur. Permit issued this twenty-second day of July, 1998 NORTH OL A E NTAL MANAGEMENT COMMISSION A. Preston Howard, Jr., P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0014079 3 Permit No. WQ0014079 July 22, 1998 ENGINEER'S CERTIFICATION Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, Project Name Location and County for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of this permit, the approved plans and specifications, and other supporting materials. Signature Registration No. Date 4