Loading...
HomeMy WebLinkAboutWQ0007449_Regional Office Historical File Pre 2018 (3)Fv A7. pG ■...-may Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen Sullins, Director Division of Water Quality February 6, 2008 Banks Garrison, Owner South Central Oil Co. 212 W. May Street Albemarle, North Carolina 28001 SUBJECT: Mallard Crossing Permit No. WQ0007449 Modification Wastewater Collection System Extension Final Engineering Certification Dear Permittee: The Division received a final engineering certification for the subject project on December 21, 2007. A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the life -of the project. If you have not received a copy, please contact your consultant immediately to obtain a copy. You are receiving this fetter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you, please complete Form PNOCF-S as this permit is not automatically transferable. Form PNOCF-S can be downloaded from htto://h2o.enr.state.nc.us/ndou/ndpuapps.html#Sewer. if you have any questions concerning this 'document or the completion of Form PNOCF-S (if necessary), please contact Ms. Dee Browder at the letterhead address or via E-mail at dee.browder@ncmail.net. Sincerely, L}Robert Krebs Surface Water Protection Regional Supervisor Enclosure Cc: HI. Moorefield, Orion Engineering Surface Water Protection Section Central Files (certification page only) NorthCarolina .Naturally Pretreatment, Emergency Response and Collection Systems Unit Internet httpilh2o.enr.nc.state.us/ndpu 1617 Mail Service Center, Raleigh, NC 27699-1617 An Equal Opportunity Action Employer Telephone (919) 733-5083 Fax (919) 733-0059 50% recycled/10% post -consumer paper Fast Track Engineering Certification Permit No. WQ0007449 Modification October 19, 2005 Complete and submit this form to the permit issuing regional office with the folio ing: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION � ❑ Partial ® Final I, j�. L• MIOu tom° ��Iv/., as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (® periodically, D weekly, ❑ full time) the construction of the Mallard Crossing, a Mecklenburg County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. ORION ENGINEERING, PLL vww.orinnengineeringpilc.con Suite 118 610-B Minuet Lane Charlotte, NC 28217 December 20, 2007 Ms, Dee Browder Division of Water Quality 610 East Center Avenue, Suite. 301 Mooresville, NC 281 '15 Re: Mallard Crossing Pump Station Permit No. WQ 0007449 October 1.9, 2005 Dear Ms. Browder: Enclosed is one set of "As Built" drawings, calculations, and the for the subject project. The one addition to the original project is required by the Charlotte Mecklenburg Utility Department for en Should you have questions, please advise. Very truly yours, H. L. Moorefield, ir., PE Lisk Sullivan Phone '704-5,23-1707 Fax 704-523-4435 gineer's Certification discharge manhole into their system. Received at the Mooresville .Regional C)ffce of the N. C. Department of Environ and Natural Resources at on by . D Q-Surface Water Pro e n n 1 Mk4-11.--0() LfO55" - ' • - L.? — - -g • exi 1-- 1" -I. ig po-c_ - • --t 1 1 • 11- ! I 11 I - . --. --.- - • I 46 e4--/ter . , . - - • - --- '---1 --- 1-- - - - ---— _,' . _ ri 1" OM P 1 ? &1 -3 I 0 4.14-44q0e, • I. ) /) IIP I m i,ui,i7t. - , , .• - , , , . , . I 1I;l•; iP 1 1;-I . 2 •1 LF. P ,i b i t) 1 1 I 1 1, •.,://; Xi 1 1 - e 2 , •!.43 t -='.- : _ 6 1 ' 1 1 - I -.1 . _ v vi _ ki Pr-fk ./ 1 7-17.0 • . • 1 .• -II— I — • .--.--`,.- ..,.. -- • 1 -1-- 1 -- —I-- -- - AJA) --' • I -.• .i ,o64Air.' 4. - •P P4-.,-,'_"?6-ii-6-31,- ' • .; 1 Li - - -I. .1 - •••[ - -- 1 - , . . .. -I _l_ _1 _ -1I1 I __I 1 , 1 I. --1 -----.'t ----1. -- j ; • ' 1 j 1 ; 1 i ; I I ! i - .--i, j .— -1.— ,.1 .. ... 1 1 I ; ; t 1 .1111 1 i • 11.1; : 6•7.(/1,0:6 'i 774-A 7,--V2. J(7 I(' ,C.)f-r-,--2 4 7 / 4_1Ai; _-, i', _ f.. 47,4...2 7, . 1 ._ , t i 1 1 • 1 1 i 1 _1 1 ' I 1 . j • A6-4-4 174-' o) 314 -4 4 1 • -1 - I : I 1 I i [ ' r 1 i - F DEC. 18. 2007 • 8:45AM ITT FLYGT CAROL INA.Startup Report ITT Flynt Corporation 611 Eogleton Downs Drive Pinevtlie, NC 28134-7622 Voice 704.504.5570 • - •Fax 704.50q 8954 Repoli Data: 1tDea07 Purchase Order No. Job No.: Pump Serial Numbers: Jw D 6/X 57 A�'t r�M�odel NO : Cb�S • L Start -Up Dale: /Q/% 1(1d 7 control Panel Mrgr. 2 # Ol0306-it [Project Location: 1 Ackre, pRE Au•C • Project Name: /24114�dPis 162 445N6 S Start -Up Technician: "Ti i. -t «lf.iVN C41 ' Er llneer'e Contact: QQ �'1Ct •Jrr Contractor's Contact: P 1 End Users Contaos FLA: 0J VOLTAGE UNITS OFF: n Lt-L2: Arr IL1•GND. / . 1HP'07 L2-L3: 21 EL2-GND:/ JL3-GND:/ZZ VOLTAGE UNITS ON: UNIT NO. 1: LT•L2: O L2•L3: P-16 L1-L3: 2.619 CURRENT: UNIT NO. 1: Lt-GND: j 2• I L2-GND: f ,.' . 2-• L3—GGND: LA, L1: 5- NO. 8 1 5 T. Phone: 7C>y 3.23- 17071. Engineer. rJ en'..1 Phone: Contractor. Phone: Eno User. VOLTAGE & CURRENT CHECKS GPM: TDH: VOLTAGE: � 00 PHASE: 3 UNIT NO. 2. Li-L2. +{ C7 L2-L3: d L 1-L3: d45 UNIT NO 3: L1-GND: I V- L2-GN0: J �Z L3-GND: /21 L1-L2: L2-L3: L1•LS. LI•GND: L2-GND; L3•GND: JUNIT NO. 2: Li: S •o L3: 'Li•�� AVERAGE L2: 1-/17 L 3 4./$ UNIT NO. 1: MAX OEV. UNIT NO. 3: L1: L2: L3: UNBALANCE CALCULATIONS VOLTAGE UNIT NO. 2: UNIT NO. 3: UNBALANCE UNBALANCE CALCULATIONS CURRENT UNIT NO. 1: AVERAGE MAX I]EV, UNIT NO. 2: UNIT NO. 3: UNBALANCE DRAW DOWN TEST MANHOLE D. = 5 ►—' SEC. DRAWDOWN SEC. DRAWDOWN SEC. DRAWDOWN = N. • 5 .. 0 0,00IGAL TT DEPTH IN. = PUMP RATE OF IN. = PUMP RATE OF IN. = PUMP RATE OF 0,00 0.00 VALUE! GPM FOR UNIT 1 674eM GPM FOR UNIT 2J /../pM GPM FOR UNIT 3 CONDITION OF STATION CONTROL PANEL: CL.ittOil f tijZf [FLOATS BRAND: AA]C%'t+dlQ OPERATION: STOP: QUANTITY1 ': ( (LEAD: V [LAG: AP-- ALTERNATION: GUIDE RAILS PLUMB?: �ar...o 'PUMPS RIDE RAILS: GENERAL NOTES: LAG/LAG: [ALARM: PUMPS CLEAR HATCH: 19/11f9n 7 1111 GgNERATOR SET DATA Generator Set Model / Serial No: Engine Model / Serial No: Radiator Serial No: Alternator Model /Serial No: Control Panel Type) Serial No: Load Transfer Panel Type/ Serial No: OC(53e:666 ran ,�aC /ot= Electrical Drawing No: Date of Delivery to End User: PRE -DELIVERY INSPECTION O 14Oa0 4CD —fri'G r- zG,336 z Lilel0 ai << ;•o ,zo8 ra ? < 2/0 1157a1 ..r 23 /110 / /?'I l�r t_URRICATION: Check all conne 1lons Check oil level Check protection switch FUEL: Check all connections (leaks. etc) • Check throttle and governor linkages AIR: Check air•fiilter pipework Check vent piping and connections Check air flap and solenoid (if fitted) WATER: Check and adjust fan belts Check antifreeze Inhibitor and levat (lop up as necessary) Check remote fans and pumps (if applicable) Check radiator core end tanks (leaks. etc) Check protection switch DC: Check and adjust alternator belts Check add Level of battery (s) (top up a necessary) Check condition of Tugs and terminals Check PCB lamps and wiring AC: Visually Inspect windings Check power connections Check ctrcuit breaker and connections Cheek.contactor panel connections and lamps;as applicable) HEATER: (If fitted) Check hose connections Check operation OFF LOAD TEST: Oil Pressure 4' 1 PSI/BAR Battery Charging Volts / f` . Z 1 V Frequency �s C �t/ Hz Other: SILENCER: Check system for fumes Comments: _ ✓ f Duty: Standby/ Prime Volts: V Rating:�VA Phase: Frequency3 %Hz .60 Inspections Satisfactory N/A Refer to Comments Not Applicable Water Temperature 1e AC Voltage 7 p tic C or RPM / 800 'CPF V rpm Distributor NameL,r::! r , . ,Q ! Signed: ^' / p WHITE - END USER YELLOW -DIKE PINK-OL1rIIrANWARRnHTYOPT CLYMPIAN WARRANTY DEPT, OLD GLENARM ROAD. LARNE. CO ANTRIM, BTdO 1 EJ, NORTHERN IRELAND OLYPoI.DOC C iT • 61 dOT • ea 7 a-QT-7T • An •, etAC wu s GENERATOR SET DATA Generator Set -Model / Serial No: Engine Model / Serial No: Radiator Serial No: Alternator Model / Serial No: Control Panel Type / Serial No: Load Transfer Panel Type/ Serial 1 LRG42.- GENERATOR SET COMMISSIONING SHEET /y0000ca PGUGFa / 08'3 652G-3 `� L /ta /y* 200 / 4C 4. No6o b2000360 7 C / i9 SC o3o Electrical Drawing No: 3e% 3 j-:0 Date of,Commiasioning: END USER DATA Company Namtv. Address: 1//(2 5 2f O/ 54f23/iQ Duty: Standby / Prime Volts: Zra' z & Rating: S kVA Phase: Frequency:dHz inspection Satisfactory NIA Refer to Comments Nol Appllcoble Genset Location: J? - 1'`77P C /Aj 8�,P1U f-n af.11 Fuel System 4ltater Level and Additives Lube Oil Leval Battery Electrolyte Level Battery Terminals and Wiring Beti Tensions Radiator and Alternator Guards Electrical Instruments Engine lnslruments Engine Temperature Engine Oil Pressure Earth Connections Electrical Connections Power Electrical Connections Como! Alarm and Shutdown Devices Enclosure Phase Rotation Comments: r/ 1 / FUSE and Fuse Ratings Manuals/Drawings Avaltable and Correll Load Test Exhaust System Cooling System Jacket Waterl0il Heater Crankcase Breather System Air Filtration System Battery Charging System Engine/Trickle Y'1 a -. Mains Fail System Functional Operation 'Z • ear•e/Panel Functional Operation Changeover Panel Functional Operation Main Circuit Breaker Functional Operation Motor Controls Synchronisieng Equipment Vibration Running Gear / r' IT IS THE RESPONSIBILITY OF THE ENO USER TO ENSURE ALL OILS ARE AS PER MANUFACTURER'S RECOMMENDATION AND A SERVICE PERIOD IS ESTABLISHED AND ADHERED TO AS FAILURE TO DO SO COULD RESULT IN WARRANTY BECOMING INOPERATIVE. Machine satisfactorily commissioned and handed over subject to oon mt rI : Distributor Nemo: "� /.? a I y' Stoned: End U,or signed: WHITE 'O USER YELLOW -DEALER PINK-OLYMPIAN WARRANTY DEPT ❑LYMPtAN WARRANTY DEPT. OLD GLENAtiM ROAD, LARNE. co ANTRIM, BT,10 1EJ. NORTHERN IRELAND OLYCOMM.DOC 7'—. i!f ,— F/F :SA dC.T•cn ,n_nr - i _/L Date: ! .-=ems=uc sENERATOR SET DATA Generator Set Model 1 Serial No: Engine Model / Set la:1Zs Radiator Serial No: Alternator Model / Serial No: Control Panel Type 1 Serial No: .Load Transfer'Panel Type/ Serial N°lJ,pu ,30110 3 3-0 C. J 0 Electrical.Drawing No:' Date of Ex Factory Shipment: Warranty Period:' WARRANTY REGISTRATION FORM 6.20F5 a14Ioao ca Duty: Standby 1 Prime Volts:3p V Rating:7C kVA f EPD /V/7/ ! 2 pip / k' 1 ;Ceti 9aF�i /9,311-'6 36c) /IR /m? tc/o/ / 5 9'7 ?//o .3„13 /9,-) iLF 12 Months from start up 18 Months from factory shipment (includes 6 month shelf life) Phase: 3 Or Frequency: 0 Hz END•US R DATA Company Name: _Fen ram'] J / r 0't ,[ - Address: ✓ n yr o c e "ed Generator Set Location: (if different) l;t b,. cr / '0/0 Date of Purchase: Day:_ Month: Year: Date of Start -Up: Day: Month: Year: Generator Set Duty: Prime / Standby Option Trailer i onop�j ! Attenuated DISTRIBUTOR DATA Distributor: I.1 i C`) t! .p�1 k► it '4' .I . Address: ,S 4.7 /aa-d J ere ' 4 il7e/ /e, _fir,' ' C 2 g47q / - gpr)• 2 ? G o Generator Set Location: 2;.Q Miles / Kilometres from Distributor I hereby confirm thaty-above generating set has been correctly installed at the above location. Signed: / / Date:Z'/ 9-01Positton: .5-7/� r-'C � • V11ARRANi1 DEPT. OLD GLENARM ROAD. LARNE, CO ANTRIM, BT40 1EJ, NORTHERN RELAND rtEG.000 C,7 • IGJ daT • GO JO-OT-7T • An •I IIAC YPJ -F- w� a lib • I � - I 1 I _ I i 1 I I j � I I I _i I i ? k - 'Vd 9 'I (r' 05s''1/' e2n y • o/ FNr.l 5'4_04*` • g'i.i r / z-Y CY017 00O( pc,6 air'i s7-t"s j Q¢iaC2.tdRs_frW (t ?0 yr�✓ xS-1. Sad (-Vrnoils) _ s cr4,5 xs i g- s71A7 G X dW1a1 No7+S 9 !Y f gY-YV-7V`,, scno7• 7( 'rr (//ddva15 • ' a pyThi L5 Y5 7F-M PV m P- - C 1• 4-D. -- - %..¢ 75 64011.8s 4,� )/,� - — --- I— — — Qao/4a = 70 _( Kvbgr 2E 4.1 t Y 74 (73 ,An' .P,5��7Jr_ 6.3/ -�-'�, b l = 1; Zli r • • 1 1 — r,0-5 _$ 1,5— ; -..Q4D.%D - 70 (19-� ' `i- ° S'e,97 /.11 _t_7, _g4 B. 3? F-7 1 A C1-. - — =?Od_e 1 r r + w.. .I 04•19/1 = 7P. (740 6 es-2,,4, g 40 z 5_4,07 FPa PF SG -AO cc l Pump, I 2-0 4.,_______,-7J(z3--.) 4 --) 70 / --iz 7 /ioO4 I I I I 4 I I_-- I - 5-:_GRM 4-4 (23 1 I I ii -- - --- I-1. -:(4'7'3- __ I©77l7I � 0 J.. _074(, i'n 1 - - - -4_�- 1 � _I _ _�I0b '7�I 45 4' 7 4 3/4-'-I Of' �755 7°7` 4405 /.4.71. 2--'lv0i:P^l'i 1 I I p, Dd r: I I I I i i I I z r�r��� G�°i7 I I I I I# # f i l l I I i III 1 1 �I ;I; 1 1j 1 i I ; I C — !- --- �� z7IF 0 • - • t I ; ; A,AI i76-A4 z - 1.1 Pa/1'11"i 14-0 . : - !Eat) v/4-416.Arr L&It.)47-11-5- FY )1z. Firr71416-1 14A-Ab 0 ic6J+41,4<5 - . • i ' , /0 • 19' i/eYi- .2„,:-.• IL . „,..—fr,60.y = (.47-511:1 . . .. ' 9- , ! '-' , i-/ , 1 L, .ts- .r -79_i(14):FJ74- , 7 7,1Y , 4io .4- 76--3;oi 1 .. : A-4,73 Aro 701t ?Fob „1.6) /74;7_ AEA aeo 7Z lipo)46)-- 7-2 ' - ) -I I I _.. 2,5 ' 047 -frit* ,61 I ,U 1 Ni 163 .5) 4:97 •-7 ' f -I ---t---j 1 ---- --- -; - -- 4‘ *,1,04----;,I:;3:Et__:____: _ __ _ Is .zreaatFri ; _ _ L7,9tioei:f4r. 7 676 194 -+ 374- Lily) •1''5 4/07 "Lie)'' _ 9 _ , -- - I ' -i - --, _ "--- - - - •--- - - -- - -- -.-73.- --- ..- --- '. - -- -73 Z,t-a) , • , ,,e, • I /J,05— `• - . ., .P7-17z:Z1-- +I i) ..i47I• -I I 1 • h I I- 1 aii-3' , — - _ 1..I ; .1111 tf• il — , 0 i- .1 -I-- 1 -'-- . 1--- - - • -- ;.--,----i----- .---------- -, I I I I I I I I / I I I I- 40. 1, g 1 1 I r---_-T:-Afri3-o-7: 4------ --1.--4"---LL-- 1 ._ _ 90_4A9E--_.._ 0 7. . . , J3-714(),_ .,I. A__ _ — Fe_. 141. 2.0.. , P ._:- __ 1 -- • 1 .1— • ivt I • - - - •I f I I 1 • I I • H.:a --If • ; i ___ k?..,p_..._,•5"4-1) : 1 1:7 -I I ' r- . 1 i , [ , -_r r - — --•, —1 - ) H & 1 c_!6 1 1 k 1 I • Z, 71 et'.4<.'s//4_004-T ••, 'g.t1 73/14 2.61 7-7- 30 (4-, I r r 1 -r 1 - ' :- I -- I -- T i —" — "---- . • _ - r , I '3,9'z2--rsc 1 x42,4- ff,olz :1‘ ZO-ro-U —"- 5,4ZW?(Z,.,?r15X 16-0 eq)1'„x40,5--x)15--o 4,43)1.41x157/10•.=- 7,741 _ _ 5, OALL-: 7,0 p / ^ '' --|--|--l-7---' . | | ' . / 7 | | / . - - ' / ^ ' ^ � | i | | - - / / / ^ [ ~ ^ ' / | / ~ - ' ` - / / � | , / / | � -_ - ' - _ ' , - - 0 IDA 2©02-04-93 MOTOR COS PHI MOTOR EFFICIENCY GEAR EFFICIENCY NTS POWER REDUCED 0 (hp) 1.6 DUTY POINTs BEP PERFORMANCE CURVE PROJECT OAD 3/4-LOAD 1/2-LOAD MOTOR SHAFT 0.97 0.97 POWER ,..... Q,96 STARTING 74.5 % 76,0 % 73.0 % CURRENT .,. RATED CURRENT ,.. INLET/OUTLET I RATED 55 mm SPEED ..... TOTMOM.OF MP. THROUGHLET INERTIA .., 1©mm NO.OF BLADES FLOWIus©r,,j1 HEADIItI POWER PIP] 70,7 29.0 1.55 ( 1.14) S: RISK OF SEDIMENTATION AT VELOCITY BELOW 1,5 m/s (Point (S) show nsk In a 55 mm pipe) CURVES SHOW PERFORMANCE W)TH � sr� u t S I P P EAR COLD WATER 2,3 hp 35 A 10 A 3325 rpm EFF. (%J NPSHPft] 33.4 (45.6) PRODUCT FS3068.18© CURVE NO 61- DI 291-©0-2390 IMPELLER AMETER _ 92 mrn MOTORTyPE STATOR 13-10-2BZ 03- FREO, ,PHASES VOLTAGE 69Hz( 1 _230V GEAR TYPE RATIO TYPE LT ISSUE REV 110 POLES 2 Q is uJ a