Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0038732_Regional Office Historical File Pre 2018
Water Resources ENVIRONMENTAL QUALITY November 8, 2016 Mr. Art Van Wingerden, Managing Member VJK DEVELOPMENT GROUP, LLC 16400 HuntersviIle Concord Road Huntersville, NC 28078 1 .1 Md�„IZ_ORY Governor DONALD R. VAN DER VAART Jetrcfwy S. JAY ZIMMERMAN Dirruor Subject: Permit No. WQ0038732 VJK DEVELOPMENT GROUP, LLC Covington Phase III B Wastewater Collection System Extension Permit Lincoln County Dear Mr. Wingerden: In accordance with your application received September 14, 2016, we are forwarding herewith Permit No. WQ0038732 dated November 8, 2016 to VJK DEVELOPMENT GROUP, LLC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 1.2: This Wastewater Collection System Extension must not be placed into service until such time as this Office has received written verification that pump station #37 has been upgraded, certified and placed into service. At that , time, this Office will release the Wastewater Collection System Extension for use and operation. Condition II.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the' licensing board. State of North Carolina I Environmental Quality 1 Water Resources I Water Quality Regional Operations Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704 663 1699 • If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Ori Tuvia at (704) 235-2190 or via e-mail at ori.tuvia nedenr.gov. Sincerely, by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: Donald Munday (P.E.) (E-copy) Mooresville Regional Office Files Water Resources Central Files PERCS (E-copy) Page 2 of 8 Environmental Quality STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION • DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter •143, General Statutes .of North Carolina as amended, and other applicable. Laws, Rules,, and Regulations, permission is hereby granted to the VJK DEVELOPMENT GROUP, LLC. Lincoln County for the construction and operation of approximately 1,357 linear feet of 8-inch PVC gravity sewer; to serve 31 Single family homes as part of Covington Phase III B development , and the discharge of 7,440 gallons per day of collected wastewater into the Water and Sewer Authority of Lincoln County existing sewerage system, 'pursuant to the -application received September 14, 2016; and in conformity with 1'5A •NCAC-2T; the 'Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump. Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed :and.. approved by the Department •of Environment and Natural Resources and considered a part of this, :permit This permit shall be effective from the date of issuance until rescinded and:shall be subject to the specified conditions and limitations contained therein. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division. of Water Resources, NCDEQ By authority of the Environmental Management Commission Permit Number: WQ0038732 Permit Issued.: .. November 8, 2016 , Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET VJK DEVELOPMENT GROUP, LLC is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the East Lincoln Sewer District Killian Creek Regional Wastewater Treatment Facility in accordance with Permit Number NC0088722. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS 1) No flow in excess of the quantity permitted herein, 7,440 GPD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A NCAC 02T.0304 (b)]. 2) This Wastewater Collection System Extension must not be placed into service until such time as this Office has received written verification that pump station #37 has been upgraded, certified and placed into service. At that tinrne, this Office will release the Wastewater Collection System Extension for use and operation. II. STANDARD CONDITIONS 1. This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Desi si Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] Page4of8 Pir 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections documented. f.' A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute § 143-215.1 C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its'representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following: Page 5 of 8 a. Any process unit failure, due to known or unknown reasons, that renders the faci incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mailmessages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part 1 of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143- 215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force rnains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted ;facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certificationis one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extensionprior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the perruit is issued to a private entity with an Operational Agreement, then a copy of the Articles of incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting document provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum. Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Page 6of8 PPPPrr Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15ANCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. . This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the . Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through § 143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page7of8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: VJK DEVELOPMENT GROUP, LLC PERMIT #: WQ0038732 PROJECT: COVINGTON PHASE III B ISSUE DATE: NOVEMBER 8, 2016 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMTTTEE'S CERTIFICATION L the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Perrnittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof Printed Name, Title Siw ature Date ENGINEER'S CERTIFICATION 1, , as a duly registered Professional Eri neer in the State of North Carolina, having been authorized to observe (0 periodically, weekly, 11 full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: Li Final fl Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 WTE OF NORTH CAROLINA COUNTY OF Lincoln Permit No. lilt -13a- HOME/PROPERTY OWNERS' OPERATIONAL AGREEMENT This AGREEMENT made pursuant to G.S. 143-215.1 (d1) and entered into this 27th day of March, 2015 , by and between the North Carolina Environmental Management Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and Covington HOA , a non-profit corporation organized and existing under and by virtue of the laws of :the State of North Carolina, hereinafter known as the ASSOCIATION. WIINESSETH: 1. The ASSOCIATION was formed for the purpose, among others, of handling the property, affairs and business of the development known as :CoiingtotPiiase [ll'B) (hereinafter the Development); of operating, maintaining, re -constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System); and of collecting dues and assessment to provide funds for such operation, maintenance, re -construction and repair. 2. The ASSOCIATION desires, to construct and/or operate a Disposal System to provide sanitary sewage disposal to serve the Development on said lands. 3. The ASSOCIATION has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and/or operate the Disposal System. 4. The Development was created subject to unit ownership in the dwellings units, other improvements and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the gi7ality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and ASSOCIATION do hereby mutually agree as follows: 1. The ASSOCIATION shall construct the Disposal System and/or make any additions or modifications to the Disposal System .in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions and law. 2. The ASSOCIATION shall provide in the Declaration and Association Bylaws that the Disposal System and appurtenances' thereto are part of the cornmon elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and local taxes and insurance. FORM: HOA 08-13 Page 1 of 2 The ASSOCIATION shell provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain, or construct the Disposal System beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance fund allocated for the facility and shall be part of the yearly budget. 4. In the event the common expense allocation and separate fund(s) are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall be provided such that special assessments can be made as necessary at any time. • 5. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the ASSOCIATION shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into .said governmental system, and shall convey or transfer as much of the Disposal System and such -necessary easements as the governmental unit mayrequire as condition of accepting the Development's wastewater, 6. Recognizing fliat it would be contrary to the public interest and to the public health, safety and welfare for ...the'ASSOCIATION to .enter into voluntary dissolution without having made adequate provision for the continued .proper maintenance, repair and operation of its Disposal System, •the ASSOCIATION shall provide in the ASSOCIA.TTON Bylaws that the ASSOCIATION shall not enter into voluntary dissolution without fist having transferred its said system and facilities to some person, coapotation or other entity acceptable to and approved by the COMMISSION by the issuance of a permit. 7.. The ASSOCIATION shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the ASSOCIATIONS successor, 8. The agreements set forth in nuMbered paragraphs 1, 2, 3, 4, 5, 6, and 7 above shall be conditions of any permit issued by the COMMISSION to the ASSOCIATION for the construction, maintenance, repair and • operation of the Disposal System. .9. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. 1N WITNESS WHEREOF this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each. of the parties named below: FOR THE ENVIRONMENTAL Covington HOA MANAGEMENT COMMISSION Name of ASSOCIATION f g ray Zimmebman, Director Division. of Water Resources 114641,14,, (Date) FORM: HOA 08-13 (Signature) Art VanWingerden. Manager Print Na e and Title (Date) Page 2 of 2 Division of Wat Resources 15A 'AC 02T 0 State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application 'Numbe to be completed by DW'tt) All items must be co Dieted or the application will ke returned APPLICANT INFORMATION: 1. Applicant's name: VJK Develo _rnertt Grou LL,C 2. Applicant type: ® Individual 0 Corporati El Federal ❑ State/County 0 party, municipality, HOA, utility, etc.) General Partnership © Privately -Owned Public Utility 0 Municipal Other Signature authority's name: Art Van Wingerden per .15A NCAC 02T...0106(b) Title:.Mana,ging Member 4. Applicant's mailing address: 16400 Huntersville Concord Road City: Huntersviiie State: NC Zip: 28078- Applicant's contact information: Phone number: (704) 875-137'1 Email Address: PROJECT INFORMATION: 1, Project name: Covington_Phase 1; 2, Application/Project status: Proposed (New Permit) [] Existing Permit Project If a modification, provide the existing pennit number: WQOO and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Lincoln 4, Approximate Coordinates (Decimal Degrees): Latitude: N.35-31° Longitude:-W.80-5n9` 5. Parcel .ID (if applicable): 4604-79-6223 (or Parcel ID to closest downstream sewer) CONSULTANT INFORMATION: Professional Engineer: Donald 1 Mundav i..rcen;sc Number: 17327 Firm: Piedmont De.sit n Associates, P.A. Mailing address: 125 E. Plaza Drive, Ste 1 1 City: Mooresville State: NC Zip: 28115-_ Phone number: (704) 664-7888 Email Address: dmunday ccpdapa.corn IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1, Facility Name: Killian Creek WWTP Permit Number: 0088722 Owner Name: East Lincoln Water and Sewer District V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different titan WWTF): 1. Permit Number(s): WQ. Downstream (Receiving) Sewer Size: inch. System Wide Collection System. Permit Number(s) (if applicable): WQCS Owner Nante(s): FORM: FTA 1i4-16 Page i of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a DeveIoper's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ® Yes ❑No ❑N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Residential Leased ❑ School / preschool / day care ❑ Food and drink facilities ❑ Businesses / offices / factories ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash 0 Other (Explain in Attachment) 5, Nature of wastewater : 1100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103 (20)) �AIs there a Pretreatment Program in effect? ❑ Yes ® No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ® No If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(t)) Daily Design Flow n'b No. of Units Flow Single family homes 240 gal/day 31 7440 GPD gal/ GPD gal/ GPD gal/ GPD gall GPD gall GPD Total 7440 GPD a See 15A NCAC 02T .0114(b), (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i e , minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 7440 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: O Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1305 PVC 8 52 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the IVIDC VHI. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - . ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): • Size (inches) Length (feet) Material 6. Power reliability in accordance with I5A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): > Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility Or if the pump station has an average daily flow Iess than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305 (h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. > If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T ,0305(f) & (g) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Storm sewers and other utilities not listed below (vertical) Water mains (vertical -water over sewer including in benched trenches) Water mains (horizontal) Reclaimed water lines (vertical - reclaimed over sewer) Reclaimed water lines (horizontal - reclaimed over sewer) **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item 1X.2) **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundation Any basement Top slope of embankment or cuts of 2 feet or more vertical height Drainage systems and interceptor drains Any swimming pools Final earth grade (vertical) Yes ❑ No Separation Required 24 inches 18 inches 10 feet 18 inches 2 feet 100 feet 50 feet 10 feet 5 feet 10 feet 10 feet 5 feet 10 feet 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water CIassifications webpage ➢ If noncompliance with 02T.0305(f) or (0, see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected Yes ❑No 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .02007 ® Yes ❑ No ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No ➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15ANCAC 02T,0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ®No ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and Iocation). High priority lines shall be inspected by the permittee or its representative at Least once every six -months and inspections documented per I5A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 �?epare xn aeeoxdap�a �tlte appltcals a xs�tt alions,?k rah , e R irg' 4 s a 3 '�rZ� �+ v?3l x45'+ r�.'ih4 oir Cmdv t %,Seer sx atest,iVerst i�),r "and t naulr qD Ipti3, Crtten k, r ao ▪ Fa T'i'r s4 4 tb e+ d t �✓ k `au �nRaree Iditnnsk�l est version k Althougit other prntessiettats;,ma rhave deve▪ loped, eerta}nv- �.•: f.._ t 1 i� -•..[ E L. CV'�Se.. i J __A C� t a f 1 1 ; "7- 51 4 A•Y rt t tblastost ot, the .materials under-Imy's�gna tus nnd;seal sign ies ttiat�I have re ewed2tlus' e + i c'7b• r %f• -;..ra�...��, � `}�''., 3q 4�, � 't.-"'"c,�kl iaK•.1^-�_'1�i�1 �µrr'�'t�. ..�,F- a u� }r� .yi �sZ, er�,r �5a �'+r�d y� x�Sl��� i CAiL�02T,'�We`N1�n�muni lle��gnkC�nteria luritite E'ermit[�in� af'P�iTr}n S�t�n�t�+ +�: 'f a 5 '7` 1¢✓ tyta r� r 19a- `tF" C:Fi �+ 5�;,"- EY 5. a s-+; ue �M '.�s,{ �1Y'`l'S„ kl Cray' 1iSezx�er]Mth ntnm Dcsigii�Cntetla la€esi<v rs�nu ��5 a p�tca6lo � � , � �: �1 ®va t"� i_ _._�7t ..ni ..L^'S �; (!'•z f�i`,3�Fus �, .}` S:i}�,r�� t'S. to a �' olica $ii"�(Y G]O 14 and sn o this documentsr . za aIbe F t'�ac Ap ltcatiou«4piu+iasuprortlfl e; t s,namel v44i4 •--. ka�• •. Ja 4 , a� Mattes lit •Apptcetsnn�iteill'1,), : x FS a a„ i' i �6 7+ ,,., i - -•s'ra• fir. 4 .r r G 34''•• • • Mete and consist nt rith tt eeir oaro ipAlte�stn=t teEpletts, speetfiratEonst .i,r t s C,}2 ? r5 v k� !i l r 9 gaeeurnentette. #a the west ormy kn�uwleage .q. further attest.thacato nbest YA .. �3kY r: 3 .. � , • Icx' ;t:=;�4?t'1.. r:#� �':ii�.� �5¢ x', ,�� �r? >; :as ,L } tirt r4= a Ba onststent��V1f�1}t316; 1rop e{ ' e31 IncVY'Ai t4t.rkx'i. -if \ l \ i�GLiS 1Th ,7 C.katcr IiC;u� State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: VUK Development Group, LLC Project Name for which flow is being requested: Covington Phase III B More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Killian Creek WWTP b. WWTP Facility Permit #: NC0084573 All flows are in MGD c. WWTP facility's permitted flow 3.35 d. Estimated obligated flow not yet tributary to the WWTP 0.791 e. WWTP facility's actual avg. flow 1.058 f. Total flow for this specific request 0.007 g. Total actual and obligated flows to the facility h. Percent of permitted flow used 1.849 55.2% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Station Firm (Name or Capacity, * Number) MGD #4 0.302 #15 2.52 (A) Design Average Daily Flow** (Firm / pf), MGD (B) Approx. Current Avg. Daily Flow, MGD 0.121 0.054 I.01 0.858 #37 4.17 1.67 1.058 (C) Obligated, Not Yet Tributary Daily Flow, MGD (D)=(B+C) Total Current Flow Plus Obligated Flow 0.055 0.109 0.628 1.486 0.791 (E)=(A-D) Available \� Capacity*** 0.012 -0.476 1.849 -0.179 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is ¢ 0. Downstream Facility Name (Sewer): East Lincoln Water and Sewer District Downstream Permit Number: WQCS00149 Page 1 of 6 FTSE 04-16 III. Certification Statement: I Donald V. Chamblee, Jr. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing O icial Signature ""19/Zal � Date Page 2 of 6 FTSE 04-16 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): is Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 42.3 % and 0.628 MGD of the Available Capacity (E) in Pump Station 15 ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.060 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely LowesvilIe Sewer is in design or under construction with planned completion in 2017 ; and/or d. The following applies: The County is currently in bid phase for the Lowesville Sewer Project which will double the capacity at Station # 15. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143-215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. 0)1. Signing Official Signatza e Date Page 3 of 6 FTSE 04-16 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section If where Available Capacity is < 0. Pump Station (Name or Number): 1 Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 47.3 % and 0.791 MGD of the Available Capacity (E) in Pump Station #37 ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.060 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Killian Creek Pump Station Upgrades is in design or under construction with planned completion in 2017 ; and/or d. The following applies: The County is near ly complete with the construction phase of the Killian Creek Upgrade at Station #37. This upgrade will more than double the capacity at the station. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143-215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Cf 126(6 Date Page 3 of 6 FTSE 04-16 L Instructions for Flow Tracking/Acceptance form (FTSE) and Planning Assessment Addendum (PAA) Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + f] h. Percent of permitted flow used: Equals [(g / c)* 100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January I5, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f.=0.015MGD g. = 3.215 MGD h. = 53.6% The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD: c. = 6.0 MGD d.=0.515 MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8 % Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 04-16 Section II List the pump station name or number and approximate pump station firm capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet tributary (C). Firm capacity is the maximum pumped flow that can be achieved with the Largest pump out of service as per the Minimum Design Criteria. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not Less than 2.5. If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in the permitting process. (A) (B) Design Firm Average Pump Station Capacity Daily Flow (Name or Number) MGD (Firm / pf) Kaw Creek PS 0.800 0.320 Valley Road PS Approx. Current Avg. Daily Flow, MGD (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity* 0.252 0.080 0.332 -0.012 1.895 0.758 0.472 0.135 0.607 0.151 Page 5 of 6 FTSE 04-16 .. Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section II where available capacity is < O. A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or construction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion, flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance compliance. For example: Given that: a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01 MGD per year; and that c. A funded capital project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: The master plan and ten year capital plan contain recommended scope and funding for a capital project entitled Kaw Creek Pump Station upgrade with funding planned in July 2014. This project is planned to add 0.100 MGD to the firm capacity of the pump station by October 2015. Inclusion of this proposed capital project as a condition of this Flow Tracking/Acceptance for Sewer Extension Permit Application elevates this project's priority for funding and construction to be implemented ahead of the activation of obligated, not yet tributary flows in amounts that exceed the firm pump station capacities identified in Section II above. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. Page 6 of 6 FTSE 04-16 UWU PLO INl SUUXCL Fax:9197330719 Jan 29 2007 14:10 P.02 °i�`�0 Michael F. Easley, Governer 6 William G. Ross Jr.. Secretary North Carolina 13epart'nentOf Envirumrentand Natural Resouloft =i Aron W. Klimek, P.E., Director • DMvisian of Water Quality January 29, 2007 Mr. Stephen A. Gilbert, P. E, Director Lincoln County Public Utilities 115 West Main Street • Lincolnton, North Carolina 28092 Subject: Lincoln County - Middle Forney Creek WW1"? Residential Flow Reduction Approval Lincoln County Dear Mr. Gilbert: Ipn August 28, 2006, the Division of Water Quality received a flow reduction request for residences in Lincoln County served by the Middle Forney Creek WWTP (Permit No. NC0074012). The letter requests an allowable flow rate of 160 GPD per residential connection based on the evaluated data from the WWIP and the active number of residential connections. The DRY data provided between January 1996 and December 2006 with daily readings taken during November 2006 and December 2006 was analyzed by central office and regional office staff with additional information requested. Based upon this data and the County use to our additional information requests, the Division hereby approves the use of 80 (YPD per residential bedroom, with a minimum of 160gpd for one and two bedroom units in all applicable non -discharge permit applications. Flow shall be incremented by 80/gpd for each bedroom, above two. Regardless of the adjusted design daily wastewater flow rate, at no time ,ball the wastewater flows exceed the a luent limits defmcd in the NPDESiserrna, "t for the treatment facility or exceed the capacity of the sewers downstream of any new sewer extensjon or service connection(s). A pemnut modification and fee is required to apply this flow reduction to any existing permits where flows have bees allocated_ Ifyou have any questiross or comments regarding this matter, please contact Bennie Goetze, Jr., P. B. at (919)733-5083 ext. 375. Sincerely, Alan W. Klimek, P.E. dl cc: Ms. Dee Browder, Mooresville Regional (Ace Ms. Susan Wilson, NPDES West Program 1,.1itCs Flow Reduction File Pre4eatmert, Emergency Response and Collection Systems Unit Internet htipl/h2aenrncstate.tislndpu Caro a 1617 Moll Service Center, Raleigh, NC 27699-1617 An Equal OppotturrItyActon Employer aural l Telephone (919) 7335083 Fax (919) 733-0059 50% recycled/10`l6 post -consumer paper 7/20/2016 Corporations Division Click Here To: North Carolina Elaine F. Marshall DEPARTMENT of THE Secretary SECRETARY OF STATE PO Box 29822 Raleigh, NC 27626-0622 (919}807-2000 Account Login Register View Document Filings File an Annual Report • Amend a Previous Annual Report Print a Pre -Populated Annual Report form Corporate Names Legal: VJK Development Group, LLC Limited Liability Company Information Sosld: Status: Annual Report Status: Citizenship: Date Formed: Fiscal Month: State of Incorporation: Registered Agent: Corporate Addresses 1302553 Current -Active Current Domestic 2/18/2013 December NC Colitti, Michael Mailing: Principal Office: Reg Office: Reg Mailing: 16400 Huntersville-Concord Rd. Huntersville, NC 28078-6650 16400 Huntersville-Concord Rd. Huntersville, NC 28078-6650 16400 Huntersville-Concord Rd. Huntersville, NC 28078-6650 16400 Huntersville-Concord Rd. Huntersville, NC 28078-6650 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Managing Member : Managing Member : Managing Member : Managing Member : Managing Member : Managing Member : Todd Johnson 16959 Huntersville-Concord Rd • Huntersville NC 28078 Joey Karaffa • 14920 Old Vermillion Dr Huntersville NC 28078 Abe Van Wingerden 15726 Huntersville-Concord Rd Huntersville NC 28078 Art Van Wingerden 16701 Huntersville-Concord Rd Huntersville •NO 28078 Michael Van Wingerden 14925 Ramah Church Road Huntersville NC 28078 Thomas Van Wingerden 6395 Pleasant Grove Church Rd htipsJ/www.sosnc.gov/5earchlprofcorp!10177535 1/2 r!Z pe6 Google Maps Go << 11k,I. R wwa EV;tellin,, _» Cat : Kfihrtht tuao,'"Ny;, _»_ Map data C2016 kale 1000ft w#i+mgl _W t$C5G7304wmm9506Je 1/1 PIEDMONT DESIGN ASSOCIATES, P.A. 125 East Plaza Drive, Suite #101 Engineering Mooresville, NC 28115 Surveying Phone: 704-664-7888 Fax: 704-664-1778 Planning Email: jhart@pdapa.com July 20, 2016 RE: Covington Subdivision Phase RIB To whom it may concern: This project consists of 1357 LF of 8" gravity sanitary sewer line and six manholes to serve 31 single family homes in Covington Subdivision Phase IIIB in Lincoln County, North Carolina. This permit will add flow for 31 lots (3 fiats @ 240 GPD each) and 7,440 GPD, Phase IIIB connects to an existing manhole at the intersection of Blades Trail and Sarah Drive which flows to the west to an existing pump station (LCPW Pump Station #4) along Blades Trail which is part of the system owned by East Lincoln Water and Sewer District, Please call me if you have any questions, thank you. Piedmont Design Associates, P.A. (j• John H. Hart Design Technician SEWER SYSTEM CALCULATIONS FOR COVINGTON SUBDIVISION (FORMERLY BURTON CREEK) PHASE IIIB.. DENVER, LINCOLN COUNTY, NORTH CAROLINA July 20, 2016 PREPARED FOR: VJK Development Group, LLC 16400 Huntersville Concord Road Huntersville, NC 28078 Phone: (704) 875-1371 PREPARED BY: Piedmont Design Associates, P.A. Suite 101, Westfield Center 125 East Plaza. Drive Mooresville, NC 28115 Phone: (704) 664-7888 Fax: (704) 664-1778 PIEDMONT DE5ION ASSOCIATES, P.A. 125 East Plaza Drive, Suite 101 Mooresville, North Carolina 28116-8812 Telephone (704) 664-7888 Fax (704) 664-1778 Project: Job No. Engineering Surveying Planning Covington Subdivision Phases 1, 2, 3 & 4 05-1 1 -1 1 Date: 03/23/201 i Phase la 1b 1c 1 (Total) 2a (Prev. Permited) 2b 2c 2(Total) 3a 3b 3c 3 (Total) # of Connections 35 39 19 93 74 22 72 168 29 31 12 72 Flow/RDU 240 240 240 240 240 240 240 . 240 240 240 240 240 16. Design Calcs for Proposed Gravity Collection Sewer Average Daily Design Flow (GPD) 8,400 9,360 4,560 22,320 17,760 5,280 17,280 40,320 6,960 7,440 2,880 Average Daily Design Flow (GPM) 5.83 6.50 3.17 15.50 12.33 3.67 12.00 28.00 Line Size (Inches) 8 8 8 8 8 8 8 8 Mannings 1/n11 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 Min. Design Slope (Ft/Ft) 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 Full Flow Line Capacity (GPM) 421.22 421.22 421.22 421.22 421.22 42122 42122 42122 Full Flow Velocity (FPS) 2.69 2.69 2.69 2.69 ADDF % of Line Capacity 1.38% 1.54% 0.75% 3.68% Peakng Factor 2.5 2.5 2.5 2.5 Peak Daily Flow % of Line Capacity 3.46% 3.86% 1.88% 9.20% 2.69 2.69 2.69 2.69 2,93% 0.87% 2.85% 6.65% 2.5 2.5 2.5 2.5 7.32% 2.18% 7.12% 16.62% 17,280 4.83 5.17 2.00 12.00 4 AII(Total) Page 1 of 1 58 391 240 240 13,920 93,840 9.67 8 8 8 8 8 0.013 0.013 0.013 0.013 0.013 0.0060 0.0060 0.0060 0.0060 0.0060 421.22 421.22 421.22 421.22 421.22 2.69 2.69 2.69 2.69 2.69 1.15% 1.23% 0.47% 2.85% 2.29% 2.5 2.5 2.5 2.5 2.5 2.87% 3.07% 1.19% 7.12% 5.74% 65.17 8 0.013 • 0.0060 421.22 2.69 15.47% 2.5 38.68% Filename:Burton Creek-Pump-staids COUNTY OF LINCOLN, NORTH CAROLINA 1 1 5 WEST MAIN STREET, 2N0 FLOOR CITIZENS CENTER, LINCOLNTON, NORTH CAROLINA 28092 DEPARTMENT OF PUBLIC WORKS PHONE (704) 736-8497 FAX (704) 736-8499 W W W. LINCOLNCOUNTY.ORG September 09, 2016 VJK Development Group, LLC Attn: Art VanWingerden 16400 Huntersville Concord Road Huntersville, NC 28078 RE: Covington Phase IIIB Sewer Availability Mr. VanWingerden, This letter is provided in response to your request, dated July 20, 2016, for flow acceptance of the wastewater treatment infrastructure (the "System") for the Covington Phase IIIB Development (the "Project"). Lincoln County (the "County") has the actual average daily flow capacity at its Killian Creek Wastewater Treatment Plant to treat the domestic wastewater as requested, and does conditionally grant approval for the Project, subject, however, to the terms and conditions below: 1. The amount of flow requested for the Project is for 31 Iots with a total flow of 7,440 gallons per day of additional flow at the NCDENR approved reduced flow rate of 240 gallons per day per home into LS-4; and 2. For the NCDENR Permits, the receiving sewer treatment facility is the Killian Creek WWTP, Permit #NC 0088722. The sewer collections facility is the East Lincoln County Water and Sewer District, Permit #WQCS 00149; and 3. The County shall not be named as the Permittee on NCDENR system applications. You must make the application to NCDENR in your own name for the System; and 4. Acceptance of the System and transferal of the System to the County is subject to the following: a. A complete final inspection and approval of the System by the County, and receipt of other applicable documentation requested by the County; and b. Approval of the System by NCDENR, and proof provided to the County of a valid permit issued by NCDENR with an Authorization to Construct (ATC); and c. Initiating construction of the Project within two years of the date of this conditional approval. You must notify the Lincoln County Public Works Department in writing when construction of the Project is initiated; and d. The County continuing to have actual average daily flow capacity to treat the domestic wastewater as requested at the time all other conditions precedent have been satisfied. This acceptance and allocation of flow shall only be effective upon your compliance with all of the above terms and conditions and the County providing an acknowledgment that you have complied with all of the above terms and conditions. Included in this mailing is the Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE — 04/16) with the County's portion completed. If you have any questions, please do not hesitate to call me at 704-736-8497. Chris Henderson Engineering Associate Cc: File Letter of Transmittal Piedmont Design Associates, P.A. 125 East Plaza Drive, Suite 101 Mooresville, NC 28115 (704)664-7888 Fax: (704)664-1778 Email: ihart,(c11pdapa.com To: NCDENR-DWR 610 E. Center Avenue Mooresville, NC 28115 DATE September 13, 2016 COPIES 2 These are transmitted For approval ❑ For your use Q As requested Job Number: 05-11-11 Covington Phase IIIB NO. DESCRIPTION All Calculations and forms to be reviewed. 1 original and 1 copy. For review & comment ❑ FOR BIDS DUE: REMARKS: ❑ Approved as submitted 0 Resubmit © copies for app. ❑ Approved as noted L Submit ❑ copies for dist. ❑ Returned for ❑ Return ❑ corrected prints corrections Please review and if you have any questions, give myself or Donald L. l unday of our office a call. Signed: esign Technician cc: Corporations Division Page 1 of 1 North Carolina leino F, marshal, DEPARTMENT OF THE Secretary C ETA �� . �' r PO Box 29822 Ralelrfl, NC276'2s.WJ&2 ; (9190r7-2{7i18 Click Here To: Account Login Register View Document Filings File an Annual Report Amend a Previous Annual Report Print a Pre -Populated Annual Report form Corporate Names Legal: VJK Development Group, LLC Limited Liability Company Information Sosld: Status: Annual Report Status: Citizenship: Date Formed: Fiscal Month: State of Incorporation: Registered Agent: Corporate Addresses 1302553 Current -Active Current Domestic 2/18/2013 December NC Colitti, Michael Mailing: Principal Office: Reg Office: Reg Mailing: 16400 Huntersville-Concord Rd. Huntersville, NC 28078-6650 16400 Huntersville-Concord Rd. Huntersville, NC 28078-6650 16400 Huntersville-Concord Rd. Huntersville, NC 28078-6650 16400 Huntersville-Concord Rd. Huntersville, NC 28078-6650 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Managing Member : Managing Member : Managing Member : Managing Member : Managing Member : Managing Member : Todd Johnson 16959 Huntersville-Concord Rd Huntersville NC 28078 Joey Karaffa 14920 Old Vermillion Dr Huntersville NC 28078 Abe Van Wingerden 15726 Huntersville-Concord Rd Huntersville NC 28078 Art Van Wingerden 16701 Huntersville-Concord Rd Huntersville NC 28078 Michael Van Wingerden 14925 Ramah Church Road Huntersville NC 28078 Thomas Van Wingerden 6395 Pleasant Grove Church Rd Kannapolis NC 28081 http://www.sosnc.gov/Search/profcorp/10177535 9/15/2016 VtNumber WQ0036732 Central Files: APS _ SWP _ 11/7/2016 Permit Tracking Slip Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer ori.tuvia Coastal SWRuIe Permitted Flow 7,440 Facility Status Project Type In review New Project Version "A Permit Classification Individual Permit Contact Affiliation Facility Name Covington Phase III B Location Address Owner Major/Minor Minor Facility Contact Affiliation Region Mooresville County Lincoln Owner Name Vjk Development Group LLC Dates/Events Owner Type Non-Govemment Owner Affiliation Art Van Wingerden 16400 Huntersville Concord Rd Huntersville NC 28078 Orig Issue 11/8/2016 App Received 9/14/2016 Regulated Activities Subdivision Wastewater collection Outfal I Draft Initiated Scheduled Issuance Public Notice Issue Effective 11/8/2016 11/8/2016 Requested /Received Events Expiration Additional information requested Additional information received 9/19/16 11f7/16 Waterbody Name Streamlndex Number Current Class Subbasin ts, Water Resources ENVtRONMENTAL QUALITY September 20, 2017 lVIr. Art Van Wingerden, Managing Member VJK DEVELOPMENT GROUP, LLC 16400 Huntersville Concord Road Huntersville, NC 28078 SUBJECT: Final Engineering Certification Acknowledgement Covington Phase III B Permit No, WQ0038732 Permitee:VJK DEVELOPMENT GROUP, LLC County: Lincoln Dear Mr, Wingerden: ROY COOPER Goverlor ICHAkEL S. REGAN Secretary S. JAY ZI The Division of Water Resource's Mooresville Regional Office received the final engineering certification with record drawings for the subject sewer extension project on 9/19/2017. Enclosed is a certification page for your records. A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. However, if a full technical review is conducted, you will be notified of any items of non-compliance. Please be reminded that the Perrnittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received such copy from your consultant, please contact them immediately to obtain a copy. Lastly, you are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you or your company, please complete Form PNOCF since the permit is not automatically transferable. Form PNOCF can be downloaded from http://portal.ncdentorg/web/wq/swp/ps/cs/pnoc from the Collection Systems Applications page. Should you have any questions, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori cdent,gov. Sincerely, Ori Tuvia, Environmental Engineer Mooresville Regional Office Division of Water Resources, DEQ cc: Donald Munday (P.E.) (E-copy) Central Files MRO ERMAN Director State of North Carolina 'Environmental Quality Water Resources OICE Center Avenue, Suite 301, Mocresvifle. NC 2811$ Ptone: 704-663-1699 Interoet: ,arn,v.scilear goat V. FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: VJK DEVELOPMENT GROUP, LLC PERMIT #: WQ0038732 PROJECT: COVINGTON PHASE III R ISSUE DATE: NOVEMBER 8, 2016 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this perrnit until the Division has received this Certification and all required supporting doctunentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Pennittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITrEE$S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and a Pennittee is Rrcp red to operate & maintain the wastevaterr collection system permitted herein or s-thZereof. re ENGINEER'S CERTIFICATION July 31, 2017 Date 1, Donald L Munday , as a duly registered Professional En ineer in the State of North Carolina, having been authorized to observe ( j periodically, 0 weekly, U full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum. Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seat gnature & date: Ej Final [j Partial (include description) Comments/Qualifiers (attach if necessary): NC DWR Water Quality Reglonal Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: l7041663-1699 FAX (704)-633-6040 Water Resources ENVIRONMENTAL QUALITY ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director As built check list (reference 2T .0300) Reviewed By: Ori Tuvia Review Date: 9/20/17 Project Name: Covington Phase 111 B WQ#: WQ0038732 1) As -built has been signed, sealed, and dated by an N.C. PE ® Yes ❑ No 2) Adequate information related to sewer lines : Note that per the 2T and MDC, there is a minimum 8" for public gravity or minimum 6" for private gravity, Three (3) feet minimum cover shalt be provided for all sewers unless ferrous material pipe is specified. Manholes shall be installed: at the end of each line, at all changes in grade, size, or alignment, at all intersections, and at distances not greater than 425 feet, minimum diameter of manholes shall be 4 feet (48 inches). ® Yes ❑ No ❑ N/A 3) Adequate information related to pump stations: Ensure power reliability option is selected (15A NCAC 02T.0305(h)). ❑ Yes ❑ No ® N/A 4) Is Project design is in accordance with (see section B.13 of FTA 12-12) 15A NCAC 02T Gravity Sewer Minimum Design Criteria (Iatest version) Minimum Design Criteria for Permitting of Pump Stations and Force Mains (latest version). ['Yes ❑ No ® N/A If no, a variance approval is required per the requirements of 15A NCAC 02T.0105(b) 0 Applicant must submit TWO copies of the plans, specifications, and calculations ❑ Contact the Central Office to discuss the variance request to determine a course of action. The central office will review the variance request, and if approvable, specific language regarding the variance will be forwarded to the Regional Office reviewer to incorporate into the permit. A copy of the variance letter (or email correspondence) should be kept with the application file. 5) Project contains high priority lines (15A NCAC 02T .0402(2)) ❑ Yes ® No If Yes, insure that the permit contains the necessary condition related to high priority lines 15A NCAC 02T.0403 (a)(5) 6) Is the Sewer As -built length within 10% of the fast track applied Length? (I Original length of pipe — As built length [ / Original length) < 10%. ® Yes ❑ No If no application need to be modified State of North Carolina Environmental Quality I Water Resources [ Water Quality Regional Operations Mooresville Regional Office 1610 East Center Avenue, Suite 301 j Mooresville, North Carolina 28115 704 663 1699