Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW1210802_Design Calculations_20210818
WGLA Engineering, PLLC 724 5th Avenue West Hendersonville, NC 28739 (828) 687-7177 wgla.com August 11, 2021 Mr. Mike Randall Stormwater Permitting Section NC Dept. of Environment & Natural Resources 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Pardee Partners ASC Town of Mills River Post Construction Stormwater Permit (High Density) WGLA # 21108 Dear Mr. Randall: Please find enclosed the Stormwater Management Plans and calculations for the proposed Pardee Partners ASC building in Mills River, North Carolina. This project involves the construction of a new medical facility on approximately 3.31 +/- acres in the Town of Mills River, North Carolina. The estimated impervious area developed will be 1.25 +/- acres, so the estimated percent built upon at completion will be approximately 37.76%. As a result this project is not considered a low -density development. Post construction stormwater management for this project will be accomplished by a collection system from the parking and drive areas into a bio-retention cell. Additionally, the building downspouts will be collected and directed to the bio-retention cell. If you have any questions about our submittal or need additional information, don't hesitate to contact our office. Sincerely, WGLA Engineering, PLLC ared L. DeRidder, P.E. C I V I L E N G I N E E R S & L A N D P L A N N E R S Pardee Partners ASC Town of Mills River Henderson County, North Carolina SUPPORTING CALCULATIONS FOR Pardee Partners ASC Stormwater Management Plan (High Density) — Supporting Documentation TOWN OF MILLS RIVER HENDERSON C NTY, NORTH CAROLINA WHIM e0000,00 o�, o ,o�oFEssio ^� 2 ; 8 SEAL o 0 0 041349 gy^- O-G -ZoZ( WGLA Engineering, PLLC CONSULTING ENGINEERS 724 5TH Avenue West Hendersonville, NC 28739 P-1342 August 2021 Pardee Partners ASC Town of Mills River Henderson County, North Carolina Narrative and Project Description: Site Location: The site is located on Highway 280 in Mills River, North Carolina. The construction entrance to this site is located approximately 3,700 if north of the intersection of Highway 280 and Haywood Road (Hwy 191). Project Description: The parent parcel to be developed is currently 21.00 +/- acres. The subject parcel will be subdivided to a 3.31 acre parcel under separate ownership from the parent tract. This 3.31 acres is the project area in which all of the high -density calculations are based on. The remaining 17.69 acres +/- will remain vacant except that a portion of this acreage will have a shared roadway constructed that will serve the subject parcel and possible future parcels (undetermined at this time). This portion of roadway is submitted under separate permit as low -density stormwater project under Henderson County ownership. Site Description: During the construction phase, one gravel construction entrance will be installed along Highway 280. Silt fencing with reinforced stabilized outlets will be installed along the perimeter of the project area to capture runoff. Runoff from the disturbed area will primarily flow from north to south into the proposed sediment basin with baffles placed in the low-lying area of the property. No stream or wetland impacts are proposed for this rough grading project. A portion of this project is located inside the Mills River Water Supply Watershed (WS-III). After the site is stabilized, a bio-retention cell will be constructed along the southern boundary of the property. The site currently has no impervious area, therefor the basin will be sized to accommodate all of the proposed impervious area of this site. Boring information for this area has been collected and the proposed bio-cell underdrains will be approximately 2 ft above the seasonal high water table. The drawdown time for the one -inch design storm runoff volume is between 48 and 120 hours with a minimum of 85% total suspended solids removal. The bio-cell is also designed to safely pass the 25-year storm event. 30 inches of soil media will be provided in the basin, and the basin will be planted with sod. The basin will also be constructed with armored (rip -rap) outlet protection at each inlet to the bioretention cell to reduce inlet velocity and to collect any trash or sediment from the impervious area. The basin will then discharge to a proposed armored (rip -rap lined) swale which will discharge into the existing adjacent stream. �_!"'�•N.C.G.S.'CAP,IAND' 3TAT! Of NCRTh OAOJNA '.OJN'Y Of h!ND!F-EON ..-L N-621438.11V sN, t3A� 1'- E•936231.40" l COMBINE FACTOR-0.9997i522 I, , e.Nl!WCYBfRCf h0 ".A°ON �P e NAD.83186 COUNTY. L'_FTItt �hA� TnL M4> AT TO WTICh Th5 C6RTInXION L b hfflA.°D MC�S A_-9ATVIDRY R!CNIR.°M.T3 FOR REC�NG. a ( 51TE ���; LNIEW DfRD!R DATE .sJeDIVL1ovADMluIsrRAToeroR tENDIR50N COUNTY CC7IYYThATThL7AT>:W WBEEN P-VICAWAN7 1 j WAIMOILCOMPAIJY A»ROvEJ A5 (AL N ACCOe7ANC! MR T! D.B. 915, PG. 233 ! I YENJEK'.ON COVA,'SUf>7'l50N ORDINANCE. �.\ I VA:IKIIY MAP AOTTO Al ao I I "201VINC14 ACMINI3TFATOR DINT! NOTES:!AS APPARENT `� r I•A::AFCA:aWW TSBYCDORDAAT!M>JTA�ION �JaWeAq I >OSSE5510N OVERLAP \1 I I M!ThOJ. I 0.11 ACRE+- ALUMINUM CAP � ' TY15 sJ.. Mf I IVATT 5Wn,art 10 0% PJW FONUMENT 0, 575'54�/ I / ABSTP.AL'OA ATTOTO550>TFSS+aI:D E.• FCUND � 0'f � '// I I e!P:ReLJTO AA AROFN.^'-Ai-AN. I '•I AQ /�� \`` I �/ Ii 'THIS 5JRJ!1' MAY B! 50BIMT TO A_PJG,Y5JDY-%VAr. ANDUW JTT-M.!R' ok)r.ANJRMD-1 Ni t�.Jfid `\ 2 ! •= \ AAD UMVRITi!N.F50Q)9 AID L'N'�'7:,D!l. \ f'� �,` / I) '4aJ01V NG >eO>Rtt CIVN-R AfJFMAtONTACM FA7M 1/4'RFBAR FOUND `� I 0.00 ThE hNX-SON COUNTY GB IIY25V- '\ I \ I /7�°/ f �. I �• _ _ ; f NO VAOMPDJND UTUJT15 l=LOCAT.D. I `�yf�\ j3.,,e A•_I.'�00.6i2•A9-09 D!M17PS DGGII)r. • i 47' 'dA50 ONYICA: D!1,R,ANAlIMM 5>1C11 MMD iM SUMMEYOUTDOOR �.-. f /45 JAMESL NAMIAOND S� SUWE"T>RO!R-7/:L�INAr9 PTA/ERT151NG LEASE \ -°6' D.B. 1174, PG.49B D.B.712. PG.533 ^\^\ 57P5752,f I i ` >ROGRAN.':0071NSJ ANC: °AtEm,37CC.^631D71. IVrth !FICiM DAT! 01 ONTOM2. M. I eI I _'y`\ Se�FAA `ol 'ANY PJV55. STR.:IMS. LP:'KS. aDN75.AL5. e � 5 � pt lt?YANDi.OL...:DCAi!D ON Thy %;L a�Y, ShONNOF 1 �� /� ^\^ �•'rf/� `al NOT 5h01w �:R-qV, MAY D!SUW!C*tO dJFp,RA: V. �) ih°OIVN-:1X 65• 915T.LEER$°5A7N519JI'IfO hAVfihf e I AEJS D51GNA ') by M-MN 10--MM AVROFC!D. BY ih!>.EJ>E2 AJihDRR15.i0 MAL•5U-Y DCfE:JABlAi DN. O j � I /A ^\'�q2 �fl � 'A:: DISTANC54hOtYNh2'OV AFL hORGOMA:6FDAF7 D6TANC5 UN:55 DT,TV5! J0^!D. �E."dND =rs-PJarows'a >5.1�,>NSNr. P�NRN^hUJ ^.rtv • FJprt 0>war eo - Rro1rGPs:D coucRm n>! p!An.Mrv, MIMMAm+OPr -rtoF:mcxA�rJUND W uo':DI •-5!r%•caAeYAm•1.RaWarla.ca> 6. Ym WAY ,Vkv D•'m •_^vAX' ):(• RV TONIi VY m-scvrtAPr, D:n9vAvrOJ: - LY:9rlJfimUN: _ �JAD VAWN)•-- C -=JNDiLP S 5vwmJ -=9AVRYRYY.WR JA! ----:xrorGPAr.: ——•EUI:DNGS'.IEILA:N!IHS.AI —--FIGT.O'AVaY:N!RJM ----•tEoe I `.J I 1 I I PA• TG9 ACRE REMAINDEP,OF PIN: 9631.68-8240 DB I G44 PG WE PIAT50E 9999 INO-UDING P 'MANBIT DRAINAGE EASEMENT. APPARENT AREA OF P05-1 Slow OVERLAP AND APPARENT AREA OF DEED GAP ThE FRMALIN FAMILYTRU5T I, TR. 2 AND TR. 3 PERMAIJENT J.B.845, PG. 029 DRAINAGE EA5EMENT D.B. 734, PG. 333 Y •' __�j TR, 0.254 ACRE I f \\ THE WMR COMPANIES \� I IEA5E ,1 D.B. 994, PG. /j 723 _ I I 3.31 ACRES iI 3 j II I I� I PORTION OF I PIN: 9631-68.8240 N e � �I �\ DB 1644, PAGE 608 I PlATS:IDE 9999 Ij I11 I \ I ET:1, 141 BENT 2 112, "if I 3.4O WEST Of LINE AT 909.73' I M-30'03•W 293.29' RDTAU ell kPlS'B PEBAR FDU!!D " eN1a`>G. 1-i RENT EA AP FOUND MOU1 D.B. 3 ONPOLD"6. G5. INC. 8 (i / I SUDE 8932 W qll % I^ Im AN 4-EIP FOUND 2• IR'A%IE FOUND 0 to IDL-ANG TAT! mr of wAY DD.•432. I. IOI nI 3M' 9P MOUNTAIN BEAN hOLDING5, INC. D.B. 3150. PG. 641 PRELIMINARY FOR REVIEW PURPOSES ONLY. NOT FORSK.ECORDING, SALE5, I. JARED R O1'MBEY, N.C. PROFL ONAL AND SURVEYOR, CERTIFYThAT THI5 PLAT WA5 DRAWN UNDER MY5UPERV1510N FROM AN ACTUALSURVEY MADE t 4OR CE UNDER FM5UPER/95 ON ROPBOYDEaCRPDON RECORDED IN DEED BOOK 1644. PAGE G08):TNATTNE BOUNDAR)E5 NOT 5URVMD ARE CIFARLYINDICATED BYDAS)IED UNE5 A5SEAL DRAWN FROM INFGRJMTION FOUND IN DEED BOOK5 /55NOWN; TNATTNE RATIO OF PRECI510N A5 CALCULATED IS I:I0,000 OR GREATER; L-4781, _ TBATINLS PLAT WAS PREPARED IN ACCORDANCE WITTI GS.47-30 AS AMENDED. 1 A750 HI!RMYCRfIFYTINTThl5 5URVEY 15 OF THE FOLLOWING CATEGORY A5 DE5CRIBED IN G.S. 47-30(D(I 1): (a.)TNATTNE 5URUP/CRfA75A 5UBDIVI510N OF WlDWrrHIN THE AREA OF A COUNIIY DR MUNICIRAMYThAT NAS AN ORDINANCE ThAT REGULATE$ PAP CrJ5 OF LAND. MTWE55 MYSIGNATURE. ZF45E NUMBER. AND 5EALTHL5 DAY OF_ A.D.. 20 ClJRetNT RECORD ONNER INFORMATION: NENDER50N COUNTY BOUNDARY 6 MINOR5UBDN151ON SURVEY FOR PARDEE PARTNERS ASC REFt�ENcs Cff)W K I G-4 PASE GOB 'AT 5.79999 TOTAL AREA TH15 5URVEY = 21.00 ACP.E5 MIS GVEYTOAMF.MP, hE97ER-ON COUNIY• N.C. DATE:=-27-2021 RAW BY: J.R. OWNBw OwCEIEF: EAY )OBY21030G L-4782 N.C. PROR5510NAv LAND 5URVEYOR ULtw5E I 8T7 0 80 160' SCAT I' = 50' Pardee Partners ASC Town of Mills River Henderson County, North Carolina Table of Contents Stormwater Management Permit Application Form Permit Application Fee NOAA Rainfall Data Soil Report Current Property Deed USGS Site Location Map Hydrograph Input Data Water Quality Volume Calculation Water Quality Drawdown Calculation Stormwater Pipe Calculations Swale Design Calculations Boring Information / Water -Table Depth O&M Agreement Pardee Partners ASC Town of Mills River Henderson County, North Carolina Stormwater Management Permit Application Form DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form nzay be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Pardee Partners Mills River - Site 2. Location of Project (street address): TBD Boylston Hwy City:Mills River County:Henderson 3. Directions to project (from nearest major intersection): Zip:28759 From Interstate 26 take exit 40 to merge onto Hwy-280 East towards Brevard. Continue on Hwy-280 for 4.2 miles and turn left into site The construction entrance is located directly off of Hwy-280. 4. Latitude:350 23' 44.51" N Longitude:82* 34' 0.602" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenezaals Willi modifications also requires SWU-102 - Renezoal Application Form b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 5.18 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:Erosion Control to be submitted to NCDEQ - Asheville Branch 5. Is the project located within 5 miles of a public airport? [-]No NYes If yes, see S.L. 2012-200, Part VI: httl2://Vortal.ncdenr.org/web/Ir/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: Henderson County Hospital Corporation Signing Official & Title:johnna Reed Chief Administrative Officer b. Contact information for person listed in item 1a above: Street Address:800 N Justice Street City: Hendersonville State:NC Zip:28791 Mailing Address (if applicable): City: State: Phone: ( 1 Fax: Zip: Email: c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Henderson County Signing Official & Title:jolm Mitchell County Manager b. Contact information for person listed in item 2a above: Street Address:1 Historic Courthouse Square City: Hendersonville State:NC Zip:28792 Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Ad City: State: Phone: ( 1 Fax: Zip: 4. Local jurisdiction for building permits: Henderson County Point of Contact:Tom Staufer Phone #: (828 ) 697-4830 Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will meet disconnected impervious surface criteria. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph 1I - Post Construction 3. Stormwater runoff from this project drains to the French Broad River basin. 4. Total Property Area: 3.31 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:2.85 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line, The resultant project area is used to calculate overall percent built upon area (BUA). Noii-coastal zoetlands landzoard of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 37.76 % 9. How many drainage areas does the project have?1 (For high density, count I for each proposed engineered stornnoater BMR For low density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project hlformation item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area Receiving Stream Name Mills River Stream Class * WSIII Stream Index Number * 6-54-(5) Total Drainage Area (so 115,635 On -site Drainage Area (so 115,635 Off -site Drainage Area (so 0 Proposed Impervious Area** sf 54,450 Impervious Area** total 37.76 Impervious' Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area On -site Buildings/Lots (so 15,000 On -site Streets (so 17,280 On -site Parking (so 4,536 On -site Sidewalks (so 815 Other on -site (sf) 16819 Future (so 0 Off -site (so 0 Existing BUA*** (sf) 0 Total (so: 54,450 * Stream Class and Index Number call be determined at: http,*ortal.ncdenr.org weblzvq&s/csu/classi cations Imppervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 ***Report only that amount of existing BUA that will remain after development, Do not report any existing BUA that is to be removed and which zoill be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Survey. Off -site drainage will be bypassed around our site Proiects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species ivatershed that rrray be subject to more stringent stormwater requirements as per 1 SA NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http:/Zportal.ncdenr.org/web/`"wq/ws/su/`"bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/""ws/su/mal2s.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/""`ws/su/""`statesw/`forms docs. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Iq Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M al-2 agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexl2ress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedide a site visit for DEMLR to verifij the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 1644 Page No: 608 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC _k- 14e_ Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/`CSearch.asl2x VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httl2://12ortal.ncdenr.org/web/`Ir/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Tared L. DeRidder, PE Consulting Firm: WGLA Engineering, PLLC Mailing Address:725 5th Avenue West City:Hendersonville State:NC Zip:28739 Phone: (828 ) 687-7177 x 306 Fax: ( ) Email:,jderidder@wgla.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) (print or type name o person listed in Contact Information, item 2a J U Lti�� P) �� Aej) 4441 �oc�H i+j 14er, certify ta 1, (p Jp .f p f ) + owrothe property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Info"nation, item 1a) - -� ���y1�1w 1'� ee � with (print or type name of organization listed in Contact Information, item 1a) 1tC ItC— to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: / / Date: I, f�) I S, �A'�'4� a Notary Public for the State of A� County of 1e n dt do hereby certify that Tol, n n $, R " ti personally appeared before me thisd� day of - of `� 0a ) , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, '� at S. AL6 a\QNotary Public 20'; Q Henderson CO County = My Comm. ExP. 08.04-2021 �Q o9/CHI CIA\�O�\\\\�,. SEAL My commission expires 0 `// tC-t/ X. APPLICANT'S CERTIFICATION John M �cha'l 1, (print or hjpe name of person listed in Contact Information, item 1a)Ir+rn�-������ certify that the information included on this permit application form is, to the best ,of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwStgr rule, under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signa Date: -7 / L 2 f I, AW- 1_IQ6r) K1 A.60 (\ a Notary Public for the _St1ate of �& I UX'Q� I lgOL Countyof �C QM LN1 do hereby certify that ,�ph r) ) \�C W�,\ personally appeared before me this I(Pday of AAI N , aw , and acknowledge the due execu 'on of the application for a stormwater permit. Witness my hand and official seal, FJOANNE MARTIN HINSONOTARY PUBLICenderson CountyNorth Carolinasion Expires May 23, 2023 V SEAL My commission expires �3 � D0'13 Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Pardee Partners Mills River - Site 2. Location of Project (street address): TBD Boylston Hwy City:Mills River County:Henderson Zip:28759 3. Directions to project (from nearest major intersection): From Interstate 26, take exit 40 to merge onto Hwy-280 East towards Brevard. Continue on Hw3L-280 for 4.2 miles and turn left into site. The construction entrance is located directly off of Hwy-280. 4. Latitude:35° 23' 44.51" N Longitude:82° 34' 0.602" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenezoals with modifications also requires SWU-102 - Renezoal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater NSedimentation/Erosion Control: 5.18 ❑404/401 Permit: Proposed Impacts _ ac of Disturbed Area b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:Erosion Control to be submitted to NCDEQ - Asheville Branch 5. Is the project located within 5 miles of a public airport? []No ®Yes If yes, see S.L. 2012-200, Part VI: littp://portal.ncdenr.org/web/Ir/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: Henderson County Hospital Corporation Signing Official & Title joluuza Reed Chief Administrative Officer b. Contact information for person listed in item 1a above: Street Address:800 N Tustice Street City: Hendersonville State:NC Zip:28791 Mailing Address (if applicable): City: State: Phone: ( ) Fax: j ) c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:Henderson County Signing Official & Title:Tohn Mitchell County Manager b. Contact information for person listed in item 2a above: Street Address:1 Historic Courthouse Square City:Hendersonville Mailing Address (if applicable): City: Phone: Email: State:NC Zip:28792 State: Zip: Fax: ( 1 a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:, Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Phone: ( 1 Fax: Zip: 4. Local jurisdiction for building permits: Henderson County Point of Contact:Tom Staufer Phone #: (828 ) 697-4830 Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, hKigft summarize how the stormwater runoff will be treated. Stormwater will meet disconnected impervious surface criteria. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the French Broad River basin. 4. Total Property Area: 3.31 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:2.85 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward firom the NHW (or MHVV) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 37.76 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Naive Mills River Stream Class * WSIII Stream Index Number * 6-54-(5) Total Drainage Area (sf) 115,635 On -site Drainage Area (so 115,635 Off -site Drainage Area (sf) 0 Proposed Impervious Area** (so 54,450 % Impervious Area** total 37.76 Impervious' Surface Area Drainage Area 1 Drainage Area Drainage Area Drainage Area _ On -site Buildings/Lots (so 15,000 On -site Streets (so 17,280 On -site Parking (so 4,536 On -site Sidewalks (so 815 Other on -site (sf) 16819 Future (so 0 Off -site (sf) 0 Existing BUA*** (so 0 Total (so: 1 54,450 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications *x Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SAM-101 Version Oct. 31, 2013 Page 3 of 6 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Survey. Off -site drainage will be bypassed around our site Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncden-r.org/web/"wq/ws/su/`bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/"`ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/`"`wq/`ws/`su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portaLncdenx.org/web/wq/ws/su/``statesw/forms—docs. I ja 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to htto://www.envl-ieliD.org/ pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). !�7 p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 1644 Page No: 608 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. ht!p://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://12ortal.ncdenr.org/web/Ir/"state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Tared L. DeRidder, PE Consulting Firm: WGLA Engineering, PLLC Mailing Address:725 51h Avenue West City:Hendersonville State:NC Zip:28739 Phone: (828 ) 687-7177 x 306 Fax: ( ) Email:ideridder®wgla.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or hjpe name of person listed in Contact Information, item 2a) J 6 ho )M'4chtl)� &06 111vm5e,-, certify that, owrothe property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) � 3'�� h� a l'� ee w with (print or hjpe name of organization listed in Contact Information, item 1a) ItC RL to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on then lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature:Date: I K t6e, Q& n'C''` a Notary Public for the State of `77 County of / e n derr�� do hereby certify that -TeJA n - personally appeared before me this�� day of ��� U� , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, t OtL 0,4-z -, ������iruuun,� \\\\\`\�P�A P S . No Public p _ Q Henderson co County = My Comm. Exp• 08-04.2021 �Q 2 09TNr SEAL My commission expires 'r/ Y/ t a-t/ X. APPLICANT'S CERTIFICATION®�n 1G I, (print or hjpe name of person listed in Contact Information, item 1a) �n , certify that the information included on this permit application form is, to the best�of my knowledge, correct and that the project will be constructed hi conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormw�r rule,, under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature: Date:_ ! . 'Z-f I, QNML6�() kry6yr*-A a Notary Public for the State of NoAr UMIVX County of do hereby certify that s f2h personally appeared before me this day of 1 CID& I , an acknowledge the due execution- of the application for a stormwater permit. Witness my hand and official seal, JOANNE MARTIN HINSON NOTARY PUBLIC Henderson County North Carolina My Cornmission Expires May 23, 2023 SEAL My commission expires wai) Form SV U-101 Version Oct. 31, 2013 Page 6 of 6 Pardee Partners ASC Town of Mills River Henderson County, North Carolina Permit Application Fee m pAnoccMEMORIAL HOSPITAL onONORTH JUSTICE STREET ncNoExsoNV|uE,mCz8791 NCDEPTENVIRONMENTAL QUALITY, 1606 MAIL SERVICE CENTER, RALBGM 07/29/2021 597558 NC270S9-18O0 (10935) INV. NUMBER DESCRIPTION DATE P.O. NO. INV. AMOUNT DEDUCTIONS NET AMOUNT Page l of 1 m m 07/29/21, 109'�5�` Check Amount Void After 180 Days 2 PAY NC DEPT ENVIRONMENTAL QUALITY TO 1606 MAIL SERVICE CENTER T THE 2 OF n"OO59?5563Ill 1;053 1003[]01: [)05p. I I L. 390F3 Gill Pardee Partners ASC Town of Mills River Henderson County, North Carolina NOAA Rainfall Data 4/29/2021 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Mills River, North Carolina, USA* /4 Latitude: 35.3908°, Longitude:-82.5680 Elevation: 2084.97 ft** source: ESRI Maps %Id ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M, Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical i Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration 1 000�0�0000 2 5 10 25 50 100 200 500 1000 0.370 0.440 0.527 0.593 0.679 0.745 0.811 0.877 0.962 1.03 5-min 0.333-0.411) (0.397-0.488) (0.475-0.585) (0.533-0,657) (0.606-0.751) (0.661-0.823) 1(0.716-0.898) 0.769-0.974) (0.834-1.08) (0.885-1.16) 10-min 0.533-0 656) (0.636-0.781 0.76 -0 937 0. 534.05) 0.966-18.20 (1. 5 1931 1: 4-21943 1.22--31954) 1.32--1.70 1. 9--1 83) 15-min (0.666-0 820) (0.799-0 982)1(0.962-1.19) 1.08 1.33 1.22 1.52 1.33---1.66) 1.44-61 80 1.541595 1.66 2?14 1. 5 2429 1.01 1.22 1.52 1.74 2.03 2.26 2.49 2.73 3.05 3.30 30-min (0.913-1.12) 1 (1.10-1.36) 1 (1.37-1.68) 1 (1.56-1.93) 1 (1.81-2.25) 1 (2.01-2.50) 1 (2.20-2.76) 1 (2.39-3.03) 2.64.3.41) (2.83-3.71) 60-min 1. 4?640 1.395370 1.75 2416 2.04 2651 (2.41 2199 2.72 3739 3. 3--34.81 3. 6 4325 3.794.89 (4. 3 5?42 1.48 1.80 2.27 2.65 3.17 3.60 4.05 4.53 5.20 5.75 2-hr 1.34-1.64) 1 (1.62-1.99) 1 (2.04-2.51) 1 (2.37-2.92) 1 (2.82-3.51) 1 (3.18-3.99) 1 (3.56-4.49) 1 (3.94-5.03) (4.47-5.81) (4.89-6.46) 3-hr (1.44-61078 1.73 2?14 2.17 2168 2.52 3112 (3.01 3976 3. 2 4831 3.84 4988 4.29 5652 4.91 6647 5.42-77..26 2.03 2.42 2.98 7 F 3-A7 4.16 1 F 4.76 5.41 6.11 7.14 8.01 6-hr (1.85-2.23) 1 (2.21-2.66) 1 (2.72-3.28) 3.14-3.81) 1 (3.75-4.58) 1 (4.25-5.23) 4.78-5.95) 1 (5.34-6.74) (6.13-7.92) 6.79-8.94) 2.55 3.04 3.73 4.29 5.06 5.69 6.35 7.03 7.99 8.75 12-hr (2.34-2.78) 1 (2.79-3.32) 1 (3.424.08) 1 (3.92-4.68) 1 (4.61-5.53) 1 (5.16-6.22) 11 (5.72-6.95) 11 (6.29-7.73) (7.07-8.85) (7.67-9.76) 3 04 3.65 4.48 5.14 6.06 6.81 7.57 8.37 9.48 10.4 24-hr (2.82-3.29) 1 (3.38-3.95) 1 (4.154.85) 1 (4.76-5.56) 5.59-6.55) 1 (6.25-7.35) 1 (6.92.8.16) (7.60-9.03) (8.54-10.2) (9.25-11.2) 3.62 4.32 5.26 6.00 7.03 7.86 8.71 9.59 10--81F 11.8 2-day (3.38-3.89) 1 (4.02-4.65) 1 (4.89-5.65) 1 (5.58-6.45) 11 (6.51-7.55) 1 (7.25-8.43) 1 (8.01-9.36) (8.77-10.3) (9.81-11.7) (10.6-12.7) 3.86 4.60 5.55 6.31 7.33 8.15 8.98 9.83 11.0 11.9 3-day (3.61-4.14) 4.30-4.93) 1 (5.18-5.95) 1 (5.88-6.75) 1 (6.81-7.85) 1 (7.55-8.72) (8.29-9.63) (9.03-10.6) (10.0-11.8) 10.8-12.9) 4-day 3.844.38 (4.57 5..22) 1 (5.47 6524) 6. 8-67 06) 7. 1 8415 7.84 9401 8.56 9689) 9.28- 0.8 (10.2-12.0) 1(11 0?13.0 4.80 5.69 6.82 7.72 8.93 9.90 10.9 11.9 13.3 14.3 7-day (4.50-5.13) 1 (5.34-6.10) 1 (6.39-7.30) 1 (7.22-8.25) 1 (8.32-9.55) 1 (9.20-10.6) 1 (10.1-11.6) 1 (11.0-12.7) (12.1-14.2) 13.0-15.4) 10-day 5. 9 5083) 6. 3 6091 7.28 8119 8.187 9620 (9. 6--10.6 10.3- U .7 11.2?12.8 (12.12-13.9 13.14- 5.5 (14.13- 6.7 20-day 727) 07 78886 32 97 9.65- 0.8 10.7- 3.9 12.10-13.4 13.I0- 4.6) 14.I0- 5.7 14.9- 6.8 16.I0- 8.2) 16.19-19.3 9.15 10.7 12.3 13.4 14.9 16.0 17.0 18.0 19.2 20.0 30-day (8.69-9.63) 1 (10.2-11.3) 1 (11.7-12.9) 1 (12.7-14.1) 1 (14.1-15.7) 1 (15.1-16.8) 1 (16.1-17.9) 1 (16.9-19.0) (18.0-20.3) (18.8-21.2) 45-day 11 11 2.2 13.I0- 4.3 14.6-16.1 15.6--167.4 17.E- 9.0 18 2- 0.1) 19�021.2 19 91 2.1 2 9-23.2 21?5-24.0 25.3 26.0 14.0 16.3 18.2 19.5 21.2 22.3 23.3 24.2 60-day (13.3-14.7) (15.5-17.1)J(17.3-19.1) 18.6-20.5) (20.2-22.2 (21.2-23.4) (22.2-24.5) (23.0-25.5) (23.9-26.6 (24.6-27.4) t Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence Interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical hftps:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.3908&Ion=-82.5680&data=depth&units=english&series=pds 1/4 4/29/2021 Precipitation Frequency Data Server 0 NOAA Atlas 14, Volume 2, Version 3 Location name: Mills River, North Carolina, USA* 6'' Latitude: 35.3908*, Longitude:-82.568* Elevation: 2084.97 ft** ` source: ESRI Maps ** source: USGS "^ ` POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Marlin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) Duration 1 2 5 10 25 50 100 ���� 200 500 1000 4.44 5.28 6.32 7.12 8.15 8.94 9.73 10.5 11.5 12.4 5-min 4.00.4.93) 1 (4.76-5.86) 1 (5.70-7.02) 1 (6.40-7.88) 7.27-9.01) 11 (7.93-9.88) 1 (8.59-10.8) 1 (9.23-11.7) 1 (10.0-12.9) 1 (10.6-13.9 10-min 3. 0 3594 3. 2 4?69 4.57 5662 5. 2 6930 5. 04.18 6. 1 7.87) 6.83 8356 7.31 9426 7.91 10.2 (8.36 141.0) 15-min 2 66 3528 3. 0 3493 3.854.74 4.32 5031 4. 0 6907) 5.33 6.64 (5. 5 7.22 6.150.79) 1 (6. 4 8656) 11 (7. 0 9617 2.02 2.44 3.03 3.48 4.06 4.52 4.99 5.46 6.10 6.60 30-min (1.83-2.25) 1 (2.21-2.71) 1 (2.73-3.37) 1 (3.13-3.85) 1 (3.63-4.50) 1 (4.01-5.00) 1 (4.41-5.53) 1 (4.79-6.06) 1 (5.28-6.82) 1 (5.66.7.42) 60-min 1 14- .40 1. 9-1370) (1.75 2416 2.04 2651) 2.41 2199) (2.72 3?39 3. 3 3 81 3.36 4325) 3. 9 4789) 4. 3 5A2 0.741 0.900 1.14 1.32 1.59 1.80 2.03 2.27 2 660 2.88 2-hr (0.668.0.822) (0.812-0.996) 1.02-1.25) 1 (1.19-1.46) 1 (1.41-1.76) (1.59-1.99) 1 (1.78-2.25) 1 (1.97-2.52) 2.24-2.90) 1 (2.45-3.23) 3-hr 0.480-0 592 0.577--0712) (0.722-0 891 0. 38- 04 1.00 1325) 1.14�943 1.284.63 1.43--61584) 1.64 2?15 1. 0-12.42 0.339 0.404 0.498 0.579 0.695 0.795 0.903 1.02 1.19 1.34 6-hr (0.310-0.373) (0.369-0.444) (0.464.0.647) (0.525-0.636) (0.626-0.764 0.710-0.873) (0.798-0.994) (0.891-1.13) (1.02-1.32) (1.13-1.49) 0.211 0.252 0.310 0.356 0.420 0.473 0.527 0.584 0.663 0.727 12-hr (0.194-0.231) (0.232-0.276) (0.284-0.338) (0.326-0.389) (0.382-0.459) (0.429-0.516) (0.475-0.577)1(0.522-0.642) (0.586-0.734) 0.636-0.810) 0.127 0.152 0.187 0.214 0.253 0.284 0.316 0.349 0.395 0.432 24-hr (0.118-0.137) (0.141-0.165)1(0.173-0.202) (0.198-0,232) (0.233-0.273) (0.260-0.306) (0.288-0.340) (0.317-0.376) (0.356-0.427) (0.386-0.468) 0.075 0.090 0.109 0.125 0.146 0.164 0.181 0.200 0.225 0.245 2-day (0.070-0.081) (0.084-0.097) (0.102-0.118) (0.116-0.134) (0.136-0.157) (0.151-0.176) (0.167-0.195) (0.183-0.215) (0.204-0.243) (0.221-0.265) 0.054 0.064 0.077 0.088 0.102 0.113 0.125 0.137 0.153 0.166 3-day (0.050.0.057) 1(0.060-0.068) (0.072-0.083) (0.082-0.094) (0.095-0.109) 0.105-0.121) (0.115-0.134) (0.125-0.147) (0.139-0.164) (0.150-0.179) 4-day 0040-0 046 0.048-0 054 0.057--0 065 0064-0 074 0.0074-0 085 0082-0 094 0.089-0..1103 0. 97-05112 0.107-0..1125 0.114-0..1135) 0.029 0.034 0.041 0.046 0.053 0.059 0.065 0.071 0.079 0.085 7-day (0.027-0.031) (0.032-0.036) (0.038-0.043) (0.043-0.049) (0.050-0.057) 1(0.055-0.063) (0.060-0.069) (0.065-0.076) (0.072-0.085) 1(0.078-0.092) 10-day 0. 22-0 024 0026-0 029 0030-0 034 0034-0 038 0.039-0 044 0043-0 049) (004 -0 053) 1(0051---0 058 0.056-0 064) 0060-0 070 70 20-day 0.015-0 016) (0.001 -0 019 0020-0 022 0022-0 025 0. 25-0 028 002 030 (0029-0 033)1(0031---0 035 (0.033-0 038)1(0035.0 040 0.028 0.013 0.015 0.017 0.019 0.021 0.022 0.024 0.025 0.027 30-day (0.012-0.013) (0.014-0.016) (0.016.0.018) (0.018-0.020)1(0.020.0.022) (0.021-0.023) (0.022-0.025) (0.024-0.026)1(0.025-0.028) (0.026-0.029) 010-0 012-0 017-0 45-day (0. 011 0. 013 0.014-0 015 00015-0 016) (0.016-0 018 0. 019 0.018-0 020 (0008-0 020)1(0.019-0 022 0020-0 022 0.010 0.011 0.013 0.014 0.015 0.015 0.016 0.017 0.018 0.018 60-day (0.009-0.010 (0.011-0.012) (0.012-0.013) (0.013-0.014) (0.014-0.015) (0.015-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.018) (0.017-0.019) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence Interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc. nws.noaa.gov/hdsc/pfds/pfds_printpage. html?lat=35.3908&Ion=-82.5680&data=intensity&un its=english&series=pds 1 /4 Pardee Partners ASC Town of Mills River Henderson County, North Carolina Soil Report USDA United States Department of Agriculture MRCS Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Henderson County, North Carolina Pardee Partners ASC March 10, 2021 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nres.usda.gov/wps/ portal/nres/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nres) or your NRCS State Soil Scientist (http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nres142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. Contents Preface.................................................................................................................... 2 How Soil Surveys Are Made..................................................................................5 SoilMap.................................................................................................................. 8 SoilMap................................................................................................................9 Legend................................................................................................................10 MapUnit Legend................................................................................................ 11 MapUnit Descriptions.........................................................................................11 Henderson County, North Carolina.................................................................13 Co—Codorus loam(arkaqua)..................................................................... 13 Ro—Rosman loam......................................................................................14 To—Toxaway silt loam.................................................................................15 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil -vegetation -landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil -landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil -landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field -observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and Ce Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 35° 23' 48' N 0 93 Custom Soil Resource Report Soil Map 35° 23' 37* N 'A T Y7' W L 357510 357550 357590 357630 3 Map Scale: 1:1,660 if printed on A portrait (8.5" x 11") sheet. N Meters 0 20 40 80 ,20 AMap projection: Web Mercahx Comer coordinates: WGS84 Edge tics: UM Zone 17N WGS 9 3576M 357710 35° 23' 48' N 8 m F3 2 93 0 93 _0 93 35° 23' 37" N 357750 3 m 0 ' D ylo 0 C a m o o 2' m m° � ° CD w o y E To •n o a" N'ac = L 0 um - o vm v0cn vco wy ddd Do o o CD O w o c c :3 c :3 n. CL �,NwwO w $ 3 v N 'U r O 7 'O O O d m N O O 0 _ M N r m W G) '. a ° L, d llli v � o � ET m 3 rn � `<° o 0 p C a. y = a N O w = N n CD D7' N N N s 3 3 O p� CO viO to cn c 0 o -1 S w ❑, v O Nf O w n cn O (D O 3 -o (D CD N o= 3 m N 3 3 CD (D Now -= 2_ c -y m w (D'� W O 6c m w w C N �o m � om 0 In �' a o z n� w O N o•o < DZ < 0 m a N 0 -N^ 0 fD o o O w _o m m N w CD 9'm p 3Dn� no. �• �? o�Di< o' °�daf3 cn mo (a o z qo w d m m ay c o> w m N my qo N c mm o 3 w CD m w w mco m o;m m �� w d� m � < =r m �m 3 = 01 v rJ R,n o=a5En N v w vd o N:3 NC) 3C�c O 3�N m a �(D m <= �a m cyo.� 3 W N oCD Cr N fD -0 n' O N n n. ,�. nv�.�= N -� (D N C m o U .Zl o a N O :3 ° Cr •� Z 3 a'O N w< 3 s o w N o O� ffo 0 3 cu a2 c�i o K N c o w o moos < N CD '71 3v w N n o v w 0 o � f m m o o? o w w CD w -hCD c N 3 w o O �D�o o C wNvoQ N N �ov� a 3 � N 0 w e 0, a i7 � •c �; S O N w �' O N Z O D w N n' � Cl) 'wp � Er 7 0 a d N 3 S N N o� Z @ c• Z 7' (D O (D N c N w 3 N CD m m In _' CD � O r" °mw3S' w 0 n m w m S cCD n°' � � : wv w0 " m 3 v Z 3o. w cn 3c0 o , 3c @ca : o N `? Q m S a N N N 0= l o m I v. ai m w (n o _. m w CD ❑. v N l / c N O 3 cn �T N cn cn O c "9 n CD N CD 0 a Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Co Codorus loam (arkaqua) 8.7 83 9% Ro Rosman loam 0.9 9.2% To Toxaway silt loam 0.7 6.9% Totals for Area of Interest 10.3 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, 11 Custom Soil Resource Report onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha -Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Henderson County, North Carolina Co—Codorus loam (arkaqua) Map Unit Setting National map unit symbol. Icl 8 Elevation: 1,200 to 2,000 feet Mean annual precipitation: 45 to 70 inches Mean annual air temperature: 46 to 57 degrees F Frost -free period: 116 to 170 days Farmland classification: Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season Map Unit Composition Arkaqua, frequently flooded, and similar soils: 90 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Arkaqua, Frequently Flooded Setting Landform: Flood plains Down -slope shape: Linear Across -slope shape: Linear Parent material: Loamy alluvium Typical profile Ap - 0 to 9 inches: loam Bw - 9 to 30 inches: clay loam Bg - 30 to 46 inches: sandy clay loam Cg - 46 to 80 inches: loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: 44 to 72 inches to strongly contrasting textural stratification Drainage class: Somewhat poorly drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 18 to 24 inches Frequency of flooding: OccasionalNone Frequency of ponding: None Available water capacity: Moderate (about 7.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: B/D Hydric soil rating: No Minor Components Toxaway, undrained Percent of map unit: 5 percent Landform: Depressions on flood plains 13 Custom Soil Resource Report Down -slope shape: Linear, concave Across -slope shape: Concave Hydric soil rating: Yes Ro—Rosman loam Map Unit Setting National map unit symbol: lc20 Elevation: 1,200 to 2,000 feet Mean annual precipitation: 45 to 70 inches Mean annual air temperature: 46 to 57 degrees F Frost -free period: 116 to 170 days Farmland classification: Prime farmland if protected from flooding or not frequently flooded during the growing season Map Unit Composition Rosman, frequently flooded, and similar soils: 90 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Rosman, Frequently Flooded Setting Landform: Flood plains Down -slope shape: Linear Across -slope shape: Linear Parent material. Loamy alluvium Typical profile A - 0 to 16 inches: fine sandy loam Bw - 16 to 80 inches: loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): High (1.98 to 5.95 in/hr) Depth to water table: About 42 to 60 inches Frequency of flooding: FrequentNone Frequency of ponding: None Available water capacity. Moderate (about 8.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6w Hydrologic Soil Group: A Hydric soil rating: No 14 Custom Soil Resource Report Minor Components Hemphill, undrained Percent of map unit. 5 percent Landform: Depressions on stream terraces Down -slope shape: Concave Across -slope shape: Concave Hydric soil rating: Yes To—Toxaway silt loam Map Unit Setting National map unit symbol. Ic26 Elevation: 1,850 to 2,050 feet Mean annual precipitation: 45 to 70 inches Mean annual air temperature: 46 to 57 degrees F Frost -free period: 116 to 170 days Farmland classification: Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season Map Unit Composition Toxaway, frequently flooded, and similar soils: 95 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Toxaway, Frequently Flooded Setting Landform: Depressions on flood plains Down -slope shape: Concave, linear Across -slope shape: Concave Parent material: Loamy alluvium Typical profile A - 0 to 26 inches: loam Cg - 26 to 80 inches: stratified sandy clay loam to sand Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Very poorly drained Runoff class: Very high Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 0 to 12 inches Frequency of flooding: FrequentNone Frequency of ponding: None Available water capacity: Moderate (about 8.1 inches) 15 Custom Soil Resource Report Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: B/D Hydric soil rating: Yes Minor Components Toxaway, undrained Percent of map unit: 5 percent Landform: Depressions on flood plains Down -slope shape: Linear, concave Across -slope shape: Concave Hydric soil rating: Yes 9.9 Pardee Partners ASC Town of Mills River Henderson County, North Carolina Current Property Deed Doc Stamps $3,500.00 STATE OF NORTH CAROLINA COUNTY OF HENDERSON .00K ,6uii�mM�imi08n°' This document presented and filed: 12/18/2015 01:32:22 PM WILLIAM LEE KING, Henderson COUNTY, NC Transfer Tax: $3.500.00 Prepared by: Matthew Mullinax Deed Prep'n Only GENERAL WARRANTY DEED THIS DEED, made and entered into this 1811 day of December, 2015, by and between JAMES CALVIN MOORE, a single man, GARY EARL MOORE and wife, SHARON MOORE; DENNIS EDWIN MOORE and wife, LISA MOORE, a one-half (%:) undivided interest, and BEULAH S. MOORE, a single woman, and BEULAH S. MOORE, Collector of the Estate of Thomas W. Moore, Sr., a one-half (%:) undivided interest, (herein collectively referred to as the "party ofthe first part" and having a mailing address of 649 South Mills River Road; Mills River, NC 28759) and HENDERSON COUNTY, one ofthe counties ofthe State of North Carolina, (the "party ofthe second part" and having a mailing address of 800 North Justice Street; Hendersonville, North Carolina 28791); WITNESSETH: The said party ofthe first part, for and in consideration ofthe sum ofTen Dollars ($10.00) and Other Valuable Consideration to them in hand paid by the said party ofthe second part, the receipt of which is hereby acknowledged, has bargained and sold, and by these presents does bargain, sell, and convey in fee simple unto said party ofthe second part, its heirs and assigns, a certain tract or parcel of land lying and being in Mills River Township, Henderson County, North Carolina, more particularly described as follows: BEING all ofthat 21.00 acres tract depicted on plat entitled Plat of Survey for Calvin Moore and Tom Moore, and dated December 17, 2015, of record at Plat Slide 9999 in the office of the Register of Deeds for Henderson County, North Carolina, reference to which plat is hereby made for a more particular description. ALSO BEING all of that real property described in deed of record in Deed Book 450, at page 529 in the office ofthe Register of Deeds for Henderson County, North Carolina. TO HAVE AND TO HOLD the aforesaid tract or parcel of land, together with all privileges and appurtenances thercunto belonging, to the said party ofthe second part, its successors and assigns in fee simple forever. And said party ofthe first part does covenant that they are seized of said lands in fee simple and have the right to convey the same in fee simple, that title to same is marketable and free and clear of all encumbrances, and that they will warrant and defend the title herein conveyed against the lawful claims ofatl persons whomsoever. This conveyance and these warranties are made subject to the right-of-way ofHighway 280/191, to those easements as described in those instruments recorded in Deed Book 734, Page 347 and Deed Book 734, Page 333, Henderson County Registry, to the utility easements of record and to 2015 Henderson County and Mills River ad valorem property taxes. Book 1644 Page 609 The real property conveyed herein does not includes the primary residence of any part. IN TESTIMONY WHEREOF, said party of the first part has hereunto set their respective hands and seals the day and year first above written. � (SEAL) �TAMES CALVIN MOORE R MOORE (SEAL) GARY EA ��p tioti.� '')m OV-9— (SEAL) SHARON MOORE 14 1 M� A A (SEAL) DENNIS EDWIN MOORE O Ck'-Z — 1 / t GIS-t (SEAL) LISA MOORE D 42: QfJ. )91e 21 (SEAL) BEULAH S. MOORE s (SEAL) BEULAH S. MOORE, Collector Estate of Thomas W. Moore, Sr. STATE OF NORTH CAROLINA COUNTY OF HENDERSON I, a Notary Public of the County and State aforesaid, certify that JAMES CALVIN MOORE, a single man, personally appeared before me this day and acknowledged the voluntary execution of the foregoing instrument for the purpose stated therein. Witness my hand and official stamp or seal, this II " day of December, 2015. �ol�` d.i f - ZZ Notary Public My commission expires: '7 E EAMy Publicon Countyorth Carolina Book 1644 Page 610 STATE OF NORTH CAROLINA COUNTY OF HENDERSON I, a Notary Public ofthe County and State aforesaid, certify that GARY EARL MOORE and wife, SHARON MOORE, personally appeared before me this day and acknowledged the voluntary execution ofthe foregoing instrument for the purpose stated therein. Witness my hand and official stamp or seal, this 18"i day of December, 2015. Notary Public My commission expires: HEIDI BEAM Notary Public Henderson County State of North Carolina STATE OF NORTH CAROLINA COUNTY OF HENDERSON I, a Notary Public ofthe County and State aforesaid, certify that DENNIS EDWIN MOORE and wife, LISA MOORE, personally appeared before me this day and acknowledged the voluntary execution ofthe foregoing instrument for the purpose stated therein. Witness my hand and official stamp or seal, this 1.8' day of December, 2015. 1, /tLt 'A p�LYtJ Notary Public My commission expires: 1 1 a q J, 7BEAM HEINotaic Henderunty STATE OF NORTH CAROLINA State of arolina COUNTY OF HENDERSON I, a Notary Public of the County and State aforesaid, certify that BEULAH S. MOORE, a single woman, personally appeared before me this day and acknowledged the voluntary execution of the foregoing instrument for the purpose stated therein. Witness my hand and official stamp or seal, this 18is ] 8"� December, 2015. Notary Public My commission expires: // _QV,_ /.7 HEIDI BEAM Notary Public Henderson County State of North Carolina Hook 1644 Page 611 STATE OF NORTH CAROLINA COUNTY OF HENDERSON 1, a Notary Public ofthe County and State aforesaid, certify that BEULAH S. MOORE, Collector ofthe Estate of Thomas W. Moore, SR., personally appeared before me this day and acknowledged the voluntary execution of the foregoing instrument for the purpose stated therein. Witness my hand and official stamp or seal, this 18" day of December, 2015. Notary Public My commission expires: `lEz:1 Pardee Partners ASC Town of Mills River Henderson County, North Carolina USGS Site Location Map L USGS U.S. DEPARTMENT OF THE INTERIOR , yy SKYLAND QUADRANGLE U.S. GEOLOGICAL SURVEY ♦� NDRTH CMolnu „ <Y US Topo 1.S-WNUEE S[ UEf nn °t5� atliv haerted wNe1NkM 5tMn eeegkal2ureE SCALE 3:24000 itfE00' tr.WnwE — ?F Qf+rru r4�rWwruw°. gn m ennunare f� Ut..n.'•j°iu. Ike d� w — ��+ ouc w aau r4 a m°iv�u,+°�.ww rw...� _rn you uar werr��u�'�rrrt uawvwuumsoeaer rnn Www xuuasrwa nu Ve �ra.��°m eiA ov a..w+re mrN mouanrur r1 mow. uF M— �d r.+, remwou�.r ram. °w�W�irm.ew jili/L'SI rI�u SKYLAND, NC ^ _ 201, Pardee Partners ASC Town of Mills River Henderson County, North Carolina Hydrograph Input Data Hydrograph Input Data Project: Pardee Partners ASC wgla #: 21108 Date: Mar-21 Location: Mills River Predevelopment Drainage Basin (3.31± ac.) Ex. Brush = 3.31± ac. CN67 ( Soil Type "B") (100%) [ NCDENR Table 8.03g] Brush in Fair Condition Tc = 68.6 min. Sheet Flow = n = 0.4 [ NCDENR Table 8.03h] Light Wood L = 300 If Slope = 1 % Shallow Concentrated Flow #1 = L = 3201f (Unpaved) Slope = 1 % Post Development Drainage Basin (Not Routed) (1.35± ac.) Grass = 1.35± ac. CN61 ( Soil Type "B") (100%) [ NCDENR Table 8.03e] Grass in Good Condition Tc = 6.9 Min Shallow Concentrated Flow #2= L = 670 If (unpaved) Slope = 1 % Post Development Drainage Basin (Routed) (1.96± ac.) Impervious = 1.65± ac. CN98 ( Soil Type "B") (84.18%) [ NCDENR Table 8.03e] Impervious Grass = 0.31± ac. CN74 ( Soil Type "B") (15.82%) [ NCDENR Table 8.03e] Grass in Good Condition Tc = 5 min Pardee Partners ASC Town of Mills River Henderson County, North Carolina Water Quality Volume Calculation WATER QUALITY VOLUME CALCULATION WGLA Engineering, PLLC Project: Date: Location: Pardee Partners ASC 3/10/2021 Mills River Determine Runoff Volume (NCDENR BMP 3.3.1) Rv=0.05+0.9xIA Drainage Area = Impervious Area = Impervious Fraction (IA) _ Rv = 1.96 (acres) 1.65 (acres) 0.842 0.808 V = 3630 x RD x Rv x A (Volume to be controlled) Rp = runoff depth Required Volume V = Provided Volume V = 1 (inches) 5,746 cf 6,184 cf wgla.com Pardee Partners ASC Town of Mills River Henderson County, North Carolina Water Quality Drawdown Calculation Water Quality Drawdown Calculation WGLA Engineering, PLLC Project Name: Pardee Partners ASC Project No.: 21108 Date: 5/25/2021 Location: Town of Mills River NC Wq Volume = 6,184 ft3 Q = Cd A 42gho [NCDENR BMP 3.5.2] Q = ft3/sec 6,184 ft3 x 1 hr = 0.036 cfs 48 hrs 3,600 sec Cd = 0.6 g = 32.2 ft/seC2 ho = 0.83333 ft A = 0.00814 ft2 x 144 in = 1.17 in 1 ftz Caluclate Orifice Radius: A =0 r2 r = 0.61 in, therefore 0 = 1.22 in Select Orifice Discharge 0 = 1.125 in Check Discharge Time for Selected Orifice Discharge Flow = Q = Cd A 42gho 0.030 cfs Discharge time = t = Wq Volume Discharge Flow 56.64 h rs Pardee Partners ASC Town of Mills River Henderson County, North Carolina Stormwater Pipe Calculations Project: Pardee Mills River wgla #: 21108 Date: 8/9/2021 Location: Town of Mills River 25 Design Storm: 1 = 8.15 NOAA Atlas 14, Volume 2, Version 3 Tc (min) = 5.00 Minimum Pipe Dia =' Grass c = 0.30 Impervious c = 0.90 Wooded c = 0.20 Drainage Grass Misc Imp Wooded Weighted Structure # Area (ac.) Area (ac.) Area (ac.) Area (ac.) c 1 0.31 0.14 0.17 0.00 0.63 2 0.14 0.06 0.08 0.00 0.64 3 0.38 0.02 0.36 0.00 0.87 4 0.17 0.02 0.15 0.00 0.83 5 0.27 0.12 0.15 0.00 0.63 6 0.35 0.09 0.26 0.00 0.75 7 0.35 0.00 0.35 0.00 0.90. 8 0.19 0.06 0.13 0.00 0.71 _ 9 0.00 0.00 0.00 0.00 0.00 10 0.00 0.00 0.00 0.00 0.00 11 0.00 0.00 0.00 0.00 0.00 15 Top/Throa Inv In Inv Out Q (cfs) t Elev Elev Elev Type 1.59 2083.00 2080.00 2080.00 CB 0.73 2083.61 2079.64 2079.64 CB 2.69 2084.00 2079.04 2079.04 CB 1.15 2084.42 2077.92 2077.92 CB 1.39 2083.39 2077.14 2077.14 CB 2.13 2083.59 2079.59 2079.59 CB 2.57 2085.23 2078.48 2078.48 JMH 1.10 2083.39 2077.10 2077.10 CB 0.00 2077.00 2077.00 2077.00 PIPE 0.00 2076.50 2072.35 2072.35 OCS 0.00' 2072.23, 2072.23 2072.23 PIPE Information in this chart must be entered from upstream inlet to downstream inlet with the outlet for a respective pipe system being the last downstream structure listed. Failure to list pipe branches in this order may cause an error in some calculations due to the nature of the Excel funtions Review the actual pipe diameters shown to ensure that downstream branches have not been calculated to be smaller than upstream branches rn U) N n in m 1k p to o in ii v -r- 3 Throat Elev (Upstream Inlet) Inv Elev i Inv Elev (Upstream ! (Dnstream Inlet Inlet Inlet Depth (Upstream Inlet Slope N Material Manning's n Branch Q cfs) Total Q cfs Dta. Theo. in m Z, Q E Qpipe (cfs) Vpipe (fps) A 1 to ' 2 72 2083.00 1 2080.00 2079.64 3.00 0.50% HDPE 1 0.011 1.59 1.59 9.5 15 5.41 4.41 2083.61 2079.64 2079.04 3.97 0.50% HDPE 0.011 0.73 2.32 11.0 15 5.42 4.42 3 2 to 3 119.683 2084.00 2079.04 2077.92 4.96 HDPE 0.011 2.69 5.01 14.6 15 5.40_ 4.40 C 3 to 4 224.835 2084.42 2077.92 2077.14 6.50 ! 0.50% HDPE 0.011 1.15 6.16 15.8 18 8.82 4.99 D 4 to 5 155.317 2083.39 2077.14 2077.10 1.39 7.56 17.1 18 8.80 4.98 E 5 to 8 9 6.25 0.50% HDPE 0.011 2083.59 j 2079.59 2078.48 2.13 2.13 9.3 15 7.66 6.24 F 6 to 7 110.991 4.00 1.00% HDPE 0.011 2085.23 2078.48 2076.10 6.76 1.25% HDPE 0.011 2.57 4.69 12.0 15 8.55 6.97 G 7 to 8 190.3 H 8 to 9 19.03 2083.39 2077.10 2077.00 6.30 0.50% _ _ RCP 0.011 1.10 13.35 21.1 24 18.94 6.03 to 11 24.088 2076.50 2072.35 2072.23 4.15 0.50% RCP 0.011 0.00 0.00 0.0 24 19.00 6.05 1 10 Pardee Partners ASC Town of Mills River Henderson County, North Carolina Swale Design Calculations SWALE NUMBER: PROJECT NAME: PROJECT NO.: DATE: LOCATION: DESIGN STORM RETURN YR: APPROACH: INPUT DATA: Drainage Area, Bare Soil (Ac) Drainage Area, Grass (Ac) Drainage Area, Woods (Ac) Drainage Area, Impervious (Ac) "C" Value Bare Soil "C" Value Grass "C" Value Woods "C" Value for Paved Rainfall Intensity (in/hr) Ditch Slope (Decimal) Bottom Width (ft) Ditch Side Slope (x:1) Try Type Allowable Shear Stress d guess (ft) n (no units) A (sqf) P (ft) R=A/P Q=1.49/n(AR^2/3)(S^ 1 /2 ) Velocitv = O/A Permanent Swale Design 1 Pardee Partners ASC 21108 5/25/2021 Town of Mills River 10 Use Trial & Error to set the flow depth, d, until Q = Q 10 0.4 (NCDENR Table 8.03b) 0.3 (NCDENR Table 8.03b) 0.2 (NCDENR Table 8.03b) 0.9 (NCDENR Table 8.03b) 0.00 NOAA Atlas 14, Volume 2, Version 3 0.005 DESIGN STORM: 5 Q 10 = CIA = 9.688 3 (see hydraflow) Rip Rap (d50= 9") 3.00 1 0.069 8.000 11.325 0.706 9.7 1.2 V = 1.2 OK { SHEAR STRESS T= yds = 0.3 OK Allow. n Values for Depth Ranges: Manning n Shear Allow. Lining Type 0 - 0.5 ft 0.5 - 2.0 ft > 2 ft Stress Velocity Bare Soil (No Temp Liner) 0.020 0.020 0.020 N/A 2.5 fps NAG S 75 (Straw with Net) 0.055 0.038 0.021 1.55 5 fps NAG S150 (Straw with Net) 0.055 0.038 0.021 1.75 6 fps NAG SC150 (Straw/Coconut) 0.050 0.034 0.018 2.00 8 fps NAG C 125 (Coconut with Net) 0.022 0.018 0.014 2.25 10 fps NAG P300 / Propex 450 0.034 0.027 0.200 8.00 16 fps Rip Rap (d50= 9") 0.104 0.069 0.035 3.00 4.5 fps Rip Rap (60=12") --- 0.078 0.040 4.00 5 fps Smooth Concrete 0.015 0.013 0.013 12.50 40 fps Sod or Established Grass 0.033 0.030 0.030 N/A 4.5 fps FINAL DESIGN j-_IEII I lEii I Side Slope 3 :1 1111 l l� �l l l- D 1.5 d 1 =111i1 =III III IIIIIB s Liner Rip Rap (d50= 9") 8 (Form Ver. 2019) Pardee Partners ASC Town of Mills River Henderson County, North Carolina Boring Information / Water -Table Depth PREPARED FOR: WNC Specialties, LLC c/o Cassetty Architects 100 Country Club Drive, Suite 206 Hendersonville, Tennessee 37075 PREPARED BY: S&ME, Inc. 44 Buck Shoals Road, Suite C-3 Arden, North Carolina 28704 May 24, 2021 May 24, 2021 WNC Specialties, LLC c/o Cassetty Architects 100 Country Club Drive, Suite 206 Hendersonville, Tennessee 37075 Attention: Ms. Johnna Reed Reference: Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 NC PE Firm License No. F-0176 Dear Ms. Reed: S&ME is pleased to submit this Supplemental Subsurface Exploration report for the referenced project. The exploration was made in accordance with our Proposal No. 212903, dated March 18, 2021 and authorized by Ms. Johnna Reed on April 14, 2021. This report presents a brief confirmation of our understanding of the project, the exploration results, and our geotechnical conclusions and recommendations regarding site grading and building and pavement support. We appreciate the opportunity to work with WNC Specialties and Cassetty Architects by providing the geotechnical engineering services for this project. Please contact us should any questions arise regarding the information in this report or when further services are needed. Sincerely, S&ME, Inc. Christopher Mentch, P.E. Associate Project Manager Matthew McCurdy, P.E. Principal Engineer S&ME, Inc. 144 Buck Shoals Road, Suite C-3 I Arden, NC 28704 1 p 828.687.9080 1 www.smeinc.com Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 Table of Contents 1.0 Project Information...........................................................................................................1 2.0 Exploration.........................................................................................................................1 3.0 Site Conditions..................................................................................................................2 3.1 Surface Features..............................................................................................................................2 3.2 Area Geology.................................................................................................................................. 2 3.3 Subsurface Conditions...................................................................................................................3 3.3.1 Surface Material................................................................................................................................3 3.3.2 Alluvial Soils.....................................................................................................................................4 3.3.2.1 Auger Refusal in Alluvium...........................................................................................................4 3.3.3 Residual Soils....................................................................................................................................4 3.3.4 Partially Weathered Rock..................................................................................................................4 3.3.4.1 Auger Refusal in Residual Material.............................................................................................5 3.3.5 Subsurface Water..............................................................................................................................5 4.0 Conclusions and Recommendations.............................................................................5 4.1 General Discussion.........................................................................................................................5 4.2 Remedial Foundation Options.....................................................................................................6 4.2.1 Option 1 — Deep Foundations...........................................................................................................6 4.2.2 Option 2 — Ground Improvement.....................................................................................................6 4.2.3 Option 3 — Partial Undercutting and Replacement..........................................................................7 4.3 Floor Slab and Pavement Support...............................................................................................8 5.0 Grading Recommendations............................................................................................8 5.1 Site Preparation...............................................................................................................................8 5.1.1 Stripping...........................................................................................................................................8 5.1.2 Underground Utility Lines...............................................................................................................8 5.1.3 Previously Cultivated Soils...............................................................................................................8 5.1.4 Alluvial Soils and Undercutting/Stabilization.................................................................................9 5.1.4.1 Building Areas................................................................................................................................ 9 May 24, 2021 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 5.1.5 Dewatering........................................................................................................................................9 5.1.6 Proofrolling.....................................................................................................................................10 5.2 Excavation.....................................................................................................................................10 5.3 Fill Placement and Compaction..................................................................................................10 5.3.1 Use of Excavated Soils as Fill..........................................................................................................11 5.3.2 Use of Off -Site Borrow Materials as Fill.........................................................................................11 5.3.3 Wet Weather Grading.....................................................................................................................11 5.4 Fill -Induced Settlement...............................................................................................................11 5.5 Excavated Slopes and Fill Embankments.................................................................................12 6.0 Building Foundation Support Recommendations...................................................12 6.1 Deep Foundation Systems...........................................................................................................12 6.2 Ground Improvement Method...................................................................................................13 6.2.1 Shallow Spread Foundations with Ground Improvement..............................................................14 6.3 Floor Slab Support........................................................................................................................14 6.4 Seismic Conditions.......................................................................................................................14 7.0 Cast -In -Place Concrete Retaining Wall Design Parameters...................................15 8.0 Limitations of Report.....................................................................................................15 List of Tables Table 3-1— Subsurface Water Data........................................................................................................... 5 Table 7-1: Lateral Earth Pressure Coefficients.....................................................................................15 Appendices Appendix I — Boring Location Plan Appendix II — Supplemental Boring Logs Appendix III — Select 2016 Boring Logs Appendix IV — Important Information May 24, 2021 iii Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina I I Z S&ME Project No. 212903 1.0 Project Information Our understanding of the project is based on the following: Our previous work for this project site including the preparation of a Subsurface Exploration Report (S&ME Project Number 1441-16-013, dated April 25, 2016); A phone call from Mr. Jarrod Finger, P.E. with Wise Engineers to Mr. Matt McCurdy, P.E. with S&ME on January 15, 2021 to discuss the new building location; An email from Mr. Jared DeRidder, P.E. with WGLA Engineering, PLLC to Mr. McCurdy on March 3, 2020 which included an Area Map (sheet C-100) dated March 1, 2021 with the new building location and our previous boring locations; A conference call with the project team and Mr. McCurdy on March 4, 2021 to discuss project details; An email from Mr. Blake Roberts with Cassetty Architects and a Request for Proposal dated March 11, 2021. Enclosed in this email was the Area Map marked up with 5 suggested boring locations; A series of emails and phone calls between Mr. Zach Scarboro, P.E. (with GeoStructures at the time — now with Keller) and Mr. McCurdy on March 16, 2021 to clarify planned boring depths and a phone call on May 21, 2021 to discuss the subsurface conditions encountered. Based on the above, we understand that an ambulatory surgery center (ASC) is planned for a site located on Boylston Highway in Mills River, North Carolina. The proposed building location has been shifted southeast from the previously proposed location during our original geotechnical exploration at the site. We understand the proposed building will be a steel -framed one-story structure. We assume there will be concrete floor slabs, some load bearing masonry walls, and exterior brick veneer. Based on our conversation with Mr. Finger, we anticipate that maximum column and wall loads will be on the order of 125 kips and 2.7 kips per linear foot, respectively. The expected floor live loads for the building will likely be on the order of 150 to 200 psf. We understand that site grades are planned to be raised, with the proposed finish floor elevation being approximately 2 to 3 feet above the existing grade. Additionally, based on the previous subsurface information obtained, we understand that the design team has considered the most likely foundation system will consist of spread footings supported by ground improvement with compacted aggregate piers. 2.0 Exploration The field exploration included a site reconnaissance by a Geotechnical Professional and the performance of five (5) supplemental soil test borings (SB-1 through SB-5) in the proposed new building area. The boring locations were established in the field by our personnel using a handheld GPS unit and a georeferenced aerial. The borings were assigned to depths of 20 feet except for SB-5, which was assigned to a depth of 35 feet. Each boring encountered early auger refusal, and five offset borings were drilled from SB-5 to SB-3 (with a larger rig) at a later date with the deepest boring meeting refusal at a depth of 18.5 feet. The borings were performed with a track -mounted Diedrich D-25 drill rig for the initial attempt and a truck - mounted CME-75 drill rig for the second attempt (both equipped with an automatic hammer), using hollow -stem auger techniques to advance the hole. Split -spoon samples and Standard Penetration Resistance (N) values were generally obtained at 2.5-foot intervals in the upper 10 feet, and then at 5-foot intervals thereafter. After May 24, 2021 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 completion of drilling, water levels were measured at each boring location. Some borings were left open to measure subsurface water depths at least 24 hours later. Once final water levels were measured, the boreholes were backfilled with soil cuttings. After completion of the field work, the split -spoon samples were transported to our laboratory where a Geotechnical Professional visually and manually classified the soils in general accordance with the guidelines of the Unified Soil Classification System (USCS). The results of the classifications as well as the field testing results are presented on the individual Boring Logs in the Appendix. Similar soils were grouped into strata on the logs. The strata contact lines represent approximate boundaries between soil types; the actual transition between soil types in the field could be gradual in both the horizontal and vertical directions. The Appendix contains a Boring Location Plan (Figure 1) showing the approximate boring locations, a Legend to Soil Classification and Symbols, select 2016 Boring Logs (near the new development location), the Supplemental Boring Logs, and the Field Testing Procedures. Coordinates were recorded with our handheld GPS unit and ground surface elevations shown on the Boring Logs were interpolated from the topographic data on the provided Conceptual Site Plan; each should be considered approximate. 3.0 Site Conditions 3.1 Surface Features Based on our previous work at this site, site visits, and on our review of the historical aerial photographs available through Google Earth, the site appears to have been historically used for agricultural purposes. The site is also in the apparent geologic floodplain of Mills River, the French Broad River, and their tributaries. A creek with flowing water crosses the site through the southwest portion of the parcel. Another creek is located near the north border of the parcel. Mills River is located about 500 feet south of the site and the French Broad River is about 2 miles east of the site. The parcel is currently undeveloped and the majority of the site is covered with overgrown grass, some underbrush, and small to medium trees along the stream banks. The site is generally level, with 3 to 4 feet of topographic relief. Our first drilling attempt for this supplemental exploration was made during cool, dry weather and much of the exposed ground appeared generally stable under the tracked drill rig; however, the second drilling attempt was delayed multiple times due to unfavorable site conditions after wet weather. It appeared that the larger truck - mounted drill rig would get stuck in wet site conditions due to very soft soils. In fact, the driller informed us that he had difficulty getting the truck rig out of the site after completion of the offset borings. 3.2 Area Geology The site is located in the Blue Ridge Physiographic Province of North Carolina (very near the contact of the Inner Belt of the Piedmont Province) as shown in the following figure. This region is an area underlain by ancient igneous and metamorphic rocks. Geologic mapping by U.S. Geological Survey (USGS) indicates the project area is typically underlain by bedrock consisting of gneiss and mica schist. May 24, 2021 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 Triassic Basin {Milton Belt 1 APPROXIMATE SITE LOCATION Murphy Kings Mtn. Belt Belt Physiographic Provinces of North Carolina The soils encountered in this area are the residual product of in -place physical and chemical weathering of the rock presently underlying the site. In areas not altered by erosion or disturbed by the activities of man, the typical residual soil profile typically consists of clayey soils near the surface, where soil weathering is more advanced, underlain by sandy silts and silty sands with varying amounts of mica. The boundary between soil and rock is not sharply defined. This transitional zone, termed "partially weathered rock," is normally found overlying parent bedrock. Partially weathered rock is defined, for engineering purposes, as residual material with standard penetration resistance values of at least 50 blows per 6 inches. Weathering is facilitated by fractures, joints, and the presence of less resistant rock types. Consequently, the profile of the partially weathered rock (as well as hard rock) is quite irregular and erratic, even over relatively short horizontal distances. Also, it is not unusual to find lenses and boulders of hard rock and zones of partially weathered rock within the soil mantle, well above the general bedrock level. Alluvial soils (alluvium) consist of soil sediments which have been eroded, deposited, and reshaped by flowing water in some form. Alluvial soils are typically found in geologic floodplains, near rivers and streams, and often in "draws". Alluvium typically has a very low consistency and is usually unconsolidated. The alluvial soils typically consist of a variety of materials, including fine particles of silt and clay and larger particles of sand, gravel, cobbles, and boulders along with organic matter. 3.3 Subsurface Conditions The following description of subsurface conditions is relatively brief and general. Borings near the new construction area from our 2016 report (13-12, and B-15 to B-17) are discussed as well as the new supplemental borings S13-1 to S13-5. For more detailed information, the individual Borings Logs contained in the Appendix should be consulted. 3.3.1 Surface Material The borings initially penetrated a 2.5- to 7-inch thick layer of organic laden topsoil. Please note that topsoil thicknesses will vary throughout the site and could be thicker in unexplored areas. This is particularly true of soils previously used for agriculture. May 24, 2021 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 3.3.2 Alluvial Soils Below the topsoil, the borings encountered alluvial soils to depths of up to 18.5 feet below the existing ground surface. The sampled alluvial soils consisted of lean clay (USCS Group Symbol CL), sandy silt (ML), silty sand (SM), silty sand with gravel (SM), silty gravel with sand (GM), and poorly graded sand with silt (SP-SM). The standard penetration resistance values (N-values) recorded in the alluvial soils ranged from 2 blows per foot (bpf) to 50 blows for 0 inches of penetration (50/0" on the log), indicating a very low to very high consistency. Please note most of these higher blow counts were likely amplified by the presence of rock fragments, gravel, cobbles, and/or boulders (often referred to as "riverjack"). As expected, these soils were predominantly moist to wet. Generally, the alluvium was described as more fine-grained soils near the surface with the materials transitioning to more coarse -grained sands and gravels (and riverjack) with depth. Previous borings B-16 and B-17 were terminated at their planned depths of 5 feet in the alluvium. 3.3.2.1 Auger Refusal in Alluvium Refusal to auger advancement was encountered in the alluvium in borings SB-1 through SB-5 at a depth of 11 to 12 feet below the existing ground surface with the Diedrich D-25 drill rig. This also occurred in three offset borings made with the larger CME-75 rig at 11 feet. Refusal is a designation applied to any material having a resistance in excess of the penetrating capacity of the drilling equipment. We anticipate the refusal encountered in these borings is due to cobbles and boulders (riverjack) in the alluvium and not due to bedrock; however, core drilling procedures are required to determine the characteristics and continuity of the materials below the level of refusal. Also, the bedrock may not be much deeper than the riverjack in some areas. 3.3.3 Residual Soils Beneath the alluvial soils, residual soils (residuum) of the type common to the Mills River area were encountered in previous borings B-12 and B-15 and in two of the recent offset borings (near B-3 and B-5). The top of the residual material ranged from about 12 to 18.5 feet below the surface. The residuum consists of sandy silt (ML), silty sand (SM), and silty gravel with sand (GM). The N-values recorded in the residual silts ranged from 15 bpf to 50 blows per 1 inch of penetration, indicating a moderate to very high consistency. Most of the residual material was defined as partially weathered rock (described below). Boring B-12 was terminated at its planned depth of 20 feet in the residuum. 3.3.4 Partially Weathered Rock Partially weathered rock (PWR) was encountered in previous boring B-15 and offsets for SB-3 and SB-5 at depths of 12 to 15 feet. The sampled PWR consisted of very dense silty sand (SM) and silty gravel with sand (GM) with N- values ranging from 50 blows for 1 to 5.5 inches of penetration. PWR is defined as residual soils that are a transitional material between very hard soil and rock which has an N-value of at least 50 blows per 6 inches. Boulders and rock lenses are typically found in PWR. May 24, 2021 4 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina III S S&ME Project No. 212903 3.3.4.1 Auger Refusal in Residual Material Refusal to auger advancement was encountered in the PWR in borings B-15 and offsets of SB-3 and SB-5 at depths of 29, 13.9, and 18.5 feet, respectively, below the existing ground surface. Refusal can result from PWR, boulders, rock seams, or the upper surface of sound continuous rock. Core drilling procedures are required to determine the characteristics and continuity of the materials below the level of refusal. Based on the results and descriptions by the driller, we expect these refusals are near the top of competent rock. 3.3.5 Subsurface Water Subsurface water depth data is included in the tale below: Table 3-1— Subsurface Water Data Boring No. B-12 (from 2016) Depth to Water at End of Drilling 11 feet Depth to Water after at least 24 Hours 6 feet 13-15 (from 2016) 10 feet 5 feet SB-1 8 feet N/A - Backfilled SB-2 10 feet 5.4 feet SB-3 8 feet 5.7 feet SB-4 9 feet N/A - Backfilled SB-5 8 feet 5.3 feet Subsurface water was not encountered in previous borings B-16 or B-17 which were only drilled to 5 feet below the surface. It should be noted that subsurface water levels will fluctuate during the year, due to such things as seasonal variations, precipitation, creek and river levels, and construction activity in the area. 4.0 Conclusions and Recommendations The conclusions and recommendations presented herein are based on information and assumptions concerning structural loads, existing grades and final site grades, our understanding of the proposed project, findings of the initial and supplemental subsurface explorations, geotechnical engineering evaluations of encountered subsurface conditions, and experience with similar projects. When reviewing this information, please keep in mind subsurface conditions vary erratically in this geologic area, particularly with respect to alluvial soils, subsurface water, fill materials, and PWR and bedrock levels. 4.1 General Discussion The borings from the 2016 exploration and the 2021 supplemental exploration indicate the majority of the site is in the apparent geologic floodplain of the creeks on and adjacent to the site and likely Mills River and the French Broad River and generally contains alluvium (soils and rocky materials deposited over time by water and during historic flooding). The subsurface water levels were generally quite shallow (near 5 feet below the surface). May 24, 2021 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 Because of the depositional nature of the alluvial materials, the soils on this site will tend to settle excessively and non -uniformly under new loads. Therefore, we would expect a high risk of settlement -related issues for structures built without remedial site work or special foundations. The main geotechnical challenge is selecting the optimum foundation type or remedial work plan to adequately support the buildings and pavements. This will ultimately be a decision based on the Owner's budget and tolerance for risk. Because of the unpredictable nature of alluvial soils, constructing buildings and pavements at this site will carry some degree of risk that the Owner must be aware of and willing to accept. In the following sections, we have described several options that could be considered to help reduce the risks, but each option also carries cost implications that will need to be determined to decide if they are acceptable. 4.2 Remedial Foundation Options Our opinion is the alluvial materials could cause excessive settlement for proposed structures if remedial work or special foundations are not used. There are a number of possible remedies for this. The most positive method for support of the new buildings would require undercutting all of the alluvial material in the building areas and replacing it with well compacted materials. However, due to the extensive volume of alluvial material and relatively shallow water table, removal of all of the alluvium is not practical from an economical or constructability standpoint. Our experience indicates other, more economical options are often used to provide suitable support. Some risk is still inherent in these remediation methods; however, these risks can be lessened by close evaluation by representatives of the geotechnical engineer during construction. Several of the options are briefly discussed below. 4.2.1 Option 1— Deep Foundations With the exception of complete removal and replacement of the alluvial soils, the option with the least risk would be special, deep foundations installed through the alluvial soils so that the loads are transferred to competent materials. Helical piers are often an economical deep foundation approach for typical lightly -loaded buildings; however, the rocky parts of the alluvial materials would likely inhibit installation of helical piers. It appears driven H-piles, auger -cast piles, or micropiles would likely be more efficient to penetrating the rocky alluvial materials; however, the cost of these foundation types are probably too high to be economically feasible for a relatively lightly loaded single -story building. 4.2.2 Option 2 — Ground Improvement There are also ground improvement methods such as compacted aggregate piers (CAP) or controlled modulus columns (CIVIC), also referred to as rigid inclusions. CAPS consist of crushed stone compacted into pre -drilled excavations (on the order of 24 to 30 inches in diameter) in soils that will stay open. In soils that tend to cave or collapse, as would be expected on this site, the stone columns can be installed by a mandrel pushed into the soil and a bottom feed vibrator. Rigid inclusions are basically an augered excavation that is backfilled with concrete and overlain with a load transfer pad constructed with crushed stone. Both systems are not structural foundation elements, but a method to modify the low -consistency soils into a stiffer composite soil matrix. We anticipate these would be installed to a depth that is predicted to satisfactorily support the building with tolerable settlements. A possible depth of installation would be about 15 to 20 feet or refusal of the equipment May 24, 2021 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 but would be based on the actual design (by others). Some difficulty in installation will still likely be encountered due to rocky materials. The designer may consider refusal in the rocky alluvial layer to be satisfactory in some cases, but this will need to be discussed with the specialty contractor. Ground improvement is typically installed by a design -build specialty contractor who provides a warranty of their work. After ground improvements are installed, the building would be supported with conventional foundations and usually an increased bearing pressure. Ground improvement can also be used to provide support for grade slabs or stabilization prior to fill placement if installed on a grid under the slab area, but this carries a higher cost. Alternatively, some undercutting of the alluvial soils and/or stabilization with crushed stone (as approved by the specialty contractor) could be utilized to initiate fill placement and support the grade slab. 4.2.3 Option 3 — Partial Undercutting and Replacement As mentioned previously, the undercutting approach with the least amount of risk would be to completely undercut all of the alluvium and replace it as new, well -controlled, structural fill. However, this is assumed to be too expensive, difficult to construct, and time consuming to be feasible. If some risk of long term settlement can be accepted, another approach is to undercut a portion of the alluvial material and replace it in a controlled, well -compacted manner. In our 2016 report, we suggested 5 to 8 feet of new, well -compacted fill be placed under the two-story structure. Since the newly -proposed building is just one- story, we suggest at least 5 to 6 feet of new fill be placed under the building with this approach. Based on the planned grades (raising existing grade by 2 to 3 feet), this would require undercutting below current grades by about 3 to 4 feet. Undercutting would extend very close to, and may encounter, the groundwater table. This would cause difficulty in executing the site remediation properly and will likely require dewatering of the over - excavations and crushed stone backfilling the first few feet of the excavation. Installing some underdrains (French drains) across the site to lower the subsurface water level as much as possible might be required. After undercutting, the bottoms of the excavations are expected to be soft, wet, and unstable, and will need to be stabilized with geotextile fabric and crushed stone as described below. The undercut areas should extend to 15 feet laterally beyond building lines. The bottom of unstable excavations will need to be stabilized with a layer of heavy geotechnical fabric and a 2-foot thick layer of crushed stone. The fabric should consist of Mirafi HP 570 and the crushed stone should consist of railroad ballast or a surge stone with particle sizes ranging from 6 inches to fines. The top part of the stone layer should be capped with about 4 inches of ABC stone or a layer of non -woven filter fabric to prevent soil fill from raveling (eroding) into the larger crushed stone layer. Then, the area should be raised to grade with well -compacted structural fill soil. After this work, the buildings and floor slabs could be supported with conventional shallow spread footings. Because of the soft alluvial soils remaining below the undercut depth with this approach, there is a small risk of future soil settlement, which could require some repair and maintenance. This risk must be understood and accepted by the Owner. However, in our experience in the Western North Carolina region, other lightly -loaded buildings have performed satisfactorily with similar stabilization methods. May 24, 2021 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina III S S&ME Project No. 212903 4.3 Floor Slab and Pavement Support If deep foundations or ground improvement are selected as the remedial approach for support of the structure, the slab can also be supported with these elements. However, this will increase the cost of the special foundation measures. Based on our experience with similar conditions, and as an approach to reduce costs, when 5 to 6 feet of new fill is placed, lightly -loaded floor slabs can usually be supported on the new fill with a relatively low risk of slab subsidence and cracking. The low consistency alluvial soils below the proposed pavement areas will also present some level of risk, although somewhat lower, following proper site preparation. The pavement areas should be proofrolled with a loaded dump truck, and the existing soils can remain in place if sufficiently stable. Some undercutting of alluvial soils in pavement areas and/or stabilization with crushed stone and fabric should be anticipated. This will be very dependent on the weather and time of year that grading occurs. In cool and wet weather, the remedial measures required will be much more extensive than in hot and dry weather. 5.0 Grading Recommendations 5.1 Site Preparation 5.1.1 Stripping Site preparation should begin with the removal of all unsuitable surface materials. This would include the removal of surface vegetation, organic laden topsoil, trees, and large root systems. Stripping should extend at least 10 feet outside the building limits and 5 feet outside pavement limits, where practical. 5.1.2 Underground Utility Lines Underground utility lines should be re-routed from under the proposed building area. Our experience indicates the backfill soils for existing utility lines are generally poorly compacted. Therefore, trench backfill soils over utility lines that are to remain in place (such as under pavements) should be tested to determine their suitability. Subsequently, utility lines that are to be relocated should be removed, and the trenches cleaned and backfilled with well compacted structural fill as discussed in Section 5.3 of this report. 5.1.3 Previously Cultivated Soils Although not sampled in the borings, based on the historic use of the site as agricultural farmland, we expect some previously cultivated soils will be present onsite. The depth of the cultivated soils is highly dependent upon the crop and the machinery/plowing techniques used. Typically, soils disturbed by cultivation are 1 to 1.5 feet thick, but is not uncommon for these type soils to extend as deep as 3 feet or more. These soils can contain root fibers and other organic materials, but usually the organic content is relatively low. Based on our review of aerial photographs and our site visit, we expect cultivated soils to be present across most of the site. Due to the sampling intervals in the borings, it is possible some of the materials shown as topsoil and alluvial soils on the Boring Logs are actually cultivated soils. May 24, 2021 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 Cultivated soils can sometimes be left in place, provided they are assessed to be stable by the proofrolling methods discussed in Section 5.1.6 and do not contain too high an organic content. However, these soils are usually unstable when wet and tend to hold water. If the cultivated soils are wet at the time of construction, they may need to be stripped similarly to topsoil. 5.1.4 Alluvial Soils and Undercutting/Stabilization As previously stated, alluvial soils were encountered in the borings to depths of up to 18.5 feet below the existing ground surface, and are not suitable for foundation support without remedial work or special foundation systems. 5.1.4.1 Building Areas If deep foundations or ground improvement are selected as the remedial approach in the building areas, and the slabs are to be soil -supported, the alluvial soil will likely require some remedial work to initiate fill placement. We recommend that the building slab be placed such that it is supported by at least 3 feet of new, well compacted structural fill. The alluvial soil will need to be stable enough to support the earthmoving and compaction equipment so that the specified degree of compaction can be achieved. The soil exposed after stripping should be evaluated by the Geotechnical Engineer prior to fill placement. If the subgrade is soft, as expected, it should be scarified and dried as much as practical and compacted. If the subgrade is still too soft to begin grading, 1 to 2 feet of soil could be undercut (if more stable with depth) and/or a layer of crushed stone and (possibly geogrid or stabilization fabric) could be placed. The stabilization layer would need to be discussed with the specialty contractor to determine what material would not inhibit installation of the deep foundations or ground improvement elements. Large size crushed stone such as surge stone or small rip -rap, and some geotextiles, could cause difficulty. 5.1.5 Dewatering We expect that dewatering could be required during undercutting and installation of utilities, depending on the depth of the excavations. Subsurface water should be lowered at least 3 feet below the deepest excavations and maintained continuously until the areas are backfilled to several feet above the water levels. Depending on the actual groundwater level and selected final grades, we expect a series of pumped sumps will be needed to effectively lower the groundwater in the undercut excavations and during installation of deeper utility lines. French drains consisting of a perforated drainage pipe, surrounded by washed crushed stone and wrapped with geotextile fabric in an excavated ditch could also be needed; however, it does not appear the site topography will allow for much, if any, gravity drainage. In utility trenches that encounter groundwater, about 6 to 12 inches of No. 57 crushed stone bedding is normally required, and the trenches may also need to be backfilled up to the groundwater line with No. 57 stone. It is our opinion that good design and construction practice requires a somewhat conservative approach when controlling groundwater. Also, groundwater control measures should be included in the construction costs. If field conditions during grading indicate the groundwater is lower than expected, the groundwater measures can be significantly reduced. May 24, 2021 Supplemental Subsurface Exploration r Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 5.1.6 Proofrolling Following stripping, and depending on the remedial approach selected for the building areas, the exposed subgrades in building areas should be thoroughly proofrolled with a heavily loaded tandem -axle dump truck or similar rubber -tired equipment under the observation of the Geotechnical Engineer. The proofrolling will help reveal the presence of unstable or otherwise unsuitable surface materials. Areas that are unstable should be undercut or stabilized in place as recommended by the Geotechnical Engineer. Areas that are obviously too soft to support equipment should not be proofrolled, and can be evaluated by probing with a small -diameter steel rod, hand auger borings and dynamic cone penetrometer tests, or backhoe-excavated test pits. 5.2 Excavation The boring data indicates excavations for mass grading, utilities, and foundations will primarily extend through low to moderate consistency alluvial soils. Also, some residual soils and partially weathered rock may be encountered below about 12 feet in some areas. These materials can be excavated by routine earthmoving equipment, such as a bulldozer, moderately heavy front-end loader, or tracked excavator. Local excavation for foundations and shallow utility trenches can be accomplished by a heavy backhoe or tracked excavator. Some of the cobbles and boulders in the alluvial zone could require more diligent excavation effort by the contractor. We expect the alluvial cobbles and boulders as well as the PWR and massive rock encountered in the borings to be below expected excavation levels during mass grading but could be encountered in utility trench excavations. Also, please keep in mind rock in a weathered, boulder, and massive form varies very erratically in depth and location in this geologic region. Accordingly, such materials could be encountered at shallow depths between or near the boring locations, and could require blasting or removal by the use of pneumatic tools. We expect most auger refusals were due to cobble/boulders near the bottom of the alluvial layer, but it is possible bedrock was encountered in some areas. All excavations should be sloped or shored in accordance with local, state, and federal regulations, including OSHA (29 CFR Part 1926) excavation trench safety standards. We expect the soft and wet alluvial soils will be unstable during excavations and will require being benched or sloped flatter than typical. The contractor is solely responsible for site safety. This information is provided only as a service and under no circumstances should S&ME be assumed to be responsible for construction site safety. 5.3 Fill Placement and Compaction After excavation and necessary undercutting, areas requiring fill placement should be raised to their design subgrade configuration with soil free of deleterious materials, and rock pieces should generally be less than 4 inches in diameter. The fill should be uniformly spread in 6- to 8-inch thick loose lifts and be compacted to at least 95 percent of the soil's maximum dry density, as determined by laboratory standard Proctor compaction tests (ASTM D-698). This percentage should be increased to 98 percent within 2 feet of the building floor slab and proposed pavement areas. The moisture content should be controlled at plus to minus 3 percent of optimum. Fill placement should be observed by a qualified Materials Technician working under the general direction of the Geotechnical Engineer. In addition to this visual evaluation, the Technician should perform a sufficient number of May 24, 2021 10 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 in -place field density tests to confirm the required degree of compaction is attained. Periodic field "check plugs" should be performed to help determine the correct Proctor data to use. 5.3.1 Use of Excavated Soils as Fill We expect the majority of the excavated soils will be cultivated and alluvial soils. These soils should be evaluated as they are excavated by a Geotechnical Engineer to determine which parts, if any, are suitable for reuse as structural fill. The majority of the samples also appeared above (to well above) optimum for compaction. We expect the majority of the excavated soils will require significant drying prior to reuse as fill. Additionally, the plastic soils near the surface can be challenging to dry, particularly if construction work is performed during wet weather. Drying these soils will require diligent effort by the contractor and may not be practical in a reasonable time frame. Also, some segregation of organic matter and/or very wet soils could be required from otherwise reusable soil. Cobbles and boulders larger than about 6 inches to 1 foot in diameter will need to be removed so the lift thicknesses can remain thin. There may be too many of these oversize particles mixed with the soil in some zones to be practical for separation and reuse. Unsuitable soils will most likely need to wasted offsite or placed in non-structural "green" areas. If any suitable soils are stockpiled for later reuse, they should be protected from precipitation as much as practical. 5.3.2 Use of Off -Site Borrow Materials as Fill We anticipate the majority of fill will be imported from off site. Imported fill used for site grading should consist of a "clean" (free of organics and debris), low plasticity soil (Liquid Limit less than 50, Plasticity Index less than 25), and be evaluated by a Geotechnical Engineer prior to hauling to the site. This evaluation should include observation of the borrow source and performance of laboratory testing that could include standard Proctor compaction, in -situ moisture content, grain size, Atterberg limits, or other appropriate tests. 5.3.3 Wet Weather Grading During wet weather, special measures will be necessary for this site. These will include the following: Excavated ditches to help reduce rainwater runoff from flowing on to the construction area. Rainwater should not be allowed to pond. The exposed ground surface should be sealed at the end of each work day (if inclement weather is expected) to help reduce rainwater seepage into the soil. The Contractor should have equipment, such as disk harrows, to help dry wet soil. Some spreading of the soil and aerating will likely be needed. Additional undercutting of unstable soil will be needed during wet weather. If the subgrades cannot be stabilized for building and pavement area support, a thicker layer of crushed stone could be necessary. 5.4 Fill -Induced Settlement Based on the subsurface conditions, the approximate 2 to 6 feet of new fill (depending on the remedial approach taken) will cause consolidation (settlement) of the existing soils. The majority of the fill -induced settlement will likely occur soon after fill placement, but a portion could continue for a period of time (probably several weeks). It May 24, 2021 11 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 is our opinion good design and construction practice requires this settlement be monitored and approved prior to construction of the foundations or ground improvement. This is typically measured by surveying several monitoring points, which can consist of reinforcing steel bars driven into the ground after the fill is complete. 5.5 Excavated Slopes and Fill Embankments We do not anticipate any large cut or fill embankments for this site; however, if relatively shallow (less than 10 feet tall) cut or fill embankments are required, the following could be applicable. Our experience is fill embankments of this height should be stable if properly constructed at an inclination no steeper than 2H:1V (Horizontal to Vertical). The embankment foundation subgrades will also need to be properly prepared. Flatter slope inclinations of about 3H:1V will typically reduce erosion, maintenance and repair, and allow landscaping equipment to more easily operate. If any cut slopes are made in the alluvial soils, they should be no steeper than 3H:1V because of the low - consistency alluvial materials. Fill placed in embankments should be compacted to a similar requirement recommended in Section 5.3 (95 percent of the standard Proctor maximum dry density). Because it is difficult to compact soils near the embankment face, we suggest constructing the embankments outside their design limits and then cutting them back, leaving the exposed face well compacted. We advise the face of slopes and embankments be protected by establishing vegetation with the use of erosion control blankets or turf mats as soon as practical after grading. Also, rainwater runoff should be diverted away from the crest of slopes. In general, utilities should be routed away from fill embankments. Any utilities that must be located near the face or the crests of the fill slopes should be designed with extra precautions to ensure they do not leak or rupture. All utility line backfill should be compacted to project specifications. It is very important all factors associated with slopes be constructed in accordance with plans and specifications. 6.0 Building Foundation Support Recommendations 6.1 Deep Foundation Systems As discussed, a deep foundation system would be a positive approach for building support. The deep foundation system will transfer the loads to competent materials (very dense soils, partially weathered rock, or bedrock) below the alluvium. A deep foundation system would provide the lowest risk of settlement, but also most likely the highest cost, and may be cost -prohibitive for the project. With the subsurface conditions at this site and planned loads, we expect driven H-piles or micropiles are the more suitable deep foundation types. (Other pile types could be feasibly used for support and we can provide additional recommendations if the contractor proposes an alternate pile type.) Rocky materials such as cobbles and possible boulders would be encountered during installation, but these foundation types should be able to penetrate the material at most locations. If obstructions are encountered, H-piles can be fitted with steel points to help drivability. More difficult obstructions typically require removal with a backhoe and offset piles could be needed in some locations. May 24, 2021 12 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 We would be pleased to expand or provide additional recommendations for deep foundations as the design process continues. 6.2 Ground Improvement Method As previously discussed, ground improvement methods can be also be used to support the foundations. A solution that is often used and relatively economical would be to use Compacted Aggregate Piers (CAP) or Controlled Modulus Columns (CMC), also referred to as rigid inclusions. Both of these systems help reduce settlement (into a tolerable range) by modifying the unsuitable soils into a stiffer composite soil matrix. These systems could be installed in a grid pattern over the entire building footprint prior to earthwork or after earthwork is complete, or they can be installed just directly under the wall and column footings prior to foundation construction. CAP's are generally constructed by augering 24- to 36-inch diameter holes on a grid pattern below the base of the footings and/or the slab and backfilling the holes with thin lifts of compacted aggregate. Compaction densifies the aggregate and increases lateral stress in the surrounding soil matrix. Building foundations can typically be constructed to bear directly on the CAP's. On this site, due to the shallow water and soft soils, we expect the holes would tend to cave in or collapse if excavated without casing. Another installation method involves placing the crushed stone through a down -hole mandrel rather than creating an open hole. Also, fewer spoils are generated with this method. CMC's are generally constructed by vibrating a hollow pipe with a closed end or drilling a specialty auger through unsuitable soils and into underlying suitable material. The pipe or auger displaces the unsuitable soils during this process. Therefore, unlike installation of traditional CAP's, there are little excavated soils to dispose of. The bottom of the pipe is then opened, the pipe is filled with concrete or grout, and the pipe is slowly extracted from the hole as more concrete/grout is added. For the auger system, concrete/grout is pumped under low pressure through the auger as the auger is extracted from the hole. A load transfer mat is typically constructed between the building foundations and the CMC's. This mat generally consists of a layer of crushed stone (NCDOT Aggregate Base Course) with possibly a layer of geotextile reinforcement. The installation of the ground improvement must be observed by the Geotechnical Engineer or their representative to confirm design depths and diameters are met and that the required installation procedures are being followed. A modulus test (load test) would be performed by in the field by the specialty contractor (with observation by the Geotechnical Engineer) to confirm the element stiffness modulus at the maximum theoretical CAP/CMP stress. Loading of the test element should be conducted up to approximately 150 percent of the maximum theoretical stress to which the elements will be subjected. At 100 percent of the maximum theoretical element stress, settlement of the footing supported by the element should not exceed one inch. As previously mentioned, these systems are designed and installed by specialty contractors. These specialty contractors can recommend the most practical method based on the subsurface conditions and structural information. Some field modifications to the designed system could be required depending on the actual subsurface conditions encountered. We could provide a list of contractors specializing in ground improvement methods if requested. May 24, 2021 13 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina III S S&ME Project No. 212903 6.2.1 Shallow Spread Foundations with Ground Improvement Typically, a design bearing pressure of approximately 4,000 psf or more would be available, but this will need to be determined by the actual design/build firm. Even with the increased bearing pressure, we recommend wall footings have a minimum width of 18 inches and column footings have a minimum width of 24 inches. We also recommend a minimum footing embedment of 2 feet. Individual foundation excavations require observation prior to concrete placement. Exposure to the environment will cause the soils surrounding the piers to rapidly deteriorate. If surface water runoff collects in any excavation, it should be removed promptly by pumping to help prevent softening of foundation supporting soils. To further reduce the potential for deterioration of bearing soils, we recommend that foundation excavation, evaluation, and placement of concrete be conducted on the same day, if practical. If an excavation is to remain open overnight, or if rain is imminent, the footing subgrade should be lowered and a 3- to 4-inch thick mud mat of lean (2,000 psi) concrete placed in the bottom of the excavation to protect the bearing soils. This will help limit the potential for additional excavation of wet, softened soils which often results in footings exposed to inclement weather. 6.3 Floor Slab Support The concrete ground floor slabs may be soil supported, provided the recommendations discussed in this report are followed. We recommend a 6-inch thick layer of crushed stone be used to separate the floor slabs from the subgrade soils. This layer will help provide uniform support for the floor slabs. The crushed stone should consist of Aggregate Base Course (NCDOT Standard Specifications) compacted to at least 100 percent of its standard Proctor maximum dry density. Based on the boring data and laboratory testing, a modulus of subgrade reaction (k) of 115 pci should be available for design of floor slabs on a properly prepared subgrade. Based on the subsurface water level, a plastic vapor retarder separating the slab from the subgrade materials should be considered. The actual requirement for the vapor retarder will also be based on the usage and design of the floor slab and its covering, as well as the local building code. 6.4 Seismic Conditions Using the boring data, our experience, and the N-value method outlined in the North Carolina Building Code, it is our interpretation this site has a seismic Site Class of D. There are no active earthquake fault zones within close proximity to the general area and thus the site vicinity is not known to be subject to concerns of any major geologic hazards such as: significant ground shaking, liquefaction, seismically induced slope failures etc. If desired, the site class could be evaluated further by shear wave velocity testing. Shear wave velocity testing is typically considered a more refined approach than the N-value method and often provides slightly higher results. However, there is no guarantee that shear wave velocity testing would necessarily result in an improvement to the site class. May 24, 2021 14 Supplemental Subsurface Exploration Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 7.0 Cast -In -Place Concrete Retaining Wall Design Parameters Retaining walls, such as the loading dock wall of the building, must be capable of resisting lateral earth pressures that will be imposed on them. Lateral earth pressures to be resisted by the walls will be partially dependent upon the method of construction. Assuming the walls are relatively rigid and structurally braced against rotation (such as loading dock walls), they should be designed for a condition approaching the "at -rest" lateral pressure. However, in the event the walls are free to deflect (about 112 to 1 inch for a 10-foot high wall) during backfilling, as for any exterior walls that are not restrained or rigidly braced, the "active" pressure conditions will be applicable for design. The following lateral earth pressure parameters are recommended for design, based on our experience, and assuming a level backfill and a frictionless wall. Table 7-1: Lateral Earth Pressure Coefficients Lateral Earth Pressure Coefficient Coefficient (K.) Value 0.53 Active Coefficient (KA) 0.36 Passive Coefficient (Kp) 2.8 Unit Weight Of Soil (Moist) 115 pcf Friction Factor For Foundations and Bearing Soils 0.35 The recommended lateral earth pressure coefficients do not consider the development of hydrostatic pressure from such things as rainwater runoff or leaking utilities behind the earth retaining wall structures. As such, positive wall drainage must be provided for all earth retaining structures. These drainage systems can be constructed of open -graded washed stone isolated from the soil backfill with a geosynthetic filter fabric and drained by perforated pipe or weepholes. As an alternative, several wall drainage products are produced specifically for this application. Lateral earth pressures arising from surcharge loading or slopes above the wall should be added to the above earth pressures to determine the total lateral pressure. The soil backfill placed behind retaining walls and for fill placed in the passive zone should be placed and compacted in accordance with Section 5.3. We caution that operating compaction equipment directly behind the retaining structures can create lateral earth pressures far in excess of those recommended for design. Therefore, bracing of the walls will be needed during backfilling operations. 8.0 Limitations of Report This report has been prepared in accordance with generally accepted geotechnical engineering practice for specific application to this project. The conclusions and recommendations contained in this report are based upon applicable standards of our practice in this geographic area at the time this report was prepared. No other representation or warranty either express or implied, is made. We relied on project information given to us to develop our conclusions and recommendations. If project information described in this report is not accurate, or if it changes during project development, we should be May 24, 2021 15 Supplemental Subsurface Exploration Pardee Partners ASC i 0 Mills River, North Carolina S S&ME Project No. 212903 111 notified of the changes so that we can modify our recommendations based on this additional information if necessary. Our conclusions and recommendations are based on limited data from a field exploration program. Subsurface conditions can vary widely between explored areas. Some variations may not become evident until construction. If conditions are encountered which appear different than those described in our report, we should be notified. This report should not be construed to represent subsurface conditions for the entire site. Unless specifically noted otherwise, our field exploration program did not include an assessment of regulatory compliance, environmental conditions or pollutants or presence of any biological materials (mold, fungi, bacteria). If there is a concern about these items, other studies should be performed. S&ME can provide a proposal and perform these services if requested. S&ME should be retained to review the final plans and specifications to confirm that earthwork, foundation, and other recommendations are properly interpreted and implemented. The recommendations in this report are contingent on S&ME's review of final plans and specifications followed by our observation and monitoring of earthwork and foundation construction activities. May 24, 2021 16 Appendices Appendix I - Boring Location Plan Appendix II - Supplemental Boring Logs TEST BORING LOG LEGEND FINE AND COARSE GRAINED SOIL INFORMATION COARSE GRAINED SOILS (SANDS AND GRAVELS) N Relative Density 0-4 Very Loose 5-10 Loose 11-30 Medium Dense 31-50 Dense Over 50 Very Dense FINE GRAINED SOILS (CLAYS AND SILTS) N Consistency 0-2 Very Soft 3-4 Soft 5-8 Firm 9-15 Stiff 16-30 Very Stiff Over 30 Hard PARTICLE SIZE Boulders Greater than 300 mm (12") Cobbles 75 mm-300 mm (3-12") Gravel 4.75 mm-75 mm (3/16-3") Coarse Sand 2 mm-4.74 mm Medium Sand .425 mm-2 mm Fine Sand 0.075 mm-0.425 mm Silts and Clays Less than 0.075 mm The STANDARD PENETRATION TEST as defined byASTM D 1586 is a method to obtain a disturbed soil sample for examination and testing and to obtain relative density and consistency information. A standard 1.4-inch I.D. / 2.0-inch O.D. split barrel sampler is driven three 6-inch increments with a 140 Ib. hammer falling 30 inches. The hammer can either be of a trip, free -fall design, or actuated by a rope and cathead. The blow counts required to drive the sampler the final two 6-inch increments are added together and designated the N-value defined in the above tables. ROCK PROPERTIES RQD ROCK HARDNESS Percent ROD Clualit Very Hard Rock can be broken by heavy hammer blows. 0-25 Very Poor Hard Rock cannot be broken by thumb pressure, but can be broken by moderate hammer blows. 25-50 Poor Moderately Hard Small pieces can be broken off along sharp edges by considerable thumb 50-75 Fair pressure; can be broken with light hammer blows. 75-90 Good Soft Rock is coherent but breaks very easily with thumb pressure at sharp edges 90-100 Excellent and crumbles with firm hand pressure. Very Soft Rock disintegrates or easily compresses when touched; can be hard to very hard soil. KEY SOIL PROPERTY SYMBOLS Undisturbed Sample IN Penetration, BPF Sum of 4" and Longer Standard Penetration RQD= Rock Pieces Recovered NMC Natural Moisture Content, % Test Sample ® (Rock Quality x100 Length of Core Run LL Liquid Limit, % Designation) Rock Core PL Plastic Limit, % Sample H PI Plasticity Index, Length of Rock PPV Pocket Penetrometer Value, TSF Core Diameter (I.D.) Inches REC= Core Recovered BQ 1-7/16 (Recovery) Length of Core Run x100 Qu Unconfined Compressive Strength, TSF Yd Dry Unit Weight, PCF NO 1 7/8 F Fines Content HQ 2-1/2 PROJECT: Pardee Partners ASC BORING LOG: S13-1 Mills River, North Carolina S&ME Project No. 212903 Sheet 1 Of 1 DATE DRILLED: 04/27/2021 ELEVATION: 2078 ft NOTES: DRILL RIG: Diedrich D-25 Track DATUM: NAVD88 DRILLER: Total Depth Drilling BORING DEPTH: 12.0 ft HAMMERTYPE: Automatic hammer CLOSURE: Soil Cuttings NORTHING: 3918050.0 EASTING: 357635.0 DRILLING METHOD: 3-1/4" HSA LOGGED BY. Christopher Mentch SAMPLING METHOD: SS PROJECT COORDINATE SYSTEM- NAD83 / UTM zone 17N STANDARD PENETRATION TEST DATA x a d W d NOTES o d ;F E o ° C '� c w a SAMPLE NO. RECOVERY ( ) MATERIAL DESCRIPTION BLOW COUNT DATA (SPT N-value) 0 %Fines PMCLL 20 40 60 80 z O ~ W 0 �`` �'` TOPSOIL, 4 inches 2078 SANDY LEAN CLAY (CL), very soft, tan and gray, fine to coarse grained, very moist to wet, trace roots in SS-1 SS-1 1-1-1 N= 2 1-1-1 SS-2 N= 2 5 2073 E > SS-3 3-3-8 N= 11 SILTY SAND WITH GRAVEL (SM), medium dense, fine to coarse grained, wet, N- values likely amplified by gravel SS-4 5-10-24 N= 34 SILTY GRAVEL WITH SAND (GM), dense to very dense, fine and coarse grained, wet, No recovery in SS-5, N-values likely 10 amplified by gravel 2068 Auger refusal at 12.0 feet 50/3" N= 100 Borehole terminated at 12.0 feet 15 2063 20 2058 DEPTH GROUNDWATER DATE/TIME (Fr► REMARKS DURING ADVANCE Q END OF DRILLING �Z 04/27/2021 8.0 AFTER DRILLING = AFTER DRILLING = III E Vertical Accuracy: Estimated from client provided topo map, Horizontal Accuracy: Handheld GPS GROUNDWATER DEPTHS ARE NOT EXACT AND MAY VARY SUBSTANTIALLY FROM THOSE INDICATED. LL=Liquid Limit, PL = Plastic Limit, NMC = Natural Moisture Content, PPV = Pocket Penetrometer (tsf), PTV = Pocket Torvane (tsf) PROJECT: Pardee Partners ASC Mills River, North Carolina S&ME Project No. 212903 BORING LOG: S13-2 Sheet 1 Of 1 DATE DRILLED: 04/27/2021 ELEVATION: 2078 ft NOTES: DRILL RIG: Diedrich D-25 Track DATUM: NAVD88 DRILLER: Total Depth Drilling BORING DEPTH: 12.0 ft HAMMERTYPE: Automatic hammer CLOSURE: Soil Cuttings NORTHING: 3918055.0 EASTING: 357652.0 DRILLING METHOD: 3-1/4" HSA LOGGED BY. Christopher Mentch SAMPLING METHOD: SS PROJECT COORDINATE SYSTEM- NAD83 / UTM zone 17N x a d W d NOTES o d ;F E o ° C '� c w a SAMPLE NO. RECOVERY ( ) MATERIAL DESCRIPTION BLOW COUNT DATA (SPT N-value) STANDARD PENETRATION TEST DATA 0 %Fines PMCLL 20 40 60 80 z O ~ W 0 5 10 15 20 Auger refusal at 12.0 feet E �`` �'` SS-1 SS-2 SS-3 SS-4 TOPSOIL, 3 inches 2-2-3 N= 5 1-2-2 N= 4 0-0-2 N= 2 10-50/4" N= 100 2078 2073 2068 2063 2058 SANDY LEAN CLAY (CL), firm to very soft, tan and brown, fine to medium grained, moist to very moist SILTY SAND WITH GRAVEL (SM), very dense, gray and tan, very moist, trace mica, N-values likely amplified by gravel, cobbles, and boulders Borehole terminated at 12.0 feet DEPTH GROUNDWATER DATE/TIME (Fr► REMARKS DURING ADVANCE Q END OF DRILLING �Z 04/27/2021 10.0 AFTER DRILLING = 05/18/2021 5.4 III E AFTER DRILLING = Vertical Accuracy: Estimated from client provided topo map, Horizontal Accuracy: Handheld GPS GROUNDWATER DEPTHS ARE NOT EXACT AND MAY VARY SUBSTANTIALLY FROM THOSE INDICATED. LL=Liquid Limit, PL = Plastic Limit, NMC = Natural Moisture Content, PPV = Pocket Penetrometer (tsf), PTV = Pocket Torvane (tsf) PROJECT: Pardee Partners ASC BORING LOG: S13-3 Mills River, North Carolina S&ME Project No. 212903 Sheet 1 Of 1 DATE DRILLED: 04/27/2021 ELEVATION: 2078 ft NOTES: Auger refusal initially encountered at 12 feet. Two offset borings were made DRILL RIG: Diedrich D-25 and CME-75 DATUM: NAVD88 with bigger rig. One boring extended beyond cobbles from 12 to 13.9 feet. DRILLER: Total Depth Drilling BORING DEPTH: 13.9 ft Combined results shown here. HAMMERTYPE: Automatic hammer CLOSURE: Soil Cuttings NORTHING: 3918011.0 EASTING: 357653.0 DRILLING METHOD: 3-1/4" HSA LOGGED BY. Christopher Mentch SAMPLING METHOD: SS PROJECT COORDINATE SYSTEM- NAD83 / UTM zone 17N STANDARD PENETRATION TEST DATA x a d W d NOTES o d ;F E o ° a SAMPLE NO. RECOVERY ( ) MATERIAL DESCRIPTION BLOW COUNT DATA 0 %Fines z O ~ C '� (SPT N-value) PMCLL c w 20 40 60 80 W 0 �`` �'` TOPSOIL, 4 inches 2078 LEAN CLAY (CL), firm, tan and brown, fine grained, very moist to wet SS-1 8 N=8 • 3-2-3 rill SS-2 N= 5 • 5 2073 E - 2 1 2 SILTY SAND (SM), very loose, black and SS-3 brown, fine to medium grained, very N= 3 moist, trace roots SILTY SAND WITH GRAVEL (SM), dense, gray tan and black, fine to coarse grained, 16-15-18 SS-4 wet, N-values likely amplified by gravel, N= 33 • 10 cobbles, and boulders 2068 E PWR SILTY SAND (SM), medium dense, gray, fine to coarse grained 38-50/3" Auger refusal at N= 100 Borehole terminated at 13.9 feet 13.9 feet 15 2063 20 2058 DEPTH GROUNDWATER DATE/TIME REMARKS (Fr► DURING ADVANCE Q END OF DRILLING �Z 04/27/2021 8.0 AFTER DRILLING = 05/18/2021 5.7 AFTER DRILLING = III E Vertical Accuracy: Estimated from client provided topo map, Horizontal Accuracy: Handheld GPS GROUNDWATER DEPTHS ARE NOT EXACT AND MAY VARY SUBSTANTIALLY FROM THOSE INDICATED. LL=Liquid Limit, PL = Plastic Limit, NMC = Natural Moisture Content, PPV = Pocket Penetrometer (tsf), PTV = Pocket Torvane (tsf) PROJECT: Pardee Partners ASC BORING LOG: S13-4 Mills River, North Carolina S&ME Project No. 212903 Sheet 1 Of 1 DATE DRILLED: 04/27/2021 ELEVATION: 2078 ft NOTES: DRILL RIG: Diedrich D-25 Track DATUM: NAVD88 DRILLER: Total Depth Drilling BORING DEPTH: 12.0 ft HAMMERTYPE: Automatic hammer CLOSURE: Soil Cuttings NORTHING: 3918013.0 EASTING: 357622.0 DRILLING METHOD: 3-1/4" HSA LOGGED BY. Christopher Mentch SAMPLING METHOD: SS PROJECT COORDINATE SYSTEM- NAD83 / UTM zone 17N STANDARD PENETRATION TEST DATA x a d W d NOTES o d ;F E o ° C '� c w a SAMPLE NO. RECOVERY ( ) MATERIAL DESCRIPTION BLOW COUNT DATA (SPT N-value) 0 %Fines PMCLL 20 40 60 80 z O ~ W 0 �`` �'` TOPSOIL, 4 inches 2078 LEAN CLAY (CL), soft to very soft, brown gray and black, fine to coarse grained, very moist to wet, trace mica, trace topsoil, SS-1 1-2-2 N 4 • trace roots in SS-1 0-0-2 SS-2 N= 2 5 2073 E 0-1-1 SS-3 N= 2 0-0-28 SIP SS-4 N= 28 • SILTY GRAVEL WITH SAND (GM), medium dense to very dense, tan and brown, 10 2068 coarse grained, N-values likely amplified by gravel, cobbles, and boulders Auger refusal at 12.0 feet 50/0" N= 100 Borehole terminated at 12.0 feet 15 2063 20 2058 DEPTH GROUNDWATER DATE/TIME (Fr► REMARKS DURING ADVANCE Q END OF DRILLING �Z 04/27/2021 9.0 AFTER DRILLING = AFTER DRILLING = III E Vertical Accuracy: Estimated from client provided topo map, Horizontal Accuracy: Handheld GPS GROUNDWATER DEPTHS ARE NOT EXACT AND MAY VARY SUBSTANTIALLY FROM THOSE INDICATED. LL=Liquid Limit, PL = Plastic Limit, NMC = Natural Moisture Content, PPV = Pocket Penetrometer (tsf), PTV = Pocket Torvane (tsf) PROJECT: Pardee Partners ASC BORING LOG: S13-5 Mills River, North Carolina S&ME Project No. 212903 Sheet 1 of 1 DATE DRILLED: 04/27/2021 ELEVATION: 2078 ft NOTES: Auger refusal initially encountered at depth of 11 feet. Three offset borings DRILL RIG: Diedrich D-25 and CME-75 DATUM: NAVD88 were made with bigger rig. One boring extended beyond cobbles from 15 to 18.5 feet. Combined results shown here. DRILLER: Total Depth Drilling BORING DEPTH: 18.5 ft HAMMERTYPE: Automatic hammer CLOSURE: Soil Cuttings NORTHING: 3918034.0 EASTING: 357642.0 DRILLING METHOD: 3-1/4" HSA LOGGED BY. Christopher Mentch SAMPLING METHOD: SS PROJECT COORDINATE SYSTEM- NAD83 / UTM zone 17N STANDARD PENETRATION TEST DATA x a d W d NOTES o d ;F E o ° C '� c w a SAMPLE NO. RECOVERY ( ) MATERIAL DESCRIPTION BLOW COUNT DATA (SPT N-value) 0 %Fines PMCLL 20 40 60 80 z O ~ W 0 �`` �'` TOPSOIL, 3 inches 2078 LEAN CLAY (CL), very soft to soft, tan and brown, fine to medium grained, moist to wet SS-1 1-1-1 N- 2 1-1-1 SS-2 N= 2 5 2073 0-1-2 SS-3 N= 3 E SS-4 4-17-25 N= 42 SILTY SAND WITH GRAVEL (SM), dense to very dense, gray and tan, fine and coarse grained, wet, trace mica 10 2068 SS-5 50/0" N= 100 15 2063 PWR SILTY GRAVEL WITH SAND (GM), very dense, fine to coarse grained, N-Values likely amplified by gravel, cobbles, and boulders Auger refusal at 18.5 feet 50/1" N= 100 Borehole terminated at 18.5 feet 20 2058 DEPTH GROUNDWATER DATE/TIME (Fr► REMARKS DURING ADVANCE Q END OF DRILLING �Z 04/27/2021 8.0 AFTER DRILLING = 05/18/2021 5.3 AFTER DRILLING = III E Vertical Accuracy: Estimated from client provided topo map, Horizontal Accuracy: Handheld GPS GROUNDWATER DEPTHS ARE NOT EXACT AND MAY VARY SUBSTANTIALLY FROM THOSE INDICATED. LL=Liquid Limit, PL = Plastic Limit, NMC = Natural Moisture Content, PPV = Pocket Penetrometer (tsf), PTV = Pocket Torvane (tsf) Appendix III - Select 2016 Boring Logs LEGEND TO SOIL CLASSIFICATION AND SYMBOLS SOIL TYPES (USCS CLASSIFICATION) (Shown in Graphic Log) CONSISTENCY OF COHESIVE SOILS CONSISTENCY Fill Very Soft Soft Asphalt Firm Stiff Concrete Very Stiff Hard Very Hard Topsoil STD. PENETRATION RESISTANCE BLOWS/FOOT 0 to 2 3 to 4 5 to 8 9 to 15 16 to 30 31 to 50 Over 50 RELATIVE DENSITY OF COHESIONLESS SOILS Gravel (GW, GM, GP) STD. PENETRATION RESISTANCE Sand (SW, SP) RELATIVE DENSITY BLOWS/FOOT Very Loose 0 to 4 Silt (ML) Loose 5 to 10 Medium Dense 11 to 30 Dense 31 to 50 Clay (CL, CH) Very Dense Over 50 Organic (OL, OH) SAMPLER TYPES CONS-nTUENT MODIFIERS (Shown in Samples Column) Trace: <5%0 Silty Sand (SM) Few: 5 to <15 /o Shelby Tube Little: 15 to <30% Clayey Sand (SC) ❑ Split Spoon Some: 30 to <50% Mostly: 50 to 100 /o Sandy Silt (ML) m Rock Core ❑ No Recovery Clayey Silt (MH) TERMS Sandy Clay (CL, CH) Standard - The Number of Blows of 140 lb. Hammer Falling Penetration 30 in. Required to Drive 1.4 in. I.D. Split Spoon Silty Clay (CL, CH) Resistance Sampler 1 Foot. As Specified in ASTM D-1586. Partially Weathered REC - Total Length of Rock Recovered in the Core Rock Barrel Divided by the Total Length of the Core Run Times 100%. Cored Rock WATER LEVELS (Shown in Water Level Column) �Z = Water Level At Time of Boring 1 = Water Level Taken After 24 Hours = Loss of Drilling Water HC = Hole Cave RQD - Total Length of Sound Rock Segments Recovered that are Longer Than or Equal to 4" (mechanical breaks excluded) Divided by the Total Length of the Core Run Times 100%. TOB - Time of Boring N.E. - Not Encountered s III PROJECT: Pardee Hospital Medical Building - Ph. I Devi. Mills River, North Carolina BORING LOG B-12 S&ME Project No. 1441-16-013 NOTES: N values of samples 4 and 5 likely CLIENT: WGLA Engineering, PLLC ELEVATION: 2076.0 ft amplified by rocky materials DATE DRILLED: 4/6116 - 4/6/16 BORING DEPTH: 20.0 ft DRILL RIG: Acker Soil Sentry WATER LEVEL: 6 ft. at 24 hrs.,11 ft. at TOB DRILLER: Metro Drill Inc. CAVE-IN DEPTH: N/A HAMMER TYPE: Automatic LOGGED BY: A. Bhuivan SAMPLING METHOD: Split spoon DRILLING METHOD: 21/," H.S.A > Z w p a BLOW COUNT CORE DATA SPT N-Value (bpf) • = U w O Z }/ FINES%A w Q w a o MATERIAL DESCRIPTION � a - � 0 ( W 2 PL NM LL Z w (!) N M 10 20 30 40 50 60 70 80 90 TOPSOIL - 2.5 inches ALLUVIUM: SANDY SILT (ML) - very soft, 1 1 1 1 2 dark brown, fine, trace roots, trace organics, moist 2 1 1 1 2 5 2071.0 ►I ALLUVIUM: SILTY SAND (SM) -loose, brown 3 3 3 4 gray, medium to fine, trace roots V 3 ALLUVIUM: POORLY GRADED SAND WITH 12 17 24 4 41 Li10 SILT (SP-SM) - dense, brown gray, coarse to 2066.0 s fine, with rock pieces, wet 51 7 V V 5 13 19 29 48 i 15 : • . 2061.0— if Y n RESIDUUM: SANDY SILT (ML) -stiff, white 6 5 7 8 40 15 n20 brown, coarse to fine, trace rock fragments, wet 2056.0 D L Boring terminated at 20 feet .III II I IIII II VOTES: 1. THIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING, SAMPLING AND PENETRATION TEST DATA IN GENERAL ACCORDANCE WITH ASTM D-1586. 3. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 4. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. Page 1 of 1 S&ME PROJECT: Pardee Hospital Medical Building - Ph. I Devi. Mills River, North Carolina BORING LOG B-15 S&ME Project No. 1441-16-013 CLIENT: WGLA Engineering, PLLC ELEVATION: 2078.0 ft NOTES: N value of sample 3 likely amplified by rocky materials DATE DRILLED: 4/5116 - 4/5/16 BORING DEPTH: 29.0 ft DRILL RIG: Acker Soil Sentry WATER LEVEL: 5 ft. at 24 hrs.,10 ft. at TOB DRILLER: Metro Drill Inc. CAVE-IN DEPTH: N/A HAMMER TYPE: Automatic LOGGED BY: A. Bhuiyan SAMPLING METHOD: No Recovery, Split spoon DRILLING METHOD: 21/," H.S.A >Z w p} BLOW COUNT / CORE DATA SPT N-Value (bpf • = w U a- o MATERIAL DESCRIPTION w > a- - � FINES%A w Q 0 ( 2 PL NM LL Z W w (!) N M 10 20 30 40 50 60 70 80 90 TOPSOIL - 3 inches ALLUVIUM: SANDY SILT (ML) - soft to firm, 1 2 2 2 4 dark brown gray, fine, trace roots, trace organics, very moist 1 2 2 3 3 6 5 2073.0 11 19 23 42 ALLUVIUM: POORLY GRADED SAND WITH 9 6 SILT (SP-SM) - dense to medium dense, 3 7 brown gray, coarse to fine, trace to little rock fragments, moist 18 12 9 4 21 L 10-2068.0 J L L 51 V V 5 10 19 0/5.5 >> 0/5.5' RESIDUUM/PARTIALLY WEATHERED L 15 ROCK: SILTY SAND (SM) - very dense, 2063.0 brown gray, medium to fine, trace rock fragments, sample 8 was moist Y L J 6 E< 50/5" >> 50/5" n 20 2058.0 D L Ll 7 >> 50/1" fl 25 7 y 2053.0 ]501"/ 8 _150/1 Refusal at 29 feet Boring terminated at 29 feet VOTES: 1. THIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING, SAMPLING AND PENETRATION TEST DATA IN GENERAL ACCORDANCE WITH ASTM D-1586. 3. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 4. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. Page 1 of 1 S&ME W 0 0 cD 0 J Z 0 07 W 2 od U) PROJECT: Pardee Hospital Medical Building - Ph. I Devi. Mills River, North Carolina BORING LOG B-16 S&ME Project No. 1441-16-013 NOTES: CLIENT: WGLA Engineering, PLLC ELEVATION: 2077.0 ft DATE DRILLED: 4/5/16 - 4/5/16 BORING DEPTH: 5.0 ft DRILL RIG: Acker Soil Sentry WATER LEVEL: Not Encountered at TOB DRILLER: Metro Drill Inc. CAVE-IN DEPTH: 3' HAMMER TYPE: Automatic LOGGED BY: A. Bhuiyan SAMPLING METHOD: Split spoon DRILLING METHOD: 21/," H.S.A > Z w p a BLOW COUNT CORE DATA SPT N-Value (bpi • = U w O Z }/ FINES%A w Q w a- o MATERIAL DESCRIPTION > a- - � 0 ( W 2 PL NM LL Z w (!) N M 10 20 30 40 50 60 70 80 90 TOPSOIL - 7 inches ALLUVIUM: SANDY SILT (ML) - very soft, 1 1 1 1 2 brown gray, fine, trace roots, trace organics, HC very moist 2 1 1 1 2 5 2072.0 Boring terminated at 5 feet NOTES: 1. THIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING, SAMPLING AND PENETRATION TEST DATA IN GENERAL ACCORDANCE WITH ASTM D-1586. 3. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 4. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. Page 1 of 1 W 0 0 cD 0 J Z 0 07 W 2 06 U) PROJECT: Pardee Hospital Medical Building - Ph. I Devi. Mills River, North Carolina BORING LOG B-17 S&ME Project No. 1441-16-013 NOTES: CLIENT: WGLA Engineering, PLLC ELEVATION: 2077.0 ft DATE DRILLED: 4/6116 - 4/6/16 BORING DEPTH: 5.0 ft DRILL RIG: Acker Soil Sentry WATER LEVEL: Not Encountered at TOB DRILLER: Metro Drill Inc. CAVE-IN DEPTH: 3' HAMMER TYPE: Automatic LOGGED BY: A. Bhuiyan SAMPLING METHOD: Split spoon DRILLING METHOD: 21/," H.S.A > Z w p a BLOW COUNT CORE DATA SPT N-Value (bpi • = U w O Z }/ FINES%A w Q w a- o MATERIAL DESCRIPTION > a- - � 0 ( W 2 PL NM LL Z w (!) N M 10 20 30 40 50 60 70 80 90 TOPSOIL - 3 inches ALLUVIUM: POORLY GRADED SAND WITH 1 4 6 6 12 SILT (SP-SM) - medium dense, gray brown, HC medium to fine, moist ALLUVIUM: POORLY GRADED SAND WITH 2 3 3 4 7 5 SILT (SP-SM) - loose, gray brown, coarse to 2072.0 fine, trace rock fragments, very moist Boring terminated at 5 feet NOTES: 1. THIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING, SAMPLING AND PENETRATION TEST DATA IN GENERAL ACCORDANCE WITH ASTM D-1586. 3. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 4. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. Page 1 of 1 Appendix IV- Important Information Field Testing Procedures Soil Test Borings All borings and sampling were conducted in accordance with ASTM D-1586 test method. Initially, the borings were advanced by either mechanically augering or wash boring through the overburden soils. When necessary, a heavy drilling fluid is used below the water table to stabilize the sides and bottom of the borehole. At regular intervals, soil samples were obtained with a standard 1.4-inch I.D., 2-inch O.D., split -barrel or split -spoon sampler. The sampler was first seated 6 inches to penetrate any loose cuttings and then driven an additional foot with blows of a 140-pound hammer falling 30 inches. The number of hammer blows required to drive the sampler the final foot is designated as the "Standard Penetration Resistance" or N-value. The penetration resistance, when properly evaluated, can be correlated to consistency, relative density, strength and compressibility of the sampled soils. Water Level Readings Water level readings are normally taken in conjunction with borings and are recorded on the Boring Logs following termination of drilling (designated by V ) and at a period of 24 hours following termination of drilling (designated by 1 ). These readings indicate the approximate location of the hydrostatic water table at the time of our field exploration. The groundwater table may be dependent upon the amount of precipitation at the site during a particular period of time. Fluctuations in the water table should also be expected with variations in surface run-off, evaporation, construction activity and other factors. Occasionally the boreholes sides will cave, preventing the water level readings from being obtained or trapping drilling water above the cave-in zone. In these instances, the hole cave-in depth (designated by HQ is measured and recorded on the Boring Logs. Water level readings taken during the field operations do not provide information on the long-term fluctuations of the water table. When this information is required, piezometers are installed to prevent the boreholes from caving. Important Information About Your Geotechnical Engineering Report Variations in subsurface conditions can be a principal cause of construction delays, cost overruns and claims. The following information is provided to assist you in understanding and managing the risk of these variations. Geotechnical Findings Are Professional Opinions Geotechnical engineers cannot specify material properties as other design engineers do. Geotechnical material properties have a far broader range on a given site than any manufactured construction material, and some geotechnical material properties may change over time because of exposure to air and water, or human activity. Site exploration identifies subsurface conditions at the time of exploration and only at the points where subsurface tests are performed or samples obtained. Geotechnical engineers review field and laboratory data and then apply their judgment to render professional opinions about site subsurface conditions. Their recommendations rely upon these professional opinions. Variations in the vertical and lateral extent of subsurface materials may be encountered during construction that significantly impact construction schedules, methods and material volumes. While higher levels of subsurface exploration can mitigate the risk of encountering unanticipated subsurface conditions, no level of subsurface exploration can eliminate this risk. Scope of Geotechnical Services Professional geotechnical engineering judgment is required to develop a geotechnical exploration scope to obtain information necessary to support design and construction. A number of unique project factors are considered in developing the scope of geotechnical services, such as the exploration objective; the location, type, size and weight of the proposed structure; proposed site grades and improvements; the construction schedule and sequence; and the site geology. Geotechnical engineers apply their experience with construction methods, subsurface conditions and exploration methods to develop the exploration scope. The scope of each exploration is unique based on available project and site information. Incomplete project information or constraints on the scope of exploration increases the risk of variations in subsurface conditions not being identified and addressed in the geotechnical report. Services Are Performed for Specific Projects Because the scope of each geotechnical exploration is unique, each geotechnical report is unique. Subsurface conditions are explored and recommendations are made for a specific project. Subsurface information and recommendations may not be adequate for other uses. Changes in a proposed structure location, foundation loads, grades, schedule, etc. may require additional geotechnical exploration, analyses, and consultation. The geotechnical engineer should be consulted to determine if additional services are required in response to changes in proposed construction, location, loads, grades, schedule, etc. Geo-Environmental Issues The equipment, techniques, and personnel used to perform a geo-environ mental study differ significantly from those used for a geotechnical exploration. Indications of environmental contamination may be encountered incidental to performance of a geotechnical exploration but go unrecognized. Determination of the presence, type or extent of environmental contamination is beyond the scope of a geotechnical exploration. Geotechnical Recommendations Are Not Final Recommendations are developed based on the geotechnical engineer's understanding of the proposed construction and professional opinion of site subsurface conditions. Observations and tests must be performed during construction to confirm subsurface conditions exposed by construction excavations are consistent with those assumed in development of recommendations. It is advisable to retain the geotechnical engineer that performed the exploration and developed the geotechnical recommendations to conduct tests and observations during construction. This may reduce the risk that variations in subsurface conditions will not be addressed as recommended in the geotechnical report. Portion obtained with permission from "Important Information About Your Geotechnical Engineering Report", ASFE, 2004 © S&ME, Inc. 2010 Pardee Partners ASC Town of Mills River Henderson County, North Carolina O&M Agreement Operation & Maintenance Agreement Cover Page Maintenance records shall be kept on the following BMP(s . This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: Soil Amendments Present: O&M tables will be Location( Location( Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): of Site I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Henderson County Hospital Corporation Title & Organization: Johnna Reed - Chief Administrative Office Street address: 800 N Justice Street City, state, zip: Hendersonville, NC 28791 Phone number(s): Emall:,Johnne.Reed@unchealth.uno.edu Signature: 99'J r "'` Date: I, IAA e6n r. V Y. r'7116 )C(AiiA a Notary Public for the State of 21 L County of 1 '�/���� dohearbycertifythatoh1rte. -F.%�Q�,C personally appeared before me this ! 0 day of !+ K j t.4- 0 ^_- f and acknowledge the due execution of the Operations and yMaintenance Agreement. Witness my hand and official seal, /�-� '4 after BARBARA S ALEXAN ER Notary Public, North Ca olina Henderson County My Commission Expifres August 04, 2026 Seal My commission expires F1(r,1Gdb STORM-EZ 8/912021 Version 1.4 O&M Manual Page 1 of 3 Bioretention Maintenance Requirements Important operation and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Wheeled or tracked equipment will NEVER be driven over the bioretention planting surface, - Special care will be taken to prevent sediment from entering the bioretention cell. - If standing water is present 2 days after rainfall, conduct an infiltration test of the soil media. After the bioretention cell is established, inspect it quarterly. Inspection activities shall be performed as follows and maintenance activites shall commence immediately to remediate any problems observed per the table below. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil to remove the gully, and plant a ground cover and erosive gullies have formed. water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe, otherwise damaged. Erosion is occurring in the Regrade the swale to smooth it over and provide erosion control swale. devices such as reinforced turf matting or riprap to avoid future problems. Stone verge is clogged or Remove sediment and replace with clean stone, covered in sediment (if applicable). The pretreatment area Flow is bypassing Regrade if necessary to route all flow to the pretreatment area. pretreatment area and/or Restabilize the area after grading. gullies have formed. Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than three possible. Remove the sediment and restabilize the pretreatment area. inches. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bloretention cell: Best professional practices Prune according to best professional practices. vegetation show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which can kill the tree if not removed). six months after planting. Bioretention Maintenance Requirements (continued) BMP element: Potential problem: How to remedlate the problem: The bioretention cell: Mulch is breaking down or has Spot mulch if there are only random void areas. Replace whole mulch soils and mulch floated away. layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. STORM-EZ 8/g/2021 Version 1.4 O&M Manual Page 2 of 3 Soils and/or mulch are Determine the extent of the clogging - remove and replace either just clogged with sediment, the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as recommended per the soil test and pH has dropped or heavy toxic soils shall be removed, disposed of properly and replaced with metals have accumulated in new planting media. the soil media. The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM-EZ 8/9/2021 Version 1.4 O&M Manual Page 3 of 3