HomeMy WebLinkAboutSW5210603_Supplement-EZ Form_20210817SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1
Project Name
Duck Thru at Spring Hope
2
Project Area ac
4.87
3
Coastal Wetland Area ac
4
Surface Water Area ac
5
Is this project High or Low Density?
_- High
6
1 Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4) _
7 1 Width of vegetated setbacks provided (fee
8 Will the vegetated setback remain vegeta
10 GIs streambank stabilization proposed on this
50
N/A
NCAC 02H.1003 4 c-d ? N/A
eject? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12
Bioretention Cell
13
Wet Pond
1
14
Stormwater Wetland
15
Permeable Pavement
16
ISand Filter
17
Rainwater Harvesting RWH
18
Green Roof
19
Level Spreader -Filter Strip LS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
22
Dry Pond
23
StormFi[ter
24
Silva Cell
25
Bayfilter
26
Filterra
FORMS LOADED
DESIGNER CERTIFICATI;Q
27
Name and Title:
J. Michael Stocks, PE President
28
Organization:
Stocks Engineering, PA
29
Street address:
801 East Washington Street
30
City, State, Zip:
Nashville, NC 27856
31
Phone numbers :
252.459.8196
32
Email:
mstocks@stocksengineering.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
of Designer
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this roiect have low densit areas?
No
4
F5
If so, number of low densitydrainage areas
0
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Wet Pond
5
Total drainage area (sq ft)
212231
189245
6
Onsite drainage area (sq ft
212231
183420
7
Offsite drainage area (sq ft
0
5845
8
Total BUA in project (sq ft)
158955 sf
156682 sf
9permitting)
New BUA on subdivided lots (subject to
s ft
158955 sf
156682 sf
10
New BUA not on subdivided lots (subject to
permitting) (sf)
11
Offsite BUA (sq ft
sf
sf
12
Breakdown of new BUA not on subdivided lots:
- Parking (sq ft
152559 sf
150286 sf
- Sidewalk (sq ft
2196 sf
2196 sf
- Roof (sq ft
4200 sf
4200 sf
- Roadway s ft
- Future (sq ft
- Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
16
lExistina BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA
75%
83%
19
Design storm inches
1.0 in
20
Design volume of SCM cu ft
12549 cf
21
Calculation method for design volume
Simple
ADDITIONAL INFORMATION
Please use this space to provide any additional information about Ithe
22 drainage area(s):
WET POND
1 11Drainage area number 1
21 Minimum reauired treatment volume (cu ft) 12534 cf
NERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
251.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
252.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
259.00
23
Elevation of the permanent pool (fmsl)
260.00
24
Elevation of the top of the vegetated shelf fmsl
260.00
25
Elevation of the temporary pool (fmsl)
261.40
26
Surface area of the main permanent pool (square feet
5762
27
Volume of the main permanent pool (cubic feet)
19092 cf
28
Avera a depth of the main pool feet
3.00 It
29
Average depth equation used
Equation 2
30
If using equation 3, main pool perimeter feet
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay cubic feet
3157 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay inches
48 in
351
Design volume of SCM (cu ft)
12549 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
2 in
38
If weir, weir height inches
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.4
41
Are the inlet(s) and outlet located in a manner that avoids short-
arcuitin ?
Yes
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
255 in
44
Depth of forebay at exit (inches)
259 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Centipede
54
Hasa plantinq plan been provided for the vegetated shelf?
Yes
ADDITIONAL INFORMATION IF
55
Please use this space to provide any additional information about the
wet pond(s):
Wet Pond 3 3:55 PM 8/12/2021