HomeMy WebLinkAboutSW5210603_Application Form_20210817 (2)DEMLR USE ONLY
Date Received
Fee Paid
Permit Number
Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction
(select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan
❑ Other WQ Mgmt Plan:
State of North Carolina
Department of Environment and Natural Resources
Division of Energy, Mineral and Land Resources
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Duck Thru at Spring Hope NC
2. Location of Project (street address):
NC Hwy 581 and US 64 West
City:Spring Hie County:Nash Zip:27882
3. Directions to project (from nearest major intersection):
From US -64 East take Exit 450 toward Spring Hope. Turn Left on NC Hwy 581 and the site is approximately
500 feet on the left.
4. Latitude:35° 56' 03.35" N Longitude:780 05' 57.48" W of the main entrance to the project.
II. PERMIT INFORMATION:
1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt
tRenewals with modifications also requires SWU-102 - Renewal Application Form
b.If this application is being submitted as the result of a modification to an existing permit, list the existing
permit number , its issue date (if known) , and the status of
construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification
2. Specify the type of project (check one):
❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other
3. If this application is being submitted as the result of a previously returned application or a letter from
DEMLR requesting a state stormwater management permit application, list the stormwater project number,
if assigned, and the previous name of the project, if different than currently
proposed,
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑CAMA Major ®Sedimentation/Erosion Control: 4.92 ac of Disturbed Area
❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts
b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number,
issue date and the type of each permit:
5. Is the project located within 5 miles of a public airport? ®No ❑Yes
If yes, see S.L. 2012-200, Part VI: http://12ortal.ncdenr.org/web/Ir/rules-and-regulations
Form SWU-101 Version Oct. 31, 2013 Page 1 of 6
IV. PROJECT INFORMATION
1. In the space provided below, briefly summarize how the stormwater runoff will be treated.
Stormwater will be conveyed through the pipes and into the onsite wet pond. The wet pond will outlet into
the NCDOT ditch.
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW -1995 ❑ Ph II - Post Construction
3. Stormwater runoff from this project drains to the Tar -Pam
4. Total Property Area: 4.87 acres
River basin.
5. Total Coastal Wetlands Area: acres
6. Total Surface Water Area: acres
Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Area+:4.87 acres
+ Total project area shall be calculated to exclude the following: the nonnal pool of impounded structures, the area
between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water
(MHM line, and coastal wetlands landward from the NHW (or MHi line. The resultant project area is used to
calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHM line may
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 75
9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered
stormwater BMP. For low density and other projects, use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information
Drainage Area 1
Drainage Area _
Drainage Area _
Drainage Area
Receiving Stream Name
Hendricks Creek
Stream Class *
QNSW
Stream Index Number *
28-55-2
Total Drainage Area (so
185,466
On -site Drainage Area (so
179,621
Off -site Drainage Area (sf)
5,845
Proposed Impervious Area** (so
156,682
% Impervious Area** total
84%
Impervious** Surface Area
Drainage Area 1
Drainage Area
Drainage Area
Drainage Area
On -site Buildings/Lots (so
4200
On -site Streets (so
On -site Parking (sf)
150,286
On -site Sidewalks (sf)
2,196
Other on -site (sf)
0
Future (so
Off -site (so
0
Existing BUA*** (so
0
Total (so:
156,682
* Stream Class and Index Number can be determined at: http://portal.iicdenr.org web/wq/ps/csu/classifications
Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
Form SWU-101 Version Oct. 31, 2013 Page 3 of 6