Loading...
HomeMy WebLinkAboutSW5210603_Application Form_20210817 (2)DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Duck Thru at Spring Hope NC 2. Location of Project (street address): NC Hwy 581 and US 64 West City:Spring Hie County:Nash Zip:27882 3. Directions to project (from nearest major intersection): From US -64 East take Exit 450 toward Spring Hope. Turn Left on NC Hwy 581 and the site is approximately 500 feet on the left. 4. Latitude:35° 56' 03.35" N Longitude:780 05' 57.48" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 4.92 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: http://12ortal.ncdenr.org/web/Ir/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will be conveyed through the pipes and into the onsite wet pond. The wet pond will outlet into the NCDOT ditch. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Tar -Pam 4. Total Property Area: 4.87 acres River basin. 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:4.87 acres + Total project area shall be calculated to exclude the following: the nonnal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MHi line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 75 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area Receiving Stream Name Hendricks Creek Stream Class * QNSW Stream Index Number * 28-55-2 Total Drainage Area (so 185,466 On -site Drainage Area (so 179,621 Off -site Drainage Area (sf) 5,845 Proposed Impervious Area** (so 156,682 % Impervious Area** total 84% Impervious** Surface Area Drainage Area 1 Drainage Area Drainage Area Drainage Area On -site Buildings/Lots (so 4200 On -site Streets (so On -site Parking (sf) 150,286 On -site Sidewalks (sf) 2,196 Other on -site (sf) 0 Future (so Off -site (so 0 Existing BUA*** (so 0 Total (so: 156,682 * Stream Class and Index Number can be determined at: http://portal.iicdenr.org web/wq/ps/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6